SlideShare a Scribd company logo
Sudden three phase short circuit test
Table of Content:
1 Objective..........................................................................................................
2 Scope...............................................................................................................
3 Referenced documents....................................................................................
4 Terms and abbreviations..................................................................................
5 Sudden three-phase short-circuit test...............................................................
5.1 Preparations...................................................................................................
5.2 Conduction of test..........................................................................................
5.3 Evaluation of the test......................................................................................
6 Proceeding in case of deviations ......................................................................
7 Copyright............................................................................................................
1 Objective
The sudden three-phase short-circuit test is performed to determine the following
machine quantities:
- Direct-axis transient reactance Xd'
- Direct-axis subtransient reactance Xd"
- Direct-axis transient short-circuit time constant Td'
- Direct-axis subtransient short-circuit time constant Td"
- Armature short-circuit time constant Ta.
- Evidence of mechanical strength
2 Scope
This procedure applies to all types of synchronous machines during final inspections at
site or in the workshop.
3 Referenced documents
IEC 34-4, 40-41 Rotating electrical machines – Methods for determining
Synchronous machine quantities from tests
IEEE 115, 11.7 Test Procedures for synchronous machines
EN 60034-4 Rotating electrical machines - Methods for determining
Synchronous machine quantities from tests
4 Terms and abbreviations
none
5 Sudden three-phase short-circuit test
5.1 Preparations
Visual inspections:
- End winding supports
- Condition of foundation
- Are the foundation bolts tightened?
8/25/2005 9:02 a8/p8 © VA TECH HYDRO Page 1 of 4
- Correct assembly and fixation of all rotor components
- Disconnect the line terminals from the terminal buses (may not be necessary in all
cases).
- Connect the power cable between the line terminals and the circuit breaker, which is
used to make the short-circuit and install measuring devices for recording the short-
circuit currents in wye-connection.
Note: Normally the plant circuit breaker will be used for this purpose. To install a
separate
short-circuit breaker in the plant requires high efforts and good coordination between the
user of the plant and the generator manufacturer, as well as considerable extra costs.
In the workshop a special short-circuit breaker with synchronized phases is used. The
short circuit itself can be made with a special bar across the terminal buses or a
disconnector installed in the current leads (e.g. braking disconnector). This is placed
after the circuit breaker and is inserted before switching in the circuit breaker. Consider
that it is designed to support the current forces and can carry the substained short circuit
current during the recording time.
-
For current transformation the following equipment may be alternatively used:
- Linearized current transformers
- Low inductance precision shunts
- Unlock protection relays as required.
- Remove the grounding cable of the neutral terminals and directly connect the common
terminal of the three-phase short-circuit wye to ground.
- Attach a voltmeter and potential transformer to the generator line terminals (if required)
to measure the armature voltage prior to the sudden short-circuit.
- Connect and set the precision instruments for measuring the terminal voltage and field
current.
Note: The following analog- or digital instruments or equivalent (at least 4 channels) may
be used for recording purposes:
- Digital storage oscilloscope (Hioki 8855)
- Memory Recorder (YEW AR 1100 A)
- Memory Recorder (YEW DL 708)
- Connect the output signals of the current transformer (CT) or equivalent to the
recorder, whereby the current signal of the CT is converted into a voltage signal required
for the digital storage oscilloscope using precision shunts.
- Calibrate and set the trigger of the recording instruments to the expected levels.
5.2 Conduction of test
- Operate the unit at rated speed in no-load condition with the manual control of the
excitation system. In case of static excitation set the ignition anlge of the gate trigger
pulse to achieve the required generator voltage. Neither a current regulator (for the field
current) nor a voltage regulator (for the generator voltage) may be switched on.
Note: If a prime mover is not available, this test can also be performed by retardation
method, initiating the sudden short-circuit, when the decelerating machine passes
through nominal speed.
8/25/2005 9:02 a8/p8 © VA TECH HYDRO Page 2 of 4
- Supply small field current and then initiate a trial run of the sudden short-circuit test.
Verify that recorders are triggered and all signals are recorded properly.
- Adjust the excitation to the desired value of the terminal voltage.
Note: The usual test voltage is approx. 0.5 Un. The test may be repeated at various open
circuit voltages as required by the contract. For voltages exceeding this limit value,
explicit agreement of the turbine manufacturer should be reached. Through the machine
set must withstand the short-circuit forces, there is a high risk of damages to the
foundation (especially in case of bulb-type generators). Therefore it is not recommended
to perform a 100% Un sudden short-circuit directly at all stator terminals. Consider that
machine life endurance may be reduced.
- Read off the terminal voltage, frequency and field current immediately before
performing the sudden short circuit test. If still free channels are available on the digital
storage oscilloscope, at least the phase-to-phase voltage of the generator should be
recorded by oscilloscope.
- Close the circuit breaker in order to initiate the sudden short-circuits. Recording
instruments will be triggered and the three armature currents, the field current and the
voltage going to zero should be recorded continuously.
- After approx. 10 sec. record the armature currents manually, then switch off the
excitation and open the circuit breaker.
- Check the recordings in order to ensure that the data was registrated correctly.
Performed by: GP-QS1
5.3 Evaluation of the test
- Mathematical evaluation acc. to IEC-standard.
Note: Since the sudden short-circuit test is mainly performed with reduced voltages, in
general only unsaturated values for the reactance’s can be determined. Saturated
values should be estimated from the calculation values.
- The evaluation of analog short-circuit current characteristics can only be done by hand.
- Digital storage data may be computer evaluated, using a special program for
separating the envelope of the current waveform into 2 exponential functions.
- If a 100% Un sudden short-circuit is performed at the generator terminals (only after
agreement with the customer), despite of the prohibitive aspects mentioned, thorough
visual inspection for cracks, permanent deformations and any other damages shall be
made after the test.
e.g.:
- End winding support
- Condition of winding (ties, spacers …)
- Condition of foundation
- Foundation bolts
- Assembly and fixation of rotor components
- Acc. to international standards, a repetition of the voltage test, preferably 80% of test
voltage, are recommended.
8/25/2005 9:02 a8/p8 © VA TECH HYDRO Page 3 of 4
6 Proceeding in case of deviations
Any nominal value, minimum value, maximum value, tolerance etc. given in an
instruction is intended to serve for quality purposes only. In case of deviations, a non-
conformity report has to be written acc. to PNG Power Standard
7 Copyright
This Document is properly of PNG Power internal use only and must neither be copied.
Neither is it to be handed over nor in other way communicated to a third party.
Infringement will lead to prosecution.
8/25/2005 9:02 a8/p8 © VA TECH HYDRO Page 4 of 4

