SlideShare a Scribd company logo
Range Management
John Chappell MBE
MSc BEng(Hons) CEng FIMechE
Copyright © United Utilities Water Limited 2015 2
I am a Maintainer
The Vision – created November 2014
Copyright © United Utilities Water Limited 2015 4
Operational Engineering
Steve Fraser
Managing Director
Wholesale
Richard Ratcliff
Wholesale
Engineering Director
John Chappell
Head of Operational
Engineering
Dave Evans
Operational
Engineering ESM
AMS (Eng)
OE PEMs
Warren Bullough
A I Delivery Manager
(WW)
Steve Wade
A I Delivery Manager
(W)
Chris Lomax
Chief Electrical
Dan Brooks
Chief Mechanical
Alison Summersfield
Lead Range
Manager
Ged Hyland
Maintenance
Engineering
Laura Wood
Executive Secretary
Copyright © United Utilities Water Limited 2015 5
Range Management
Performance
Metrics
Service
Schedule
Glovebox
Manual
Haynes
Manual
Spares Training
1st & 2nd Editions
Fleet wide improvement
• Learn from best (and worst) in fleet
• Apply across whole fleet
• Consistently
• ‘Real’ Continuous Improvement
Copyright © United Utilities Water Limited 2015 6
Range Management
Site-Specific Performance: PM, AEM, ADT, AM
IN WW PT SW SC CT PS ST SD HP TL SA AS SS TT FI FS CH FE TW
IN WW PT SW SC CT PS ST SD HP TL SA AS SS TT FI FS CH FE TW
IN WW PT SW SC CT PS ST SD HP TL SA AS SS TT FI FS CH FE TW
20 System Blocks (Not all require an RM FTE)
Consolidate across all Sites: (no. Assets/Process Cell; baseline Ww Process Codes with CW synergy)
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
40,000
45,000
IN WW PT SW SC CT PS ST SD HP TL SA AS SS TT FI FS CH FE TW
CW
WW
Process Code Description PGI PGI Description Clean Water Wastewater
TERTIARY TREATMENT PR-TTB Tertiary – Baff 1
PR-TTC Tertiary – Couffs 1
PR-TTI Tertiary – Immedium Sand Filters 1
PR-TTN Tertiary – Nitrifying Tower Filters 1
PR-TTR Tertiary – Rapid Gravity Filters 1
PR-TTS Tertiary – Submerged Aeration Filter 1
PR-TTU Tertiary - UV 1
3 x Statutory RMs is a Water Industry short
term necessity
PSSR LOLER HV/LV
PUMPS
Copyright © United Utilities Water Limited 2016 7
Range Management Resources
Current Ranges Covered & Gaps highlighted in month
David Francis (Jacobs) : Chemical Treatment
Jeffrey Ng (Jacobs) : Scraper Bridges (PS & FS)
Alan Groves (Jacobs) : HV/LV (incl. Diesel Generators)
Darren Howarth : Inlet Works
Mark Byrne : Secondary Treatment – Trickling filters
Dave Belshaw : Tertiary Treatment (incl. SAFs & RBCs)
Bob Turner : Pumps
(Alan Groves (Jacobs) : HV/LV (incl. Diesel Generators))
Bob Turner : Pumps
(David Francis : Chemical Treatment)
Alan Groves (Jacobs): HV/LV (incl. Diesel Generators)
Alison Summersfield (Lead): Sludge Digestion
Keith Wearing: Energy Generation
David Francis (Jacobs) : Chemical Treatment
Alan Groves (Jacobs) : HV/LV (incl. Diesel Generators)
Dave Belshaw : Disinfection - UV
Bob Turner : Pumps
Mark Byrne : Filtration – Membrane Technology
WaterWasteWaterNetworkBioresource
Services
Requests made:
• Chlorine Dosing
• More Water support
• Tertiary BAFFs
• 2nd Treatment
• Anoxic mixers
• Blowers
• NEREDA
• SAFs & RBCs
• Sludge
• GBTs
• Centrifuges
Copyright © United Utilities Water Limited 2016 8
6 Pillar Delivery Plans
03-Apr
10-Apr
17-Apr
24-Apr
01-May
08-May
15-May
22-May
29-May
05-Jun
12-Jun
19-Jun
26-Jun
03-Jul
10-Jul
17-Jul
24-Jul
31-Jul
07-Aug
14-Aug
21-Aug
28-Aug
04-Sep
11-Sep
18-Sep
25-Sep
02-Oct
09-Oct
16-Oct
23-Oct
30-Oct
06-Nov
13-Nov
20-Nov
27-Nov
04-Dec
11-Dec
18-Dec
25-Dec
1. Fleet performance
Full Inventory for Region
Operational - Ammonia Removal
Operational - Energy Consumption
Operational - Alkalinity
Operational - Dissolved Oxygen
Operational - Wash cycles
Maintenance - Cyclic
Maintenance - Proactive
Maintenance - Reactive
Analysis of Reactive costs
Identification of key asset issues and prioirities
2. Service Schedule
OEM O&M Task Summary
Generic RCM Workbank review
Site Specific Task Variation
3. Glovebox Manual
Quick Start Guide - Wigan
Lineside Trial Schematic - Wigan
4. SOP (Haynes)
Overarching Operating Standard
Overarching Maintenance Standard
Asset Specific SOP - Brightwater BAFF
Asset Specific SOP - OTV Veolia BAFF
SSI template defined and issued for population
5. Spares
OEM Spares Recommendation
BOM Created
Critical Spares Holding (long-lead breakdowns)
Fully-costed whole-life Spares Holding Strategy
Build & Monitor Spares Kanban (MSL, MRO)
6. Training
Syllabus created & submit to L&D
Identify users for training
6 Pillar Delivery Plan
Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17
Copyright © United Utilities Water Limited 2015 9
Tertiary Treatment: UV (Dave Belshaw)
Dashboard TrainingGlovebox/Lineside - Blackburn“Haynes” Manual – Blackburn Optimisation
Operational Support
Preston Wigan
Blackburn Carnforth
Lancaster Morecambe
Pilling Preesall
Garstang Walton – Le- Dale
Water
• Common UV Lamp Breakage Procedures
• Low cost engineering solution for in service, switched off UV plant
• Easy no lift de-comm/re-comm required to maintain quality supply to customers
• Innovation support – LED trial at Cumwhinton. DfMA plug and play UV rigs
Wastewater
• Stainless Steel wiper trials
• Improved Quartz cleaning without the use of chemicals
• Further development of SOPs and moving over Haynes manual to match Sludge Digestion format
• Real-time UV mimics for ICC
• Continued input in to UV Asset Standards & Signature Design Review
Copyright © United Utilities Water Limited 2015 10
70%
0%
Stop doing these cyclics
– has little effect
100%
70%
Move the resource
Reliability Centred Maintenance – Step 1
Achieve 100% of these cyclics
– to prevent or detect
problems before they fail
ReactiveCost
CyclicCompliance
Any Questions?

