Management of Ageing Assets at
Sellafield as part of a Systems
Engineering Approach
2
The concept of “Ageing”
The effects of environment and
service will in time degrade assets to a
level of physical condition or
performance where actions over and
above routine maintenance are
required to keep the asset fit-for-
service for the remainder of its
intended life. This is the concept of an
‘ageing asset’.
Source HSE RR912 “Management of ageing -
A framework for nuclear chemical facilities” (2012)
RR912 Headline Paragraphs
• Managing ageing plant effectively requires a paradigm shift in
the way that asset condition is regarded, assessed and
maintained.
• The conventional approach to asset management is often
reactive.
• The focus is on carrying out work that must be done now,
rather than work that will prevent future problems.
• The result is often unanticipated failures, long backlogs of
maintenance work and no time to carry out the preventative
maintenance which would alleviate many of the problems
4
Quick Figures - Sellafield by
numbers
That’s a lot of Assets
Sellafield Today
NO MARKING REQUIRED
Pre-Systems Engineering
• Preventative Maintenance identified, scheduled and
delivered with a focus on demonstrating maintenance of
nuclear safety functions
• Asset Condition assessment conducted by Asset
Management team with aim to identify and deal with
degraded asset condition
• Technical teams delivering bespoke ageing management for
specific key assets
• High level and broad ranging asset categorisation process
that was suboptimal at focussing priority and rigour of the
above activities
7
Systems Engineering Developments
• System Engineer “ownership” of Plant Based Systems
• Periodic (Plant Based) System Health Reporting
• Top down Asset Importance Categorisation process to drive
a consistent and graded approach
• Graded Asset Condition Assessment process driven by asset
importance categorisation
• System Engineers engage in appropriate ageing
management as a requirement of the Asset Condition
Assessment process
• Graded System Health Monitoring set to takeover from
System Health Reporting
8
Organisational Strategic Planning Elements
NDA Client Specification, Strategic Objectives, Decision Calendars, New Build, Wiring Diagrams, Scope and Context,
Performance Plan
Socio Economic
Environment
Risk & Review
Safety Case,
Risk
Management,
Asset Risk /
QRP,
Business
Continuity,
Condition /
System
Health,
Compliance &
Audit,
Asset
Management
Group and
Governance
Committee,
etc
Asset Management
Strategy & Planning
Asset Management Policy
& Strategy, Integrated
Waste Strategy including
Decommissioning.
Magnox & Oxide
Operating Plans, etc
Asset Management
Decision Making
Strategic Modelling,
Sellafield Site
Remediation Model,
etc
Organisation
& People
Enablers
Sellafield Ltd
Organisational
Design,
Asset
Management
Roles &
Accountabiliti
es (R2A2s),
Sellafield Ltd
Training Policy
(ISO 9001).
Asset Information
Information Strategy, Information Categorisation,
Information Systems, Information R2A2’s
Domestic /
Overseas
Customers
Regulators / Legal
Requirements
Asset Owner
(Government /
NDA)
Lifecycle Delivery
Asset Care &
Contingency
Plans
Dispose Maintain
Acquire
Operate
AMP
Based on the IAM Conceptual Model for Asset Management
ScopeofSellafieldAssetManagementSystem
10
A System Health
Approach
11
• With the significant number of assets delivering a diverse
range of missions
• Where should you go proactively looking for risk first?
• Are resources aligned to the areas where priority attention is
required?
“To help Sellafield apply appropriate and consistent levels of
rigour to their assets so that risk to programme delivery can
be identified and managed early enough to keep both risk and
cost at tolerable levels.”
Asset Importance
Categorisation – why
do it?
General Categorisation Considerations
• Functional Importance Categorisation - Not Risk – The output from
categorisation helps prioritise where and how hard we go looking for risk.
• Categorisation cannot be all things to all people – it should guide further
activities/rigour but never prevent us from doing the right thing.
• Statutory/Regulatory requirements must be carried out regardless of
Importance Categorisation output.
• We are legally required to routinely
• Test fire alarms
• Inspect ladders and lifting equipment etc.
• This process is intended to identify what we are going to do over and beyond
our “business as usual” requirements
• Otherwise everything becomes “important” and the process fails to provide
sufficient discrimination to help us prioritise additional rigour.
12
13
• The Asset Categorisation process is applied by the System
Engineer using the Asset Management Database
• A discrete question set helps to identify how a loss of asset
function impacts on key themes including:
• Nuclear safety
• Productivity
• Emergency response
• Environmental Protection
• The functional importance ranking assesses how
dramatically a loss of function could impact these themes
• A separate resilience score captures if the loss of function
can be delivered by other assets or means (…….or ultimately
whether we have resilience from within)
Application of Importance Categorisation
Application of Asset Categorisation
14
• Ideally everything on site would be categorised down to
nuts and bolts
• This would be very time consuming and severely hamper
benefit delivery
• A top down approach was adopted to help focus attention
from the start
15
Plant Based System
Functional
Area
Functional
Area
Functional
Area
Sub-
system
Sub-
system
Sub-
system
Sub-
system
Sub-
system
SSC
SSC
SSC
SSC
SSC
SSC
SSC
StrategicObjectives
SystemEngineerAnalysis
Top-down approach to Asset
Importance Categorisation
LineofSight
Functional Plant
Building
Functional Group
Resilience
Importance
Single point
vulnerability
Back up system exists Several levels of
redundancy
High importance • Detailed maintenance
strategy, top priority to carry
out
• Full understanding of ageing
(modelled, expert input)
• Full reporting of performance
• Detailed maintenance
strategy, top priority to carry
out
• Full understanding of ageing
(modelled, expert input)
• Full reporting of performance
• Generic maintenance strategy
exists
• Some understanding of ageing
(modelled)
• Some reporting of
performance
Moderate importance • Detailed maintenance
strategy, top priority to carry
out
• Full understanding of ageing
(modelled, expert input)
• Full reporting of performance
• Generic maintenance strategy
exists
• Some understanding of ageing
(modelled)
• Legal requirements only
Low importance • Generic maintenance strategy
exists
• Legal requirements only • Legal requirements only
16
Ageing Management Circle
17
• For the suitably important assets, the System Engineer follows the
Ageing Management Circle1 for their assets
1- C Pickford, M Niblett, How do I Assess Structure System or Component (SSC) Condition and Manage
Ageing?, SLP 1.06.03.04, Issue 3, April 2016, Sellafield Ltd
Asset Condition Assessment - comes
with (or without) Confidence
18
rget
nfidence
Degradation
Mechanisms
Identified
Degradation
Mechanisms
Modelled
Degradation
Mechanisms
Monitored
Confidence
Level
Achieved
Justifying Statement
(Confidence Achieved)
Action Plan to
Address Confidence
Gap
Confidence Factors
Confidence
Achieved Confidence
Show Hide
Condition Grade
A Good Condition
B Acceptable
Condition
C Poor
Condition
D Unacceptable
Condition
Required Confidence
Level
Confidence Achieved
Optimal Optimal
High High
Moderate Moderate
Low Low
Minimal Minimal
Optimal Optimal
High High
Moderate Moderate
Low Low
Minimal Minimal
Optimal Optimal
High High
Moderate Moderate
Low Low
Minimal Minimal
Optimal Optimal
High High
Moderate Moderate
Low Low
Minimal Minimal
Optimal Optimal
High High
Moderate Moderate
Low Low
Minimal Minimal
Required Confidence Level is set by
Asset Importance Categorisation
Confidence Gap RYAG relates to the
Confidence Gap and is always
reported alongside Condition Grade
……plus a future looking prediction as to how condition
will change over time
19
• Large number of problems
• Little data
• Requirement to schedule interventions based on facts
• Organisation change – Introducing System Engineering
• Ownership and Responsibility
Mathematical Ageing Models
20
• Ageing models are used wherever a loss of function is
intolerable (Asset Categorisation)
• The term “ageing model” is loosely applied and can mean
several things
• A prediction of when spares will run out/obsolescence kicks in
• A mathematical model predicting wear/corrosion/etc
• The purpose of an age model is to identify when an
investment in the asset is likely to be required
• Change design as spares no longer required
• Replace structural elements
• Stop production
Ageing Models
SEs Approach to Age Modelling
• Complete the following table for those systems which are
suitably important
• A database of starter forms exist and continues to grow
simplifying this form development
21
SEs Approach to Age Modelling
• This form allows us to begin to understand how to mitigate
ageing
• Remove stressors
• Change environment
• Change how it is operated
• Improve design
• New material
• New geometry
• Improve maintenance strategy
• Input to TBoM
• Crucially it doesn’t tell us how quickly the asset is going to
degrade
22
SEs Approach to Age Modelling
• Need to understand rate of ageing as well as mechanism
• Fundamental to this is the operating context
• How component is used
• Where it is operated
• Why are planes stored in the Nevada desert and not on the
beach at site?
• Need to understand how much the component can degrade
by and when it was installed
• Material loss
• Change in properties etc.
• Potential data management issue when assets are 70 years
old!
23
SEs Approach to Age Modelling
• Expecting System Engineers with different
backgrounds/disciplines to develop age models is unrealistic
• Expecting a central expertise to develop age models for all
suitably important assets on site is equally unrealistic
• A database has been developed which:
• Captures the knowledge of the central expertise
• Make use of these data simple to apply to models
• Crucially, the most important assets require any models to
be reviewed/verified by the central expertise
24
25
Ageing Models Database
26
Ageing Models Database
27
Age model- Example
28
Age model- Example
29
Adding real data to the model impacts on predicted life and proposed inspection
frequencies:
Prior to data the recommendation was 0.7 /
0.1
Age model- Example
Ageing Models Database
• Simple tool, guides user and provides relevant points of
contact for further information
• Uses verified data to make life predictions
• Avoids spurious internet searches!
• Drives inspection frequencies
• Dependent on importance, confidence, importance and remnant
life
• As data are gathered these are refined
• Crucial that, where possible, models are verified by real
measurement data
• Increases confidence
• Refines models for others
30
31
Where are we on this journey?
• Organisation Structure
• Gathering Data
• Providing tools and processes
• Challenge
Summary
Thank you for listening
32
Any Questions?

