Fairfax County Leigh Meadow Kickoff Presentation January 2016Fairfax County
The Leigh Meadow basin retrofit and stream restoration project will improve watershed conditions, mitigate flooding where possible, reduce erosion and protect infrastructure.
Turkeycock Creek at Brookside Office Park Stream StabilizationFairfax County
Stabilize the stream, specifically targeting the left bank adjacent to the Brookside Office Park parking lot, to mitigate further erosion and ensure bank stability.
Peyton Run at Longwood Knolls Community Meeting Oct 1, 2018Fairfax County
This project will restore up to 2,500 feet of stream on Longwood Knolls HOA and Cherry Run section 3 subdivision properties. Sediment and nutrient inputs will be reduced and habitat will be improved.
Restore ~1,400 feet by returning the form and function of the channel to dynamic equilibrium and improve the ecological processes of the riparian corridor.
Stabilize the eroding stream banks
Water quality improvement
Sustainability
Infrastructure protection
Habitat improvement
Fairfax County Leigh Meadow Kickoff Presentation January 2016Fairfax County
The Leigh Meadow basin retrofit and stream restoration project will improve watershed conditions, mitigate flooding where possible, reduce erosion and protect infrastructure.
Turkeycock Creek at Brookside Office Park Stream StabilizationFairfax County
Stabilize the stream, specifically targeting the left bank adjacent to the Brookside Office Park parking lot, to mitigate further erosion and ensure bank stability.
Peyton Run at Longwood Knolls Community Meeting Oct 1, 2018Fairfax County
This project will restore up to 2,500 feet of stream on Longwood Knolls HOA and Cherry Run section 3 subdivision properties. Sediment and nutrient inputs will be reduced and habitat will be improved.
Restore ~1,400 feet by returning the form and function of the channel to dynamic equilibrium and improve the ecological processes of the riparian corridor.
Stabilize the eroding stream banks
Water quality improvement
Sustainability
Infrastructure protection
Habitat improvement
Rocky Run Tributary at Dulles Access Road Stream Restoration ProjectFairfax County
Restore up to 1,200 feet of stream within the wooded dry pond footprint.
Stabilize streambed and banks
Reduce sediment and nutrient inputs into stream
Improve habitat
Reduce long-term maintenance of pond
Consider water quality enhancements and a litter collection system in the open pond area
Maintain close coordination with stakeholders
Flag Run at Elgar Street Stream Restoration Project - May 24, 2017Fairfax County
The project will restore about 2,900 linear feet of the channel to stabilize the banks and prevent future erosion. A healthy ecosystem will be created by installing native trees and herbaceous plants.
Rocky Run Tributary at Hickory Hollow Lane Stream Restoration Feb. 2021Fairfax County
The Rocky Run Tributary at Hickory Hollow Lane project goals are to stabilize the stream, reduce excess sediment from flowing downstream; improve aesthetics, reduce hazards, reconnect the stream to the floodplain, improve the riparian buffer and reduce road flooding, among other goals.
Pike Branch at Ridgeview Park Stream Restoration Oct 2018Fairfax County
This project will restore 2,800 feet of stream in Ridgeview Park and surrounding properties. The streambed and banks will be stabilized to reduce sediment and nutrient inputs into stream system. Improved habitat will provide better ecology.
Cameron Run Tributary at La Vista Drive Stream Restoration June 2020Fairfax County
This Fairfax County project seeks to stabilize excessive, ongoing stream erosion which threatens sanitary sewer pipes, undermines trees, impacts water quality and degrades habitat for aquatic life.
Piney Run at Lake Werowance Stream Restoration ProjectFairfax County
Improve watershed conditions and reduce downstream impacts through….
