SlideShare a Scribd company logo
Strategies for Continuous
CTMS Improvement
September 20, 2012
Parambir Singh
Vice President of
Clinical Trial Management Solutions
BioPharm Systems
Welcome & Introductions
Param Singh
Vice President of Clinical Trial Management Solutions
BioPharm Systems, Inc.
• CTMS practice director since 2007
– Expertise in managing all phases and styles of clinical trials
– Leads the team that implements, supports, and enhances Oracle’s
LabPas and Siebel Clinical solutions
• Extensive Siebel Clinical implementation experience
– 11+ years of experience implementing Siebel Clinical
– 15+ implementations
– Spearheaded the creation of the Siebel Clinical “accelerator”
ASCEND
Welcome & Introductions
CTMS Practice Services
Implementations
Manage implementations of Siebel
Clinical, Siebel Clinical ASCEND, and
Oracle Health Sciences LabPas.
Integrations
Build interfaces between Siebel
Clinical or LabPas and other clinical
and non-clinical systems.
Training
Develop and/or deliver standard and
custom training classes and materials.
Process Guidance
Provide insight, advice, and solutions
to specific clinical trial management
issues.
Agenda
• Importance of a Continuous Improvement Plan
– Establish Change Control Board
– Define Enhancement Processes
• Sources of Input
– Meetings & Frequency
• How to Manage Enhancements
• How to Prioritize Enhancements
• When to Make Enhancements
• Best Practices for Continuous Improvement Plans
• Q&A
Common Scenario
• Just completed the initial system implementation
• End users are trained, but not yet in the system
• Not all desired requirements included in the initial release
• May potentially roll out the system to other business units
• The annual project budget meeting is coming up
WHAT TO DO NEXT?
Importance of a Continuous Improvement Plan
• Bridges the gap for post production support
• Less anxious end users
• Helps focus on business critical requirements
• Encourages end user communication and feedback
• Allows system to be flexible if business process changes
• Establishes an objective way to evaluate potential
enhancements
• Increases system acceptance and usability
Establish Change Control Board
Change
Control
Board
Clinical
Administrator
Business
Representative
IT Project
Manager
Define Enhancement Processes
When to roll out the
enhancements
How to manage and
prioritize enhancements
How often to meet and
review enhancements
How to collect
enhancements
Define the following in your plan:
Sources of Input
Enhancement
Request Log
Deferred
Requirements
User Feedback
Help Desk Log
Training
Feedback
Infrastructure
Roadmap
User
Community
Conference
Meetings & Frequency
• Meet with end users
• Review Help Desk Log
• Change Control Board
Meeting
How to Manage Enhancements
• Use a spreadsheet to track requests
• Categorize each request as an enhancement or defect
• Assess each request from different perspectives
– Business operation criticality
– Design/development complexity
– Validation effort
– Impacted modules and upgrade risks
Assess by Business Operation Criticality
• Identify business requestor
• Capture clear business request details
• Provide justification for enhancement
• Determine impact on daily operations
• Identify potential alternatives/workarounds
• Capture request date
• Capture requestor’s initial priority ranking on the
enhancement
Assess by Design/Development Complexity
• Level of effort required
• Custom coding needs
• Leverage in-house resources
• Fit with current system architecture
• Identify alternative approaches
Assess by Validation Effort
• Level of validation required
• Validation scenario complexity
• Regression testing needs
Assess by Impacted Modules and Upgrade Risks
• Impact on existing functionality
• Number of modules impacted
• Impact on existing integration
• Impact on future upgrades
How to Prioritize Enhancements
• Provide business justification
• All business units should evaluate
• Rank requirements by level of importance
– High / Medium / Low
– Numerical
• For example, in a 10 item enhancement list, ask users to rank them
from 1 to 10, and with no two items sharing the same ranking (all
unique)
When to Make Enhancements
• Initial Enhancements
– At least 3 months after the initial release
– Provide end users an opportunity to get familiar with the system
– Provides time to gather and refine list of enhancements
• Subsequent Releases
– Depend on budget available
– May have minor releases every 3 or 6 months
– Can roll the enhancements in with a major release such as
integration
Demo: Defining scope of a point release
Summary: Continuous Improvement Process
Collect
enhancement list
Review, assess,
and prioritize
enhancement list
Determine scope
of project
Create change
control charter
Kickoff project
Best Practices for Continuous Improvement Plans
• Start thinking of the plan prior to the initial go-live
• Schedule recurring meetings to establish the continuous
improvement process
• After initial release, ensure users have a chance to use the
system and understand its functionality before planning
any additional releases
• Note: The continuous improvement process can also result
in non-system changes, such as training material updates,
business process re-engineering, etc.
Thank you for attending!
Questions?
Contact Us
• North America Sales Contact:
– Rod Roderick
– rroderick@biopharm.com
– +1 877 654 0033
• Europe/Middle East/Africa Sales Contact:
– Rudolf Coetzee
– rcoetzee@biopharm.com
– +44 (0) 1865 910200
• General Inquiries:
– info@biopharm.com

