Embed presentation
Downloaded 27 times















The document outlines a project on ramp construction, highlighting the comparison between ramps and stairs, and detailing the recommended slope of 1:20. It includes project specifics such as location, client, architect, project cost of 251 crores, and a duration of 9 months. Notably, it mentions the training duration of 25 days and notes that circular and round slopes cannot be constructed.