Stabilize the channel
Reduce erosion
Protect vegetation
Restore native vegetation & riparian buffer
Connect and enhance wetlands within former lakebed
Improve water quality
Leigh Meadow & Towlston Basin (0584DP/0103DP)Fairfax County
Leigh Meadow & Towlston Basin project was substantially completed on October 29, 2021. This project consists of 1,660 feet of stream restoration, a 22,300 cubic foot Regenerative Stormwater Conveyance (RSC) facility and a 28,500 cubic foot sand filter. The scope of work also included grading, excavation, pollution and sediment removal, and restoration planting.
Piney Run at Lake Werowance Stream Restoration Project Oct 2019Fairfax County
Restore approximately 3,500 feet of stream on Lake Werowance Inc. and privately owned properties.
Stabilize streambed and banks
Reduce sediment and nutrient inputs into stream system
Improve habitat
Maintain close coordination with stakeholders
Enhance water quality and biological diversity through the enhancements of existing wetland features within the former lakebed
Paul Spring Branch at Sherwood Hall Stream Restoration ProjectFairfax County
The plan is to return the form and function of the channel to dynamic equilibrium and improve the ecological processes of the riparian corridor within the constraints of the developed landscape.
Little Pimmit Run at Woodland Terrace Community Meeting 09 30-2020Fairfax County
A community meeting was held on Sept 30, 2020 to inform residents and gather information from them about the stream restoration project at Little Pimmit Run Tributary at Woodland Terrace.
Rocky Run Tributary at Dulles Access Road Stream Restoration ProjectFairfax County
Restore up to 1,200 feet of stream within the wooded dry pond footprint.
Stabilize streambed and banks
Reduce sediment and nutrient inputs into stream
Improve habitat
Reduce long-term maintenance of pond
Consider water quality enhancements and a litter collection system in the open pond area
Maintain close coordination with stakeholders
Flag Run at Elgar Street Stream Restoration Project - May 24, 2017Fairfax County
The project will restore about 2,900 linear feet of the channel to stabilize the banks and prevent future erosion. A healthy ecosystem will be created by installing native trees and herbaceous plants.
Rocky Run Tributary at Hickory Hollow Lane Stream Restoration Feb. 2021Fairfax County
The Rocky Run Tributary at Hickory Hollow Lane project goals are to stabilize the stream, reduce excess sediment from flowing downstream; improve aesthetics, reduce hazards, reconnect the stream to the floodplain, improve the riparian buffer and reduce road flooding, among other goals.
Pike Branch at Ridgeview Park Stream Restoration Oct 2018Fairfax County
This project will restore 2,800 feet of stream in Ridgeview Park and surrounding properties. The streambed and banks will be stabilized to reduce sediment and nutrient inputs into stream system. Improved habitat will provide better ecology.
Cameron Run Tributary at La Vista Drive Stream Restoration June 2020Fairfax County
This Fairfax County project seeks to stabilize excessive, ongoing stream erosion which threatens sanitary sewer pipes, undermines trees, impacts water quality and degrades habitat for aquatic life.
Piney Run at Lake Werowance Stream Restoration ProjectFairfax County
Improve watershed conditions and reduce downstream impacts through….
Stabilize the channel
Reduce erosion
Protect vegetation
Restore native vegetation & riparian buffer
Connect and enhance wetlands within former lakebed
Improve water quality
Leigh Meadow & Towlston Basin (0584DP/0103DP)Fairfax County
Leigh Meadow & Towlston Basin project was substantially completed on October 29, 2021. This project consists of 1,660 feet of stream restoration, a 22,300 cubic foot Regenerative Stormwater Conveyance (RSC) facility and a 28,500 cubic foot sand filter. The scope of work also included grading, excavation, pollution and sediment removal, and restoration planting.
Piney Run at Lake Werowance Stream Restoration Project Oct 2019Fairfax County
Restore approximately 3,500 feet of stream on Lake Werowance Inc. and privately owned properties.
Stabilize streambed and banks
Reduce sediment and nutrient inputs into stream system
Improve habitat
Maintain close coordination with stakeholders
Enhance water quality and biological diversity through the enhancements of existing wetland features within the former lakebed
Paul Spring Branch at Sherwood Hall Stream Restoration ProjectFairfax County
The plan is to return the form and function of the channel to dynamic equilibrium and improve the ecological processes of the riparian corridor within the constraints of the developed landscape.