More Related Content

What's hot

Systems Development Lifecycle Walkthrough (Cambridge Technical Level 3 IT)
Systems Development Lifecycle Walkthrough (Cambridge Technical Level 3 IT)Systems Development Lifecycle Walkthrough (Cambridge Technical Level 3 IT)
Systems Development Lifecycle Walkthrough (Cambridge Technical Level 3 IT)
LucySim1
 
Erp product evaluation, selection, implementation and support
Erp product evaluation, selection, implementation and supportErp product evaluation, selection, implementation and support
Erp product evaluation, selection, implementation and support
Hazelknight Media & Entertainment Pvt Ltd
 
Project Metrics & Measures
Project Metrics & MeasuresProject Metrics & Measures
Project Metrics & Measures
Anand Subramaniam
 
Performance Assurance for Packaged Applications
Performance Assurance for Packaged ApplicationsPerformance Assurance for Packaged Applications
Performance Assurance for Packaged Applications
Alexander Podelko
 
eOperations Performance Measurement and Monitoring
eOperations Performance Measurement and MonitoringeOperations Performance Measurement and Monitoring
eOperations Performance Measurement and Monitoring
sidhts
 
CMMI & Six Sigma Integration
CMMI & Six Sigma IntegrationCMMI & Six Sigma Integration
CMMI & Six Sigma Integration
Anand Subramaniam
 
Product Management in Operations Environment
Product Management in Operations EnvironmentProduct Management in Operations Environment
Product Management in Operations Environment
AMJAD SHAIKH
 
Bse 3105 lecture 3-software evolution planning
Bse 3105  lecture 3-software evolution planningBse 3105  lecture 3-software evolution planning
Bse 3105 lecture 3-software evolution planning
Alonzee Tash
 
015 changes-process model
015 changes-process model015 changes-process model
015 changes-process model
Dr Fereidoun Dejahang
 
Q3edge Case Study
Q3edge Case StudyQ3edge Case Study
Q3edge Case Study
Sushant Pande,PRINCE2
 
015 changes-process model
015 changes-process model015 changes-process model
015 changes-process model
DrFereydounDejahang
 
Erp selection steps
Erp selection stepsErp selection steps
Erp selection stepsanilbele
 
Varun singh knowledge_management
Varun singh knowledge_managementVarun singh knowledge_management
Varun singh knowledge_management
Varun Singh
 
Cmmi model – capabilities maturity model integration
Cmmi model – capabilities maturity model integrationCmmi model – capabilities maturity model integration
Cmmi model – capabilities maturity model integration
Arshian Siddiqui
 
Project status
Project statusProject status
Project statusanstratis
 
Rajesh_Change Manager
Rajesh_Change ManagerRajesh_Change Manager
Rajesh_Change ManagerM Rajesh
 

What's hot (19)

Systems Development Lifecycle Walkthrough (Cambridge Technical Level 3 IT)
Systems Development Lifecycle Walkthrough (Cambridge Technical Level 3 IT)Systems Development Lifecycle Walkthrough (Cambridge Technical Level 3 IT)
Systems Development Lifecycle Walkthrough (Cambridge Technical Level 3 IT)
 
Erp product evaluation, selection, implementation and support
Erp product evaluation, selection, implementation and supportErp product evaluation, selection, implementation and support
Erp product evaluation, selection, implementation and support
 
Project Metrics & Measures
Project Metrics & MeasuresProject Metrics & Measures
Project Metrics & Measures
 
Performance Assurance for Packaged Applications
Performance Assurance for Packaged ApplicationsPerformance Assurance for Packaged Applications
Performance Assurance for Packaged Applications
 
eOperations Performance Measurement and Monitoring
eOperations Performance Measurement and MonitoringeOperations Performance Measurement and Monitoring
eOperations Performance Measurement and Monitoring
 
Presentation
PresentationPresentation
Presentation
 
Robert Latest cv
Robert Latest cvRobert Latest cv
Robert Latest cv
 
CMMI & Six Sigma Integration
CMMI & Six Sigma IntegrationCMMI & Six Sigma Integration
CMMI & Six Sigma Integration
 
Product Management in Operations Environment
Product Management in Operations EnvironmentProduct Management in Operations Environment
Product Management in Operations Environment
 
Bse 3105 lecture 3-software evolution planning
Bse 3105  lecture 3-software evolution planningBse 3105  lecture 3-software evolution planning
Bse 3105 lecture 3-software evolution planning
 
