 Over all scope of work:-
 Transformer Routine testing
 Buchholze Relay Servicing and testing
 OTI /WTI testing and calibration
 Radiators maintenance
 Conservator Tank maintenance
 Oil Treatment
 Main tank and cover maintenance
 OLTC Maintenance
 Active part Maintenance
We are providing routine site testing before and after
overhauling to ensure Improvement of transformer
performance and quality. Routine testing of
transformer gives us a brief idea about its internal
heartiness and efficiency. We are providing all tastings
with suitable approved and calibrated testing
equipments and appropriate method as per Indian
standards. We are providing approved testing
certificate which is suitable for local energy suppliers
like GETCO, MSEB.. Etc.
Sr.No Name of Testing Purpose of Testing
Before Overhauling After Overhauling
1 Voltage ratio test To check present Voltage regulation To check Improvement in Voltage
regulation
2 Magnetic balance test To check present flux distribution in
core.
To check Improvement of flux
distribution in core.
3 Vector Group To verify Vector Group of Transformer
4 IR & PI value Test To check present winding insulation
resistance value.
To check improvement in
winding insulation resistance
value.
Buchholze relay is known as heart of transformer it is mounted
in between transformer main tank and conservator tank, its
function is to give alarm and tripping due to air lag in it at time
of fault generation. Healthiness and effectiveness of Buchholze
relay is most important. We are providing following services
regarding Buchholze relay in overhauling process to improve its
life and service.
Sr.No Service Benefit
1 Gasket replacement of Buchholze relay top
and bottom joint.
To avoid oil leakage from joint.
2 Gasket replacement of air realized and oil
drain plug
To avoid oil leakage from air realized and oil drain
plug.
3 Testing of mercury switch To check healthiness of Buchholze relay
4 Tightening of internal connection stud To prevent if from sparking.
5 Checking of Buchholze relay protection
system
a) To ensure healthiness of protection system of
Buchholze relay including circuit breaker,
enunciator and indicators.
b) Physical Checking of control cable to prevent
from earth fault and leakage.
OTI/ WTI are use for measurement of oil and winding
temperature respectively. Precision in temperature indication is
depends on healthiness of OTI and WTI meters. We are providing our
finest services during
overhauling to improve its effectiveness and efficiency.
OTI and WTI gives signal of alarm and trip signals to protection system
at the time of temperature rise beyond its set value.
Sr.No Services Benefit
1 Calibration of OTI/WTI To ensure its accuracy.
2 Testing of mercury switch To ensure healthiness of mercury switch.
3 Testing of OTI/WTI protection system a) To ensure healthiness of protection
system of OTI/WTI including circuit
breaker, enunciator and indicators.
b) Physical Checking of control cable to
prevent from earth fault and leakage
4 Setting of temperature for alarm and
tripping
To prevent transformer from over lading
and over heating which are main
reasons of transformer failures.
Radiators are most important part of transformer. Proper
designing and provision of radiators improves
transformer cooling so ultimate loading capacity and
life of transformer improves automatically. Internal
cleaning and maintenance of radiators prevents
overheating and oil leakage.
Sr.No Services Benefit
1 External cleaning of radiators and all joints. To improve its rusting and dusting resist
capacity.
2 Gasket replacement of Air realized and oil
drain valve of radiators
To make them free from leakage.
3 Gasket Replacement of Radiators and
radiators butterfly valve.
To Make radiators and valve section free
from leakage.
4 Replacement of nut bolts if required to provide proper fitting.
5 Internal cleaning of radiators with oil flushing inside radiators.
 Conservator tank it self indicates it s role in transformer
performance. Conservator tank is simply use for storage of extra transformer
oil that utilized by transformer at the time of heavy loading, what happens
actually at the time of loading hot and cold oil gets circulate in transformer via
radiators for cooling of transformer . at that time cold oil stored in conservator
goes down towards core and winding to make it cool. Silica gel breather is also
connected through conservator for cooling so pollution of air and all dust
partials also stores in conservator, plus due to that dust partials and
transformer oil, inside of conservator tank gets rusted and the whole rust and
dust stores in conservator so internal cleaning and maintenance of it is