Little Pimmit Run at Woodland Terrace Community Meeting 09 30-2020Fairfax County
A community meeting was held on Sept 30, 2020 to inform residents and gather information from them about the stream restoration project at Little Pimmit Run Tributary at Woodland Terrace.
Crook Branch at Mantua Elementary School Stream Restoration Community Meeting...Fairfax County
A section of Crook Branch will be restored to accomplish the following goals:
Stabilize stream
Reduce excess sediment from being transported downstream
Reduce excess nutrients from entering the waterway
Improve aesthetics
Reduce hazards (steep, eroding banks)
Reconnect stream to floodplain
Improve Riparian Buffers
Restore ~4,000 feet by returning the form and function of the channel to dynamic equilibrium and improve the ecological processes of the riparian corridor.
Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020Fairfax County
The virtual community meeting held on Sept 29, 2020 advised residents about the proposed stream restoration in a Pimmit Run tributary at the George Marshall High School in Fairfax County, VA.
Piney Run Public Meeting 1 October 17, 2018Fairfax County
This project will restore 4,300 feet of stream on Lake Werowance Inc. and privately owned properties. Goals are stabilized stream banks and bed, reduced sediment and nutrients, improved habitat, and enhanced water quality.
Difficult Run at Brittenford Drive Information Meeting May 17, 2017Fairfax County
This project will mitigate flooding, reduce erosion, and protect public and private property. Approximately 3,000 feet of the main channel and 1,500 feet of tributaries will be restored.
Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali...Fairfax County
Chesterbrook Road Emergency Project – Summer 2019
Final Scoping Technical Memorandum – January 2020
Professional Services Contract Execution – April 2021
Community Meeting on stream restoration Pre-design/Channel alignments – April 2021
Final Preliminary Engineering Report – October 2021
Community Meeting on Sanitary Realignment Preliminary Engineering Report – October 2021
Value Engineering Study completed – November 2021
One joint study for both projects
Community Meeting with Board of Supervisor – December 2021
Community meeting – January 2022
Design Contract Development – (We are at this step)
Land Acquisition – (We are at this step)
Complete Design
Construction
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...Fairfax County
Restore up to 7,500 feet of stream channel and tributaries
Reduce erosion and sediment transport
Install new sanitary sewers serving over 500 single family homes
Improve watershed conditions and reduce downstream impacts
Improve and protect public infrastructure
Prevent costly emergency repairs
Reduce risk to public health and the environment
Maintain close coordination with stakeholders and community
Build partnerships with local organizations
Little Pimmit Run at Woodland Terrace Community Meeting Sept. 30 2020Fairfax County
1. Restore up to 1,000 feet of stream channel
– Reduce sediment restricting flow in the drainage system
2. Improve drainage at the North Albemarle St. and Chesterbrook Rd. intersection
– Maximize efficiency of drainage system
3. Maintain close coordination with stakeholders
Similar to Leigh Meadow and Towlston Basin Kickoff Presentation Jan 2018 (20)
Merrifield Nursery Emergency Gravity Sewer ReplacementFairfax County
During a routine Closed-Circuit Television (CCTV) Camera inspection by Wastewater Collection Division (WCD), it was found that 45 linear feet of 8-inch asbestos reinforced concrete pipe (RCP) between MH-292 to MH-291 was within imminent danger of failing. The bottom of the RCP was missing within the 45 linear feet of repair and the pipe was on the verge of surcharging. After an immediate pre-construction meeting with Merrifield Nursery, it was agreed to work from 6pm-10am everyday of the week to avoid disruption and potentially placing patrons at risk during the biggest time of the year for Merrifield Garden Center. The contractor mobilized to the site and began the 20-foot excavation to replace 45 linear feet of broken gravity sewer. The project started on March 14th, 2022 and was substantially complete on March 23, 2022.
