SR NO . NAME ENROLLMENT NO .
1 Patel Margi M. 130450106035
2 Shah Ishani M. 130450106044
What is traffic engineering?
 Traffic Engineering is that branch of civil
engineering which deals with the application of
scientific principles, tools, techniques and findings
for safe rapid convenient economic movement of
people and goods.
 The basic object of traffic engineering is to achieve
efficient, free and rapid flow of traffic with least no
of accidents.
Study of traffic engineering
 The study of traffic engineering may be divided into
following sections-
1. Traffic Characteristics
2. Traffic Studies and Analysis
3. Traffic operation-control and regulation
4. Planning and analysis
5. Geometric Design
6. Administration and Management
What is Traffic Study???.....
 Traffic studies may be grouped into three
main categories:
1. Inventories
2. Administrative studies
3. Dynamic studies.
Types & purpose of traffic surveys
Volume study
Speed study
Origin and destination – O & D study
Traffic capacity study
Accident study
Parking study
(1)
Traffic volume study
 Traffic volume is defined as the number of
vehicles crossing a section of road per unit time at
any selected period.
 Traffic volume studies are conducted to collect
data on the number of vehicles and/or pedestrians
that pass a point on a highway facility during a
specified time period.
 This time period varies from as little as 15 min to
as much as a year, depending on the anticipated
use of the data.
To determine of vehicle composition in traffic
stream.
To determine the service flow rate in PCU/PCE
unit.
To estimate of ADT based on expansion factor.
To determine the directional distribution(DD).
To draw flow fluctuation curves
Effectiveness of a traffic control
measure
To check existing, operating service
condition of a roadway section
Planning traffic operation and control of
existing facility
To design intersection, signal timings,
channelization
Structural design of pavements, geometric
design and road way capacity
Volume Study
Traffic volume studies are usually conducted when
certain volume characteristics are needed, some of
which follow:
 Average Annual Daily Traffic (AADT)
 Average Daily Traffic (ADT)
 Peak Hour Volume (PHV)
 Vehicle Classification (VC)
 Vehicle Miles of Travel (VMT)
Methodology
Traffic volume
study
Automatic
Counting
Method
Contact system
based
Contactless
system based
Manual
Counting
Method
Direct Method
indirect Method
Manual Counting Method: Direct method
Data is counted by using hand tally and manual
counters/enumerators.
 Advantages: By this method traffic volume as well as
vehicle classification and turning proportions can be
obtained. Data can be used immediately after collection.
 Disadvantages: This method is not practicable for long
duration count and when flow is high. Error is common
especially when volume is high. Count cannot be cross
checked. Count cannot be done in bad weather.
Mechanical Counting Boards
Mechanical count boards
consist of counters mounted
on a board that record each
direction of travel. Common
counts include pedestrian,
bicycle, vehicle
classification, and traffic
volume counts.
Electronic Counting Boards
Electronic counting boards
are battery-operated,
lighter, more compact, and
easier to handle. They have
an internal clock that
automatically separates the
data by time interval.
Instruments used in Direct method
Hand Counter Instrument to
Measure Distance
Manual Counting Method: Indirect Method
In this method, data is collected using video camera. Video is
captured for long time and data is collected later by rewinding.
 Advantages: Besides traffic volume, several traffic
parameters can be obtained from recorded film. Data can be
cross checked and quality can be ensured. This method is
applicable when volume is high. It is suitable for non-lane
based traffic operation.
 Disadvantages: A suitable elevated place is required for
filming operation. Data cannot be used immediately after
collection.
Manual Counting Method: Indirect Method
Video cameras are
mounted to
record the traffic
condition on a
road.
Automatic counting method:
In this method, vehicles are counted automatically
without any human involvement.
 Contact system based (pneumatic, mechanical,
magnetic or piezoelectric method)
 Contactless system based (electrical/optical,
ultrasound/infrared radar, micro wave, CCTV/video
image processing method etc.)
 Advantages:
This method is suitable for long duration or
continuous count. Count is not affected by bad
weather condition.
 Disadvantages:
It requires strict lane discipline. Non motorized
vehicles are hard to detect
Equipment used for Automatic counting
method: Contact system
Pneumatic Road
Tube Counter
Motion sensors
Equipment used for Automatic counting
method: Contactless system