necessary. IN SOME CASE DURING OVERHAULING WE FOUND MORE THAN 5KG
OF DUST AND RUSTS IN CONSERVATOR IN 15YEARS OLD TRANSFORMERS.
Sr.No Services Benefit
1 Gasket Replacement of conservator
main cover
To prevent it from oil leakage.
2 Internal & External cleaning of with wire brush to remove dust and rust.
3 Gaskets replacement of valves and
oil topping flange.
To prevent it from oil leakage.
4 Cleaning and gasket replacement oil MOG
5 Replacement of silica gel breather To provider dry air for transformer breathing.
6 Air cell filling if applicable.
7 Oil level glass and gasket set replacement
We are provides maintenance services regarding
transformer main tank cover as describe below. Main tank cover
contains pressure expansion vent which is use full to protect the
transformer at the time of un necessary pressure generates
inside transformer due to certain fault. We are also provides all
HT – LT Bushing cleaning with suitable cleaning material.
Sr.No Services
1 Gaskets replacement of main tank cover
2 Gasket and pressure die farm replacement of explosion vent
3 Gaskets replacement of all valves and air realized plug mounted on tank cover.
4 Cleaning of transformer tank cover with cleaning brush.
Transformer oil is made up from petroleum distinction. It is mainly carbon
composition, so it contains very good insulation and cooling property. But due to
dissolution of gases, impurities and continues heating cooling cycle its insulation
property gets spoil so its filtration and testing becomes necessary at the interval of
quarter or year.
We are providing oil filtration with dual filter high pressure vacuumed machine. We
are also providing approved oil BDV and DGA test certificates.
Sr.No Services Benefit
1 Oil filtration with high pressure vacuum
filtration machine.
To improve its quality and BDV
value.
2 BDV testing before overhauling To identify oil quality before
filtration
3 BDV testing after overhauling To check quality improvement after
filtration.
4 Oil circulation in transformer via oil filtration
machine
To improve IR and PI value of
Transformer
OLTC( Online tap changer) is a addition chamber
of transformer that use for changing output it voltage by
interchanging tap position of winding. OLTC chamber gets
addition oil and oil storage chamber . Due to operation of OLTC
tap changing switch at 11KV sparking and carbon generates on
its tap contact and rotating contacts. The generation and lagging
of heavy carbon spoils oil quality and ultimate transformer life
careless regarding oltc maintenance is a enough reason for
transformer failure.
Sr.No Services Benefit
1 Oil filtration of OLTC oil To make oil free from impurities and carbon
partials
2 Cleaning and proper thigh ting of OLTC internal contacts
3 OLTC top and bottom inspection window gasket replacements
4 OLTC mechanical and electrical operation testing
5 OLTC to panel wiring checking and maintenance
Core and winding is main part of
transformer. we are getting power transfer
and voltage regulation due to correct
design of active part.
paper insulation is used for coil winding. due to heating of oil
carbon particles and surges gets deposited on core and coil
portion. That surge and carbon particles increase the load
loss ( cu loss) of transformer. During overhauling we
removes that impurities via hot oil wash and physical
gentle cleaning of core and winding.
Sr.No Services Benefit
1 Hot oil wash of core and coil To make core and winding free from impurities
and surge that leads to loss reduction.
2 OFTC contacts cleaning , thigh ting and operation checking and smoothing.
3 OLTC switch gaskets
replacements
To make oltc switch free from oil leakage.
4 Physical inspection of
winding joints and tapping
conditions and maintenance
if required.
To avoid transformer failure and improve
transformer life.
5 Thigh ting of core clamps and core tie rods.
6 Gaskets and rubber rings replacement of HV and LV bushings.
We are providing quality painting with the help of air gun and
compressor. We are providing a high resistance anti corrosive paint to
improve metal corrosive resistance. We provides one layer of primer
and then after two layer of well known branded paints to make it
better and protected from weather conditions.
We are providing above mention services in transformer overhauling
and remaining
general maintenance work is mention hear: -
Sr.No Services
1 Cleaning and painting of transformer tank and cover
2 Cleaning and painting of conservator tank
3 Internal cleaning of transformer tank
4 Cleaning and painting of OLTC (if applicable)
5 Cleaning and painting of radiators.
6 Nut , bolt and washer replacement at every joints where required.
7 Shifting of transformer during overhauling if required.
TR OverHauling PPT

