Sub-station Maintenance
WEL- Maintained
Main Equipments in 33 KV Sub-Station
1) Power transformer
2) Circuit breaker
3) Isolator
4) Earthing switch
5) lightning arrestor
6) Busbar
7) Current transformer
8) Potential transformer
9) Protective relay
10) DC battery set
11)Capacitor bank
12)Fire fighting system
Power Transformer
Transformer is used to step down the voltage from 33 kV
voltage to 11kv voltage .
Maintenance of Transformers
.
Check Earth resistance
Check Oil level in main tank & OLTC tank.
Check the color of silica gel in breather ;it must be blue in
color .if it is turned pink then recondition it or replace it
Check On load Tap Changer Lower/Raise trail by Local & Remote.
Trip trail by draining oil in Buchholz relay
Tight all connections.
Check breakdown voltage of oil.
Clean the bushings.
Attend the oil leakages
Note Temperature of Oil & leakage
Current Transformer
Direct measurement of current in high voltage
system is not possible because of insulation problem
of measuring instruments. It is also not possible to
use current flowing through the system directly for
protection purpose due to its high value and high
insulation problem.
Basic functions of current transformers are:
 To reduce the line current to a value which is suitable for
standard measuring instruments, relays, etc.
 To isolate the measuring instruments namely meters, relays,
etc. from high voltage side of an installation.
 To protect measuring instruments against short circuit
currents.
 To sense abnormalities in current and to give current signals
to protective relays to isolate the defective system.
CT Earthing
Check the oil level
Oil leakages
Primary injection
Potential Transformer
Check the N earthing
Basic functions of potential
transformers are:
• To reduce the line voltage to a value
which is suitable for standard measuring
instruments, relays, etc.
• To isolate the measuring instruments,
meters, relays, etc. from high voltage side of
an installation.
• To sense abnormalities in voltage and
give voltage signals to protective relays to
isolate the defective system.
Single phase electromagnetic PT is
manufactured in two types:
1. Single Pole ( between lines & earth)
2. Double Pole (between line-to-line)
Energypac ensure quality test facility as to
IEC-76, VDE 0537, ANSI C 57.12 and BS 171
and every transformer are dispatched from the
factory after being tested properly and passing
quality requirements.
Potential Transformer consists of
 Primary and Secondary Windings
 Electromagnetic Core
 Bottom Tank and Oil Expansion Chamber
 Porcelain Bushing
Breaker
SUBSTATION EARTHING
Easy but most Important!!!!!!!!
Grounding-provided a low impedance path to earth.
Grounding Conductor- A conductor used to connect
equipment or the grounded circuit of a wiring system to a
grounding electrode that normally carry current.
Normally green colour conductor are used for
grounding
Substation Grounding-A Great Start !
All metallic components are bonded to earth-
-Breakers
-Transformer
-Structure
-Panels
-lighting shielding
-Relays
-metering equipment
Connect the control room earthing system
with grid
Grounding Multi panel
1. Total number of DTs(Distribution Transformer) in the
Division/Sub-division.
2. Monthly DT failure report in each sub-division. A separate
report in a uniformly prescribed format for each DT failure
3. Weekly/Monthly interruption report in a sub-division
4. Monthly record of consumer complaints and records of failure
against each DT.
5. Weekly
leakage of transformer oil.
6. Fortnightly
Oil Level in Transformer.
Operation of cooling fan in
manually and auto mode.
MAINTAINANCE SCHEDULE OF
TRANSFORMER
7. Monthly
Connections (HT & LT terminals)
Explosion vent
Pressure relief device
Watering to earthing Montly
8. Half yearly
Cable boxes, gasket joints .
Bushings .
9. Yearly
Oil in transformer.
Earth resistance.
Oil BDV(Break Down Voltage) test Yearly .
Transformer Input &Out put terminal
tightening Yearly.
Cleaning of transformer.
MAINTAINENCE SCHEDULE OF
33KV OUTDOOR BREAKER
 Inspection of the external condition
 checking correct function of position indicators and
interlocks
 Be sure the circuit breaker and its mechanism are
disconnected from all electric power, both high voltage
and control voltage, before it is inspected or repaired.
 After the circuit breaker has been disconnected from the
electrical power, attach the grounding leads properly
before touching any of the circuit breaker parts.
 Clean the insulating parts including the bushings.
 See that bolts, nuts, washers, cotter pins, and all
terminal connections are in place and tight.
 After maintenance of circuit breaker must operate the
breaker from local and remote position .
MAINTENANCE OF 11KV
SWITCHGEAR
 Proper condition of the switchgear should
be monitored by regular inspections.
 Inspection is primarily to constitute a
visual check for corrosion and moisture.
 Proper mechanical/electrical function of
the following facilities:
switching devices,
interlocking,
protection and signaling facilities

