Specific Considerations for Kitchen Extract Systems
7.1 The kitchen extract system presents particular
hazards due to the potential for the accumulation of
grease. Accumulated grease within an extract system
forms a hidden combustion load. Under certain
circumstances flame or very high temperature within
the duct can ignite the grease causing fire to spread
rapidly through the duct. Flame and heat within the
duct can ignite surrounding materials at various points
along the ductwork path and transfer fire in ways that
are difficult to predict and control by designers,
installers and ultimately fire fighters.
7.2 Kitchen extract ventilation syst ems are defined
here as the extractmsystems intended to collect
and remove contaminants, heat and moisture from
cooking appliances (See also DW/172). A kitchen
extract system wouldnt typically comprise of the
following components:Canopy
Also referred to as hood, canopy hood, extraction
hood, cooking hood, cooker hood, cooking canopy or
extraction canopy. This would most likely include a
vertical canopy skirt running around the perimeter
of the canopy. Channel on the bottom edge of the
skirt; a canopy roof sitting horizontally on the top of
and joining the skirts; a grease filter housing assembly
(with grease filters and traps) hanging within the
boundary of the skirts.

For further information
www.londonandmidland.co.uk
Canopy/Extract plenum This is typically the area immediately behind the grease
filter housing and below where the ducting commences.
Ducting Beyond the canopy/extract plenum, extraction ductwork
would be connected. This may involve short transition
ducts connected directly to the suction side of an extract
fan or could include many linear metres of horizontal
and/or vertical ductwork. Vertical ductwork, also referred
to as riser may passmthrough many levels of a building.
Contained within the ducting there may be attenuators,
flow control dampers, fire dampers, air turning vanes and
sensors.
Extract Fan To create extraction from the canopy an extract fan would
be connected to the ductwork, some extract fans (roof
mounted) discharge directly to atmosphere via a cowl.
Discharge Duct On the exhaust side of the fan a discharge duct would
direct extract air out of the building via an outlet. This
outlet point may include weather louvres and mesh to
prevent the ingress of weather and vermin. Other systems
such as ventilated ceilings and directly ducted extraction
are also used. It is important that the person responsible
for implementing cleaning regimes clearly understands t
he breakdown of the system so that any cleaning regime is
compliant with the terms of buildings insurance relevant
to the kitchen extract maintenance.

For further information
www.londonandmidland.co.uk
7.3 Other extraction systems serving the
cooking area, such as potwash/dishwash
systems, general extraction etc. may also
be affected by grease deposits and similar
considerations will apply.

time of system survey, a detailed schematic
should be provided, highlighting any areas
which are inaccessible and therefore, will
remain uncleaned. The client must be
advised of any inaccessible areas, the reason
for their inaccessibility and, if possible, the
likely cost to provide full and free access.
It is the clients responsibility to highlight
this to their insurer or other relevant
third party, if required, who must confirm
whether an exception to the total cleaning
in accordance with TR/19 is acceptable.

7.4 Kitchen extract systems are liable to
internal fouling by grease and oils. It is
usual for the systems to be protected by
grease filters, but these differ widely in
terms of efficiency of grease removal and
of barrier to flame. Total grease removal is
not normally feasib
le and therefore fouling of systems 7.7 This section of the Guide provides
downstream will occur to a greater or lesser specific advice on how to clean and
degree.
maintain kitchen extract systems, but
similar consideration will apply to non7.5 Grease deposits within systems also pose kitchen areas that might be affected by
hygiene, odour, vermin and mechanical grease and/or oil deposits.
efficiency hazards. Poorly designed and
installed or damaged ductwork can leak
grease, thus extending the fire risk, hygiene,
odour and vermin hazards. Also, where
ductwork di
storts under fire conditions, burning grease
can leak out and spread the fire to duct
surroundings.
7.6 Supply or make-up ventilation
systems should be maintained in
hygienicmcondition as detailed in this
Guide. Due to the accumulated grease
within extract systems, the majority of the
duct - work cleaning will be by manual
rather than mechanical methods. At the

For further information
www.londonandmidland.co.uk
Design and Access to the Internal
Surfaces of the Kitchen Extract
7.8 Advice is provided in B&ES/HVCA DW/172:
Specification for kitchen ventilation system (2005)
7.9 Internal surfaces of kitchen extract systems should
be free of irregularities, all of which make grease
accumulation more likely and cleaning more difficult.
7.10 It is essential that a kitchen extract ductwork system,
and canopy/extract plenum, is provided with access
panels of sufficient number, quality and size to enable
unrestricted access for regular cleaning and inspection
of the internal surfaces and in-line components.
7.11 Location of access to the internal surfaces of a kitchen
extract system is dependent on a number of design and
operational considerations
• Design and location of ductwork
• Building design and construction materials
• Location of kitchen within the building
• Location of extract fan and accessibility for
maintenance
• Accessibility to physically reach the ductwork
• Any building modifications and current uses that may
restrict access
• Location and number of system components requiring
access.

For further information
www.londonandmidland.co.uk
7.12 Access panels should be suitable for the purpose
for which they are intended. The panels and frames
should be constructed of the same material as the
ductwork. As a minimum they should incorporate
quick release catches, sealing gasket and thermal,
acoustic and fire rated insulation properties equal to
that of the duct to which they are fitted. Particular
consideration must be given to maintaining the fire
integrity of firerated ductwork. The recommendations
of the manufacturer or specialist fire protection
adviser should be followed where appropriate.
7.13 Access panels should be as large as the duct size
permits to a maximum of 460mm x 610mm without
weakening the structure of the system. Openings
should not be obstructed by other building services,
stored equipment or by the fabric of the building. The
panel and aperture should be free of any sharp
edges.
7.14 Access panels should be fitted at the side of
the duct, a minimum of 10mm above the base to
minimise the risk of grease leakage. Exceptionally,
they may be fitted on the top of the duct, but due
consideration should be given to the accessibility of
the panel. Where access panels must be fitted to the
underside of a duct, particular care must be taken
to ensure a leakfree fit and notice should be affixed
warning of the risk of oil being released on opening
the panels. In designing systems due consideration
should be given to providing physical unobstructed
access to all access panels.

For further information
www.londonandmidland.co.uk
7.15 Access panels should be fitted on either
side of in-line components, as detailed in Table 8, to
allow physical entry to clean these intricate surfaces.
This Table includes components, such as fire
dampers and attenuators, which are not normally
recommended to be installed, but are often found in
practice
This has a significant impact on installations
such as ventilation extractions where a significant
risk exists if the installation fails.
Table 8: Location of Access Panels for Cleaning and
Inspection Purposes
Volume Control Dampers
Fire Dampers (see Note 7)
Attenuators
Changes in Direction

Both sides
Both sides
Both sides
Both sides

Filter Sections
Horizontal Ducts

Both sides
Generally every 3 metres
(see Note 2)

Risers

Top and bottom as a minimum (see Note 3)

Extract Fans
Discharge grille/mesh

Both sides (see Note 4)
One side (see Note 6)

For further information
www.londonandmidland.co.uk
Notes to Table 8
1. Additional builders work hatches may need to
be fitted in ceilings/walls in existing installations, or
provided for in new constructions. Consideration
should also be given to safe high level access to
o
high
g
external ductwork.
2. Access openings for cleaning purposes are generally
eaning purposes e generally
p s
e
required at a maximum of 3 metre centres and/or at
metre centres and/or at
e e
each change of direction. This distance should be
on. This distance should be
h
sa e
l
duct prevents adequate
v
u t
reduced where the size of the duct prevents adequate
e
e
several changes n
v
h
cleaning by hand, where there are several changes in
r external features restrict the
r
e
direction or where other external features restrict the
positioning of panels.
ct risers often require access
e
t
3. Internal kitchen extract risers often require access
doors fitted on atleast each floor level so that all
r level so that all
e
internal surfaces can be reached and fire dampers,
e reached and re dampers,
c
d
a
where fitted, cleaned and checked. In older buildings
d checked. n older buildings
e
n
this may require additional builders works (e.g.
tional builders works (e.g.
a
d r
k
g
hatches through brickwork) to reach the riser ducts
work) to reach the riser ducts
c h
(see 7.6).
4. Extract fan design should allow thorough cleaning
ould allow thorough cleaning
lo h
of impellor blades and internal sur faces without the
nternal surfaces without the
e
t
need for dismantling, i.e. ductwork with access panels
ductwork with access panels
t
c
should be provided immediately upstream and
mmediately upstream and
e a y
t
downstream. Larger fans should be designed with
ns should be designed with
l
s e
h
panels in the casing. Similarly, attenuators or other inilarly, attenuators or other int u r
cure cleaning activity should
e n
t
line fittings likely to obscure cleaning activity should
t d .
be provided with access on both sides.
both sides.