More Related Content

What's hot

Transformer oil-specifications new
Transformer oil-specifications newTransformer oil-specifications new
Transformer oil-specifications new
Molla Morshad
 
Testing and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation EquipmentsTesting and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation Equipments
Sumeet Ratnawat
 
Transformer Repair Workshop Report [EEE]
Transformer Repair Workshop Report [EEE] Transformer Repair Workshop Report [EEE]
Transformer Repair Workshop Report [EEE]
Nik Sharma
 
Transformer & OLTC
Transformer & OLTCTransformer & OLTC
Transformer & OLTCRohit Dave
 
Partial Discharge Test - Switchgear
Partial Discharge Test - Switchgear Partial Discharge Test - Switchgear
Partial Discharge Test - Switchgear
RajuGupta88
 
Transformer Oil Testing
Transformer Oil TestingTransformer Oil Testing
Transformer Oil Testing
engrsurif
 
Transformers in NTPC
Transformers in NTPCTransformers in NTPC
Transformers in NTPC
Sagnik Saha
 
2. station transformer 100 mva 230kv-datasheet revb
2. station transformer 100 mva 230kv-datasheet revb2. station transformer 100 mva 230kv-datasheet revb
2. station transformer 100 mva 230kv-datasheet revbVan Phuong Pham
 
Transformer maintenance
Transformer maintenance Transformer maintenance
Transformer maintenance
Molla Morshad
 
Buchholz relay
Buchholz relayBuchholz relay
Buchholz relay
malay ranjan
 
transformer protection
transformer protection transformer protection
transformer protection
jason adidela
 
Relay Setting Calculation For REF615/ REJ601
Relay Setting Calculation For REF615/ REJ601Relay Setting Calculation For REF615/ REJ601
Relay Setting Calculation For REF615/ REJ601
SARAVANAN A
 
Relay coordination
Relay coordinationRelay coordination
Relay coordination
D Målîk
 
Motor protection
Motor protectionMotor protection
Motor protection
H. Kheir
 
Furan Testing of Transformers Oil
Furan Testing of Transformers OilFuran Testing of Transformers Oil
Furan Testing of Transformers Oil
Nitish Kumar
 
Areva "Manufacturing of transformer, uses & it’s accessories"
Areva "Manufacturing of transformer, uses & it’s accessories"Areva "Manufacturing of transformer, uses & it’s accessories"
Areva "Manufacturing of transformer, uses & it’s accessories"
Harshit Srivastava
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
Nikhil Kachare
 
Substation Maintenance
Substation MaintenanceSubstation Maintenance
Substation Maintenance
karikalan123
 
Low voltage switchgear ppt
Low voltage switchgear pptLow voltage switchgear ppt
Low voltage switchgear ppt
Eleczo - The Electrical Zone
 
Practical handbook-for-relay-protection-engineers
Practical handbook-for-relay-protection-engineersPractical handbook-for-relay-protection-engineers
Practical handbook-for-relay-protection-engineers
SARAVANAN A
 

What's hot (20)

Transformer oil-specifications new
Transformer oil-specifications newTransformer oil-specifications new
Transformer oil-specifications new
 
Testing and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation EquipmentsTesting and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation Equipments
 
Transformer Repair Workshop Report [EEE]
Transformer Repair Workshop Report [EEE] Transformer Repair Workshop Report [EEE]
Transformer Repair Workshop Report [EEE]
 
Transformer & OLTC
Transformer & OLTCTransformer & OLTC
Transformer & OLTC
 
Partial Discharge Test - Switchgear
Partial Discharge Test - Switchgear Partial Discharge Test - Switchgear
Partial Discharge Test - Switchgear
 
Transformer Oil Testing
Transformer Oil TestingTransformer Oil Testing
Transformer Oil Testing
 
Transformers in NTPC
Transformers in NTPCTransformers in NTPC
Transformers in NTPC
 
2. station transformer 100 mva 230kv-datasheet revb
2. station transformer 100 mva 230kv-datasheet revb2. station transformer 100 mva 230kv-datasheet revb
2. station transformer 100 mva 230kv-datasheet revb
 
Transformer maintenance
Transformer maintenance Transformer maintenance
Transformer maintenance
 
Buchholz relay
Buchholz relayBuchholz relay
Buchholz relay
 
transformer protection
transformer protection transformer protection
transformer protection
 
