• A six story building located in Singapore, housed multiple
local institutions and establishments such as offices, a branch
bank, and a nightclub
• On March 15, 1986, the Hotel New World collapsed in less
than 60 seconds at approximately 11:30 am
• The result was the entrapmentt of fifty people, seventeen of
whom were eventually rescued, and thirty-three who were
killed
INTRODUCTION
3
• After the Hotel New World collapsed, building codes and
standards were improved throughout Singapore as well as the
implementation of engineering ethics
INTRODUCTION
4
• It had thirty six reinforced concrete columns that supported
six concrete floors, totalling a weight of 6,000 tons
• A parking lot was composed of the underground while a bank
branch took up most of the ground floor
• The next floor was a popular nightclub
• The remaining floors were occupied by a budget hotel named
The Hotel New World
HISTORY AND DESCRIPTION
5
• All the mechanical equipment such as water tanks and air
conditioning units, which were used to cool off the building
in the hot climate, resided on the roof. The total height came
to be twenty four meters
• The building experienced no severe impact or structural
damage during its lifetime. In 1975 however, there was a gas
leak in the building that poisoned thirty-five people
HISTORY AND DESCRIPTION
6
March 14th
 At 7pm, the hostess of the nightclub hears a noise and
witnesses a crack in one of the columns while setting up for
the evening
March 15th
 At 10:10 am, another crack was heard which resulted in
falling debris
DAY OF COLLAPSE
7
At 10:45 am, the receptionist heard a “loud bang” from
somewhere in the building
At 11:10 am, a passerby claimed to have felt an earthquake
and the receptionist heard another loud noise
At 11:21 am, one the workers attending to the cracked
column saw debris falling from the ceiling to the ground
DAY OF COLLAPSE
8
 At 11:26 am, the whole building started to vibrate and shake
as it was on the verge of collapsing
 In less than one minute, one of the tallest buildings in
Singapore transformed into rubble and dust
DAY OF COLLAPSE
9
10
• First, many engineers who examined the rubble and the
speed of the collapse led to the belief that an internal
explosion caused by a bomb or terrorist attack was responsible
for the collapse
• As investigations progressed, no evidence of an explosion
was found
FORENSIC STUDY
11
• Secondly, Samples were brought into labs for strength and
consistency testing
• The concrete met all of the international safety standards,
concluding that the strength of the material was not the
problem
FORENSIC STUDY
12
• Third, They examined the land under the building and
realized that it was not an issue and there was no failure in
the foundation
• Then the investigators referred back to the plans and realized
that each failure corresponded to different columns; they
failed because they were stressed to their limit
• This was proven by examining the concrete on the
microscopic level
FORENSIC STUDY
13
• When the concrete is stressed to the limit, tiny cracks also
known as micro-cracks invisible to the naked eye in the
particles are developed
• Such cracks reduced the weight that is supported by the piers
and initiated a progressive collapse
FORENSIC STUDY
14
• The investigators found heavy equipment in the rubble that
was not in the original design plans
• During its fifteen years of life span, the owner of the building
had added extra weight
FORENSIC STUDY
15
FORENSIC STUDY
16
• However, all this extra weight that was added to the structure
fell under the live load category and was already accounted
for
• Found that the extra weight added to the building is not the
proper reason for failure
FORENSIC STUDY
17
• Finally, the engineers returned to their blue prints and
calculations and realized that the building’s dead load was
not accounted for in the original design
FORENSIC STUDY
18
• After heavy examination and study of the collapse, it was
clear that the collapse of the New World Hotel was not
caused by an explosion, nor by improper construction,
material deficiency, swamp land or by the live load added to
the building by the owner
• The building failed because the engineers did not account for
the building’s weight or dead load during the design phase
CONCLUSION
19
• This monumental mistake meant that the building was on the
verge of collapse ever since it was built
• The building's columns were stressed to their limit since their
construction and the collapse was a matter of time
• Also, the substantial loads added to the building that caused
an overload to the poorly constructed structure contributed
to the collapse, as well as the lack of proper maintenance and
engineering
CONCLUSION
20
21

