Abstract

This paper consists of basic understanding of JIT and TQM philosophies, the inter-
linkages between these and challenges associated in their implementation.
Paper also discusses how JIT can feeds to the accomplishment of TQM. JIT and
TQM are perfectly complimentary to each other. The objective of both is to
expose and correct problems at source, so as to avoid wasting resources on
production of defective products. Paper illustrates how TQM and JIT can
enhance value for customers and at the same time can ensure higher profits for
firm.
Indus World School of Business

Introduction to TQM and JIT

Total Quality Management (TQM)

   Total quality management (TQM) is not a mere technique; it is a broad management approach or
   methodology and more than that a philosophy, dealing with processes and attitudes. TQM places
   quality as the primary objective for the organization, as opposed to the traditional management
   objective of maximizing production and subsequently controlling costs. Although, TQM was initially
   developed for the manufacturing environment, it can be equally applicable to any environment, which
   involves inputs and outputs, such as knowledge service industry like universities.

   Principles of TQM

   There is a goal of ‘Continuous Improvement’ against achieving some static level of quality. It is
   about approaching excellence in an incremental way without increasing cost. It considers quality as a
   continuous ongoing process. Quality is responsibility and mission of all. Hence all employees should
   be continuously trained and motivate to consistently achieve better and better quality. Even
   ‘Commitment of Top Management’ should be visible and clear to all.

   Instead of reactive and person dependent system, TQM is a ‘Proactive Systematic Approach’. This
   means ‘prevention and immediate detection of errors and problems at root source’ is preferred over of
   ‘correction for problems after its occurrence’. Responsibility for quality takes place at the source.
   This feature demands ‘Quality Design’ rather than inspection of quality after poor design.

   The essence of TQM is the simple but extremely powerful belief that it is better and hence cheaper; to
   do every process right at first time, rather than not to do it right and then corrects it afterwards. Doing
   things right at first time requires no money. Doing things wrong is what only costs money, as
   allowing defective products to get produced wastes time and resources. Thus, longer it takes to
   identify problem, more will be the cost incurred to correct it. TQM is systematic way of guaranteeing
   that all activities within an organization happen as planned. It is the management attitude that
   concerns with preventing problems at source, rather than allowing problems to occur and then
   correcting them afterwards.

   New and old cultures Comparison:

    Quality Element              Traditional                          TQM
    Definition                   Product Oriented                     Customer Oriented
    Priorities                   Second to service and cost           First among equals of service and
                                                                      cost
    Decisions                    Short term                           Long term
    Emphasis                     Detection                            Prevention
    Errors                       Operations                           System
    Responsibility               Quality control                      Everyone
    Problem Solving              Managers                             Teams
    Procurement                  Price                                Life cycle costs, Partnership
    Manager’s Role               Plan, assign, control, Delegate,     facilitate and mentor
                                 coach, and enforce




                                                                    Total Quality Management & Just In Time
Indus World School of Business



Building blocks of TQM: Purpose; Product; Process; Procedure; People (The 5Ps),
management systems and performance measurement

Everything we do is a Process which solves a purpose through a product (in fact all a customer need
is a service/benefit which he/she derive from that product). Every process transforms a set of inputs,
which can include action (performed by a set of people), methods and operations into the desired
outputs which satisfy the customers’ (internal or external) needs and expectations. In each area or
function within an organization there will be many processes taking place, and each can be analyzed
by an examination of the inputs and outputs to determine the action necessary to improve quality.
TQM is management and alignment of all the inputs depicted in diagram, in a direction that maximize
the value for customer.

The only point at which true responsibility for performance and quality can lie is with the People who
actually do the job or carry out the process, each of which has one or several suppliers and customers.

An efficient and effective way to tackle process or quality improvement is through teamwork.
However, people will not engage in improvement activities without commitment and recognition
from the organization’s leaders, a climate for improvement and a strategy that is implemented
thoughtfully and effectively.




                                                                                             Figure 1

TQM creates, encourages and nurtures simplicity, instead of bureaucratic approach of adding
controls. It attempts to identify and eliminate non-value-added activities thus naturally motivating
people to use quality procedures.



                                                               Total Quality Management & Just In Time
Indus World School of Business
   TQM attempts to expose problems rather than hide or burry them. ‘Just in Time (JIT)’ helps us to
   understand more on this. TQM identifies and addresses causes of problems, not effects.