Relay Setting Calculation For REF615/ REJ601
Relay Setting Calculation For REF615/ REJ601Relay Setting Calculation For REF615/ REJ601
Relay Setting Calculation For REF615/ REJ601
 
Relay coordination
Relay coordinationRelay coordination
Relay coordination
 
Motor protection
Motor protectionMotor protection
Motor protection
 
Furan Testing of Transformers Oil
Furan Testing of Transformers OilFuran Testing of Transformers Oil
Furan Testing of Transformers Oil
 
Areva "Manufacturing of transformer, uses & it’s accessories"
Areva "Manufacturing of transformer, uses & it’s accessories"Areva "Manufacturing of transformer, uses & it’s accessories"
Areva "Manufacturing of transformer, uses & it’s accessories"
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
 
Substation Maintenance
Substation MaintenanceSubstation Maintenance
Substation Maintenance
 
Low voltage switchgear ppt
Low voltage switchgear pptLow voltage switchgear ppt
Low voltage switchgear ppt
 
Practical handbook-for-relay-protection-engineers
Practical handbook-for-relay-protection-engineersPractical handbook-for-relay-protection-engineers
Practical handbook-for-relay-protection-engineers
 

Viewers also liked

Overhauling a 4stroke engine unit by amukotuwa special app
Overhauling a 4stroke engine unit by amukotuwa special appOverhauling a 4stroke engine unit by amukotuwa special app
Overhauling a 4stroke engine unit by amukotuwa special appGihan Amukotuwa
 
automobile Petrol Engine overhaul sinhala
automobile Petrol Engine overhaul sinhalaautomobile Petrol Engine overhaul sinhala
automobile Petrol Engine overhaul sinhala
Upul Priyashantha
 
Power Distribution Overview
Power Distribution OverviewPower Distribution Overview
Power Distribution Overview
HIMADRI BANERJI
 
Presentation on power distribution, operation and maintenance in comilla pbs 1
Presentation on power distribution, operation and maintenance in comilla pbs 1Presentation on power distribution, operation and maintenance in comilla pbs 1
Presentation on power distribution, operation and maintenance in comilla pbs 1
Kawsar Ahmed
 
Transformers protection, an introduction
Transformers protection, an introductionTransformers protection, an introduction
Transformers protection, an introduction
H. Kheir
 
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)ABB - TRANSFORMERS-PROTECTION-COURSE (2001)
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)J. FR
 
Ppt on protection of power transformers
Ppt on protection of power transformersPpt on protection of power transformers
Ppt on protection of power transformers
siddharam kantoli
 
Power transformer protection
Power transformer protectionPower transformer protection
Power transformer protection
michaeljmack
 
electrical distribution system ppt/13b61a0221
electrical distribution system ppt/13b61a0221electrical distribution system ppt/13b61a0221
electrical distribution system ppt/13b61a0221
saikrishna kandhikatla
 
Power transmission & distribution
Power transmission & distributionPower transmission & distribution
Power transmission & distribution
Prabhakaran Ravichandran
 
protection and relay scheme
protection and relay schemeprotection and relay scheme
protection and relay scheme
infosaneeshss
 
Electricity distribution system in india
Electricity distribution system in indiaElectricity distribution system in india
Electricity distribution system in india
Jasgt Singh
 
Electrical distribution system
Electrical distribution system Electrical distribution system
Electrical distribution system
Ankush Bharti
 
Protection of power transformer
Protection of power transformerProtection of power transformer
Protection of power transformer
Ritesh Verma
 

Viewers also liked (17)

Overhauling a 4stroke engine unit by amukotuwa special app
Overhauling a 4stroke engine unit by amukotuwa special appOverhauling a 4stroke engine unit by amukotuwa special app
Overhauling a 4stroke engine unit by amukotuwa special app
 
automobile Petrol Engine overhaul sinhala
automobile Petrol Engine overhaul sinhalaautomobile Petrol Engine overhaul sinhala
automobile Petrol Engine overhaul sinhala
 
Engine overhaul
Engine overhaulEngine overhaul
Engine overhaul
 
PowerPoin Overhaul
PowerPoin OverhaulPowerPoin Overhaul
PowerPoin Overhaul
 
Relay testing procedure
Relay testing procedure Relay testing procedure
Relay testing procedure
 