015 changes-process model
015 changes-process model015 changes-process model
015 changes-process model
 
Cyndee_Blenkush_Resume
Cyndee_Blenkush_ResumeCyndee_Blenkush_Resume
Cyndee_Blenkush_Resume
 
Q3edge Case Study
Q3edge Case StudyQ3edge Case Study
Q3edge Case Study
 
015 changes-process model
015 changes-process model015 changes-process model
015 changes-process model
 
Erp selection steps
Erp selection stepsErp selection steps
Erp selection steps
 
Varun singh knowledge_management
Varun singh knowledge_managementVarun singh knowledge_management
Varun singh knowledge_management
 
Cmmi model – capabilities maturity model integration
Cmmi model – capabilities maturity model integrationCmmi model – capabilities maturity model integration
Cmmi model – capabilities maturity model integration
 
Project status
Project statusProject status
Project status
 
Rajesh_Change Manager
Rajesh_Change ManagerRajesh_Change Manager
Rajesh_Change Manager
 

Similar to Strategies for Continuous CTMS Improvement

Change, Release, Management In-Depth vTom.pptx
Change, Release, Management In-Depth vTom.pptxChange, Release, Management In-Depth vTom.pptx
Change, Release, Management In-Depth vTom.pptx
AdilPatel34
 
Practical tips for implementing corporate performance management system
Practical tips for implementing corporate performance management systemPractical tips for implementing corporate performance management system
Practical tips for implementing corporate performance management system
Ketan Parekh
 
Chapter no .07 performance measurement and controls in scm
Chapter no .07 performance measurement and controls in scmChapter no .07 performance measurement and controls in scm
Chapter no .07 performance measurement and controls in scm
Israr Khan Raja
 
Focus your investments in innovations
Focus your investments in innovationsFocus your investments in innovations
Focus your investments in innovations
Kobi Vider
 
Making the Move to an Enterprise Clinical Trial Management System
Making the Move to an Enterprise Clinical Trial Management SystemMaking the Move to an Enterprise Clinical Trial Management System
Making the Move to an Enterprise Clinical Trial Management SystemPerficient
 
The study of Perpetual Evolution_Group 5_ Final Project_PPT.pdf
The study of Perpetual Evolution_Group 5_ Final Project_PPT.pdfThe study of Perpetual Evolution_Group 5_ Final Project_PPT.pdf
The study of Perpetual Evolution_Group 5_ Final Project_PPT.pdf
RuhiRangwala1
 
The ABCs of Clinical Trial Management Systems
The ABCs of Clinical Trial Management SystemsThe ABCs of Clinical Trial Management Systems
The ABCs of Clinical Trial Management Systems
Perficient, Inc.
 
Sanitized Knowledge Transfer Deliverable:Rapid Process Change Tutorial
Sanitized Knowledge Transfer Deliverable:Rapid Process Change TutorialSanitized Knowledge Transfer Deliverable:Rapid Process Change Tutorial
Sanitized Knowledge Transfer Deliverable:Rapid Process Change Tutorialguesta83e9d
 
The five core processes: Service transition
The five core processes: Service transitionThe five core processes: Service transition
The five core processes: Service transition
Rhy Carloy Basalo
 
Creating Functional Testing Strategy.pptx
Creating Functional Testing Strategy.pptxCreating Functional Testing Strategy.pptx
Creating Functional Testing Strategy.pptx
Mohit Rajvanshi
 
Role of the CFO in Selecting and Implementing Enterprise Solutions
Role of the CFO in Selecting and Implementing Enterprise SolutionsRole of the CFO in Selecting and Implementing Enterprise Solutions
Role of the CFO in Selecting and Implementing Enterprise Solutions
Proformative, Inc.
 
ServiceNow Consulting Roadmaps and Holistics approach.pdf
ServiceNow Consulting Roadmaps and Holistics approach.pdfServiceNow Consulting Roadmaps and Holistics approach.pdf
ServiceNow Consulting Roadmaps and Holistics approach.pdf
Aelum Consulting
 
Preventive Maintenance Best Practices workshop Brochure
Preventive Maintenance Best Practices workshop BrochurePreventive Maintenance Best Practices workshop Brochure
Preventive Maintenance Best Practices workshop Brochure
Ricky Smith CMRP, CMRT
 
Partner for Process Transformation
Partner for Process Transformation Partner for Process Transformation
Partner for Process Transformation
Thought At Work
 
Solution Architecture – Approach to Rapidly Scoping The Initial Solution Options
Solution Architecture – Approach to Rapidly Scoping The Initial Solution OptionsSolution Architecture – Approach to Rapidly Scoping The Initial Solution Options
Solution Architecture – Approach to Rapidly Scoping The Initial Solution Options
Alan McSweeney
 
