De energiekosten schieten omhoog. De energiebudgetten worden zwaar overschreden en het einde is nog niet in zicht. Om de marges op peil te houden is ingrijpen op de kosten een belangrijke optie. Dat betekent: op zoek gaan naar besparingen en het elimineren van ‘waste’. Maar ook het her-prioriteren van geplande investeringen (CAPEX) en operationele verbeteringen (OPEX).
In dit webinar bieden Joris Grimbergen en Mario Idsinga handvatten om de stijgende energiekosten te compenseren.
Webinar | APM Best Practices - Effectively managing the safety lifecycleStork
Effectively managing the safety lifecycle requires teamwork between multiple disciplines, departments and companies, but it shouldn’t require multiple solutions. See how you can consolidate the entire safety lifecycle into a streamlined solution ensuring risk is reduced, instrumented systems are available and compliance requirements are met. The “cradle to grave” lifecycle approach that is enabled by the APM Safety work process provides visibility across the organization to what teams are doing, and how well their doing it.
In this third webinar in a series about APM, Stork, SOCAR Turkey and GE Digital share their insights on process safety best practices, from various perspectives: the process, the solution and the culture.
Managing your OnStream Inspection Program and External vs Internal inspectionsEdwin A Merrick
API 510 recognizes the need to be able to obtain valid inspection results from conducting and external inspection in-lieu of an internal inspection of Pressure Vessels.
How Bell Energy can help you be a Sustainable and Profitable OrganizationChandrashekhar Kulkarni
Welcome to Bell Energy Corporate Presentation where we showcase our value added services and our resources that will help your company manage Process Safety, Health Safety & Environment, Asset Integrity, Corporate Governance and Sustainability.
Webinar: Hoe houdt u de marge op peil bij de huidige record hoge energieprijzenStork
De energiekosten schieten omhoog. De energiebudgetten worden zwaar overschreden en het einde is nog niet in zicht. Om de marges op peil te houden is ingrijpen op de kosten een belangrijke optie. Dat betekent: op zoek gaan naar besparingen en het elimineren van ‘waste’. Maar ook het her-prioriteren van geplande investeringen (CAPEX) en operationele verbeteringen (OPEX).
In dit webinar bieden Joris Grimbergen en Mario Idsinga handvatten om de stijgende energiekosten te compenseren.
Webinar | APM Best Practices - Effectively managing the safety lifecycleStork
Effectively managing the safety lifecycle requires teamwork between multiple disciplines, departments and companies, but it shouldn’t require multiple solutions. See how you can consolidate the entire safety lifecycle into a streamlined solution ensuring risk is reduced, instrumented systems are available and compliance requirements are met. The “cradle to grave” lifecycle approach that is enabled by the APM Safety work process provides visibility across the organization to what teams are doing, and how well their doing it.
In this third webinar in a series about APM, Stork, SOCAR Turkey and GE Digital share their insights on process safety best practices, from various perspectives: the process, the solution and the culture.
Managing your OnStream Inspection Program and External vs Internal inspectionsEdwin A Merrick
API 510 recognizes the need to be able to obtain valid inspection results from conducting and external inspection in-lieu of an internal inspection of Pressure Vessels.
How Bell Energy can help you be a Sustainable and Profitable OrganizationChandrashekhar Kulkarni
Welcome to Bell Energy Corporate Presentation where we showcase our value added services and our resources that will help your company manage Process Safety, Health Safety & Environment, Asset Integrity, Corporate Governance and Sustainability.
Webinar | Efficiënter werken met geoptimaliseerde asset dataStork
Binnen veel organisaties werken afdelingen niet optimaal samen. Ze opereren op hun eigen ‘eilandjes’. Dit komt terug in de informatievoorziening: departmentale silos en systemen die niet op elkaar zijn afgestemd, met allerlei inefficiënties tot gevolg. Ook bij asset management en maintenance zien we dit terug. In dit webinar tonen Marc Hoppenbrouwers (Stork) en Thomas Koop (CEA Systems) waarom organisaties die hun asset data centraal stellen succesvoller zijn.
