SlideShare a Scribd company logo
Calorimetric Measurements and Evaluation of Calorimetric losses
Table of Content:
1 Objective........................................................................................................
2 Scope.............................................................................................................
3 Referenced Documents.................................................................................
4 Definitions and Abbreviations........................................................................
5 General...........................................................................................................
5.1 Measured calorimetric quantities.....................................................
5.2 Determination of losses from calorimetric quantities.......................
5.3 Evaluation of calorimetric losses.....................................................
6 Conduction of test...........................................................................................
7 Measuring equipment.....................................................................................
7.1 Measuring devices and installation requirements........................................
7.2 Measuring accuracy.....................................................................................
8 Determination of efficiency..............................................................................
9 Proceeding in case of deviations....................................................................
Page 1 of 7
Page 2 of 7
Page 3 of 7
Page 4 of 7
Page 5 of 7
Page 6 of 7
9 Proceeding in case of deviations
Any nominal value, minimum value, maximum value, tolerance etc given in an instruction
is intended to serve for quality control purposes only. In the case of deviations, a
nonconformity report has to be written according to PNG Power Standard
10 This Document is properly of PNG Power internal use only and must neither be
copied. Neither is it to be handed over nor in other way communicated to a third party.
Infringement will lead to prosecution.
Page 7 of 7

More Related Content

What's hot

BMG Money Credit Education Toolkit
BMG Money Credit Education ToolkitBMG Money Credit Education Toolkit
BMG Money Credit Education Toolkit
Richsard Smith
 
NemanjaMarjanovicG00263151FinalYearProjectReport
NemanjaMarjanovicG00263151FinalYearProjectReportNemanjaMarjanovicG00263151FinalYearProjectReport
NemanjaMarjanovicG00263151FinalYearProjectReportNemanja Marjanović
 
Hồ Sơ Năng Lực Mediphar USA
Hồ Sơ Năng Lực Mediphar USAHồ Sơ Năng Lực Mediphar USA
Hồ Sơ Năng Lực Mediphar USA
MedipharUSA
 
Proyecto final
Proyecto final Proyecto final
PROJECT MANAGEMENT PLAN - Kismayo, Somalia
PROJECT MANAGEMENT PLAN - Kismayo, SomaliaPROJECT MANAGEMENT PLAN - Kismayo, Somalia
PROJECT MANAGEMENT PLAN - Kismayo, SomaliaShanna-Kay Smith
 
Home and Garden Website Templates
Home and Garden Website TemplatesHome and Garden Website Templates
Home and Garden Website Templates
Ingenyes
 
The mysterious s_curve
The mysterious s_curveThe mysterious s_curve
The mysterious s_curve
M.S. Aftab
 
PCI Guidance On Penetration Testing
PCI Guidance On Penetration TestingPCI Guidance On Penetration Testing
PCI Guidance On Penetration Testing
The Hacker News
 
Standards, Legal and Privacy aspects for IoT
Standards, Legal and Privacy aspects for IoTStandards, Legal and Privacy aspects for IoT
Standards, Legal and Privacy aspects for IoT
IET India
 
Advanced System Analysis And Design
Advanced System Analysis And Design Advanced System Analysis And Design
Advanced System Analysis And Design
Anit Thapaliya
 
The on-time completion of light rails in the United States: a qualitative com...
The on-time completion of light rails in the United States: a qualitative com...The on-time completion of light rails in the United States: a qualitative com...
The on-time completion of light rails in the United States: a qualitative com...
Sally Indah N
 
Peraturan Permainan FIBA 2017
Peraturan Permainan FIBA 2017Peraturan Permainan FIBA 2017
Peraturan Permainan FIBA 2017
Jimmy L
 
Dissertation_katia_2015_ultima
Dissertation_katia_2015_ultimaDissertation_katia_2015_ultima
Dissertation_katia_2015_ultimaKatia Cuellar
 
The Thin Months Revisited
The Thin Months RevisitedThe Thin Months Revisited
The Thin Months Revisited
After The Harvest
 

What's hot (16)

BMG Money Credit Education Toolkit
BMG Money Credit Education ToolkitBMG Money Credit Education Toolkit
BMG Money Credit Education Toolkit
 
