SlideShare a Scribd company logo
Journal for Research | Volume 04 | Issue 01 | March 2018
ISSN: 2395-7549
All rights reserved by www.journal4research.org 6
An Integrated Approach to Reduce Intra City
Traffic at Coimbatore
Lakshmipriya. N Nitheesh .V.B
UG Student UG Student
Department of Civil Engineering Department of Civil Engineering
Dr. Mahalingam College of Engineering & Technology,
Pollachi, Tamil Nadu, India
Dr. Mahalingam College of Engineering & Technology,
Pollachi, Tamil Nadu, India
Abstract
Coimbatore (11.0168°N,76.9558°E) is a fast developing cosmopolitan city with large number of industries and educational
institutions. The development has lead to a large number of vehicles causing heavy traffic. The traffic congestion at Coimbatore
has been a major problem which causes traffic jams and accidents. The major reason for traffic has been the mofussil buses that
operate in the city. Around 1300 mofussil buses enter into the city, these buses play an important role in traffic congestion. The
best solution is to construct a centralized bus stand at the outskirts of the city. This would reduce the traffic, accidents and also
leads to development of the outskirts of the city. A suitable location near the city with sufficient road access to connecting cities
has been chosen and the bus terminus has been designed, modeled with all facilities and features.
Keywords: Coimbatore Bus Traffic, Bus Terminus Design, Modeling of Bus Terminus, Centralized Bus Terminus
_______________________________________________________________________________________________________
I. INTRODUCTION
RAFFIC congestion due to moffusil buses is a major trouble at Coimbatore (THE HINDU- march 21), which is also a major
reason for accidents. The major bus stands are Ukkadam bus stand, Gandhipuram bus stand, Singanallur bus stand, SETC bus
stand. Around 1500 buses are handled by these bus stands in a single day. These bus stands connect major cities like Trichy,
Madurai, Salem, some parts of Kerala and mostly all major part of Tamilnadu. All the buses enter the city causing heavy traffic.
The apt solution for this problem is the construction of a centralized bus terminus. Centralized bus terminus that is planned to be
constructed must have easy access to the city and all connecting routes to other cities. The terminus must have all amenities for
the comfort of passengers. The paper contains, choosing of apt location, planning, design and modeling of the bus terminus. It
also includes detail estimate for the construction of the bus terminus and the income forecast details.
II. CHOOSING LOCATION
The first and foremost step is choosing the location of the bus stand. Various important factors that has to be considered while
choosing a location for the bus terminus are,
 Accessibility from the city
 Road connectivity to major cities
 Availability of vast barren land
Other factors like operational considerations, turning, layover, driver change are also considered. A feasibility study was done
to choose the location of the bus terminus. Considering all the factors, VELLALORE (10.9778° N, 77.0277° E) was found to be
the apt location for the centralized bus terminus.
Fig. 1: Location of Vellalore.
An Integrated Approach to Reduce Intra City Traffic at Coimbatore
(J4R/ Volume 04 / Issue 01 / 002)
All rights reserved by www.journal4research.org 7
Fig. 2: Location of bus terminus at vellalore.
Fig. 3: Layout
Suitability of the Location:
Vellalore is a panchayat town and a western suburb of Coimbatore. Vellalore is situated at the outskirts of the city. It is a place
that has a lot of unused lands. Construction of centralized bus terminus at this location improves the locality to a greater extent,
this would pave way to the extension of the city.
Accessibility of the Location:
Accessibility from the city is an important factor, where Vellalore has accessibility to avinashi road, one of the important roads
of the city. Avinashi road is just 7 km away from Vellalore. Avinashi road can be Accessed by vellalore road and kamaraj road.
Fig. 4: Layout
An Integrated Approach to Reduce Intra City Traffic at Coimbatore
(J4R/ Volume 04 / Issue 01 / 002)
All rights reserved by www.journal4research.org 8
The road that connects avinashi road and vellalore is a single lane road and cannot handle the traffic when the bus terminus is
in use. The road must be made as a two lane road to accommodate the traffic. Another major reason for choosing this location is
that it lies on NH-544(formerly known as NH- 47). NH-544 connects major cities like cochin, thrissur, salem, kanniyakumari.
This road is currently a two lane road but actually as per the agreement of government with L&T, the road must be made as six
lane road. So this road can sufficiently handle the traffic of the mofussil buses.
III. DESIGN REQUIREMENTS OF THE TERMINUS
Capacity:
The centralized terminus that is planned is an integration of Gandhipuram bus stand, Singanallur bus stand, Ukkadam bus stand,
SETC bus stand. Therefore, the capacity of the bus terminus must occupy the handling capacity of all these bus stands. On
calculating the number of buses that is handled
By all these bus stand was found to be around 1500 buses, where Gandhipuram bus stand alone handles 648 buses that travels
to 14 different destinations. Area of the bus stand, bus shed and parking facilities must be in accordance with SP7- National
building code 2005. Three wheeler and taxi stand area must be 500m2 for 15,000 populations. Bus terminal must have an area of
4000m2 for 1,00,000 populations. Bus depot must have an area of 2 hectares for 5,00,000 populations. These area requirements
must be adhered.
Interior dimensions:
Interior dimensions include the design of bus bays and turning spaces for buses. Taking a multi-axle bus into account, length is
12 m and breadth is 3.2m and a turning radius of 10m. 15 bus bays may be provided in a single side. A factor in the location of a
terminus is how to turn the bus around to start the route in the other direction, which may be difficult in areas where road space is
an issue, or the road layout prevents U- turns. This does not apply for true circle routes, where buses simply operate permanently
in the clockwise or anti-clockwise direction. Termini in bus stations will often include reversing/run-around space, negating the
turning issue. If numbers of bays are increased, it would increase the walking distance of a passenger. Entry and exit must be
designed such that buses can turn and move inside easily.
Sanitary and drainage requirements:
Bus terminus will be used by a large number of persons. In such a case sanitary requirements is very important. Number of water
closets for male, female, urinals for male, wash basins, shower stalls must be provided in accordance with part ix section 2-
Drainage and Sanitation of National Building Code of India. Separate sanitation facilities are to be provided for passengers and
for drivers and other administrative workers in the terminus. Drainage must be provided such that no water must get stagnated.
Adequate storm drains must be provided.
Practical considerations:
Provisions for future extensions without dismantling should be made in the planning. Proper planning should be done to prevent
any congestion within the bus terminus. A bus terminus must have all amenities that can comfort the passenger. Amenities like,
hotels, pharmacies, staying rooms, waiting hall, locker rooms, ATM facilities must be present in a bus terminal. Structural
stability is so important and must bear any natural disaster. Each element like beam, slab, column, staircase, water tank must
structurally bear the loads. Since number of passengers will be more or less constant and huge on regular basis, proper design of
a septic tank is mandatory in order to avoid physical discomforts for both the passengers as well as environment. Septic tank
design must be done in accordance to IS2470.
IV. DESIGNED CENTRALIZED TERMINUS
A centralized bus terminus which would be sufficient to handle the mofussil bus traffic at Coimbatore has been planned and
designed. The designed bus terminus has a land area of 30 acres. It can handle up to 1600 buses with 8 platforms and 160 bus