Vehicle numbers are recorder using ultrasound, light
beam or other infrared technology.
Traffic volume data can be presented in any of the
forms-
1) Average annual Daily traffic :
ADT: Average daily traffic is the volume of traffic
counted on the roadway(two way) over a given
time period (greater than one day but less than one
year) divided by the number of days in that time
period.
AADT: Average annual daily traffic is obtained by
adding daily traffic counts over one year divided
by 365 days.
2)Variations Charts:
These help in deciding the facilities and regulations
needed during peak traffic regulations.
3)Traffic flow maps-These help to find the traffic volume
distribution at a glance.
Volume flow diagram-These data are needed for
intersection design.
4)Thirtieth highest hourly volume:
It is found from the plot between hourly volume and the
no of hours in an year that the traffic volume is exceeded.
(2)
Speed study
 Speed studies are necessary because the actual
speed of vehicles over a particular may vary
depending on various factors such as geometric
features, traffic conditions, time, place,
environment and driver.
 Speed studies un be studied under following
heads:
 Spot speed: This is the instantaneous speed of
vehicle at a specified section or location.
 Average speed: Average speed is the average of
the spot speeds of all the vehicles passing a given
point on the roadways
 Running speed: It is the average speed
maintained by a vehicles over a particular stretch
of road , while the vehicle is in motion
 Travel speed(overall speed): it is the effective
speed with which a vehicle traverse a particular
route between two stations.
Travel speed =
By measuring time
Required to travel
known distance
Radar speed
meter
Photographic
method
Measurement of spot speed
Long base method Short base
method
1)Direct timing procedure
2)Enoscope
3)Pressure contact tubes
(3)
PARKING SPACE
STUDY
INTRODUCTION
 Parking is one of the major problems that is
created by the increasing road traffic. It is an
impact of transport development.
 The availability of less space in urban areas has
increased the demand for parking space
especially in areas like Central business district.
This affects the mode choice also.
 This has a great economical impact.
Effect of parking
 Congestion
 Accidents
 Obstruction to fire fighting
operations
 Effect on environment
General Terms of Parking Facilities
1. Parking Accumulation :-The total number of
vehicles parked in an area at a specified moment.
2. Parking volume:-The number of vehicles parked in
a particular area over a given period of time. It is
usually measured in vehicles per day.
3. Parking load:-The area under the parking
accumulation curve during a specified period.
4 Parking duration:-The length of time spent in a
parking space.
5 Parking index:-Percentage of parking bays
actually occupied by parked vehicles as compared
to the theoretical number available.
6 Parking turn over:-Rate of the usage of the
available parking space. Thus if there were 10
parking spaces used by 100 vehicles in a period of
say 12 hours then the parking turnover would be
 On street parking
On street parking means the vehicles are parked on
the sides of the street itself. This will be usually
controlled by government agencies itself.
 Off-street parking
Parking bay like at the mall
Parking system
On – street or Kerb Parking
1. Parallel Parking
2. 30 degree parking
3. 45 degree parking
4. 60 degree Parking
5. 90 degree Parking
Parallel Parking
30 degree parking
45 degree parking
60 degree Parking
90 degree Parking
Off-street Parking
1.Surface car parks
2.Multistoried car parks
3.Roof parks
4.Mechanical parks
5.Underground car parks
Off-street Parking
Surface car parks
Multistoried car parks
Roof parks
Mechanical parks
Underground car parks
Peripheral Parking Schemes
1. Park and walk
Under this scheme the motorists are
included to park at the outskirts of the town and
walk down to the town.
2. Park and ride
This scheme provide for peripheral parking
facilities and public transport side to the
destinations in the town.
Parking studies
 Inventory of existing parking space supply and measure current
levels of space usage (accumulation and space turn over).
 Identify salient parking characteristics (duration, purpose, trip
destination and walking distances to destination).
 Qualify demands and needs.
 Estimate facility capital and operating costs, usage and
revenues.
Types of Parking Surveys
 Parking Space in inventory
 Parking Usage Survey by Patrol
 Questionnaire Type Parking Usage Survey
 Cordon Count
Comprehensive Parking Studies
 Location where parked
 Trip purpose and frequency
 Primary trip destination
 Length of time parked
 Parking fees paid and
 Distance walked from primary space to primary destination
He final ppt