NemanjaMarjanovicG00263151FinalYearProjectReport
NemanjaMarjanovicG00263151FinalYearProjectReportNemanjaMarjanovicG00263151FinalYearProjectReport
NemanjaMarjanovicG00263151FinalYearProjectReport
 
Table of contents
Table of contentsTable of contents
Table of contents
 
Hồ Sơ Năng Lực Mediphar USA
Hồ Sơ Năng Lực Mediphar USAHồ Sơ Năng Lực Mediphar USA
Hồ Sơ Năng Lực Mediphar USA
 
Proyecto final
Proyecto final Proyecto final
Proyecto final
 
PROJECT MANAGEMENT PLAN - Kismayo, Somalia
PROJECT MANAGEMENT PLAN - Kismayo, SomaliaPROJECT MANAGEMENT PLAN - Kismayo, Somalia
PROJECT MANAGEMENT PLAN - Kismayo, Somalia
 
Home and Garden Website Templates
Home and Garden Website TemplatesHome and Garden Website Templates
Home and Garden Website Templates
 
The mysterious s_curve
The mysterious s_curveThe mysterious s_curve
The mysterious s_curve
 
Official basketball rules_2014_y
Official basketball rules_2014_yOfficial basketball rules_2014_y
Official basketball rules_2014_y
 
PCI Guidance On Penetration Testing
PCI Guidance On Penetration TestingPCI Guidance On Penetration Testing
PCI Guidance On Penetration Testing
 
Standards, Legal and Privacy aspects for IoT
Standards, Legal and Privacy aspects for IoTStandards, Legal and Privacy aspects for IoT
Standards, Legal and Privacy aspects for IoT
 
Advanced System Analysis And Design
Advanced System Analysis And Design Advanced System Analysis And Design
Advanced System Analysis And Design
 
The on-time completion of light rails in the United States: a qualitative com...
The on-time completion of light rails in the United States: a qualitative com...The on-time completion of light rails in the United States: a qualitative com...
The on-time completion of light rails in the United States: a qualitative com...
 
Peraturan Permainan FIBA 2017
Peraturan Permainan FIBA 2017Peraturan Permainan FIBA 2017
Peraturan Permainan FIBA 2017
 
Dissertation_katia_2015_ultima
Dissertation_katia_2015_ultimaDissertation_katia_2015_ultima
Dissertation_katia_2015_ultima
 
The Thin Months Revisited
The Thin Months RevisitedThe Thin Months Revisited
The Thin Months Revisited
 

Viewers also liked

High potential test
High potential testHigh potential test
High potential test
Donald Stephen
 
Check pole connector
Check pole connectorCheck pole connector
Check pole connector
Donald Stephen
 
Core deffect detector
Core deffect detectorCore deffect detector
Core deffect detector
Donald Stephen
 
Stator insulation test setup
Stator insulation test setupStator insulation test setup
Stator insulation test setupDonald Stephen
 
Load test
Load testLoad test
Load test
Donald Stephen
 
Determination of the transient open circuit time constant
Determination of the transient open circuit time constantDetermination of the transient open circuit time constant
Determination of the transient open circuit time constant
Donald Stephen
 
Measurement of winding resistances
Measurement of winding resistancesMeasurement of winding resistances
Measurement of winding resistancesDonald Stephen
 
Rotor insul test setup
Rotor insul test setupRotor insul test setup
Rotor insul test setup
Donald Stephen
 
Participants 2009 bilderberg meetings
Participants 2009   bilderberg meetingsParticipants 2009   bilderberg meetings
Participants 2009 bilderberg meetings
Donald Stephen
 
Insulation resistance testing
Insulation resistance testingInsulation resistance testing
Insulation resistance testing
Donald Stephen
 
Sustained three phase short-circuit test and overcurrent test
Sustained three phase short-circuit test and overcurrent testSustained three phase short-circuit test and overcurrent test
Sustained three phase short-circuit test and overcurrent testDonald Stephen
 
Measurement of shaft voltage and shaft current on machines with sleeve bearings
Measurement of shaft voltage and shaft current on machines with sleeve bearingsMeasurement of shaft voltage and shaft current on machines with sleeve bearings
Measurement of shaft voltage and shaft current on machines with sleeve bearingsDonald Stephen
 