Implementation of TQM

   TQM starts with a vision in mind which requires commitment. The whole process is
   displayed in following diagram.




                                                                                           Figure 2

It includes following steps -

Commitment                                         Quality control
   Vital for TQM                                      Coordinates all corporate efforts to TQM
   Should be visible and by example                   Members from each unit of the company
   Should be transmitted to each employee             Develops strategic plans
   Ultimate goal: satisfy customers!                  Addresses key questions for
   May need selling arguments                            implementation
                                                       Responsible of the TQM Mission
                                                          Statement


                                                              Total Quality Management & Just In Time
Indus World School of Business

Education                                           Organization
    On the business’ own interpretation and        Using the company’s structure an Using the
       implementation of TQM                        company’s structure an organization for quality
    Will require continuity                        should be developed based on:
    Needs to define who, what, how, how much,           Objectives
       and who is responsible                            Delegation
    Re-education is necessary education is              Accountability
       necessary                                         Achievement measurement
                                                         Efficient communication
Quality cost measurement                            Training
Methods to measure, document and analyze the cost        What is the difference between Education
of quality are required                                     and Training?
                                                         Thorough learning of tools and techniques
                                                            for quality improvement techniques
Quality improvement teams (QIT)                     Investigation and corrective actions
Functions:                   Characteristics       To reach the targets, the QIT should set a system
 Implement           unit     Intradepartmental    of:
    TQM                      Membership is open         Procedures
 Solve          problems      based on knowledge        Forms
    identified by goal         of the operation          Documentation
    setting                  The leader should
 Address local issues         know the business
                             Membership is finite
Quality Audit                                       Awareness
Feedback mechanism of TQM conducted by the               Continuous communication about the
quality council or senior managers                          TQM status and advances
Goals:                                                   Employs communication tools
     Verify reported quality improvements               Compatible with the company’s culture
     Verify the achievement of goals
     Confirm that improvements match targets
Recognition
          Achievements of individuals and groups should be made public
          Financial rewards should be included

  Here we can see it is a continuous process and one has to keep learning and making amendments
  continuously.

Just-In-time

   Just-In-time or JIT, is a management philosophy aimed at eliminating manufacturing wastes by
   producing only the right amount and combination of parts at the right place at the right time. It is also
   that ‘Just in Time (JIT)’ enforces ‘Continuous Improvement’ by continual reduction of non-value-
   added inventory stocks to lower and then further lower levels. This is based on the fact that wastes
   result from any activity that adds cost without adding value to the product, such as transferring of
   inventories from one place to another or even the mere act of storing them.

   The goal of JIT, therefore, is to minimize the presence of non-value-adding operations and non-
   moving inventories in the production line. This will result in shorter throughput times, better on-time



                                                                   Total Quality Management & Just In Time
Indus World School of Business
delivery performance, higher equipment utilization, lesser space requirement, lower costs, and greater
profits.

JIT was developed as a means of meeting customer demands with minimum delays. Thus, in the
olden days, JIT is used not to reduce manufacturing wastage, but primarily to produce goods so that
customer orders are met exactly when they need the products and in result create a pull of demand for
products rather than loading distribution channels with excess products. Another important aspect of
JIT is the use of a 'pull' system to move inventories through the production line. Under such a system,
the requirements of the next station are what modulate the production of a particular station. It is
therefore necessary under JIT to define a process by which the pulling of lots from one station to the
next is facilitated.

JIT is also known as lean production or stockless production, since the key behind a successful
implementation of JIT is the reduction of inventory levels at the various stations of the production
line to the absolute minimum. This necessitates good coordination between stations such that every
station produces only the exact volume that the next station needs (immediate customer of output).
On the other hand, a station pulls in only the exact volume that it needs from the preceding station.

The JIT system consists of defining the production flow and setting up the production floor such that
the flow of materials as they get manufactured through the line is smooth and unimpeded, thereby
reduce material waiting time. This requires that the capacities of the various workstations that the
materials pass through are evenly matched and balanced, such that bottlenecks in the production line
are eliminated. This set-up ensures that the materials will undergo manufacturing without queuing or
stoppage.