bays. It can station up to 250 buses. The total built up area of the platform is 10,800m2
. The terminus also includes a G+1
building with a built up area of 12,000m2
. The terminal building has various amenities like,4 hotels, 2 veg and 2 non-veg hotel ,6
smaller eateries inside the terminus, Two 24-hour pharmacy and first-aid facilities and medical assistance, Shops, supermarkets,
ATM, rooms (a/c and non-a/c) for rent, Toilets, Wheel chairs are provided for the physically disabled, Passenger waiting hall,
Locker rooms. Terminus also includes a 6400m2
area for two wheelers and for wheeler.
An Integrated Approach to Reduce Intra City Traffic at Coimbatore
(J4R/ Volume 04 / Issue 01 / 002)
All rights reserved by www.journal4research.org 9
Fig. 5: Plan view of the bus stand
V. STRUCTURAL DESIGN
Each and every structural element of the bus terminus which includes beam, slab, column, water tank, septic tank has been
designed to bear all loads with adherence to Indian standards. Design has been done manually and also analyzed through
STAAD Pro.
Fig. 6: Using STAAD. Pro
VI. PAVEMENT DESIGN
Rigid pavement is composed of a concrete surface course an underlying base and sub-base course (optional) and is stiffer than
the flexible pavement. The cement concrete may be plain, reinforced or prestressed concrete. In the rigid pavement the load
transfer phenomenon is quite different than the flexible pavement. The concrete surface layer alone provides most of the rigid
pavement. The flexible pavement requires maintenance and routine repairs every few years and they deteriorate rapidly, cracks
and pot-holes are likely to appear due to poor drainage and heavy vehicular traffic. Thus rigid pavement is preferred even though
the initial cost is high, it will be economic in the longer run compared to flexible pavement. Hence rigid pavement is designed in
accordance to IRC 58.
VII.MODELING & RENDERING
Capacity:
The centralized terminus that is planned is an integration of Gandhipuram bus stand, Singanallur bus stand, Ukkadam bus stand,
SETC bus stand. Therefore, the capacity of the bus terminus must occupy the handling capacity of all these bus stands. On
calculating the number of buses that is handled
By all these bus stand was found to be around 1500 buses, where Gandhipuram bus stand alone handles 648 buses that travels to
14 different destinations. Area of the bus stand, bus shed and parking facilities must be in accordance with SP7- National
building code 2005. Three wheeler and taxi stand area must be 500m2
for 15,000 populations. Bus terminal must have an area of
4000m2
for 1,00,000 populations. Bus depot must have an area of 2 hectares for 5,00,000 populations. These area requirements
must be adhered.
An Integrated Approach to Reduce Intra City Traffic at Coimbatore
(J4R/ Volume 04 / Issue 01 / 002)
All rights reserved by www.journal4research.org 10
Interior dimensions:
Interior dimensions include the design of bus bays and turning spaces for buses. Taking a multi-axle bus into account, length is
12 m and breadth is 3.2m and a turning radius of 10m. 15 bus bays may be provided in a single side. A factor in the location of a
terminus is how to turn the bus around to start the route in the other direction, which may be difficult in areas where road space is
an issue, or the road layout prevents U- turns. This does not apply for true circle routes, where buses simply operate permanently
in the clockwise or anti-clockwise direction. Termini in bus stations will often include reversing/run-around space, negating the
turning issue. If numbers of bays are increased, it would increase the walking distance of a passenger. Entry and exit must be
designed such that buses can turn and move inside easily.
Sanitary and drainage requirements:
Bus terminus will be used by a large number of persons. In such a case sanitary requirements is very important. Number of water
closets for male, female, urinals for male, wash basins, shower stalls must be provided in accordance with part ix section 2-
Drainage and Sanitation of National Building Code of India. Separate sanitation facilities are to be provided for passengers and
for drivers and other administrative workers in the terminus. Drainage must be provided such that no water must get stagnated.
Adequate storm drains must be provided.
Practical considerations:
Provisions for future extensions without dismantling should be made in the planning. Proper planning should be done to prevent
any congestion within the bus terminus. A bus terminus must have all amenities that can comfort the passenger. Amenities like,
hotels, pharmacies, staying rooms, waiting hall, locker rooms, ATM facilities must be present in a bus terminal. Structural
stability is so important and must bear any natural disaster. Each element like beam, slab, column, staircase, water tank must
structurally bear the loads. Since number of passengers will be more or less constant and huge on regular basis, proper design of
a septic tank is mandatory in order to avoid physical discomforts for both the passengers as well as environment. Septic tank
design must be done in accordance to IS2470.
Modeling and rendering any structure has become an essential component as they portray the real time structure. Building
Information Modeling (BIM) is the fastest developing one nowadays. Modeling gives a neat and clear cut idea of each and every
element of the structure. Revit Architecture has been used for modeling and lumion has been used for rendering and walk
through, to show the real time design of the centralized terminus.
Fig. 7: 3D view of bus stand
Fig. 8: 3D view of bus base and utility area
An Integrated Approach to Reduce Intra City Traffic at Coimbatore
(J4R/ Volume 04 / Issue 01 / 002)
All rights reserved by www.journal4research.org 11
VIII. ESTIMATE & INCOME
The total cost for the bus terminus is estimated to be around 87 cores.
Fig. 9: Cost percentage representation using pei chart
Income from the bus terminal has been calculated based on half occupancy.
Monthly revenue from the bus stand has been analyzed to be as follows:
 Shops - 8,80,000
 Single room - 1,92,000
 Double room - 3,12,000
 Restaurants - 8,00,000
 TOTAL - Rs. 21,84,000
Apart from the above the bus stand will also fetch more indirect benefits to the government as well as to the Vellalore locality
in the aspects of physio-economic growth.
IX. CONCLUSION
Coimbatore, the Manchester of south India houses more than 25,000 industries. It has a very fast growth rate in economic means.
Due to this development it has lead to in city bus traffic. Centralized bus terminus at the apt location is a permanent solution. The
bus terminus can also be extended in future if required. Construction of this centralized bus terminus at vellalore not only
reduces intra city bus traffic but also yields an income of 21 lakhs per month and also leads to the development of the locality
leading an extension to the city.
REFERENCES
[1] Krishna Raju. N (2001) “Design of Reinforced Concrete Structures”, CBS publishers & Distributors.
[2] Dr. B.C. Punmia, Ashok Kumar Jain and Arun Kumar Jain (2006) “R.C.C. Designs”, Laxmi Publications Pvt. Ltd.,
[3] IRC 058-1988, Guidelines for the design of rigid pavement for highways (first revision) published by THE INDIAN ROADS CONGRESS.
[4] Reagen, P.E. and Yu, C.W. Limit State Design of Structural Concrete, Chatto and Windus, London, 1973.
[5] Indian Standard Code of Practice for Plain and Reinforced Concrete (fourth revision) IS: 456-2000, Bureau of Indian Standards, July 2000, New Delhi.
[6] Design Aids for Reinforced Concrete to IS: 456-1979. SP: 16 Indian Standard Institution, 1980.
[7] Nilson A.H, Design of concrete structure (Twelfth edition- 1997), The McGraw-Hill companies inc.
[8] Pytel A. Singer L.S, Strength of Materials(Fourth edition- 1987), by Harper & Row Publishers inc.
[9] Shedd T.C, Vawter JA. Theory of Simple Structures(2nd edition-1941), by Jhon Wiley & Sons inc.
[10] U.S. Department of Justice. 2002. ADA Standards for Accessible Design. Section10.2, BusStops and Terminals. http://www.ada.gov/adastd94.pdf.