More Related Content

What's hot

Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...aarenneoone
 
IBS design proposal of apartment
IBS design proposal of apartmentIBS design proposal of apartment
IBS design proposal of apartmentJy Chong
 
Architecture Museum Malacca Dilapidation Report
Architecture Museum Malacca Dilapidation ReportArchitecture Museum Malacca Dilapidation Report
Architecture Museum Malacca Dilapidation ReportNaqiuddin Johari
 
Jaya supermarket presentation 2011 latest
Jaya supermarket presentation 2011 latestJaya supermarket presentation 2011 latest
Jaya supermarket presentation 2011 latestKartini Ibrahim
 
A brief background & development history on klcc
A brief background & development history on klccA brief background & development history on klcc
A brief background & development history on klccSyahDa_96
 
Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)Nekumi Kida
 
Project 1: Industrialised Building System [ IBS ]
Project 1: Industrialised Building System [ IBS ]Project 1: Industrialised Building System [ IBS ]
Project 1: Industrialised Building System [ IBS ]JerotichMaswan
 
History report final [pdf] [updated]
History report final [pdf] [updated]History report final [pdf] [updated]
History report final [pdf] [updated]Soh Shing
 
Engineering Failure(Case Study of Rana Plaza Collapse-An Example of Engineeri...
Engineering Failure(Case Study of Rana Plaza Collapse-An Example of Engineeri...Engineering Failure(Case Study of Rana Plaza Collapse-An Example of Engineeri...
Engineering Failure(Case Study of Rana Plaza Collapse-An Example of Engineeri...Ariful Islam
 
highland tower case study
highland tower case studyhighland tower case study
highland tower case studyamira688
 
Blockwork system
Blockwork systemBlockwork system
Blockwork systemWen Crystal
 
Petronas tower - Malaysia (Theory of Structures)
Petronas tower - Malaysia  (Theory of Structures)Petronas tower - Malaysia  (Theory of Structures)
Petronas tower - Malaysia (Theory of Structures)RADHIKASARDA8
 
Building Services Assignment 1
Building Services Assignment 1Building Services Assignment 1
Building Services Assignment 1Nur Zaas
 

What's hot (20)

Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...
 
Lift Design
Lift  DesignLift  Design
Lift Design
 
Objective of site visit
Objective of site visitObjective of site visit
Objective of site visit
 
IBS design proposal of apartment
IBS design proposal of apartmentIBS design proposal of apartment
IBS design proposal of apartment
 
Ibs part1
Ibs part1Ibs part1
Ibs part1
 
Architecture Museum Malacca Dilapidation Report
Architecture Museum Malacca Dilapidation ReportArchitecture Museum Malacca Dilapidation Report
Architecture Museum Malacca Dilapidation Report
 
Jaya supermarket presentation 2011 latest
Jaya supermarket presentation 2011 latestJaya supermarket presentation 2011 latest
Jaya supermarket presentation 2011 latest
 
Refurbishment
RefurbishmentRefurbishment
Refurbishment
 
klcc
klccklcc
klcc
 
Site visit report
Site visit reportSite visit report
Site visit report
 
A brief background & development history on klcc
A brief background & development history on klccA brief background & development history on klcc
A brief background & development history on klcc
 
Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)
 
Project 1: Industrialised Building System [ IBS ]
Project 1: Industrialised Building System [ IBS ]Project 1: Industrialised Building System [ IBS ]
Project 1: Industrialised Building System [ IBS ]
 
History report final [pdf] [updated]
History report final [pdf] [updated]History report final [pdf] [updated]
History report final [pdf] [updated]
 
Engineering Failure(Case Study of Rana Plaza Collapse-An Example of Engineeri...
Engineering Failure(Case Study of Rana Plaza Collapse-An Example of Engineeri...Engineering Failure(Case Study of Rana Plaza Collapse-An Example of Engineeri...
Engineering Failure(Case Study of Rana Plaza Collapse-An Example of Engineeri...
 