Power Distribution Overview
Power Distribution OverviewPower Distribution Overview
Power Distribution Overview
 
Presentation on power distribution, operation and maintenance in comilla pbs 1
Presentation on power distribution, operation and maintenance in comilla pbs 1Presentation on power distribution, operation and maintenance in comilla pbs 1
Presentation on power distribution, operation and maintenance in comilla pbs 1
 
Transformers protection, an introduction
Transformers protection, an introductionTransformers protection, an introduction
Transformers protection, an introduction
 
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)ABB - TRANSFORMERS-PROTECTION-COURSE (2001)
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)
 
Ppt on protection of power transformers
Ppt on protection of power transformersPpt on protection of power transformers
Ppt on protection of power transformers
 
Power transformer protection
Power transformer protectionPower transformer protection
Power transformer protection
 
electrical distribution system ppt/13b61a0221
electrical distribution system ppt/13b61a0221electrical distribution system ppt/13b61a0221
electrical distribution system ppt/13b61a0221
 
Power transmission & distribution
Power transmission & distributionPower transmission & distribution
Power transmission & distribution
 
protection and relay scheme
protection and relay schemeprotection and relay scheme
protection and relay scheme
 
Electricity distribution system in india
Electricity distribution system in indiaElectricity distribution system in india
Electricity distribution system in india
 
Electrical distribution system
Electrical distribution system Electrical distribution system
Electrical distribution system
 
Protection of power transformer
Protection of power transformerProtection of power transformer
Protection of power transformer
 

Similar to TR OverHauling PPT

Inspection and Testing of various electrical equipment
Inspection and Testing of various electrical equipmentInspection and Testing of various electrical equipment
Inspection and Testing of various electrical equipment
AkankshaSharma570781
 
IRJET- Systematic Steps in Overhauling of a Transformer
IRJET- Systematic Steps in Overhauling of a TransformerIRJET- Systematic Steps in Overhauling of a Transformer
IRJET- Systematic Steps in Overhauling of a Transformer
IRJET Journal
 
test paper - marking schedule
test paper - marking scheduletest paper - marking schedule
test paper - marking scheduleRichard Smith
 
Transformer
TransformerTransformer
Transformer
Cyber4Tech
 
high-Vacuum Transformer Oil Filtration And Dehydration Plants In India-AR ENGG.
high-Vacuum Transformer Oil Filtration And Dehydration Plants In India-AR ENGG.high-Vacuum Transformer Oil Filtration And Dehydration Plants In India-AR ENGG.
high-Vacuum Transformer Oil Filtration And Dehydration Plants In India-AR ENGG.
vitika12345
 
high-Vacuum Transformer Oil Filtration And Dehydration Plants In India-AR ENGG.
high-Vacuum Transformer Oil Filtration And Dehydration Plants In India-AR ENGG.high-Vacuum Transformer Oil Filtration And Dehydration Plants In India-AR ENGG.
high-Vacuum Transformer Oil Filtration And Dehydration Plants In India-AR ENGG.
vitika12345
 
GlobeCore transformer oil regeneration plant CMM 12R_ 4000
GlobeCore transformer oil regeneration plant CMM 12R_ 4000 GlobeCore transformer oil regeneration plant CMM 12R_ 4000
GlobeCore transformer oil regeneration plant CMM 12R_ 4000
GlobeCore
 
Industrial training in Transformer manufacturing company
Industrial training in Transformer manufacturing companyIndustrial training in Transformer manufacturing company
Industrial training in Transformer manufacturing company
Shridhar kulkarni
 
At6702 uw
At6702 uwAt6702 uw
At6702 uw
FAKKIR MOHAMED
 
AE2028 AEMR
AE2028 AEMRAE2028 AEMR
AE2028 AEMR
Aghilesh V
 
Transformer Overview.pptx
Transformer Overview.pptxTransformer Overview.pptx
Transformer Overview.pptx
ImranShah585030
 
transformers.ppt
transformers.ppttransformers.ppt
transformers.ppt
mohamedtaha40900
 
transformer Sales, after sales & service presentation
transformer Sales, after sales & service presentationtransformer Sales, after sales & service presentation
transformer Sales, after sales & service presentationFawaz Baik
 