More Related Content

What's hot

Electrical Measurements
Electrical MeasurementsElectrical Measurements
Electrical Measurements
Kintali Manohar
 
Power transformers
Power transformersPower transformers
Power transformers
bhavana kanisetty
 
Conductor Insulator &semiconductor
Conductor Insulator &semiconductorConductor Insulator &semiconductor
Conductor Insulator &semiconductor
Sohaib Romie
 
industrial training on 132 kv substation
industrial training on 132 kv substationindustrial training on 132 kv substation
industrial training on 132 kv substation
pk130992
 
Different types of thyristors and their applications
Different types of thyristors and their applicationsDifferent types of thyristors and their applications
Different types of thyristors and their applications
elprocus
 
Safe Operation and Maintenance of Circuit Breakers and Switchgear
Safe Operation and Maintenance of Circuit Breakers and SwitchgearSafe Operation and Maintenance of Circuit Breakers and Switchgear
Safe Operation and Maintenance of Circuit Breakers and Switchgear
Living Online
 
Contactor
ContactorContactor
Contactor
vishal gupta
 
Regeneración de aislamientos de transformadores eléctricos inmersos en aceite...
Regeneración de aislamientos de transformadores eléctricos inmersos en aceite...Regeneración de aislamientos de transformadores eléctricos inmersos en aceite...
Regeneración de aislamientos de transformadores eléctricos inmersos en aceite...
TRANSEQUIPOS S.A.
 
Dol presentation
Dol presentationDol presentation
Dol presentation
Nii Odartei Lante
 
SCR_Firing_commutation
SCR_Firing_commutationSCR_Firing_commutation
SCR_Firing_commutation
jayantmane
 
Tan delta test for power transformers
Tan delta test for power transformersTan delta test for power transformers
Tan delta test for power transformers
jibinjoy1988
 
Generator protection
Generator protectionGenerator protection
Generator protection
Chetan Patil
 
Generator grounding
Generator groundingGenerator grounding
Generator grounding
michaeljmack
 
Relay Presentation PPT by G@nesh
Relay Presentation PPT by G@neshRelay Presentation PPT by G@nesh
Relay Presentation PPT by G@nesh
KOMMARINASANTHOSH
 
Power electronics Phase Controlled Rectifiers - SCR
Power electronics   Phase Controlled Rectifiers - SCRPower electronics   Phase Controlled Rectifiers - SCR
Power electronics Phase Controlled Rectifiers - SCR
Burdwan University
 
Fuse and its types
Fuse and its typesFuse and its types
Fuse and its types
Slides Hub
 
04 ret670 test report
04 ret670 test report04 ret670 test report
04 ret670 test report
niranjan131
 
