SlideShare a Scribd company logo
Total station is a surveying equipment
combination of:
1. Electronic Measurement Instrument
2. Electronic Theodolite
3. Microprocessor
4. Electronic Data collector
5. Storage System.
The instrument can be used to measure horizontal
and vertical angles as well as sloping distance of
object to the instrument.
What is a Total Station?
Types of survey
Traverse survey
Triangulation survey
Plane table survey
Which includes:
1. Linear Measurements
2. Angular Measurements
3. Height Measurements
Linear measurements we usually do with:
chain
Tape
EDM (Electronic distance measurement instrument)
GPS (Global Positioning System)
Angular measurements we usually do with:
Compass
Theodolite
Height we usually do with:
Dumpy level
Auto level
Theodolite & Digital leveler
Advantages of Digital levels
 Field work is carried out very fast.
 Accuracy of measurement is high.
 Manual errors involved in reading and recording
are eliminated.
 Calculation of coordinates is very fast and
accurate. Even corrections for temperature and
pressure are automatically made.
 Computers can be employed for map making and
plotting contour and cross-sections. Contour
intervals and scales can be changed in no time.
Capabilities of Digital levels
 measuring elevation
 measuring height difference
 measuring height difference with multiple
instrument positions
 levelling
 slope setting
 setting out with horizontal distance
levelling of ceilings
Total station is a combination of :
EDM
Theodolite
Auto Leveler
Microprocessor with specific memory
Battery/spare
which works about 5 working hours
About 100 models were released till now by
different firms.
Basic components of Total station
 It is a combination of ranging
rod, staff and optical cuboidal
mirror.
 having 2/3 lifts with 5cms
interval graduations.
 adjustable height from 1.5m to
3.75m.
 More number of prisms, will
give more accuracy.
Prism reflector:
•GUN: data screen LCD
eye piece
telescope 24x to 43x
environmental box
microprocessor with memory card of 1 or 2 GB capacity
1MB can store 800 points.
•Tripod: with different material
Aluminum tripod weighs 13 to 14lbs
Wooden tripod will be about 18 lbs.
•Optical and Laser plumb bobs.
•Battery –as an external attachment
with indicators
1.5hours charged battery can work for 3to 5 hours
ACCURACY OF TOTAL STATION
More accuracy can be achieve by :
1. Careful Centering
2. Accurate pointing target
3. Average of multiple points
4. Better optical lenses
5. Strong Tripod
6. Verticality of prism pole
1. Angular accuracy is from 1 to 20 Sec.
2. Linear accuracy is from 2mm to 10mm/per KM
3. Different instruments have different accuracy
Angular
Linear
With 1 Prism With 3 prisms
NIKON 1 Sec + 2 mm + 1 mm
LIEKA 1 Sec + 2 mm + 1 mm
SOKKIA 1 Sec 2 mm + 1 mm
Accuracy varies with Price
Distance measure with:
1.Single Prism – up to 2.5 Km
2.Two prisms - 5 to 7 Km
3.Three prisms - 10 to 12 Km
Functions of T.S:
1. It simultaneously measures angles & distances and
Record
2. Correcting the measured distance
3. Computing the point elevation
4. Computing the coordinates of every point
5. Remote elevation measurement
6. Remote distance measurement
7. Area calculations
8. Data Transferring facility from instrument to S/W
and S/W
to instrument
9. Format of conversion of units
REM
Remote Elevation Measurement
RDM
Remote Distance Measurement
Application of Total station:
1. Updating mapping
2. Topographic survey
3. Hydrographic survey
4. Cadastral survey
5. Project construction survey
6. Road, Rail Survey
7. Mining survey
Operations involved while using Total Stations
:
1. Establishing the site Data Point:
a) Selecting the site Data Point
b) Establishing North
2. Setting up the Total station:
a) Placing and leveling Tripod on Data point
b) Placing and leveling the Gun on Tripod
c) Linking the data connector to Gun
3. Data collector options and setting
a) Main menu
b) Basic settings
4. Creating and Operating Job files:
a) Creating a new Job file
b) Opening an existing file
5. Shooting points
a) Identifying the important points to shoot
b) shooting points
c) Shooting additional points
d) Noting the special features
6.Post Processing – Data down loading, conversion
7.Plotting/Map generation.
Computer software packages
The following post processing computer software
packages are in use for various engineering
applications.
1.Arc Pad, arc view, arc info
2.Micro Station - Map generation
3.Erdas – Image processing s/w
4.Surfer, Auto plotter, Civil cad, Pythagoras
– preparation of contours
5. Survey aid – to draw c/s and l/s
The information received is to be analyzed depending
on the users requirement.
Limitations:
1. It is not a Rugged instrument (Sensitive).
2. Prism verticality is questionable.
3. Visibility is must.
4. More Expensive.
5. Requires standardization at every six months.
6. Amount of error is greater at short distances.
7. Height of instrument and prism is to fix.
8. Awareness on battery maintenance.
9. To establish north- compass is required.
SAFETY PRECAUTIONS
1. Focusing directly at the sun, can result - loss of eyesight
on the spot. Use a filter when observing the sun.
2. Never remove the hand grip carelessly. If the grip is
loosely or incompletely attached, the instrument could fall
and may cause a serious injury.
3. Make sure not to short the battery terminals. If these are
shorted, the resulting high current would not only damage
to the battery, but also start a fire.
4. If the instrument or battery comes in contact with water,
wipe it off as quickly as possible and set it in a dry place
for a while. When it is completely dry, put it back in the
case.
5. Never disassemble the instrument, if you find a problem.
Contact the dealer.
HOW TO SUPERVISE THE TOTAL STATION WORK
 Have keen observation on the prism boy’s attitude. When high precision is
required, use the prism tripod, to avoid human error.
 The position of prism shall always be on hard surface instead of soft soil.
 Focusing shall be exactly at the centre of prism, with the help of cross
hairs and prism plate.
 While measuring the instrument height and prism height, enough attention
shall be diverted. Also, have keen observation while entering the above
data.
 Note the location and coordinates of station point and back sight so that
specified intermediate points can be checked at later date.
 Obtain a soft copy of field work raw data from the survey agency so that
the results can be checked at any time.
 Obtain more number of points to get an average.
Thank
You