More Related Content

What's hot

Bus Karo: Bus Depot Design Guideline
Bus Karo: Bus Depot Design Guideline Bus Karo: Bus Depot Design Guideline
Bus Karo: Bus Depot Design Guideline
WRI India
 
Landscape design for multimodal transport corridors
Landscape design for multimodal transport corridorsLandscape design for multimodal transport corridors
Landscape design for multimodal transport corridors
Geeva Chandana
 
Proposal for redesigning Panadura Bus Terminal- Sri Lanka
Proposal for redesigning Panadura Bus Terminal- Sri LankaProposal for redesigning Panadura Bus Terminal- Sri Lanka
Proposal for redesigning Panadura Bus Terminal- Sri Lanka
Asitha Jagoda Arachchi
 
Inter state bus terminal - Litrature study
Inter state bus terminal - Litrature studyInter state bus terminal - Litrature study
Inter state bus terminal - Litrature study
Akshey Sharma
 
Isbt kashmere gate 2
Isbt kashmere gate 2Isbt kashmere gate 2
Isbt kashmere gate 2
Kishmish Sethi
 
Standards for bus terminals
Standards for bus terminalsStandards for bus terminals
Standards for bus terminals
Indrajit Koner
 
Ad bus terminal chennai
Ad bus terminal chennaiAd bus terminal chennai
Ad bus terminal chennai
Bhagyashree G Zadmukhe
 
Chennai mofussil bus terminal
Chennai mofussil bus terminalChennai mofussil bus terminal
Chennai mofussil bus terminal
Shivang Madaan
 
Redesign of Gandhinagar Bus Terminal a Case Study
Redesign of Gandhinagar Bus Terminal a Case StudyRedesign of Gandhinagar Bus Terminal a Case Study
Redesign of Gandhinagar Bus Terminal a Case Study
IRJET Journal
 
APSRTC presentation
APSRTC presentationAPSRTC presentation
APSRTC presentation
Kunal Chaudhary
 
karunamoyee metro station thesis B.Arch
karunamoyee metro station thesis B.Archkarunamoyee metro station thesis B.Arch
karunamoyee metro station thesis B.Arch
Tuhina Chatterjee
 
Transportation analysis at anand vihar
Transportation analysis at anand viharTransportation analysis at anand vihar
Transportation analysis at anand vihar
Sneha Lata
 
BUS DEPOT DESIGN PRESENTATION
BUS DEPOT DESIGN PRESENTATIONBUS DEPOT DESIGN PRESENTATION
BUS DEPOT DESIGN PRESENTATIONShankar Sarkar
 
Geeta mandir bus port
Geeta mandir bus portGeeta mandir bus port
Geeta mandir bus port
Palak Khandelwal
 
Vyttila Mobility hub
Vyttila Mobility hubVyttila Mobility hub
Vyttila Mobility hub
Dhanuraj D
 
European Bus Operators' Forum - Yo Kaminagai
European Bus Operators' Forum - Yo KaminagaiEuropean Bus Operators' Forum - Yo Kaminagai
European Bus Operators' Forum - Yo KaminagaiRussell Publishing
 
ISBT Amritsar (ISBT Media)
ISBT Amritsar (ISBT Media)ISBT Amritsar (ISBT Media)
ISBT Amritsar (ISBT Media)
asquaremedia
 
Kashmere gate isbt
Kashmere gate isbtKashmere gate isbt
Kashmere gate isbt
Sneha Lata
 
placement of bus stops
placement of bus stopsplacement of bus stops
placement of bus stopstarlesubba
 
03 public transport
03 public transport03 public transport
03 public transport
Universiti Kebangsaan Malaysia
 

What's hot (20)

Bus Karo: Bus Depot Design Guideline
Bus Karo: Bus Depot Design Guideline Bus Karo: Bus Depot Design Guideline
Bus Karo: Bus Depot Design Guideline
 
Landscape design for multimodal transport corridors
Landscape design for multimodal transport corridorsLandscape design for multimodal transport corridors
Landscape design for multimodal transport corridors
 
Proposal for redesigning Panadura Bus Terminal- Sri Lanka
Proposal for redesigning Panadura Bus Terminal- Sri LankaProposal for redesigning Panadura Bus Terminal- Sri Lanka
Proposal for redesigning Panadura Bus Terminal- Sri Lanka
 
Inter state bus terminal - Litrature study
Inter state bus terminal - Litrature studyInter state bus terminal - Litrature study
Inter state bus terminal - Litrature study
 
Isbt kashmere gate 2
Isbt kashmere gate 2Isbt kashmere gate 2
Isbt kashmere gate 2
 
Standards for bus terminals
Standards for bus terminalsStandards for bus terminals
Standards for bus terminals
 
Ad bus terminal chennai
Ad bus terminal chennaiAd bus terminal chennai
Ad bus terminal chennai
 
Chennai mofussil bus terminal
Chennai mofussil bus terminalChennai mofussil bus terminal
Chennai mofussil bus terminal
 
Redesign of Gandhinagar Bus Terminal a Case Study
Redesign of Gandhinagar Bus Terminal a Case StudyRedesign of Gandhinagar Bus Terminal a Case Study
Redesign of Gandhinagar Bus Terminal a Case Study
 
APSRTC presentation
APSRTC presentationAPSRTC presentation
APSRTC presentation
 
karunamoyee metro station thesis B.Arch
karunamoyee metro station thesis B.Archkarunamoyee metro station thesis B.Arch
karunamoyee metro station thesis B.Arch
 
Transportation analysis at anand vihar
Transportation analysis at anand viharTransportation analysis at anand vihar
Transportation analysis at anand vihar
 
BUS DEPOT DESIGN PRESENTATION
BUS DEPOT DESIGN PRESENTATIONBUS DEPOT DESIGN PRESENTATION
BUS DEPOT DESIGN PRESENTATION
 
Geeta mandir bus port
Geeta mandir bus portGeeta mandir bus port
Geeta mandir bus port
 
Vyttila Mobility hub
Vyttila Mobility hubVyttila Mobility hub
Vyttila Mobility hub
 
European Bus Operators' Forum - Yo Kaminagai
European Bus Operators' Forum - Yo KaminagaiEuropean Bus Operators' Forum - Yo Kaminagai
European Bus Operators' Forum - Yo Kaminagai
 
ISBT Amritsar (ISBT Media)
ISBT Amritsar (ISBT Media)ISBT Amritsar (ISBT Media)
ISBT Amritsar (ISBT Media)
 
Kashmere gate isbt
Kashmere gate isbtKashmere gate isbt
Kashmere gate isbt
 
placement of bus stops
placement of bus stopsplacement of bus stops
placement of bus stops
 
03 public transport
03 public transport03 public transport
03 public transport
 

Similar to AN INTEGRATED APPROACH TO REDUCE INTRA CITY TRAFFIC AT COIMBATORE | J4RV4I1002

Effective learning from delhi brts –a case study of pune brts
Effective learning from delhi brts –a case study of pune brtsEffective learning from delhi brts –a case study of pune brts
Effective learning from delhi brts –a case study of pune brts
eSAT Journals
 
Market research on the Bandra Skywalk
Market research on the Bandra SkywalkMarket research on the Bandra Skywalk
Market research on the Bandra SkywalkHeemanish Midde
 
CSG__UNIT-3.pptx
CSG__UNIT-3.pptxCSG__UNIT-3.pptx
CSG__UNIT-3.pptx
Venkat Ramana
 
Transportation Planning as Effective Mean to Rejuvenate a Pilgrimage Town
Transportation  Planning as Effective Mean to Rejuvenate a Pilgrimage TownTransportation  Planning as Effective Mean to Rejuvenate a Pilgrimage Town
Transportation Planning as Effective Mean to Rejuvenate a Pilgrimage Town
IRJET Journal
 
Principles of transportation engineering
Principles of transportation engineeringPrinciples of transportation engineering
Principles of transportation engineering
Shweta Vantamuri
 
BBM Report
BBM ReportBBM Report
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVIA STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
IRJET Journal
 
Time Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai MonorailTime Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai Monorail
IRJET Journal
 
IRJET- Redesign of Existing Private Bus Terminal at Kothamangalam
IRJET- Redesign of Existing Private Bus Terminal at KothamangalamIRJET- Redesign of Existing Private Bus Terminal at Kothamangalam
IRJET- Redesign of Existing Private Bus Terminal at Kothamangalam
IRJET Journal
 