More Related Content

What's hot

Asset Performance Management in Oil and Gas Industry
Asset Performance Management in Oil and Gas Industry Asset Performance Management in Oil and Gas Industry
Asset Performance Management in Oil and Gas Industry
Arrelic
 
Webinar: Hoe houdt u de marge op peil bij de huidige record hoge energieprijzen
Webinar: Hoe houdt u de marge op peil bij de huidige record hoge energieprijzenWebinar: Hoe houdt u de marge op peil bij de huidige record hoge energieprijzen
Webinar: Hoe houdt u de marge op peil bij de huidige record hoge energieprijzen
Stork
 
Merck's West Point Facility Embraces RCM
Merck's West Point Facility Embraces RCMMerck's West Point Facility Embraces RCM
Merck's West Point Facility Embraces RCM
Mike Poland, CMRP
 
Asset Management Before and After the Equipment Purchase
Asset Management Before and After the Equipment PurchaseAsset Management Before and After the Equipment Purchase
Asset Management Before and After the Equipment Purchase
DNVGLEnergy
 
Embedding integrated asset investment planning dunea and seams iam
Embedding integrated asset investment planning   dunea and seams iamEmbedding integrated asset investment planning   dunea and seams iam
Embedding integrated asset investment planning dunea and seams iam
Nikki Peacock
 
Track 2 Tuesday Michael Rose and Chris Gould- pres.
Track 2 Tuesday Michael Rose and Chris Gould- pres.Track 2 Tuesday Michael Rose and Chris Gould- pres.
Track 2 Tuesday Michael Rose and Chris Gould- pres.Mike Poland, CMRP
 
Monetizing Risks - A Prioritization & Optimization Solution
Monetizing Risks - A Prioritization & Optimization SolutionMonetizing Risks - A Prioritization & Optimization Solution
Monetizing Risks - A Prioritization & Optimization Solution
Black & Veatch
 
Introduction to The Augustus Group and RBI
Introduction to The Augustus Group and RBIIntroduction to The Augustus Group and RBI
Introduction to The Augustus Group and RBI
Edwin A Merrick
 
Decommissioning your offshore assets
Decommissioning your offshore assetsDecommissioning your offshore assets
Decommissioning your offshore assets
Advisian
 
How green standards are changing data center design and operations
How green standards are changing data center design and operationsHow green standards are changing data center design and operations
How green standards are changing data center design and operations
Schneider Electric
 
Optimisation of maintenance strategies for offshore wind farms
Optimisation of maintenance strategies for offshore wind farmsOptimisation of maintenance strategies for offshore wind farms
Optimisation of maintenance strategies for offshore wind farms
Lloyd's Register Energy
 
Tool Box Talk - World Class Maintenance Edited
Tool Box Talk - World Class Maintenance   EditedTool Box Talk - World Class Maintenance   Edited
Tool Box Talk - World Class Maintenance Edited
Ricky Smith CMRP, CMRT
 