- Dit webinar wordt u aangeboden in samenwerking met CEA Systems -
This presentation was delivered by Bell Energy as part of training program in 2013. It provides the reader, basic to intermediate level of information on the use of Bowties for managing Hazards & Effects. Bowties can be used by any industry whether they are Oil & Gas, Finance, Banks, Aviation, Power, Nuclear, Construction, Infrastructure. To know more about bowties, please visit www.bell-energy.com or contact us on uaeoffice@bell-energy.net
Asset Integrity Management for purpose-built FPSOs and subsea system facilitiesAdvisian
Abe Nezamian discusses various aspects of ageing related to FPSOs (floating facilities for production, storage and offtake) and outlines the required procedures for maintaining structural integrity.
Operational Efficiency Based on Innovative Automation, Industry Expertise, En...Sergey Mishin
Eastern Europe (Russian speaking) conference for #executives in #refining and #petrochemistry. The presentation describes why #automation is crucial for financial results changing #industries in a way similar to iPhone for personal life 10 years ago.
A real-world introduction to PSM’s 14 Elements360factors
A number of recent incidents in various parts of the world have highlighted the increasing importance of effective Process Safety Management (PSM). This webinar presents a high-level overview of OSHA’s PSM requirements as well as real-world examples of how companies handle compliance.
Objectives
• Describe some of the major catastrophes which led to the formulation of PSM regulations.
• Introduce the 14 Elements of PSM.
• Present examples of various implementation approaches.
Webinar | Efficiënter werken met geoptimaliseerde asset dataStork
Binnen veel organisaties werken afdelingen niet optimaal samen. Ze opereren op hun eigen ‘eilandjes’. Dit komt terug in de informatievoorziening: departmentale silos en systemen die niet op elkaar zijn afgestemd, met allerlei inefficiënties tot gevolg. Ook bij asset management en maintenance zien we dit terug. In dit webinar tonen Marc Hoppenbrouwers (Stork) en Thomas Koop (CEA Systems) waarom organisaties die hun asset data centraal stellen succesvoller zijn.
- Dit webinar wordt u aangeboden in samenwerking met CEA Systems -
This presentation was delivered by Bell Energy as part of training program in 2013. It provides the reader, basic to intermediate level of information on the use of Bowties for managing Hazards & Effects. Bowties can be used by any industry whether they are Oil & Gas, Finance, Banks, Aviation, Power, Nuclear, Construction, Infrastructure. To know more about bowties, please visit www.bell-energy.com or contact us on uaeoffice@bell-energy.net
Asset Integrity Management for purpose-built FPSOs and subsea system facilitiesAdvisian
Abe Nezamian discusses various aspects of ageing related to FPSOs (floating facilities for production, storage and offtake) and outlines the required procedures for maintaining structural integrity.
Operational Efficiency Based on Innovative Automation, Industry Expertise, En...Sergey Mishin
Eastern Europe (Russian speaking) conference for #executives in #refining and #petrochemistry. The presentation describes why #automation is crucial for financial results changing #industries in a way similar to iPhone for personal life 10 years ago.
A real-world introduction to PSM’s 14 Elements360factors
A number of recent incidents in various parts of the world have highlighted the increasing importance of effective Process Safety Management (PSM). This webinar presents a high-level overview of OSHA’s PSM requirements as well as real-world examples of how companies handle compliance.
Objectives
• Describe some of the major catastrophes which led to the formulation of PSM regulations.
• Introduce the 14 Elements of PSM.
• Present examples of various implementation approaches.
Application of Six Sigma Methodologyto Reduce Defects of a Gri.docxjustine1simpson78276
Application of Six Sigma Methodology
to Reduce Defects of a Grinding Process
Case study 1
Done by: Connor Austin & Abdulla Aldhaheri
CODE: CAACCS1092616
Company Profile
Name: Unknown
Location: India
Type: Automotive Company
The company with manpower of approximately 2550 people is manufacturing common rail direct injection (CRDI) system pumps for vehicles.
Drivers For Change
Rejection level was too high.
The goal of visually inspecting all parts could not be reached.
Six Sigma Project
Define
Measure
Analyze
Improve
Control
Define
The team selected for this project includes the Senior Manager—Manufacturing as the Black Belt (BB). The other members of the team were Planning Manager, Maintenance Manager, Quality Control Senior Engineer and one Machine Operator.
Reduce rejection by 50%
The scope of the project was focusing in the fine grinding for improvement.
Measure
The Six Sigma team found the rejection were mainly due to the occurrence of different types of defects, such as burr, shades, deep lines, patches and damage on the component after machining.
Measure Cont.
