Necessity of Materials Planning Material Planning is
necessary
• To avoid over ordering on under-ordering of materials.
• To reduce unwanted expenses due to last minute
ordering.
• To reduce capital locked up in excess.
• Independent Demand:
Demand for final products.
• Dependent Demand:

Demand fort items that are sub assemblies or
component parts to be used in production of finished
goods.
• It is a production planning process that starts from the
demand for finished products and plans the production
step by step of subassemblies and parts.
• Materials Requirements Planning (MRP) is a set of
techniques that takes the Master Production Schedule and
other information from inventory records and product
structure records as inputs to determine the requirements
and schedule of timing for each item.
• This inventory management system is appropriate for items that
have a dependent demand .
• MRP is applicable for industries that offer a variety of finished

products where the customer is allowed to choose among many
different options.
• MRP is most appropriate when the manufacturing environment
is complex and uncertain.
Control inventory levels

Assign operating priorities

Plan capacity to load the
production system
• Master Production Schedule (MPS)
• Bills of materials (BOM)
• Inventory status file
• Lead time
• Primary reports
1. Work orders
2. Purchase orders
3. Action notices or rescheduling notices
• Secondary reports
1. Exception reports

2. Planning reports
3. Performance Control reports
• Inventory transaction
• A listing of all of the raw materials, parts, subassemblies, and
assemblies needed to produce one unit of a product .
• BOM Shows way a finished product or parent item is put together
from individual components.
• Parent item shown at highest level or level zero , Parts that go into
parent item are called level 1 components and so on.
• Production planners explode BOM to determine the number, due
dates, and order dates of subcomponents.
• Based on actual customer orders and predicted demand.
• Indicates when each ordered item will be produced in coming
weeks, and in how much quantity.

• It is a plan specifying timing and quantity of production for
each end item.
• MPS inputs come from sales and marketing .
• MPS covers about 1-3 months into the future.
• Detailed information regarding the quantity of each item,
available in hand, on order to be released, for use in various
time periods.

• MRP system using inventory master file is used to determine the
quantity of material available for use in a given period.
• If sufficient items not available , the system includes the item on
the planned order release report .
• Also known as Inventory Master File
• Primary reports
1. Work orders / Planned orders - schedule indicating the
amount and timing of future orders.

2. Order Release - Authorization for the execution of planned
orders.
3. Action Notices or Rescheduling Notices - which orders are
to be released, revised and canceled during the current time
period.
• Secondary Reports
1. Performance control Reports – evaluate system operations . They
aid in measuring deviations from plans, and also provide information
to assess cost performance.
2. Planning Reports – are useful to forecast future inventory
requirements.
3. Exception Reports – these help to find the major discrepancies
such as late and overdue orders, excessive scrap rates, reporting
errors, etc.
• Exploding and Offsetting
• Gross and Net Requirements
• Releasing Orders
• Low level Coding and Netting
• Lead time – it is the time needed to perform the process . It
includes order preparation, queuing, processing moving receiving
and inspecting time as well as any expected delays.

• Exploding the requirements – it is the process of multiplying the
requirements by usage quantity of each item and recording the
appropriate requirements throughout the product tree.
• Offsetting – it is a process of placing the exploded requirements
in their proper periods based on lead time.
• Gross Requirement - Total expected demand of the product.
• Net Requirements - Actual amount needed in each time period.
Net Requirements = Gross Requirement – available inventory
• Planned on hand - Expected inventory on hand at the beginning of
each time period.
• Planned-order receipts - Quantity expected to received at the
beginning of the period
• Planned-order releases - Planned amount to order in each time
period
• Releasing an order – means authorization is given to buy the
necessary material or to manufacturing of required component.
• Scheduled Receipts – are orders placed on manufacturing or

on a vendor and represent a commitment to make or buy.
• Now, considering Scheduled Receipts,
Net Requirement = Gross Requirement – Scheduled Receipts –
available inventory
• Netting – is a process in which any stock on hand is subtracted from
the gross requirement determined through explosion, giving the
quantity of each item needed to manufacture the required finished
products.

