CHANGES -
PROCESS MODEL
• Designers, engineers and other professionals have to
make assumptions based on existing available
information and their experience.
CHANGES -
PROCESS MODEL
• Lack of knowledge is considered to be a main source
of changes in construction.
CHANGES -
PROCESS MODEL
• There should be a Change identification and
evaluation model to provide an early warning to the
management team.
CHANGES -
PROCESS MODEL
• The design of a process model
should consider all the influential
factors such as :
CHANGES -
PROCESS MODEL
• What causes the change?
CHANGES -
PROCESS MODEL
•The likelihood of change
occurrence.
CHANGES -
PROCESS MODEL
•The change consequences.
CHANGES -
PROCESS MODEL
• Changes in themselves do not decrease
productivity or efficiency, it is the manpower
involved in the process.
CHANGES -
PROCESS MODEL
• If a change occurs in the final stage of a
construction project the crew must stop
working until the changes are carried out first.
CHANGES -
PROCESS MODEL
• On average, there is a 30% loss of efficiency
when changes are being performed, although
it is possible to carry out many changes
without a loss of efficiency.
CHANGES -
PROCESS MODEL
• The variables affecting efficiency are believed
to be the time of the change.
CHANGES -
PROCESS MODEL
• A major change may cause consecutive
delays in project schedule Re-estimation of
work statement Additional demands of
equipment Materials Labour Changes.
CHANGES -
PROCESS MODEL
• If not resolved through a formalized change
management process, can become the major
source of contract disputes, which is a severe
risk contributing to project failure.
It can be caused by either internal or external
Factors (ARETHEY AVOIDABLE?).
In construction projects, a change refers to an
alteration or a modification to pre-existing
conditions, assumptions or requirements.
A process model can help management team to manage changes
better.
External causes may be due to technological change
(AVOIDABLE?).
Different changes may have different effects or consequences.
The objective of change management is to forecast
possible changes.
Most researchers distinguish
three kinds of changes:
Rework
change order
and Construction
Change Directive
Initiate change management
Select change management
The main requirements are:
Sufficient resources for change management function
Approaches towards
change management
Align project elements to
change management process
The main functions that these
requirements should provide,
are:
Project baseline
detailed cost plan
detailed time plan
The project
programme
should be developed
to manipulate change
(cost, time, quality, safety, Customer
satisfaction, constructability, sustainable
construction,..)
Knowledge base
This must includes criteria for deciding on
change and evaluation in terms of : KPI’s
Integrated system for
design management
An Architect's change may
change the mechanical work
layout or electrical works.
3-D
modelling
• It will assists the
impact of proposed
construction changes
in a more logical
mannor.
Procurement
routes
• A good selection of procurement
should consider change.
• The likelihood of changes
becomes a criterion for selecting
the procurement route.
• A civil engineering project V
building project.
VE andVM
•Value management
(VM) andValue
Engineering (VE)
systems.
IT
communication
•Advance
communication
system
Dispute resolution
mechanism
•A fully developed
dispute
resolution
method.
 RMS must indicate:
 Various risks that may occur at different times
within the project life cycle.
 The possibility of change occurrence that can be
reasonably foreseen should be estimated
(including its timing).
 Risk analysis at an early stage will enable
appropriate procedures to be established and
appropriate contingencies to be prepared.
 Scenario planning will help represent these
changes.
Monitor deviations
from project
programme
Analyse and consider
implications of
identified deviations
Develop mitigation
strategy for change
event
Update change
management
repository
The need to
rework
The volume
of rework due
to change in
terms of
costing and
duration
Size of disruption
to the workflow
Pre-
change
plan
Main
functions
Methods
to identify
change
Carry
out
change
Financial models
that incorporate
financial
parameters to
control the
operation at any
one time
Linear models
where decision
criteria are
subjectively
weighted and rated
by a decision-maker
and combined into
a single measure
Linear
models
• incorporating multiple ratings
that add the corresponding
probabilities for the multiple
ratings of a given criterion and
measures the imprecision and
uncertainty associated with
the process
Multi-attribute
utility models
• Combines qualitative
and quantitative
decision criteria that are
aggregated to arrive at
an expected utility
Social
Factors
Technological
Factors
Managerial
Factors
Modification in
physical
properties
Changes in
control
systems
Changes in
processes
Project and
organisational
performance criteria
Analyse work
inactivity and
ineffective work
Resources
Scope
Goals
Removeany Ambiguity
Leadership
Co-ordination
communication
Team work
Resources
Scope
Goals
Remove any Ambiguity
Leadership
Co-ordination
communication
Team work