Essential elements of data center operations
Essential elements of data center operationsEssential elements of data center operations
Essential elements of data center operations
Schneider Electric
 
Business continuity planning
Business continuity planningBusiness continuity planning
Business continuity planningSandeep Kashyap
 
Business continuity planning and disaster recovery
Business continuity planning and disaster recoveryBusiness continuity planning and disaster recovery
Business continuity planning and disaster recovery
madunix
 
Challenges and Opportunities in Implementing an Asset Management Program
Challenges and Opportunities in Implementing an Asset Management Program Challenges and Opportunities in Implementing an Asset Management Program
Challenges and Opportunities in Implementing an Asset Management Program
Black & Veatch
 
How To Beat The Recession: BOS, Operations Excellence and a Problem Solving C...
How To Beat The Recession: BOS, Operations Excellence and a Problem Solving C...How To Beat The Recession: BOS, Operations Excellence and a Problem Solving C...
How To Beat The Recession: BOS, Operations Excellence and a Problem Solving C...
Dave Watkins
 
Operational Efficiency Based on Innovative Automation, Industry Expertise, En...
Operational Efficiency Based on Innovative Automation, Industry Expertise, En...Operational Efficiency Based on Innovative Automation, Industry Expertise, En...
Operational Efficiency Based on Innovative Automation, Industry Expertise, En...
Sergey Mishin
 
Recovery audit services
Recovery audit servicesRecovery audit services
Recovery audit services
Genpact Ltd
 
Business Continuity Workshop Final
Business Continuity Workshop   FinalBusiness Continuity Workshop   Final
Business Continuity Workshop Final
Bill Lisse
 

What's hot (20)

Asset Performance Management in Oil and Gas Industry
Asset Performance Management in Oil and Gas Industry Asset Performance Management in Oil and Gas Industry
Asset Performance Management in Oil and Gas Industry
 
Webinar: Hoe houdt u de marge op peil bij de huidige record hoge energieprijzen
Webinar: Hoe houdt u de marge op peil bij de huidige record hoge energieprijzenWebinar: Hoe houdt u de marge op peil bij de huidige record hoge energieprijzen
Webinar: Hoe houdt u de marge op peil bij de huidige record hoge energieprijzen
 
Merck's West Point Facility Embraces RCM
Merck's West Point Facility Embraces RCMMerck's West Point Facility Embraces RCM
Merck's West Point Facility Embraces RCM
 
Asset Management Before and After the Equipment Purchase
Asset Management Before and After the Equipment PurchaseAsset Management Before and After the Equipment Purchase
Asset Management Before and After the Equipment Purchase
 
Embedding integrated asset investment planning dunea and seams iam
Embedding integrated asset investment planning   dunea and seams iamEmbedding integrated asset investment planning   dunea and seams iam
Embedding integrated asset investment planning dunea and seams iam
 
Track 2 Tuesday Michael Rose and Chris Gould- pres.
Track 2 Tuesday Michael Rose and Chris Gould- pres.Track 2 Tuesday Michael Rose and Chris Gould- pres.
Track 2 Tuesday Michael Rose and Chris Gould- pres.
 
Monetizing Risks - A Prioritization & Optimization Solution
Monetizing Risks - A Prioritization & Optimization SolutionMonetizing Risks - A Prioritization & Optimization Solution
Monetizing Risks - A Prioritization & Optimization Solution
 
Introduction to The Augustus Group and RBI
Introduction to The Augustus Group and RBIIntroduction to The Augustus Group and RBI
Introduction to The Augustus Group and RBI
 
Decommissioning your offshore assets
Decommissioning your offshore assetsDecommissioning your offshore assets
Decommissioning your offshore assets
 
How green standards are changing data center design and operations
How green standards are changing data center design and operationsHow green standards are changing data center design and operations
How green standards are changing data center design and operations
 
Optimisation of maintenance strategies for offshore wind farms
Optimisation of maintenance strategies for offshore wind farmsOptimisation of maintenance strategies for offshore wind farms
Optimisation of maintenance strategies for offshore wind farms
 
Tool Box Talk - World Class Maintenance Edited
Tool Box Talk - World Class Maintenance   EditedTool Box Talk - World Class Maintenance   Edited
Tool Box Talk - World Class Maintenance Edited
 
Essential elements of data center operations
Essential elements of data center operationsEssential elements of data center operations
Essential elements of data center operations
 
Business continuity planning
Business continuity planningBusiness continuity planning
Business continuity planning
 
Business continuity planning and disaster recovery
Business continuity planning and disaster recoveryBusiness continuity planning and disaster recovery
Business continuity planning and disaster recovery
 
Challenges and Opportunities in Implementing an Asset Management Program
Challenges and Opportunities in Implementing an Asset Management Program Challenges and Opportunities in Implementing an Asset Management Program
Challenges and Opportunities in Implementing an Asset Management Program
 
How To Beat The Recession: BOS, Operations Excellence and a Problem Solving C...
How To Beat The Recession: BOS, Operations Excellence and a Problem Solving C...How To Beat The Recession: BOS, Operations Excellence and a Problem Solving C...
How To Beat The Recession: BOS, Operations Excellence and a Problem Solving C...
 
Operational Efficiency Based on Innovative Automation, Industry Expertise, En...
Operational Efficiency Based on Innovative Automation, Industry Expertise, En...Operational Efficiency Based on Innovative Automation, Industry Expertise, En...
Operational Efficiency Based on Innovative Automation, Industry Expertise, En...
 
Recovery audit services
Recovery audit servicesRecovery audit services
Recovery audit services
 
Business Continuity Workshop Final
Business Continuity Workshop   FinalBusiness Continuity Workshop   Final
Business Continuity Workshop Final
 

Similar to Stream D_Richard Longman, Chris Pickford, Mike Niblett

Chapter 6.pdf
Chapter 6.pdfChapter 6.pdf
Chapter 6.pdf
ssuser8cd298
 
Maintenance & inspection adapted to equipment criticality gunnars & jonsson...
Maintenance & inspection adapted to equipment criticality   gunnars & jonsson...Maintenance & inspection adapted to equipment criticality   gunnars & jonsson...
Maintenance & inspection adapted to equipment criticality gunnars & jonsson...
Jens Gunnars
 
A Decision Support System Based on RCM Approach to Define Maintenance Strategies
A Decision Support System Based on RCM Approach to Define Maintenance StrategiesA Decision Support System Based on RCM Approach to Define Maintenance Strategies
A Decision Support System Based on RCM Approach to Define Maintenance StrategiesCONFENIS 2012
 