SEM 1 PRESENTATION
SEM 1 PRESENTATIONSEM 1 PRESENTATION
SEM 1 PRESENTATION
Shubhraneel Aich
 
DESIGN STANDARDS FOR PLANNING A BUS TERMINUS
DESIGN STANDARDS FOR PLANNING A BUS TERMINUSDESIGN STANDARDS FOR PLANNING A BUS TERMINUS
DESIGN STANDARDS FOR PLANNING A BUS TERMINUS
SruthiTummalapalli
 
A Review on High Speed Rail Project between Ahmedabad and Mumbai
A Review on High Speed Rail Project between Ahmedabad and MumbaiA Review on High Speed Rail Project between Ahmedabad and Mumbai
A Review on High Speed Rail Project between Ahmedabad and Mumbai
IJSRD
 
Alternatives to traffic congestion in Vadodara
Alternatives to traffic congestion in VadodaraAlternatives to traffic congestion in Vadodara
Alternatives to traffic congestion in Vadodara
MIRAL SONI
 
Pedestrian Friendly Shopping Plaza at M.G. Road, Kochi
Pedestrian Friendly Shopping Plaza at M.G. Road, KochiPedestrian Friendly Shopping Plaza at M.G. Road, Kochi
Pedestrian Friendly Shopping Plaza at M.G. Road, Kochi
Centre for Public Policy Research
 
design of saperate lane for ambulance at high intensity traffic zone
design of saperate lane for ambulance at high intensity traffic zone design of saperate lane for ambulance at high intensity traffic zone
design of saperate lane for ambulance at high intensity traffic zone
ElbichAkhtarkhan
 
TRANSPORTATION EXISTING SCENARIO AND PROPOSALS FOR UJJAIN CITY
TRANSPORTATION EXISTING SCENARIO AND PROPOSALS FOR UJJAIN CITYTRANSPORTATION EXISTING SCENARIO AND PROPOSALS FOR UJJAIN CITY
TRANSPORTATION EXISTING SCENARIO AND PROPOSALS FOR UJJAIN CITY
shrikrishna kesharwani
 
Rapid transit system
Rapid transit systemRapid transit system
Rapid transit system
abhishekdayal001
 
Possibilities For Bus Lane System
Possibilities For Bus Lane SystemPossibilities For Bus Lane System
Possibilities For Bus Lane SystemNaveen Chandra
 
TOD - Transit Oriented Development
TOD - Transit Oriented DevelopmentTOD - Transit Oriented Development
TOD - Transit Oriented Development
Shruthi Kshirasagar
 
Studying parking policies and proposing solutions for illegally parked vehicl...
Studying parking policies and proposing solutions for illegally parked vehicl...Studying parking policies and proposing solutions for illegally parked vehicl...
Studying parking policies and proposing solutions for illegally parked vehicl...
IRJET Journal
 

Similar to AN INTEGRATED APPROACH TO REDUCE INTRA CITY TRAFFIC AT COIMBATORE | J4RV4I1002 (20)

Effective learning from delhi brts –a case study of pune brts
Effective learning from delhi brts –a case study of pune brtsEffective learning from delhi brts –a case study of pune brts
Effective learning from delhi brts –a case study of pune brts
 
Market research on the Bandra Skywalk
Market research on the Bandra SkywalkMarket research on the Bandra Skywalk
Market research on the Bandra Skywalk
 
CSG__UNIT-3.pptx
CSG__UNIT-3.pptxCSG__UNIT-3.pptx
CSG__UNIT-3.pptx
 
Transportation Planning as Effective Mean to Rejuvenate a Pilgrimage Town
Transportation  Planning as Effective Mean to Rejuvenate a Pilgrimage TownTransportation  Planning as Effective Mean to Rejuvenate a Pilgrimage Town
Transportation Planning as Effective Mean to Rejuvenate a Pilgrimage Town
 
Principles of transportation engineering
Principles of transportation engineeringPrinciples of transportation engineering
Principles of transportation engineering
 
BBM Report
BBM ReportBBM Report
BBM Report
 
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVIA STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
 
Time Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai MonorailTime Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai Monorail
 
IRJET- Redesign of Existing Private Bus Terminal at Kothamangalam
IRJET- Redesign of Existing Private Bus Terminal at KothamangalamIRJET- Redesign of Existing Private Bus Terminal at Kothamangalam
IRJET- Redesign of Existing Private Bus Terminal at Kothamangalam
 
SEM 1 PRESENTATION
SEM 1 PRESENTATIONSEM 1 PRESENTATION
SEM 1 PRESENTATION
 
DESIGN STANDARDS FOR PLANNING A BUS TERMINUS
DESIGN STANDARDS FOR PLANNING A BUS TERMINUSDESIGN STANDARDS FOR PLANNING A BUS TERMINUS
DESIGN STANDARDS FOR PLANNING A BUS TERMINUS
 
A Review on High Speed Rail Project between Ahmedabad and Mumbai
A Review on High Speed Rail Project between Ahmedabad and MumbaiA Review on High Speed Rail Project between Ahmedabad and Mumbai
A Review on High Speed Rail Project between Ahmedabad and Mumbai
 
Alternatives to traffic congestion in Vadodara
Alternatives to traffic congestion in VadodaraAlternatives to traffic congestion in Vadodara
Alternatives to traffic congestion in Vadodara
 
Pedestrian Friendly Shopping Plaza at M.G. Road, Kochi
Pedestrian Friendly Shopping Plaza at M.G. Road, KochiPedestrian Friendly Shopping Plaza at M.G. Road, Kochi
Pedestrian Friendly Shopping Plaza at M.G. Road, Kochi
 
design of saperate lane for ambulance at high intensity traffic zone
design of saperate lane for ambulance at high intensity traffic zone design of saperate lane for ambulance at high intensity traffic zone
design of saperate lane for ambulance at high intensity traffic zone
 
TRANSPORTATION EXISTING SCENARIO AND PROPOSALS FOR UJJAIN CITY
TRANSPORTATION EXISTING SCENARIO AND PROPOSALS FOR UJJAIN CITYTRANSPORTATION EXISTING SCENARIO AND PROPOSALS FOR UJJAIN CITY
TRANSPORTATION EXISTING SCENARIO AND PROPOSALS FOR UJJAIN CITY
 
Rapid transit system
Rapid transit systemRapid transit system
Rapid transit system
 
Possibilities For Bus Lane System
Possibilities For Bus Lane SystemPossibilities For Bus Lane System
Possibilities For Bus Lane System
 
TOD - Transit Oriented Development
TOD - Transit Oriented DevelopmentTOD - Transit Oriented Development
TOD - Transit Oriented Development
 
Studying parking policies and proposing solutions for illegally parked vehicl...
Studying parking policies and proposing solutions for illegally parked vehicl...Studying parking policies and proposing solutions for illegally parked vehicl...
Studying parking policies and proposing solutions for illegally parked vehicl...
 