More Related Content

What's hot

Traffic Engineering And Drainage
Traffic Engineering And DrainageTraffic Engineering And Drainage
Traffic Engineering And DrainagePrashant Ranjan
 
Factors influence site selection of an airport
Factors influence site selection of an airportFactors influence site selection of an airport
Factors influence site selection of an airportMaddelaSiddhardha
 
Spot speed studies and speed delay time survey
Spot speed studies and speed delay time surveySpot speed studies and speed delay time survey
Spot speed studies and speed delay time surveySai Santosh Yakkali
 
Lect 28-traffic intersections
Lect 28-traffic intersectionsLect 28-traffic intersections
Lect 28-traffic intersectionsHamidullahFarhang
 
2.1 HIGHWAY TRANSPORTATION : HIGHWAY PLANNING AND DEVELOPMENT (TRE) 3150611 GTU
2.1 HIGHWAY TRANSPORTATION : HIGHWAY PLANNING AND DEVELOPMENT (TRE) 3150611 GTU2.1 HIGHWAY TRANSPORTATION : HIGHWAY PLANNING AND DEVELOPMENT (TRE) 3150611 GTU
2.1 HIGHWAY TRANSPORTATION : HIGHWAY PLANNING AND DEVELOPMENT (TRE) 3150611 GTUVATSAL PATEL
 
Traffic volume study
Traffic volume studyTraffic volume study
Traffic volume studyStone Rayhan
 
Volume study presentation grp 04
Volume study presentation grp 04Volume study presentation grp 04
Volume study presentation grp 04Stone Rayhan
 
Traffic signal co ordination
Traffic signal co ordinationTraffic signal co ordination
Traffic signal co ordinationKartik Yadiyapur
 
Highway safety for civil engineers
Highway safety for civil engineersHighway safety for civil engineers
Highway safety for civil engineersHaider Jafferi
 
Traffic studies ORIGIN AND DESTINATION STUDIES
Traffic studies ORIGIN AND DESTINATION STUDIESTraffic studies ORIGIN AND DESTINATION STUDIES
Traffic studies ORIGIN AND DESTINATION STUDIESDavinderpal Singh
 
Geometric Design - Horizontal and vertical curves
Geometric Design - Horizontal and vertical curvesGeometric Design - Horizontal and vertical curves
Geometric Design - Horizontal and vertical curvessachin dass
 
Classification of Roads and Road patterns
Classification of Roads and Road patternsClassification of Roads and Road patterns
Classification of Roads and Road patternsRAMPRASAD KUMAWAT
 
Capacity & Level of Service: Highways & Signalized Intersections (Indo-HCM)
Capacity & Level of Service: Highways & Signalized Intersections (Indo-HCM)Capacity & Level of Service: Highways & Signalized Intersections (Indo-HCM)
Capacity & Level of Service: Highways & Signalized Intersections (Indo-HCM)Vijai Krishnan V
 

What's hot (20)

Unit 1
Unit 1Unit 1
Unit 1
 
Traffic Engineering And Drainage
Traffic Engineering And DrainageTraffic Engineering And Drainage
Traffic Engineering And Drainage
 
Factors influence site selection of an airport
Factors influence site selection of an airportFactors influence site selection of an airport
Factors influence site selection of an airport
 
Spot speed studies and speed delay time survey
Spot speed studies and speed delay time surveySpot speed studies and speed delay time survey
Spot speed studies and speed delay time survey
 
Lect 28-traffic intersections
Lect 28-traffic intersectionsLect 28-traffic intersections
Lect 28-traffic intersections
 
2.1 HIGHWAY TRANSPORTATION : HIGHWAY PLANNING AND DEVELOPMENT (TRE) 3150611 GTU
2.1 HIGHWAY TRANSPORTATION : HIGHWAY PLANNING AND DEVELOPMENT (TRE) 3150611 GTU2.1 HIGHWAY TRANSPORTATION : HIGHWAY PLANNING AND DEVELOPMENT (TRE) 3150611 GTU
2.1 HIGHWAY TRANSPORTATION : HIGHWAY PLANNING AND DEVELOPMENT (TRE) 3150611 GTU
 
Traffic volume study
Traffic volume studyTraffic volume study
Traffic volume study
 
Volume study presentation grp 04
Volume study presentation grp 04Volume study presentation grp 04
Volume study presentation grp 04
 
Superelevation
SuperelevationSuperelevation
Superelevation
 
Parking study
Parking studyParking study
Parking study
 
Traffic signal co ordination
Traffic signal co ordinationTraffic signal co ordination
Traffic signal co ordination
 
road markings
road markingsroad markings
road markings
 
Intersection designs ppt
Intersection designs pptIntersection designs ppt
Intersection designs ppt
 
O & d survey
O & d survey O & d survey
O & d survey
 
Road Safety as a Key Element in Planning & Design
Road Safety as a Key Element in Planning & DesignRoad Safety as a Key Element in Planning & Design
Road Safety as a Key Element in Planning & Design
 