• Low Level Code – is the lowest level on which a part resides in all
bills of material.
Low level codes are determined by starting at lowest level of bill of

material and working up, recording the level against the part. If part
exists on higher level, its existence on the lower level is already
recorded.
• Time buckets - The column in an inventory record that
represents a unit of time. It may be in days or weeks.

• Action bucket - The current time period.
• Action notices - Output from the MRP system identifying the
need for an action, to avoid future problem.
• Planning Horizon – is the total number of periods in a record.
• Keep inventory levels to a cost-effective minimum.
• Keeps track of inventory that is used.
• Tracks the amount of material that is required .

• Set safety stock levels for emergencies.
• Determine the best lot sizes to fulfill orders.
• Set up production times among the separate manufacturing
stages.
• Plan for future needs of raw
• Inaccurate information can result in mis-planning , overstock,
under-stock, or lack of appropriate resources.
• The inaccurate master schedule will provide wrong lengths of

time for production . Hence affecting planning.
• MRP systems can be costly and time-consuming to set up.
Manufacturing resource planning (MRPII) is defined as a method
for the effective planning of all resources of a manufacturing
company. Ideally, it addresses operational planning in units and

financial planning .
This is not exclusively a software function, but a combination of
people skills, dedication to data base accuracy, and computer
resources. It is a total company management concept for using
human resources which is used more productively.
• Business Planning
• Purchasing

• Distribution Requirement

Scheduling

• Forecasting

• Service Requirement Planning

• Inventory Control

• Capacity Requirement Planning

• Order Entry And

• Accounting

Management
• Shop Floor Control
• Faster Production Scheduling
• More efficient use of resources
Reduced inventories
Less idle time

Fewer bottlenecks
• Better priority planning
Quicker production starts
Schedule flexibility
• Improved customer service
Meet delivery dates

Improved quality
Lower price possibility
• Improved employee moral
• Better management information
• Error Due To Poor Information
• Use of averages
MRP I and MRP II

More Related Content

What's hot

Aggregate planning
Aggregate planningAggregate planning
Aggregate planningAtif Ghayas
 
Material requirement planning - Production and Operation Management
Material requirement planning - Production and Operation ManagementMaterial requirement planning - Production and Operation Management
Material requirement planning - Production and Operation ManagementSuryakumar Thangarasu
 
Material resource planning
Material resource planningMaterial resource planning
Material resource planningNishant Agrawal
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and ControlNishant Agrawal
 
Material requirement planning (mrp1)
Material requirement planning (mrp1)Material requirement planning (mrp1)
Material requirement planning (mrp1)saleh asgari
 
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL Junaid Hassan
 
small and effective ppt on master production schedule
small and effective ppt on master production schedulesmall and effective ppt on master production schedule
small and effective ppt on master production scheduleyashbhhardwaj260
 
Master production schedule
Master production scheduleMaster production schedule
Master production scheduleyashbhhardwaj260
 
Introduction to production planning and control
Introduction to production planning and controlIntroduction to production planning and control
Introduction to production planning and controlMohanKirthik
 
material requirement planning
material requirement planningmaterial requirement planning
material requirement planningNaushii Khan
 
Material Requirement Planning (MRP)
Material Requirement Planning (MRP)Material Requirement Planning (MRP)
Material Requirement Planning (MRP) Konok Mondal
 
types of production system
types of production systemtypes of production system
types of production systemram4181
 
INVENTORY MANAGEMENT
INVENTORY MANAGEMENT INVENTORY MANAGEMENT
INVENTORY MANAGEMENT Zamri Yahya
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL AttiMurugan
 

What's hot (20)

Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Material requirement planning - Production and Operation Management
Material requirement planning - Production and Operation ManagementMaterial requirement planning - Production and Operation Management
Material requirement planning - Production and Operation Management
 
PPT ON Just in time technique (JIT)
PPT ON Just in time technique (JIT)PPT ON Just in time technique (JIT)
PPT ON Just in time technique (JIT)
 
Material resource planning
Material resource planningMaterial resource planning
Material resource planning
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
 