Sudden three phase short-circuit test
Sudden three phase short-circuit testSudden three phase short-circuit test
Sudden three phase short-circuit testDonald Stephen
 
Impedance measurement of field windings
Impedance measurement of field windingsImpedance measurement of field windings
Impedance measurement of field windings
Donald Stephen
 
Loss tangent delta test
Loss tangent delta testLoss tangent delta test
Loss tangent delta test
Donald Stephen
 
Line to-line sustained short-circuit test
Line to-line sustained short-circuit testLine to-line sustained short-circuit test
Line to-line sustained short-circuit testDonald Stephen
 
Insulation resistance test
Insulation resistance testInsulation resistance test
Insulation resistance test
Donald Stephen
 
Stator core compr test
Stator core compr testStator core compr test
Stator core compr test
Donald Stephen
 
Stator core induction test
Stator core induction testStator core induction test
Stator core induction testDonald Stephen
 

Viewers also liked (20)

High potential test
High potential testHigh potential test
High potential test
 
Check pole connector
Check pole connectorCheck pole connector
Check pole connector
 
Core deffect detector
Core deffect detectorCore deffect detector
Core deffect detector
 
Stator insulation test setup
Stator insulation test setupStator insulation test setup
Stator insulation test setup
 
Load test
Load testLoad test
Load test
 
Determination of the transient open circuit time constant
Determination of the transient open circuit time constantDetermination of the transient open circuit time constant
Determination of the transient open circuit time constant
 
Measurement of winding resistances
Measurement of winding resistancesMeasurement of winding resistances
Measurement of winding resistances
 
Rotor insul test setup
Rotor insul test setupRotor insul test setup
Rotor insul test setup
 
Participants 2009 bilderberg meetings
Participants 2009   bilderberg meetingsParticipants 2009   bilderberg meetings
Participants 2009 bilderberg meetings
 
Insulation resistance testing
Insulation resistance testingInsulation resistance testing
Insulation resistance testing
 
Sustained three phase short-circuit test and overcurrent test
Sustained three phase short-circuit test and overcurrent testSustained three phase short-circuit test and overcurrent test
Sustained three phase short-circuit test and overcurrent test
 
Measurement of shaft voltage and shaft current on machines with sleeve bearings
Measurement of shaft voltage and shaft current on machines with sleeve bearingsMeasurement of shaft voltage and shaft current on machines with sleeve bearings
Measurement of shaft voltage and shaft current on machines with sleeve bearings
 
Sudden three phase short-circuit test
Sudden three phase short-circuit testSudden three phase short-circuit test
Sudden three phase short-circuit test
 
Impedance measurement of field windings
Impedance measurement of field windingsImpedance measurement of field windings
Impedance measurement of field windings
 
Loss tangent delta test
Loss tangent delta testLoss tangent delta test
Loss tangent delta test
 
Crack monitor
Crack monitorCrack monitor
Crack monitor
 
Line to-line sustained short-circuit test
Line to-line sustained short-circuit testLine to-line sustained short-circuit test
Line to-line sustained short-circuit test
 
Insulation resistance test
Insulation resistance testInsulation resistance test
Insulation resistance test
 
Stator core compr test
Stator core compr testStator core compr test
Stator core compr test
 
Stator core induction test
Stator core induction testStator core induction test
Stator core induction test
 

Similar to Efficiency determination on hydrogenerators by calorimetric method

Baseline survey of basic health service package paid by health insurance fund...
Baseline survey of basic health service package paid by health insurance fund...Baseline survey of basic health service package paid by health insurance fund...
Baseline survey of basic health service package paid by health insurance fund...
HFG Project
 
Performance Measures Report Results Summary
Performance Measures Report Results SummaryPerformance Measures Report Results Summary
Performance Measures Report Results SummaryKelly Carlson
 
Ship maintenance performance measurement
Ship maintenance performance measurementShip maintenance performance measurement
Ship maintenance performance measurementGopalakrishnan P
 
Fr a200
Fr a200Fr a200
Fr a200
Toàn Huỳnh
 
Practica de los margenes
Practica de los margenesPractica de los margenes
Practica de los margenes
Allison Arguello
 