Engineering practice lab manual for electronics
Engineering practice lab manual for electronicsEngineering practice lab manual for electronics
Engineering practice lab manual for electronics
Padhu Ar
 
Electrical Safety for Non-Electrical Workers.138344394216476.OS
Electrical Safety for Non-Electrical Workers.138344394216476.OSElectrical Safety for Non-Electrical Workers.138344394216476.OS
Electrical Safety for Non-Electrical Workers.138344394216476.OS
Eiyla Hamdan
 
Electromagnetic relay
Electromagnetic relayElectromagnetic relay
Electromagnetic relay
jawaharramaya
 

What's hot (20)

Electrical Measurements
Electrical MeasurementsElectrical Measurements
Electrical Measurements
 
Power transformers
Power transformersPower transformers
Power transformers
 
Conductor Insulator &semiconductor
Conductor Insulator &semiconductorConductor Insulator &semiconductor
Conductor Insulator &semiconductor
 
industrial training on 132 kv substation
industrial training on 132 kv substationindustrial training on 132 kv substation
industrial training on 132 kv substation
 
Different types of thyristors and their applications
Different types of thyristors and their applicationsDifferent types of thyristors and their applications
Different types of thyristors and their applications
 
Safe Operation and Maintenance of Circuit Breakers and Switchgear
Safe Operation and Maintenance of Circuit Breakers and SwitchgearSafe Operation and Maintenance of Circuit Breakers and Switchgear
Safe Operation and Maintenance of Circuit Breakers and Switchgear
 
Contactor
ContactorContactor
Contactor
 
Regeneración de aislamientos de transformadores eléctricos inmersos en aceite...
Regeneración de aislamientos de transformadores eléctricos inmersos en aceite...Regeneración de aislamientos de transformadores eléctricos inmersos en aceite...
Regeneración de aislamientos de transformadores eléctricos inmersos en aceite...
 
Dol presentation
Dol presentationDol presentation
Dol presentation
 
SCR_Firing_commutation
SCR_Firing_commutationSCR_Firing_commutation
SCR_Firing_commutation
 
Tan delta test for power transformers
Tan delta test for power transformersTan delta test for power transformers
Tan delta test for power transformers
 
Generator protection
Generator protectionGenerator protection
Generator protection
 
Generator grounding
Generator groundingGenerator grounding
Generator grounding
 
Relay Presentation PPT by G@nesh
Relay Presentation PPT by G@neshRelay Presentation PPT by G@nesh
Relay Presentation PPT by G@nesh
 
Power electronics Phase Controlled Rectifiers - SCR
Power electronics   Phase Controlled Rectifiers - SCRPower electronics   Phase Controlled Rectifiers - SCR
Power electronics Phase Controlled Rectifiers - SCR
 
Fuse and its types
Fuse and its typesFuse and its types
Fuse and its types
 
04 ret670 test report
04 ret670 test report04 ret670 test report
04 ret670 test report
 
Engineering practice lab manual for electronics
Engineering practice lab manual for electronicsEngineering practice lab manual for electronics
Engineering practice lab manual for electronics
 
Electrical Safety for Non-Electrical Workers.138344394216476.OS
Electrical Safety for Non-Electrical Workers.138344394216476.OSElectrical Safety for Non-Electrical Workers.138344394216476.OS
Electrical Safety for Non-Electrical Workers.138344394216476.OS
 
Electromagnetic relay
Electromagnetic relayElectromagnetic relay
Electromagnetic relay
 

Viewers also liked

Deep bar n double cage rotors
Deep bar n double cage rotorsDeep bar n double cage rotors
Deep bar n double cage rotors
Manish Sahu
 
Mobile Gaming: Corona SDK & Adobe AIR RIA Unleashed 2011
Mobile Gaming: Corona SDK & Adobe AIR RIA Unleashed 2011Mobile Gaming: Corona SDK & Adobe AIR RIA Unleashed 2011
Mobile Gaming: Corona SDK & Adobe AIR RIA Unleashed 2011
Jesse Warden
 
Ee423 fault analysis_notes
Ee423  fault analysis_notesEe423  fault analysis_notes
Ee423 fault analysis_notesAcot Benard
 
Open circuit saturation test
Open circuit saturation testOpen circuit saturation test
Open circuit saturation testDonald Stephen
 
Corona presentation
Corona presentationCorona presentation
Corona presentationBriana Leigh
 
Corona1
Corona1Corona1
Short circuit
Short circuit   Short circuit
Short circuit
Maria Romina Angustia
 
Electrical Heating 01 - 03
Electrical Heating 01 - 03Electrical Heating 01 - 03
Electrical Heating 01 - 03
Vijay Raskar
 
