• CMOC - Northparkes
Mines
• Introduction – Northparkes &
CMOC
• LV Board Explosion
– Incident Investigation Findings
– Likely Root Causes
– Actions Taken
– Key Learnings
Michael Wood, Senior Electrical Engineer, Northparkes Mines
Introduction
2
UNDERGROUND COPPER AND GOLD MINE
JOINT VENTURE OPERATION –
80% CHINA MOLYBDENUM CO., LTD
20% SUMITOMO GROUP (JAPAN)
Joint Venture Operation
80% China Molybdenum Co., Ltd
20% Sumitomo Group
Underground Copper & Gold Mine
Introduction
Location
3
PARKES
SYDNEY
NEW SOUTH WALES
NORTHPARKES MINES
Introduction
4
LIFT 1
E48
LIFT 2
LOADING
STATION
CRUSHER
0 200 40
0
60
0
80
0
1000
m
E26
EXTRACTION
LEVEL
HOIST
Introduction
5
Introduction
6
Introduction
7
• Secondary Crushing Station in
foreground
• 2.2km curved overland conveyor
in centre of picture
• Stockpiles, Mills and tails dams
in background
Introduction
Dual module processing plant 8
CMOC’s portfolio
High quality and diversified asset portfolio with strong leverage to China and emerging economies
Sandaozhuang (100%)
Molybdenum / Tungsten
Shangfanggou (55%)
Molybdenum / Iron
East Gobi Project (65%)
Molybdenum
Moly Roaster & FeMo
plants
Shanghai Regional Office
Luoyang City HQ
BeijingXinjiang
CHINA
Henan Province
Sydney
Northparkes (80%)
Copper / gold
Sydney Regional Office
AUSTRALIA
DRCKinshasa
Phoenix, AZ, USA 
Overseas HQ
BRAZIL
Nióbio Brasil Limitada &
Fosfatos Brasil Limitada
(100%)
Niobium and
Phosphates –
Tenke Fungurume
Copper and Cobalt
Incident Details – LV board explosion
• Date and Time of Incident: 13/03/17 - 10:56 AM
• Incident Location: 142SW001 415V Switch Room
• Who was involved: No personnel directly involved
• Summary of Incident: Electrical fault inside the
switchboard resulted in an arc flash damaging the
equipment
10
Background Information
11
Electrical
Arc Fault
Arc Flash
A
B
C
Ia
Ib
Ic
If
Electrical
System
Damage to
Equipment
12
Switch room
Winder Control
Headframe
Incident Details
• Mine control operator reported a loss of network
communications to the surface material handling
equipment. Occurred the same time as a lightning
storm.
• Fire alarm and fire suppression equipment in the E26
switch room had operated.
• 415V Switchboard in the E26 Switch room showed
evidence of arc flash and damage to the equipment.
• Scene preserved, the NSW Resource Regulator was
notified, all clear given to commence investigation and
rectification work 13
Incident Details
• The arc flash event was contained inside the 415V
Switchboard and the fault was interrupted by the air
circuit breaker (ACB)
• The switchboard supplies electrical power to the winder
excitation circuit and surface conveyor CV01.
• The repair took 44 hours to complete as ACB and busbar
components were replaced and busbar fabricated
offsite.
• All electrical equipment around the area was checked
for condition, electrical protection and fire systems were
reinstated.
14
Photographs
15
Switchboard with panel cover still in place
– arc flash contained
Damage from arc flash inside the
compartment
Evidence of arcing originates in this location
16
17
18
19
20
21
22
23
24
25
26
27
Photographs
28
Compartment - after repair New busbar showing method of installation and insulation between
phases
What Actions did we take
29
Root Cause/Contributing Factor Actions
Dust/Moisture Ingress Reseal board to reinstate IP rating.
Dust/Moisture Ingress Plug opening of the switch room wall on cable entering the room.
Dust/Moisture Ingress Review and update long term online / offline maintenance tactics of switchboards
Voltage Rise Evaluate lightning protection requirement on new installation
Voltage Rise Evaluate and review lightning protection state of existing installations
Dust/Moisture Ingress (Others) Inspect E26 HV switchboard to confirm IP rating
Dust/Moisture Ingress (Others) Audit site switchboards for sealing condition (IP rating)
Voltage Rise (Others) Test switchboard’s transformer oil and excitation transformer oil for sign of voltage stress
Voltage Rise Replace arc flash sensors (potential damage by heat) and reinstate full functionality
Voltage Rise Review and audit status of installed arc flash system
Is This a Trend?
• Occurrences of equipment damage from lightning
strikes in the life of the mine?
– 1 occurrence over > 20 years, lightning strike on
headframe damaged underground radio network
30
Conclusion – Key Learnings
• Investigate thoroughly to determine the root cause
• Ensure protection systems are effective and
maintained
• Apply learnings across the business not just at
incident site
• Good team effort to ensure a safe and timely
recovery
• Engage external expertise where required to assist
(OEM’s, Consultants, RR)
• But wait there is more……………………
31
AS4730 – Winder Brakes & Control Systems
Standards out for public comment 6/11/17 to 8/1/18
• DR AS/NZS 4730.1:2017 : Mining - Winding equipment -
Winder control systems
• DR AS/NZS 4730.2:2017 : Mining - Winding equipment -
Braking systems
Have a look on the SAI Global website and have your say
32