More Related Content

What's hot

Resume Jian Zhou rev 0
Resume Jian Zhou rev 0Resume Jian Zhou rev 0
Resume Jian Zhou rev 0
Jian Zhou
 
3.3 everglades restoration plans
3.3 everglades restoration plans3.3 everglades restoration plans
3.3 everglades restoration plans
ascemiami-dade
 
Savannah cruise ship study phase i report presentaion 06-24-13
Savannah cruise ship study phase i report presentaion  06-24-13Savannah cruise ship study phase i report presentaion  06-24-13
Savannah cruise ship study phase i report presentaion 06-24-13
jhayman09
 
DIF Hydrate Remediation & Blockage Removal Presentation
DIF Hydrate Remediation & Blockage Removal PresentationDIF Hydrate Remediation & Blockage Removal Presentation
DIF Hydrate Remediation & Blockage Removal Presentation
jlauletta
 
Engineering of Subsea Production Systems
Engineering of Subsea Production SystemsEngineering of Subsea Production Systems
Engineering of Subsea Production Systems
petroEDGE
 
14OTC 25107-Active Heating for Life of Field Flow Assurance
14OTC 25107-Active Heating for Life of Field Flow Assurance14OTC 25107-Active Heating for Life of Field Flow Assurance
14OTC 25107-Active Heating for Life of Field Flow Assurance
Paul McDermott
 
Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...
Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...
Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...
Stephen Flood
 

What's hot (20)

Contractor Awareness Training Below Ground Facilities 2016
Contractor Awareness Training Below Ground Facilities 2016Contractor Awareness Training Below Ground Facilities 2016
Contractor Awareness Training Below Ground Facilities 2016
 