CISM_WK_2.pptx
CISM_WK_2.pptxCISM_WK_2.pptx
CISM_WK_2.pptx
dotco
 
Reliability Centered Maintenance
Reliability Centered MaintenanceReliability Centered Maintenance
Reliability Centered Maintenance
Nafis Ahmad
 
2018-GoMaximo-Asset-Management-Fundamentals.pptx
2018-GoMaximo-Asset-Management-Fundamentals.pptx2018-GoMaximo-Asset-Management-Fundamentals.pptx
2018-GoMaximo-Asset-Management-Fundamentals.pptx
Saravana Kumar
 
I ChemE Presentation
I ChemE PresentationI ChemE Presentation
I ChemE Presentation
TheonLtd
 
Lecture-3-Introduction to Maintenance Management.ppt
Lecture-3-Introduction to Maintenance Management.pptLecture-3-Introduction to Maintenance Management.ppt
Lecture-3-Introduction to Maintenance Management.ppt
Thushan9
 
Structured NERC CIP Process Improvement Using Six Sigma
Structured NERC CIP Process Improvement Using Six SigmaStructured NERC CIP Process Improvement Using Six Sigma
Structured NERC CIP Process Improvement Using Six Sigma
EnergySec
 
IADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDFIADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDFPieter van Asten
 
Asset management
Asset managementAsset management
Asset management
Syed Atif Naseem
 
Reliability Engineering in Biomanufacturing - Presentation by Michael Andrews
Reliability Engineering in Biomanufacturing - Presentation by Michael AndrewsReliability Engineering in Biomanufacturing - Presentation by Michael Andrews
Reliability Engineering in Biomanufacturing - Presentation by Michael Andrews
WPICPE
 
Example Asset Management Framework
Example Asset Management FrameworkExample Asset Management Framework
Example Asset Management Framework
Shaun Nichol
 
Preventive and Predictive maintenance.ppt
Preventive and Predictive maintenance.pptPreventive and Predictive maintenance.ppt
Preventive and Predictive maintenance.ppt
Mamoonurrasheed9
 
crisc_wk_6.pptx
crisc_wk_6.pptxcrisc_wk_6.pptx
crisc_wk_6.pptx
dotco
 
Bcp drp
Bcp drpBcp drp
Bcp drp
aqel aqel
 
ITIL Best Practice for Software Companies
ITIL Best Practice for Software CompaniesITIL Best Practice for Software Companies
ITIL Best Practice for Software Companies
Daniel Brody
 
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCEMAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
laxtwinsme
 
management system development and planning
management system development and planningmanagement system development and planning
management system development and planning
milkesa13
 

Similar to Stream D_Richard Longman, Chris Pickford, Mike Niblett (20)

Chapter 6.pdf
Chapter 6.pdfChapter 6.pdf
Chapter 6.pdf
 
Maintenance & inspection adapted to equipment criticality gunnars & jonsson...
Maintenance & inspection adapted to equipment criticality   gunnars & jonsson...Maintenance & inspection adapted to equipment criticality   gunnars & jonsson...
Maintenance & inspection adapted to equipment criticality gunnars & jonsson...
 
A Decision Support System Based on RCM Approach to Define Maintenance Strategies
A Decision Support System Based on RCM Approach to Define Maintenance StrategiesA Decision Support System Based on RCM Approach to Define Maintenance Strategies
A Decision Support System Based on RCM Approach to Define Maintenance Strategies
 
CISM_WK_2.pptx
CISM_WK_2.pptxCISM_WK_2.pptx
CISM_WK_2.pptx
 
Reliability Centered Maintenance
Reliability Centered MaintenanceReliability Centered Maintenance
Reliability Centered Maintenance
 
2018-GoMaximo-Asset-Management-Fundamentals.pptx
2018-GoMaximo-Asset-Management-Fundamentals.pptx2018-GoMaximo-Asset-Management-Fundamentals.pptx
2018-GoMaximo-Asset-Management-Fundamentals.pptx
 
I ChemE Presentation
I ChemE PresentationI ChemE Presentation
I ChemE Presentation
 
Lecture-3-Introduction to Maintenance Management.ppt
Lecture-3-Introduction to Maintenance Management.pptLecture-3-Introduction to Maintenance Management.ppt
Lecture-3-Introduction to Maintenance Management.ppt
 
Structured NERC CIP Process Improvement Using Six Sigma
Structured NERC CIP Process Improvement Using Six SigmaStructured NERC CIP Process Improvement Using Six Sigma
Structured NERC CIP Process Improvement Using Six Sigma
 
IADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDFIADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDF
 
Asset management
Asset managementAsset management
Asset management
 
Reliability Engineering in Biomanufacturing - Presentation by Michael Andrews
Reliability Engineering in Biomanufacturing - Presentation by Michael AndrewsReliability Engineering in Biomanufacturing - Presentation by Michael Andrews
Reliability Engineering in Biomanufacturing - Presentation by Michael Andrews
 
Example Asset Management Framework
Example Asset Management FrameworkExample Asset Management Framework
Example Asset Management Framework
 
Preventive and Predictive maintenance.ppt
Preventive and Predictive maintenance.pptPreventive and Predictive maintenance.ppt
Preventive and Predictive maintenance.ppt
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
crisc_wk_6.pptx
crisc_wk_6.pptxcrisc_wk_6.pptx
crisc_wk_6.pptx
 
Bcp drp
Bcp drpBcp drp
Bcp drp
 
ITIL Best Practice for Software Companies
ITIL Best Practice for Software CompaniesITIL Best Practice for Software Companies
ITIL Best Practice for Software Companies
 
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCEMAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
 
management system development and planning
management system development and planningmanagement system development and planning
management system development and planning
 

More from BecarAsset

Stream E_Peter Jay
Stream E_Peter JayStream E_Peter Jay
Stream E_Peter Jay
BecarAsset
 
Stream E_Netherlands IAM chapter
Stream E_Netherlands IAM chapterStream E_Netherlands IAM chapter
Stream E_Netherlands IAM chapter
BecarAsset
 
Stream E_Mike Dixon
Stream E_Mike DixonStream E_Mike Dixon
Stream E_Mike Dixon
BecarAsset
 
Stream E_Boudewijn Neijens - IAM Canada intro
Stream E_Boudewijn Neijens - IAM Canada introStream E_Boudewijn Neijens - IAM Canada intro
Stream E_Boudewijn Neijens - IAM Canada intro
BecarAsset
 