More Related Content

What's hot

Siemens ngg-molded-case-circuit-breaker-product presentation
Siemens ngg-molded-case-circuit-breaker-product presentationSiemens ngg-molded-case-circuit-breaker-product presentation
Siemens ngg-molded-case-circuit-breaker-product presentation
Hazem El-Henawy
 
Lv switchgear & lv cable sizing
Lv switchgear & lv cable sizingLv switchgear & lv cable sizing
Lv switchgear & lv cable sizing
Asif Eqbal
 
2015 Arc Flash Conference MV Switchgear Standards
2015 Arc Flash Conference MV Switchgear Standards2015 Arc Flash Conference MV Switchgear Standards
2015 Arc Flash Conference MV Switchgear Standards
Bryan Johnson
 
Blind Spots of Low Voltage Testing Webinar Presented by Megger Baker
Blind Spots of Low Voltage Testing Webinar Presented by Megger BakerBlind Spots of Low Voltage Testing Webinar Presented by Megger Baker
Blind Spots of Low Voltage Testing Webinar Presented by Megger Baker
Transcat
 
Getting the Most out of your Electrical Room
Getting the Most out of your Electrical RoomGetting the Most out of your Electrical Room
Getting the Most out of your Electrical Room
michaeljmack
 
Molded Case Circuit Breakers Technical Information
Molded Case Circuit Breakers Technical InformationMolded Case Circuit Breakers Technical Information
Molded Case Circuit Breakers Technical Information
CTY TNHH HẠO PHƯƠNG
 
Practical Power System Protection for Engineers and Technicians
Practical Power System Protection for Engineers and TechniciansPractical Power System Protection for Engineers and Technicians
Practical Power System Protection for Engineers and Technicians
Living Online
 
Medium Voltage Reduced Voltage Autotransformer
Medium Voltage Reduced Voltage AutotransformerMedium Voltage Reduced Voltage Autotransformer
Medium Voltage Reduced Voltage Autotransformer
michaeljmack
 
L.v tech presentation 2
L.v tech presentation 2L.v tech presentation 2
Electrical Engineering Basics - What Design Engineers Need to Know
Electrical Engineering Basics - What Design Engineers Need to KnowElectrical Engineering Basics - What Design Engineers Need to Know
Electrical Engineering Basics - What Design Engineers Need to Know
milestoneseng
 