Transformer oil
Transformer oilTransformer oil
Transformer oil
Tharuki De Silva
 
power transformer and its usage
power transformer and its usage power transformer and its usage
power transformer and its usage
gourav1245
 
Installation of power transformers
Installation of power transformersInstallation of power transformers
Installation of power transformers
Parul Patel
 
Agc wp-onloadtapchangerfiltsys
Agc wp-onloadtapchangerfiltsysAgc wp-onloadtapchangerfiltsys
Agc wp-onloadtapchangerfiltsys
AGC International, LLC
 
MTCB lab manual.docx Maintenance of transformer and Circuit Breaker B
MTCB lab manual.docx   Maintenance of transformer and Circuit Breaker BMTCB lab manual.docx   Maintenance of transformer and Circuit Breaker B
MTCB lab manual.docx Maintenance of transformer and Circuit Breaker B
parulmp07
 
Transformer Maintenance
Transformer Maintenance Transformer Maintenance
Transformer Maintenance
Molla Morshad
 
SEG Series.pptx
SEG Series.pptxSEG Series.pptx
SEG Series.pptx
JayeshChand2
 

Similar to TR OverHauling PPT (20)

Inspection and Testing of various electrical equipment
Inspection and Testing of various electrical equipmentInspection and Testing of various electrical equipment
Inspection and Testing of various electrical equipment
 
IRJET- Systematic Steps in Overhauling of a Transformer
IRJET- Systematic Steps in Overhauling of a TransformerIRJET- Systematic Steps in Overhauling of a Transformer
IRJET- Systematic Steps in Overhauling of a Transformer
 
test paper - marking schedule
test paper - marking scheduletest paper - marking schedule
test paper - marking schedule
 
Transformer
TransformerTransformer
Transformer
 
high-Vacuum Transformer Oil Filtration And Dehydration Plants In India-AR ENGG.
high-Vacuum Transformer Oil Filtration And Dehydration Plants In India-AR ENGG.high-Vacuum Transformer Oil Filtration And Dehydration Plants In India-AR ENGG.
high-Vacuum Transformer Oil Filtration And Dehydration Plants In India-AR ENGG.
 
high-Vacuum Transformer Oil Filtration And Dehydration Plants In India-AR ENGG.
high-Vacuum Transformer Oil Filtration And Dehydration Plants In India-AR ENGG.high-Vacuum Transformer Oil Filtration And Dehydration Plants In India-AR ENGG.
high-Vacuum Transformer Oil Filtration And Dehydration Plants In India-AR ENGG.
 
GlobeCore transformer oil regeneration plant CMM 12R_ 4000
GlobeCore transformer oil regeneration plant CMM 12R_ 4000 GlobeCore transformer oil regeneration plant CMM 12R_ 4000
GlobeCore transformer oil regeneration plant CMM 12R_ 4000
 
Industrial training in Transformer manufacturing company
Industrial training in Transformer manufacturing companyIndustrial training in Transformer manufacturing company
Industrial training in Transformer manufacturing company
 
At6702 uw
At6702 uwAt6702 uw
At6702 uw
 
AE2028 AEMR
AE2028 AEMRAE2028 AEMR
AE2028 AEMR
 
Transformer Overview.pptx
Transformer Overview.pptxTransformer Overview.pptx
Transformer Overview.pptx
 
transformers.ppt
transformers.ppttransformers.ppt
transformers.ppt
 
transformer Sales, after sales & service presentation
transformer Sales, after sales & service presentationtransformer Sales, after sales & service presentation
transformer Sales, after sales & service presentation
 
Transformer oil
Transformer oilTransformer oil
Transformer oil
 
power transformer and its usage
power transformer and its usage power transformer and its usage
power transformer and its usage
 
Installation of power transformers
Installation of power transformersInstallation of power transformers
Installation of power transformers
 
Agc wp-onloadtapchangerfiltsys
Agc wp-onloadtapchangerfiltsysAgc wp-onloadtapchangerfiltsys
Agc wp-onloadtapchangerfiltsys
 
MTCB lab manual.docx Maintenance of transformer and Circuit Breaker B
MTCB lab manual.docx   Maintenance of transformer and Circuit Breaker BMTCB lab manual.docx   Maintenance of transformer and Circuit Breaker B
MTCB lab manual.docx Maintenance of transformer and Circuit Breaker B
 