The Sully Basins Stormwater Pond Retrofits project was substantially completed on April 19, 2022. The project is located within the Cub Run watershed. The project consisted of repair and enhancement of multiple stormwater basins, 0326DP, 0964DP and 1484DP. The project also included construction of new stone cascades, stone weir basin structures and the construction of wetlands with high and low marsh areas. The project will facilitate improved sediment removal and improve downstream water quality using forebays and micro pools. Aquatic and natural habitat were also added within the three basins.
Clarks Crossing Road Improvements 05-13-22Fairfax County
The Clarks Crossing Road Pedestrian Access Improvement project improved the pedestrian and bicycle access along Clarks Crossing Road and was substantially completed on March 23, 2022.
This project completed the missing link between the existing sidewalk at Brookside Lane and the previously constructed sidewalk along Clarks Crossing Road. The scope of this project included construction of asphalt sidewalk, curb ramps, curb and gutter, drainage improvements along Brookside Lane and asphalt mill/overlay on Clarks Crossing and Brookside Lane.
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxFairfax County
Future wastewater flows in northern Fairfax County exceed existing system capacity
Treatment capacity is available in Noman M. Cole Jr. Pollution Control Plant in Lorton, VA
New pipes and pumps are needed to move future flows to treatment plant
NEXT STEPS
Field investigations / surveys
Finalize alignments and pump station layout
Use of open cut excavation
Use of trenchless methods
Easement acquisition needed
Develop traffic control plans
Description:
The project consists of a new, 23,000 square feet, two-story, four-bay fire station facility and associated improvements to the 3.3-acre site including storm water detention, landscaping and parking. The scope also included the demolition of the existing fire station, and a temporary fire station to house the Fire and Rescue Department during construction of the new facility. The key elements of the overall project include:
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationFairfax County
Scotts Run @ Old Meadow Road Stream Restoration was substantially completed on March 30, 2022. The Scotts Run project consisted of restoring, enhancement, and stabilizing of approximately 2,930 linear feet of eroding stream using Natural Channel Design criteria. This project included two phases: Phase I was funded by proffers from a private development and Phase II was County funded. Also included was the removal of invasive non-native plants and the installation of new plantings to stabilize the stream and floodplain.
Riverwood Community Meeting - 04-14-2022- Presentation.pptxFairfax County
The new 4-inch ductile iron force main will serve the surrounding community for the foreseeable future. Replacement of the force main will:
Reduce the level and frequency of maintenance required to keep the force main operating.
Prevent costly emergency repairs.
Provide residents with safe, reliable utility infrastructure.
Enhance the quality of life for residents.
Reduce risks to public health and the environment.
Burke Centre VRE Connector Phase IV project was substantially completed on March 7, 2022. This project enhanced the access to mass transit by creating a more direct connection from the VRE Station to the residential areas west of Premier Court. This project also connects the Oak Bluff community to the Virginia Rail Express (VRE) Burke Station and provides a multi-use shared pedestrian and bicycle trail for outdoor recreation.
Long Branch Public Meeting - FINAL - 04-11-2022Fairfax County
Overarching Project Goals:
-Achieve Long Branch Central TMDL waste load reduction requirements.
-Provide long-term stability and have low maintenance.
-Improve water quality within the Long Branch Central Watershed.
-Improve habitat and environmental health (ecological lift).
Objectives: Share our project understanding with the council and seek input on the unique opportunities and housing goals for this site that could help guide
our master planning process.
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptxFairfax County
4,800 linear feet of stream will be restored using Natural Channel Design methodologies
Pollutant reduction
1,439 lbs/total phosphorus
3,400 lbs/total nitrogen
462.1 tons of total suspended sediment
Protection of private property and public infrastructure
Increased ecological diversity with native vegetation
DEQ has awarded a SLAF grant to this project for these environmental benefits
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT Fairfax County
The Lake Barton Dredging, Restoration, and Riser Modification project was substantially completed on December 29, 2021. The project is located within the Pohick Creek watershed. The project consisted of dredging and removal of approximately 19,100 cubic yards of sediment to restore the sediment trapping capacity and improve water quality. The project also included construction of new sediment forebays, in-lake haul roads, and riser modifications (new mid-level sluice gate and cold-water intake) to facilitate future maintenance, stabilize the shoreline, and improve downstream water quality. Fish habitat was also added within the lake.