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
 
Resume Jian Zhou rev 0
Resume Jian Zhou rev 0Resume Jian Zhou rev 0
Resume Jian Zhou rev 0
 
3.3 everglades restoration plans
3.3 everglades restoration plans3.3 everglades restoration plans
3.3 everglades restoration plans
 
Stormwater Maintenance Awareness Training, Part I: Overview, October 6, 2015
Stormwater Maintenance Awareness Training, Part I: Overview, October 6, 2015Stormwater Maintenance Awareness Training, Part I: Overview, October 6, 2015
Stormwater Maintenance Awareness Training, Part I: Overview, October 6, 2015
 
Stormwater Maintenance Awareness Training, Part V: Vegetative Practices, Octo...
Stormwater Maintenance Awareness Training, Part V: Vegetative Practices, Octo...Stormwater Maintenance Awareness Training, Part V: Vegetative Practices, Octo...
Stormwater Maintenance Awareness Training, Part V: Vegetative Practices, Octo...
 
Presentation: Power & Eenrgy for Unmanned Undersea Vehicles (UUVs)
Presentation: Power & Eenrgy for Unmanned Undersea Vehicles (UUVs)Presentation: Power & Eenrgy for Unmanned Undersea Vehicles (UUVs)
Presentation: Power & Eenrgy for Unmanned Undersea Vehicles (UUVs)
 
Savannah cruise ship study phase i report presentaion 06-24-13
Savannah cruise ship study phase i report presentaion  06-24-13Savannah cruise ship study phase i report presentaion  06-24-13
Savannah cruise ship study phase i report presentaion 06-24-13
 
Draft Chesapeake Bay TMDL Action Plan Public Meeting
Draft Chesapeake Bay TMDL Action Plan Public MeetingDraft Chesapeake Bay TMDL Action Plan Public Meeting
Draft Chesapeake Bay TMDL Action Plan Public Meeting
 
Contractor Awareness Training Above Ground Facilities Part 2 2016
Contractor Awareness Training Above Ground Facilities Part 2 2016Contractor Awareness Training Above Ground Facilities Part 2 2016
Contractor Awareness Training Above Ground Facilities Part 2 2016
 
Contractor Awareness Training Vegetative Practices 2016
Contractor Awareness Training Vegetative Practices 2016Contractor Awareness Training Vegetative Practices 2016
Contractor Awareness Training Vegetative Practices 2016
 
DIF Hydrate Remediation & Blockage Removal Presentation
DIF Hydrate Remediation & Blockage Removal PresentationDIF Hydrate Remediation & Blockage Removal Presentation
DIF Hydrate Remediation & Blockage Removal Presentation
 
Engineering of Subsea Production Systems
Engineering of Subsea Production SystemsEngineering of Subsea Production Systems
Engineering of Subsea Production Systems
 
Lecture44
Lecture44Lecture44
Lecture44
 
James River Partnership 2013
James River Partnership 2013James River Partnership 2013
James River Partnership 2013
 
Cinder Bed Road Realignment
Cinder Bed Road RealignmentCinder Bed Road Realignment
Cinder Bed Road Realignment
 
James riverpartnership2003
James riverpartnership2003James riverpartnership2003
James riverpartnership2003
 
14OTC 25107-Active Heating for Life of Field Flow Assurance
14OTC 25107-Active Heating for Life of Field Flow Assurance14OTC 25107-Active Heating for Life of Field Flow Assurance
14OTC 25107-Active Heating for Life of Field Flow Assurance
 
Sneak preview - SMM presentation
Sneak preview - SMM presentationSneak preview - SMM presentation
Sneak preview - SMM presentation
 
Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...
Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...
Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...
 

Similar to Stream D_John Chappell

LTCP Meeting 9-16-04
LTCP Meeting 9-16-04LTCP Meeting 9-16-04
LTCP Meeting 9-16-04
HartTWI
 
RMJanclaes_resume_jan2016
RMJanclaes_resume_jan2016RMJanclaes_resume_jan2016
RMJanclaes_resume_jan2016
Rick Janclaes
 
CPAC Meeting 10-25-04
CPAC Meeting 10-25-04CPAC Meeting 10-25-04
CPAC Meeting 10-25-04
HartTWI
 
Jeb Tyrie Full CV 2016
Jeb Tyrie Full CV 2016Jeb Tyrie Full CV 2016
Jeb Tyrie Full CV 2016
jeb tyrie
 