Heating ppt
Heating pptHeating ppt
Heating ppt
Prabhakar Naik
 
Electrical power ecx3232 lab report
Electrical power ecx3232 lab reportElectrical power ecx3232 lab report
Electrical power ecx3232 lab reportSandun Perera
 
Unsymmetrical fault analysis 2003 final new 2007
Unsymmetrical fault analysis 2003 final new 2007Unsymmetrical fault analysis 2003 final new 2007
Unsymmetrical fault analysis 2003 final new 2007
Viren Pandya
 
Corona effect, corona ring and any other topics
Corona effect, corona ring and any other topicsCorona effect, corona ring and any other topics
Corona effect, corona ring and any other topics
Mithilesh Raj
 
Electrical Heating
Electrical HeatingElectrical Heating
Electrical Heatingpopet
 
Electrical Heating 01-03
Electrical Heating 01-03Electrical Heating 01-03
Electrical Heating 01-03
Vijay Raskar
 
Series and parallel circuit
Series and parallel circuitSeries and parallel circuit
Series and parallel circuit
Noman Rajput
 
Chapter 4 synchronous machine
Chapter 4 synchronous machineChapter 4 synchronous machine
Chapter 4 synchronous machinemkazree
 
Electrical machine lab
Electrical machine labElectrical machine lab
Electrical machine lab
DHEERAJ DHAKAR
 
Sc and oc test on transformer
Sc and oc test on transformerSc and oc test on transformer
Sc and oc test on transformer
Pooja Dubey
 

Viewers also liked (20)

Deep bar n double cage rotors
Deep bar n double cage rotorsDeep bar n double cage rotors
Deep bar n double cage rotors
 
Mobile Gaming: Corona SDK & Adobe AIR RIA Unleashed 2011
Mobile Gaming: Corona SDK & Adobe AIR RIA Unleashed 2011Mobile Gaming: Corona SDK & Adobe AIR RIA Unleashed 2011
Mobile Gaming: Corona SDK & Adobe AIR RIA Unleashed 2011
 
Ee423 fault analysis_notes
Ee423  fault analysis_notesEe423  fault analysis_notes
Ee423 fault analysis_notes
 
Open circuit saturation test
Open circuit saturation testOpen circuit saturation test
Open circuit saturation test
 
Corona presentation
Corona presentationCorona presentation
Corona presentation
 
Corona1
Corona1Corona1
Corona1
 
Short circuit
Short circuit   Short circuit
Short circuit
 
Electrical Heating 01 - 03
Electrical Heating 01 - 03Electrical Heating 01 - 03
Electrical Heating 01 - 03
 
Seminar
SeminarSeminar
Seminar
 
Heating ppt
Heating pptHeating ppt
Heating ppt
 
Electrical power ecx3232 lab report
Electrical power ecx3232 lab reportElectrical power ecx3232 lab report
Electrical power ecx3232 lab report
 
Unsymmetrical fault analysis 2003 final new 2007
Unsymmetrical fault analysis 2003 final new 2007Unsymmetrical fault analysis 2003 final new 2007
Unsymmetrical fault analysis 2003 final new 2007
 
Corona effect, corona ring and any other topics
Corona effect, corona ring and any other topicsCorona effect, corona ring and any other topics
Corona effect, corona ring and any other topics
 
Protection of alternator
Protection of alternatorProtection of alternator
Protection of alternator
 
Electrical Heating
Electrical HeatingElectrical Heating
Electrical Heating
 
Electrical Heating 01-03
Electrical Heating 01-03Electrical Heating 01-03
Electrical Heating 01-03
 
Series and parallel circuit
Series and parallel circuitSeries and parallel circuit
Series and parallel circuit
 
Chapter 4 synchronous machine
Chapter 4 synchronous machineChapter 4 synchronous machine
Chapter 4 synchronous machine
 
Electrical machine lab
Electrical machine labElectrical machine lab
Electrical machine lab
 
Sc and oc test on transformer
Sc and oc test on transformerSc and oc test on transformer
Sc and oc test on transformer
 

Similar to Sudden three phase short-circuit test

Determination of the transient open circuit time constant
Determination of the transient open circuit time constantDetermination of the transient open circuit time constant
Determination of the transient open circuit time constant
Donald Stephen
 
FOR AUTONICS IC.pdf
FOR AUTONICS IC.pdfFOR AUTONICS IC.pdf
FOR AUTONICS IC.pdf
eShikhon
 
project presentation on "THMC"
project presentation on "THMC"project presentation on "THMC"
project presentation on "THMC"
Teja venkat
 
Abb lv breakers working with trip curves
Abb lv breakers working with trip curvesAbb lv breakers working with trip curves
Abb lv breakers working with trip curves
Luis Antonio González Mederos
 