Top Business Benefits of Application Lifecycle Management (ALM)
Top Business Benefits of Application Lifecycle Management (ALM)Top Business Benefits of Application Lifecycle Management (ALM)
Top Business Benefits of Application Lifecycle Management (ALM)
Imaginet
 
Detailed concepts of the Plan Do Check Act Process – Critical to achieving an...
Detailed concepts of the Plan Do Check Act Process – Critical to achieving an...Detailed concepts of the Plan Do Check Act Process – Critical to achieving an...
Detailed concepts of the Plan Do Check Act Process – Critical to achieving an...
ASQ Buffalo NY
 
Kristian Fischer - Put Test in the Driver's Seat
Kristian Fischer - Put Test in the Driver's SeatKristian Fischer - Put Test in the Driver's Seat
Kristian Fischer - Put Test in the Driver's Seat
TEST Huddle
 

Similar to Strategies for Continuous CTMS Improvement (20)

Change, Release, Management In-Depth vTom.pptx
Change, Release, Management In-Depth vTom.pptxChange, Release, Management In-Depth vTom.pptx
Change, Release, Management In-Depth vTom.pptx
 
Practical tips for implementing corporate performance management system
Practical tips for implementing corporate performance management systemPractical tips for implementing corporate performance management system
Practical tips for implementing corporate performance management system
 
Chapter no .07 performance measurement and controls in scm
Chapter no .07 performance measurement and controls in scmChapter no .07 performance measurement and controls in scm
Chapter no .07 performance measurement and controls in scm
 
Focus your investments in innovations
Focus your investments in innovationsFocus your investments in innovations
Focus your investments in innovations
 
Making the Move to an Enterprise Clinical Trial Management System
Making the Move to an Enterprise Clinical Trial Management SystemMaking the Move to an Enterprise Clinical Trial Management System
Making the Move to an Enterprise Clinical Trial Management System
 
Sdec10 lean AMS
Sdec10 lean AMSSdec10 lean AMS
Sdec10 lean AMS
 
The study of Perpetual Evolution_Group 5_ Final Project_PPT.pdf
The study of Perpetual Evolution_Group 5_ Final Project_PPT.pdfThe study of Perpetual Evolution_Group 5_ Final Project_PPT.pdf
The study of Perpetual Evolution_Group 5_ Final Project_PPT.pdf
 
The ABCs of Clinical Trial Management Systems
The ABCs of Clinical Trial Management SystemsThe ABCs of Clinical Trial Management Systems
The ABCs of Clinical Trial Management Systems
 
Sanitized Knowledge Transfer Deliverable:Rapid Process Change Tutorial
Sanitized Knowledge Transfer Deliverable:Rapid Process Change TutorialSanitized Knowledge Transfer Deliverable:Rapid Process Change Tutorial
Sanitized Knowledge Transfer Deliverable:Rapid Process Change Tutorial
 
The five core processes: Service transition
The five core processes: Service transitionThe five core processes: Service transition
The five core processes: Service transition
 
Creating Functional Testing Strategy.pptx
Creating Functional Testing Strategy.pptxCreating Functional Testing Strategy.pptx
Creating Functional Testing Strategy.pptx
 
Role of the CFO in Selecting and Implementing Enterprise Solutions
Role of the CFO in Selecting and Implementing Enterprise SolutionsRole of the CFO in Selecting and Implementing Enterprise Solutions
Role of the CFO in Selecting and Implementing Enterprise Solutions
 
ServiceNow Consulting Roadmaps and Holistics approach.pdf
ServiceNow Consulting Roadmaps and Holistics approach.pdfServiceNow Consulting Roadmaps and Holistics approach.pdf
ServiceNow Consulting Roadmaps and Holistics approach.pdf
 
Preventive Maintenance Best Practices workshop Brochure
Preventive Maintenance Best Practices workshop BrochurePreventive Maintenance Best Practices workshop Brochure
Preventive Maintenance Best Practices workshop Brochure
 
Partner for Process Transformation
Partner for Process Transformation Partner for Process Transformation
Partner for Process Transformation
 
Faheem- CV
Faheem- CVFaheem- CV
Faheem- CV
 
Solution Architecture – Approach to Rapidly Scoping The Initial Solution Options
Solution Architecture – Approach to Rapidly Scoping The Initial Solution OptionsSolution Architecture – Approach to Rapidly Scoping The Initial Solution Options
Solution Architecture – Approach to Rapidly Scoping The Initial Solution Options
 
Top Business Benefits of Application Lifecycle Management (ALM)
Top Business Benefits of Application Lifecycle Management (ALM)Top Business Benefits of Application Lifecycle Management (ALM)
Top Business Benefits of Application Lifecycle Management (ALM)
 
Detailed concepts of the Plan Do Check Act Process – Critical to achieving an...
Detailed concepts of the Plan Do Check Act Process – Critical to achieving an...Detailed concepts of the Plan Do Check Act Process – Critical to achieving an...
Detailed concepts of the Plan Do Check Act Process – Critical to achieving an...
 