For further information
www.londonandmidland.co.uk
System Testing
(Inspection/Monitoring)
7.18 The Health & Safety Executive and industry and
insurance guidance and regulations (see Appendices
gulations (see Appendices
p
c
en extract systems should
a
B&ES) stipulate that kitchen extract systems should
d other risks.
be kept clean to minimise fire and other risks.
f measuring and
This Guide now provides a method of measuring and
irtiness
defining cleanliness and dirtiness as a benchmark
benchmark
for good practice.
nd Cleaning Co. LTD Branch
n o
7.19 The London and Midland Cleaning Co. LTD Branch
y
t
s
has investigated a variety of methods for testing
methods
testing
o measure grease
e u
e
ductwork system internal surfaces to measure grease
ds
Wet Film Thickness
deposits and recommends the Wet Film Thickness
nt method. This method
t
Test (W.F.T.T.) measurement method. This method
is described in Appendix D.3.
s
T
r
7.20 The Deposit Thickness Test (D.T.T ), as described
(D.T.T), described
sed
in Section 5, may also be used and may be necessary
may be necessary
y hardbaked, carbonised,
k
o
in the case of extremely hardbaked, carbonised,
s
deposits. It is however less reliable for soft or liquid
for soft r liquid
g
a b
deposits and the finding of hard-baked deposits
hard-baked deposits
requirement to clean or in
u
would normally indicate a requirement to clean or in
rification requirement to
o
the case of cleanliness verification a requirement to
reclean.
ds provide an objective,
v
7.21 The testing methods provide an objective,
measurement of grease
r
repeatable and verifiable measurement of grease
he subjectivity of visual
b
deposits, and over come the subjectivity of visual
inspection alone.

For further information
www.londonandmidland.co.uk
7.22 It is recommended that testing be carried out
at intervals not exceeding 12 months. Monitoring of
grease deposits may need to be carried out more
rried out more
frequently if it is necessary to establish a precise
stablish precise
s
r
e
definition of required cleaning frequencies. The
frequencies. The
e
s
cleaning frequency required should be estimated by
d
estimated y
s
t
a specialist service provider and/or client on initial
initial
or
inspection or assessment and subsequent pre-clean
sequent pre-clean
t
n
testing will confirm whether the initial predicted
e
predicted
d
frequency is correct or requires adjustment.
justment.
7.23 Measurements should be taken at the following
following
en
o
locations where practicable:
• Canopy/Extract plenum behind filters
• Duct 1 metre from canopy
• Duct 3 metres from canopy
• Duct midway between canopy and fan
• Duct upstream of fan
• Discharge duct downstream of fan
u
7.24 Table 9 sets out guideline maximum levels of
maximum levels of
mended.
d
grease deposit and actions recommended.
iming will depend
i
The actual recommended action timing will depend
sk vulnerability of
a
on the rate of accumulation, the risk vulnerability of
rticular warranties
e
the system and site and any particular warranties
imposed by the building insurers.

For further information
www.londonandmidland.co.uk
Table 9: Surface Grease Deposit Limits
Wet Film Thickness Test
Measurement
200μm as a mean across
the
system
Any single measurement
above 500μm

Recommended Action
Complete cleaning required

Urgent local cleaning
required

Notes to Table 9
1. In the absence of, and the likely theoretical
difficulties of, an absolute
measure of the
flammability of various quantities of grease deposit,
the surface grease deposit limits are given in Table 9
and paragraph 7.42.
These levels were determined by extensive field
testing to measure at what levels good practice
employers, or operators of systems, carry out system
cleaning and what levels of cleanliness are normally
achieved by specialist duct cleaners using available
cleaning and measurement technology within
reasonable economic bounds.
2. The deposit limits refer to the degree of grease
deposition within the ductwork consistent with good
practice. Other factors such as cooking methods,
potential ignition sources,and other combustible
debris will affect the risk of fire.
3. The mean measurement is calculated by dividing
the total of the test results by the number of testing
locations.

For further information
www.londonandmidland.co.uk
4. The second category of any single
measurement above 500um is provided to
cater for local “hot spots” which should be
cleaned even where the whole system does
not require complete cleaning. Examples
might be immediately local to a canopy or
at a fan.

3. Existence and visual condition of any fire
suppression or detection system
4. Damage to fire protection
5. Ductwork grease leakage
6. Ductwork damage

5. The extent of urgent local cleaning
precipitated by the presence of grease 7. Damage to or inappropriate ductwork
deposits above 500um should be subject fixtures
to reasonable appreciation of the extent of
8. Visual/audible check of fan operation
fouling and risk posed.
7.25 The surface grease deposits limits 9. Rubbish/debris adjacent to system
should not be confused with the level set
for Post - Clean verification which is far 10. Visual assessment of any special
more stringent and detailed in
filtration
paragraph 7.42
11. Discharge condition, including grease
7.26 Stand-alone, regular or post-clean splatter/staining
testing can usefully be combined with
inspection of other kitchen extract system 7.27 Such inspection should not be regarded
safety issues. If specified by a client, a as a substitute for proper maintenance of
service provider should provide evidence plant such as fans and fire suppression or
of competence to carry out such inspection. detection systems.
Such inspection should include, but not be
restricted to:
1. Adequacy of filters and their regular
maintenance
2. Adequacy of regular cleaning of canopy,
and associated drains and traps

For further information
www.londonandmidland.co.uk
Cleaning Methods
7.28 This guide is not intended to be definitive in relation to the method of cleaning, as there
are many existing methods that can be applied in tandem, and emergent new technologies.
Examples of cleaning methods are listed in
Table 10.
7.29 To conform with the Guide, the actual method or methods must be capable of
achieving the required results, i.e. Post-Clean Verification, not only on the internal surfaces
of the extract duct but also on system components.
7.30 When choosing the cleaning method, consideration should be given to operative
safety and also to effects on the surrounding environment,
particularly where using wet cleaning methods, since grease/moisture can leak from the
ductwork components and damage the surrounding fabric.
Table 10: Examples of Cleaning Methodology
Generic Name

Energy Source

Removal Method

Hand wipe

Manual

Hand scrape

Manual

Chemical

Manual

High pressure water
wash (steam)

Electrical or compressed air

Blasting (remote or direct) using
suitablemedium as appropriate

Compressed air

Wiping the surface of the
ductwork
Removing heavy deposits by
hand scraping
Softens or dissolves deposits
making them suitable for hand
scraping
Vapour or liquid expelled at
high pressure from lance to dislodge/dissolve deposits
Blasting medium dislodges
contaminant from duct and
component surfaces to be
removed via vacuum
techniques or high volume
filtered extraction.

For further information
www.thelondonandmidland.co.uk
7.31 Steam cleaning and high pressure water
washing are not recommended for ductwork that is
situated above false ceilings or in sensitive areas, due
to possible leakage of contaminants from the duct,
unless specifically designed for wet cleaning.
7.32 After applying wet cleaning methods care should
be taken to ensure that any condensed vapours and
cleaning fluids are removed from all parts of the
system
7.33 The use of chemical cleaning agents should only
be considered where a risk/COSHH assessment has
been carried out (See Section 10), the details recorded
and the effects of the applied chemicals have been
assessed on the material construction, environment
and for hazards to cleaning personnel.
7.34 It should be noted that it is not normally
economically practicable to clean kitchen extract
systems to a “like new” bright metal condition due to
substratestaining.

For further information
www.londonandmidland.co.uk
Frequency of Cleaning
7.35 The need for specialist cleaning of extract systems
will depend on the level of usage of the cooking
equipment, types and quantity of cooking and other
risk factors such as vulnerability of the system to
ignition and of the building and its occupant/users to
system fire, hygiene, vermin and mechanical hazards.
Typical cleaning intervals are shown in Table 11:
Table 11: Frequency of Cleaning
Heavy Use
Moderate Use
Light Use

12-16 hours per
day
6-12 hours
per day
2-6 hours per day

- 3 monthly
- 6 monthly
- 12 monthly

Note to Table 11
The canopy and canopy/extract plenum is an area of
higher fire risk and consideration should be given to
more frequent cleaning in accordance with insurance
requirements (see 7.39)
7.36 The frequency of cleaning should
be adjusted by means of system testing (inspection/
monitoring) - see paragraph 7.23, so that surface
grease deposit limits in Table 9 are not exceeded. The
buildings insurance companyshould be consulted to
ensure that the cleaning regime is compliant with the
terms of their specific warranty.