Reston Arts Community Center Feasibility - Wrap UpFairfax County
This is the last of 5 engagement meetings. We are excited to report back what we heard from you – your preferences, priorities, questions, hopes, concerns. The information we received will be used to inform the space allocations and cost estimating for discussion of the proffer by Fairfax County.
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Fairfax County
Benefits of Consolidated Facility
Building and Site Efficiencies
Operational Efficiencies
Addresses Space Deficiencies
Addresses Renovations and Capital Renewal Requirements
for WCD
Provides for a Centrally Located Site that Accommodates Program
Consolidates Integrated Services on One Centrally Located Site
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Fairfax County
This is the 4th of 5 engagement meetings. We are excited to hear from you – your preferences, priorities, questions, hopes, concerns. The information we receive today will be used to inform the space allocations and cost estimating for discussion of the proffer by Fairfax County.
Oak Marr Pump Station Rehabilitation – Construction ProjectFairfax County
Neighborhood was built in the 1980s, and the sewer infrastructure has been in operation since.
Aged pump station equipment – pumps, valves, fans, concrete, etc.
This aging equipment has the potential of causing:
Sanitary Sewer Overflows (SSO)
Sewer back-ups into homes
Environmental damages
Maintenance problems
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Fairfax County
Identify and evaluate house flooding and public safety concerns
Improve drainage conditions to convey 100-year storm if feasible
Reduce and treat stormwater runoff at the source
Improve water quality and stream protection
Use resilient & functional designs
Make improvements compatible with characteristics of neighborhood
Partner with community to develop sound, cost effective solutions that can be collaboratively implemented and maintained
Build on lessons learned to help improve site development process for infill development
Reston Arts Center Feasibility - Focus Group Visual ArtsFairfax County
These community outreach meetings are being conducted to understand community needs for a proposed arts venue in the Reston Town Center.
The proposed arts center would be a result of a proffer from Boston Properties in the next phase of Reston Town Center development (Block J).
The proffer would provide for an approximately 60,000 gross square foot facility to house a stage suitable for large-scale music and dance performances, as well as other arts-related amenities.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
6th International Conference on Machine Learning & Applications (CMLA 2024)ClaraZara1
6th International Conference on Machine Learning & Applications (CMLA 2024) will provide an excellent international forum for sharing knowledge and results in theory, methodology and applications of on Machine Learning & Applications.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
Using recycled concrete aggregates (RCA) for pavements is crucial to achieving sustainability. Implementing RCA for new pavement can minimize carbon footprint, conserve natural resources, reduce harmful emissions, and lower life cycle costs. Compared to natural aggregate (NA), RCA pavement has fewer comprehensive studies and sustainability assessments.
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesChristina Lin
Traditionally, dealing with real-time data pipelines has involved significant overhead, even for straightforward tasks like data transformation or masking. However, in this talk, we’ll venture into the dynamic realm of WebAssembly (WASM) and discover how it can revolutionize the creation of stateless streaming pipelines within a Kafka (Redpanda) broker. These pipelines are adept at managing low-latency, high-data-volume scenarios.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
An Approach to Detecting Writing Styles Based on Clustering Techniquesambekarshweta25
An Approach to Detecting Writing Styles Based on Clustering Techniques
Authors:
-Devkinandan Jagtap
-Shweta Ambekar
-Harshit Singh
-Nakul Sharma (Assistant Professor)
Institution:
VIIT Pune, India
Abstract:
This paper proposes a system to differentiate between human-generated and AI-generated texts using stylometric analysis. The system analyzes text files and classifies writing styles by employing various clustering algorithms, such as k-means, k-means++, hierarchical, and DBSCAN. The effectiveness of these algorithms is measured using silhouette scores. The system successfully identifies distinct writing styles within documents, demonstrating its potential for plagiarism detection.