Stream E_Dr. Tim King - Dr. Demetrius Onoufriou - data, information + decisio...
Stream E_Dr. Tim King - Dr. Demetrius Onoufriou - data, information + decisio...Stream E_Dr. Tim King - Dr. Demetrius Onoufriou - data, information + decisio...
Stream E_Dr. Tim King - Dr. Demetrius Onoufriou - data, information + decisio...
BecarAsset
 
Stream E_Chris Lloyd and David Ashworth
Stream E_Chris Lloyd and David AshworthStream E_Chris Lloyd and David Ashworth
Stream E_Chris Lloyd and David Ashworth
BecarAsset
 
Stream D_Sian Thomas Rachel Blundell
Stream D_Sian Thomas Rachel BlundellStream D_Sian Thomas Rachel Blundell
Stream D_Sian Thomas Rachel Blundell
BecarAsset
 
Stream D_John Chappell
Stream D_John ChappellStream D_John Chappell
Stream D_John Chappell
BecarAsset
 
Stream D_David Riley
Stream D_David RileyStream D_David Riley
Stream D_David Riley
BecarAsset
 
Stream D_Julian Schwarzenbach Andy Watts and Wayne Reed
Stream D_Julian Schwarzenbach Andy Watts and Wayne ReedStream D_Julian Schwarzenbach Andy Watts and Wayne Reed
Stream D_Julian Schwarzenbach Andy Watts and Wayne Reed
BecarAsset
 
Stream C_Ross Agnew Ursula Bryan
Stream C_Ross Agnew Ursula BryanStream C_Ross Agnew Ursula Bryan
Stream C_Ross Agnew Ursula Bryan
BecarAsset
 
Stream C_Luke Body
Stream C_Luke BodyStream C_Luke Body
Stream C_Luke Body
BecarAsset
 
Stream C_Javier Serrano
Stream C_Javier SerranoStream C_Javier Serrano
Stream C_Javier Serrano
BecarAsset
 
Stream C_David Tyler
Stream C_David TylerStream C_David Tyler
Stream C_David Tyler
BecarAsset
 
Stream C_Cristian Augusto Eemolina Alvarez
Stream C_Cristian Augusto Eemolina AlvarezStream C_Cristian Augusto Eemolina Alvarez
Stream C_Cristian Augusto Eemolina Alvarez
BecarAsset
 
Stream C_Bill Emery
Stream C_Bill EmeryStream C_Bill Emery
Stream C_Bill Emery
BecarAsset
 
Stream C_Christian Schmidt Berthelsen
Stream C_Christian Schmidt BerthelsenStream C_Christian Schmidt Berthelsen
Stream C_Christian Schmidt Berthelsen
BecarAsset
 
Stream B_Rob Knight
Stream B_Rob KnightStream B_Rob Knight
Stream B_Rob Knight
BecarAsset
 
Stream B_Phil Richardson
Stream B_Phil RichardsonStream B_Phil Richardson
Stream B_Phil Richardson
BecarAsset
 
Stream B_Nicolas Rouge and Olivier Bernard
Stream B_Nicolas Rouge and Olivier BernardStream B_Nicolas Rouge and Olivier Bernard
Stream B_Nicolas Rouge and Olivier Bernard
BecarAsset
 

More from BecarAsset (20)

Stream E_Peter Jay
Stream E_Peter JayStream E_Peter Jay
Stream E_Peter Jay
 
Stream E_Netherlands IAM chapter
Stream E_Netherlands IAM chapterStream E_Netherlands IAM chapter
Stream E_Netherlands IAM chapter
 
Stream E_Mike Dixon
Stream E_Mike DixonStream E_Mike Dixon
Stream E_Mike Dixon
 
Stream E_Boudewijn Neijens - IAM Canada intro
Stream E_Boudewijn Neijens - IAM Canada introStream E_Boudewijn Neijens - IAM Canada intro
Stream E_Boudewijn Neijens - IAM Canada intro
 
Stream E_Dr. Tim King - Dr. Demetrius Onoufriou - data, information + decisio...
Stream E_Dr. Tim King - Dr. Demetrius Onoufriou - data, information + decisio...Stream E_Dr. Tim King - Dr. Demetrius Onoufriou - data, information + decisio...
Stream E_Dr. Tim King - Dr. Demetrius Onoufriou - data, information + decisio...
 
Stream E_Chris Lloyd and David Ashworth
Stream E_Chris Lloyd and David AshworthStream E_Chris Lloyd and David Ashworth
Stream E_Chris Lloyd and David Ashworth
 
Stream D_Sian Thomas Rachel Blundell
Stream D_Sian Thomas Rachel BlundellStream D_Sian Thomas Rachel Blundell
Stream D_Sian Thomas Rachel Blundell
 
Stream D_John Chappell
Stream D_John ChappellStream D_John Chappell
Stream D_John Chappell
 
Stream D_David Riley
Stream D_David RileyStream D_David Riley
Stream D_David Riley
 
Stream D_Julian Schwarzenbach Andy Watts and Wayne Reed
Stream D_Julian Schwarzenbach Andy Watts and Wayne ReedStream D_Julian Schwarzenbach Andy Watts and Wayne Reed
Stream D_Julian Schwarzenbach Andy Watts and Wayne Reed
 
Stream C_Ross Agnew Ursula Bryan
Stream C_Ross Agnew Ursula BryanStream C_Ross Agnew Ursula Bryan
Stream C_Ross Agnew Ursula Bryan
 
Stream C_Luke Body
Stream C_Luke BodyStream C_Luke Body
Stream C_Luke Body
 
Stream C_Javier Serrano
Stream C_Javier SerranoStream C_Javier Serrano
Stream C_Javier Serrano
 
Stream C_David Tyler
Stream C_David TylerStream C_David Tyler
Stream C_David Tyler
 
Stream C_Cristian Augusto Eemolina Alvarez
Stream C_Cristian Augusto Eemolina AlvarezStream C_Cristian Augusto Eemolina Alvarez
Stream C_Cristian Augusto Eemolina Alvarez
 
Stream C_Bill Emery
Stream C_Bill EmeryStream C_Bill Emery
Stream C_Bill Emery
 
Stream C_Christian Schmidt Berthelsen
Stream C_Christian Schmidt BerthelsenStream C_Christian Schmidt Berthelsen
Stream C_Christian Schmidt Berthelsen
 
Stream B_Rob Knight
Stream B_Rob KnightStream B_Rob Knight
Stream B_Rob Knight
 
Stream B_Phil Richardson
Stream B_Phil RichardsonStream B_Phil Richardson
Stream B_Phil Richardson
 
Stream B_Nicolas Rouge and Olivier Bernard
Stream B_Nicolas Rouge and Olivier BernardStream B_Nicolas Rouge and Olivier Bernard
Stream B_Nicolas Rouge and Olivier Bernard
 

Recently uploaded

The KA Housing - Catalogue - Listing Turkey
The KA Housing - Catalogue - Listing TurkeyThe KA Housing - Catalogue - Listing Turkey
The KA Housing - Catalogue - Listing Turkey
Listing Turkey
 
SVN Live 6.3.24 Weekly Property Broadcast
SVN Live 6.3.24 Weekly Property BroadcastSVN Live 6.3.24 Weekly Property Broadcast
SVN Live 6.3.24 Weekly Property Broadcast
SVN International Corp.
 