UBBL 1984 pdf
UBBL 1984 pdfUBBL 1984 pdf
UBBL 1984 pdf
 
highland tower case study
highland tower case studyhighland tower case study
highland tower case study
 
Blockwork system
Blockwork systemBlockwork system
Blockwork system
 
Petronas tower - Malaysia (Theory of Structures)
Petronas tower - Malaysia  (Theory of Structures)Petronas tower - Malaysia  (Theory of Structures)
Petronas tower - Malaysia (Theory of Structures)
 
Building Services Assignment 1
Building Services Assignment 1Building Services Assignment 1
Building Services Assignment 1
 

Viewers also liked

New Hotel Classification
New Hotel ClassificationNew Hotel Classification
New Hotel Classificationatoutfrancepro
 
EXPERIMENTAL STUDIES ON STRENGTH AND SCC CHARACTERISTICS OF BASALT FIBER REIN...
EXPERIMENTAL STUDIES ON STRENGTH AND SCC CHARACTERISTICS OF BASALT FIBER REIN...EXPERIMENTAL STUDIES ON STRENGTH AND SCC CHARACTERISTICS OF BASALT FIBER REIN...
EXPERIMENTAL STUDIES ON STRENGTH AND SCC CHARACTERISTICS OF BASALT FIBER REIN...IAEME Publication
 
Collapse of 4 storied building in begunbari --
Collapse of 4 storied building in begunbari --Collapse of 4 storied building in begunbari --
Collapse of 4 storied building in begunbari --Sumon Dhrubo
 
YHGI Hotel Project Presentaion
YHGI Hotel Project PresentaionYHGI Hotel Project Presentaion
YHGI Hotel Project Presentaiongbedian
 
Basalt Rebar
Basalt RebarBasalt Rebar
Basalt Rebarabhi4her
 
Seminar basalt fiber rebars
Seminar basalt fiber rebarsSeminar basalt fiber rebars
Seminar basalt fiber rebarsATHUL ASOK
 
Project management failure case study
Project management failure case studyProject management failure case study
Project management failure case studyManisha Mishra
 
Business Plan "Wellness Hospitality"
Business Plan "Wellness Hospitality"Business Plan "Wellness Hospitality"
Business Plan "Wellness Hospitality"MTM IULM
 
Classification of hotel departement
Classification of hotel departementClassification of hotel departement
Classification of hotel departementAbdul Ghani
 
FIBER REINFORCED CONCRETE
FIBER REINFORCED CONCRETEFIBER REINFORCED CONCRETE
FIBER REINFORCED CONCRETEmanish jashnani
 
Hotel and classification of hotels by heena tomar
Hotel and classification of hotels by heena tomarHotel and classification of hotels by heena tomar
Hotel and classification of hotels by heena tomarHeena Tomar
 
case study on failed construction projects
case study on failed construction projectscase study on failed construction projects
case study on failed construction projectsSULAKSHYA GAUR
 
Hilton Hotels -- PowerPoint Presentation
Hilton Hotels -- PowerPoint PresentationHilton Hotels -- PowerPoint Presentation
Hilton Hotels -- PowerPoint PresentationMichael Reed McLaughlin
 
Business Plan "New Hotel Enterprise"
Business Plan "New Hotel Enterprise"Business Plan "New Hotel Enterprise"
Business Plan "New Hotel Enterprise"MTM IULM
 

Viewers also liked (20)

New Hotel Classification
New Hotel ClassificationNew Hotel Classification
New Hotel Classification
 
Hotel project
Hotel projectHotel project
Hotel project
 
EXPERIMENTAL STUDIES ON STRENGTH AND SCC CHARACTERISTICS OF BASALT FIBER REIN...
EXPERIMENTAL STUDIES ON STRENGTH AND SCC CHARACTERISTICS OF BASALT FIBER REIN...EXPERIMENTAL STUDIES ON STRENGTH AND SCC CHARACTERISTICS OF BASALT FIBER REIN...
EXPERIMENTAL STUDIES ON STRENGTH AND SCC CHARACTERISTICS OF BASALT FIBER REIN...
 