For further information
www.londonandmidland.co.uk
7.37 Any cleaning regime should be
justified by a considered risk assessment.
(The latest Fire Precautions Workplace, and
Management of Health & Safety at Work
Regulations apply).
7.38 Regular cleaning will result in an
improved mean standard and reduce the
costs of cleaning as deposits are not allowed
to bake and harden.

7.43 On completion a report should be
provided containing the following:The system(s) cleaned
• Pre-clean measurements (as
• per System Testing)
• Post-clean measurements
• Photographic records
• Additional works carried out (if any)
• COSHH data on any chemicals used
• Recommendations for future
• cleaning requirements
• Observations on the condition of the
ductwork system

7.39 Periodic specialist cleaning should be
accompanied by daily or weekly cleaning of
canopies, filters and associated drains and
traps in accordance with manufacturers’
recommendations, typically carried out by 7.44 If specified, additional kitchen
the kitchen operator.
extract safety issues should also be reported
(as outlined in paragraph 7.26).
Post-Clean Verification of Cleanliness
7.45 The Post-Clean Verification of Cleanliness
7.40 The primary method of assessment is report should assist to serve as evidence
visual. For cleaned system verification, the of system status to insurance assessors,
surface should be visibly clean and capable Environmental Health Officers, landlord’s
of meeting the level of cleanliness specified. agents, etc.
7.41 Verification of cleanliness should be
by means of the Deposit Thickness Test
or Wet Film Thickness Test as detailed in
System Testing (Inspection/Monitoring) at
paragraph

The London & Midland Cleaning Co. LTD
Lamoc House
7-9 Summer Hill Terrarce
Birmingham
B1 3RA

7.42 The level of cleanliness is that
no single measurement should exceed
50μm

Tel:0121 236 1448/4050
24hr:07445 823 580
Fax:0121 236 2704

For further information
www.londonandmidland.co.uk

More Related Content

What's hot

Etabs installation and cracking procedure
Etabs installation and cracking procedureEtabs installation and cracking procedure
Etabs installation and cracking procedure
Rifat Bin Ahmed
 
FDI Product Range Brochure 14-15
FDI Product Range Brochure 14-15FDI Product Range Brochure 14-15
FDI Product Range Brochure 14-15Tino Quintal
 
Cours Béton Armé II _ Nguyen Quang Huy
Cours Béton Armé II _ Nguyen Quang HuyCours Béton Armé II _ Nguyen Quang Huy
Cours Béton Armé II _ Nguyen Quang Huy
Quang Huy Nguyen
 
Etabs acecoms rcc structure design
 Etabs acecoms rcc structure design Etabs acecoms rcc structure design
Etabs acecoms rcc structure design
Engr. Md. Mozammel H Mozumder
 
université artois BA-EUROCODE-2-partie4.pdf
université artois BA-EUROCODE-2-partie4.pdfuniversité artois BA-EUROCODE-2-partie4.pdf
université artois BA-EUROCODE-2-partie4.pdf
HugoLAURENT7
 
Structural Engineering Solutions for Architecture Challenges by Dr. Naveed
Structural Engineering Solutions for Architecture Challenges by Dr. Naveed Structural Engineering Solutions for Architecture Challenges by Dr. Naveed
Structural Engineering Solutions for Architecture Challenges by Dr. Naveed
AIT Solutions
 
Elastic flexural torsional buckling
Elastic flexural torsional bucklingElastic flexural torsional buckling
Elastic flexural torsional buckling
Bhavin Shah
 
HYUNDAI ALUMINUM FORMWORK SYSTEM_INTRODUCTION
HYUNDAI ALUMINUM FORMWORK SYSTEM_INTRODUCTIONHYUNDAI ALUMINUM FORMWORK SYSTEM_INTRODUCTION
HYUNDAI ALUMINUM FORMWORK SYSTEM_INTRODUCTION
seungeushin
 
Shear wall and its design guidelines
Shear wall and its design guidelinesShear wall and its design guidelines
Shear wall and its design guidelines
Muhammad Zain Ul abdin
 
Presentation on Suspension Bridge
Presentation on Suspension BridgePresentation on Suspension Bridge
Presentation on Suspension Bridge
mantukr4ever
 
DISEÑO DE UN PUENTE COLGANTE
DISEÑO DE UN PUENTE COLGANTEDISEÑO DE UN PUENTE COLGANTE
DISEÑO DE UN PUENTE COLGANTE
Edwin Alexis SemiNArio Beltran
 
How to model and analyse structures using etabs
How to model and analyse structures using etabsHow to model and analyse structures using etabs
How to model and analyse structures using etabs
Wilson vils
 
Design of bolted connections
Design of bolted connectionsDesign of bolted connections
Design of bolted connections
Arjun raj.
 
SFD & BMD Shear Force & Bending Moment Diagram
SFD & BMD Shear Force & Bending Moment DiagramSFD & BMD Shear Force & Bending Moment Diagram
SFD & BMD Shear Force & Bending Moment Diagram
Sanjay Kumawat
 
Calcul des poteaux élancés selon l'Eurocode 2
Calcul des poteaux élancés selon l'Eurocode 2Calcul des poteaux élancés selon l'Eurocode 2
Calcul des poteaux élancés selon l'Eurocode 2
Quang Huy Nguyen
 
ANALYSIS & DESIGN OF G+3 STORIED REINFORCED CONCRETE BUILDING
ANALYSIS & DESIGN OF G+3 STORIED REINFORCED CONCRETE BUILDING ANALYSIS & DESIGN OF G+3 STORIED REINFORCED CONCRETE BUILDING
ANALYSIS & DESIGN OF G+3 STORIED REINFORCED CONCRETE BUILDING
Abhilash Chandra Dey
 
Overhead Cranes, Jib Cranes, Commercial Doors & Loading Dock Equipment - O'Br...
Overhead Cranes, Jib Cranes, Commercial Doors & Loading Dock Equipment - O'Br...Overhead Cranes, Jib Cranes, Commercial Doors & Loading Dock Equipment - O'Br...
Overhead Cranes, Jib Cranes, Commercial Doors & Loading Dock Equipment - O'Br...
O'Brien Installations Limited
 
Analysis and design of shear wall transfer beam structure
Analysis and design of shear wall   transfer beam structureAnalysis and design of shear wall   transfer beam structure
Analysis and design of shear wall transfer beam structure
phamtraoag
 
Yield line theory
Yield line theoryYield line theory
Yield line theory
Vikas Mehta
 
Diagrammes d'interraction M-N Selon l'Eurocode 2
Diagrammes d'interraction M-N Selon l'Eurocode 2Diagrammes d'interraction M-N Selon l'Eurocode 2
Diagrammes d'interraction M-N Selon l'Eurocode 2
Quang Huy Nguyen
 

What's hot (20)

Etabs installation and cracking procedure
Etabs installation and cracking procedureEtabs installation and cracking procedure
Etabs installation and cracking procedure
 
FDI Product Range Brochure 14-15
FDI Product Range Brochure 14-15FDI Product Range Brochure 14-15
FDI Product Range Brochure 14-15
 
Cours Béton Armé II _ Nguyen Quang Huy
Cours Béton Armé II _ Nguyen Quang HuyCours Béton Armé II _ Nguyen Quang Huy
Cours Béton Armé II _ Nguyen Quang Huy
 
Etabs acecoms rcc structure design
 Etabs acecoms rcc structure design Etabs acecoms rcc structure design
Etabs acecoms rcc structure design
 
université artois BA-EUROCODE-2-partie4.pdf
université artois BA-EUROCODE-2-partie4.pdfuniversité artois BA-EUROCODE-2-partie4.pdf
université artois BA-EUROCODE-2-partie4.pdf
 
Structural Engineering Solutions for Architecture Challenges by Dr. Naveed
Structural Engineering Solutions for Architecture Challenges by Dr. Naveed Structural Engineering Solutions for Architecture Challenges by Dr. Naveed
Structural Engineering Solutions for Architecture Challenges by Dr. Naveed
 
Elastic flexural torsional buckling
Elastic flexural torsional bucklingElastic flexural torsional buckling
Elastic flexural torsional buckling
 