Similar to Stream D_John Chappell (20)

Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
2008 03 Tidal Power: The Options Peter Kydd, Parsons Brinckerhoff
2008 03 Tidal Power: The Options Peter Kydd, Parsons Brinckerhoff 2008 03 Tidal Power: The Options Peter Kydd, Parsons Brinckerhoff
2008 03 Tidal Power: The Options Peter Kydd, Parsons Brinckerhoff
 
LTCP Meeting 9-16-04
LTCP Meeting 9-16-04LTCP Meeting 9-16-04
LTCP Meeting 9-16-04
 
Investigation of Metal and Chemical Hydrides for Hydrogen Storage in Novel Fu...
Investigation of Metal and Chemical Hydrides for Hydrogen Storage in Novel Fu...Investigation of Metal and Chemical Hydrides for Hydrogen Storage in Novel Fu...
Investigation of Metal and Chemical Hydrides for Hydrogen Storage in Novel Fu...
 
CaBA conference 2015 III
CaBA conference 2015  IIICaBA conference 2015  III
CaBA conference 2015 III
 
CEB Presentation 2073
CEB Presentation 2073CEB Presentation 2073
CEB Presentation 2073
 
RMJanclaes_resume_jan2016
RMJanclaes_resume_jan2016RMJanclaes_resume_jan2016
RMJanclaes_resume_jan2016
 
Lecture 8 Costs H4D Stanford 2016
Lecture 8 Costs H4D Stanford 2016Lecture 8 Costs H4D Stanford 2016
Lecture 8 Costs H4D Stanford 2016
 
Cliff Denholm, Stream Restoration Incorporated, "Passive Treatment of Acidi...
Cliff  Denholm, Stream Restoration Incorporated,  "Passive Treatment of Acidi...Cliff  Denholm, Stream Restoration Incorporated,  "Passive Treatment of Acidi...
Cliff Denholm, Stream Restoration Incorporated, "Passive Treatment of Acidi...
 
Ion mobility & PetroOrg software : Novel techniques for petroleomics investig...
Ion mobility & PetroOrg software : Novel techniques for petroleomics investig...Ion mobility & PetroOrg software : Novel techniques for petroleomics investig...
Ion mobility & PetroOrg software : Novel techniques for petroleomics investig...
 
ANS-3.5 Overview
ANS-3.5 OverviewANS-3.5 Overview
ANS-3.5 Overview
 
20 EPA Review of DOE’s 2014 Compliance Recertification Application for WIPP
20 EPA Review of DOE’s 2014 Compliance Recertification Application for WIPP20 EPA Review of DOE’s 2014 Compliance Recertification Application for WIPP
20 EPA Review of DOE’s 2014 Compliance Recertification Application for WIPP
 
Thriving in a Lower for Longer Environment - Mary Van Domelen
Thriving in a Lower for Longer Environment - Mary Van DomelenThriving in a Lower for Longer Environment - Mary Van Domelen
Thriving in a Lower for Longer Environment - Mary Van Domelen
 
2011 ras for_managers_11-22
2011 ras for_managers_11-222011 ras for_managers_11-22
2011 ras for_managers_11-22
 
CPAC Meeting 10-25-04
CPAC Meeting 10-25-04CPAC Meeting 10-25-04
CPAC Meeting 10-25-04
 
ORP FY13 Budget Workshop
ORP FY13 Budget WorkshopORP FY13 Budget Workshop
ORP FY13 Budget Workshop
 
Produced Water | Session XI - Alleman
Produced Water | Session XI - AllemanProduced Water | Session XI - Alleman
Produced Water | Session XI - Alleman
 
Accotink Tributary at Danbury Forest
Accotink Tributary at Danbury ForestAccotink Tributary at Danbury Forest
Accotink Tributary at Danbury Forest
 
CM_APW_2015
CM_APW_2015CM_APW_2015
CM_APW_2015
 
Jeb Tyrie Full CV 2016
Jeb Tyrie Full CV 2016Jeb Tyrie Full CV 2016
Jeb Tyrie Full CV 2016
 