Electrical Lessons learned
Electrical Lessons learnedElectrical Lessons learned
Electrical Lessons learned
michaeljmack
 
ABB switchgear safety hazards passive & active arc fault protection by David ...
ABB switchgear safety hazards passive & active arc fault protection by David ...ABB switchgear safety hazards passive & active arc fault protection by David ...
ABB switchgear safety hazards passive & active arc fault protection by David ...
Keren Meers
 
Emergency, Legally Required and Optional Standby Systems
Emergency, Legally Required and Optional Standby SystemsEmergency, Legally Required and Optional Standby Systems
Emergency, Legally Required and Optional Standby Systems
michaeljmack
 
Ieee pes psrc
Ieee pes psrcIeee pes psrc
Ieee pes psrc
michaeljmack
 
Generator grounding
Generator groundingGenerator grounding
Generator grounding
michaeljmack
 
Installing, Programming & Commissioning of Power System Protection Relays and...
Installing, Programming & Commissioning of Power System Protection Relays and...Installing, Programming & Commissioning of Power System Protection Relays and...
Installing, Programming & Commissioning of Power System Protection Relays and...
Living Online
 
Introduction to mv switchgear
Introduction to mv switchgearIntroduction to mv switchgear
Introduction to mv switchgear
Modal Holong Education
 
5220 l11
5220 l115220 l11
5220 l11
Gilberto Mejía
 
Mccb elcb technical note dienhathe.org
Mccb elcb technical note dienhathe.orgMccb elcb technical note dienhathe.org
Mccb elcb technical note dienhathe.org
Dien Ha The
 
Pd Maintenance
Pd MaintenancePd Maintenance
Pd Maintenance
dwessin
 

What's hot (20)

Siemens ngg-molded-case-circuit-breaker-product presentation
Siemens ngg-molded-case-circuit-breaker-product presentationSiemens ngg-molded-case-circuit-breaker-product presentation
Siemens ngg-molded-case-circuit-breaker-product presentation
 
Lv switchgear & lv cable sizing
Lv switchgear & lv cable sizingLv switchgear & lv cable sizing
Lv switchgear & lv cable sizing
 
2015 Arc Flash Conference MV Switchgear Standards
2015 Arc Flash Conference MV Switchgear Standards2015 Arc Flash Conference MV Switchgear Standards
2015 Arc Flash Conference MV Switchgear Standards
 
Blind Spots of Low Voltage Testing Webinar Presented by Megger Baker
Blind Spots of Low Voltage Testing Webinar Presented by Megger BakerBlind Spots of Low Voltage Testing Webinar Presented by Megger Baker
Blind Spots of Low Voltage Testing Webinar Presented by Megger Baker
 
Getting the Most out of your Electrical Room
Getting the Most out of your Electrical RoomGetting the Most out of your Electrical Room
Getting the Most out of your Electrical Room
 
Molded Case Circuit Breakers Technical Information
Molded Case Circuit Breakers Technical InformationMolded Case Circuit Breakers Technical Information
Molded Case Circuit Breakers Technical Information
 
Practical Power System Protection for Engineers and Technicians
Practical Power System Protection for Engineers and TechniciansPractical Power System Protection for Engineers and Technicians
Practical Power System Protection for Engineers and Technicians
 
Medium Voltage Reduced Voltage Autotransformer
Medium Voltage Reduced Voltage AutotransformerMedium Voltage Reduced Voltage Autotransformer
Medium Voltage Reduced Voltage Autotransformer
 
L.v tech presentation 2
L.v tech presentation 2L.v tech presentation 2
L.v tech presentation 2
 
Electrical Engineering Basics - What Design Engineers Need to Know
Electrical Engineering Basics - What Design Engineers Need to KnowElectrical Engineering Basics - What Design Engineers Need to Know
Electrical Engineering Basics - What Design Engineers Need to Know
 
Electrical Lessons learned
Electrical Lessons learnedElectrical Lessons learned
Electrical Lessons learned
 
ABB switchgear safety hazards passive & active arc fault protection by David ...
ABB switchgear safety hazards passive & active arc fault protection by David ...ABB switchgear safety hazards passive & active arc fault protection by David ...
ABB switchgear safety hazards passive & active arc fault protection by David ...
 