Introduction:
Stylometry, the study of linguistic and structural features in texts, is used for tasks like plagiarism detection, genre separation, and author verification. This paper leverages stylometric analysis to identify different writing styles and improve plagiarism detection methods.
Methodology:
The system includes data collection, preprocessing, feature extraction, dimensional reduction, machine learning models for clustering, and performance comparison using silhouette scores. Feature extraction focuses on lexical features, vocabulary richness, and readability scores. The study uses a small dataset of texts from various authors and employs algorithms like k-means, k-means++, hierarchical clustering, and DBSCAN for clustering.
Results:
Experiments show that the system effectively identifies writing styles, with silhouette scores indicating reasonable to strong clustering when k=2. As the number of clusters increases, the silhouette scores decrease, indicating a drop in accuracy. K-means and k-means++ perform similarly, while hierarchical clustering is less optimized.
Conclusion and Future Work:
The system works well for distinguishing writing styles with two clusters but becomes less accurate as the number of clusters increases. Future research could focus on adding more parameters and optimizing the methodology to improve accuracy with higher cluster values. This system can enhance existing plagiarism detection tools, especially in academic settings.
An Approach to Detecting Writing Styles Based on Clustering Techniques
Leigh Meadow and Towlston Basin Kickoff Presentation Jan 2018
1. A Fairfax County, VA, publication
Department of Public Works and Environmental Services
Working for You!
Leigh Meadow and Towlston Basin
(0103DP/0584DP)
January 2018
3. Stormwater Planning Division
Social Goals
1. Maintain open dialogue and share information.
2. Coordinate with all the stakeholders and the community.
3. Design Team – Stantec Consulting Services, Utilities Design
and Construction Division, Stormwater Planning Division, and
the Community.
3
4. Stormwater Planning Division
Stormwater Program Drivers
• Municipal Separate Storm Sewer Permit (MS-4)
• Chesapeake Bay Total Maximum Daily Loads (TMDL)
– Regulates amount of pollutants in waterways
• Other Local TMDLs
• Maintenance of Existing Facilities
• Dam Regulations
• Public Safety /Emergency Response
– Flooding
– Snow Removal
4
7. Stormwater Planning Division
Project Goals
• Retrofit two detention basins (0584DP and 0103DP).
0584DP - Regenerative Stormwater Conveyance
0103DP – Sand Filter
• Restore up to 1600 feet of stream on Leigh Meadow HOA
and Towlston Meadow HOA properties.
Stabilize streambed and banks
Reduces sediment and nutrient inputs into stream
system
Improve habitat
Maintain close coordination with stakeholders
7
12. Stormwater Planning Division
Towlston Meadow Basin Outfall Conditions
12
Mowed turf grass does not provide enough root
depth to increase soil resistance to erosion.
24 inch drop about 50 feet downstream of basin.
26. 26
Before and After Examples
Stormwater Planning Division
Before One year after construction.
Bridal Path
27. Before and After Examples
27
Banks Park
Before One year after construction
Stormwater Planning Division
28. Stormwater Planning Division 28
Next Steps – Schedule
• Easement acquisition – Completed in October 2017
• Concept design – March 2018
• Revised Concept design – June 2018
• Complete Design – November 2018
• Start Construction – July 2019
• Complete Construction – July 2020
29. Stormwater Planning Division
Contact Information
Contact Information
Design
Fred Wilkins – Project Manager
703-324-5189
Fred.Wilkins@fairfaxcounty.gov
Fairfax County Stormwater Planning Division
703-324-5500 TTY 711
12000 Government Center Parkway
Suite 449
Fairfax, Virginia 22035
www.fairfaxcounty.gov/dpwes/stormwater
To request this information in an alternate format call 703-324-5500, TTY 711
29