JIT is most applicable to operations or production flows that do not change, i.e., those that are simply
repeated over and over again. An example of this would be an automobile assembly line, wherein
every car undergoes the same production process as the one before it.

Some semiconductor companies have likewise practiced JIT successfully (e.g. Dell). Still, there are
some semiconductor companies that don’t practice JIT for the simple reason that their operations are
too complex for JIT application. On the other hand, that’s precisely the challenge of JIT – creation of
a production set-up that is simple enough to allow JIT.

With JIT, it is believed that the root causes of most problems are due to faulty production process
design. Hence, with JIT, nothing is taken for granted, everything is subject to analysis. Each activity
is identified as either ‘Value-Added’ or ‘Non-Value-Added’. The reduction of ‘Non-Value-Added’
activities is achieved mainly through increasing manufacturing flexibility and improved quality.

Inventory stocks allow production process to continue even when some problem occurs. In a way,
inventory stocks act like a buffers to hide any problem that may occur. But, with JIT, there are no
buffers to hide problems and thus, occurrence of problem can shut down the entire production
process. Thus, JIT philosophy helps organization to prominently expose problems and thus, bring a
clear focus on removal of it at source, by eliminating the cause, rather than effects, of problem.

JIT is an extremely powerful tool to identify where improvements should be made. It helps you to
identify cause (not the effect) of problem and its elimination. Failures and exceptions are treated as
opportunities to improve the system. In fact, JIT initiates failures due to problems to expose them. It
is a system of trouble-shooting, within a culture of constant analysis and improvement. It is clear, as
an attitude and approach, JIT and TQM are perfectly complimentary to each other, to expose and
correct problems at source, so as to avoid wasting resources on production of defective products.


                                                                Total Quality Management & Just In Time
Indus World School of Business

Evolution of JIT

   JIT finds its origin in Japan, where it has been in practice since the early 1970’s. It was developed and
   perfected by Taiichi Ohno of Toyota, who is now referred to as the father of JIT.

   Before the introduction of JIT, there were a lot of manufacturing defects for the existing system at
   that time. This included inventory problems, product defects, risen costs, and large lot production and
   delivery delays. The inventory problems included the unused accumulated inventory that was not
   only unproductive but also required a lot of efforts in storing and managing them. Other implied
   problems were parts storage, equipment breakdowns and uneven production levels. For the product
   defects, manufacturers knew that only one single product defect could destroy the producer’s
   credibility. They must create a defect free process. Thus began the search for the system that could
   bring about a turnaround.

   Springing from Japan's post World War II goal of full employment through industrialization,
   Japanese manufacturers imported technology to avoid heavy R & D expenditures and focused on
   improving the production process. Their aim was to increase product quality and reliability. Taiichi
   Ohio established Toyota as leaders in quality and delivery time through the implementation of JIT.
   This position was gained due to a commitment to two philosophies- elimination of waste and
   respect for people.

   Japanese developed what we today understand as Just-in-time, through intensive government
   supported work, and intended to improve their then inferior industries. Their programmers began by
   learning existing techniques from experts such as Deming and Juran. The characteristic of Japan like
   restrained spaces, no natural energy sources, no mineral wealth put it under pressure and appears to
   have banished complacency.

The Goal of JIT

   The prime goal of JIT is the achievement of zero inventories, minimal work in progress not just
   within the confine of a single organization, but ultimately throughout the entire supply chain.

   There are three main objectives.

          Increasing the organization’s ability to complete with others and remain competitive over the
           long run. The competitiveness of the firm is increased by the use of JIT manufacturing
           process as they can develop a more optimal process for their firms.
          Increasing efficiency within the production process. Efficiency is obtained through the
           increase of productivity and decrease of cost.
          Reducing wasted materials, time and effort. It can help to reduce the costs.

   Other objectives of JIT:

   Identify and response to consumers needs: Customer’s needs and wants seem to be the major focus
   for business. This objective will help the firm on what is demanded from customers, and what is
   required of production.
   Optimal quality cost relationship: The organization should focus on zero defect production process.
   Although it seems to be unrealistic, in the long run, it will eliminate a huge a huge amount of
   resources and efforts in inspecting, reworking & the production of defected goods.
   Develop a reliable relationship between the suppliers: A good and long long-term relationship
   between organization and its suppliers helps to manage a more efficient process in inventory


                                                                   Total Quality Management & Just In Time
Indus World School of Business
   management, material management and delivery system. It will also assure that the supply is stable
   and available when needed.
   Plant design for maximizing efficiency: The design of plant is essential in terms of manufacturing
   efficiency and utility of resources.
   Adopt the work for continuous improvement: Commit a long- term continuous improvement
   throughout the organization. It will help the organization to remain competitive in the long run.
   Reduce unwanted wastes: Wastes that do not add value to the products itself should be eliminated.
   JIT helps significantly in reducing wastes.