Capstone jordan new award metrics for sustainability_final
Capstone jordan new award metrics for sustainability_finalCapstone jordan new award metrics for sustainability_final
Capstone jordan new award metrics for sustainability_finalLuke Statz
 
Gender livestock and livelihood indicators
Gender livestock and livelihood indicatorsGender livestock and livelihood indicators
Gender livestock and livelihood indicatorsPeter Chikwekwete
 
Configuration-Release management
Configuration-Release managementConfiguration-Release management
Configuration-Release managementRavindranath Tagore
 
Relazione forno orizzontale
Relazione forno orizzontaleRelazione forno orizzontale
Relazione forno orizzontaleALESSANDRO LOTTI
 
Nea2 f final june 2012
Nea2 f  final june 2012Nea2 f  final june 2012
Nea2 f final june 2012jimbrown123
 
Guide to Hydrological Practices: Data Acquisition and Processing, Analysis, F...
Guide to Hydrological Practices: Data Acquisition and Processing, Analysis, F...Guide to Hydrological Practices: Data Acquisition and Processing, Analysis, F...
Guide to Hydrological Practices: Data Acquisition and Processing, Analysis, F...
indiawrm
 
Report on flood hazard model
Report on flood hazard modelReport on flood hazard model
Report on flood hazard model
CIRM
 
CEI China Port Development Report 210
CEI China Port Development Report 210CEI China Port Development Report 210
CEI China Port Development Report 210
China Economic Indicator
 
Urban Violence Survey in Nakuru County, Kenya
Urban Violence Survey in Nakuru County, KenyaUrban Violence Survey in Nakuru County, Kenya
Urban Violence Survey in Nakuru County, Kenya
Famous Nakuru
 
Urban Violence Survey in Nakuru County, Kenya
Urban Violence Survey in Nakuru County, KenyaUrban Violence Survey in Nakuru County, Kenya
Urban Violence Survey in Nakuru County, Kenya
Midrift Human Rights Network
 
Cambridge as level correction of errors
Cambridge as level correction of errorsCambridge as level correction of errors
Cambridge as level correction of errors
Sanjaya Jayasundara
 
Introduction to objectual philosophy
Introduction to objectual philosophyIntroduction to objectual philosophy
Introduction to objectual philosophy
Aurel Rusu
 
Protective Device Coordination
Protective Device CoordinationProtective Device Coordination
Protective Device Coordinationjoeengi
 

Similar to Efficiency determination on hydrogenerators by calorimetric method (20)

YieldCos in the U.S. Final AN
YieldCos in the U.S. Final ANYieldCos in the U.S. Final AN
YieldCos in the U.S. Final AN
 
Baseline survey of basic health service package paid by health insurance fund...
Baseline survey of basic health service package paid by health insurance fund...Baseline survey of basic health service package paid by health insurance fund...
Baseline survey of basic health service package paid by health insurance fund...
 
Performance Measures Report Results Summary
Performance Measures Report Results SummaryPerformance Measures Report Results Summary
Performance Measures Report Results Summary
 
Ship maintenance performance measurement
Ship maintenance performance measurementShip maintenance performance measurement
Ship maintenance performance measurement
 
Fr a200
Fr a200Fr a200
Fr a200
 
Practica de los margenes
Practica de los margenesPractica de los margenes
Practica de los margenes
 
Capstone jordan new award metrics for sustainability_final
Capstone jordan new award metrics for sustainability_finalCapstone jordan new award metrics for sustainability_final
Capstone jordan new award metrics for sustainability_final
 
Gender livestock and livelihood indicators
Gender livestock and livelihood indicatorsGender livestock and livelihood indicators
Gender livestock and livelihood indicators
 
Configuration-Release management
Configuration-Release managementConfiguration-Release management
Configuration-Release management
 
E elt constrproposal
E elt constrproposalE elt constrproposal
E elt constrproposal
 
Relazione forno orizzontale
Relazione forno orizzontaleRelazione forno orizzontale
Relazione forno orizzontale
 
Nea2 f final june 2012
Nea2 f  final june 2012Nea2 f  final june 2012
Nea2 f final june 2012
 
Guide to Hydrological Practices: Data Acquisition and Processing, Analysis, F...
Guide to Hydrological Practices: Data Acquisition and Processing, Analysis, F...Guide to Hydrological Practices: Data Acquisition and Processing, Analysis, F...
Guide to Hydrological Practices: Data Acquisition and Processing, Analysis, F...
 