Collapse of 4 storied building in begunbari --
Collapse of 4 storied building in begunbari --Collapse of 4 storied building in begunbari --
Collapse of 4 storied building in begunbari --
 
Basalt fiber concretes tb_btg
Basalt fiber concretes tb_btgBasalt fiber concretes tb_btg
Basalt fiber concretes tb_btg
 
YHGI Hotel Project Presentaion
YHGI Hotel Project PresentaionYHGI Hotel Project Presentaion
YHGI Hotel Project Presentaion
 
Building failure case study
Building failure case studyBuilding failure case study
Building failure case study
 
Basalt Rebar
Basalt RebarBasalt Rebar
Basalt Rebar
 
Seminar basalt fiber rebars
Seminar basalt fiber rebarsSeminar basalt fiber rebars
Seminar basalt fiber rebars
 
Project management failure case study
Project management failure case studyProject management failure case study
Project management failure case study
 
Business Plan "Wellness Hospitality"
Business Plan "Wellness Hospitality"Business Plan "Wellness Hospitality"
Business Plan "Wellness Hospitality"
 
Classification of hotel departement
Classification of hotel departementClassification of hotel departement
Classification of hotel departement
 
Basalt rock fibre
Basalt   rock   fibreBasalt   rock   fibre
Basalt rock fibre
 
FIBER REINFORCED CONCRETE
FIBER REINFORCED CONCRETEFIBER REINFORCED CONCRETE
FIBER REINFORCED CONCRETE
 
Hotel and classification of hotels by heena tomar
Hotel and classification of hotels by heena tomarHotel and classification of hotels by heena tomar
Hotel and classification of hotels by heena tomar
 
seminar on BASALT FIBER REINFORCED CONCRETE
seminar on BASALT FIBER REINFORCED CONCRETEseminar on BASALT FIBER REINFORCED CONCRETE
seminar on BASALT FIBER REINFORCED CONCRETE
 
case study on failed construction projects
case study on failed construction projectscase study on failed construction projects
case study on failed construction projects
 
Fibre concrete
Fibre concreteFibre concrete
Fibre concrete
 
Hilton Hotels -- PowerPoint Presentation
Hilton Hotels -- PowerPoint PresentationHilton Hotels -- PowerPoint Presentation
Hilton Hotels -- PowerPoint Presentation
 
Business Plan "New Hotel Enterprise"
Business Plan "New Hotel Enterprise"Business Plan "New Hotel Enterprise"
Business Plan "New Hotel Enterprise"
 

Similar to The Hotel New World Collapse

Grant Wilkinson, Senior Engineer, Ruamoko Solutions
Grant Wilkinson, Senior Engineer, Ruamoko SolutionsGrant Wilkinson, Senior Engineer, Ruamoko Solutions
Grant Wilkinson, Senior Engineer, Ruamoko SolutionsSmartNet
 
Al Hamra Firdous Tower, Kuwait and 432 park avenue , NY BMC 6.pptx
Al Hamra Firdous Tower, Kuwait and 432 park avenue , NY BMC 6.pptxAl Hamra Firdous Tower, Kuwait and 432 park avenue , NY BMC 6.pptx
Al Hamra Firdous Tower, Kuwait and 432 park avenue , NY BMC 6.pptxRaiyyanKhalak
 
Cn tower.. a detailed study
Cn tower.. a detailed studyCn tower.. a detailed study
Cn tower.. a detailed studyMelbin Biju
 
Cn tower.. a detailed study
Cn tower.. a detailed studyCn tower.. a detailed study
Cn tower.. a detailed studyMelbin Biju
 
Underwater construction
Underwater constructionUnderwater construction
Underwater constructionHetviPatel58
 
Petronas Twin Towers
Petronas Twin TowersPetronas Twin Towers
Petronas Twin Towersmatsrock
 
A presentation on high rise
A presentation on high riseA presentation on high rise
A presentation on high riseAnamikaAntora
 
Faisalaiah project (english) 3 REV.03
Faisalaiah project (english) 3 REV.03Faisalaiah project (english) 3 REV.03
Faisalaiah project (english) 3 REV.03Wael Nafad
 
foundation and structural system of the shard building
foundation and structural system  of the shard buildingfoundation and structural system  of the shard building
foundation and structural system of the shard buildingBirukYared3
 