Kristian Fischer - Put Test in the Driver's Seat
Kristian Fischer - Put Test in the Driver's SeatKristian Fischer - Put Test in the Driver's Seat
Kristian Fischer - Put Test in the Driver's Seat
 

More from Perficient

Freedom and Flexibility with Siebel Clinical (CTMS) Open UI
Freedom and Flexibility with Siebel Clinical (CTMS) Open UIFreedom and Flexibility with Siebel Clinical (CTMS) Open UI
Freedom and Flexibility with Siebel Clinical (CTMS) Open UIPerficient
 
Managing Global Studies with Oracle's Siebel Clinical Trial Management System...
Managing Global Studies with Oracle's Siebel Clinical Trial Management System...Managing Global Studies with Oracle's Siebel Clinical Trial Management System...
Managing Global Studies with Oracle's Siebel Clinical Trial Management System...Perficient
 
How to Rapidly Configure Oracle Life Sciences Data Hub (LSH) to Support the M...
How to Rapidly Configure Oracle Life Sciences Data Hub (LSH) to Support the M...How to Rapidly Configure Oracle Life Sciences Data Hub (LSH) to Support the M...
How to Rapidly Configure Oracle Life Sciences Data Hub (LSH) to Support the M...Perficient
 
Cloud-based vs. On-site CTMS - Which is Right for Your Organization?
Cloud-based vs. On-site CTMS - Which is Right for Your Organization?Cloud-based vs. On-site CTMS - Which is Right for Your Organization?
Cloud-based vs. On-site CTMS - Which is Right for Your Organization?Perficient
 
Clinical Trial Supply Management with Siebel CTMS
Clinical Trial Supply Management with Siebel CTMSClinical Trial Supply Management with Siebel CTMS
Clinical Trial Supply Management with Siebel CTMSPerficient
 
Using Oracle Health Sciences Data Management Workbench to Optimize the Manage...
Using Oracle Health Sciences Data Management Workbench to Optimize the Manage...Using Oracle Health Sciences Data Management Workbench to Optimize the Manage...
Using Oracle Health Sciences Data Management Workbench to Optimize the Manage...Perficient
 
Integrating Oracle Argus Safety with other Clinical Systems Using Argus Inter...
Integrating Oracle Argus Safety with other Clinical Systems Using Argus Inter...Integrating Oracle Argus Safety with other Clinical Systems Using Argus Inter...
Integrating Oracle Argus Safety with other Clinical Systems Using Argus Inter...Perficient
 
How St. Jude Medical Manages Oracle Clinical Studies Using Accel-Copy
How St. Jude Medical Manages Oracle Clinical Studies Using Accel-CopyHow St. Jude Medical Manages Oracle Clinical Studies Using Accel-Copy
How St. Jude Medical Manages Oracle Clinical Studies Using Accel-CopyPerficient
 
Evaluating and Investigating Drug Safety Signals with Public Databases
Evaluating and Investigating Drug Safety Signals with Public DatabasesEvaluating and Investigating Drug Safety Signals with Public Databases
Evaluating and Investigating Drug Safety Signals with Public DatabasesPerficient
 
Plug & Play: Benefits of Out-of-the-Box Clinical Development Analytics (CDA) ...
Plug & Play: Benefits of Out-of-the-Box Clinical Development Analytics (CDA) ...Plug & Play: Benefits of Out-of-the-Box Clinical Development Analytics (CDA) ...
Plug & Play: Benefits of Out-of-the-Box Clinical Development Analytics (CDA) ...Perficient
 
The Perils of Clinical Trial Budgeting
The Perils of Clinical Trial BudgetingThe Perils of Clinical Trial Budgeting
The Perils of Clinical Trial Budgeting
Perficient
 
2013 OHSUG - Use Cases for using the Program Type View in Oracle Life Science...
2013 OHSUG - Use Cases for using the Program Type View in Oracle Life Science...2013 OHSUG - Use Cases for using the Program Type View in Oracle Life Science...
2013 OHSUG - Use Cases for using the Program Type View in Oracle Life Science...
Perficient
 
2013 OHSUG - The Ins and Outs of CTMS Data Migration
2013 OHSUG - The Ins and Outs of CTMS Data Migration2013 OHSUG - The Ins and Outs of CTMS Data Migration
2013 OHSUG - The Ins and Outs of CTMS Data Migration
Perficient
 