Material requirement planning (mrp1)
Material requirement planning (mrp1)Material requirement planning (mrp1)
Material requirement planning (mrp1)
 
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
 
Mrp ii
Mrp iiMrp ii
Mrp ii
 
small and effective ppt on master production schedule
small and effective ppt on master production schedulesmall and effective ppt on master production schedule
small and effective ppt on master production schedule
 
Master production schedule
Master production scheduleMaster production schedule
Master production schedule
 
Introduction to production planning and control
Introduction to production planning and controlIntroduction to production planning and control
Introduction to production planning and control
 
Kanban system presentation
Kanban system presentationKanban system presentation
Kanban system presentation
 
material requirement planning
material requirement planningmaterial requirement planning
material requirement planning
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Material Requirement Planning (MRP)
Material Requirement Planning (MRP)Material Requirement Planning (MRP)
Material Requirement Planning (MRP)
 
types of production system
types of production systemtypes of production system
types of production system
 
UNIT 4 - PRODUCTION SCHEDULING
UNIT 4 - PRODUCTION SCHEDULINGUNIT 4 - PRODUCTION SCHEDULING
UNIT 4 - PRODUCTION SCHEDULING
 
Types of layout
Types of layoutTypes of layout
Types of layout
 
INVENTORY MANAGEMENT
INVENTORY MANAGEMENT INVENTORY MANAGEMENT
INVENTORY MANAGEMENT
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
 

Viewers also liked

Logistics Strategy
Logistics StrategyLogistics Strategy
Logistics Strategyhanson han
 
MRP II - Manufacturing Resource Planning ( Planejamento de Recursos de Produção)
MRP II - Manufacturing Resource Planning ( Planejamento de Recursos de Produção)MRP II - Manufacturing Resource Planning ( Planejamento de Recursos de Produção)
MRP II - Manufacturing Resource Planning ( Planejamento de Recursos de Produção)Sidnei Reis
 
58262864 09-administracao-financeira-do-estoque
58262864 09-administracao-financeira-do-estoque58262864 09-administracao-financeira-do-estoque
58262864 09-administracao-financeira-do-estoqueTeodosio Junior
 
MRP1 vs MRP2
MRP1 vs MRP2MRP1 vs MRP2
MRP1 vs MRP2Ari Limpo
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentationjhanakshah
 
Mrp MRPII Erp Implementation
Mrp MRPII Erp ImplementationMrp MRPII Erp Implementation
Mrp MRPII Erp ImplementationAnand Subramaniam
 

Viewers also liked (14)

Logistics Strategy
Logistics StrategyLogistics Strategy
Logistics Strategy
 
Facility location
Facility locationFacility location
Facility location
 
MRP II
MRP II MRP II
MRP II
 
MRP II - Manufacturing Resource Planning ( Planejamento de Recursos de Produção)
MRP II - Manufacturing Resource Planning ( Planejamento de Recursos de Produção)MRP II - Manufacturing Resource Planning ( Planejamento de Recursos de Produção)
MRP II - Manufacturing Resource Planning ( Planejamento de Recursos de Produção)
 
58262864 09-administracao-financeira-do-estoque
58262864 09-administracao-financeira-do-estoque58262864 09-administracao-financeira-do-estoque
58262864 09-administracao-financeira-do-estoque
 
QUALITY & COST
QUALITY & COSTQUALITY & COST
QUALITY & COST
 
Aula de mrp
Aula de mrpAula de mrp
Aula de mrp
 
MRP1 vs MRP2
MRP1 vs MRP2MRP1 vs MRP2
MRP1 vs MRP2
 
Aula mrp
Aula  mrpAula  mrp
Aula mrp
 
Logistics ppt
Logistics pptLogistics ppt
Logistics ppt
 
Plant layout
Plant layoutPlant layout
Plant layout
 
Ergonomics
ErgonomicsErgonomics
Ergonomics
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentation
 
Mrp MRPII Erp Implementation
Mrp MRPII Erp ImplementationMrp MRPII Erp Implementation
Mrp MRPII Erp Implementation
 