More from Journal For Research

Design and Analysis of Hydraulic Actuator in a Typical Aerospace vehicle | J4...
Design and Analysis of Hydraulic Actuator in a Typical Aerospace vehicle | J4...Design and Analysis of Hydraulic Actuator in a Typical Aerospace vehicle | J4...
Design and Analysis of Hydraulic Actuator in a Typical Aerospace vehicle | J4...
Journal For Research
 
Experimental Verification and Validation of Stress Distribution of Composite ...
Experimental Verification and Validation of Stress Distribution of Composite ...Experimental Verification and Validation of Stress Distribution of Composite ...
Experimental Verification and Validation of Stress Distribution of Composite ...
Journal For Research
 
Image Binarization for the uses of Preprocessing to Detect Brain Abnormality ...
Image Binarization for the uses of Preprocessing to Detect Brain Abnormality ...Image Binarization for the uses of Preprocessing to Detect Brain Abnormality ...
Image Binarization for the uses of Preprocessing to Detect Brain Abnormality ...
Journal For Research
 
A Research Paper on BFO and PSO Based Movie Recommendation System | J4RV4I1016
A Research Paper on BFO and PSO Based Movie Recommendation System | J4RV4I1016A Research Paper on BFO and PSO Based Movie Recommendation System | J4RV4I1016
A Research Paper on BFO and PSO Based Movie Recommendation System | J4RV4I1016
Journal For Research
 
IoT based Digital Agriculture Monitoring System and Their Impact on Optimal U...
IoT based Digital Agriculture Monitoring System and Their Impact on Optimal U...IoT based Digital Agriculture Monitoring System and Their Impact on Optimal U...
IoT based Digital Agriculture Monitoring System and Their Impact on Optimal U...
Journal For Research
 
A REVIEW PAPER ON BFO AND PSO BASED MOVIE RECOMMENDATION SYSTEM | J4RV4I1015
A REVIEW PAPER ON BFO AND PSO BASED MOVIE RECOMMENDATION SYSTEM | J4RV4I1015A REVIEW PAPER ON BFO AND PSO BASED MOVIE RECOMMENDATION SYSTEM | J4RV4I1015
A REVIEW PAPER ON BFO AND PSO BASED MOVIE RECOMMENDATION SYSTEM | J4RV4I1015
Journal For Research
 
HCI BASED APPLICATION FOR PLAYING COMPUTER GAMES | J4RV4I1014
HCI BASED APPLICATION FOR PLAYING COMPUTER GAMES | J4RV4I1014HCI BASED APPLICATION FOR PLAYING COMPUTER GAMES | J4RV4I1014
HCI BASED APPLICATION FOR PLAYING COMPUTER GAMES | J4RV4I1014
Journal For Research
 
A REVIEW ON DESIGN OF PUBLIC TRANSPORTATION SYSTEM IN CHANDRAPUR CITY | J4RV4...
A REVIEW ON DESIGN OF PUBLIC TRANSPORTATION SYSTEM IN CHANDRAPUR CITY | J4RV4...A REVIEW ON DESIGN OF PUBLIC TRANSPORTATION SYSTEM IN CHANDRAPUR CITY | J4RV4...
A REVIEW ON DESIGN OF PUBLIC TRANSPORTATION SYSTEM IN CHANDRAPUR CITY | J4RV4...
Journal For Research
 
A REVIEW ON LIFTING AND ASSEMBLY OF ROTARY KILN TYRE WITH SHELL BY FLEXIBLE G...
A REVIEW ON LIFTING AND ASSEMBLY OF ROTARY KILN TYRE WITH SHELL BY FLEXIBLE G...A REVIEW ON LIFTING AND ASSEMBLY OF ROTARY KILN TYRE WITH SHELL BY FLEXIBLE G...
A REVIEW ON LIFTING AND ASSEMBLY OF ROTARY KILN TYRE WITH SHELL BY FLEXIBLE G...
Journal For Research
 
LABORATORY STUDY OF STRONG, MODERATE AND WEAK SANDSTONES | J4RV4I1012
LABORATORY STUDY OF STRONG, MODERATE AND WEAK SANDSTONES | J4RV4I1012LABORATORY STUDY OF STRONG, MODERATE AND WEAK SANDSTONES | J4RV4I1012
LABORATORY STUDY OF STRONG, MODERATE AND WEAK SANDSTONES | J4RV4I1012
Journal For Research
 
DESIGN ANALYSIS AND FABRICATION OF MANUAL RICE TRANSPLANTING MACHINE | J4RV4I...
DESIGN ANALYSIS AND FABRICATION OF MANUAL RICE TRANSPLANTING MACHINE | J4RV4I...DESIGN ANALYSIS AND FABRICATION OF MANUAL RICE TRANSPLANTING MACHINE | J4RV4I...
DESIGN ANALYSIS AND FABRICATION OF MANUAL RICE TRANSPLANTING MACHINE | J4RV4I...
Journal For Research
 
AN OVERVIEW: DAKNET TECHNOLOGY - BROADBAND AD-HOC CONNECTIVITY | J4RV4I1009
AN OVERVIEW: DAKNET TECHNOLOGY - BROADBAND AD-HOC CONNECTIVITY | J4RV4I1009AN OVERVIEW: DAKNET TECHNOLOGY - BROADBAND AD-HOC CONNECTIVITY | J4RV4I1009
AN OVERVIEW: DAKNET TECHNOLOGY - BROADBAND AD-HOC CONNECTIVITY | J4RV4I1009
Journal For Research
 
LINE FOLLOWER ROBOT | J4RV4I1010
LINE FOLLOWER ROBOT | J4RV4I1010LINE FOLLOWER ROBOT | J4RV4I1010
LINE FOLLOWER ROBOT | J4RV4I1010
Journal For Research
 
CHATBOT FOR COLLEGE RELATED QUERIES | J4RV4I1008
CHATBOT FOR COLLEGE RELATED QUERIES | J4RV4I1008CHATBOT FOR COLLEGE RELATED QUERIES | J4RV4I1008
CHATBOT FOR COLLEGE RELATED QUERIES | J4RV4I1008
Journal For Research
 
A REVIEW STUDY ON GAS-SOLID CYCLONE SEPARATOR USING LAPPLE MODEL | J4RV4I1001
A REVIEW STUDY ON GAS-SOLID CYCLONE SEPARATOR USING LAPPLE MODEL | J4RV4I1001A REVIEW STUDY ON GAS-SOLID CYCLONE SEPARATOR USING LAPPLE MODEL | J4RV4I1001
A REVIEW STUDY ON GAS-SOLID CYCLONE SEPARATOR USING LAPPLE MODEL | J4RV4I1001
Journal For Research
 
IMAGE SEGMENTATION USING FCM ALGORITM | J4RV3I12021
IMAGE SEGMENTATION USING FCM ALGORITM | J4RV3I12021IMAGE SEGMENTATION USING FCM ALGORITM | J4RV3I12021
IMAGE SEGMENTATION USING FCM ALGORITM | J4RV3I12021
Journal For Research
 
USE OF GALVANIZED STEELS FOR AUTOMOTIVE BODY- CAR SURVEY RESULTS AT COASTAL A...
USE OF GALVANIZED STEELS FOR AUTOMOTIVE BODY- CAR SURVEY RESULTS AT COASTAL A...USE OF GALVANIZED STEELS FOR AUTOMOTIVE BODY- CAR SURVEY RESULTS AT COASTAL A...
USE OF GALVANIZED STEELS FOR AUTOMOTIVE BODY- CAR SURVEY RESULTS AT COASTAL A...
Journal For Research
 
UNMANNED AERIAL VEHICLE FOR REMITTANCE | J4RV3I12023
UNMANNED AERIAL VEHICLE FOR REMITTANCE | J4RV3I12023UNMANNED AERIAL VEHICLE FOR REMITTANCE | J4RV3I12023
UNMANNED AERIAL VEHICLE FOR REMITTANCE | J4RV3I12023
Journal For Research
 
SURVEY ON A MODERN MEDICARE SYSTEM USING INTERNET OF THINGS | J4RV3I12024
SURVEY ON A MODERN MEDICARE SYSTEM USING INTERNET OF THINGS | J4RV3I12024SURVEY ON A MODERN MEDICARE SYSTEM USING INTERNET OF THINGS | J4RV3I12024
SURVEY ON A MODERN MEDICARE SYSTEM USING INTERNET OF THINGS | J4RV3I12024
Journal For Research
 
AN IMPLEMENTATION FOR FRAMEWORK FOR CHEMICAL STRUCTURE USING GRAPH GRAMMAR | ...
AN IMPLEMENTATION FOR FRAMEWORK FOR CHEMICAL STRUCTURE USING GRAPH GRAMMAR | ...AN IMPLEMENTATION FOR FRAMEWORK FOR CHEMICAL STRUCTURE USING GRAPH GRAMMAR | ...
AN IMPLEMENTATION FOR FRAMEWORK FOR CHEMICAL STRUCTURE USING GRAPH GRAMMAR | ...
Journal For Research
 

More from Journal For Research (20)

Design and Analysis of Hydraulic Actuator in a Typical Aerospace vehicle | J4...
Design and Analysis of Hydraulic Actuator in a Typical Aerospace vehicle | J4...Design and Analysis of Hydraulic Actuator in a Typical Aerospace vehicle | J4...
Design and Analysis of Hydraulic Actuator in a Typical Aerospace vehicle | J4...
 