2013 OHSUG - Siebel Clinical Integration with Other Systems
2013 OHSUG - Siebel Clinical Integration with Other Systems2013 OHSUG - Siebel Clinical Integration with Other Systems
2013 OHSUG - Siebel Clinical Integration with Other Systems
Perficient
 
2013 OHSUG - Sharing CTMS Data between Sponsors and Contract Research Organiz...
2013 OHSUG - Sharing CTMS Data between Sponsors and Contract Research Organiz...2013 OHSUG - Sharing CTMS Data between Sponsors and Contract Research Organiz...
2013 OHSUG - Sharing CTMS Data between Sponsors and Contract Research Organiz...
Perficient
 
2013 OHSUG - Oracle Clinical and RDC Training for Data Management and Clinica...
2013 OHSUG - Oracle Clinical and RDC Training for Data Management and Clinica...2013 OHSUG - Oracle Clinical and RDC Training for Data Management and Clinica...
2013 OHSUG - Oracle Clinical and RDC Training for Data Management and Clinica...
Perficient
 
2013 OHSUG - Merging Multiple Drug Safety and Pharmacovigilance Databases int...
2013 OHSUG - Merging Multiple Drug Safety and Pharmacovigilance Databases int...2013 OHSUG - Merging Multiple Drug Safety and Pharmacovigilance Databases int...
2013 OHSUG - Merging Multiple Drug Safety and Pharmacovigilance Databases int...
Perficient
 
2013 OHSUG - Integration of Argus and Other Products Using the E2B Interchange
2013 OHSUG - Integration of Argus and Other Products Using the E2B Interchange2013 OHSUG - Integration of Argus and Other Products Using the E2B Interchange
2013 OHSUG - Integration of Argus and Other Products Using the E2B Interchange
Perficient
 
2013 OHSUG - Use Cases for Using the Program Type View in Oracle Life Science...
2013 OHSUG - Use Cases for Using the Program Type View in Oracle Life Science...2013 OHSUG - Use Cases for Using the Program Type View in Oracle Life Science...
2013 OHSUG - Use Cases for Using the Program Type View in Oracle Life Science...
Perficient
 
2013 OHSUG - Facilitating Pharmacovigilance Globalization with Process Reengi...
2013 OHSUG - Facilitating Pharmacovigilance Globalization with Process Reengi...2013 OHSUG - Facilitating Pharmacovigilance Globalization with Process Reengi...
2013 OHSUG - Facilitating Pharmacovigilance Globalization with Process Reengi...
Perficient
 

More from Perficient (20)

Freedom and Flexibility with Siebel Clinical (CTMS) Open UI
Freedom and Flexibility with Siebel Clinical (CTMS) Open UIFreedom and Flexibility with Siebel Clinical (CTMS) Open UI
Freedom and Flexibility with Siebel Clinical (CTMS) Open UI
 
Managing Global Studies with Oracle's Siebel Clinical Trial Management System...
Managing Global Studies with Oracle's Siebel Clinical Trial Management System...Managing Global Studies with Oracle's Siebel Clinical Trial Management System...
Managing Global Studies with Oracle's Siebel Clinical Trial Management System...
 
How to Rapidly Configure Oracle Life Sciences Data Hub (LSH) to Support the M...
How to Rapidly Configure Oracle Life Sciences Data Hub (LSH) to Support the M...How to Rapidly Configure Oracle Life Sciences Data Hub (LSH) to Support the M...
How to Rapidly Configure Oracle Life Sciences Data Hub (LSH) to Support the M...
 
Cloud-based vs. On-site CTMS - Which is Right for Your Organization?
Cloud-based vs. On-site CTMS - Which is Right for Your Organization?Cloud-based vs. On-site CTMS - Which is Right for Your Organization?
Cloud-based vs. On-site CTMS - Which is Right for Your Organization?
 
Clinical Trial Supply Management with Siebel CTMS
Clinical Trial Supply Management with Siebel CTMSClinical Trial Supply Management with Siebel CTMS
Clinical Trial Supply Management with Siebel CTMS
 
Using Oracle Health Sciences Data Management Workbench to Optimize the Manage...
Using Oracle Health Sciences Data Management Workbench to Optimize the Manage...Using Oracle Health Sciences Data Management Workbench to Optimize the Manage...
Using Oracle Health Sciences Data Management Workbench to Optimize the Manage...
 
Integrating Oracle Argus Safety with other Clinical Systems Using Argus Inter...
Integrating Oracle Argus Safety with other Clinical Systems Using Argus Inter...Integrating Oracle Argus Safety with other Clinical Systems Using Argus Inter...
Integrating Oracle Argus Safety with other Clinical Systems Using Argus Inter...
 