Similar to MRP I and MRP II

Presentation2 mrp
Presentation2 mrpPresentation2 mrp
Presentation2 mrpgsuicmez
 
Module 3 - Aggregate Planning Tacticts2.pptx
Module 3 - Aggregate Planning Tacticts2.pptxModule 3 - Aggregate Planning Tacticts2.pptx
Module 3 - Aggregate Planning Tacticts2.pptxShivakumar Malagihal
 
Session 6-7-8 MRP.pptx PPC MBA Sem IV IB
Session 6-7-8 MRP.pptx PPC MBA Sem IV IBSession 6-7-8 MRP.pptx PPC MBA Sem IV IB
Session 6-7-8 MRP.pptx PPC MBA Sem IV IBDrDeeptiSharma12
 
Mrp systems & scheduling
Mrp systems & schedulingMrp systems & scheduling
Mrp systems & schedulingvarun0610
 
Material Requirements Planning (MRP).pptx
Material Requirements Planning (MRP).pptxMaterial Requirements Planning (MRP).pptx
Material Requirements Planning (MRP).pptxIrelynJasmin
 
Material requirement planning (mrp)
Material requirement planning (mrp)Material requirement planning (mrp)
Material requirement planning (mrp)Somashekar S.M
 
Planning Process and CBP V1.1.ppt
Planning Process and CBP V1.1.pptPlanning Process and CBP V1.1.ppt
Planning Process and CBP V1.1.pptSwayamTiwari12
 
Manish 13 mrp2
Manish 13 mrp2Manish 13 mrp2
Manish 13 mrp2samjune
 
SAP MM PP Material requirement planning
SAP MM PP Material requirement planning SAP MM PP Material requirement planning
SAP MM PP Material requirement planning Lokesh Modem
 
Inventory management
Inventory managementInventory management
Inventory managementRajThakuri
 
material requirements planning
material requirements planningmaterial requirements planning
material requirements planningAmalia Syafitri
 
Material Requirements planning system 01Page to 04 Page
Material Requirements planning system                      01Page to 04 PageMaterial Requirements planning system                      01Page to 04 Page
Material Requirements planning system 01Page to 04 PageHasibul Islam
 
CAPP, MRP, CRP, CAQC (model 2)
CAPP, MRP, CRP, CAQC (model 2) CAPP, MRP, CRP, CAQC (model 2)
CAPP, MRP, CRP, CAQC (model 2) Deepika V S
 
Sap mrp materials requirements planning
Sap mrp   materials requirements planningSap mrp   materials requirements planning
Sap mrp materials requirements planningmadhu jetty
 
SCM 304 Supply Chain Management Material Requirements .docx
SCM 304 Supply Chain Management Material Requirements .docxSCM 304 Supply Chain Management Material Requirements .docx
SCM 304 Supply Chain Management Material Requirements .docxbagotjesusa
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and controlLaxmikant Deshmukh
 

Similar to MRP I and MRP II (20)

Presentation2 mrp
Presentation2 mrpPresentation2 mrp
Presentation2 mrp
 
Module 3 - Aggregate Planning Tacticts2.pptx
Module 3 - Aggregate Planning Tacticts2.pptxModule 3 - Aggregate Planning Tacticts2.pptx
Module 3 - Aggregate Planning Tacticts2.pptx
 
MRP & ERP.pdf
MRP & ERP.pdfMRP & ERP.pdf
MRP & ERP.pdf
 
Session 6-7-8 MRP.pptx PPC MBA Sem IV IB
Session 6-7-8 MRP.pptx PPC MBA Sem IV IBSession 6-7-8 MRP.pptx PPC MBA Sem IV IB
Session 6-7-8 MRP.pptx PPC MBA Sem IV IB
 
Mrp systems & scheduling
Mrp systems & schedulingMrp systems & scheduling
Mrp systems & scheduling
 
Erp chapter 3
Erp chapter 3Erp chapter 3
Erp chapter 3
 
Material Requirements Planning (MRP).pptx
Material Requirements Planning (MRP).pptxMaterial Requirements Planning (MRP).pptx
Material Requirements Planning (MRP).pptx
 