More Related Content

What's hot

Theodolite
TheodoliteTheodolite
Theodolite
Akshaj Sapehia
 
Total station
Total stationTotal station
Total station
Rushabh shah
 
Total station, digital self leveling levels,
Total station, digital self leveling levels,Total station, digital self leveling levels,
Total station, digital self leveling levels,
Darshil Vekaria
 
Principles of photogrammetry
Principles of photogrammetryPrinciples of photogrammetry
Principles of photogrammetry
Juan José Machado Oviedo
 
9. MORDAN SURVEYING INSTRUMENTS (SUR) 3140601 GTU
9. MORDAN SURVEYING INSTRUMENTS (SUR) 3140601 GTU9. MORDAN SURVEYING INSTRUMENTS (SUR) 3140601 GTU
9. MORDAN SURVEYING INSTRUMENTS (SUR) 3140601 GTU
VATSAL PATEL
 
Module 1 tacheometry
Module 1 tacheometryModule 1 tacheometry
Module 1 tacheometry
Dr. BASWESHWAR JIRWANKAR
 
Total station Surveying
Total station SurveyingTotal station Surveying
Total station Surveying
Kiran M
 
GPS Surveying
GPS SurveyingGPS Surveying
GPS Surveying
Malla Reddy University
 
ROAD PROFILING, CROSS SECTION & SETTING OUT SEWER LINE
ROAD  PROFILING, CROSS SECTION & SETTING OUT SEWER LINEROAD  PROFILING, CROSS SECTION & SETTING OUT SEWER LINE
ROAD PROFILING, CROSS SECTION & SETTING OUT SEWER LINE
KiplimoCalvin
 
Total station
Total stationTotal station
Total station
Sumit Jha
 
Introduction to Surveying
Introduction to SurveyingIntroduction to Surveying
Introduction to Surveying
Phurba Tamang
 
Total Station & GPS
 Total Station & GPS Total Station & GPS
Total Station & GPS
Akshay Krishna K R
 
tacheometric surveying
tacheometric surveyingtacheometric surveying
tacheometric surveying
Mujeeb Muji
 