Experimental Verification and Validation of Stress Distribution of Composite ...
Experimental Verification and Validation of Stress Distribution of Composite ...Experimental Verification and Validation of Stress Distribution of Composite ...
Experimental Verification and Validation of Stress Distribution of Composite ...
 
Image Binarization for the uses of Preprocessing to Detect Brain Abnormality ...
Image Binarization for the uses of Preprocessing to Detect Brain Abnormality ...Image Binarization for the uses of Preprocessing to Detect Brain Abnormality ...
Image Binarization for the uses of Preprocessing to Detect Brain Abnormality ...
 
A Research Paper on BFO and PSO Based Movie Recommendation System | J4RV4I1016
A Research Paper on BFO and PSO Based Movie Recommendation System | J4RV4I1016A Research Paper on BFO and PSO Based Movie Recommendation System | J4RV4I1016
A Research Paper on BFO and PSO Based Movie Recommendation System | J4RV4I1016
 
IoT based Digital Agriculture Monitoring System and Their Impact on Optimal U...
IoT based Digital Agriculture Monitoring System and Their Impact on Optimal U...IoT based Digital Agriculture Monitoring System and Their Impact on Optimal U...
IoT based Digital Agriculture Monitoring System and Their Impact on Optimal U...
 
A REVIEW PAPER ON BFO AND PSO BASED MOVIE RECOMMENDATION SYSTEM | J4RV4I1015
A REVIEW PAPER ON BFO AND PSO BASED MOVIE RECOMMENDATION SYSTEM | J4RV4I1015A REVIEW PAPER ON BFO AND PSO BASED MOVIE RECOMMENDATION SYSTEM | J4RV4I1015
A REVIEW PAPER ON BFO AND PSO BASED MOVIE RECOMMENDATION SYSTEM | J4RV4I1015
 
HCI BASED APPLICATION FOR PLAYING COMPUTER GAMES | J4RV4I1014
HCI BASED APPLICATION FOR PLAYING COMPUTER GAMES | J4RV4I1014HCI BASED APPLICATION FOR PLAYING COMPUTER GAMES | J4RV4I1014
HCI BASED APPLICATION FOR PLAYING COMPUTER GAMES | J4RV4I1014
 
A REVIEW ON DESIGN OF PUBLIC TRANSPORTATION SYSTEM IN CHANDRAPUR CITY | J4RV4...
A REVIEW ON DESIGN OF PUBLIC TRANSPORTATION SYSTEM IN CHANDRAPUR CITY | J4RV4...A REVIEW ON DESIGN OF PUBLIC TRANSPORTATION SYSTEM IN CHANDRAPUR CITY | J4RV4...
A REVIEW ON DESIGN OF PUBLIC TRANSPORTATION SYSTEM IN CHANDRAPUR CITY | J4RV4...
 
A REVIEW ON LIFTING AND ASSEMBLY OF ROTARY KILN TYRE WITH SHELL BY FLEXIBLE G...
A REVIEW ON LIFTING AND ASSEMBLY OF ROTARY KILN TYRE WITH SHELL BY FLEXIBLE G...A REVIEW ON LIFTING AND ASSEMBLY OF ROTARY KILN TYRE WITH SHELL BY FLEXIBLE G...
A REVIEW ON LIFTING AND ASSEMBLY OF ROTARY KILN TYRE WITH SHELL BY FLEXIBLE G...
 
LABORATORY STUDY OF STRONG, MODERATE AND WEAK SANDSTONES | J4RV4I1012
LABORATORY STUDY OF STRONG, MODERATE AND WEAK SANDSTONES | J4RV4I1012LABORATORY STUDY OF STRONG, MODERATE AND WEAK SANDSTONES | J4RV4I1012
LABORATORY STUDY OF STRONG, MODERATE AND WEAK SANDSTONES | J4RV4I1012
 
DESIGN ANALYSIS AND FABRICATION OF MANUAL RICE TRANSPLANTING MACHINE | J4RV4I...
DESIGN ANALYSIS AND FABRICATION OF MANUAL RICE TRANSPLANTING MACHINE | J4RV4I...DESIGN ANALYSIS AND FABRICATION OF MANUAL RICE TRANSPLANTING MACHINE | J4RV4I...
DESIGN ANALYSIS AND FABRICATION OF MANUAL RICE TRANSPLANTING MACHINE | J4RV4I...
 
AN OVERVIEW: DAKNET TECHNOLOGY - BROADBAND AD-HOC CONNECTIVITY | J4RV4I1009
AN OVERVIEW: DAKNET TECHNOLOGY - BROADBAND AD-HOC CONNECTIVITY | J4RV4I1009AN OVERVIEW: DAKNET TECHNOLOGY - BROADBAND AD-HOC CONNECTIVITY | J4RV4I1009
AN OVERVIEW: DAKNET TECHNOLOGY - BROADBAND AD-HOC CONNECTIVITY | J4RV4I1009
 
LINE FOLLOWER ROBOT | J4RV4I1010
LINE FOLLOWER ROBOT | J4RV4I1010LINE FOLLOWER ROBOT | J4RV4I1010
LINE FOLLOWER ROBOT | J4RV4I1010
 
CHATBOT FOR COLLEGE RELATED QUERIES | J4RV4I1008
CHATBOT FOR COLLEGE RELATED QUERIES | J4RV4I1008CHATBOT FOR COLLEGE RELATED QUERIES | J4RV4I1008
CHATBOT FOR COLLEGE RELATED QUERIES | J4RV4I1008
 
A REVIEW STUDY ON GAS-SOLID CYCLONE SEPARATOR USING LAPPLE MODEL | J4RV4I1001
A REVIEW STUDY ON GAS-SOLID CYCLONE SEPARATOR USING LAPPLE MODEL | J4RV4I1001A REVIEW STUDY ON GAS-SOLID CYCLONE SEPARATOR USING LAPPLE MODEL | J4RV4I1001
A REVIEW STUDY ON GAS-SOLID CYCLONE SEPARATOR USING LAPPLE MODEL | J4RV4I1001
 
IMAGE SEGMENTATION USING FCM ALGORITM | J4RV3I12021
IMAGE SEGMENTATION USING FCM ALGORITM | J4RV3I12021IMAGE SEGMENTATION USING FCM ALGORITM | J4RV3I12021
IMAGE SEGMENTATION USING FCM ALGORITM | J4RV3I12021
 
USE OF GALVANIZED STEELS FOR AUTOMOTIVE BODY- CAR SURVEY RESULTS AT COASTAL A...
USE OF GALVANIZED STEELS FOR AUTOMOTIVE BODY- CAR SURVEY RESULTS AT COASTAL A...USE OF GALVANIZED STEELS FOR AUTOMOTIVE BODY- CAR SURVEY RESULTS AT COASTAL A...
USE OF GALVANIZED STEELS FOR AUTOMOTIVE BODY- CAR SURVEY RESULTS AT COASTAL A...
 