Hioki solution car_industry_ denkei
Hioki solution car_industry_ denkeiHioki solution car_industry_ denkei
Hioki solution car_industry_ denkei
NIHON DENKEI SINGAPORE
 
Sharp 32 pulg 32c24
Sharp 32 pulg 32c24Sharp 32 pulg 32c24
Sharp 32 pulg 32c24
Irwing Sanchez
 
Fed e-quick-start-up-guide-bientanfuji-dienhathe.com
Fed e-quick-start-up-guide-bientanfuji-dienhathe.comFed e-quick-start-up-guide-bientanfuji-dienhathe.com
Fed e-quick-start-up-guide-bientanfuji-dienhathe.com
Dien Ha The
 
10 - Ac Power Regulators & Control Power Transformers - Fuji Electric
10 - Ac Power Regulators & Control Power Transformers - Fuji Electric10 - Ac Power Regulators & Control Power Transformers - Fuji Electric
10 - Ac Power Regulators & Control Power Transformers - Fuji Electric
CTY TNHH HẠO PHƯƠNG
 
IRJET - Automated Monitoring Test Rig for Circuit Breaker Operation
IRJET -  	  Automated Monitoring Test Rig for Circuit Breaker OperationIRJET -  	  Automated Monitoring Test Rig for Circuit Breaker Operation
IRJET - Automated Monitoring Test Rig for Circuit Breaker Operation
IRJET Journal
 
Unit 6 power quality
Unit 6 power qualityUnit 6 power quality
Unit 6 power quality
hariyenireddy1
 
Power Quality Analyzer Kew 6315
Power Quality Analyzer Kew 6315Power Quality Analyzer Kew 6315
Power Quality Analyzer Kew 6315
Kyoritsu India
 
Power Quality Analyzer Kew 6315
Power Quality Analyzer Kew 6315Power Quality Analyzer Kew 6315
Power Quality Analyzer Kew 6315
Kyoritsu India
 
Catalog biến tần Inovance MD310
Catalog biến tần Inovance MD310Catalog biến tần Inovance MD310
Catalog biến tần Inovance MD310
CTY TNHH HẠO PHƯƠNG
 
sharp_14mn10_ch_sn-000.pptx
sharp_14mn10_ch_sn-000.pptxsharp_14mn10_ch_sn-000.pptx
sharp_14mn10_ch_sn-000.pptx
ssuser27df19
 
The Intellectual Automated Substation
The Intellectual Automated SubstationThe Intellectual Automated Substation
The Intellectual Automated Substation
ijtsrd
 
Real time parameter estimation for power quality control and intelligent prot...
Real time parameter estimation for power quality control and intelligent prot...Real time parameter estimation for power quality control and intelligent prot...
Real time parameter estimation for power quality control and intelligent prot...
EG TECHNOLOGIES
 
Hoja de datos lm 555 y configuraciones
Hoja de datos lm 555 y configuraciones Hoja de datos lm 555 y configuraciones
Hoja de datos lm 555 y configuraciones
Marlon Torres
 
lm555.pdf
lm555.pdflm555.pdf
lm555.pdf
Slides51
 
Resize bientanfuji-dienhathe.com
Resize bientanfuji-dienhathe.comResize bientanfuji-dienhathe.com
Resize bientanfuji-dienhathe.com
Dien Ha The
 
Ct2000 es manual_english_version_1[1].0
Ct2000 es manual_english_version_1[1].0Ct2000 es manual_english_version_1[1].0
Ct2000 es manual_english_version_1[1].0
Toàn Huỳnh
 

Similar to Sudden three phase short-circuit test (20)

Determination of the transient open circuit time constant
Determination of the transient open circuit time constantDetermination of the transient open circuit time constant
Determination of the transient open circuit time constant
 
FOR AUTONICS IC.pdf
FOR AUTONICS IC.pdfFOR AUTONICS IC.pdf
FOR AUTONICS IC.pdf
 
project presentation on "THMC"
project presentation on "THMC"project presentation on "THMC"
project presentation on "THMC"
 
Abb lv breakers working with trip curves
Abb lv breakers working with trip curvesAbb lv breakers working with trip curves
Abb lv breakers working with trip curves
 
Hioki solution car_industry_ denkei
Hioki solution car_industry_ denkeiHioki solution car_industry_ denkei
Hioki solution car_industry_ denkei
 
Sharp 32 pulg 32c24
Sharp 32 pulg 32c24Sharp 32 pulg 32c24
Sharp 32 pulg 32c24
 
Fed e-quick-start-up-guide-bientanfuji-dienhathe.com
Fed e-quick-start-up-guide-bientanfuji-dienhathe.comFed e-quick-start-up-guide-bientanfuji-dienhathe.com
Fed e-quick-start-up-guide-bientanfuji-dienhathe.com
 