More Related Content

What's hot

Installation Operation & Maintenance of 33kV & 11kV Switchgear
Installation   Operation & Maintenance of 33kV & 11kV SwitchgearInstallation   Operation & Maintenance of 33kV & 11kV Switchgear
Installation Operation & Maintenance of 33kV & 11kV SwitchgearSheikh Nazmul Islam
 
Operation and maintenance of transformer
Operation and maintenance of transformerOperation and maintenance of transformer
Operation and maintenance of transformerKapil Singh
 
Presentation on substations
Presentation on substationsPresentation on substations
Presentation on substationsvishalgohel12195
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentationNadir Baloch
 
presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.Hemendra Kumar Rajput
 
Testing,maintenance&protection
Testing,maintenance&protectionTesting,maintenance&protection
Testing,maintenance&protectionRakesh Joshi
 
Presentation on Power transformer
Presentation on Power transformerPresentation on Power transformer
Presentation on Power transformerSudarshan Pandey
 
Switchgear Equipment in a Substation
Switchgear Equipment in a SubstationSwitchgear Equipment in a Substation
Switchgear Equipment in a SubstationMd. Atiqur Rahman
 
Unit 03 Protective relays
Unit  03 Protective relaysUnit  03 Protective relays
Unit 03 Protective relaysPremanandDesai
 
Transformer & OLTC
Transformer & OLTCTransformer & OLTC
Transformer & OLTCRohit Dave
 
Fault Level Calculation
Fault Level CalculationFault Level Calculation
Fault Level CalculationDinesh Sarda
 
Lv switchgear & lv cable sizing
Lv switchgear & lv cable sizingLv switchgear & lv cable sizing
Lv switchgear & lv cable sizingAsif Eqbal
 

What's hot (20)

Testing of transformer
Testing of transformerTesting of transformer
Testing of transformer
 
Panel designing
Panel designingPanel designing
Panel designing
 
Installation Operation & Maintenance of 33kV & 11kV Switchgear
Installation   Operation & Maintenance of 33kV & 11kV SwitchgearInstallation   Operation & Maintenance of 33kV & 11kV Switchgear
Installation Operation & Maintenance of 33kV & 11kV Switchgear
 
132 33kv substation
132 33kv substation132 33kv substation
132 33kv substation
 
Operation and maintenance of transformer
Operation and maintenance of transformerOperation and maintenance of transformer
Operation and maintenance of transformer
 
Presentation on substations
Presentation on substationsPresentation on substations
Presentation on substations
 
132 kv
132 kv132 kv
132 kv
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
 
presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.
 
Tap Changer
Tap ChangerTap Changer
Tap Changer
 
Testing,maintenance&protection
Testing,maintenance&protectionTesting,maintenance&protection
Testing,maintenance&protection
 
Presentation on Power transformer
Presentation on Power transformerPresentation on Power transformer
Presentation on Power transformer
 
Switchgear Equipment in a Substation
Switchgear Equipment in a SubstationSwitchgear Equipment in a Substation
Switchgear Equipment in a Substation
 
Buchholz relay
Buchholz relayBuchholz relay
Buchholz relay
 
Unit 03 Protective relays
Unit  03 Protective relaysUnit  03 Protective relays
Unit 03 Protective relays
 
SWITCHGEAR
SWITCHGEARSWITCHGEAR
SWITCHGEAR
 
Transformer & OLTC
Transformer & OLTCTransformer & OLTC
Transformer & OLTC
 
Vacuum circuit breaker
Vacuum circuit breakerVacuum circuit breaker
Vacuum circuit breaker
 
Fault Level Calculation
Fault Level CalculationFault Level Calculation
Fault Level Calculation
 
Lv switchgear & lv cable sizing
Lv switchgear & lv cable sizingLv switchgear & lv cable sizing
Lv switchgear & lv cable sizing
 

Similar to Maintenance schedule of Substation.

switchgearpresentation-151030171028-lva1-app6892.pptx
switchgearpresentation-151030171028-lva1-app6892.pptxswitchgearpresentation-151030171028-lva1-app6892.pptx
switchgearpresentation-151030171028-lva1-app6892.pptxDrNiveditaSingh3
 