Material requirement planning (mrp)
Material requirement planning (mrp)Material requirement planning (mrp)
Material requirement planning (mrp)
 
Planning Process and CBP V1.1.ppt
Planning Process and CBP V1.1.pptPlanning Process and CBP V1.1.ppt
Planning Process and CBP V1.1.ppt
 
Manish 13 mrp2
Manish 13 mrp2Manish 13 mrp2
Manish 13 mrp2
 
SAP MM PP Material requirement planning
SAP MM PP Material requirement planning SAP MM PP Material requirement planning
SAP MM PP Material requirement planning
 
Inventory management
Inventory managementInventory management
Inventory management
 
material requirements planning
material requirements planningmaterial requirements planning
material requirements planning
 
Material Requirements planning system 01Page to 04 Page
Material Requirements planning system                      01Page to 04 PageMaterial Requirements planning system                      01Page to 04 Page
Material Requirements planning system 01Page to 04 Page
 
CAPP, MRP, CRP, CAQC (model 2)
CAPP, MRP, CRP, CAQC (model 2) CAPP, MRP, CRP, CAQC (model 2)
CAPP, MRP, CRP, CAQC (model 2)
 
Sap mrp materials requirements planning
Sap mrp   materials requirements planningSap mrp   materials requirements planning
Sap mrp materials requirements planning
 
SCM 304 Supply Chain Management Material Requirements .docx
SCM 304 Supply Chain Management Material Requirements .docxSCM 304 Supply Chain Management Material Requirements .docx
SCM 304 Supply Chain Management Material Requirements .docx
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 
MRP
MRPMRP
MRP
 
Sap mrp
Sap mrpSap mrp
Sap mrp
 

Recently uploaded

Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...lizamodels9
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Non Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxNon Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxAbhayThakur200703
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 

Recently uploaded (20)

Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Non Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxNon Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptx
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 