HYUNDAI ALUMINUM FORMWORK SYSTEM_INTRODUCTION
HYUNDAI ALUMINUM FORMWORK SYSTEM_INTRODUCTIONHYUNDAI ALUMINUM FORMWORK SYSTEM_INTRODUCTION
HYUNDAI ALUMINUM FORMWORK SYSTEM_INTRODUCTION
 
Shear wall and its design guidelines
Shear wall and its design guidelinesShear wall and its design guidelines
Shear wall and its design guidelines
 
Presentation on Suspension Bridge
Presentation on Suspension BridgePresentation on Suspension Bridge
Presentation on Suspension Bridge
 
DISEÑO DE UN PUENTE COLGANTE
DISEÑO DE UN PUENTE COLGANTEDISEÑO DE UN PUENTE COLGANTE
DISEÑO DE UN PUENTE COLGANTE
 
How to model and analyse structures using etabs
How to model and analyse structures using etabsHow to model and analyse structures using etabs
How to model and analyse structures using etabs
 
Design of bolted connections
Design of bolted connectionsDesign of bolted connections
Design of bolted connections
 
SFD & BMD Shear Force & Bending Moment Diagram
SFD & BMD Shear Force & Bending Moment DiagramSFD & BMD Shear Force & Bending Moment Diagram
SFD & BMD Shear Force & Bending Moment Diagram
 
Calcul des poteaux élancés selon l'Eurocode 2
Calcul des poteaux élancés selon l'Eurocode 2Calcul des poteaux élancés selon l'Eurocode 2
Calcul des poteaux élancés selon l'Eurocode 2
 
ANALYSIS & DESIGN OF G+3 STORIED REINFORCED CONCRETE BUILDING
ANALYSIS & DESIGN OF G+3 STORIED REINFORCED CONCRETE BUILDING ANALYSIS & DESIGN OF G+3 STORIED REINFORCED CONCRETE BUILDING
ANALYSIS & DESIGN OF G+3 STORIED REINFORCED CONCRETE BUILDING
 
Overhead Cranes, Jib Cranes, Commercial Doors & Loading Dock Equipment - O'Br...
Overhead Cranes, Jib Cranes, Commercial Doors & Loading Dock Equipment - O'Br...Overhead Cranes, Jib Cranes, Commercial Doors & Loading Dock Equipment - O'Br...
Overhead Cranes, Jib Cranes, Commercial Doors & Loading Dock Equipment - O'Br...
 
Analysis and design of shear wall transfer beam structure
Analysis and design of shear wall   transfer beam structureAnalysis and design of shear wall   transfer beam structure
Analysis and design of shear wall transfer beam structure
 
Yield line theory
Yield line theoryYield line theory
Yield line theory
 
Diagrammes d'interraction M-N Selon l'Eurocode 2
Diagrammes d'interraction M-N Selon l'Eurocode 2Diagrammes d'interraction M-N Selon l'Eurocode 2
Diagrammes d'interraction M-N Selon l'Eurocode 2
 

Viewers also liked

Pathway Cleaning - TR19 regulations - Ductwork Clean - Extraction Clean
Pathway Cleaning - TR19 regulations - Ductwork Clean - Extraction Clean Pathway Cleaning - TR19 regulations - Ductwork Clean - Extraction Clean
Pathway Cleaning - TR19 regulations - Ductwork Clean - Extraction Clean
The Pathway Group
 
Example kitchen ventilation calculation
Example kitchen ventilation calculationExample kitchen ventilation calculation
Example kitchen ventilation calculation
williammana
 
HVCA TR19
HVCA TR19HVCA TR19
HVCA TR19
garyaugust
 
Gary nicholls presentation tr19 ventilation swiftclean seminars
Gary nicholls presentation tr19 ventilation swiftclean seminarsGary nicholls presentation tr19 ventilation swiftclean seminars
Gary nicholls presentation tr19 ventilation swiftclean seminars
Jackielansley
 
Commercial kitchen hoods
Commercial kitchen hoodsCommercial kitchen hoods
Commercial kitchen hoods
exhausthooddepot
 
Gary August CV2011
Gary August CV2011Gary August CV2011
Gary August CV2011
garyaugust
 
Kitchen Exhaust India
Kitchen Exhaust IndiaKitchen Exhaust India
Kitchen Exhaust India
Revac Chefmate
 
Solar Evaporative Air Cooler
Solar Evaporative Air Cooler Solar Evaporative Air Cooler
Solar Evaporative Air Cooler
Sheshadri Shekhar Rauth
 
Intro to commercial kitchen design
Intro to commercial kitchen designIntro to commercial kitchen design
Intro to commercial kitchen designMichelleWidner
 
Designing a commercial kitchen
Designing a commercial kitchenDesigning a commercial kitchen
Designing a commercial kitchenPatrick Colley
 
Hierarchical Object Oriented Design
Hierarchical Object Oriented DesignHierarchical Object Oriented Design
Hierarchical Object Oriented Design
sahibsahib
 

Viewers also liked (11)

Pathway Cleaning - TR19 regulations - Ductwork Clean - Extraction Clean
Pathway Cleaning - TR19 regulations - Ductwork Clean - Extraction Clean Pathway Cleaning - TR19 regulations - Ductwork Clean - Extraction Clean
Pathway Cleaning - TR19 regulations - Ductwork Clean - Extraction Clean
 
Example kitchen ventilation calculation
Example kitchen ventilation calculationExample kitchen ventilation calculation
Example kitchen ventilation calculation
 
HVCA TR19
HVCA TR19HVCA TR19
HVCA TR19
 
Gary nicholls presentation tr19 ventilation swiftclean seminars
Gary nicholls presentation tr19 ventilation swiftclean seminarsGary nicholls presentation tr19 ventilation swiftclean seminars
Gary nicholls presentation tr19 ventilation swiftclean seminars
 
Commercial kitchen hoods
Commercial kitchen hoodsCommercial kitchen hoods
Commercial kitchen hoods
 
Gary August CV2011
Gary August CV2011Gary August CV2011
Gary August CV2011
 
Kitchen Exhaust India
Kitchen Exhaust IndiaKitchen Exhaust India
Kitchen Exhaust India
 
Solar Evaporative Air Cooler
Solar Evaporative Air Cooler Solar Evaporative Air Cooler
Solar Evaporative Air Cooler
 
Intro to commercial kitchen design
Intro to commercial kitchen designIntro to commercial kitchen design
Intro to commercial kitchen design
 
Designing a commercial kitchen
Designing a commercial kitchenDesigning a commercial kitchen
Designing a commercial kitchen
 
Hierarchical Object Oriented Design
Hierarchical Object Oriented DesignHierarchical Object Oriented Design
Hierarchical Object Oriented Design
 

Similar to TR19 Regulations - B&ES Guide to Good Practice - London & Midland Cleaning Company

Chapter 8 duct design and sealing
Chapter 8 duct design and sealingChapter 8 duct design and sealing
Chapter 8 duct design and sealingsahiloct11969
 
1603104213-hatchery-planning-design-and-construction.pptx
1603104213-hatchery-planning-design-and-construction.pptx1603104213-hatchery-planning-design-and-construction.pptx
1603104213-hatchery-planning-design-and-construction.pptx
MkulimaHodari1
 
S3 Supply Air Duct System Assignment
S3 Supply Air Duct System AssignmentS3 Supply Air Duct System Assignment
S3 Supply Air Duct System Assignment
no suhaila
 
Infection Prevention & Control During Constructions and Renovation
Infection Prevention & Control During Constructions and RenovationInfection Prevention & Control During Constructions and Renovation
Infection Prevention & Control During Constructions and Renovation
Philippine Hospital Infection Contol Nurses Associaton (PHICNA) Inc.
 
Quality HVAC Installation Made Easy
Quality HVAC Installation Made EasyQuality HVAC Installation Made Easy
Quality HVAC Installation Made Easy
ERH West
 
Natural ventilation, Artificial ventilation, Air conditioning
Natural ventilation, Artificial ventilation, Air conditioningNatural ventilation, Artificial ventilation, Air conditioning
Natural ventilation, Artificial ventilation, Air conditioning
SusmitaMulayPatil
 
building services
building servicesbuilding services
building servicesszelun
 
Class II Biological Safety Cabinet Ergonomic Green Considerations
Class II Biological Safety Cabinet Ergonomic Green ConsiderationsClass II Biological Safety Cabinet Ergonomic Green Considerations
Class II Biological Safety Cabinet Ergonomic Green Considerations
Atlantic Technology Group, Inc.
 