Power transformer testing and commissioning guidelines r
Power transformer testing and commissioning guidelines rPower transformer testing and commissioning guidelines r
Power transformer testing and commissioning guidelines rAshish Patel
 
Switchgear & Rectifier ppt
Switchgear & Rectifier pptSwitchgear & Rectifier ppt
Switchgear & Rectifier pptvikas kumar
 
Ppt on 132 kv gss by ashok khoja
Ppt on  132 kv gss  by ashok khojaPpt on  132 kv gss  by ashok khoja
Ppt on 132 kv gss by ashok khojaASHOK KHOJA
 
Appraisal ppt ankur
Appraisal ppt ankurAppraisal ppt ankur
Appraisal ppt ankurAnkur Mishra
 
Presentation training
Presentation trainingPresentation training
Presentation trainingSrajan Raj
 
Transformer Repair Workshop Report [EEE]
Transformer Repair Workshop Report [EEE] Transformer Repair Workshop Report [EEE]
Transformer Repair Workshop Report [EEE] Nik Sharma
 
ppt on summer training on uppcl
ppt on summer training on uppclppt on summer training on uppcl
ppt on summer training on uppclSunny Daksh
 
PROTECTIVE DEVICES & MAINTENANCE.ppt
PROTECTIVE DEVICES & MAINTENANCE.pptPROTECTIVE DEVICES & MAINTENANCE.ppt
PROTECTIVE DEVICES & MAINTENANCE.pptQwer401863
 

Similar to Maintenance schedule of Substation. (20)

transformers.ppt
transformers.ppttransformers.ppt
transformers.ppt
 
POWER GRID
POWER GRIDPOWER GRID
POWER GRID
 
switchgearpresentation-151030171028-lva1-app6892.pptx
switchgearpresentation-151030171028-lva1-app6892.pptxswitchgearpresentation-151030171028-lva1-app6892.pptx
switchgearpresentation-151030171028-lva1-app6892.pptx
 
Power transformer testing and commissioning guidelines r
Power transformer testing and commissioning guidelines rPower transformer testing and commissioning guidelines r
Power transformer testing and commissioning guidelines r
 
Switchgear & Rectifier ppt
Switchgear & Rectifier pptSwitchgear & Rectifier ppt
Switchgear & Rectifier ppt
 
Ppt on 132 kv gss by ashok khoja
Ppt on  132 kv gss  by ashok khojaPpt on  132 kv gss  by ashok khoja
Ppt on 132 kv gss by ashok khoja
 
Heavy maintenance
Heavy maintenanceHeavy maintenance
Heavy maintenance
 
Appraisal ppt ankur
Appraisal ppt ankurAppraisal ppt ankur
Appraisal ppt ankur
 
Presentation training
Presentation trainingPresentation training
Presentation training
 
Voltage Regulation
Voltage RegulationVoltage Regulation
Voltage Regulation
 
Gss ppt by kanhaiya
Gss ppt  by kanhaiyaGss ppt  by kanhaiya
Gss ppt by kanhaiya
 
Transformer Repair Workshop Report [EEE]
Transformer Repair Workshop Report [EEE] Transformer Repair Workshop Report [EEE]
Transformer Repair Workshop Report [EEE]
 
Transformer
TransformerTransformer
Transformer
 
MV Switchgear from IEEE
MV Switchgear from IEEEMV Switchgear from IEEE
MV Switchgear from IEEE
 
Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Summer Training presentation on 132/33 KV sub-station Minto park, AllahabadSummer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad
 
ppt on summer training on uppcl
ppt on summer training on uppclppt on summer training on uppcl
ppt on summer training on uppcl
 
PROTECTIVE DEVICES & MAINTENANCE.ppt
PROTECTIVE DEVICES & MAINTENANCE.pptPROTECTIVE DEVICES & MAINTENANCE.ppt
PROTECTIVE DEVICES & MAINTENANCE.ppt
 
132 kV uppcl
132 kV uppcl132 kV uppcl
132 kV uppcl
 
Kde200 user manual
Kde200 user manualKde200 user manual
Kde200 user manual
 
ntpc
ntpcntpc
ntpc
 

Recently uploaded

HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 

Recently uploaded (20)

★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 

Maintenance schedule of Substation.