MRP I and MRP II

  • 1. PRESENTED BY: Rincy Joseph Surbhi Gupta Sugandha Vidge Parana Vijay Dulguun Turbat (69) (71) (80) (110)
  • 2. Necessity of Materials Planning Material Planning is necessary • To avoid over ordering on under-ordering of materials. • To reduce unwanted expenses due to last minute ordering. • To reduce capital locked up in excess.
  • 3. • Independent Demand: Demand for final products. • Dependent Demand: Demand fort items that are sub assemblies or component parts to be used in production of finished goods.
  • 4. • It is a production planning process that starts from the demand for finished products and plans the production step by step of subassemblies and parts. • Materials Requirements Planning (MRP) is a set of techniques that takes the Master Production Schedule and other information from inventory records and product structure records as inputs to determine the requirements and schedule of timing for each item.
  • 5. • This inventory management system is appropriate for items that have a dependent demand . • MRP is applicable for industries that offer a variety of finished products where the customer is allowed to choose among many different options. • MRP is most appropriate when the manufacturing environment is complex and uncertain.
  • 6. Control inventory levels Assign operating priorities Plan capacity to load the production system
  • 7. • Master Production Schedule (MPS) • Bills of materials (BOM) • Inventory status file • Lead time
  • 8. • Primary reports 1. Work orders 2. Purchase orders 3. Action notices or rescheduling notices • Secondary reports 1. Exception reports 2. Planning reports 3. Performance Control reports • Inventory transaction
  • 9. • A listing of all of the raw materials, parts, subassemblies, and assemblies needed to produce one unit of a product . • BOM Shows way a finished product or parent item is put together from individual components. • Parent item shown at highest level or level zero , Parts that go into parent item are called level 1 components and so on. • Production planners explode BOM to determine the number, due dates, and order dates of subcomponents.
  • 10. • Based on actual customer orders and predicted demand. • Indicates when each ordered item will be produced in coming weeks, and in how much quantity. • It is a plan specifying timing and quantity of production for each end item. • MPS inputs come from sales and marketing . • MPS covers about 1-3 months into the future.
  • 11. • Detailed information regarding the quantity of each item, available in hand, on order to be released, for use in various time periods. • MRP system using inventory master file is used to determine the quantity of material available for use in a given period. • If sufficient items not available , the system includes the item on the planned order release report . • Also known as Inventory Master File
  • 12. • Primary reports 1. Work orders / Planned orders - schedule indicating the amount and timing of future orders. 2. Order Release - Authorization for the execution of planned orders. 3. Action Notices or Rescheduling Notices - which orders are to be released, revised and canceled during the current time period.
  • 13. • Secondary Reports 1. Performance control Reports – evaluate system operations . They aid in measuring deviations from plans, and also provide information to assess cost performance. 2. Planning Reports – are useful to forecast future inventory requirements. 3. Exception Reports – these help to find the major discrepancies such as late and overdue orders, excessive scrap rates, reporting errors, etc.
  • 14. • Exploding and Offsetting • Gross and Net Requirements • Releasing Orders • Low level Coding and Netting
  • 15. • Lead time – it is the time needed to perform the process . It includes order preparation, queuing, processing moving receiving and inspecting time as well as any expected delays. • Exploding the requirements – it is the process of multiplying the requirements by usage quantity of each item and recording the appropriate requirements throughout the product tree. • Offsetting – it is a process of placing the exploded requirements in their proper periods based on lead time.
  • 16. • Gross Requirement - Total expected demand of the product. • Net Requirements - Actual amount needed in each time period. Net Requirements = Gross Requirement – available inventory • Planned on hand - Expected inventory on hand at the beginning of each time period. • Planned-order receipts - Quantity expected to received at the beginning of the period • Planned-order releases - Planned amount to order in each time period
  • 17. • Releasing an order – means authorization is given to buy the necessary material or to manufacturing of required component. • Scheduled Receipts – are orders placed on manufacturing or on a vendor and represent a commitment to make or buy. • Now, considering Scheduled Receipts, Net Requirement = Gross Requirement – Scheduled Receipts – available inventory
  • 18. • Netting – is a process in which any stock on hand is subtracted from the gross requirement determined through explosion, giving the quantity of each item needed to manufacture the required finished products. • Low Level Code – is the lowest level on which a part resides in all bills of material. Low level codes are determined by starting at lowest level of bill of material and working up, recording the level against the part. If part exists on higher level, its existence on the lower level is already recorded.
  • 19. • Time buckets - The column in an inventory record that represents a unit of time. It may be in days or weeks. • Action bucket - The current time period. • Action notices - Output from the MRP system identifying the need for an action, to avoid future problem. • Planning Horizon – is the total number of periods in a record.
  • 20. • Keep inventory levels to a cost-effective minimum. • Keeps track of inventory that is used. • Tracks the amount of material that is required . • Set safety stock levels for emergencies. • Determine the best lot sizes to fulfill orders. • Set up production times among the separate manufacturing stages. • Plan for future needs of raw
  • 21. • Inaccurate information can result in mis-planning , overstock, under-stock, or lack of appropriate resources. • The inaccurate master schedule will provide wrong lengths of time for production . Hence affecting planning. • MRP systems can be costly and time-consuming to set up.
  • 22.
  • 23. Manufacturing resource planning (MRPII) is defined as a method for the effective planning of all resources of a manufacturing company. Ideally, it addresses operational planning in units and financial planning . This is not exclusively a software function, but a combination of people skills, dedication to data base accuracy, and computer resources. It is a total company management concept for using human resources which is used more productively.
  • 24.
  • 25. • Business Planning • Purchasing • Distribution Requirement Scheduling • Forecasting • Service Requirement Planning • Inventory Control • Capacity Requirement Planning • Order Entry And • Accounting Management • Shop Floor Control • Faster Production Scheduling
  • 26. • More efficient use of resources Reduced inventories Less idle time Fewer bottlenecks • Better priority planning Quicker production starts Schedule flexibility
  • 27. • Improved customer service Meet delivery dates Improved quality Lower price possibility • Improved employee moral • Better management information
  • 28. • Error Due To Poor Information • Use of averages