Brookvent part f compliance guide
Brookvent part f compliance guideBrookvent part f compliance guide
Brookvent part f compliance guide
Agnieszka Garczyńska
 
Applying design and construction standards to successfully build a cleanroom ...
Applying design and construction standards to successfully build a cleanroom ...Applying design and construction standards to successfully build a cleanroom ...
Applying design and construction standards to successfully build a cleanroom ...
alone160162
 
Parenteral production
Parenteral   productionParenteral   production
Parenteral productionceutics1315
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenance
vijay oak
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenance
vijay oak
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenance
vijay oak
 
HVAC Install - Trust But Verify
HVAC Install  - Trust But VerifyHVAC Install  - Trust But Verify
HVAC Install - Trust But Verify
ERH West
 
Point 2.pptx
Point 2.pptxPoint 2.pptx
Point 2.pptx
PoojaPatil489194
 

Similar to TR19 Regulations - B&ES Guide to Good Practice - London & Midland Cleaning Company (20)

Chapter 8 duct design and sealing
Chapter 8 duct design and sealingChapter 8 duct design and sealing
Chapter 8 duct design and sealing
 
DW172
DW172DW172
DW172
 
1603104213-hatchery-planning-design-and-construction.pptx
1603104213-hatchery-planning-design-and-construction.pptx1603104213-hatchery-planning-design-and-construction.pptx
1603104213-hatchery-planning-design-and-construction.pptx
 
S3 Supply Air Duct System Assignment
S3 Supply Air Duct System AssignmentS3 Supply Air Duct System Assignment
S3 Supply Air Duct System Assignment
 
Infection Prevention & Control During Constructions and Renovation
Infection Prevention & Control During Constructions and RenovationInfection Prevention & Control During Constructions and Renovation
Infection Prevention & Control During Constructions and Renovation
 
Quality HVAC Installation Made Easy
Quality HVAC Installation Made EasyQuality HVAC Installation Made Easy
Quality HVAC Installation Made Easy
 
Natural ventilation, Artificial ventilation, Air conditioning
Natural ventilation, Artificial ventilation, Air conditioningNatural ventilation, Artificial ventilation, Air conditioning
Natural ventilation, Artificial ventilation, Air conditioning
 
building services
building servicesbuilding services
building services
 
Class II Biological Safety Cabinet Ergonomic Green Considerations
Class II Biological Safety Cabinet Ergonomic Green ConsiderationsClass II Biological Safety Cabinet Ergonomic Green Considerations
Class II Biological Safety Cabinet Ergonomic Green Considerations
 
Brookvent part f compliance guide
Brookvent part f compliance guideBrookvent part f compliance guide
Brookvent part f compliance guide
 
Applying design and construction standards to successfully build a cleanroom ...
Applying design and construction standards to successfully build a cleanroom ...Applying design and construction standards to successfully build a cleanroom ...
Applying design and construction standards to successfully build a cleanroom ...
 
Parenteral production
Parenteral   productionParenteral   production
Parenteral production
 
Parenteral production
Parenteral   productionParenteral   production
Parenteral production
 
AIS_brochure
AIS_brochureAIS_brochure
AIS_brochure
 
AIS_brochure
AIS_brochureAIS_brochure
AIS_brochure
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenance
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenance
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenance
 
HVAC Install - Trust But Verify
HVAC Install  - Trust But VerifyHVAC Install  - Trust But Verify
HVAC Install - Trust But Verify
 
Point 2.pptx
Point 2.pptxPoint 2.pptx
Point 2.pptx
 

More from The Pathway Group

Talk to us - Safaraz Ali for linkedin.pptx
Talk to us - Safaraz Ali for linkedin.pptxTalk to us - Safaraz Ali for linkedin.pptx
Talk to us - Safaraz Ali for linkedin.pptx
The Pathway Group
 
Responsible Individual Training - F5 Foster Care.pptx
Responsible Individual Training -  F5 Foster Care.pptxResponsible Individual Training -  F5 Foster Care.pptx
Responsible Individual Training - F5 Foster Care.pptx
The Pathway Group
 
Responsible Individual Training fostercare- F5 Foster Care UK
Responsible Individual Training  fostercare-  F5 Foster Care UKResponsible Individual Training  fostercare-  F5 Foster Care UK
Responsible Individual Training fostercare- F5 Foster Care UK
The Pathway Group
 
Pathway Group 2024 by Safaraz Ali.pdf
Pathway Group 2024 by Safaraz Ali.pdfPathway Group 2024 by Safaraz Ali.pdf
Pathway Group 2024 by Safaraz Ali.pdf
The Pathway Group
 
1973 Toyota Production System Handbook
1973 Toyota Production System Handbook1973 Toyota Production System Handbook
1973 Toyota Production System Handbook
The Pathway Group
 
Multicultural-Apprenticeship-Awards-2023-Compressed-Brochure.pdf
Multicultural-Apprenticeship-Awards-2023-Compressed-Brochure.pdfMulticultural-Apprenticeship-Awards-2023-Compressed-Brochure.pdf
Multicultural-Apprenticeship-Awards-2023-Compressed-Brochure.pdf
The Pathway Group
 
Empowering The Nation - White Paper .pdf
Empowering The Nation - White Paper .pdfEmpowering The Nation - White Paper .pdf
Empowering The Nation - White Paper .pdf
The Pathway Group
 
Peer Meetup by Safaraz Ali 13.Oct.2023.pdf
Peer Meetup by Safaraz Ali 13.Oct.2023.pdfPeer Meetup by Safaraz Ali 13.Oct.2023.pdf
Peer Meetup by Safaraz Ali 13.Oct.2023.pdf
The Pathway Group
 
Peer Meetup by Safaraz Ali 13.Oct.2023.ppt
Peer Meetup by Safaraz Ali 13.Oct.2023.pptPeer Meetup by Safaraz Ali 13.Oct.2023.ppt
Peer Meetup by Safaraz Ali 13.Oct.2023.ppt
The Pathway Group
 
A Guide to Apprenticeships for the Higher Education Sector.pdf
A Guide to Apprenticeships for the Higher Education Sector.pdfA Guide to Apprenticeships for the Higher Education Sector.pdf
A Guide to Apprenticeships for the Higher Education Sector.pdf
The Pathway Group
 
All Matters Regulatory - Apprenticeship Training Material - Pathway Group.pdf
All Matters Regulatory - Apprenticeship Training Material - Pathway Group.pdfAll Matters Regulatory - Apprenticeship Training Material - Pathway Group.pdf
All Matters Regulatory - Apprenticeship Training Material - Pathway Group.pdf
The Pathway Group
 
All Matters Regulatory - Apprenticeship Training Material - Pathway Group.ppt
All Matters Regulatory - Apprenticeship Training Material - Pathway Group.pptAll Matters Regulatory - Apprenticeship Training Material - Pathway Group.ppt
All Matters Regulatory - Apprenticeship Training Material - Pathway Group.ppt
The Pathway Group
 
End-Point Assessment Organisations EPAOs - Apprenticeship Training Material -...
End-Point Assessment Organisations EPAOs - Apprenticeship Training Material -...End-Point Assessment Organisations EPAOs - Apprenticeship Training Material -...
End-Point Assessment Organisations EPAOs - Apprenticeship Training Material -...
The Pathway Group
 
End-Point Assessment Organisations EPAOs - Apprenticeship Training Material -...
End-Point Assessment Organisations EPAOs - Apprenticeship Training Material -...End-Point Assessment Organisations EPAOs - Apprenticeship Training Material -...
End-Point Assessment Organisations EPAOs - Apprenticeship Training Material -...
The Pathway Group
 
How Apprenticeships Work & Why They Work - Apprenticeship Training Material -...
How Apprenticeships Work & Why They Work - Apprenticeship Training Material -...How Apprenticeships Work & Why They Work - Apprenticeship Training Material -...
How Apprenticeships Work & Why They Work - Apprenticeship Training Material -...
The Pathway Group
 
How Apprenticeships Work & Why They Work - Apprenticeship Training Material -...
How Apprenticeships Work & Why They Work - Apprenticeship Training Material -...How Apprenticeships Work & Why They Work - Apprenticeship Training Material -...
How Apprenticeships Work & Why They Work - Apprenticeship Training Material -...
The Pathway Group
 
The World of Learning - Apprenticeship Training Material - Pathway Group.ppt
The World of Learning - Apprenticeship Training Material - Pathway Group.pptThe World of Learning - Apprenticeship Training Material - Pathway Group.ppt
The World of Learning - Apprenticeship Training Material - Pathway Group.ppt
The Pathway Group
 