More from BecarAsset

Stream E_Dr. Tim King - Dr. Demetrius Onoufriou - data, information + decisio...
Stream E_Dr. Tim King - Dr. Demetrius Onoufriou - data, information + decisio...Stream E_Dr. Tim King - Dr. Demetrius Onoufriou - data, information + decisio...
Stream E_Dr. Tim King - Dr. Demetrius Onoufriou - data, information + decisio...
BecarAsset
 

More from BecarAsset (20)

Stream E_Peter Jay
Stream E_Peter JayStream E_Peter Jay
Stream E_Peter Jay
 
Stream E_Netherlands IAM chapter
Stream E_Netherlands IAM chapterStream E_Netherlands IAM chapter
Stream E_Netherlands IAM chapter
 
Stream E_Mike Dixon
Stream E_Mike DixonStream E_Mike Dixon
Stream E_Mike Dixon
 
Stream E_Boudewijn Neijens - IAM Canada intro
Stream E_Boudewijn Neijens - IAM Canada introStream E_Boudewijn Neijens - IAM Canada intro
Stream E_Boudewijn Neijens - IAM Canada intro
 
Stream E_Dr. Tim King - Dr. Demetrius Onoufriou - data, information + decisio...
Stream E_Dr. Tim King - Dr. Demetrius Onoufriou - data, information + decisio...Stream E_Dr. Tim King - Dr. Demetrius Onoufriou - data, information + decisio...
Stream E_Dr. Tim King - Dr. Demetrius Onoufriou - data, information + decisio...
 
Stream E_Chris Lloyd and David Ashworth
Stream E_Chris Lloyd and David AshworthStream E_Chris Lloyd and David Ashworth
Stream E_Chris Lloyd and David Ashworth
 
Stream D_Sian Thomas Rachel Blundell
Stream D_Sian Thomas Rachel BlundellStream D_Sian Thomas Rachel Blundell
Stream D_Sian Thomas Rachel Blundell
 
Stream D_Richard Longman, Chris Pickford, Mike Niblett
Stream D_Richard Longman, Chris Pickford, Mike NiblettStream D_Richard Longman, Chris Pickford, Mike Niblett
Stream D_Richard Longman, Chris Pickford, Mike Niblett
 
Stream D_Richard Hawkins, Patrick Reniers
Stream D_Richard Hawkins, Patrick ReniersStream D_Richard Hawkins, Patrick Reniers
Stream D_Richard Hawkins, Patrick Reniers
 
Stream D_Magnolia Román Cáceres
Stream D_Magnolia Román CáceresStream D_Magnolia Román Cáceres
Stream D_Magnolia Román Cáceres
 
Stream D_John Ahmet Erkoyuncu
Stream D_John Ahmet ErkoyuncuStream D_John Ahmet Erkoyuncu
Stream D_John Ahmet Erkoyuncu
 
Stream D_David Riley
Stream D_David RileyStream D_David Riley
Stream D_David Riley
 
Stream D_Julian Schwarzenbach Andy Watts and Wayne Reed
Stream D_Julian Schwarzenbach Andy Watts and Wayne ReedStream D_Julian Schwarzenbach Andy Watts and Wayne Reed
Stream D_Julian Schwarzenbach Andy Watts and Wayne Reed
 
Stream C_Ross Agnew Ursula Bryan
Stream C_Ross Agnew Ursula BryanStream C_Ross Agnew Ursula Bryan
Stream C_Ross Agnew Ursula Bryan
 
Stream C_Luke Body
Stream C_Luke BodyStream C_Luke Body
Stream C_Luke Body
 
Stream C_Javier Serrano
Stream C_Javier SerranoStream C_Javier Serrano
Stream C_Javier Serrano
 
Stream C_David Tyler
Stream C_David TylerStream C_David Tyler
Stream C_David Tyler
 
Stream C_Cristian Augusto Eemolina Alvarez
Stream C_Cristian Augusto Eemolina AlvarezStream C_Cristian Augusto Eemolina Alvarez
Stream C_Cristian Augusto Eemolina Alvarez
 
Stream C_Bill Emery
Stream C_Bill EmeryStream C_Bill Emery
Stream C_Bill Emery
 
Stream C_Christian Schmidt Berthelsen
Stream C_Christian Schmidt BerthelsenStream C_Christian Schmidt Berthelsen
Stream C_Christian Schmidt Berthelsen
 

Recently uploaded

Killer Referans Bahcesehir Catalog Listing Turkey
Killer Referans Bahcesehir Catalog Listing TurkeyKiller Referans Bahcesehir Catalog Listing Turkey
Killer Referans Bahcesehir Catalog Listing Turkey
Listing Turkey
 