More Related Content

What's hot

Doc3
Doc3Doc3
041 Integrating Lean Construction (PART 2)
041 Integrating Lean Construction (PART 2)041 Integrating Lean Construction (PART 2)
041 Integrating Lean Construction (PART 2)
Dr Fereidoun Dejahang
 
Presentation
PresentationPresentation
Presentation
AHM Pervej Kabir
 
5 MRP-II.pptx
5 MRP-II.pptx5 MRP-II.pptx
5 MRP-II.pptx
nirajchaudhari27
 
Change management
Change managementChange management
Change management
mehak1990
 
Project management techniques
Project management techniquesProject management techniques
Project management techniques
kartik16star
 
Maintenance module1 ppt number 3
Maintenance module1 ppt number 3Maintenance module1 ppt number 3
Maintenance module1 ppt number 3
Dhanesh S
 
Cost management plan
Cost management planCost management plan
Cost management plan
Jody R Flower
 
Mb0044 production and operation management
Mb0044   production and operation managementMb0044   production and operation management
Mb0044 production and operation management
smumbahelp
 
Ebbpa3 b ch 9
Ebbpa3 b   ch 9Ebbpa3 b   ch 9
Ebbpa3 b ch 9
ngobeni energy
 
Cost
CostCost
Systems Life Cycle
Systems Life CycleSystems Life Cycle
Systems Life Cycle
Nirmal PR
 
Chapt10
Chapt10Chapt10
Chapt12
Chapt12Chapt12
Project management : Project Monitoring and Control by iFour Technolab Pvt. Ltd.
Project management : Project Monitoring and Control by iFour Technolab Pvt. Ltd.Project management : Project Monitoring and Control by iFour Technolab Pvt. Ltd.
Project management : Project Monitoring and Control by iFour Technolab Pvt. Ltd.
iFour Institute - Sustainable Learning
 
Failure Modes & Effects Analysis (FMEA)
Failure Modes & Effects Analysis (FMEA)Failure Modes & Effects Analysis (FMEA)
Failure Modes & Effects Analysis (FMEA)
Anand Subramaniam
 
Tqm unit 4
Tqm unit 4Tqm unit 4

What's hot (17)

Doc3
Doc3Doc3
Doc3
 
041 Integrating Lean Construction (PART 2)
041 Integrating Lean Construction (PART 2)041 Integrating Lean Construction (PART 2)
041 Integrating Lean Construction (PART 2)
 
Presentation
PresentationPresentation
Presentation
 
5 MRP-II.pptx
5 MRP-II.pptx5 MRP-II.pptx
5 MRP-II.pptx
 
Change management
Change managementChange management
Change management
 
Project management techniques
Project management techniquesProject management techniques
Project management techniques
 
Maintenance module1 ppt number 3
Maintenance module1 ppt number 3Maintenance module1 ppt number 3
Maintenance module1 ppt number 3
 
Cost management plan
Cost management planCost management plan
Cost management plan
 
Mb0044 production and operation management
Mb0044   production and operation managementMb0044   production and operation management
Mb0044 production and operation management
 
Ebbpa3 b ch 9
Ebbpa3 b   ch 9Ebbpa3 b   ch 9
Ebbpa3 b ch 9
 
Cost
CostCost
Cost
 
Systems Life Cycle
Systems Life CycleSystems Life Cycle
Systems Life Cycle
 
Chapt10
Chapt10Chapt10
Chapt10
 
Chapt12
Chapt12Chapt12
Chapt12
 
Project management : Project Monitoring and Control by iFour Technolab Pvt. Ltd.
Project management : Project Monitoring and Control by iFour Technolab Pvt. Ltd.Project management : Project Monitoring and Control by iFour Technolab Pvt. Ltd.
Project management : Project Monitoring and Control by iFour Technolab Pvt. Ltd.
 
Failure Modes & Effects Analysis (FMEA)
Failure Modes & Effects Analysis (FMEA)Failure Modes & Effects Analysis (FMEA)
Failure Modes & Effects Analysis (FMEA)
 
Tqm unit 4
Tqm unit 4Tqm unit 4
Tqm unit 4
 

Similar to 015 changes-process model

Project control and process instrumentation
Project control and process instrumentationProject control and process instrumentation
Project control and process instrumentation
Kuppusamy P
 
4 integration
4 integration4 integration
4 integration
Waseem Siddique
 
Process models
Process modelsProcess models
Process models
Preeti Mishra
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
DrFereydounDejahang
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
DrFereydounDejahang
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
Dr Fereidoun Dejahang
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
Dr Fereidoun Dejahang
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
drdej19
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
Dr Fereidoun Dejahang
 