The World of Learning - Apprenticeship Training Material - Pathway Group.pdf
The World of Learning - Apprenticeship Training Material - Pathway Group.pdfThe World of Learning - Apprenticeship Training Material - Pathway Group.pdf
The World of Learning - Apprenticeship Training Material - Pathway Group.pdf
The Pathway Group
 
How Independent Training Providers (ITPs) can survive and thrive in an inflat...
How Independent Training Providers (ITPs) can survive and thrive in an inflat...How Independent Training Providers (ITPs) can survive and thrive in an inflat...
How Independent Training Providers (ITPs) can survive and thrive in an inflat...
The Pathway Group
 
Birmingham Pakistani Report PDF June 2023.pdf
Birmingham Pakistani Report PDF June 2023.pdfBirmingham Pakistani Report PDF June 2023.pdf
Birmingham Pakistani Report PDF June 2023.pdf
The Pathway Group
 

More from The Pathway Group (20)

Talk to us - Safaraz Ali for linkedin.pptx
Talk to us - Safaraz Ali for linkedin.pptxTalk to us - Safaraz Ali for linkedin.pptx
Talk to us - Safaraz Ali for linkedin.pptx
 
Responsible Individual Training - F5 Foster Care.pptx
Responsible Individual Training -  F5 Foster Care.pptxResponsible Individual Training -  F5 Foster Care.pptx
Responsible Individual Training - F5 Foster Care.pptx
 
Responsible Individual Training fostercare- F5 Foster Care UK
Responsible Individual Training  fostercare-  F5 Foster Care UKResponsible Individual Training  fostercare-  F5 Foster Care UK
Responsible Individual Training fostercare- F5 Foster Care UK
 
Pathway Group 2024 by Safaraz Ali.pdf
Pathway Group 2024 by Safaraz Ali.pdfPathway Group 2024 by Safaraz Ali.pdf
Pathway Group 2024 by Safaraz Ali.pdf
 
1973 Toyota Production System Handbook
1973 Toyota Production System Handbook1973 Toyota Production System Handbook
1973 Toyota Production System Handbook
 
Multicultural-Apprenticeship-Awards-2023-Compressed-Brochure.pdf
Multicultural-Apprenticeship-Awards-2023-Compressed-Brochure.pdfMulticultural-Apprenticeship-Awards-2023-Compressed-Brochure.pdf
Multicultural-Apprenticeship-Awards-2023-Compressed-Brochure.pdf
 
Empowering The Nation - White Paper .pdf
Empowering The Nation - White Paper .pdfEmpowering The Nation - White Paper .pdf
Empowering The Nation - White Paper .pdf
 
Peer Meetup by Safaraz Ali 13.Oct.2023.pdf
Peer Meetup by Safaraz Ali 13.Oct.2023.pdfPeer Meetup by Safaraz Ali 13.Oct.2023.pdf
Peer Meetup by Safaraz Ali 13.Oct.2023.pdf
 
Peer Meetup by Safaraz Ali 13.Oct.2023.ppt
Peer Meetup by Safaraz Ali 13.Oct.2023.pptPeer Meetup by Safaraz Ali 13.Oct.2023.ppt
Peer Meetup by Safaraz Ali 13.Oct.2023.ppt
 
A Guide to Apprenticeships for the Higher Education Sector.pdf
A Guide to Apprenticeships for the Higher Education Sector.pdfA Guide to Apprenticeships for the Higher Education Sector.pdf
A Guide to Apprenticeships for the Higher Education Sector.pdf
 
All Matters Regulatory - Apprenticeship Training Material - Pathway Group.pdf
All Matters Regulatory - Apprenticeship Training Material - Pathway Group.pdfAll Matters Regulatory - Apprenticeship Training Material - Pathway Group.pdf
All Matters Regulatory - Apprenticeship Training Material - Pathway Group.pdf
 
All Matters Regulatory - Apprenticeship Training Material - Pathway Group.ppt
All Matters Regulatory - Apprenticeship Training Material - Pathway Group.pptAll Matters Regulatory - Apprenticeship Training Material - Pathway Group.ppt
All Matters Regulatory - Apprenticeship Training Material - Pathway Group.ppt
 
End-Point Assessment Organisations EPAOs - Apprenticeship Training Material -...
End-Point Assessment Organisations EPAOs - Apprenticeship Training Material -...End-Point Assessment Organisations EPAOs - Apprenticeship Training Material -...
End-Point Assessment Organisations EPAOs - Apprenticeship Training Material -...
 
End-Point Assessment Organisations EPAOs - Apprenticeship Training Material -...
End-Point Assessment Organisations EPAOs - Apprenticeship Training Material -...End-Point Assessment Organisations EPAOs - Apprenticeship Training Material -...
End-Point Assessment Organisations EPAOs - Apprenticeship Training Material -...
 
How Apprenticeships Work & Why They Work - Apprenticeship Training Material -...
How Apprenticeships Work & Why They Work - Apprenticeship Training Material -...How Apprenticeships Work & Why They Work - Apprenticeship Training Material -...
How Apprenticeships Work & Why They Work - Apprenticeship Training Material -...
 
How Apprenticeships Work & Why They Work - Apprenticeship Training Material -...
How Apprenticeships Work & Why They Work - Apprenticeship Training Material -...How Apprenticeships Work & Why They Work - Apprenticeship Training Material -...
How Apprenticeships Work & Why They Work - Apprenticeship Training Material -...
 
The World of Learning - Apprenticeship Training Material - Pathway Group.ppt
The World of Learning - Apprenticeship Training Material - Pathway Group.pptThe World of Learning - Apprenticeship Training Material - Pathway Group.ppt
The World of Learning - Apprenticeship Training Material - Pathway Group.ppt
 
The World of Learning - Apprenticeship Training Material - Pathway Group.pdf
The World of Learning - Apprenticeship Training Material - Pathway Group.pdfThe World of Learning - Apprenticeship Training Material - Pathway Group.pdf
The World of Learning - Apprenticeship Training Material - Pathway Group.pdf
 
How Independent Training Providers (ITPs) can survive and thrive in an inflat...
How Independent Training Providers (ITPs) can survive and thrive in an inflat...How Independent Training Providers (ITPs) can survive and thrive in an inflat...
How Independent Training Providers (ITPs) can survive and thrive in an inflat...
 
Birmingham Pakistani Report PDF June 2023.pdf
Birmingham Pakistani Report PDF June 2023.pdfBirmingham Pakistani Report PDF June 2023.pdf
Birmingham Pakistani Report PDF June 2023.pdf
 

Recently uploaded

-- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month ---- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month --
NZSG
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
SynapseIndia
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
Ben Wann
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
fakeloginn69
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
BBPMedia1
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
KaiNexus
 
The key differences between the MDR and IVDR in the EU
The key differences between the MDR and IVDR in the EUThe key differences between the MDR and IVDR in the EU
The key differences between the MDR and IVDR in the EU
Allensmith572606
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
FelixPerez547899
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
agatadrynko
 
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
bosssp10
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
techboxsqauremedia
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
Bojamma2
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
Ben Wann
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
sarahvanessa51503
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
Lviv Startup Club
 

Recently uploaded (20)

-- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month ---- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month --
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
 
The key differences between the MDR and IVDR in the EU
The key differences between the MDR and IVDR in the EUThe key differences between the MDR and IVDR in the EU
The key differences between the MDR and IVDR in the EU
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
 
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
 

TR19 Regulations - B&ES Guide to Good Practice - London & Midland Cleaning Company