Company used an equation called the Kappa equation to determine if their measurement system was acceptable.
The Kappa value that was calculated was .814, which is greater than .6. So, the measurement system was accpetalbe.
Measure Cont.
Analyze
Find the potential causes of defects.
Gather data from the process in order to obtain a better picture of the potential causes.
Analyze Cont.
Improve
The parameters selected through these discussions were load applied, initial load setting, coolant flow rate, upper wheel rpm, lower wheel rpm and cage rpm.
decided to experiment all these parameters at three levels.
Improve Cont.
The team concluded from the risk analysis that each method had its own impact on the process.
A program was started to implement each method in order to improve the process. A two week timeframe was used to implement the solutions.
Control Phase
The solutions that the team found were standardized in order to produce consistent results.
Control Phase Cont.
A control chart was implemented to keep an eye on assignable causes in the future.
For every shift, data on number of defects observed during 100% visual inspection were collected and these values were plotted.
Six Sigma Tools Used
Pareto Chart
Cause and Effect Diagram
Histogram
KPIV and KPOV
Key Process Input Variables
Load Applied
Initial Load setting
Coolant Flow Rate
RPMs
Key Process Output Variable
Reduction in rejection by 50%
Results Achieved
After implementation the rejection percentage went from 16% to 1.19%
The approximate Six Sigma level increased from 2.47 to 3.76.
Goal was achieved as the rejection rate was significantly improved.
Lessons Learned
The company learned the power of statistical thinking and its impact on processes.
The results obtained by this project will provide start-up data for further implementations in future.
Managem.
Introduction of FMEA; Definition, Activities, important terms, factors, RPN; Process of FMEA; Steps of FMEA
Types of FMEA; FMEA Application; FMEA Related Tools:
Root Cause Analysis, Pareto Chart, Cause Effect Diagram
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
6th International Conference on Machine Learning & Applications (CMLA 2024)ClaraZara1
6th International Conference on Machine Learning & Applications (CMLA 2024) will provide an excellent international forum for sharing knowledge and results in theory, methodology and applications of on Machine Learning & Applications.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
We have compiled the most important slides from each speaker's presentation. This year’s compilation, available for free, captures the key insights and contributions shared during the DfMAy 2024 conference.
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Cosmetic shop management system project report.pdf
Introduction to The Augustus Group and RBI
1. 1
Risk Based Inspection Plan
for MI Enhancement and
Optimization
A Cost Effective Solution for
Asset Preservation
2. The Augustus Group (TAG or Augustus)
Mission Statement
• Problem Solving
– Assist with Problem Definition and
Strategy for Solution
– Work with You as Part of Your Team
• Provide Project Management and
Engineering Consulting in our
Specialized Technologies
3. Huntsman
Chemical
BHP Refinery
Aimvenca &
Sincor
Jose Cryogenics
(PDVSA)
ENGEN Refinery
Altura Energy
Marathon
Ashland
HB Fuller
Condea Vista
Minh Foods
ABB Lummus
Global Santa Fe
NCRA
CVR Refining
Aristech
Chemical
AKZONobel
NASA
Chemical
Manufacturer’s
Association
Electric Power
Research Institute
BP Refining &
Chemicals
BP Upstream
Arco Chemicals
Engen Refinery
DSM CoPolymer
Orion Refinery
SK Chemical
Yukong Refinery
Eastman Chemical
Company
Transworld Pipeline
Williams Refining
Products and
Industrial Projects
Carghill Fertilizer
Services and Experience
Industries
Petroleum and Chemical Downstream
Oil and Gas Upstream, on-shore and off-
shore
Food and Pharmaceutical
Nuclear and Fossil Power
Waste Water Treatment
Principle Services
Risk-Based Inspection of Facilities,
Equipment, and Pipelines
Tank and Pipe line Integrity Management
and Risk Analysis
Incident Investigation &
Insurance/Litigation Support
Metallurgy, Corrosion Engineering &
Fitness for Service
Fire & Explosion Hazard Analysis and
Management
Environmental Impact and Remediation
Studies and Plans
Security Planning and Emergency
Response
Audits, Seminars, and Training
Regulatory Support
4. RBI & TA Planning, Petroleum and Chemical
Industry Examples on TAG’s Resume
Risk Analysis of Oman to India $6B Deep-water
Pipeline, Circa 1994
RBI Analysis of 650 Pressure Vessels, BHP Refinery,
Circa 1995
About 30 RBI Implementations Worldwide, 1995 - Present
Pre-TA Analysis of About 300 Pressure Vessels
Previously Not Inspected, 3 Mo. Prior to TA, $14M
Savings, Circa 2006
Risk Based Bolting QC Program, Two Mo. Prior to TA,
$MM no Leak Startup, Circa 2006
5. Most Companies Have or/are Making the
Transition
NFPA Diamond
Conventional
MI Program
API 570 Piping
Classes:
I – Highest potential
of immediate
emergency on leak
II – Not included in
other classes,
majority of lines
III – Flammable, but
do not significantly
vaporize on leak, and
not in high activity
area.