How St. Jude Medical Manages Oracle Clinical Studies Using Accel-Copy
How St. Jude Medical Manages Oracle Clinical Studies Using Accel-CopyHow St. Jude Medical Manages Oracle Clinical Studies Using Accel-Copy
How St. Jude Medical Manages Oracle Clinical Studies Using Accel-Copy
 
Evaluating and Investigating Drug Safety Signals with Public Databases
Evaluating and Investigating Drug Safety Signals with Public DatabasesEvaluating and Investigating Drug Safety Signals with Public Databases
Evaluating and Investigating Drug Safety Signals with Public Databases
 
Plug & Play: Benefits of Out-of-the-Box Clinical Development Analytics (CDA) ...
Plug & Play: Benefits of Out-of-the-Box Clinical Development Analytics (CDA) ...Plug & Play: Benefits of Out-of-the-Box Clinical Development Analytics (CDA) ...
Plug & Play: Benefits of Out-of-the-Box Clinical Development Analytics (CDA) ...
 
The Perils of Clinical Trial Budgeting
The Perils of Clinical Trial BudgetingThe Perils of Clinical Trial Budgeting
The Perils of Clinical Trial Budgeting
 
2013 OHSUG - Use Cases for using the Program Type View in Oracle Life Science...
2013 OHSUG - Use Cases for using the Program Type View in Oracle Life Science...2013 OHSUG - Use Cases for using the Program Type View in Oracle Life Science...
2013 OHSUG - Use Cases for using the Program Type View in Oracle Life Science...
 
2013 OHSUG - The Ins and Outs of CTMS Data Migration
2013 OHSUG - The Ins and Outs of CTMS Data Migration2013 OHSUG - The Ins and Outs of CTMS Data Migration
2013 OHSUG - The Ins and Outs of CTMS Data Migration
 
2013 OHSUG - Siebel Clinical Integration with Other Systems
2013 OHSUG - Siebel Clinical Integration with Other Systems2013 OHSUG - Siebel Clinical Integration with Other Systems
2013 OHSUG - Siebel Clinical Integration with Other Systems
 
2013 OHSUG - Sharing CTMS Data between Sponsors and Contract Research Organiz...
2013 OHSUG - Sharing CTMS Data between Sponsors and Contract Research Organiz...2013 OHSUG - Sharing CTMS Data between Sponsors and Contract Research Organiz...
2013 OHSUG - Sharing CTMS Data between Sponsors and Contract Research Organiz...
 
2013 OHSUG - Oracle Clinical and RDC Training for Data Management and Clinica...
2013 OHSUG - Oracle Clinical and RDC Training for Data Management and Clinica...2013 OHSUG - Oracle Clinical and RDC Training for Data Management and Clinica...
2013 OHSUG - Oracle Clinical and RDC Training for Data Management and Clinica...
 
2013 OHSUG - Merging Multiple Drug Safety and Pharmacovigilance Databases int...
2013 OHSUG - Merging Multiple Drug Safety and Pharmacovigilance Databases int...2013 OHSUG - Merging Multiple Drug Safety and Pharmacovigilance Databases int...
2013 OHSUG - Merging Multiple Drug Safety and Pharmacovigilance Databases int...
 
2013 OHSUG - Integration of Argus and Other Products Using the E2B Interchange
2013 OHSUG - Integration of Argus and Other Products Using the E2B Interchange2013 OHSUG - Integration of Argus and Other Products Using the E2B Interchange
2013 OHSUG - Integration of Argus and Other Products Using the E2B Interchange
 
2013 OHSUG - Use Cases for Using the Program Type View in Oracle Life Science...
2013 OHSUG - Use Cases for Using the Program Type View in Oracle Life Science...2013 OHSUG - Use Cases for Using the Program Type View in Oracle Life Science...
2013 OHSUG - Use Cases for Using the Program Type View in Oracle Life Science...
 
2013 OHSUG - Facilitating Pharmacovigilance Globalization with Process Reengi...
2013 OHSUG - Facilitating Pharmacovigilance Globalization with Process Reengi...2013 OHSUG - Facilitating Pharmacovigilance Globalization with Process Reengi...
2013 OHSUG - Facilitating Pharmacovigilance Globalization with Process Reengi...
 