   JIT also helps in eliminating.
        Waste from overproduction
        Waste of waiting time
        Transportation waste
        Inventory Waste
        Waste of motion (energy)
        Waste from defects
   JIT can help an organization to remain competitive by offering consumers higher quality of products
   than their competitors, which is very important in the survival of the market place.

Challenges

   Though the objective of JIT is to reduce wastes at different levels of supply chain and to minimize the
   blockage of working capital throughout the supply chain, unfortunately majority of the manufacturing
   firms due to lack of integrity in whole supply chain exercise this concept to either to them only or to
   their first supplier. Due to lack of integrity in the supply chain the whole philosophy of JIT (i.e. to
   maximize customer’s value by reducing the redundant activities and redundant overheads) gets
   defeated.

   Manufacturers just pass the inventory overhead from their balance sheets to that of their suppliers (or
   sub-supplier/tier-2 suppliers). Which is not the JIT philosophy; it is more about taking whole supply
   chain as one system and making it efficient by reducing inventory blockages.

   One of the goals of JIT is to increase efficiency of supply chain but one can argue that it might reduce
   the efficiency of whole production system by increasing the risk of stock out of either inputs (raw
   material etc.) or output (i.e. finished goods). In both case it will lead to customer dissatisfaction.

   JIT may further multiply the bullwhip effect and can cause the distorted information flow through
   supply chain and thus may end up with shock out.

Conclusion
   Most of the discussions in prior studies have cantered on either JIT or TQM but an increasing
   number of researchers have begun to explore the issues relating to a joint implementation of
   JIT and TQM. Many previous studies have encountered difficulty in precisely listing the
   practices comprising JIT and TQM because of the extensive overlap between these
   approaches. The overlapping practices of JIT and TQM are more than coincidental and they
   may be mutually supportive.
   Manufacturing practices can be divided into three groups: unique JIT practices, unique TQM
   practices, and common infrastructure practices and evaluated their impacts on cycle time and
   quality (i.e. JIT and TQM performance measures, respectively). The use of TQM practices
   improved JIT performance through process variance reduction and reduced rework time,

                                                                   Total Quality Management & Just In Time
Indus World School of Business

    thereby providing the levels of quality that allow production to proceed with minimum safety
    stock inventory while remaining on schedule. In turn, the use of JIT practices improved
    quality performance through problem exposure and improved process feedback. Not only
    that there are relationships and interactions between JIT and TQM practices and
    performance, and JIT and TQM function effectively in isolation, their combination yields
    synergies for further performance improvements. While the unique JIT and TQM practices
    added predictive power of the JIT and TQM related performance, the most significant factor
    turned out to be the common infrastructure practices (including information feedback,
    management support, plant environment, workforce management, and supplier relationship).
    The companies implementing both JIT and TQM jointly outperform those implementing only
    one of these, or none.
    All major elements of JIT are embedded in a more comprehensive TQM campaign because
    TQM has a much broader focus on improving the overall effectiveness of an organization.
    Management should not treat JIT and TQM as being exclusive business strategies. Rather,
    management should take an integrated view of joint JIT-TQM implementation.




References


   Kristy O. Cua, Kathleen E. McKone, Roger G. Schroeder. Relationships between implementation of TQM, JIT,
    and TPM and manufacturing performance; Journal of Operations Management 19 (2001) 675–694.
   Steven W. Pool. The learning organization: motivating employees by integrating TQM philosophy in a
    supportive organizational culture; Leadership & Organization Development Journal 21/8 [2000] 373-378.
   Kumar V. JIT Based Quality Management: Concepts and Implications in Indian Context; International Journal
    of Engineering Science and Technology Vol.2(1), 2010, 40-50
   Mullarkey S., Jackson P.R. and Parker S.K. Employee reactions to JIT manufacturing practices: a two-phase
    investigation; International Journal of Operations & Production Management, Vol. 15 No. 11, 1995, pp. 62-
    79. © MCB University Press, 0144-3577