Torun Center Residences Istanbul - Listing Turkey
Torun Center Residences Istanbul - Listing TurkeyTorun Center Residences Istanbul - Listing Turkey
Torun Center Residences Istanbul - Listing Turkey
Listing Turkey
 
Listing Turkey - Sinpaş Queen Bomonti Katalog
Listing Turkey - Sinpaş Queen Bomonti KatalogListing Turkey - Sinpaş Queen Bomonti Katalog
Listing Turkey - Sinpaş Queen Bomonti Katalog
Listing Turkey
 

Recently uploaded (20)

Top 10 International Schools in Bangalore
Top 10 International Schools in BangaloreTop 10 International Schools in Bangalore
Top 10 International Schools in Bangalore
 
Urbanrise Paradise on Earth - Unveiling Unprecedented Luxury in Exquisite Vil...
Urbanrise Paradise on Earth - Unveiling Unprecedented Luxury in Exquisite Vil...Urbanrise Paradise on Earth - Unveiling Unprecedented Luxury in Exquisite Vil...
Urbanrise Paradise on Earth - Unveiling Unprecedented Luxury in Exquisite Vil...
 
Sefakoy Sinpas Boulevard Istanbul - Presentation
Sefakoy Sinpas Boulevard Istanbul - PresentationSefakoy Sinpas Boulevard Istanbul - Presentation
Sefakoy Sinpas Boulevard Istanbul - Presentation
 
Elegant Evergreen Homes - Timeless Luxury in Yelahanka, Bangalore
Elegant Evergreen Homes - Timeless Luxury in Yelahanka, BangaloreElegant Evergreen Homes - Timeless Luxury in Yelahanka, Bangalore
Elegant Evergreen Homes - Timeless Luxury in Yelahanka, Bangalore
 
One FNG by Group 108 Sector 142 Noida Construction Update
One FNG by Group 108 Sector 142 Noida Construction UpdateOne FNG by Group 108 Sector 142 Noida Construction Update
One FNG by Group 108 Sector 142 Noida Construction Update
 
Avrupa Konutlari Yenimahalle - Listing Turkey
Avrupa Konutlari Yenimahalle - Listing TurkeyAvrupa Konutlari Yenimahalle - Listing Turkey
Avrupa Konutlari Yenimahalle - Listing Turkey
 
Types and Sources of Mortgage Leads: What You Need to Know
Types and Sources of Mortgage Leads: What You Need to KnowTypes and Sources of Mortgage Leads: What You Need to Know
Types and Sources of Mortgage Leads: What You Need to Know
 
MC Heights-Best Construction Company in jhang
MC Heights-Best Construction Company in jhangMC Heights-Best Construction Company in jhang
MC Heights-Best Construction Company in jhang
 
2BHK-3BHK NEW FLAT FOR SALE IN TUPUDANA,RANCHI.
2BHK-3BHK NEW FLAT FOR SALE IN TUPUDANA,RANCHI.2BHK-3BHK NEW FLAT FOR SALE IN TUPUDANA,RANCHI.
2BHK-3BHK NEW FLAT FOR SALE IN TUPUDANA,RANCHI.
 
Sinpas Gokorman Presentation. - Listing Turkey
Sinpas Gokorman Presentation. - Listing TurkeySinpas Gokorman Presentation. - Listing Turkey
Sinpas Gokorman Presentation. - Listing Turkey
 
Killer Referans Bahcesehir Catalog Listing Turkey
Killer Referans Bahcesehir Catalog Listing TurkeyKiller Referans Bahcesehir Catalog Listing Turkey
Killer Referans Bahcesehir Catalog Listing Turkey
 
Torun Center Residences Istanbul - Listing Turkey
Torun Center Residences Istanbul - Listing TurkeyTorun Center Residences Istanbul - Listing Turkey
Torun Center Residences Istanbul - Listing Turkey
 
Vacant Land for Sale - 3612 Pioneer Road, Town of Middleton, WI
Vacant Land for Sale - 3612 Pioneer Road, Town of Middleton, WIVacant Land for Sale - 3612 Pioneer Road, Town of Middleton, WI
Vacant Land for Sale - 3612 Pioneer Road, Town of Middleton, WI
 