6. Most Companies Have or/are
Making the Transition
NFPA Diamond Discrimination
Engineering
Analysis
RBI
Expert
Opinion
High
Low
High
RCM
Risk Based Mechanical
Integrity Using FFS and
Advanced NDE When
Needed
Conventional
MI Program
API 570 Piping
Classes:
I – Highest potential
of immediate
emergency on leak
II – Not included in
other classes,
majority of lines
III – Flammable, but
do not significantly
vaporize on leak, and
not in high activity
area.
7. Most Companies Have or/are
Making the Transition
NFPA Diamond Discrimination
Engineering
Analysis
RBI
Expert
Opinion
High
Low
High
RCM
Consequence Ranking
ABCDE
1
2
3
4
5
ProbabilityRanking
HIGH
MED HIGH
MEDIUM
LOW
Risk Based Mechanical
Integrity Using FFS and
Advanced NDE When
Needed
Conventional
MI Program
API 570 Piping
Classes:
I – Highest potential
of immediate
emergency on leak
II – Not included in
other classes,
majority of lines
III – Flammable, but
do not significantly
vaporize on leak, and
not in high activity
area.
8. Risk Based Inspection (RBI) Provides
MI Program Definition
Focuses Limited
Resources on High Risk
Items
Substantially Reduces
Time & Money Spent
Compared to Traditional
Programs
Recognized & Accepted as
Good Engineering Practice
RBI Approach
Conventional Approach
9. Why Do we Do It?
Risk Based Inspection Planning For
On-stream Inspections
Optimization Of Outage or
Turnaround Scope
Risk Based Inspection Planning For New
Design Prior To Construction And
Operations
Application Of Risk Based Principals To
Management Of Degraded Equipment
Risk Based Inspection of Orphaned
Buried Piping
RBI/FFS of Bullet Tanks Suspected of
Caustic Cracking
Hazard
Screen
Risk
Benchmark
Inspection
Plans
Non-
Intrusive
Inspections
Opportunity
Inspections
Turnaround
Plan
Evergreen
Risk
Analysis
Turnaround
Inspections
10. Important Concepts
Three Parameters Define Risk
Scenario or what can go wrong
Probability of the scenario occurring or POF
Consequence if the scenario occurs or COF
Risk = POF x COF (parameters are not absolutes)
Inspections do not reduce risk, inspections:
Improve our state of knowledge of the POF
Provide information to manage potential damage that
could lead to failure
Risk-Based Inspection is Simply the Application
of Engineering Intensity to the Inspection
Function
11. Scenario - Initiation of Event and
Probability of Failure
Damage
Mechanism
Initiates, P1
Damage
Arrests
Damage
Continues,
P2
Damage is
Detected
Damage is
not
Detected or
Arrested
Damage
Continues,
P3
Damage
does not
arrest
Pressure
Boundary
is
Breached
Stressor(s)
Active
Mitigating
Factors &/or
Self Limiting
Nature of
Mechanism
Initiating Events
Effectiveness
of Non-Destructive
Examination
Damage
Continues
to Failure
(1-f2) = probability
damage will
be detected by NDE
Damage
Mechanisms are
Identified and Evaluated
Considering Process
Stream Conditions,
Metallurgy, and
Stressors
(1-f1) = probability
damage will
be mitigated
12. Scenario – Effect of Event and
Consequence of Failure
Pressure
Boundary
is
Breached
Leak is not
Arrested or
Mitigated
Leak
Continues,
P4
Leak
Disperses no
Con-
sequence
Leak Finds
Ignition
Source
Or Receptor
Destruction
Occurs,
P5
Leak
Arrests
Damage
Continues
to Failure
Effectiveness of
Detection System
Or Mitigation
Potential for
Finding
Ignition
Source or
Toxic Receptor
(1-f3) = probability
lleak will be mitigated
(1-f4) = probabability
leak will disperse
with no problems
Pinhole
or Minor Leak,
Subcritical
Defect or Leak, or
Gross Failure are
Evaluated for
Potential Damage
Mechanisms
13. How it Is Done?
For Success Will Need:
1. Management Commitment
2. Policy, Procedures
3. Tools (Management Systems,
SW, etc.)