10 - Ac Power Regulators & Control Power Transformers - Fuji Electric
10 - Ac Power Regulators & Control Power Transformers - Fuji Electric10 - Ac Power Regulators & Control Power Transformers - Fuji Electric
10 - Ac Power Regulators & Control Power Transformers - Fuji Electric
 
IRJET - Automated Monitoring Test Rig for Circuit Breaker Operation
IRJET -  	  Automated Monitoring Test Rig for Circuit Breaker OperationIRJET -  	  Automated Monitoring Test Rig for Circuit Breaker Operation
IRJET - Automated Monitoring Test Rig for Circuit Breaker Operation
 
Unit 6 power quality
Unit 6 power qualityUnit 6 power quality
Unit 6 power quality
 
Power Quality Analyzer Kew 6315
Power Quality Analyzer Kew 6315Power Quality Analyzer Kew 6315
Power Quality Analyzer Kew 6315
 
Power Quality Analyzer Kew 6315
Power Quality Analyzer Kew 6315Power Quality Analyzer Kew 6315
Power Quality Analyzer Kew 6315
 
Catalog biến tần Inovance MD310
Catalog biến tần Inovance MD310Catalog biến tần Inovance MD310
Catalog biến tần Inovance MD310
 
sharp_14mn10_ch_sn-000.pptx
sharp_14mn10_ch_sn-000.pptxsharp_14mn10_ch_sn-000.pptx
sharp_14mn10_ch_sn-000.pptx
 
The Intellectual Automated Substation
The Intellectual Automated SubstationThe Intellectual Automated Substation
The Intellectual Automated Substation
 
Real time parameter estimation for power quality control and intelligent prot...
Real time parameter estimation for power quality control and intelligent prot...Real time parameter estimation for power quality control and intelligent prot...
Real time parameter estimation for power quality control and intelligent prot...
 
Hoja de datos lm 555 y configuraciones
Hoja de datos lm 555 y configuraciones Hoja de datos lm 555 y configuraciones
Hoja de datos lm 555 y configuraciones
 
lm555.pdf
lm555.pdflm555.pdf
lm555.pdf
 
Resize bientanfuji-dienhathe.com
Resize bientanfuji-dienhathe.comResize bientanfuji-dienhathe.com
Resize bientanfuji-dienhathe.com
 
Ct2000 es manual_english_version_1[1].0
Ct2000 es manual_english_version_1[1].0Ct2000 es manual_english_version_1[1].0
Ct2000 es manual_english_version_1[1].0
 

More from Donald Stephen

Tangent delta test report form
Tangent delta test report formTangent delta test report form
Tangent delta test report formDonald Stephen
 
Stator insulation test setup
Stator insulation test setupStator insulation test setup
Stator insulation test setupDonald Stephen
 
Stator core induction test
Stator core induction testStator core induction test
Stator core induction testDonald Stephen
 
Stator core compr test
Stator core compr testStator core compr test
Stator core compr test
Donald Stephen
 
Rotor insul test setup
Rotor insul test setupRotor insul test setup
Rotor insul test setup
Donald Stephen
 
Measurement of winding resistances
Measurement of winding resistancesMeasurement of winding resistances
Measurement of winding resistancesDonald Stephen
 
Measurement of shaft voltage and shaft current on machines with sleeve bearings
Measurement of shaft voltage and shaft current on machines with sleeve bearingsMeasurement of shaft voltage and shaft current on machines with sleeve bearings
Measurement of shaft voltage and shaft current on machines with sleeve bearingsDonald Stephen
 
Measurement of partial discharges
Measurement of partial dischargesMeasurement of partial discharges
Measurement of partial dischargesDonald Stephen
 
Loss tangent delta test
Loss tangent delta testLoss tangent delta test
Loss tangent delta test
Donald Stephen
 
Load test
Load testLoad test
Load test
Donald Stephen
 
Line to-line sustained short-circuit test
Line to-line sustained short-circuit testLine to-line sustained short-circuit test
Line to-line sustained short-circuit testDonald Stephen
 
Insulation resistance testing
Insulation resistance testingInsulation resistance testing
Insulation resistance testing
Donald Stephen
 
Insulation resistance test
Insulation resistance testInsulation resistance test
Insulation resistance test
Donald Stephen
 
Impedance measurement of field windings
Impedance measurement of field windingsImpedance measurement of field windings
Impedance measurement of field windings
Donald Stephen
 
High potential test
High potential testHigh potential test
High potential test
Donald Stephen
 