Product innovation & process innovation
Product innovation & process innovationProduct innovation & process innovation
Product innovation & process innovation
VijayKrKhurana
 
04. Project Management
04. Project Management04. Project Management
04. Project Management
BhuWan Khadka
 
CPI_MOM_KBR_20110909_v1
CPI_MOM_KBR_20110909_v1CPI_MOM_KBR_20110909_v1
CPI_MOM_KBR_20110909_v1
Shailendra Singh
 
CAD _ UNIT 1.pptx
CAD _ UNIT 1.pptxCAD _ UNIT 1.pptx
CAD _ UNIT 1.pptx
jayabal subbaian
 
Mitigation And Performance Recovery Using Earned Value
Mitigation And Performance Recovery Using Earned ValueMitigation And Performance Recovery Using Earned Value
Mitigation And Performance Recovery Using Earned Value
Chris Carson
 
Schedule Recovery Using Earned Value
Schedule Recovery Using Earned ValueSchedule Recovery Using Earned Value
Schedule Recovery Using Earned Value
Chris Carson
 
Lect6 life cycle phases
Lect6 life cycle phasesLect6 life cycle phases
Lect6 life cycle phases
meena466141
 
Project integration management
Project integration managementProject integration management
Project integration management
Saad Al Jabri
 
Project plan overview
Project plan overviewProject plan overview
Project plan overview
Lou Bahrmasel, PMP, MBA
 
APM Practitioner Qualification revision cards
APM Practitioner Qualification revision cardsAPM Practitioner Qualification revision cards
APM Practitioner Qualification revision cards
Jacobs Engineering
 
test
testtest

Similar to 015 changes-process model (20)

Project control and process instrumentation
Project control and process instrumentationProject control and process instrumentation
Project control and process instrumentation
 
4 integration
4 integration4 integration
4 integration
 
Process models
Process modelsProcess models
Process models
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
 
Product innovation & process innovation
Product innovation & process innovationProduct innovation & process innovation
Product innovation & process innovation
 
04. Project Management
04. Project Management04. Project Management
04. Project Management
 
CPI_MOM_KBR_20110909_v1
CPI_MOM_KBR_20110909_v1CPI_MOM_KBR_20110909_v1
CPI_MOM_KBR_20110909_v1
 
CAD _ UNIT 1.pptx
CAD _ UNIT 1.pptxCAD _ UNIT 1.pptx
CAD _ UNIT 1.pptx
 
Mitigation And Performance Recovery Using Earned Value
Mitigation And Performance Recovery Using Earned ValueMitigation And Performance Recovery Using Earned Value
Mitigation And Performance Recovery Using Earned Value
 
Schedule Recovery Using Earned Value
Schedule Recovery Using Earned ValueSchedule Recovery Using Earned Value
Schedule Recovery Using Earned Value
 
Lect6 life cycle phases
Lect6 life cycle phasesLect6 life cycle phases
Lect6 life cycle phases
 
Project integration management
Project integration managementProject integration management
Project integration management
 
Project plan overview
Project plan overviewProject plan overview
Project plan overview
 
APM Practitioner Qualification revision cards
APM Practitioner Qualification revision cardsAPM Practitioner Qualification revision cards
APM Practitioner Qualification revision cards
 
test
testtest
test
 

More from DrFereydounDejahang

022 b construction productivity-write
022 b construction productivity-write022 b construction productivity-write
022 b construction productivity-write
DrFereydounDejahang
 
022 construction productivity (2)
022 construction productivity (2)022 construction productivity (2)
022 construction productivity (2)
DrFereydounDejahang
 
021 construction productivity (1)
021 construction productivity (1)021 construction productivity (1)
021 construction productivity (1)
DrFereydounDejahang
 
019 competencies-managers
019 competencies-managers019 competencies-managers
019 competencies-managers
DrFereydounDejahang
 
018 company productivity
018 company productivity018 company productivity
018 company productivity
DrFereydounDejahang
 
017 communication
017 communication017 communication
017 communication
DrFereydounDejahang
 
016 communication in construction sector
016 communication in construction sector016 communication in construction sector
016 communication in construction sector
DrFereydounDejahang
 
013 changes in construction projects
013 changes in construction projects013 changes in construction projects
013 changes in construction projects
DrFereydounDejahang
 
012 business planning process
012 business planning process012 business planning process
012 business planning process
DrFereydounDejahang
 
018 company productivity
018 company productivity018 company productivity
018 company productivity
DrFereydounDejahang
 
017 communication
017 communication017 communication
017 communication
DrFereydounDejahang
 
016 communication in construction sector
016 communication in construction sector016 communication in construction sector
016 communication in construction sector
DrFereydounDejahang
 