   Crosby, P. Quality is Free: the art of making quality certain; McGraw Hill. (Book)
   Crosby, P. Quality without Tears: The Art of Hassle-Free Management. McGraw-Hill. (Book)
   Kanishka B. Quality Management; Oxford University Press. (Book)


                                                                     Total Quality Management & Just In Time

TQM & JIT

  • 1.
    Total Quality Management & Just In Time In the Guidance of: Prof. S. Chakraborty By: Gagan Pardeep PG12 IWSB Indus World School Of Business 15A KP-II Gr. NOIDA U.P. Abstract This paper consists of basic understanding of JIT and TQM philosophies, the inter- linkages between these and challenges associated in their implementation. Paper also discusses how JIT can feeds to the accomplishment of TQM. JIT and TQM are perfectly complimentary to each other. The objective of both is to expose and correct problems at source, so as to avoid wasting resources on production of defective products. Paper illustrates how TQM and JIT can enhance value for customers and at the same time can ensure higher profits for firm.
  • 2.
    Indus World Schoolof Business Introduction to TQM and JIT Total Quality Management (TQM) Total quality management (TQM) is not a mere technique; it is a broad management approach or methodology and more than that a philosophy, dealing with processes and attitudes. TQM places quality as the primary objective for the organization, as opposed to the traditional management objective of maximizing production and subsequently controlling costs. Although, TQM was initially developed for the manufacturing environment, it can be equally applicable to any environment, which involves inputs and outputs, such as knowledge service industry like universities. Principles of TQM There is a goal of ‘Continuous Improvement’ against achieving some static level of quality. It is about approaching excellence in an incremental way without increasing cost. It considers quality as a continuous ongoing process. Quality is responsibility and mission of all. Hence all employees should be continuously trained and motivate to consistently achieve better and better quality. Even ‘Commitment of Top Management’ should be visible and clear to all. Instead of reactive and person dependent system, TQM is a ‘Proactive Systematic Approach’. This means ‘prevention and immediate detection of errors and problems at root source’ is preferred over of ‘correction for problems after its occurrence’. Responsibility for quality takes place at the source. This feature demands ‘Quality Design’ rather than inspection of quality after poor design. The essence of TQM is the simple but extremely powerful belief that it is better and hence cheaper; to do every process right at first time, rather than not to do it right and then corrects it afterwards. Doing things right at first time requires no money. Doing things wrong is what only costs money, as allowing defective products to get produced wastes time and resources. Thus, longer it takes to identify problem, more will be the cost incurred to correct it. TQM is systematic way of guaranteeing that all activities within an organization happen as planned. It is the management attitude that concerns with preventing problems at source, rather than allowing problems to occur and then correcting them afterwards. New and old cultures Comparison: Quality Element Traditional TQM Definition Product Oriented Customer Oriented Priorities Second to service and cost First among equals of service and cost Decisions Short term Long term Emphasis Detection Prevention Errors Operations System Responsibility Quality control Everyone Problem Solving Managers Teams Procurement Price Life cycle costs, Partnership Manager’s Role Plan, assign, control, Delegate, facilitate and mentor coach, and enforce Total Quality Management & Just In Time
  • 3.
    Indus World Schoolof Business Building blocks of TQM: Purpose; Product; Process; Procedure; People (The 5Ps), management systems and performance measurement Everything we do is a Process which solves a purpose through a product (in fact all a customer need is a service/benefit which he/she derive from that product). Every process transforms a set of inputs, which can include action (performed by a set of people), methods and operations into the desired outputs which satisfy the customers’ (internal or external) needs and expectations. In each area or function within an organization there will be many processes taking place, and each can be analyzed by an examination of the inputs and outputs to determine the action necessary to improve quality. TQM is management and alignment of all the inputs depicted in diagram, in a direction that maximize the value for customer. The only point at which true responsibility for performance and quality can lie is with the People who actually do the job or carry out the process, each of which has one or several suppliers and customers. An efficient and effective way to tackle process or quality improvement is through teamwork. However, people will not engage in improvement activities without commitment and recognition from the organization’s leaders, a climate for improvement and a strategy that is implemented thoughtfully and effectively. Figure 1 TQM creates, encourages and nurtures simplicity, instead of bureaucratic approach of adding controls. It attempts to identify and eliminate non-value-added activities thus naturally motivating people to use quality procedures. Total Quality Management & Just In Time