Rams Garden Bahcelievler - Istanbul - ListingTurkey
Rams Garden Bahcelievler - Istanbul - ListingTurkeyRams Garden Bahcelievler - Istanbul - ListingTurkey
Rams Garden Bahcelievler - Istanbul - ListingTurkey
Listing Turkey
 
Killer Referans Bahcesehir Catalog Listing Turkey
Killer Referans Bahcesehir Catalog Listing TurkeyKiller Referans Bahcesehir Catalog Listing Turkey
Killer Referans Bahcesehir Catalog Listing Turkey
Listing Turkey
 
How to keep your Home naturally Cool and Warm
How to keep your Home naturally Cool and WarmHow to keep your Home naturally Cool and Warm
How to keep your Home naturally Cool and Warm
Vinra Construction
 
Presentation to Windust Meadows HOA Board of Directors June 4, 2024: Focus o...
Presentation to Windust Meadows HOA Board of Directors June 4, 2024:  Focus o...Presentation to Windust Meadows HOA Board of Directors June 4, 2024:  Focus o...
Presentation to Windust Meadows HOA Board of Directors June 4, 2024: Focus o...
Joseph Lewis Aguirre
 
Listing Turkey - Yeni Eyupevleri Istanbul
Listing Turkey - Yeni Eyupevleri IstanbulListing Turkey - Yeni Eyupevleri Istanbul
Listing Turkey - Yeni Eyupevleri Istanbul
Listing Turkey
 
One20 North Vancouver Floor Plans by Three Shores Development.
One20 North Vancouver Floor Plans by Three Shores Development.One20 North Vancouver Floor Plans by Three Shores Development.
One20 North Vancouver Floor Plans by Three Shores Development.
VickyAulakh1
 
Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szet...
Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szet...Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szet...
Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szet...
Volition Properties
 
GT234 CADASTRAL SURVEYING gggggggggg.ppt
GT234 CADASTRAL SURVEYING gggggggggg.pptGT234 CADASTRAL SURVEYING gggggggggg.ppt
GT234 CADASTRAL SURVEYING gggggggggg.ppt
leonardmichael1
 
Riverview City Loni Kalbhor Pune Brochure
Riverview City Loni Kalbhor Pune BrochureRiverview City Loni Kalbhor Pune Brochure
Riverview City Loni Kalbhor Pune Brochure
kishor21012022
 
Optimizing Your MCA Lead Capture Process for Better Results
Optimizing Your MCA Lead Capture Process for Better ResultsOptimizing Your MCA Lead Capture Process for Better Results
Optimizing Your MCA Lead Capture Process for Better Results
Lead Generation Media
 
Digital marketing strategy for Real Estate
Digital marketing strategy for Real EstateDigital marketing strategy for Real Estate
Digital marketing strategy for Real Estate
dheerajkumar8179
 
Torun Center Residences Istanbul - Listing Turkey
Torun Center Residences Istanbul - Listing TurkeyTorun Center Residences Istanbul - Listing Turkey
Torun Center Residences Istanbul - Listing Turkey
Listing Turkey
 
Hawthorn Module 1 Coverted to Slide Show - 04.06.2024.docx
Hawthorn Module 1 Coverted to Slide Show - 04.06.2024.docxHawthorn Module 1 Coverted to Slide Show - 04.06.2024.docx
Hawthorn Module 1 Coverted to Slide Show - 04.06.2024.docx
anothershaneroberts
 
Total Environment Tangled Up In The Green - Residential Plots Where Nature an...
Total Environment Tangled Up In The Green - Residential Plots Where Nature an...Total Environment Tangled Up In The Green - Residential Plots Where Nature an...
Total Environment Tangled Up In The Green - Residential Plots Where Nature an...
JagadishKR1
 
One FNG by Group 108 Sector 142 Noida Construction Update
One FNG by Group 108 Sector 142 Noida Construction UpdateOne FNG by Group 108 Sector 142 Noida Construction Update
One FNG by Group 108 Sector 142 Noida Construction Update
One FNG
 
Sense Levent Kagithane Catalog - Listing Turkey
Sense Levent Kagithane Catalog - Listing TurkeySense Levent Kagithane Catalog - Listing Turkey
Sense Levent Kagithane Catalog - Listing Turkey
Listing Turkey
 
Rixos Tersane Istanbul Residences Brochure_May2024_ENG.pdf
Rixos Tersane Istanbul Residences Brochure_May2024_ENG.pdfRixos Tersane Istanbul Residences Brochure_May2024_ENG.pdf
Rixos Tersane Istanbul Residences Brochure_May2024_ENG.pdf
Listing Turkey
 
Biography and career about Lixin Azarmehr
Biography and career about Lixin AzarmehrBiography and career about Lixin Azarmehr
Biography and career about Lixin Azarmehr
Lixin Azarmehr
 

Recently uploaded (20)

The KA Housing - Catalogue - Listing Turkey
The KA Housing - Catalogue - Listing TurkeyThe KA Housing - Catalogue - Listing Turkey
The KA Housing - Catalogue - Listing Turkey
 
SVN Live 6.3.24 Weekly Property Broadcast
SVN Live 6.3.24 Weekly Property BroadcastSVN Live 6.3.24 Weekly Property Broadcast
SVN Live 6.3.24 Weekly Property Broadcast
 
Rams Garden Bahcelievler - Istanbul - ListingTurkey
Rams Garden Bahcelievler - Istanbul - ListingTurkeyRams Garden Bahcelievler - Istanbul - ListingTurkey
Rams Garden Bahcelievler - Istanbul - ListingTurkey
 
Killer Referans Bahcesehir Catalog Listing Turkey
Killer Referans Bahcesehir Catalog Listing TurkeyKiller Referans Bahcesehir Catalog Listing Turkey
Killer Referans Bahcesehir Catalog Listing Turkey
 
How to keep your Home naturally Cool and Warm
How to keep your Home naturally Cool and WarmHow to keep your Home naturally Cool and Warm
How to keep your Home naturally Cool and Warm
 
Presentation to Windust Meadows HOA Board of Directors June 4, 2024: Focus o...
Presentation to Windust Meadows HOA Board of Directors June 4, 2024:  Focus o...Presentation to Windust Meadows HOA Board of Directors June 4, 2024:  Focus o...
Presentation to Windust Meadows HOA Board of Directors June 4, 2024: Focus o...
 