What is BDA? Understanding the Bangalore Development Authority
What is BDA? Understanding the Bangalore Development AuthorityWhat is BDA? Understanding the Bangalore Development Authority
What is BDA? Understanding the Bangalore Development Authority
 
Shapoorji Pallonji Plots Jadhavgadh Fort Pune.pdf
Shapoorji Pallonji Plots Jadhavgadh Fort Pune.pdfShapoorji Pallonji Plots Jadhavgadh Fort Pune.pdf
Shapoorji Pallonji Plots Jadhavgadh Fort Pune.pdf
 
Redevelopment in Pune Challenges & Solutions (PPT).pdf
Redevelopment in Pune Challenges & Solutions (PPT).pdfRedevelopment in Pune Challenges & Solutions (PPT).pdf
Redevelopment in Pune Challenges & Solutions (PPT).pdf
 
Kohinoor Dhanori Apartments Pune Brochure
Kohinoor Dhanori Apartments Pune BrochureKohinoor Dhanori Apartments Pune Brochure
Kohinoor Dhanori Apartments Pune Brochure
 
Listing Turkey - Sinpaş Queen Bomonti Katalog
Listing Turkey - Sinpaş Queen Bomonti KatalogListing Turkey - Sinpaş Queen Bomonti Katalog
Listing Turkey - Sinpaş Queen Bomonti Katalog
 
Salarpuria Sattva Lakeridge Neopolis Hyderabad.pdf.pdf
Salarpuria Sattva Lakeridge Neopolis Hyderabad.pdf.pdfSalarpuria Sattva Lakeridge Neopolis Hyderabad.pdf.pdf
Salarpuria Sattva Lakeridge Neopolis Hyderabad.pdf.pdf
 
Optimizing Your MCA Lead Capture Process for Better Results
Optimizing Your MCA Lead Capture Process for Better ResultsOptimizing Your MCA Lead Capture Process for Better Results
Optimizing Your MCA Lead Capture Process for Better Results
 