  • 4.
    Indus World Schoolof Business TQM attempts to expose problems rather than hide or burry them. ‘Just in Time (JIT)’ helps us to understand more on this. TQM identifies and addresses causes of problems, not effects. Implementation of TQM TQM starts with a vision in mind which requires commitment. The whole process is displayed in following diagram. Figure 2 It includes following steps - Commitment Quality control  Vital for TQM  Coordinates all corporate efforts to TQM  Should be visible and by example  Members from each unit of the company  Should be transmitted to each employee  Develops strategic plans  Ultimate goal: satisfy customers!  Addresses key questions for  May need selling arguments implementation  Responsible of the TQM Mission Statement Total Quality Management & Just In Time
  • 5.
    Indus World Schoolof Business Education Organization  On the business’ own interpretation and Using the company’s structure an Using the implementation of TQM company’s structure an organization for quality  Will require continuity should be developed based on:  Needs to define who, what, how, how much,  Objectives and who is responsible  Delegation  Re-education is necessary education is  Accountability necessary  Achievement measurement  Efficient communication Quality cost measurement Training Methods to measure, document and analyze the cost  What is the difference between Education of quality are required and Training?  Thorough learning of tools and techniques for quality improvement techniques Quality improvement teams (QIT) Investigation and corrective actions Functions:  Characteristics To reach the targets, the QIT should set a system  Implement unit Intradepartmental of: TQM  Membership is open  Procedures  Solve problems based on knowledge  Forms identified by goal of the operation  Documentation setting  The leader should  Address local issues know the business  Membership is finite Quality Audit Awareness Feedback mechanism of TQM conducted by the  Continuous communication about the quality council or senior managers TQM status and advances Goals:  Employs communication tools  Verify reported quality improvements  Compatible with the company’s culture  Verify the achievement of goals  Confirm that improvements match targets Recognition  Achievements of individuals and groups should be made public  Financial rewards should be included Here we can see it is a continuous process and one has to keep learning and making amendments continuously. Just-In-time Just-In-time or JIT, is a management philosophy aimed at eliminating manufacturing wastes by producing only the right amount and combination of parts at the right place at the right time. It is also that ‘Just in Time (JIT)’ enforces ‘Continuous Improvement’ by continual reduction of non-value- added inventory stocks to lower and then further lower levels. This is based on the fact that wastes result from any activity that adds cost without adding value to the product, such as transferring of inventories from one place to another or even the mere act of storing them. The goal of JIT, therefore, is to minimize the presence of non-value-adding operations and non- moving inventories in the production line. This will result in shorter throughput times, better on-time Total Quality Management & Just In Time
  • 6.
    Indus World Schoolof Business delivery performance, higher equipment utilization, lesser space requirement, lower costs, and greater profits. JIT was developed as a means of meeting customer demands with minimum delays. Thus, in the olden days, JIT is used not to reduce manufacturing wastage, but primarily to produce goods so that customer orders are met exactly when they need the products and in result create a pull of demand for products rather than loading distribution channels with excess products. Another important aspect of JIT is the use of a 'pull' system to move inventories through the production line. Under such a system, the requirements of the next station are what modulate the production of a particular station. It is therefore necessary under JIT to define a process by which the pulling of lots from one station to the next is facilitated. JIT is also known as lean production or stockless production, since the key behind a successful implementation of JIT is the reduction of inventory levels at the various stations of the production line to the absolute minimum. This necessitates good coordination between stations such that every station produces only the exact volume that the next station needs (immediate customer of output). On the other hand, a station pulls in only the exact volume that it needs from the preceding station. The JIT system consists of defining the production flow and setting up the production floor such that the flow of materials as they get manufactured through the line is smooth and unimpeded, thereby reduce material waiting time. This requires that the capacities of the various workstations that the materials pass through are evenly matched and balanced, such that bottlenecks in the production line are eliminated. This set-up ensures that the materials will undergo manufacturing without queuing or stoppage. JIT is most applicable to operations or production flows that do not change, i.e., those that are simply