Highway safety for civil engineers
Highway safety for civil engineersHighway safety for civil engineers
Highway safety for civil engineers
 
Traffic studies ORIGIN AND DESTINATION STUDIES
Traffic studies ORIGIN AND DESTINATION STUDIESTraffic studies ORIGIN AND DESTINATION STUDIES
Traffic studies ORIGIN AND DESTINATION STUDIES
 
Geometric Design - Horizontal and vertical curves
Geometric Design - Horizontal and vertical curvesGeometric Design - Horizontal and vertical curves
Geometric Design - Horizontal and vertical curves
 
Classification of Roads and Road patterns
Classification of Roads and Road patternsClassification of Roads and Road patterns
Classification of Roads and Road patterns
 
Capacity & Level of Service: Highways & Signalized Intersections (Indo-HCM)
Capacity & Level of Service: Highways & Signalized Intersections (Indo-HCM)Capacity & Level of Service: Highways & Signalized Intersections (Indo-HCM)
Capacity & Level of Service: Highways & Signalized Intersections (Indo-HCM)
 

Viewers also liked

Traffic Volume Studies
Traffic Volume StudiesTraffic Volume Studies
Traffic Volume StudiesMd Tanvir Alam
 
Transportation Engineering I
Transportation Engineering  ITransportation Engineering  I
Transportation Engineering IGAURAV. H .TANDON
 
Traffic Volume Study
Traffic Volume StudyTraffic Volume Study
Traffic Volume StudyAbontee
 
Traffic analysis with respect to pedestrian facilities
Traffic analysis with respect to pedestrian facilitiesTraffic analysis with respect to pedestrian facilities
Traffic analysis with respect to pedestrian facilitiesAbhinav Pateriya
 
Traffic volume study
Traffic volume studyTraffic volume study
Traffic volume studyStone Rayhan
 
9-Traffic Volume ( Transportation and Traffic Engineering Dr. Sheriff El-Bada...
9-Traffic Volume ( Transportation and Traffic Engineering Dr. Sheriff El-Bada...9-Traffic Volume ( Transportation and Traffic Engineering Dr. Sheriff El-Bada...
9-Traffic Volume ( Transportation and Traffic Engineering Dr. Sheriff El-Bada...Hossam Shafiq I
 
Parking study traffic eng
Parking study traffic engParking study traffic eng
Parking study traffic engamira688
 
Spot Speed Study (Lab)
Spot Speed Study (Lab)Spot Speed Study (Lab)
Spot Speed Study (Lab)Priyansh Singh
 
Traffic volume-study
Traffic volume-studyTraffic volume-study
Traffic volume-studyStone Rayhan
 
Chapter 2 traffic studies
Chapter 2 traffic studiesChapter 2 traffic studies
Chapter 2 traffic studiesAnkit Patel
 
Parking problems
Parking problemsParking problems
Parking problemsubaidpvkd
 
Intelligent Transportation System
Intelligent Transportation SystemIntelligent Transportation System
Intelligent Transportation Systemguest6d72ec
 
Traffic analysis and Widening of Roads
Traffic analysis and Widening of RoadsTraffic analysis and Widening of Roads
Traffic analysis and Widening of RoadsAbhinav Pateriya
 
E4 Advanced Transportation Center | Michael Boehm, Wallace Walrod, Scott Kitc...
E4 Advanced Transportation Center | Michael Boehm, Wallace Walrod, Scott Kitc...E4 Advanced Transportation Center | Michael Boehm, Wallace Walrod, Scott Kitc...
E4 Advanced Transportation Center | Michael Boehm, Wallace Walrod, Scott Kitc...UCICove
 
2015 03 25 Powerpoint Presentation
2015 03 25 Powerpoint Presentation2015 03 25 Powerpoint Presentation
2015 03 25 Powerpoint PresentationTy Bos
 

Viewers also liked (20)

Traffic Volume Studies
Traffic Volume StudiesTraffic Volume Studies
Traffic Volume Studies
 
Hwre en nu 35,44
Hwre en nu 35,44Hwre en nu 35,44
Hwre en nu 35,44
 
Transportation Engineering I
Transportation Engineering  ITransportation Engineering  I
Transportation Engineering I
 
Traffic Volume Study
Traffic Volume StudyTraffic Volume Study
Traffic Volume Study
 
Traffic analysis with respect to pedestrian facilities
Traffic analysis with respect to pedestrian facilitiesTraffic analysis with respect to pedestrian facilities
Traffic analysis with respect to pedestrian facilities
 
Traffic volume study
Traffic volume studyTraffic volume study
Traffic volume study
 
9-Traffic Volume ( Transportation and Traffic Engineering Dr. Sheriff El-Bada...
9-Traffic Volume ( Transportation and Traffic Engineering Dr. Sheriff El-Bada...9-Traffic Volume ( Transportation and Traffic Engineering Dr. Sheriff El-Bada...
9-Traffic Volume ( Transportation and Traffic Engineering Dr. Sheriff El-Bada...
 