Report on flood hazard model
Report on flood hazard modelReport on flood hazard model
Report on flood hazard model
 
CEI China Port Development Report 210
CEI China Port Development Report 210CEI China Port Development Report 210
CEI China Port Development Report 210
 
Urban Violence Survey in Nakuru County, Kenya
Urban Violence Survey in Nakuru County, KenyaUrban Violence Survey in Nakuru County, Kenya
Urban Violence Survey in Nakuru County, Kenya
 
Urban Violence Survey in Nakuru County, Kenya
Urban Violence Survey in Nakuru County, KenyaUrban Violence Survey in Nakuru County, Kenya
Urban Violence Survey in Nakuru County, Kenya
 
Cambridge as level correction of errors
Cambridge as level correction of errorsCambridge as level correction of errors
Cambridge as level correction of errors
 
Introduction to objectual philosophy
Introduction to objectual philosophyIntroduction to objectual philosophy
Introduction to objectual philosophy
 
Protective Device Coordination
Protective Device CoordinationProtective Device Coordination
Protective Device Coordination
 

More from Donald Stephen

Tangent delta test report form
Tangent delta test report formTangent delta test report form
Tangent delta test report formDonald Stephen
 
Open circuit saturation test
Open circuit saturation testOpen circuit saturation test
Open circuit saturation testDonald Stephen
 
Measurement of partial discharges
Measurement of partial dischargesMeasurement of partial discharges
Measurement of partial dischargesDonald Stephen
 
Determination of inertia by load rejection
Determination of inertia by load rejectionDetermination of inertia by load rejection
Determination of inertia by load rejection
Donald Stephen
 
Temperature rise test
Temperature rise testTemperature rise test
Temperature rise test
Donald Stephen
 
Future strategic-issues-and-warfare
Future strategic-issues-and-warfareFuture strategic-issues-and-warfare
Future strategic-issues-and-warfare
Donald Stephen
 

More from Donald Stephen (8)

Tangent delta test report form
Tangent delta test report formTangent delta test report form
Tangent delta test report form
 
Open circuit saturation test
Open circuit saturation testOpen circuit saturation test
Open circuit saturation test
 
Noise measurement
Noise measurementNoise measurement
Noise measurement
 
Measurement of partial discharges
Measurement of partial dischargesMeasurement of partial discharges
Measurement of partial discharges
 
Determination of inertia by load rejection
Determination of inertia by load rejectionDetermination of inertia by load rejection
Determination of inertia by load rejection
 
Temperature rise test
Temperature rise testTemperature rise test
Temperature rise test
 
Future strategic-issues-and-warfare
Future strategic-issues-and-warfareFuture strategic-issues-and-warfare
Future strategic-issues-and-warfare
 
The Watcher
The WatcherThe Watcher
The Watcher
 

Recently uploaded

Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
top1002
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
AmarGB2
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 

Recently uploaded (20)

Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 

Efficiency determination on hydrogenerators by calorimetric method

  • 1. Calorimetric Measurements and Evaluation of Calorimetric losses Table of Content: 1 Objective........................................................................................................ 2 Scope............................................................................................................. 3 Referenced Documents................................................................................. 4 Definitions and Abbreviations........................................................................ 5 General........................................................................................................... 5.1 Measured calorimetric quantities..................................................... 5.2 Determination of losses from calorimetric quantities....................... 5.3 Evaluation of calorimetric losses..................................................... 6 Conduction of test........................................................................................... 7 Measuring equipment..................................................................................... 7.1 Measuring devices and installation requirements........................................ 7.2 Measuring accuracy..................................................................................... 8 Determination of efficiency.............................................................................. 9 Proceeding in case of deviations.................................................................... Page 1 of 7
  • 7. 9 Proceeding in case of deviations Any nominal value, minimum value, maximum value, tolerance etc given in an instruction is intended to serve for quality control purposes only. In the case of deviations, a nonconformity report has to be written according to PNG Power Standard 10 This Document is properly of PNG Power internal use only and must neither be copied. Neither is it to be handed over nor in other way communicated to a third party. Infringement will lead to prosecution. Page 7 of 7