Transformer Maintenance
Transformer Maintenance Transformer Maintenance
Transformer Maintenance
 
SEG Series.pptx
SEG Series.pptxSEG Series.pptx
SEG Series.pptx
 

TR OverHauling PPT

  • 1.
  • 2.  Over all scope of work:-  Transformer Routine testing  Buchholze Relay Servicing and testing  OTI /WTI testing and calibration  Radiators maintenance  Conservator Tank maintenance  Oil Treatment  Main tank and cover maintenance  OLTC Maintenance  Active part Maintenance
  • 3. We are providing routine site testing before and after overhauling to ensure Improvement of transformer performance and quality. Routine testing of transformer gives us a brief idea about its internal heartiness and efficiency. We are providing all tastings with suitable approved and calibrated testing equipments and appropriate method as per Indian standards. We are providing approved testing certificate which is suitable for local energy suppliers like GETCO, MSEB.. Etc. Sr.No Name of Testing Purpose of Testing Before Overhauling After Overhauling 1 Voltage ratio test To check present Voltage regulation To check Improvement in Voltage regulation 2 Magnetic balance test To check present flux distribution in core. To check Improvement of flux distribution in core. 3 Vector Group To verify Vector Group of Transformer 4 IR & PI value Test To check present winding insulation resistance value. To check improvement in winding insulation resistance value.
  • 4. Buchholze relay is known as heart of transformer it is mounted in between transformer main tank and conservator tank, its function is to give alarm and tripping due to air lag in it at time of fault generation. Healthiness and effectiveness of Buchholze relay is most important. We are providing following services regarding Buchholze relay in overhauling process to improve its life and service. Sr.No Service Benefit 1 Gasket replacement of Buchholze relay top and bottom joint. To avoid oil leakage from joint. 2 Gasket replacement of air realized and oil drain plug To avoid oil leakage from air realized and oil drain plug. 3 Testing of mercury switch To check healthiness of Buchholze relay 4 Tightening of internal connection stud To prevent if from sparking. 5 Checking of Buchholze relay protection system a) To ensure healthiness of protection system of Buchholze relay including circuit breaker, enunciator and indicators. b) Physical Checking of control cable to prevent from earth fault and leakage.
  • 5. OTI/ WTI are use for measurement of oil and winding temperature respectively. Precision in temperature indication is depends on healthiness of OTI and WTI meters. We are providing our finest services during overhauling to improve its effectiveness and efficiency. OTI and WTI gives signal of alarm and trip signals to protection system at the time of temperature rise beyond its set value. Sr.No Services Benefit 1 Calibration of OTI/WTI To ensure its accuracy. 2 Testing of mercury switch To ensure healthiness of mercury switch. 3 Testing of OTI/WTI protection system a) To ensure healthiness of protection system of OTI/WTI including circuit breaker, enunciator and indicators. b) Physical Checking of control cable to prevent from earth fault and leakage 4 Setting of temperature for alarm and tripping To prevent transformer from over lading and over heating which are main reasons of transformer failures.
  • 6. Radiators are most important part of transformer. Proper designing and provision of radiators improves transformer cooling so ultimate loading capacity and life of transformer improves automatically. Internal cleaning and maintenance of radiators prevents overheating and oil leakage. Sr.No Services Benefit 1 External cleaning of radiators and all joints. To improve its rusting and dusting resist capacity. 2 Gasket replacement of Air realized and oil drain valve of radiators To make them free from leakage. 3 Gasket Replacement of Radiators and radiators butterfly valve. To Make radiators and valve section free from leakage. 4 Replacement of nut bolts if required to provide proper fitting. 5 Internal cleaning of radiators with oil flushing inside radiators.
  • 7.  Conservator tank it self indicates it s role in transformer performance. Conservator tank is simply use for storage of extra transformer oil that utilized by transformer at the time of heavy loading, what happens actually at the time of loading hot and cold oil gets circulate in transformer via radiators for cooling of transformer . at that time cold oil stored in conservator goes down towards core and winding to make it cool. Silica gel breather is also connected through conservator for cooling so pollution of air and all dust partials also stores in conservator, plus due to that dust partials and transformer oil, inside of conservator tank gets rusted and the whole rust and dust stores in conservator so internal cleaning and maintenance of it is necessary. IN SOME CASE DURING OVERHAULING WE FOUND MORE THAN 5KG OF DUST AND RUSTS IN CONSERVATOR IN 15YEARS OLD TRANSFORMERS. Sr.No Services Benefit 1 Gasket Replacement of conservator main cover To prevent it from oil leakage. 2 Internal & External cleaning of with wire brush to remove dust and rust. 3 Gaskets replacement of valves and oil topping flange. To prevent it from oil leakage. 4 Cleaning and gasket replacement oil MOG 5 Replacement of silica gel breather To provider dry air for transformer breathing. 6 Air cell filling if applicable. 7 Oil level glass and gasket set replacement