Listing Turkey - Yeni Eyupevleri Istanbul
Listing Turkey - Yeni Eyupevleri IstanbulListing Turkey - Yeni Eyupevleri Istanbul
Listing Turkey - Yeni Eyupevleri Istanbul
 
One20 North Vancouver Floor Plans by Three Shores Development.
One20 North Vancouver Floor Plans by Three Shores Development.One20 North Vancouver Floor Plans by Three Shores Development.
One20 North Vancouver Floor Plans by Three Shores Development.
 
Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szet...
Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szet...Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szet...
Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szet...
 
GT234 CADASTRAL SURVEYING gggggggggg.ppt
GT234 CADASTRAL SURVEYING gggggggggg.pptGT234 CADASTRAL SURVEYING gggggggggg.ppt
GT234 CADASTRAL SURVEYING gggggggggg.ppt
 
Riverview City Loni Kalbhor Pune Brochure
Riverview City Loni Kalbhor Pune BrochureRiverview City Loni Kalbhor Pune Brochure
Riverview City Loni Kalbhor Pune Brochure
 
Optimizing Your MCA Lead Capture Process for Better Results
Optimizing Your MCA Lead Capture Process for Better ResultsOptimizing Your MCA Lead Capture Process for Better Results
Optimizing Your MCA Lead Capture Process for Better Results
 
Digital marketing strategy for Real Estate
Digital marketing strategy for Real EstateDigital marketing strategy for Real Estate
Digital marketing strategy for Real Estate
 
Torun Center Residences Istanbul - Listing Turkey
Torun Center Residences Istanbul - Listing TurkeyTorun Center Residences Istanbul - Listing Turkey
Torun Center Residences Istanbul - Listing Turkey
 
Hawthorn Module 1 Coverted to Slide Show - 04.06.2024.docx
Hawthorn Module 1 Coverted to Slide Show - 04.06.2024.docxHawthorn Module 1 Coverted to Slide Show - 04.06.2024.docx
Hawthorn Module 1 Coverted to Slide Show - 04.06.2024.docx
 
Total Environment Tangled Up In The Green - Residential Plots Where Nature an...
Total Environment Tangled Up In The Green - Residential Plots Where Nature an...Total Environment Tangled Up In The Green - Residential Plots Where Nature an...
Total Environment Tangled Up In The Green - Residential Plots Where Nature an...
 
One FNG by Group 108 Sector 142 Noida Construction Update
One FNG by Group 108 Sector 142 Noida Construction UpdateOne FNG by Group 108 Sector 142 Noida Construction Update
One FNG by Group 108 Sector 142 Noida Construction Update
 
Sense Levent Kagithane Catalog - Listing Turkey
Sense Levent Kagithane Catalog - Listing TurkeySense Levent Kagithane Catalog - Listing Turkey
Sense Levent Kagithane Catalog - Listing Turkey
 
Rixos Tersane Istanbul Residences Brochure_May2024_ENG.pdf
Rixos Tersane Istanbul Residences Brochure_May2024_ENG.pdfRixos Tersane Istanbul Residences Brochure_May2024_ENG.pdf
Rixos Tersane Istanbul Residences Brochure_May2024_ENG.pdf
 
Biography and career about Lixin Azarmehr
Biography and career about Lixin AzarmehrBiography and career about Lixin Azarmehr
Biography and career about Lixin Azarmehr
 