Parking study traffic eng
Parking study traffic engParking study traffic eng
Parking study traffic eng
 
Spot Speed Study (Lab)
Spot Speed Study (Lab)Spot Speed Study (Lab)
Spot Speed Study (Lab)
 
Traffic volume-study
Traffic volume-studyTraffic volume-study
Traffic volume-study
 
Chapter 2 traffic studies
Chapter 2 traffic studiesChapter 2 traffic studies
Chapter 2 traffic studies
 
Parking problems
Parking problemsParking problems
Parking problems
 
Traffic control
Traffic controlTraffic control
Traffic control
 
Intelligent Transportation System
Intelligent Transportation SystemIntelligent Transportation System
Intelligent Transportation System
 
Traffic signs
Traffic signsTraffic signs
Traffic signs
 
Traffic analysis and Widening of Roads
Traffic analysis and Widening of RoadsTraffic analysis and Widening of Roads
Traffic analysis and Widening of Roads
 
E4 Advanced Transportation Center | Michael Boehm, Wallace Walrod, Scott Kitc...
E4 Advanced Transportation Center | Michael Boehm, Wallace Walrod, Scott Kitc...E4 Advanced Transportation Center | Michael Boehm, Wallace Walrod, Scott Kitc...
E4 Advanced Transportation Center | Michael Boehm, Wallace Walrod, Scott Kitc...
 
2015 03 25 Powerpoint Presentation
2015 03 25 Powerpoint Presentation2015 03 25 Powerpoint Presentation
2015 03 25 Powerpoint Presentation
 
CIS Traffic Survey Results
CIS Traffic Survey ResultsCIS Traffic Survey Results
CIS Traffic Survey Results
 
Volume data anlaysis
Volume data anlaysisVolume data anlaysis
Volume data anlaysis
 

Similar to He final ppt

Traffic studies (transportation engineering)
Traffic studies (transportation engineering)Traffic studies (transportation engineering)
Traffic studies (transportation engineering)Civil Zone
 
,Exit Exam Tutorial -Traffic Engineering.pdf
,Exit Exam Tutorial -Traffic Engineering.pdf,Exit Exam Tutorial -Traffic Engineering.pdf
,Exit Exam Tutorial -Traffic Engineering.pdfsandipanpaul16
 
Traffic volume study
Traffic volume studyTraffic volume study
Traffic volume studyKalpataru Das
 
Traffic studies and importance
Traffic studies and importance Traffic studies and importance
Traffic studies and importance SACHIN NAGAYACH
 
Presentation on Traffic Volume Study for the course CE 454
Presentation on Traffic Volume Study for the course CE 454Presentation on Traffic Volume Study for the course CE 454
Presentation on Traffic Volume Study for the course CE 454nazifa tabassum
 
IRJET - Synchronization of Traffic Signal System :- A Case Study of Godh ...
IRJET -  	  Synchronization of Traffic Signal System :- A Case Study of Godh ...IRJET -  	  Synchronization of Traffic Signal System :- A Case Study of Godh ...
IRJET - Synchronization of Traffic Signal System :- A Case Study of Godh ...IRJET Journal
 
ATE - U-I.pptx
ATE - U-I.pptxATE - U-I.pptx
ATE - U-I.pptxCivilhod15
 
Chapter 2trafficstudies-160822181308
Chapter 2trafficstudies-160822181308Chapter 2trafficstudies-160822181308
Chapter 2trafficstudies-160822181308saibabu48
 
Traffic volume-study-presentation-final
Traffic volume-study-presentation-finalTraffic volume-study-presentation-final
Traffic volume-study-presentation-finalStone Rayhan
 
A Report on Spot Speed Study.pdf
A Report on Spot Speed Study.pdfA Report on Spot Speed Study.pdf
A Report on Spot Speed Study.pdfLisa Riley
 