  • 8. We are provides maintenance services regarding transformer main tank cover as describe below. Main tank cover contains pressure expansion vent which is use full to protect the transformer at the time of un necessary pressure generates inside transformer due to certain fault. We are also provides all HT – LT Bushing cleaning with suitable cleaning material. Sr.No Services 1 Gaskets replacement of main tank cover 2 Gasket and pressure die farm replacement of explosion vent 3 Gaskets replacement of all valves and air realized plug mounted on tank cover. 4 Cleaning of transformer tank cover with cleaning brush.
  • 9. Transformer oil is made up from petroleum distinction. It is mainly carbon composition, so it contains very good insulation and cooling property. But due to dissolution of gases, impurities and continues heating cooling cycle its insulation property gets spoil so its filtration and testing becomes necessary at the interval of quarter or year. We are providing oil filtration with dual filter high pressure vacuumed machine. We are also providing approved oil BDV and DGA test certificates. Sr.No Services Benefit 1 Oil filtration with high pressure vacuum filtration machine. To improve its quality and BDV value. 2 BDV testing before overhauling To identify oil quality before filtration 3 BDV testing after overhauling To check quality improvement after filtration. 4 Oil circulation in transformer via oil filtration machine To improve IR and PI value of Transformer
  • 10. OLTC( Online tap changer) is a addition chamber of transformer that use for changing output it voltage by interchanging tap position of winding. OLTC chamber gets addition oil and oil storage chamber . Due to operation of OLTC tap changing switch at 11KV sparking and carbon generates on its tap contact and rotating contacts. The generation and lagging of heavy carbon spoils oil quality and ultimate transformer life careless regarding oltc maintenance is a enough reason for transformer failure. Sr.No Services Benefit 1 Oil filtration of OLTC oil To make oil free from impurities and carbon partials 2 Cleaning and proper thigh ting of OLTC internal contacts 3 OLTC top and bottom inspection window gasket replacements 4 OLTC mechanical and electrical operation testing 5 OLTC to panel wiring checking and maintenance
  • 11. Core and winding is main part of transformer. we are getting power transfer and voltage regulation due to correct design of active part. paper insulation is used for coil winding. due to heating of oil carbon particles and surges gets deposited on core and coil portion. That surge and carbon particles increase the load loss ( cu loss) of transformer. During overhauling we removes that impurities via hot oil wash and physical gentle cleaning of core and winding. Sr.No Services Benefit 1 Hot oil wash of core and coil To make core and winding free from impurities and surge that leads to loss reduction. 2 OFTC contacts cleaning , thigh ting and operation checking and smoothing. 3 OLTC switch gaskets replacements To make oltc switch free from oil leakage. 4 Physical inspection of winding joints and tapping conditions and maintenance if required. To avoid transformer failure and improve transformer life. 5 Thigh ting of core clamps and core tie rods. 6 Gaskets and rubber rings replacement of HV and LV bushings.
  • 12. We are providing quality painting with the help of air gun and compressor. We are providing a high resistance anti corrosive paint to improve metal corrosive resistance. We provides one layer of primer and then after two layer of well known branded paints to make it better and protected from weather conditions. We are providing above mention services in transformer overhauling and remaining general maintenance work is mention hear: - Sr.No Services 1 Cleaning and painting of transformer tank and cover 2 Cleaning and painting of conservator tank 3 Internal cleaning of transformer tank 4 Cleaning and painting of OLTC (if applicable) 5 Cleaning and painting of radiators. 6 Nut , bolt and washer replacement at every joints where required. 7 Shifting of transformer during overhauling if required.