  • 1.
  • 2. B&ES Guide to Good Practice Internal Cleanliness of Ventilation Specific Considerations for Kitchen Extract Systems 7.1 The kitchen extract system presents particular hazards due to the potential for the accumulation of grease. Accumulated grease within an extract system forms a hidden combustion load. Under certain circumstances flame or very high temperature within the duct can ignite the grease causing fire to spread rapidly through the duct. Flame and heat within the duct can ignite surrounding materials at various points along the ductwork path and transfer fire in ways that are difficult to predict and control by designers, installers and ultimately fire fighters. 7.2 Kitchen extract ventilation syst ems are defined here as the extractmsystems intended to collect and remove contaminants, heat and moisture from cooking appliances (See also DW/172). A kitchen extract system wouldnt typically comprise of the following components:Canopy Also referred to as hood, canopy hood, extraction hood, cooking hood, cooker hood, cooking canopy or extraction canopy. This would most likely include a vertical canopy skirt running around the perimeter of the canopy. Channel on the bottom edge of the skirt; a canopy roof sitting horizontally on the top of and joining the skirts; a grease filter housing assembly (with grease filters and traps) hanging within the boundary of the skirts. For further information www.londonandmidland.co.uk
  • 3. Canopy/Extract plenum This is typically the area immediately behind the grease filter housing and below where the ducting commences. Ducting Beyond the canopy/extract plenum, extraction ductwork would be connected. This may involve short transition ducts connected directly to the suction side of an extract fan or could include many linear metres of horizontal and/or vertical ductwork. Vertical ductwork, also referred to as riser may passmthrough many levels of a building. Contained within the ducting there may be attenuators, flow control dampers, fire dampers, air turning vanes and sensors. Extract Fan To create extraction from the canopy an extract fan would be connected to the ductwork, some extract fans (roof mounted) discharge directly to atmosphere via a cowl. Discharge Duct On the exhaust side of the fan a discharge duct would direct extract air out of the building via an outlet. This outlet point may include weather louvres and mesh to prevent the ingress of weather and vermin. Other systems such as ventilated ceilings and directly ducted extraction are also used. It is important that the person responsible for implementing cleaning regimes clearly understands t he breakdown of the system so that any cleaning regime is compliant with the terms of buildings insurance relevant to the kitchen extract maintenance. For further information www.londonandmidland.co.uk
  • 4. 7.3 Other extraction systems serving the cooking area, such as potwash/dishwash systems, general extraction etc. may also be affected by grease deposits and similar considerations will apply. time of system survey, a detailed schematic should be provided, highlighting any areas which are inaccessible and therefore, will remain uncleaned. The client must be advised of any inaccessible areas, the reason for their inaccessibility and, if possible, the likely cost to provide full and free access. It is the clients responsibility to highlight this to their insurer or other relevant third party, if required, who must confirm whether an exception to the total cleaning in accordance with TR/19 is acceptable. 7.4 Kitchen extract systems are liable to internal fouling by grease and oils. It is usual for the systems to be protected by grease filters, but these differ widely in terms of efficiency of grease removal and of barrier to flame. Total grease removal is not normally feasib le and therefore fouling of systems 7.7 This section of the Guide provides downstream will occur to a greater or lesser specific advice on how to clean and degree. maintain kitchen extract systems, but similar consideration will apply to non7.5 Grease deposits within systems also pose kitchen areas that might be affected by hygiene, odour, vermin and mechanical grease and/or oil deposits. efficiency hazards. Poorly designed and installed or damaged ductwork can leak grease, thus extending the fire risk, hygiene, odour and vermin hazards. Also, where ductwork di storts under fire conditions, burning grease can leak out and spread the fire to duct surroundings. 7.6 Supply or make-up ventilation systems should be maintained in hygienicmcondition as detailed in this Guide. Due to the accumulated grease within extract systems, the majority of the duct - work cleaning will be by manual rather than mechanical methods. At the For further information www.londonandmidland.co.uk
  • 5. Design and Access to the Internal Surfaces of the Kitchen Extract 7.8 Advice is provided in B&ES/HVCA DW/172: Specification for kitchen ventilation system (2005) 7.9 Internal surfaces of kitchen extract systems should be free of irregularities, all of which make grease accumulation more likely and cleaning more difficult. 7.10 It is essential that a kitchen extract ductwork system, and canopy/extract plenum, is provided with access panels of sufficient number, quality and size to enable unrestricted access for regular cleaning and inspection of the internal surfaces and in-line components. 7.11 Location of access to the internal surfaces of a kitchen extract system is dependent on a number of design and operational considerations • Design and location of ductwork • Building design and construction materials • Location of kitchen within the building • Location of extract fan and accessibility for maintenance • Accessibility to physically reach the ductwork • Any building modifications and current uses that may restrict access • Location and number of system components requiring access. For further information www.londonandmidland.co.uk
  • 6. 7.12 Access panels should be suitable for the purpose for which they are intended. The panels and frames should be constructed of the same material as the ductwork. As a minimum they should incorporate quick release catches, sealing gasket and thermal, acoustic and fire rated insulation properties equal to that of the duct to which they are fitted. Particular consideration must be given to maintaining the fire integrity of firerated ductwork. The recommendations of the manufacturer or specialist fire protection adviser should be followed where appropriate. 7.13 Access panels should be as large as the duct size permits to a maximum of 460mm x 610mm without weakening the structure of the system. Openings should not be obstructed by other building services, stored equipment or by the fabric of the building. The panel and aperture should be free of any sharp edges. 7.14 Access panels should be fitted at the side of the duct, a minimum of 10mm above the base to minimise the risk of grease leakage. Exceptionally, they may be fitted on the top of the duct, but due consideration should be given to the accessibility of the panel. Where access panels must be fitted to the underside of a duct, particular care must be taken to ensure a leakfree fit and notice should be affixed warning of the risk of oil being released on opening the panels. In designing systems due consideration should be given to providing physical unobstructed access to all access panels. For further information www.londonandmidland.co.uk
  • 7. 7.15 Access panels should be fitted on either side of in-line components, as detailed in Table 8, to allow physical entry to clean these intricate surfaces. This Table includes components, such as fire dampers and attenuators, which are not normally recommended to be installed, but are often found in practice This has a significant impact on installations such as ventilation extractions where a significant risk exists if the installation fails. Table 8: Location of Access Panels for Cleaning and Inspection Purposes Volume Control Dampers Fire Dampers (see Note 7) Attenuators Changes in Direction Both sides Both sides Both sides Both sides Filter Sections Horizontal Ducts Both sides Generally every 3 metres (see Note 2) Risers Top and bottom as a minimum (see Note 3) Extract Fans Discharge grille/mesh Both sides (see Note 4) One side (see Note 6) For further information www.londonandmidland.co.uk
  • 8. Notes to Table 8 1. Additional builders work hatches may need to be fitted in ceilings/walls in existing installations, or provided for in new constructions. Consideration should also be given to safe high level access to o high g external ductwork. 2. Access openings for cleaning purposes are generally eaning purposes e generally p s e required at a maximum of 3 metre centres and/or at metre centres and/or at e e each change of direction. This distance should be on. This distance should be h sa e l duct prevents adequate v u t reduced where the size of the duct prevents adequate e e several changes n v h cleaning by hand, where there are several changes in r external features restrict the r e direction or where other external features restrict the positioning of panels. ct risers often require access e t 3. Internal kitchen extract risers often require access doors fitted on atleast each floor level so that all r level so that all e internal surfaces can be reached and fire dampers, e reached and re dampers, c d a where fitted, cleaned and checked. In older buildings d checked. n older buildings e n this may require additional builders works (e.g. tional builders works (e.g. a d r k g hatches through brickwork) to reach the riser ducts work) to reach the riser ducts c h (see 7.6). 4. Extract fan design should allow thorough cleaning ould allow thorough cleaning lo h of impellor blades and internal sur faces without the nternal surfaces without the e t need for dismantling, i.e. ductwork with access panels ductwork with access panels t c should be provided immediately upstream and mmediately upstream and e a y t downstream. Larger fans should be designed with ns should be designed with l s e h panels in the casing. Similarly, attenuators or other inilarly, attenuators or other int u r cure cleaning activity should e n t line fittings likely to obscure cleaning activity should t d . be provided with access on both sides. both sides. For further information www.londonandmidland.co.uk