Efficiency determination on hydrogenerators by calorimetric method
Efficiency determination on hydrogenerators by calorimetric methodEfficiency determination on hydrogenerators by calorimetric method
Efficiency determination on hydrogenerators by calorimetric method
Donald Stephen
 
Determination of inertia by load rejection
Determination of inertia by load rejectionDetermination of inertia by load rejection
Determination of inertia by load rejection
Donald Stephen
 
Core deffect detector
Core deffect detectorCore deffect detector
Core deffect detector
Donald Stephen
 

More from Donald Stephen (20)

Tangent delta test report form
Tangent delta test report formTangent delta test report form
Tangent delta test report form
 
Stator insulation test setup
Stator insulation test setupStator insulation test setup
Stator insulation test setup
 
Stator core induction test
Stator core induction testStator core induction test
Stator core induction test
 
Stator core compr test
Stator core compr testStator core compr test
Stator core compr test
 
Rotor insul test setup
Rotor insul test setupRotor insul test setup
Rotor insul test setup
 
Noise measurement
Noise measurementNoise measurement
Noise measurement
 
Measurement of winding resistances
Measurement of winding resistancesMeasurement of winding resistances
Measurement of winding resistances
 
Measurement of shaft voltage and shaft current on machines with sleeve bearings
Measurement of shaft voltage and shaft current on machines with sleeve bearingsMeasurement of shaft voltage and shaft current on machines with sleeve bearings
Measurement of shaft voltage and shaft current on machines with sleeve bearings
 
Measurement of partial discharges
Measurement of partial dischargesMeasurement of partial discharges
Measurement of partial discharges
 
Loss tangent delta test
Loss tangent delta testLoss tangent delta test
Loss tangent delta test
 
Load test
Load testLoad test
Load test
 
Line to-line sustained short-circuit test
Line to-line sustained short-circuit testLine to-line sustained short-circuit test
Line to-line sustained short-circuit test
 
Insulation resistance testing
Insulation resistance testingInsulation resistance testing
Insulation resistance testing
 
Insulation resistance test
Insulation resistance testInsulation resistance test
Insulation resistance test
 
Impedance measurement of field windings
Impedance measurement of field windingsImpedance measurement of field windings
Impedance measurement of field windings
 
High potential test
High potential testHigh potential test
High potential test
 
Efficiency determination on hydrogenerators by calorimetric method
Efficiency determination on hydrogenerators by calorimetric methodEfficiency determination on hydrogenerators by calorimetric method
Efficiency determination on hydrogenerators by calorimetric method
 
Determination of inertia by load rejection
Determination of inertia by load rejectionDetermination of inertia by load rejection
Determination of inertia by load rejection
 
Crack monitor
Crack monitorCrack monitor
Crack monitor
 
Core deffect detector
Core deffect detectorCore deffect detector
Core deffect detector
 

Recently uploaded

Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
ssuser7dcef0
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 

Recently uploaded (20)

Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 

Sudden three phase short-circuit test

  • 1. Sudden three phase short circuit test Table of Content: 1 Objective.......................................................................................................... 2 Scope............................................................................................................... 3 Referenced documents.................................................................................... 4 Terms and abbreviations.................................................................................. 5 Sudden three-phase short-circuit test............................................................... 5.1 Preparations................................................................................................... 5.2 Conduction of test.......................................................................................... 5.3 Evaluation of the test...................................................................................... 6 Proceeding in case of deviations ...................................................................... 7 Copyright............................................................................................................ 1 Objective The sudden three-phase short-circuit test is performed to determine the following machine quantities: - Direct-axis transient reactance Xd' - Direct-axis subtransient reactance Xd" - Direct-axis transient short-circuit time constant Td' - Direct-axis subtransient short-circuit time constant Td" - Armature short-circuit time constant Ta. - Evidence of mechanical strength 2 Scope This procedure applies to all types of synchronous machines during final inspections at site or in the workshop. 3 Referenced documents IEC 34-4, 40-41 Rotating electrical machines – Methods for determining Synchronous machine quantities from tests IEEE 115, 11.7 Test Procedures for synchronous machines EN 60034-4 Rotating electrical machines - Methods for determining Synchronous machine quantities from tests 4 Terms and abbreviations none 5 Sudden three-phase short-circuit test 5.1 Preparations Visual inspections: - End winding supports - Condition of foundation - Are the foundation bolts tightened? 8/25/2005 9:02 a8/p8 © VA TECH HYDRO Page 1 of 4
  • 2. - Correct assembly and fixation of all rotor components - Disconnect the line terminals from the terminal buses (may not be necessary in all cases). - Connect the power cable between the line terminals and the circuit breaker, which is used to make the short-circuit and install measuring devices for recording the short- circuit currents in wye-connection. Note: Normally the plant circuit breaker will be used for this purpose. To install a separate short-circuit breaker in the plant requires high efforts and good coordination between the user of the plant and the generator manufacturer, as well as considerable extra costs. In the workshop a special short-circuit breaker with synchronized phases is used. The short circuit itself can be made with a special bar across the terminal buses or a disconnector installed in the current leads (e.g. braking disconnector). This is placed after the circuit breaker and is inserted before switching in the circuit breaker. Consider that it is designed to support the current forces and can carry the substained short circuit current during the recording time. - For current transformation the following equipment may be alternatively used: - Linearized current transformers - Low inductance precision shunts - Unlock protection relays as required. - Remove the grounding cable of the neutral terminals and directly connect the common terminal of the three-phase short-circuit wye to ground. - Attach a voltmeter and potential transformer to the generator line terminals (if required) to measure the armature voltage prior to the sudden short-circuit. - Connect and set the precision instruments for measuring the terminal voltage and field current. Note: The following analog- or digital instruments or equivalent (at least 4 channels) may be used for recording purposes: - Digital storage oscilloscope (Hioki 8855) - Memory Recorder (YEW AR 1100 A) - Memory Recorder (YEW DL 708) - Connect the output signals of the current transformer (CT) or equivalent to the recorder, whereby the current signal of the CT is converted into a voltage signal required for the digital storage oscilloscope using precision shunts. - Calibrate and set the trigger of the recording instruments to the expected levels. 5.2 Conduction of test - Operate the unit at rated speed in no-load condition with the manual control of the excitation system. In case of static excitation set the ignition anlge of the gate trigger pulse to achieve the required generator voltage. Neither a current regulator (for the field current) nor a voltage regulator (for the generator voltage) may be switched on. Note: If a prime mover is not available, this test can also be performed by retardation method, initiating the sudden short-circuit, when the decelerating machine passes through nominal speed. 8/25/2005 9:02 a8/p8 © VA TECH HYDRO Page 2 of 4
  • 3. - Supply small field current and then initiate a trial run of the sudden short-circuit test. Verify that recorders are triggered and all signals are recorded properly. - Adjust the excitation to the desired value of the terminal voltage. Note: The usual test voltage is approx. 0.5 Un. The test may be repeated at various open circuit voltages as required by the contract. For voltages exceeding this limit value, explicit agreement of the turbine manufacturer should be reached. Through the machine set must withstand the short-circuit forces, there is a high risk of damages to the foundation (especially in case of bulb-type generators). Therefore it is not recommended to perform a 100% Un sudden short-circuit directly at all stator terminals. Consider that machine life endurance may be reduced. - Read off the terminal voltage, frequency and field current immediately before performing the sudden short circuit test. If still free channels are available on the digital storage oscilloscope, at least the phase-to-phase voltage of the generator should be recorded by oscilloscope. - Close the circuit breaker in order to initiate the sudden short-circuits. Recording instruments will be triggered and the three armature currents, the field current and the voltage going to zero should be recorded continuously. - After approx. 10 sec. record the armature currents manually, then switch off the excitation and open the circuit breaker. - Check the recordings in order to ensure that the data was registrated correctly. Performed by: GP-QS1 5.3 Evaluation of the test - Mathematical evaluation acc. to IEC-standard. Note: Since the sudden short-circuit test is mainly performed with reduced voltages, in general only unsaturated values for the reactance’s can be determined. Saturated values should be estimated from the calculation values. - The evaluation of analog short-circuit current characteristics can only be done by hand. - Digital storage data may be computer evaluated, using a special program for separating the envelope of the current waveform into 2 exponential functions. - If a 100% Un sudden short-circuit is performed at the generator terminals (only after agreement with the customer), despite of the prohibitive aspects mentioned, thorough visual inspection for cracks, permanent deformations and any other damages shall be made after the test. e.g.: - End winding support - Condition of winding (ties, spacers …) - Condition of foundation - Foundation bolts - Assembly and fixation of rotor components - Acc. to international standards, a repetition of the voltage test, preferably 80% of test voltage, are recommended. 8/25/2005 9:02 a8/p8 © VA TECH HYDRO Page 3 of 4
  • 4. 6 Proceeding in case of deviations Any nominal value, minimum value, maximum value, tolerance etc. given in an instruction is intended to serve for quality purposes only. In case of deviations, a non- conformity report has to be written acc. to PNG Power Standard 7 Copyright This Document is properly of PNG Power internal use only and must neither be copied. Neither is it to be handed over nor in other way communicated to a third party. Infringement will lead to prosecution. 8/25/2005 9:02 a8/p8 © VA TECH HYDRO Page 4 of 4