repeated over and over again. An example of this would be an automobile assembly line, wherein every car undergoes the same production process as the one before it. Some semiconductor companies have likewise practiced JIT successfully (e.g. Dell). Still, there are some semiconductor companies that don’t practice JIT for the simple reason that their operations are too complex for JIT application. On the other hand, that’s precisely the challenge of JIT – creation of a production set-up that is simple enough to allow JIT. With JIT, it is believed that the root causes of most problems are due to faulty production process design. Hence, with JIT, nothing is taken for granted, everything is subject to analysis. Each activity is identified as either ‘Value-Added’ or ‘Non-Value-Added’. The reduction of ‘Non-Value-Added’ activities is achieved mainly through increasing manufacturing flexibility and improved quality. Inventory stocks allow production process to continue even when some problem occurs. In a way, inventory stocks act like a buffers to hide any problem that may occur. But, with JIT, there are no buffers to hide problems and thus, occurrence of problem can shut down the entire production process. Thus, JIT philosophy helps organization to prominently expose problems and thus, bring a clear focus on removal of it at source, by eliminating the cause, rather than effects, of problem. JIT is an extremely powerful tool to identify where improvements should be made. It helps you to identify cause (not the effect) of problem and its elimination. Failures and exceptions are treated as opportunities to improve the system. In fact, JIT initiates failures due to problems to expose them. It is a system of trouble-shooting, within a culture of constant analysis and improvement. It is clear, as an attitude and approach, JIT and TQM are perfectly complimentary to each other, to expose and correct problems at source, so as to avoid wasting resources on production of defective products. Total Quality Management & Just In Time
  • 7.
    Indus World Schoolof Business Evolution of JIT JIT finds its origin in Japan, where it has been in practice since the early 1970’s. It was developed and perfected by Taiichi Ohno of Toyota, who is now referred to as the father of JIT. Before the introduction of JIT, there were a lot of manufacturing defects for the existing system at that time. This included inventory problems, product defects, risen costs, and large lot production and delivery delays. The inventory problems included the unused accumulated inventory that was not only unproductive but also required a lot of efforts in storing and managing them. Other implied problems were parts storage, equipment breakdowns and uneven production levels. For the product defects, manufacturers knew that only one single product defect could destroy the producer’s credibility. They must create a defect free process. Thus began the search for the system that could bring about a turnaround. Springing from Japan's post World War II goal of full employment through industrialization, Japanese manufacturers imported technology to avoid heavy R & D expenditures and focused on improving the production process. Their aim was to increase product quality and reliability. Taiichi Ohio established Toyota as leaders in quality and delivery time through the implementation of JIT. This position was gained due to a commitment to two philosophies- elimination of waste and respect for people. Japanese developed what we today understand as Just-in-time, through intensive government supported work, and intended to improve their then inferior industries. Their programmers began by learning existing techniques from experts such as Deming and Juran. The characteristic of Japan like restrained spaces, no natural energy sources, no mineral wealth put it under pressure and appears to have banished complacency. The Goal of JIT The prime goal of JIT is the achievement of zero inventories, minimal work in progress not just within the confine of a single organization, but ultimately throughout the entire supply chain. There are three main objectives.  Increasing the organization’s ability to complete with others and remain competitive over the long run. The competitiveness of the firm is increased by the use of JIT manufacturing process as they can develop a more optimal process for their firms.  Increasing efficiency within the production process. Efficiency is obtained through the increase of productivity and decrease of cost.  Reducing wasted materials, time and effort. It can help to reduce the costs. Other objectives of JIT: Identify and response to consumers needs: Customer’s needs and wants seem to be the major focus for business. This objective will help the firm on what is demanded from customers, and what is required of production. Optimal quality cost relationship: The organization should focus on zero defect production process. Although it seems to be unrealistic, in the long run, it will eliminate a huge a huge amount of resources and efforts in inspecting, reworking & the production of defected goods. Develop a reliable relationship between the suppliers: A good and long long-term relationship between organization and its suppliers helps to manage a more efficient process in inventory Total Quality Management & Just In Time
  • 8.