  • 3.
  • 4. Main Equipments in 33 KV Sub-Station 1) Power transformer 2) Circuit breaker 3) Isolator 4) Earthing switch 5) lightning arrestor 6) Busbar 7) Current transformer 8) Potential transformer 9) Protective relay 10) DC battery set 11)Capacitor bank 12)Fire fighting system
  • 5. Power Transformer Transformer is used to step down the voltage from 33 kV voltage to 11kv voltage .
  • 7. Check Oil level in main tank & OLTC tank.
  • 8. Check the color of silica gel in breather ;it must be blue in color .if it is turned pink then recondition it or replace it
  • 9. Check On load Tap Changer Lower/Raise trail by Local & Remote.
  • 10. Trip trail by draining oil in Buchholz relay
  • 11. Tight all connections. Check breakdown voltage of oil. Clean the bushings. Attend the oil leakages Note Temperature of Oil & leakage
  • 13. Direct measurement of current in high voltage system is not possible because of insulation problem of measuring instruments. It is also not possible to use current flowing through the system directly for protection purpose due to its high value and high insulation problem. Basic functions of current transformers are:  To reduce the line current to a value which is suitable for standard measuring instruments, relays, etc.  To isolate the measuring instruments namely meters, relays, etc. from high voltage side of an installation.  To protect measuring instruments against short circuit currents.  To sense abnormalities in current and to give current signals to protective relays to isolate the defective system.
  • 14. CT Earthing Check the oil level Oil leakages Primary injection
  • 16. Basic functions of potential transformers are: • To reduce the line voltage to a value which is suitable for standard measuring instruments, relays, etc. • To isolate the measuring instruments, meters, relays, etc. from high voltage side of an installation. • To sense abnormalities in voltage and give voltage signals to protective relays to isolate the defective system.
  • 17. Single phase electromagnetic PT is manufactured in two types: 1. Single Pole ( between lines & earth) 2. Double Pole (between line-to-line) Energypac ensure quality test facility as to IEC-76, VDE 0537, ANSI C 57.12 and BS 171 and every transformer are dispatched from the factory after being tested properly and passing quality requirements. Potential Transformer consists of  Primary and Secondary Windings  Electromagnetic Core  Bottom Tank and Oil Expansion Chamber  Porcelain Bushing
  • 18.
  • 20.
  • 21.
  • 22.
  • 23.
  • 24. SUBSTATION EARTHING Easy but most Important!!!!!!!! Grounding-provided a low impedance path to earth. Grounding Conductor- A conductor used to connect equipment or the grounded circuit of a wiring system to a grounding electrode that normally carry current. Normally green colour conductor are used for grounding
  • 25. Substation Grounding-A Great Start ! All metallic components are bonded to earth- -Breakers -Transformer -Structure -Panels -lighting shielding -Relays -metering equipment Connect the control room earthing system with grid
  • 27. 1. Total number of DTs(Distribution Transformer) in the Division/Sub-division. 2. Monthly DT failure report in each sub-division. A separate report in a uniformly prescribed format for each DT failure 3. Weekly/Monthly interruption report in a sub-division 4. Monthly record of consumer complaints and records of failure against each DT. 5. Weekly leakage of transformer oil. 6. Fortnightly Oil Level in Transformer. Operation of cooling fan in manually and auto mode. MAINTAINANCE SCHEDULE OF TRANSFORMER
  • 28. 7. Monthly Connections (HT & LT terminals) Explosion vent Pressure relief device Watering to earthing Montly 8. Half yearly Cable boxes, gasket joints . Bushings . 9. Yearly Oil in transformer. Earth resistance. Oil BDV(Break Down Voltage) test Yearly . Transformer Input &Out put terminal tightening Yearly. Cleaning of transformer.
  • 29. MAINTAINENCE SCHEDULE OF 33KV OUTDOOR BREAKER  Inspection of the external condition  checking correct function of position indicators and interlocks  Be sure the circuit breaker and its mechanism are disconnected from all electric power, both high voltage and control voltage, before it is inspected or repaired.  After the circuit breaker has been disconnected from the electrical power, attach the grounding leads properly before touching any of the circuit breaker parts.
  • 30.  Clean the insulating parts including the bushings.  See that bolts, nuts, washers, cotter pins, and all terminal connections are in place and tight.  After maintenance of circuit breaker must operate the breaker from local and remote position .
  • 31. MAINTENANCE OF 11KV SWITCHGEAR  Proper condition of the switchgear should be monitored by regular inspections.  Inspection is primarily to constitute a visual check for corrosion and moisture.  Proper mechanical/electrical function of the following facilities: switching devices, interlocking, protection and signaling facilities