013 changes in construction projects
013 changes in construction projects013 changes in construction projects
013 changes in construction projects
DrFereydounDejahang
 
012 business planning process
012 business planning process012 business planning process
012 business planning process
DrFereydounDejahang
 
011 business performance management
011 business performance management011 business performance management
011 business performance management
DrFereydounDejahang
 
010 bmw tpm management training
010 bmw tpm management training010 bmw tpm management training
010 bmw tpm management training
DrFereydounDejahang
 
009 benefits realization
009 benefits realization009 benefits realization
009 benefits realization
DrFereydounDejahang
 
008 benefits management
008 benefits management 008 benefits management
008 benefits management
DrFereydounDejahang
 
007 benefits management-use of it
007 benefits management-use of it007 benefits management-use of it
007 benefits management-use of it
DrFereydounDejahang
 
006 benefits & knowledge management-short
006 benefits & knowledge  management-short006 benefits & knowledge  management-short
006 benefits & knowledge management-short
DrFereydounDejahang
 

More from DrFereydounDejahang (20)

022 b construction productivity-write
022 b construction productivity-write022 b construction productivity-write
022 b construction productivity-write
 
022 construction productivity (2)
022 construction productivity (2)022 construction productivity (2)
022 construction productivity (2)
 
021 construction productivity (1)
021 construction productivity (1)021 construction productivity (1)
021 construction productivity (1)
 
019 competencies-managers
019 competencies-managers019 competencies-managers
019 competencies-managers
 
018 company productivity
018 company productivity018 company productivity
018 company productivity
 
017 communication
017 communication017 communication
017 communication
 
016 communication in construction sector
016 communication in construction sector016 communication in construction sector
016 communication in construction sector
 
013 changes in construction projects
013 changes in construction projects013 changes in construction projects
013 changes in construction projects
 
012 business planning process
012 business planning process012 business planning process
012 business planning process
 
018 company productivity
018 company productivity018 company productivity
018 company productivity
 
017 communication
017 communication017 communication
017 communication
 
016 communication in construction sector
016 communication in construction sector016 communication in construction sector
016 communication in construction sector
 
013 changes in construction projects
013 changes in construction projects013 changes in construction projects
013 changes in construction projects
 
012 business planning process
012 business planning process012 business planning process
012 business planning process
 
011 business performance management
011 business performance management011 business performance management
011 business performance management
 
010 bmw tpm management training
010 bmw tpm management training010 bmw tpm management training
010 bmw tpm management training
 
009 benefits realization
009 benefits realization009 benefits realization
009 benefits realization
 
008 benefits management
008 benefits management 008 benefits management
008 benefits management
 
007 benefits management-use of it
007 benefits management-use of it007 benefits management-use of it
007 benefits management-use of it
 
006 benefits & knowledge management-short
006 benefits & knowledge  management-short006 benefits & knowledge  management-short
006 benefits & knowledge management-short
 

Recently uploaded

Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
21UME003TUSHARDEB
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Sinan KOZAK
 
Introduction to AI Safety (public presentation).pptx
Introduction to AI Safety (public presentation).pptxIntroduction to AI Safety (public presentation).pptx
Introduction to AI Safety (public presentation).pptx
MiscAnnoy1
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
Anant Corporation
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
RamonNovais6
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
UReason
 
john krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptxjohn krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptx
Madan Karki
 
Hematology Analyzer Machine - Complete Blood Count
Hematology Analyzer Machine - Complete Blood CountHematology Analyzer Machine - Complete Blood Count
Hematology Analyzer Machine - Complete Blood Count
shahdabdulbaset
 
artificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptxartificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptx
GauravCar
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
Gino153088
 
Certificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi AhmedCertificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi Ahmed
Mahmoud Morsy
 
Seminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptxSeminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptx
Madan Karki
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
171ticu
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
Prakhyath Rai
 
cnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classicationcnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classication
SakkaravarthiShanmug
 

Recently uploaded (20)

Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
 
Introduction to AI Safety (public presentation).pptx
Introduction to AI Safety (public presentation).pptxIntroduction to AI Safety (public presentation).pptx
Introduction to AI Safety (public presentation).pptx
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
 
john krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptxjohn krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptx
 
Hematology Analyzer Machine - Complete Blood Count
Hematology Analyzer Machine - Complete Blood CountHematology Analyzer Machine - Complete Blood Count
Hematology Analyzer Machine - Complete Blood Count
 
artificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptxartificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptx
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
 
Certificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi AhmedCertificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi Ahmed
 
Seminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptxSeminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptx
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
 
cnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classicationcnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classication
 

015 changes-process model