TRAFFIC ENGINEERING & HIGHWAY DRAINAGE_.pdf
TRAFFIC ENGINEERING & HIGHWAY DRAINAGE_.pdfTRAFFIC ENGINEERING & HIGHWAY DRAINAGE_.pdf
TRAFFIC ENGINEERING & HIGHWAY DRAINAGE_.pdfPriya Sarita Mane
 
Traffic analysis and Road Widening
Traffic analysis and Road WideningTraffic analysis and Road Widening
Traffic analysis and Road WideningAbhinav Pateriya
 
Spot speed studies.ppt .mylan nejyar
Spot speed studies.ppt .mylan nejyarSpot speed studies.ppt .mylan nejyar
Spot speed studies.ppt .mylan nejyarMalika khalil
 
Traffic volume studies
Traffic volume studiesTraffic volume studies
Traffic volume studiesJanak Parmar
 
Wrong-way vehicle motion detection system
Wrong-way vehicle motion detection systemWrong-way vehicle motion detection system
Wrong-way vehicle motion detection systemIRJET Journal
 
intelligent transport systems
intelligent transport systemsintelligent transport systems
intelligent transport systemsAnkit Kansotia
 
Unit 3 i ppt
Unit 3 i pptUnit 3 i ppt
Unit 3 i pptUMASAI8
 

Similar to He final ppt (20)

Traffic studies (transportation engineering)
Traffic studies (transportation engineering)Traffic studies (transportation engineering)
Traffic studies (transportation engineering)
 
,Exit Exam Tutorial -Traffic Engineering.pdf
,Exit Exam Tutorial -Traffic Engineering.pdf,Exit Exam Tutorial -Traffic Engineering.pdf
,Exit Exam Tutorial -Traffic Engineering.pdf
 
Traffic volume study
Traffic volume studyTraffic volume study
Traffic volume study
 
Traffic studies and importance
Traffic studies and importance Traffic studies and importance
Traffic studies and importance
 
Presentation on Traffic Volume Study for the course CE 454
Presentation on Traffic Volume Study for the course CE 454Presentation on Traffic Volume Study for the course CE 454
Presentation on Traffic Volume Study for the course CE 454
 
IRJET - Synchronization of Traffic Signal System :- A Case Study of Godh ...
IRJET -  	  Synchronization of Traffic Signal System :- A Case Study of Godh ...IRJET -  	  Synchronization of Traffic Signal System :- A Case Study of Godh ...
IRJET - Synchronization of Traffic Signal System :- A Case Study of Godh ...
 
ATE - U-I.pptx
ATE - U-I.pptxATE - U-I.pptx
ATE - U-I.pptx
 
Traffic Volume Study
Traffic Volume StudyTraffic Volume Study
Traffic Volume Study
 
Chapter 2trafficstudies-160822181308
Chapter 2trafficstudies-160822181308Chapter 2trafficstudies-160822181308
Chapter 2trafficstudies-160822181308
 
Traffic volume-study-presentation-final
Traffic volume-study-presentation-finalTraffic volume-study-presentation-final
Traffic volume-study-presentation-final
 
A Report on Spot Speed Study.pdf
A Report on Spot Speed Study.pdfA Report on Spot Speed Study.pdf
A Report on Spot Speed Study.pdf
 
TRAFFIC ENGINEERING & HIGHWAY DRAINAGE_.pdf
TRAFFIC ENGINEERING & HIGHWAY DRAINAGE_.pdfTRAFFIC ENGINEERING & HIGHWAY DRAINAGE_.pdf
TRAFFIC ENGINEERING & HIGHWAY DRAINAGE_.pdf
 
Traffic analysis and Road Widening
Traffic analysis and Road WideningTraffic analysis and Road Widening
Traffic analysis and Road Widening
 
Spot speed studies.ppt .mylan nejyar
Spot speed studies.ppt .mylan nejyarSpot speed studies.ppt .mylan nejyar
Spot speed studies.ppt .mylan nejyar
 
Traffic engineering
Traffic engineeringTraffic engineering
Traffic engineering
 
Traffic volume studies
Traffic volume studiesTraffic volume studies
Traffic volume studies
 
Wrong-way vehicle motion detection system
Wrong-way vehicle motion detection systemWrong-way vehicle motion detection system
Wrong-way vehicle motion detection system
 
intelligent transport systems
intelligent transport systemsintelligent transport systems
intelligent transport systems
 
Unit 3 i ppt
Unit 3 i pptUnit 3 i ppt
Unit 3 i ppt
 
Unit 3 i ppt
Unit 3 i pptUnit 3 i ppt
Unit 3 i ppt
 

More from ShahIshani1996

More from ShahIshani1996 (6)