UNMANNED AERIAL VEHICLE FOR REMITTANCE | J4RV3I12023
UNMANNED AERIAL VEHICLE FOR REMITTANCE | J4RV3I12023UNMANNED AERIAL VEHICLE FOR REMITTANCE | J4RV3I12023
UNMANNED AERIAL VEHICLE FOR REMITTANCE | J4RV3I12023
 
SURVEY ON A MODERN MEDICARE SYSTEM USING INTERNET OF THINGS | J4RV3I12024
SURVEY ON A MODERN MEDICARE SYSTEM USING INTERNET OF THINGS | J4RV3I12024SURVEY ON A MODERN MEDICARE SYSTEM USING INTERNET OF THINGS | J4RV3I12024
SURVEY ON A MODERN MEDICARE SYSTEM USING INTERNET OF THINGS | J4RV3I12024
 
AN IMPLEMENTATION FOR FRAMEWORK FOR CHEMICAL STRUCTURE USING GRAPH GRAMMAR | ...
AN IMPLEMENTATION FOR FRAMEWORK FOR CHEMICAL STRUCTURE USING GRAPH GRAMMAR | ...AN IMPLEMENTATION FOR FRAMEWORK FOR CHEMICAL STRUCTURE USING GRAPH GRAMMAR | ...
AN IMPLEMENTATION FOR FRAMEWORK FOR CHEMICAL STRUCTURE USING GRAPH GRAMMAR | ...
 

Recently uploaded

Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 

Recently uploaded (20)

Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 

AN INTEGRATED APPROACH TO REDUCE INTRA CITY TRAFFIC AT COIMBATORE | J4RV4I1002

  • 1. Journal for Research | Volume 04 | Issue 01 | March 2018 ISSN: 2395-7549 All rights reserved by www.journal4research.org 6 An Integrated Approach to Reduce Intra City Traffic at Coimbatore Lakshmipriya. N Nitheesh .V.B UG Student UG Student Department of Civil Engineering Department of Civil Engineering Dr. Mahalingam College of Engineering & Technology, Pollachi, Tamil Nadu, India Dr. Mahalingam College of Engineering & Technology, Pollachi, Tamil Nadu, India Abstract Coimbatore (11.0168°N,76.9558°E) is a fast developing cosmopolitan city with large number of industries and educational institutions. The development has lead to a large number of vehicles causing heavy traffic. The traffic congestion at Coimbatore has been a major problem which causes traffic jams and accidents. The major reason for traffic has been the mofussil buses that operate in the city. Around 1300 mofussil buses enter into the city, these buses play an important role in traffic congestion. The best solution is to construct a centralized bus stand at the outskirts of the city. This would reduce the traffic, accidents and also leads to development of the outskirts of the city. A suitable location near the city with sufficient road access to connecting cities has been chosen and the bus terminus has been designed, modeled with all facilities and features. Keywords: Coimbatore Bus Traffic, Bus Terminus Design, Modeling of Bus Terminus, Centralized Bus Terminus _______________________________________________________________________________________________________ I. INTRODUCTION RAFFIC congestion due to moffusil buses is a major trouble at Coimbatore (THE HINDU- march 21), which is also a major reason for accidents. The major bus stands are Ukkadam bus stand, Gandhipuram bus stand, Singanallur bus stand, SETC bus stand. Around 1500 buses are handled by these bus stands in a single day. These bus stands connect major cities like Trichy, Madurai, Salem, some parts of Kerala and mostly all major part of Tamilnadu. All the buses enter the city causing heavy traffic. The apt solution for this problem is the construction of a centralized bus terminus. Centralized bus terminus that is planned to be constructed must have easy access to the city and all connecting routes to other cities. The terminus must have all amenities for the comfort of passengers. The paper contains, choosing of apt location, planning, design and modeling of the bus terminus. It also includes detail estimate for the construction of the bus terminus and the income forecast details. II. CHOOSING LOCATION The first and foremost step is choosing the location of the bus stand. Various important factors that has to be considered while choosing a location for the bus terminus are,  Accessibility from the city  Road connectivity to major cities  Availability of vast barren land Other factors like operational considerations, turning, layover, driver change are also considered. A feasibility study was done to choose the location of the bus terminus. Considering all the factors, VELLALORE (10.9778° N, 77.0277° E) was found to be the apt location for the centralized bus terminus. Fig. 1: Location of Vellalore.
  • 2. An Integrated Approach to Reduce Intra City Traffic at Coimbatore (J4R/ Volume 04 / Issue 01 / 002) All rights reserved by www.journal4research.org 7 Fig. 2: Location of bus terminus at vellalore. Fig. 3: Layout Suitability of the Location: Vellalore is a panchayat town and a western suburb of Coimbatore. Vellalore is situated at the outskirts of the city. It is a place that has a lot of unused lands. Construction of centralized bus terminus at this location improves the locality to a greater extent, this would pave way to the extension of the city. Accessibility of the Location: Accessibility from the city is an important factor, where Vellalore has accessibility to avinashi road, one of the important roads of the city. Avinashi road is just 7 km away from Vellalore. Avinashi road can be Accessed by vellalore road and kamaraj road. Fig. 4: Layout
  • 3. An Integrated Approach to Reduce Intra City Traffic at Coimbatore (J4R/ Volume 04 / Issue 01 / 002) All rights reserved by www.journal4research.org 8 The road that connects avinashi road and vellalore is a single lane road and cannot handle the traffic when the bus terminus is in use. The road must be made as a two lane road to accommodate the traffic. Another major reason for choosing this location is that it lies on NH-544(formerly known as NH- 47). NH-544 connects major cities like cochin, thrissur, salem, kanniyakumari. This road is currently a two lane road but actually as per the agreement of government with L&T, the road must be made as six lane road. So this road can sufficiently handle the traffic of the mofussil buses. III. DESIGN REQUIREMENTS OF THE TERMINUS Capacity: The centralized terminus that is planned is an integration of Gandhipuram bus stand, Singanallur bus stand, Ukkadam bus stand, SETC bus stand. Therefore, the capacity of the bus terminus must occupy the handling capacity of all these bus stands. On calculating the number of buses that is handled By all these bus stand was found to be around 1500 buses, where Gandhipuram bus stand alone handles 648 buses that travels to 14 different destinations. Area of the bus stand, bus shed and parking facilities must be in accordance with SP7- National building code 2005. Three wheeler and taxi stand area must be 500m2 for 15,000 populations. Bus terminal must have an area of 4000m2 for 1,00,000 populations. Bus depot must have an area of 2 hectares for 5,00,000 populations. These area requirements must be adhered. Interior dimensions: Interior dimensions include the design of bus bays and turning spaces for buses. Taking a multi-axle bus into account, length is 12 m and breadth is 3.2m and a turning radius of 10m. 15 bus bays may be provided in a single side. A factor in the location of a terminus is how to turn the bus around to start the route in the other direction, which may be difficult in areas where road space is an issue, or the road layout prevents U- turns. This does not apply for true circle routes, where buses simply operate permanently in the clockwise or anti-clockwise direction. Termini in bus stations will often include reversing/run-around space, negating the turning issue. If numbers of bays are increased, it would increase the walking distance of a passenger. Entry and exit must be designed such that buses can turn and move inside easily. Sanitary and drainage requirements: Bus terminus will be used by a large number of persons. In such a case sanitary requirements is very important. Number of water closets for male, female, urinals for male, wash basins, shower stalls must be provided in accordance with part ix section 2- Drainage and Sanitation of National Building Code of India. Separate sanitation facilities are to be provided for passengers and for drivers and other administrative workers in the terminus. Drainage must be provided such that no water must get stagnated. Adequate storm drains must be provided. Practical considerations: Provisions for future extensions without dismantling should be made in the planning. Proper planning should be done to prevent any congestion within the bus terminus. A bus terminus must have all amenities that can comfort the passenger. Amenities like, hotels, pharmacies, staying rooms, waiting hall, locker rooms, ATM facilities must be present in a bus terminal. Structural stability is so important and must bear any natural disaster. Each element like beam, slab, column, staircase, water tank must structurally bear the loads. Since number of passengers will be more or less constant and huge on regular basis, proper design of a septic tank is mandatory in order to avoid physical discomforts for both the passengers as well as environment. Septic tank design must be done in accordance to IS2470. IV. DESIGNED CENTRALIZED TERMINUS A centralized bus terminus which would be sufficient to handle the mofussil bus traffic at Coimbatore has been planned and designed. The designed bus terminus has a land area of 30 acres. It can handle up to 1600 buses with 8 platforms and 160 bus bays. It can station up to 250 buses. The total built up area of the platform is 10,800m2 . The terminus also includes a G+1 building with a built up area of 12,000m2 . The terminal building has various amenities like,4 hotels, 2 veg and 2 non-veg hotel ,6 smaller eateries inside the terminus, Two 24-hour pharmacy and first-aid facilities and medical assistance, Shops, supermarkets, ATM, rooms (a/c and non-a/c) for rent, Toilets, Wheel chairs are provided for the physically disabled, Passenger waiting hall, Locker rooms. Terminus also includes a 6400m2 area for two wheelers and for wheeler.
  • 4. An Integrated Approach to Reduce Intra City Traffic at Coimbatore (J4R/ Volume 04 / Issue 01 / 002) All rights reserved by www.journal4research.org 9 Fig. 5: Plan view of the bus stand V. STRUCTURAL DESIGN Each and every structural element of the bus terminus which includes beam, slab, column, water tank, septic tank has been designed to bear all loads with adherence to Indian standards. Design has been done manually and also analyzed through STAAD Pro. Fig. 6: Using STAAD. Pro VI. PAVEMENT DESIGN Rigid pavement is composed of a concrete surface course an underlying base and sub-base course (optional) and is stiffer than the flexible pavement. The cement concrete may be plain, reinforced or prestressed concrete. In the rigid pavement the load transfer phenomenon is quite different than the flexible pavement. The concrete surface layer alone provides most of the rigid pavement. The flexible pavement requires maintenance and routine repairs every few years and they deteriorate rapidly, cracks and pot-holes are likely to appear due to poor drainage and heavy vehicular traffic. Thus rigid pavement is preferred even though the initial cost is high, it will be economic in the longer run compared to flexible pavement. Hence rigid pavement is designed in accordance to IRC 58. VII.MODELING & RENDERING Capacity: The centralized terminus that is planned is an integration of Gandhipuram bus stand, Singanallur bus stand, Ukkadam bus stand, SETC bus stand. Therefore, the capacity of the bus terminus must occupy the handling capacity of all these bus stands. On calculating the number of buses that is handled By all these bus stand was found to be around 1500 buses, where Gandhipuram bus stand alone handles 648 buses that travels to 14 different destinations. Area of the bus stand, bus shed and parking facilities must be in accordance with SP7- National building code 2005. Three wheeler and taxi stand area must be 500m2 for 15,000 populations. Bus terminal must have an area of 4000m2 for 1,00,000 populations. Bus depot must have an area of 2 hectares for 5,00,000 populations. These area requirements must be adhered.
  • 5. An Integrated Approach to Reduce Intra City Traffic at Coimbatore (J4R/ Volume 04 / Issue 01 / 002) All rights reserved by www.journal4research.org 10 Interior dimensions: Interior dimensions include the design of bus bays and turning spaces for buses. Taking a multi-axle bus into account, length is 12 m and breadth is 3.2m and a turning radius of 10m. 15 bus bays may be provided in a single side. A factor in the location of a terminus is how to turn the bus around to start the route in the other direction, which may be difficult in areas where road space is an issue, or the road layout prevents U- turns. This does not apply for true circle routes, where buses simply operate permanently in the clockwise or anti-clockwise direction. Termini in bus stations will often include reversing/run-around space, negating the turning issue. If numbers of bays are increased, it would increase the walking distance of a passenger. Entry and exit must be designed such that buses can turn and move inside easily. Sanitary and drainage requirements: Bus terminus will be used by a large number of persons. In such a case sanitary requirements is very important. Number of water closets for male, female, urinals for male, wash basins, shower stalls must be provided in accordance with part ix section 2- Drainage and Sanitation of National Building Code of India. Separate sanitation facilities are to be provided for passengers and for drivers and other administrative workers in the terminus. Drainage must be provided such that no water must get stagnated. Adequate storm drains must be provided. Practical considerations: Provisions for future extensions without dismantling should be made in the planning. Proper planning should be done to prevent any congestion within the bus terminus. A bus terminus must have all amenities that can comfort the passenger. Amenities like, hotels, pharmacies, staying rooms, waiting hall, locker rooms, ATM facilities must be present in a bus terminal. Structural stability is so important and must bear any natural disaster. Each element like beam, slab, column, staircase, water tank must structurally bear the loads. Since number of passengers will be more or less constant and huge on regular basis, proper design of a septic tank is mandatory in order to avoid physical discomforts for both the passengers as well as environment. Septic tank design must be done in accordance to IS2470. Modeling and rendering any structure has become an essential component as they portray the real time structure. Building Information Modeling (BIM) is the fastest developing one nowadays. Modeling gives a neat and clear cut idea of each and every element of the structure. Revit Architecture has been used for modeling and lumion has been used for rendering and walk through, to show the real time design of the centralized terminus. Fig. 7: 3D view of bus stand Fig. 8: 3D view of bus base and utility area
  • 6. An Integrated Approach to Reduce Intra City Traffic at Coimbatore (J4R/ Volume 04 / Issue 01 / 002) All rights reserved by www.journal4research.org 11 VIII. ESTIMATE & INCOME The total cost for the bus terminus is estimated to be around 87 cores. Fig. 9: Cost percentage representation using pei chart Income from the bus terminal has been calculated based on half occupancy. Monthly revenue from the bus stand has been analyzed to be as follows:  Shops - 8,80,000  Single room - 1,92,000  Double room - 3,12,000  Restaurants - 8,00,000  TOTAL - Rs. 21,84,000 Apart from the above the bus stand will also fetch more indirect benefits to the government as well as to the Vellalore locality in the aspects of physio-economic growth. IX. CONCLUSION Coimbatore, the Manchester of south India houses more than 25,000 industries. It has a very fast growth rate in economic means. Due to this development it has lead to in city bus traffic. Centralized bus terminus at the apt location is a permanent solution. The bus terminus can also be extended in future if required. Construction of this centralized bus terminus at vellalore not only reduces intra city bus traffic but also yields an income of 21 lakhs per month and also leads to the development of the locality leading an extension to the city. REFERENCES [1] Krishna Raju. N (2001) “Design of Reinforced Concrete Structures”, CBS publishers & Distributors. [2] Dr. B.C. Punmia, Ashok Kumar Jain and Arun Kumar Jain (2006) “R.C.C. Designs”, Laxmi Publications Pvt. Ltd., [3] IRC 058-1988, Guidelines for the design of rigid pavement for highways (first revision) published by THE INDIAN ROADS CONGRESS. [4] Reagen, P.E. and Yu, C.W. Limit State Design of Structural Concrete, Chatto and Windus, London, 1973. [5] Indian Standard Code of Practice for Plain and Reinforced Concrete (fourth revision) IS: 456-2000, Bureau of Indian Standards, July 2000, New Delhi. [6] Design Aids for Reinforced Concrete to IS: 456-1979. SP: 16 Indian Standard Institution, 1980. [7] Nilson A.H, Design of concrete structure (Twelfth edition- 1997), The McGraw-Hill companies inc. [8] Pytel A. Singer L.S, Strength of Materials(Fourth edition- 1987), by Harper & Row Publishers inc. [9] Shedd T.C, Vawter JA. Theory of Simple Structures(2nd edition-1941), by Jhon Wiley & Sons inc. [10] U.S. Department of Justice. 2002. ADA Standards for Accessible Design. Section10.2, BusStops and Terminals. http://www.ada.gov/adastd94.pdf.