Stream D_John Chappell

  • 1. Range Management John Chappell MBE MSc BEng(Hons) CEng FIMechE
  • 2. Copyright © United Utilities Water Limited 2015 2 I am a Maintainer
  • 3. The Vision – created November 2014
  • 4. Copyright © United Utilities Water Limited 2015 4 Operational Engineering Steve Fraser Managing Director Wholesale Richard Ratcliff Wholesale Engineering Director John Chappell Head of Operational Engineering Dave Evans Operational Engineering ESM AMS (Eng) OE PEMs Warren Bullough A I Delivery Manager (WW) Steve Wade A I Delivery Manager (W) Chris Lomax Chief Electrical Dan Brooks Chief Mechanical Alison Summersfield Lead Range Manager Ged Hyland Maintenance Engineering Laura Wood Executive Secretary
  • 5. Copyright © United Utilities Water Limited 2015 5 Range Management Performance Metrics Service Schedule Glovebox Manual Haynes Manual Spares Training 1st & 2nd Editions Fleet wide improvement • Learn from best (and worst) in fleet • Apply across whole fleet • Consistently • ‘Real’ Continuous Improvement
  • 6. Copyright © United Utilities Water Limited 2015 6 Range Management Site-Specific Performance: PM, AEM, ADT, AM IN WW PT SW SC CT PS ST SD HP TL SA AS SS TT FI FS CH FE TW IN WW PT SW SC CT PS ST SD HP TL SA AS SS TT FI FS CH FE TW IN WW PT SW SC CT PS ST SD HP TL SA AS SS TT FI FS CH FE TW 20 System Blocks (Not all require an RM FTE) Consolidate across all Sites: (no. Assets/Process Cell; baseline Ww Process Codes with CW synergy) 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 IN WW PT SW SC CT PS ST SD HP TL SA AS SS TT FI FS CH FE TW CW WW Process Code Description PGI PGI Description Clean Water Wastewater TERTIARY TREATMENT PR-TTB Tertiary – Baff 1 PR-TTC Tertiary – Couffs 1 PR-TTI Tertiary – Immedium Sand Filters 1 PR-TTN Tertiary – Nitrifying Tower Filters 1 PR-TTR Tertiary – Rapid Gravity Filters 1 PR-TTS Tertiary – Submerged Aeration Filter 1 PR-TTU Tertiary - UV 1 3 x Statutory RMs is a Water Industry short term necessity PSSR LOLER HV/LV PUMPS
  • 7. Copyright © United Utilities Water Limited 2016 7 Range Management Resources Current Ranges Covered & Gaps highlighted in month David Francis (Jacobs) : Chemical Treatment Jeffrey Ng (Jacobs) : Scraper Bridges (PS & FS) Alan Groves (Jacobs) : HV/LV (incl. Diesel Generators) Darren Howarth : Inlet Works Mark Byrne : Secondary Treatment – Trickling filters Dave Belshaw : Tertiary Treatment (incl. SAFs & RBCs) Bob Turner : Pumps (Alan Groves (Jacobs) : HV/LV (incl. Diesel Generators)) Bob Turner : Pumps (David Francis : Chemical Treatment) Alan Groves (Jacobs): HV/LV (incl. Diesel Generators) Alison Summersfield (Lead): Sludge Digestion Keith Wearing: Energy Generation David Francis (Jacobs) : Chemical Treatment Alan Groves (Jacobs) : HV/LV (incl. Diesel Generators) Dave Belshaw : Disinfection - UV Bob Turner : Pumps Mark Byrne : Filtration – Membrane Technology WaterWasteWaterNetworkBioresource Services Requests made: • Chlorine Dosing • More Water support • Tertiary BAFFs • 2nd Treatment • Anoxic mixers • Blowers • NEREDA • SAFs & RBCs • Sludge • GBTs • Centrifuges
  • 8. Copyright © United Utilities Water Limited 2016 8 6 Pillar Delivery Plans 03-Apr 10-Apr 17-Apr 24-Apr 01-May 08-May 15-May 22-May 29-May 05-Jun 12-Jun 19-Jun 26-Jun 03-Jul 10-Jul 17-Jul 24-Jul 31-Jul 07-Aug 14-Aug 21-Aug 28-Aug 04-Sep 11-Sep 18-Sep 25-Sep 02-Oct 09-Oct 16-Oct 23-Oct 30-Oct 06-Nov 13-Nov 20-Nov 27-Nov 04-Dec 11-Dec 18-Dec 25-Dec 1. Fleet performance Full Inventory for Region Operational - Ammonia Removal Operational - Energy Consumption Operational - Alkalinity Operational - Dissolved Oxygen Operational - Wash cycles Maintenance - Cyclic Maintenance - Proactive Maintenance - Reactive Analysis of Reactive costs Identification of key asset issues and prioirities 2. Service Schedule OEM O&M Task Summary Generic RCM Workbank review Site Specific Task Variation 3. Glovebox Manual Quick Start Guide - Wigan Lineside Trial Schematic - Wigan 4. SOP (Haynes) Overarching Operating Standard Overarching Maintenance Standard Asset Specific SOP - Brightwater BAFF Asset Specific SOP - OTV Veolia BAFF SSI template defined and issued for population 5. Spares OEM Spares Recommendation BOM Created Critical Spares Holding (long-lead breakdowns) Fully-costed whole-life Spares Holding Strategy Build & Monitor Spares Kanban (MSL, MRO) 6. Training Syllabus created & submit to L&D Identify users for training 6 Pillar Delivery Plan Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17
  • 9. Copyright © United Utilities Water Limited 2015 9 Tertiary Treatment: UV (Dave Belshaw) Dashboard TrainingGlovebox/Lineside - Blackburn“Haynes” Manual – Blackburn Optimisation Operational Support Preston Wigan Blackburn Carnforth Lancaster Morecambe Pilling Preesall Garstang Walton – Le- Dale Water • Common UV Lamp Breakage Procedures • Low cost engineering solution for in service, switched off UV plant • Easy no lift de-comm/re-comm required to maintain quality supply to customers • Innovation support – LED trial at Cumwhinton. DfMA plug and play UV rigs Wastewater • Stainless Steel wiper trials • Improved Quartz cleaning without the use of chemicals • Further development of SOPs and moving over Haynes manual to match Sludge Digestion format • Real-time UV mimics for ICC • Continued input in to UV Asset Standards & Signature Design Review
  • 10. Copyright © United Utilities Water Limited 2015 10 70% 0% Stop doing these cyclics – has little effect 100% 70% Move the resource Reliability Centred Maintenance – Step 1 Achieve 100% of these cyclics – to prevent or detect problems before they fail ReactiveCost CyclicCompliance