Surveying presentation and its objectives in detail including principles,hist...
Surveying presentation and its objectives in detail including principles,hist...Surveying presentation and its objectives in detail including principles,hist...
Surveying presentation and its objectives in detail including principles,hist...
amansingh2914
 
Surveying theodolite basics
Surveying  theodolite basicsSurveying  theodolite basics
Surveying theodolite basicsSavitha Pradeep
 
Total station .pptx
Total station .pptxTotal station .pptx
Total station .pptx
AlwandBarzani
 
Tacheometric surveying ppt
Tacheometric surveying pptTacheometric surveying ppt
Tacheometric surveying ppt
Naufil Sayyad
 
Surveying
SurveyingSurveying
Surveying
JNTUK
 
Traverse Survey Part 1/2
Traverse Survey Part 1/2Traverse Survey Part 1/2
Traverse Survey Part 1/2
Muhammad Zubair
 
Advance surveying equipments
Advance surveying equipmentsAdvance surveying equipments
Advance surveying equipments
Ranjan Kumar Lal
 

What's hot (20)

Theodolite
TheodoliteTheodolite
Theodolite
 
Total station
Total stationTotal station
Total station
 
Total station, digital self leveling levels,
Total station, digital self leveling levels,Total station, digital self leveling levels,
Total station, digital self leveling levels,
 
Principles of photogrammetry
Principles of photogrammetryPrinciples of photogrammetry
Principles of photogrammetry
 
9. MORDAN SURVEYING INSTRUMENTS (SUR) 3140601 GTU
9. MORDAN SURVEYING INSTRUMENTS (SUR) 3140601 GTU9. MORDAN SURVEYING INSTRUMENTS (SUR) 3140601 GTU
9. MORDAN SURVEYING INSTRUMENTS (SUR) 3140601 GTU
 
Module 1 tacheometry
Module 1 tacheometryModule 1 tacheometry
Module 1 tacheometry
 
Total station Surveying
Total station SurveyingTotal station Surveying
Total station Surveying
 
GPS Surveying
GPS SurveyingGPS Surveying
GPS Surveying
 
ROAD PROFILING, CROSS SECTION & SETTING OUT SEWER LINE
ROAD  PROFILING, CROSS SECTION & SETTING OUT SEWER LINEROAD  PROFILING, CROSS SECTION & SETTING OUT SEWER LINE
ROAD PROFILING, CROSS SECTION & SETTING OUT SEWER LINE
 
Total station
Total stationTotal station
Total station
 
Introduction to Surveying
Introduction to SurveyingIntroduction to Surveying
Introduction to Surveying
 
Total Station & GPS
 Total Station & GPS Total Station & GPS
Total Station & GPS
 
tacheometric surveying
tacheometric surveyingtacheometric surveying
tacheometric surveying
 
Surveying presentation and its objectives in detail including principles,hist...
Surveying presentation and its objectives in detail including principles,hist...Surveying presentation and its objectives in detail including principles,hist...
Surveying presentation and its objectives in detail including principles,hist...
 
Surveying theodolite basics
Surveying  theodolite basicsSurveying  theodolite basics
Surveying theodolite basics
 
Total station .pptx
Total station .pptxTotal station .pptx
Total station .pptx
 
Tacheometric surveying ppt
Tacheometric surveying pptTacheometric surveying ppt
Tacheometric surveying ppt
 
Surveying
SurveyingSurveying
Surveying
 
Traverse Survey Part 1/2
Traverse Survey Part 1/2Traverse Survey Part 1/2
Traverse Survey Part 1/2
 
Advance surveying equipments
Advance surveying equipmentsAdvance surveying equipments
Advance surveying equipments
 

Similar to Tot.st 1

Tot.st 1
Tot.st 1Tot.st 1
Tot.st 1
Shalika Manoj
 
Total Station by Denis Jangeed.pdf
Total Station by Denis Jangeed.pdfTotal Station by Denis Jangeed.pdf
Total Station by Denis Jangeed.pdf
Denish Jangid
 
Total station .pdf
Total station .pdfTotal station .pdf
Total station .pdf
AlwandBarzani
 