PETRONAS TWIN TOWERS.pptx
PETRONAS TWIN TOWERS.pptxPETRONAS TWIN TOWERS.pptx
PETRONAS TWIN TOWERS.pptxkavishka11
 
London Aquatics Center – Zaha Hadid Architects
 London Aquatics Center – Zaha Hadid Architects London Aquatics Center – Zaha Hadid Architects
London Aquatics Center – Zaha Hadid ArchitectsDhanveersinh Chavda
 
Report on Design of a HighRise.pptx
Report on Design of a HighRise.pptxReport on Design of a HighRise.pptx
Report on Design of a HighRise.pptxRezwan Ahmed
 

Similar to The Hotel New World Collapse (20)

Walkie Talkie.pptx
Walkie Talkie.pptxWalkie Talkie.pptx
Walkie Talkie.pptx
 
Burj khalifa Dubai
Burj khalifa DubaiBurj khalifa Dubai
Burj khalifa Dubai
 
Making of burj khalifa
Making of burj khalifaMaking of burj khalifa
Making of burj khalifa
 
Grant Wilkinson, Senior Engineer, Ruamoko Solutions
Grant Wilkinson, Senior Engineer, Ruamoko SolutionsGrant Wilkinson, Senior Engineer, Ruamoko Solutions
Grant Wilkinson, Senior Engineer, Ruamoko Solutions
 
Pm burj case
Pm burj casePm burj case
Pm burj case
 
Al Hamra Firdous Tower, Kuwait and 432 park avenue , NY BMC 6.pptx
Al Hamra Firdous Tower, Kuwait and 432 park avenue , NY BMC 6.pptxAl Hamra Firdous Tower, Kuwait and 432 park avenue , NY BMC 6.pptx
Al Hamra Firdous Tower, Kuwait and 432 park avenue , NY BMC 6.pptx
 
Cn tower.. a detailed study
Cn tower.. a detailed studyCn tower.. a detailed study
Cn tower.. a detailed study
 
Cn tower.. a detailed study
Cn tower.. a detailed studyCn tower.. a detailed study
Cn tower.. a detailed study
 
Underwater construction
Underwater constructionUnderwater construction
Underwater construction
 
Petronas Twin Towers
Petronas Twin TowersPetronas Twin Towers
Petronas Twin Towers
 
A presentation on high rise
A presentation on high riseA presentation on high rise
A presentation on high rise
 
Ar. Norman Foster.pptx
Ar. Norman Foster.pptxAr. Norman Foster.pptx
Ar. Norman Foster.pptx
 
Faisalaiah project (english) 3 REV.03
Faisalaiah project (english) 3 REV.03Faisalaiah project (english) 3 REV.03
Faisalaiah project (english) 3 REV.03
 
foundation and structural system of the shard building
foundation and structural system  of the shard buildingfoundation and structural system  of the shard building
foundation and structural system of the shard building
 
Engineering failures
Engineering failuresEngineering failures
Engineering failures
 
PETRONAS TWIN TOWERS.pptx
PETRONAS TWIN TOWERS.pptxPETRONAS TWIN TOWERS.pptx
PETRONAS TWIN TOWERS.pptx
 
London Aquatics Center – Zaha Hadid Architects
 London Aquatics Center – Zaha Hadid Architects London Aquatics Center – Zaha Hadid Architects
London Aquatics Center – Zaha Hadid Architects
 
Ar. paul rodloph
Ar. paul rodlophAr. paul rodloph
Ar. paul rodloph
 
Burj Al Arab
Burj Al ArabBurj Al Arab
Burj Al Arab
 
Report on Design of a HighRise.pptx
Report on Design of a HighRise.pptxReport on Design of a HighRise.pptx
Report on Design of a HighRise.pptx
 

Recently uploaded

Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 

Recently uploaded (20)

Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 

The Hotel New World Collapse

  • 1. The Hotel New World Collapse (March 15, 1986) Presented by PARVATHY SUNIL A ROLL NO. 4 M.Tech SE 1
  • 2. 2
  • 3. • A six story building located in Singapore, housed multiple local institutions and establishments such as offices, a branch bank, and a nightclub • On March 15, 1986, the Hotel New World collapsed in less than 60 seconds at approximately 11:30 am • The result was the entrapmentt of fifty people, seventeen of whom were eventually rescued, and thirty-three who were killed INTRODUCTION 3
  • 4. • After the Hotel New World collapsed, building codes and standards were improved throughout Singapore as well as the implementation of engineering ethics INTRODUCTION 4
  • 5. • It had thirty six reinforced concrete columns that supported six concrete floors, totalling a weight of 6,000 tons • A parking lot was composed of the underground while a bank branch took up most of the ground floor • The next floor was a popular nightclub • The remaining floors were occupied by a budget hotel named The Hotel New World HISTORY AND DESCRIPTION 5
  • 6. • All the mechanical equipment such as water tanks and air conditioning units, which were used to cool off the building in the hot climate, resided on the roof. The total height came to be twenty four meters • The building experienced no severe impact or structural damage during its lifetime. In 1975 however, there was a gas leak in the building that poisoned thirty-five people HISTORY AND DESCRIPTION 6
  • 7. March 14th  At 7pm, the hostess of the nightclub hears a noise and witnesses a crack in one of the columns while setting up for the evening March 15th  At 10:10 am, another crack was heard which resulted in falling debris DAY OF COLLAPSE 7
  • 8. At 10:45 am, the receptionist heard a “loud bang” from somewhere in the building At 11:10 am, a passerby claimed to have felt an earthquake and the receptionist heard another loud noise At 11:21 am, one the workers attending to the cracked column saw debris falling from the ceiling to the ground DAY OF COLLAPSE 8
  • 9.  At 11:26 am, the whole building started to vibrate and shake as it was on the verge of collapsing  In less than one minute, one of the tallest buildings in Singapore transformed into rubble and dust DAY OF COLLAPSE 9
  • 10. 10
  • 11. • First, many engineers who examined the rubble and the speed of the collapse led to the belief that an internal explosion caused by a bomb or terrorist attack was responsible for the collapse • As investigations progressed, no evidence of an explosion was found FORENSIC STUDY 11
  • 12. • Secondly, Samples were brought into labs for strength and consistency testing • The concrete met all of the international safety standards, concluding that the strength of the material was not the problem FORENSIC STUDY 12
  • 13. • Third, They examined the land under the building and realized that it was not an issue and there was no failure in the foundation • Then the investigators referred back to the plans and realized that each failure corresponded to different columns; they failed because they were stressed to their limit • This was proven by examining the concrete on the microscopic level FORENSIC STUDY 13
  • 14. • When the concrete is stressed to the limit, tiny cracks also known as micro-cracks invisible to the naked eye in the particles are developed • Such cracks reduced the weight that is supported by the piers and initiated a progressive collapse FORENSIC STUDY 14
  • 15. • The investigators found heavy equipment in the rubble that was not in the original design plans • During its fifteen years of life span, the owner of the building had added extra weight FORENSIC STUDY 15
  • 17. • However, all this extra weight that was added to the structure fell under the live load category and was already accounted for • Found that the extra weight added to the building is not the proper reason for failure FORENSIC STUDY 17
  • 18. • Finally, the engineers returned to their blue prints and calculations and realized that the building’s dead load was not accounted for in the original design FORENSIC STUDY 18
  • 19. • After heavy examination and study of the collapse, it was clear that the collapse of the New World Hotel was not caused by an explosion, nor by improper construction, material deficiency, swamp land or by the live load added to the building by the owner • The building failed because the engineers did not account for the building’s weight or dead load during the design phase CONCLUSION 19
  • 20. • This monumental mistake meant that the building was on the verge of collapse ever since it was built • The building's columns were stressed to their limit since their construction and the collapse was a matter of time • Also, the substantial loads added to the building that caused an overload to the poorly constructed structure contributed to the collapse, as well as the lack of proper maintenance and engineering CONCLUSION 20