4. Training and
5. Audit of Implementation
14. How it Is Done?
For Success Will Need:
1. Management Commitment
2. Policy & Procedures
3. Tools (Management Systems,
SW etc.)
4. Training and
5. Audit of Implementation
15. How it Is Done?
For Success Will Need:
1. Management Commitment
2. Policy & Procedures
3. Tools (Management Systems,
SW, etc.)
Management System for
Qualitative Analysis
Customized Integration
PHA Software
XLS/Access
SharePoint for Data
Management
Associated Apps
Inspection and Testing
Management System
RBI Software, e.g. Aptech,
Capstone RBMI, API,
Reliasoft, PCMS, Tischuk,
TWI, Orbit, etc.
Inspection Data
Management Software, e.g.
Ultra-pipe, 3-Rivers, etc.
Deficiency Resolution
Management System
4. Training and
5. Audit of Implementation
17. Qualitative RBI
Expert Judgment and Weighting of Qualitative Factors
Training Participants On Scope, Approach, And Details
Materials And Corrosion Analysis with Process
Segmentation
Qualitative Review With Plant Personnel
Reduction Of Data
Presentation Review Of Results and Inspection Plans
Final Report
Recommend Integration with PHA to Ensure
Continuous Improvement and Employee
Involvement
18. RBI Management System
Implementation Process
Equipment
Data
Collection
Process
System
Corrosion
Analysis
Qualitative
Analysis
Data Entry
Quantitative
Analysis
QC Audit and
Equipment
Integrity
Review
RBI Plan
Approval
Action
(Inspections
etc)
Results
Analysis
Criticality and
Plan Update
Plan
Document
Execute
Continuously
Improve
25. RESULT = 5x5 Matrix with History
Documented, For Use In Inspection Planning
Consequence Ranking
ABCDE
HIGH
MED HIGH
MEDIUM
LOW
1
2
3
4
5
ProbabilityRanking
Consequence
A-Catastrophic
B-Very Serious
C-Serious
D-Significant
E-Minor
Probability
1-Very High
2-High
3-Moderate
4-Low
5-Very Low
26. API RP 580 “Risk Based Inspection”
Supports 510, 570, and 653
with Detailed Broad Based
Guidance and Criteria
Provides Definition
What RBI is
Key Elements
How to Implement a
Program
No Preference to Single
Methodology
Further Legitimatizes RBI
Requirements for
Documentation and Record
Keeping
Training Program and
Certification in Conducting
RBI Analysis and Maintaining
the Program
QC/QA of the RBI Analysis
and Maintenance
Audits of the Program
27. Traditional MI vs RBI Implementation
Collect PFDs and P&IDs for Unit. – Identical Activity for
RBI
Create/Classify/Systems – Slight Modification to
Procedure for RBI Implementation
System Break PFD Using Traditional Methods
Collect MSDS Sheets For Each Major Stream As They Appear On
PFD
Consult With Process Engineer/Operator To Obtain Pressures And
Temperatures For Process Lines On PFD
Using Good Engineering Practices, And Accepted Procedures, Break
Major Systems At Locations That Best Achieve System Breaks IE:
Specs Break, Control Valves, Major Equipment Etc.
Transfer systems to P&IDs and add systems as needed
and line breaks per procedures. – Requirements
Essentially Identical for RBI Implementation
28. Risk Analysis - Qualitative Risk Analysis & Integration
with Process Hazard Analysis Using Agreed Upon Criteria
– Option to Use Quantitative Risk Based Software If
Desired on Select Items
Walk down P&IDs (redline as needed and make system
adjustments per field changes) and develop FIELD
INVENTORY LIST as it is in the field.