Emergency, Legally Required and Optional Standby Systems
Emergency, Legally Required and Optional Standby SystemsEmergency, Legally Required and Optional Standby Systems
Emergency, Legally Required and Optional Standby Systems
 
Ieee pes psrc
Ieee pes psrcIeee pes psrc
Ieee pes psrc
 
Generator grounding
Generator groundingGenerator grounding
Generator grounding
 
Installing, Programming & Commissioning of Power System Protection Relays and...
Installing, Programming & Commissioning of Power System Protection Relays and...Installing, Programming & Commissioning of Power System Protection Relays and...
Installing, Programming & Commissioning of Power System Protection Relays and...
 
Introduction to mv switchgear
Introduction to mv switchgearIntroduction to mv switchgear
Introduction to mv switchgear
 
5220 l11
5220 l115220 l11
5220 l11
 
Mccb elcb technical note dienhathe.org
Mccb elcb technical note dienhathe.orgMccb elcb technical note dienhathe.org
Mccb elcb technical note dienhathe.org
 
Pd Maintenance
Pd MaintenancePd Maintenance
Pd Maintenance
 

Similar to Significant incident review 415 v arc flash - Michael Wood

Michael Wood - Loader electric shocks, a case study
Michael Wood - Loader electric shocks, a case studyMichael Wood - Loader electric shocks, a case study
Michael Wood - Loader electric shocks, a case study
NSW Environment and Planning
 
A year with Larsen & Toubro
A year with  Larsen & ToubroA year with  Larsen & Toubro
A year with Larsen & Toubro
JAIPRAKASH PATIL
 
B3 - KS ORKA: Joint Venture Kaishan China & Hugar Orka Iceland
B3 - KS ORKA: Joint Venture Kaishan China & Hugar Orka IcelandB3 - KS ORKA: Joint Venture Kaishan China & Hugar Orka Iceland
B3 - KS ORKA: Joint Venture Kaishan China & Hugar Orka Iceland
Iceland Geothermal
 
Time current curves
Time current curvesTime current curves
Time current curves
Rabah Zaimeddine
 
jaycv3.2
jaycv3.2jaycv3.2
jaycv3.2
Jay Dovaston
 
ACCC Conductor Overview August 2019
ACCC Conductor Overview August 2019ACCC Conductor Overview August 2019
ACCC Conductor Overview August 2019
Dave Bryant
 
EIT_Presentation
EIT_PresentationEIT_Presentation
EIT_Presentation
Ernst Lourens de Villiers
 
EIT_Presentation
EIT_PresentationEIT_Presentation
EIT_Presentation
Ernst Lourens de Villiers
 
Energy Storage: New Capabilities for the Electric Grid – The Tehachapi Energy...
Energy Storage: New Capabilities for the Electric Grid – The Tehachapi Energy...Energy Storage: New Capabilities for the Electric Grid – The Tehachapi Energy...
Energy Storage: New Capabilities for the Electric Grid – The Tehachapi Energy...
kevinfok
 
Iain Palmer Resume 29012015
Iain Palmer Resume 29012015Iain Palmer Resume 29012015
Iain Palmer Resume 29012015
Iain Palmer
 
ONYEJOSE CHUKWUMA CONTRL ROOM OPERATOR.
ONYEJOSE CHUKWUMA CONTRL ROOM OPERATOR.ONYEJOSE CHUKWUMA CONTRL ROOM OPERATOR.
ONYEJOSE CHUKWUMA CONTRL ROOM OPERATOR.
splendidchuy
 
