A Fairfax County, VA, publication
Department of Public Works and Environmental Services
Working for You!
Stone Mill Court Reach 2 Outfall Restoration
Sully District
Difficult Run Watershed
SD-000031-195
05/30/2018
Stone Mill Court Reach 2 Outfall Restoration
Stormwater/Maintenance and Stormwater Management Division
Completed Project
2
05/15/18 05/15/18
Stormwater/Maintenance and Stormwater Management Division
Project Details
Description:
The Stone Mill Court Reach 2 Outfall Restoration Project was substantially completed on April 24, 2018.
The project consisted of the restoration of 262 linear feet of eroded channel. The goals of the project
were to address public safety concerns, stabilize a deeply eroded channel by using natural stream design
techniques, and provide enhanced water quality.
Project Overview:
• Restore the outfall channel with imbricated stone step pools and reinforced bed mix riffle sections
• Stabilize channel banks using coir matting and native vegetation
• Revegetate disturbed areas with native plants, trees, and shrubs to promote reforestation
• Provide a reduction of 32.0 lbs of Total Nitrogen per year, 14.7 lbs of Total Phosphorous per year, and
5,084 lbs of Total Suspended Solids per year
Project Team:
Project Manager: Jack Meritt, PE, Maintenance and Stormwater Management Division, Stormwater
Project Engineer: Stephen Dombroski, Maintenance and Stormwater Management Division, Stormwater
Project Design: Wetland Studies and Solutions, Inc.
Construction Contractor: Utilities Unlimited, LLC
Revegetation Contractor: GroundFX
3
Stone Mill Court Reach 2 Outfall Restoration
Stormwater/Maintenance and Stormwater Management Division
Stone Mill Court Reach 2 Outfall Restoration
Project Location: Tax Map 046-2, Sully District
4
Project Area
Stone Mill Court Reach 2 Outfall Restoration
Stormwater/Maintenance and Stormwater Management Division
Pre-Construction Condition
5
04/26/17 04/26/17
Stone Mill Court Reach 2 Outfall Restoration
Stormwater/Maintenance and Stormwater Management Division
Construction Photos
6
03/13/18
03/15/18
02/23/18
Stone Mill Court Reach 2 Outfall Restoration
Stormwater/Maintenance and Stormwater Management Division
Construction Photos
7
03/27/1803/19/18
04/04/18 04/19/18
Stone Mill Court Reach 2 Outfall Restoration
Stormwater/Maintenance and Stormwater Management Division
Before and After
8
04/26/17 05/09/18
Additional Information
For additional information, please contact
www.fairfaxcounty.gov/publicworks
Stone Mill Court Reach 2 Outfall Restoration
Stormwater/Maintenance and Stormwater Management Division 9
Irene Haske
703-324-5821
Irene.Haske@fairfaxcounty.gov

Stone Mill Court Project Completion

  • 1.
    A Fairfax County,VA, publication Department of Public Works and Environmental Services Working for You! Stone Mill Court Reach 2 Outfall Restoration Sully District Difficult Run Watershed SD-000031-195 05/30/2018
  • 2.
    Stone Mill CourtReach 2 Outfall Restoration Stormwater/Maintenance and Stormwater Management Division Completed Project 2 05/15/18 05/15/18
  • 3.
    Stormwater/Maintenance and StormwaterManagement Division Project Details Description: The Stone Mill Court Reach 2 Outfall Restoration Project was substantially completed on April 24, 2018. The project consisted of the restoration of 262 linear feet of eroded channel. The goals of the project were to address public safety concerns, stabilize a deeply eroded channel by using natural stream design techniques, and provide enhanced water quality. Project Overview: • Restore the outfall channel with imbricated stone step pools and reinforced bed mix riffle sections • Stabilize channel banks using coir matting and native vegetation • Revegetate disturbed areas with native plants, trees, and shrubs to promote reforestation • Provide a reduction of 32.0 lbs of Total Nitrogen per year, 14.7 lbs of Total Phosphorous per year, and 5,084 lbs of Total Suspended Solids per year Project Team: Project Manager: Jack Meritt, PE, Maintenance and Stormwater Management Division, Stormwater Project Engineer: Stephen Dombroski, Maintenance and Stormwater Management Division, Stormwater Project Design: Wetland Studies and Solutions, Inc. Construction Contractor: Utilities Unlimited, LLC Revegetation Contractor: GroundFX 3 Stone Mill Court Reach 2 Outfall Restoration
  • 4.
    Stormwater/Maintenance and StormwaterManagement Division Stone Mill Court Reach 2 Outfall Restoration Project Location: Tax Map 046-2, Sully District 4 Project Area
  • 5.
    Stone Mill CourtReach 2 Outfall Restoration Stormwater/Maintenance and Stormwater Management Division Pre-Construction Condition 5 04/26/17 04/26/17
  • 6.
    Stone Mill CourtReach 2 Outfall Restoration Stormwater/Maintenance and Stormwater Management Division Construction Photos 6 03/13/18 03/15/18 02/23/18
  • 7.
    Stone Mill CourtReach 2 Outfall Restoration Stormwater/Maintenance and Stormwater Management Division Construction Photos 7 03/27/1803/19/18 04/04/18 04/19/18
  • 8.
    Stone Mill CourtReach 2 Outfall Restoration Stormwater/Maintenance and Stormwater Management Division Before and After 8 04/26/17 05/09/18
  • 9.
    Additional Information For additionalinformation, please contact www.fairfaxcounty.gov/publicworks Stone Mill Court Reach 2 Outfall Restoration Stormwater/Maintenance and Stormwater Management Division 9 Irene Haske 703-324-5821 Irene.Haske@fairfaxcounty.gov