    Indus World Schoolof Business management, material management and delivery system. It will also assure that the supply is stable and available when needed. Plant design for maximizing efficiency: The design of plant is essential in terms of manufacturing efficiency and utility of resources. Adopt the work for continuous improvement: Commit a long- term continuous improvement throughout the organization. It will help the organization to remain competitive in the long run. Reduce unwanted wastes: Wastes that do not add value to the products itself should be eliminated. JIT helps significantly in reducing wastes. JIT also helps in eliminating.  Waste from overproduction  Waste of waiting time  Transportation waste  Inventory Waste  Waste of motion (energy)  Waste from defects JIT can help an organization to remain competitive by offering consumers higher quality of products than their competitors, which is very important in the survival of the market place. Challenges Though the objective of JIT is to reduce wastes at different levels of supply chain and to minimize the blockage of working capital throughout the supply chain, unfortunately majority of the manufacturing firms due to lack of integrity in whole supply chain exercise this concept to either to them only or to their first supplier. Due to lack of integrity in the supply chain the whole philosophy of JIT (i.e. to maximize customer’s value by reducing the redundant activities and redundant overheads) gets defeated. Manufacturers just pass the inventory overhead from their balance sheets to that of their suppliers (or sub-supplier/tier-2 suppliers). Which is not the JIT philosophy; it is more about taking whole supply chain as one system and making it efficient by reducing inventory blockages. One of the goals of JIT is to increase efficiency of supply chain but one can argue that it might reduce the efficiency of whole production system by increasing the risk of stock out of either inputs (raw material etc.) or output (i.e. finished goods). In both case it will lead to customer dissatisfaction. JIT may further multiply the bullwhip effect and can cause the distorted information flow through supply chain and thus may end up with shock out. Conclusion Most of the discussions in prior studies have cantered on either JIT or TQM but an increasing number of researchers have begun to explore the issues relating to a joint implementation of JIT and TQM. Many previous studies have encountered difficulty in precisely listing the practices comprising JIT and TQM because of the extensive overlap between these approaches. The overlapping practices of JIT and TQM are more than coincidental and they may be mutually supportive. Manufacturing practices can be divided into three groups: unique JIT practices, unique TQM practices, and common infrastructure practices and evaluated their impacts on cycle time and quality (i.e. JIT and TQM performance measures, respectively). The use of TQM practices improved JIT performance through process variance reduction and reduced rework time, Total Quality Management & Just In Time
  • 9.
    Indus World Schoolof Business thereby providing the levels of quality that allow production to proceed with minimum safety stock inventory while remaining on schedule. In turn, the use of JIT practices improved quality performance through problem exposure and improved process feedback. Not only that there are relationships and interactions between JIT and TQM practices and performance, and JIT and TQM function effectively in isolation, their combination yields synergies for further performance improvements. While the unique JIT and TQM practices added predictive power of the JIT and TQM related performance, the most significant factor turned out to be the common infrastructure practices (including information feedback, management support, plant environment, workforce management, and supplier relationship). The companies implementing both JIT and TQM jointly outperform those implementing only one of these, or none. All major elements of JIT are embedded in a more comprehensive TQM campaign because TQM has a much broader focus on improving the overall effectiveness of an organization. Management should not treat JIT and TQM as being exclusive business strategies. Rather, management should take an integrated view of joint JIT-TQM implementation. References  Kristy O. Cua, Kathleen E. McKone, Roger G. Schroeder. Relationships between implementation of TQM, JIT, and TPM and manufacturing performance; Journal of Operations Management 19 (2001) 675–694.  Steven W. Pool. The learning organization: motivating employees by integrating TQM philosophy in a supportive organizational culture; Leadership & Organization Development Journal 21/8 [2000] 373-378.  Kumar V. JIT Based Quality Management: Concepts and Implications in Indian Context; International Journal of Engineering Science and Technology Vol.2(1), 2010, 40-50  Mullarkey S., Jackson P.R. and Parker S.K. Employee reactions to JIT manufacturing practices: a two-phase investigation; International Journal of Operations & Production Management, Vol. 15 No. 11, 1995, pp. 62- 79. © MCB University Press, 0144-3577  Crosby, P. Quality is Free: the art of making quality certain; McGraw Hill. (Book)  Crosby, P. Quality without Tears: The Art of Hassle-Free Management. McGraw-Hill. (Book)  Kanishka B. Quality Management; Oxford University Press. (Book) Total Quality Management & Just In Time