C18808 elc tech
C18808 elc techC18808 elc tech
C18808 elc tech
EDWIN S
 
ETAP - device coordination
ETAP - device coordinationETAP - device coordination
ETAP - device coordination
Himmelstern
 
Case Study - How Proactive Electrical Maintenance team saved a Power Transformer
Case Study - How Proactive Electrical Maintenance team saved a Power TransformerCase Study - How Proactive Electrical Maintenance team saved a Power Transformer
Case Study - How Proactive Electrical Maintenance team saved a Power Transformer
System Protection
 
Final Presentation Talha (1).pptx
Final Presentation Talha (1).pptxFinal Presentation Talha (1).pptx
Final Presentation Talha (1).pptx
TalhaAbdulRehman2
 
Stephen_Anthony_Barkwitch_CV_-commissioning
Stephen_Anthony_Barkwitch_CV_-commissioningStephen_Anthony_Barkwitch_CV_-commissioning
Stephen_Anthony_Barkwitch_CV_-commissioning
Stephen Barkwitch
 
Chernobyl Timeline
Chernobyl TimelineChernobyl Timeline
Chernobyl Timeline
smmiller166
 
Installation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of TransformersInstallation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of Transformers
Living Online
 
Piotr Blaut Student Placement
Piotr Blaut Student PlacementPiotr Blaut Student Placement
Piotr Blaut Student Placement
Piotr Blaut
 
An introduction to Zeversolar inverters
An introduction to Zeversolar invertersAn introduction to Zeversolar inverters
An introduction to Zeversolar inverters
Alternergy
 

Similar to Significant incident review 415 v arc flash - Michael Wood (20)

Michael Wood - Loader electric shocks, a case study
Michael Wood - Loader electric shocks, a case studyMichael Wood - Loader electric shocks, a case study
Michael Wood - Loader electric shocks, a case study
 
A year with Larsen & Toubro
A year with  Larsen & ToubroA year with  Larsen & Toubro
A year with Larsen & Toubro
 
B3 - KS ORKA: Joint Venture Kaishan China & Hugar Orka Iceland
B3 - KS ORKA: Joint Venture Kaishan China & Hugar Orka IcelandB3 - KS ORKA: Joint Venture Kaishan China & Hugar Orka Iceland
B3 - KS ORKA: Joint Venture Kaishan China & Hugar Orka Iceland
 
Time current curves
Time current curvesTime current curves
Time current curves
 
jaycv3.2
jaycv3.2jaycv3.2
jaycv3.2
 
ACCC Conductor Overview August 2019
ACCC Conductor Overview August 2019ACCC Conductor Overview August 2019
ACCC Conductor Overview August 2019
 
EIT_Presentation
EIT_PresentationEIT_Presentation
EIT_Presentation
 
EIT_Presentation
EIT_PresentationEIT_Presentation
EIT_Presentation
 
Energy Storage: New Capabilities for the Electric Grid – The Tehachapi Energy...
Energy Storage: New Capabilities for the Electric Grid – The Tehachapi Energy...Energy Storage: New Capabilities for the Electric Grid – The Tehachapi Energy...
Energy Storage: New Capabilities for the Electric Grid – The Tehachapi Energy...
 
Iain Palmer Resume 29012015
Iain Palmer Resume 29012015Iain Palmer Resume 29012015
Iain Palmer Resume 29012015
 
ONYEJOSE CHUKWUMA CONTRL ROOM OPERATOR.
ONYEJOSE CHUKWUMA CONTRL ROOM OPERATOR.ONYEJOSE CHUKWUMA CONTRL ROOM OPERATOR.
ONYEJOSE CHUKWUMA CONTRL ROOM OPERATOR.
 