MODERN SURVEYING TECHNIQUES.pptx
 MODERN SURVEYING TECHNIQUES.pptx MODERN SURVEYING TECHNIQUES.pptx
MODERN SURVEYING TECHNIQUES.pptx
DrVenkateswarluGogan1
 
Jual Total Station Sokkia IM-105 Call 082119953499
Jual Total Station Sokkia IM-105 Call 082119953499Jual Total Station Sokkia IM-105 Call 082119953499
Jual Total Station Sokkia IM-105 Call 082119953499
Budi anto
 
Total Station Sokkia IM 102 Ketelitian 2 Detik Reflectorles
Total Station Sokkia IM 102 Ketelitian 2 Detik ReflectorlesTotal Station Sokkia IM 102 Ketelitian 2 Detik Reflectorles
Total Station Sokkia IM 102 Ketelitian 2 Detik Reflectorles
Saepulloh
 
Total Station Sokkia IM 101 Accuracy 1 Reflectorles 1000 Meter
Total Station Sokkia IM 101 Accuracy 1 Reflectorles 1000 MeterTotal Station Sokkia IM 101 Accuracy 1 Reflectorles 1000 Meter
Total Station Sokkia IM 101 Accuracy 1 Reflectorles 1000 Meter
Saepulloh
 
Modern Survey Techniques
Modern Survey TechniquesModern Survey Techniques
Modern Survey Techniques
SaumiyaRajendran
 
total station topo III.pptx
total station topo III.pptxtotal station topo III.pptx
total station topo III.pptx
maritzaDazOrtz
 
Advanced surveying instruments
Advanced surveying instrumentsAdvanced surveying instruments
Advanced surveying instruments
Ajeykumar VG
 
Total Station.pptx
Total Station.pptxTotal Station.pptx
Total Station.pptx
PavanNadgouda2
 
Abijit sharma 201818510 survey report
Abijit sharma 201818510 survey reportAbijit sharma 201818510 survey report
Abijit sharma 201818510 survey report
SingayWangchuk2
 
Modern Surveying & Mapping
Modern Surveying & MappingModern Surveying & Mapping
Modern Surveying & Mapping
Er.Karan Chauhan
 
group-3-a21-traverse-report.pdf
group-3-a21-traverse-report.pdfgroup-3-a21-traverse-report.pdf
group-3-a21-traverse-report.pdf
NkosiAnsari
 
Advance surveying 4th sam 5th cheptor
Advance surveying 4th sam 5th cheptorAdvance surveying 4th sam 5th cheptor
Advance surveying 4th sam 5th cheptor
Atmiya univercity
 
Tacheometry @surveyingreport
Tacheometry @surveyingreportTacheometry @surveyingreport
Tacheometry @surveyingreport
KiplimoCalvin
 
Surveying
Surveying Surveying
Surveying
Wajji Mirza
 
5535484946484884497358484048446605251.pdf
5535484946484884497358484048446605251.pdf5535484946484884497358484048446605251.pdf
5535484946484884497358484048446605251.pdf
krishnakondu
 
Total station surveying and its application
Total station surveying and its applicationTotal station surveying and its application
Total station surveying and its application
ChavanRavishankar
 

Similar to Tot.st 1 (20)

Tot.st 1
Tot.st 1Tot.st 1
Tot.st 1
 
Total Station by Denis Jangeed.pdf
Total Station by Denis Jangeed.pdfTotal Station by Denis Jangeed.pdf
Total Station by Denis Jangeed.pdf
 
Total station
Total stationTotal station
Total station
 
Total station .pdf
Total station .pdfTotal station .pdf
Total station .pdf
 
MODERN SURVEYING TECHNIQUES.pptx
 MODERN SURVEYING TECHNIQUES.pptx MODERN SURVEYING TECHNIQUES.pptx
MODERN SURVEYING TECHNIQUES.pptx
 
Jual Total Station Sokkia IM-105 Call 082119953499
Jual Total Station Sokkia IM-105 Call 082119953499Jual Total Station Sokkia IM-105 Call 082119953499
Jual Total Station Sokkia IM-105 Call 082119953499
 