Mos ppt m9
Mos ppt m9Mos ppt m9
Mos ppt m9
 
Maths 3 ppt
Maths 3 pptMaths 3 ppt
Maths 3 ppt
 
Dm
DmDm
Dm
 
Combiend curves of surveying
Combiend curves of surveyingCombiend curves of surveying
Combiend curves of surveying
 
marketing and national income
marketing  and national incomemarketing  and national income
marketing and national income
 
analysis of simple portal frame with sway
analysis of simple portal frame with swayanalysis of simple portal frame with sway
analysis of simple portal frame with sway
 

Recently uploaded

Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoordharasingh5698
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 

Recently uploaded (20)

Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 

He final ppt

  • 1. SHREE S’AD VIDHYA MANDAL INSTITUTE OF TECHNLOGY
  • 2. Faculty:- Aneri Chavan SUBJECT:- Highway Engineering SR NO . NAME ENROLLMENT NO . 1 Patel Margi M. 130450106035 2 Shah Ishani M. 130450106044
  • 3.
  • 4. What is traffic engineering?  Traffic Engineering is that branch of civil engineering which deals with the application of scientific principles, tools, techniques and findings for safe rapid convenient economic movement of people and goods.  The basic object of traffic engineering is to achieve efficient, free and rapid flow of traffic with least no of accidents.
  • 5. Study of traffic engineering  The study of traffic engineering may be divided into following sections- 1. Traffic Characteristics 2. Traffic Studies and Analysis 3. Traffic operation-control and regulation 4. Planning and analysis 5. Geometric Design 6. Administration and Management
  • 6. What is Traffic Study???.....  Traffic studies may be grouped into three main categories: 1. Inventories 2. Administrative studies 3. Dynamic studies.
  • 7. Types & purpose of traffic surveys Volume study Speed study Origin and destination – O & D study Traffic capacity study Accident study Parking study
  • 9.  Traffic volume is defined as the number of vehicles crossing a section of road per unit time at any selected period.  Traffic volume studies are conducted to collect data on the number of vehicles and/or pedestrians that pass a point on a highway facility during a specified time period.  This time period varies from as little as 15 min to as much as a year, depending on the anticipated use of the data.
  • 10. To determine of vehicle composition in traffic stream. To determine the service flow rate in PCU/PCE unit. To estimate of ADT based on expansion factor. To determine the directional distribution(DD). To draw flow fluctuation curves
  • 11. Effectiveness of a traffic control measure To check existing, operating service condition of a roadway section Planning traffic operation and control of existing facility To design intersection, signal timings, channelization Structural design of pavements, geometric design and road way capacity
  • 12. Volume Study Traffic volume studies are usually conducted when certain volume characteristics are needed, some of which follow:  Average Annual Daily Traffic (AADT)  Average Daily Traffic (ADT)  Peak Hour Volume (PHV)  Vehicle Classification (VC)  Vehicle Miles of Travel (VMT)
  • 14. Manual Counting Method: Direct method Data is counted by using hand tally and manual counters/enumerators.  Advantages: By this method traffic volume as well as vehicle classification and turning proportions can be obtained. Data can be used immediately after collection.  Disadvantages: This method is not practicable for long duration count and when flow is high. Error is common especially when volume is high. Count cannot be cross checked. Count cannot be done in bad weather.
  • 15. Mechanical Counting Boards Mechanical count boards consist of counters mounted on a board that record each direction of travel. Common counts include pedestrian, bicycle, vehicle classification, and traffic volume counts.
  • 16. Electronic Counting Boards Electronic counting boards are battery-operated, lighter, more compact, and easier to handle. They have an internal clock that automatically separates the data by time interval.
  • 17. Instruments used in Direct method Hand Counter Instrument to Measure Distance
  • 18. Manual Counting Method: Indirect Method In this method, data is collected using video camera. Video is captured for long time and data is collected later by rewinding.  Advantages: Besides traffic volume, several traffic parameters can be obtained from recorded film. Data can be cross checked and quality can be ensured. This method is applicable when volume is high. It is suitable for non-lane based traffic operation.  Disadvantages: A suitable elevated place is required for filming operation. Data cannot be used immediately after collection.
  • 19. Manual Counting Method: Indirect Method Video cameras are mounted to record the traffic condition on a road.
  • 20. Automatic counting method: In this method, vehicles are counted automatically without any human involvement.  Contact system based (pneumatic, mechanical, magnetic or piezoelectric method)  Contactless system based (electrical/optical, ultrasound/infrared radar, micro wave, CCTV/video image processing method etc.)