C18808 elc tech
C18808 elc techC18808 elc tech
C18808 elc tech
 
ETAP - device coordination
ETAP - device coordinationETAP - device coordination
ETAP - device coordination
 
Case Study - How Proactive Electrical Maintenance team saved a Power Transformer
Case Study - How Proactive Electrical Maintenance team saved a Power TransformerCase Study - How Proactive Electrical Maintenance team saved a Power Transformer
Case Study - How Proactive Electrical Maintenance team saved a Power Transformer
 
Final Presentation Talha (1).pptx
Final Presentation Talha (1).pptxFinal Presentation Talha (1).pptx
Final Presentation Talha (1).pptx
 
Stephen_Anthony_Barkwitch_CV_-commissioning
Stephen_Anthony_Barkwitch_CV_-commissioningStephen_Anthony_Barkwitch_CV_-commissioning
Stephen_Anthony_Barkwitch_CV_-commissioning
 
Chernobyl Timeline
Chernobyl TimelineChernobyl Timeline
Chernobyl Timeline
 
Installation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of TransformersInstallation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of Transformers
 
Piotr Blaut Student Placement
Piotr Blaut Student PlacementPiotr Blaut Student Placement
Piotr Blaut Student Placement
 
An introduction to Zeversolar inverters
An introduction to Zeversolar invertersAn introduction to Zeversolar inverters
An introduction to Zeversolar inverters
 

More from NSW Environment and Planning

12 Small mines report card 2020
12 Small mines report card 202012 Small mines report card 2020
12 Small mines report card 2020
NSW Environment and Planning
 
11 occupational hygiene monitoring of dust
11 occupational hygiene monitoring of dust11 occupational hygiene monitoring of dust
11 occupational hygiene monitoring of dust
NSW Environment and Planning
 
09 learning from disasters
09 learning from disasters09 learning from disasters
09 learning from disasters
NSW Environment and Planning
 
13 explosives awareness
13 explosives awareness13 explosives awareness
13 explosives awareness
NSW Environment and Planning
 
10 incident reporting to the regulator 2020
10 incident reporting to the regulator 202010 incident reporting to the regulator 2020
10 incident reporting to the regulator 2020
NSW Environment and Planning
 
08 dust safety and health surveillance
08 dust safety and health surveillance08 dust safety and health surveillance
08 dust safety and health surveillance
NSW Environment and Planning
 
07 feedback and consultation
07 feedback and consultation07 feedback and consultation
07 feedback and consultation
NSW Environment and Planning
 
06. how the regulator communicates with the industry
06. how the regulator communicates with the industry06. how the regulator communicates with the industry
06. how the regulator communicates with the industry
NSW Environment and Planning
 
05 reviewing your SMS
05 reviewing your SMS05 reviewing your SMS
05 reviewing your SMS
NSW Environment and Planning
 
04. slinging and lifting equipment
04. slinging and lifting equipment04. slinging and lifting equipment
04. slinging and lifting equipment
NSW Environment and Planning
 
Control focused inspection tools (Mark Smith)
Control focused inspection tools (Mark Smith)Control focused inspection tools (Mark Smith)
Control focused inspection tools (Mark Smith)
NSW Environment and Planning
 
Central assessment unit CAU(Steve Bentham)
Central assessment unit CAU(Steve Bentham)Central assessment unit CAU(Steve Bentham)
Central assessment unit CAU(Steve Bentham)
NSW Environment and Planning
 
Autonomous mining equipment (Owen Barry)
Autonomous mining equipment (Owen Barry)Autonomous mining equipment (Owen Barry)
Autonomous mining equipment (Owen Barry)
NSW Environment and Planning
 
Fires on mobile plant refuelling (Ross Stutchbury)
Fires on mobile plant refuelling (Ross Stutchbury)Fires on mobile plant refuelling (Ross Stutchbury)
Fires on mobile plant refuelling (Ross Stutchbury)
NSW Environment and Planning
 
Mobile plant rollovers and collisions (Bill McGlynn)
Mobile plant rollovers and collisions (Bill McGlynn)Mobile plant rollovers and collisions (Bill McGlynn)
Mobile plant rollovers and collisions (Bill McGlynn)
NSW Environment and Planning
 