Recently uploaded

VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
uae taxgpt
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
fisherameliaisabella
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
awaisafdar
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Navpack & Print
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
KaiNexus
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
sarahvanessa51503
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Avirahi City Dholera
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
agatadrynko
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
Ben Wann
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
fakeloginn69
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
marketingjdass
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
agatadrynko
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
NathanBaughman3
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
Sam H
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
Bojamma2
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
DerekIwanaka1
 

Recently uploaded (20)

VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
 

Strategies for Continuous CTMS Improvement

  • 1. Strategies for Continuous CTMS Improvement September 20, 2012 Parambir Singh Vice President of Clinical Trial Management Solutions BioPharm Systems
  • 2. Welcome & Introductions Param Singh Vice President of Clinical Trial Management Solutions BioPharm Systems, Inc. • CTMS practice director since 2007 – Expertise in managing all phases and styles of clinical trials – Leads the team that implements, supports, and enhances Oracle’s LabPas and Siebel Clinical solutions • Extensive Siebel Clinical implementation experience – 11+ years of experience implementing Siebel Clinical – 15+ implementations – Spearheaded the creation of the Siebel Clinical “accelerator” ASCEND
  • 3. Welcome & Introductions CTMS Practice Services Implementations Manage implementations of Siebel Clinical, Siebel Clinical ASCEND, and Oracle Health Sciences LabPas. Integrations Build interfaces between Siebel Clinical or LabPas and other clinical and non-clinical systems. Training Develop and/or deliver standard and custom training classes and materials. Process Guidance Provide insight, advice, and solutions to specific clinical trial management issues.
  • 4. Agenda • Importance of a Continuous Improvement Plan – Establish Change Control Board – Define Enhancement Processes • Sources of Input – Meetings & Frequency • How to Manage Enhancements • How to Prioritize Enhancements • When to Make Enhancements • Best Practices for Continuous Improvement Plans • Q&A
  • 5. Common Scenario • Just completed the initial system implementation • End users are trained, but not yet in the system • Not all desired requirements included in the initial release • May potentially roll out the system to other business units • The annual project budget meeting is coming up WHAT TO DO NEXT?
  • 6. Importance of a Continuous Improvement Plan • Bridges the gap for post production support • Less anxious end users • Helps focus on business critical requirements • Encourages end user communication and feedback • Allows system to be flexible if business process changes • Establishes an objective way to evaluate potential enhancements • Increases system acceptance and usability
  • 7. Establish Change Control Board Change Control Board Clinical Administrator Business Representative IT Project Manager
  • 8. Define Enhancement Processes When to roll out the enhancements How to manage and prioritize enhancements How often to meet and review enhancements How to collect enhancements Define the following in your plan:
  • 9. Sources of Input Enhancement Request Log Deferred Requirements User Feedback Help Desk Log Training Feedback Infrastructure Roadmap User Community Conference
  • 10. Meetings & Frequency • Meet with end users • Review Help Desk Log • Change Control Board Meeting
  • 11. How to Manage Enhancements • Use a spreadsheet to track requests • Categorize each request as an enhancement or defect • Assess each request from different perspectives – Business operation criticality – Design/development complexity – Validation effort – Impacted modules and upgrade risks
  • 12. Assess by Business Operation Criticality • Identify business requestor • Capture clear business request details • Provide justification for enhancement • Determine impact on daily operations • Identify potential alternatives/workarounds • Capture request date • Capture requestor’s initial priority ranking on the enhancement
  • 13. Assess by Design/Development Complexity • Level of effort required • Custom coding needs • Leverage in-house resources • Fit with current system architecture • Identify alternative approaches
  • 14. Assess by Validation Effort • Level of validation required • Validation scenario complexity • Regression testing needs
  • 15. Assess by Impacted Modules and Upgrade Risks • Impact on existing functionality • Number of modules impacted • Impact on existing integration • Impact on future upgrades
  • 16. How to Prioritize Enhancements • Provide business justification • All business units should evaluate • Rank requirements by level of importance – High / Medium / Low – Numerical • For example, in a 10 item enhancement list, ask users to rank them from 1 to 10, and with no two items sharing the same ranking (all unique)
  • 17. When to Make Enhancements • Initial Enhancements – At least 3 months after the initial release – Provide end users an opportunity to get familiar with the system – Provides time to gather and refine list of enhancements • Subsequent Releases – Depend on budget available – May have minor releases every 3 or 6 months – Can roll the enhancements in with a major release such as integration
  • 18. Demo: Defining scope of a point release
  • 19. Summary: Continuous Improvement Process Collect enhancement list Review, assess, and prioritize enhancement list Determine scope of project Create change control charter Kickoff project
  • 20. Best Practices for Continuous Improvement Plans • Start thinking of the plan prior to the initial go-live • Schedule recurring meetings to establish the continuous improvement process • After initial release, ensure users have a chance to use the system and understand its functionality before planning any additional releases • Note: The continuous improvement process can also result in non-system changes, such as training material updates, business process re-engineering, etc.
  • 21. Thank you for attending! Questions?
  • 22. Contact Us • North America Sales Contact: – Rod Roderick – rroderick@biopharm.com – +1 877 654 0033 • Europe/Middle East/Africa Sales Contact: – Rudolf Coetzee – rcoetzee@biopharm.com – +44 (0) 1865 910200 • General Inquiries: – info@biopharm.com