  • 9. System Testing (Inspection/Monitoring) 7.18 The Health & Safety Executive and industry and insurance guidance and regulations (see Appendices gulations (see Appendices p c en extract systems should a B&ES) stipulate that kitchen extract systems should d other risks. be kept clean to minimise fire and other risks. f measuring and This Guide now provides a method of measuring and irtiness defining cleanliness and dirtiness as a benchmark benchmark for good practice. nd Cleaning Co. LTD Branch n o 7.19 The London and Midland Cleaning Co. LTD Branch y t s has investigated a variety of methods for testing methods testing o measure grease e u e ductwork system internal surfaces to measure grease ds Wet Film Thickness deposits and recommends the Wet Film Thickness nt method. This method t Test (W.F.T.T.) measurement method. This method is described in Appendix D.3. s T r 7.20 The Deposit Thickness Test (D.T.T ), as described (D.T.T), described sed in Section 5, may also be used and may be necessary may be necessary y hardbaked, carbonised, k o in the case of extremely hardbaked, carbonised, s deposits. It is however less reliable for soft or liquid for soft r liquid g a b deposits and the finding of hard-baked deposits hard-baked deposits requirement to clean or in u would normally indicate a requirement to clean or in rification requirement to o the case of cleanliness verification a requirement to reclean. ds provide an objective, v 7.21 The testing methods provide an objective, measurement of grease r repeatable and verifiable measurement of grease he subjectivity of visual b deposits, and over come the subjectivity of visual inspection alone. For further information www.londonandmidland.co.uk
  • 10. 7.22 It is recommended that testing be carried out at intervals not exceeding 12 months. Monitoring of grease deposits may need to be carried out more rried out more frequently if it is necessary to establish a precise stablish precise s r e definition of required cleaning frequencies. The frequencies. The e s cleaning frequency required should be estimated by d estimated y s t a specialist service provider and/or client on initial initial or inspection or assessment and subsequent pre-clean sequent pre-clean t n testing will confirm whether the initial predicted e predicted d frequency is correct or requires adjustment. justment. 7.23 Measurements should be taken at the following following en o locations where practicable: • Canopy/Extract plenum behind filters • Duct 1 metre from canopy • Duct 3 metres from canopy • Duct midway between canopy and fan • Duct upstream of fan • Discharge duct downstream of fan u 7.24 Table 9 sets out guideline maximum levels of maximum levels of mended. d grease deposit and actions recommended. iming will depend i The actual recommended action timing will depend sk vulnerability of a on the rate of accumulation, the risk vulnerability of rticular warranties e the system and site and any particular warranties imposed by the building insurers. For further information www.londonandmidland.co.uk
  • 11. Table 9: Surface Grease Deposit Limits Wet Film Thickness Test Measurement 200μm as a mean across the system Any single measurement above 500μm Recommended Action Complete cleaning required Urgent local cleaning required Notes to Table 9 1. In the absence of, and the likely theoretical difficulties of, an absolute measure of the flammability of various quantities of grease deposit, the surface grease deposit limits are given in Table 9 and paragraph 7.42. These levels were determined by extensive field testing to measure at what levels good practice employers, or operators of systems, carry out system cleaning and what levels of cleanliness are normally achieved by specialist duct cleaners using available cleaning and measurement technology within reasonable economic bounds. 2. The deposit limits refer to the degree of grease deposition within the ductwork consistent with good practice. Other factors such as cooking methods, potential ignition sources,and other combustible debris will affect the risk of fire. 3. The mean measurement is calculated by dividing the total of the test results by the number of testing locations. For further information www.londonandmidland.co.uk
  • 12. 4. The second category of any single measurement above 500um is provided to cater for local “hot spots” which should be cleaned even where the whole system does not require complete cleaning. Examples might be immediately local to a canopy or at a fan. 3. Existence and visual condition of any fire suppression or detection system 4. Damage to fire protection 5. Ductwork grease leakage 6. Ductwork damage 5. The extent of urgent local cleaning precipitated by the presence of grease 7. Damage to or inappropriate ductwork deposits above 500um should be subject fixtures to reasonable appreciation of the extent of 8. Visual/audible check of fan operation fouling and risk posed. 7.25 The surface grease deposits limits 9. Rubbish/debris adjacent to system should not be confused with the level set for Post - Clean verification which is far 10. Visual assessment of any special more stringent and detailed in filtration paragraph 7.42 11. Discharge condition, including grease 7.26 Stand-alone, regular or post-clean splatter/staining testing can usefully be combined with inspection of other kitchen extract system 7.27 Such inspection should not be regarded safety issues. If specified by a client, a as a substitute for proper maintenance of service provider should provide evidence plant such as fans and fire suppression or of competence to carry out such inspection. detection systems. Such inspection should include, but not be restricted to: 1. Adequacy of filters and their regular maintenance 2. Adequacy of regular cleaning of canopy, and associated drains and traps For further information www.londonandmidland.co.uk
  • 13. Cleaning Methods 7.28 This guide is not intended to be definitive in relation to the method of cleaning, as there are many existing methods that can be applied in tandem, and emergent new technologies. Examples of cleaning methods are listed in Table 10. 7.29 To conform with the Guide, the actual method or methods must be capable of achieving the required results, i.e. Post-Clean Verification, not only on the internal surfaces of the extract duct but also on system components. 7.30 When choosing the cleaning method, consideration should be given to operative safety and also to effects on the surrounding environment, particularly where using wet cleaning methods, since grease/moisture can leak from the ductwork components and damage the surrounding fabric. Table 10: Examples of Cleaning Methodology Generic Name Energy Source Removal Method Hand wipe Manual Hand scrape Manual Chemical Manual High pressure water wash (steam) Electrical or compressed air Blasting (remote or direct) using suitablemedium as appropriate Compressed air Wiping the surface of the ductwork Removing heavy deposits by hand scraping Softens or dissolves deposits making them suitable for hand scraping Vapour or liquid expelled at high pressure from lance to dislodge/dissolve deposits Blasting medium dislodges contaminant from duct and component surfaces to be removed via vacuum techniques or high volume filtered extraction. For further information www.thelondonandmidland.co.uk
  • 14. 7.31 Steam cleaning and high pressure water washing are not recommended for ductwork that is situated above false ceilings or in sensitive areas, due to possible leakage of contaminants from the duct, unless specifically designed for wet cleaning. 7.32 After applying wet cleaning methods care should be taken to ensure that any condensed vapours and cleaning fluids are removed from all parts of the system 7.33 The use of chemical cleaning agents should only be considered where a risk/COSHH assessment has been carried out (See Section 10), the details recorded and the effects of the applied chemicals have been assessed on the material construction, environment and for hazards to cleaning personnel. 7.34 It should be noted that it is not normally economically practicable to clean kitchen extract systems to a “like new” bright metal condition due to substratestaining. For further information www.londonandmidland.co.uk
  • 15. Frequency of Cleaning 7.35 The need for specialist cleaning of extract systems will depend on the level of usage of the cooking equipment, types and quantity of cooking and other risk factors such as vulnerability of the system to ignition and of the building and its occupant/users to system fire, hygiene, vermin and mechanical hazards. Typical cleaning intervals are shown in Table 11: Table 11: Frequency of Cleaning Heavy Use Moderate Use Light Use 12-16 hours per day 6-12 hours per day 2-6 hours per day - 3 monthly - 6 monthly - 12 monthly Note to Table 11 The canopy and canopy/extract plenum is an area of higher fire risk and consideration should be given to more frequent cleaning in accordance with insurance requirements (see 7.39) 7.36 The frequency of cleaning should be adjusted by means of system testing (inspection/ monitoring) - see paragraph 7.23, so that surface grease deposit limits in Table 9 are not exceeded. The buildings insurance companyshould be consulted to ensure that the cleaning regime is compliant with the terms of their specific warranty. For further information www.londonandmidland.co.uk
  • 16. 7.37 Any cleaning regime should be justified by a considered risk assessment. (The latest Fire Precautions Workplace, and Management of Health & Safety at Work Regulations apply). 7.38 Regular cleaning will result in an improved mean standard and reduce the costs of cleaning as deposits are not allowed to bake and harden. 7.43 On completion a report should be provided containing the following:The system(s) cleaned • Pre-clean measurements (as • per System Testing) • Post-clean measurements • Photographic records • Additional works carried out (if any) • COSHH data on any chemicals used • Recommendations for future • cleaning requirements • Observations on the condition of the ductwork system 7.39 Periodic specialist cleaning should be accompanied by daily or weekly cleaning of canopies, filters and associated drains and traps in accordance with manufacturers’ recommendations, typically carried out by 7.44 If specified, additional kitchen the kitchen operator. extract safety issues should also be reported (as outlined in paragraph 7.26). Post-Clean Verification of Cleanliness 7.45 The Post-Clean Verification of Cleanliness 7.40 The primary method of assessment is report should assist to serve as evidence visual. For cleaned system verification, the of system status to insurance assessors, surface should be visibly clean and capable Environmental Health Officers, landlord’s of meeting the level of cleanliness specified. agents, etc. 7.41 Verification of cleanliness should be by means of the Deposit Thickness Test or Wet Film Thickness Test as detailed in System Testing (Inspection/Monitoring) at paragraph The London & Midland Cleaning Co. LTD Lamoc House 7-9 Summer Hill Terrarce Birmingham B1 3RA 7.42 The level of cleanliness is that no single measurement should exceed 50μm Tel:0121 236 1448/4050 24hr:07445 823 580 Fax:0121 236 2704 For further information www.londonandmidland.co.uk