Stream D_Richard Longman, Chris Pickford, Mike Niblett

  • 1.
  • 2. Management of Ageing Assets at Sellafield as part of a Systems Engineering Approach 2
  • 3. The concept of “Ageing” The effects of environment and service will in time degrade assets to a level of physical condition or performance where actions over and above routine maintenance are required to keep the asset fit-for- service for the remainder of its intended life. This is the concept of an ‘ageing asset’. Source HSE RR912 “Management of ageing - A framework for nuclear chemical facilities” (2012)
  • 4. RR912 Headline Paragraphs • Managing ageing plant effectively requires a paradigm shift in the way that asset condition is regarded, assessed and maintained. • The conventional approach to asset management is often reactive. • The focus is on carrying out work that must be done now, rather than work that will prevent future problems. • The result is often unanticipated failures, long backlogs of maintenance work and no time to carry out the preventative maintenance which would alleviate many of the problems 4
  • 5. Quick Figures - Sellafield by numbers That’s a lot of Assets
  • 7. Pre-Systems Engineering • Preventative Maintenance identified, scheduled and delivered with a focus on demonstrating maintenance of nuclear safety functions • Asset Condition assessment conducted by Asset Management team with aim to identify and deal with degraded asset condition • Technical teams delivering bespoke ageing management for specific key assets • High level and broad ranging asset categorisation process that was suboptimal at focussing priority and rigour of the above activities 7
  • 8. Systems Engineering Developments • System Engineer “ownership” of Plant Based Systems • Periodic (Plant Based) System Health Reporting • Top down Asset Importance Categorisation process to drive a consistent and graded approach • Graded Asset Condition Assessment process driven by asset importance categorisation • System Engineers engage in appropriate ageing management as a requirement of the Asset Condition Assessment process • Graded System Health Monitoring set to takeover from System Health Reporting 8
  • 9. Organisational Strategic Planning Elements NDA Client Specification, Strategic Objectives, Decision Calendars, New Build, Wiring Diagrams, Scope and Context, Performance Plan Socio Economic Environment Risk & Review Safety Case, Risk Management, Asset Risk / QRP, Business Continuity, Condition / System Health, Compliance & Audit, Asset Management Group and Governance Committee, etc Asset Management Strategy & Planning Asset Management Policy & Strategy, Integrated Waste Strategy including Decommissioning. Magnox & Oxide Operating Plans, etc Asset Management Decision Making Strategic Modelling, Sellafield Site Remediation Model, etc Organisation & People Enablers Sellafield Ltd Organisational Design, Asset Management Roles & Accountabiliti es (R2A2s), Sellafield Ltd Training Policy (ISO 9001). Asset Information Information Strategy, Information Categorisation, Information Systems, Information R2A2’s Domestic / Overseas Customers Regulators / Legal Requirements Asset Owner (Government / NDA) Lifecycle Delivery Asset Care & Contingency Plans Dispose Maintain Acquire Operate AMP Based on the IAM Conceptual Model for Asset Management ScopeofSellafieldAssetManagementSystem
  • 11. 11 • With the significant number of assets delivering a diverse range of missions • Where should you go proactively looking for risk first? • Are resources aligned to the areas where priority attention is required? “To help Sellafield apply appropriate and consistent levels of rigour to their assets so that risk to programme delivery can be identified and managed early enough to keep both risk and cost at tolerable levels.” Asset Importance Categorisation – why do it?
  • 12. General Categorisation Considerations • Functional Importance Categorisation - Not Risk – The output from categorisation helps prioritise where and how hard we go looking for risk. • Categorisation cannot be all things to all people – it should guide further activities/rigour but never prevent us from doing the right thing. • Statutory/Regulatory requirements must be carried out regardless of Importance Categorisation output. • We are legally required to routinely • Test fire alarms • Inspect ladders and lifting equipment etc. • This process is intended to identify what we are going to do over and beyond our “business as usual” requirements • Otherwise everything becomes “important” and the process fails to provide sufficient discrimination to help us prioritise additional rigour. 12
  • 13. 13 • The Asset Categorisation process is applied by the System Engineer using the Asset Management Database • A discrete question set helps to identify how a loss of asset function impacts on key themes including: • Nuclear safety • Productivity • Emergency response • Environmental Protection • The functional importance ranking assesses how dramatically a loss of function could impact these themes • A separate resilience score captures if the loss of function can be delivered by other assets or means (…….or ultimately whether we have resilience from within) Application of Importance Categorisation
  • 14. Application of Asset Categorisation 14 • Ideally everything on site would be categorised down to nuts and bolts • This would be very time consuming and severely hamper benefit delivery • A top down approach was adopted to help focus attention from the start
  • 16. Resilience Importance Single point vulnerability Back up system exists Several levels of redundancy High importance • Detailed maintenance strategy, top priority to carry out • Full understanding of ageing (modelled, expert input) • Full reporting of performance • Detailed maintenance strategy, top priority to carry out • Full understanding of ageing (modelled, expert input) • Full reporting of performance • Generic maintenance strategy exists • Some understanding of ageing (modelled) • Some reporting of performance Moderate importance • Detailed maintenance strategy, top priority to carry out • Full understanding of ageing (modelled, expert input) • Full reporting of performance • Generic maintenance strategy exists • Some understanding of ageing (modelled) • Legal requirements only Low importance • Generic maintenance strategy exists • Legal requirements only • Legal requirements only 16
  • 17. Ageing Management Circle 17 • For the suitably important assets, the System Engineer follows the Ageing Management Circle1 for their assets 1- C Pickford, M Niblett, How do I Assess Structure System or Component (SSC) Condition and Manage Ageing?, SLP 1.06.03.04, Issue 3, April 2016, Sellafield Ltd
  • 18. Asset Condition Assessment - comes with (or without) Confidence 18 rget nfidence Degradation Mechanisms Identified Degradation Mechanisms Modelled Degradation Mechanisms Monitored Confidence Level Achieved Justifying Statement (Confidence Achieved) Action Plan to Address Confidence Gap Confidence Factors Confidence Achieved Confidence Show Hide Condition Grade A Good Condition B Acceptable Condition C Poor Condition D Unacceptable Condition Required Confidence Level Confidence Achieved Optimal Optimal High High Moderate Moderate Low Low Minimal Minimal Optimal Optimal High High Moderate Moderate Low Low Minimal Minimal Optimal Optimal High High Moderate Moderate Low Low Minimal Minimal Optimal Optimal High High Moderate Moderate Low Low Minimal Minimal Optimal Optimal High High Moderate Moderate Low Low Minimal Minimal Required Confidence Level is set by Asset Importance Categorisation Confidence Gap RYAG relates to the Confidence Gap and is always reported alongside Condition Grade ……plus a future looking prediction as to how condition will change over time
  • 19. 19 • Large number of problems • Little data • Requirement to schedule interventions based on facts • Organisation change – Introducing System Engineering • Ownership and Responsibility Mathematical Ageing Models
  • 20. 20 • Ageing models are used wherever a loss of function is intolerable (Asset Categorisation) • The term “ageing model” is loosely applied and can mean several things • A prediction of when spares will run out/obsolescence kicks in • A mathematical model predicting wear/corrosion/etc • The purpose of an age model is to identify when an investment in the asset is likely to be required • Change design as spares no longer required • Replace structural elements • Stop production Ageing Models
  • 21. SEs Approach to Age Modelling • Complete the following table for those systems which are suitably important • A database of starter forms exist and continues to grow simplifying this form development 21
  • 22. SEs Approach to Age Modelling • This form allows us to begin to understand how to mitigate ageing • Remove stressors • Change environment • Change how it is operated • Improve design • New material • New geometry • Improve maintenance strategy • Input to TBoM • Crucially it doesn’t tell us how quickly the asset is going to degrade 22
  • 23. SEs Approach to Age Modelling • Need to understand rate of ageing as well as mechanism • Fundamental to this is the operating context • How component is used • Where it is operated • Why are planes stored in the Nevada desert and not on the beach at site? • Need to understand how much the component can degrade by and when it was installed • Material loss • Change in properties etc. • Potential data management issue when assets are 70 years old! 23
  • 24. SEs Approach to Age Modelling • Expecting System Engineers with different backgrounds/disciplines to develop age models is unrealistic • Expecting a central expertise to develop age models for all suitably important assets on site is equally unrealistic • A database has been developed which: • Captures the knowledge of the central expertise • Make use of these data simple to apply to models • Crucially, the most important assets require any models to be reviewed/verified by the central expertise 24
  • 29. 29 Adding real data to the model impacts on predicted life and proposed inspection frequencies: Prior to data the recommendation was 0.7 / 0.1 Age model- Example
  • 30. Ageing Models Database • Simple tool, guides user and provides relevant points of contact for further information • Uses verified data to make life predictions • Avoids spurious internet searches! • Drives inspection frequencies • Dependent on importance, confidence, importance and remnant life • As data are gathered these are refined • Crucial that, where possible, models are verified by real measurement data • Increases confidence • Refines models for others 30
  • 31. 31 Where are we on this journey? • Organisation Structure • Gathering Data • Providing tools and processes • Challenge Summary
  • 32. Thank you for listening 32 Any Questions?