Total Station Sokkia IM 102 Ketelitian 2 Detik Reflectorles
Total Station Sokkia IM 102 Ketelitian 2 Detik ReflectorlesTotal Station Sokkia IM 102 Ketelitian 2 Detik Reflectorles
Total Station Sokkia IM 102 Ketelitian 2 Detik Reflectorles
 
Total Station Sokkia IM 101 Accuracy 1 Reflectorles 1000 Meter
Total Station Sokkia IM 101 Accuracy 1 Reflectorles 1000 MeterTotal Station Sokkia IM 101 Accuracy 1 Reflectorles 1000 Meter
Total Station Sokkia IM 101 Accuracy 1 Reflectorles 1000 Meter
 
Modern Survey Techniques
Modern Survey TechniquesModern Survey Techniques
Modern Survey Techniques
 
total station topo III.pptx
total station topo III.pptxtotal station topo III.pptx
total station topo III.pptx
 
Advanced surveying instruments
Advanced surveying instrumentsAdvanced surveying instruments
Advanced surveying instruments
 
Total Station.pptx
Total Station.pptxTotal Station.pptx
Total Station.pptx
 
Abijit sharma 201818510 survey report
Abijit sharma 201818510 survey reportAbijit sharma 201818510 survey report
Abijit sharma 201818510 survey report
 
Modern Surveying & Mapping
Modern Surveying & MappingModern Surveying & Mapping
Modern Surveying & Mapping
 
group-3-a21-traverse-report.pdf
group-3-a21-traverse-report.pdfgroup-3-a21-traverse-report.pdf
group-3-a21-traverse-report.pdf
 
Advance surveying 4th sam 5th cheptor
Advance surveying 4th sam 5th cheptorAdvance surveying 4th sam 5th cheptor
Advance surveying 4th sam 5th cheptor
 
Tacheometry @surveyingreport
Tacheometry @surveyingreportTacheometry @surveyingreport
Tacheometry @surveyingreport
 
Surveying
Surveying Surveying
Surveying
 
5535484946484884497358484048446605251.pdf
5535484946484884497358484048446605251.pdf5535484946484884497358484048446605251.pdf
5535484946484884497358484048446605251.pdf
 
Total station surveying and its application
Total station surveying and its applicationTotal station surveying and its application
Total station surveying and its application
 

Recently uploaded

ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 

Recently uploaded (20)

ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 

Tot.st 1

  • 1.
  • 2. Total station is a surveying equipment combination of: 1. Electronic Measurement Instrument 2. Electronic Theodolite 3. Microprocessor 4. Electronic Data collector 5. Storage System. The instrument can be used to measure horizontal and vertical angles as well as sloping distance of object to the instrument. What is a Total Station?
  • 3.
  • 4. Types of survey Traverse survey Triangulation survey Plane table survey Which includes: 1. Linear Measurements 2. Angular Measurements 3. Height Measurements
  • 5. Linear measurements we usually do with: chain Tape EDM (Electronic distance measurement instrument) GPS (Global Positioning System) Angular measurements we usually do with: Compass Theodolite Height we usually do with: Dumpy level Auto level Theodolite & Digital leveler
  • 6. Advantages of Digital levels  Field work is carried out very fast.  Accuracy of measurement is high.  Manual errors involved in reading and recording are eliminated.  Calculation of coordinates is very fast and accurate. Even corrections for temperature and pressure are automatically made.  Computers can be employed for map making and plotting contour and cross-sections. Contour intervals and scales can be changed in no time.
  • 7. Capabilities of Digital levels  measuring elevation  measuring height difference  measuring height difference with multiple instrument positions  levelling  slope setting  setting out with horizontal distance levelling of ceilings
  • 8. Total station is a combination of : EDM Theodolite Auto Leveler Microprocessor with specific memory Battery/spare which works about 5 working hours About 100 models were released till now by different firms.
  • 9. Basic components of Total station  It is a combination of ranging rod, staff and optical cuboidal mirror.  having 2/3 lifts with 5cms interval graduations.  adjustable height from 1.5m to 3.75m.  More number of prisms, will give more accuracy. Prism reflector:
  • 10. •GUN: data screen LCD eye piece telescope 24x to 43x environmental box microprocessor with memory card of 1 or 2 GB capacity 1MB can store 800 points. •Tripod: with different material Aluminum tripod weighs 13 to 14lbs Wooden tripod will be about 18 lbs. •Optical and Laser plumb bobs. •Battery –as an external attachment with indicators 1.5hours charged battery can work for 3to 5 hours
  • 11.
  • 12. ACCURACY OF TOTAL STATION More accuracy can be achieve by : 1. Careful Centering 2. Accurate pointing target 3. Average of multiple points 4. Better optical lenses 5. Strong Tripod 6. Verticality of prism pole 1. Angular accuracy is from 1 to 20 Sec. 2. Linear accuracy is from 2mm to 10mm/per KM 3. Different instruments have different accuracy Angular Linear With 1 Prism With 3 prisms NIKON 1 Sec + 2 mm + 1 mm LIEKA 1 Sec + 2 mm + 1 mm SOKKIA 1 Sec 2 mm + 1 mm Accuracy varies with Price Distance measure with: 1.Single Prism – up to 2.5 Km 2.Two prisms - 5 to 7 Km 3.Three prisms - 10 to 12 Km
  • 13. Functions of T.S: 1. It simultaneously measures angles & distances and Record 2. Correcting the measured distance 3. Computing the point elevation 4. Computing the coordinates of every point 5. Remote elevation measurement 6. Remote distance measurement 7. Area calculations 8. Data Transferring facility from instrument to S/W and S/W to instrument 9. Format of conversion of units
  • 16. Application of Total station: 1. Updating mapping 2. Topographic survey 3. Hydrographic survey 4. Cadastral survey 5. Project construction survey 6. Road, Rail Survey 7. Mining survey
  • 17. Operations involved while using Total Stations : 1. Establishing the site Data Point: a) Selecting the site Data Point b) Establishing North 2. Setting up the Total station: a) Placing and leveling Tripod on Data point b) Placing and leveling the Gun on Tripod c) Linking the data connector to Gun 3. Data collector options and setting a) Main menu b) Basic settings
  • 18. 4. Creating and Operating Job files: a) Creating a new Job file b) Opening an existing file 5. Shooting points a) Identifying the important points to shoot b) shooting points c) Shooting additional points d) Noting the special features 6.Post Processing – Data down loading, conversion 7.Plotting/Map generation.
  • 19. Computer software packages The following post processing computer software packages are in use for various engineering applications. 1.Arc Pad, arc view, arc info 2.Micro Station - Map generation 3.Erdas – Image processing s/w 4.Surfer, Auto plotter, Civil cad, Pythagoras – preparation of contours 5. Survey aid – to draw c/s and l/s The information received is to be analyzed depending on the users requirement.
  • 20. Limitations: 1. It is not a Rugged instrument (Sensitive). 2. Prism verticality is questionable. 3. Visibility is must. 4. More Expensive. 5. Requires standardization at every six months. 6. Amount of error is greater at short distances. 7. Height of instrument and prism is to fix. 8. Awareness on battery maintenance. 9. To establish north- compass is required.
  • 21. SAFETY PRECAUTIONS 1. Focusing directly at the sun, can result - loss of eyesight on the spot. Use a filter when observing the sun. 2. Never remove the hand grip carelessly. If the grip is loosely or incompletely attached, the instrument could fall and may cause a serious injury. 3. Make sure not to short the battery terminals. If these are shorted, the resulting high current would not only damage to the battery, but also start a fire. 4. If the instrument or battery comes in contact with water, wipe it off as quickly as possible and set it in a dry place for a while. When it is completely dry, put it back in the case. 5. Never disassemble the instrument, if you find a problem. Contact the dealer.
  • 22. HOW TO SUPERVISE THE TOTAL STATION WORK  Have keen observation on the prism boy’s attitude. When high precision is required, use the prism tripod, to avoid human error.  The position of prism shall always be on hard surface instead of soft soil.  Focusing shall be exactly at the centre of prism, with the help of cross hairs and prism plate.  While measuring the instrument height and prism height, enough attention shall be diverted. Also, have keen observation while entering the above data.  Note the location and coordinates of station point and back sight so that specified intermediate points can be checked at later date.  Obtain a soft copy of field work raw data from the survey agency so that the results can be checked at any time.  Obtain more number of points to get an average.