  • 21.  Advantages: This method is suitable for long duration or continuous count. Count is not affected by bad weather condition.  Disadvantages: It requires strict lane discipline. Non motorized vehicles are hard to detect
  • 22. Equipment used for Automatic counting method: Contact system Pneumatic Road Tube Counter Motion sensors
  • 23. Equipment used for Automatic counting method: Contactless system Vehicle numbers are recorder using ultrasound, light beam or other infrared technology.
  • 24. Traffic volume data can be presented in any of the forms- 1) Average annual Daily traffic : ADT: Average daily traffic is the volume of traffic counted on the roadway(two way) over a given time period (greater than one day but less than one year) divided by the number of days in that time period. AADT: Average annual daily traffic is obtained by adding daily traffic counts over one year divided by 365 days.
  • 25. 2)Variations Charts: These help in deciding the facilities and regulations needed during peak traffic regulations. 3)Traffic flow maps-These help to find the traffic volume distribution at a glance. Volume flow diagram-These data are needed for intersection design. 4)Thirtieth highest hourly volume: It is found from the plot between hourly volume and the no of hours in an year that the traffic volume is exceeded.
  • 27.  Speed studies are necessary because the actual speed of vehicles over a particular may vary depending on various factors such as geometric features, traffic conditions, time, place, environment and driver.  Speed studies un be studied under following heads:  Spot speed: This is the instantaneous speed of vehicle at a specified section or location.
  • 28.  Average speed: Average speed is the average of the spot speeds of all the vehicles passing a given point on the roadways  Running speed: It is the average speed maintained by a vehicles over a particular stretch of road , while the vehicle is in motion  Travel speed(overall speed): it is the effective speed with which a vehicle traverse a particular route between two stations. Travel speed =
  • 29. By measuring time Required to travel known distance Radar speed meter Photographic method Measurement of spot speed Long base method Short base method 1)Direct timing procedure 2)Enoscope 3)Pressure contact tubes
  • 31. INTRODUCTION  Parking is one of the major problems that is created by the increasing road traffic. It is an impact of transport development.  The availability of less space in urban areas has increased the demand for parking space especially in areas like Central business district. This affects the mode choice also.  This has a great economical impact.
  • 32. Effect of parking  Congestion  Accidents  Obstruction to fire fighting operations  Effect on environment
  • 33. General Terms of Parking Facilities 1. Parking Accumulation :-The total number of vehicles parked in an area at a specified moment. 2. Parking volume:-The number of vehicles parked in a particular area over a given period of time. It is usually measured in vehicles per day. 3. Parking load:-The area under the parking accumulation curve during a specified period.
  • 34. 4 Parking duration:-The length of time spent in a parking space. 5 Parking index:-Percentage of parking bays actually occupied by parked vehicles as compared to the theoretical number available. 6 Parking turn over:-Rate of the usage of the available parking space. Thus if there were 10 parking spaces used by 100 vehicles in a period of say 12 hours then the parking turnover would be
  • 35.  On street parking On street parking means the vehicles are parked on the sides of the street itself. This will be usually controlled by government agencies itself.  Off-street parking Parking bay like at the mall Parking system
  • 36. On – street or Kerb Parking 1. Parallel Parking 2. 30 degree parking 3. 45 degree parking 4. 60 degree Parking 5. 90 degree Parking
  • 42. Off-street Parking 1.Surface car parks 2.Multistoried car parks 3.Roof parks 4.Mechanical parks 5.Underground car parks Off-street Parking
  • 48. Peripheral Parking Schemes 1. Park and walk Under this scheme the motorists are included to park at the outskirts of the town and walk down to the town. 2. Park and ride This scheme provide for peripheral parking facilities and public transport side to the destinations in the town.
  • 49. Parking studies  Inventory of existing parking space supply and measure current levels of space usage (accumulation and space turn over).  Identify salient parking characteristics (duration, purpose, trip destination and walking distances to destination).  Qualify demands and needs.  Estimate facility capital and operating costs, usage and revenues.
  • 50. Types of Parking Surveys  Parking Space in inventory  Parking Usage Survey by Patrol  Questionnaire Type Parking Usage Survey  Cordon Count
  • 51. Comprehensive Parking Studies  Location where parked  Trip purpose and frequency  Primary trip destination  Length of time parked  Parking fees paid and  Distance walked from primary space to primary destination