Develop System files for each system including MSDS
sheets and any other documentation collected to fortify
decisions made in systemizing. Classification is marked
for each system based on API 570 and MSDS /NFPA
flammability rating. – Identical Activity for RBI, Except
Potential Cost Savings and Potential to Focus on High
Risk Items if QRA is Done
Traditional MI vs RBI Implementation
29. Traditional MI vs RBI Implementation
Taking each system at a time, Develop ISOs for FE and Piping
(separate) for Visual, UT, and/or any other needed NDT. Identical
Activity for RBI; Potential Cost Savings and Potential to Focus on High
Risk Items if QRA is Done
Ensure Completeness and/or Build FE and Piping System Files –
Identical Activity for RBI
UT each FE item along with Visual (using pre-accepted Check lists) -
Identical Activity for RBI, Except Cost Savings Using Prioritization of
Assets
UT each Piping ISO including Visual (using checklists) - Identical
Activity for RBI, Except Cost Savings Using Prioritization of Assets
Enter data into data management program for review with client for
deficiencies and inspection planning. - Identical Activity for RBI, Except
Cost Savings Using Prioritization of Assets
Develop TROI list and/or NCR list for dispensation.
Analyze Data and Develop Inspection Plans for Future - Identical
Activity for RBI, Except Cost Savings Using Prioritization of Assets
31. $$-TAG Savings From FFS and RBI
Well Documented
Mid to Late 1990’s TAG Personnel Presented Cost
Savings (O&G Journal Article and NPRA)
Open Less FE Items Just For Inspection
Extend TA Interval
2009 - Well Quantified, Tesoro NPRA
TA Inspection Cost Savings Mo. 17, About $2.5M
PV Inspection,
Less RVs Maintenance
LESS UT/Year, About $600K
Safety, Environmental, and Lost Production Cost Benefits,
About $6.4M in Reduced Risk within 3 Mos Project
2012, Caustic Cracking Example, $5MM To $10MM
32. Delivered Benefits From Project
Inspection Method Current
inspections
Cost RBMI
inspection
s
Cost Projected
Savings
Delivered
savings
INSPECTION COST RECUCTIONS
Thickness reading inspection costs vessels -
annual savings
11,580 $231,600 5,790 $115,800 $115,800
Thickness reading inspection costs piping
circuits - annual savings
32,236 $644,720 8,000 $160,000 $484,720
Total projected thickness reading inspection
costs vessels and piping
43,816 $876,320 13,790 $275,800 $600,520 $600,520
(on going)
TURN AROUND SAVINGS
2006 Turn around savings from reduced
frequency of relief valve maintenance
370 $555,000 222 $333,000 $222,000 $222,000
(month 17)
2010 Turn around savings from reduced
frequency of relief valve maintenance
370 $555,000 222 $333,000 $222,000
2006 turn around savings from reducing the
number of pressure vessels to be opened for
internal inspections
261 $5,220,000 183 $3,660,000 $1,560,000 $1,543,000
(month 17)
2010 turn around savings from reducing the
number of pressure vessels to be opened for
internal inspections
261 $5,220,000 183 $3,660,000 $1,560,000
RISK REDUCTION
10 year reduced risk of equipment
failure
$13,510,000 $6,373,000
(To date!!)
34. RBI Inspection Plan
The RBI Inspection Plan must use the
risk assessment to determine:
When to Inspect (Interval)
What to Inspect (Scope)
How to Inspect (Method)
This must be done in a way that ensures that the
same risk values yield the same actions every
time.
35. Top 5 Reasons for Disappointment
with RBI
1.
2.
3.
4.
5. The consultants didn’t understand our
plant or our systems
36. 1.
2.
3.
4. RBI was too complicated for the
company team members
5. The consultants didn’t understand our
plant or our systems
Top 5 Reasons for Disappointment
with RBI
37. 1.
2.
3. Problems with basic plant data
4. RBI was too complicated for the
company team members
5. The consultants didn’t understand our
plant or our systems
Top 5 Reasons for Disappointment
with RBI
38. 1.
2. Lack of buy-in by some or all of the
organization
3. Problems with basic plant data
4. RBI was too complicated for the
company team members
5. The consultants didn’t understand our
plant or our systems
Top 5 Reasons for Disappointment
with RBI
39. 1. No measurable return on investment
2. Lack of buy-in by some or all of the
organization
3. Problems with basic plant data
4. RBI was too complicated for the
company team members
5. The consultants didn’t understand our
plant or our systems
Top 5 Reasons for Disappointment
with RBI