Metropolitan colliery gas (Dave Gordon)
Metropolitan colliery gas (Dave Gordon)Metropolitan colliery gas (Dave Gordon)
Metropolitan colliery gas (Dave Gordon)
NSW Environment and Planning
 
Airborne dust update (Mark Shepherd)
Airborne dust update (Mark Shepherd)Airborne dust update (Mark Shepherd)
Airborne dust update (Mark Shepherd)
NSW Environment and Planning
 
Emergency planning (Matt U'Brien)
Emergency planning (Matt U'Brien)Emergency planning (Matt U'Brien)
Emergency planning (Matt U'Brien)
NSW Environment and Planning
 
Electrical performance presentation (Craig Harris)
Electrical performance presentation (Craig Harris)Electrical performance presentation (Craig Harris)
Electrical performance presentation (Craig Harris)
NSW Environment and Planning
 
Where do I stand for fire protection on mobile and transportable equipment an...
Where do I stand for fire protection on mobile and transportable equipment an...Where do I stand for fire protection on mobile and transportable equipment an...
Where do I stand for fire protection on mobile and transportable equipment an...
NSW Environment and Planning
 

More from NSW Environment and Planning (20)

12 Small mines report card 2020
12 Small mines report card 202012 Small mines report card 2020
12 Small mines report card 2020
 
11 occupational hygiene monitoring of dust
11 occupational hygiene monitoring of dust11 occupational hygiene monitoring of dust
11 occupational hygiene monitoring of dust
 
09 learning from disasters
09 learning from disasters09 learning from disasters
09 learning from disasters
 
13 explosives awareness
13 explosives awareness13 explosives awareness
13 explosives awareness
 
10 incident reporting to the regulator 2020
10 incident reporting to the regulator 202010 incident reporting to the regulator 2020
10 incident reporting to the regulator 2020
 
08 dust safety and health surveillance
08 dust safety and health surveillance08 dust safety and health surveillance
08 dust safety and health surveillance
 
07 feedback and consultation
07 feedback and consultation07 feedback and consultation
07 feedback and consultation
 
06. how the regulator communicates with the industry
06. how the regulator communicates with the industry06. how the regulator communicates with the industry
06. how the regulator communicates with the industry
 
05 reviewing your SMS
05 reviewing your SMS05 reviewing your SMS
05 reviewing your SMS
 
04. slinging and lifting equipment
04. slinging and lifting equipment04. slinging and lifting equipment
04. slinging and lifting equipment
 
Control focused inspection tools (Mark Smith)
Control focused inspection tools (Mark Smith)Control focused inspection tools (Mark Smith)
Control focused inspection tools (Mark Smith)
 
Central assessment unit CAU(Steve Bentham)
Central assessment unit CAU(Steve Bentham)Central assessment unit CAU(Steve Bentham)
Central assessment unit CAU(Steve Bentham)
 
Autonomous mining equipment (Owen Barry)
Autonomous mining equipment (Owen Barry)Autonomous mining equipment (Owen Barry)
Autonomous mining equipment (Owen Barry)
 
Fires on mobile plant refuelling (Ross Stutchbury)
Fires on mobile plant refuelling (Ross Stutchbury)Fires on mobile plant refuelling (Ross Stutchbury)
Fires on mobile plant refuelling (Ross Stutchbury)
 
Mobile plant rollovers and collisions (Bill McGlynn)
Mobile plant rollovers and collisions (Bill McGlynn)Mobile plant rollovers and collisions (Bill McGlynn)
Mobile plant rollovers and collisions (Bill McGlynn)
 
Metropolitan colliery gas (Dave Gordon)
Metropolitan colliery gas (Dave Gordon)Metropolitan colliery gas (Dave Gordon)
Metropolitan colliery gas (Dave Gordon)
 
Airborne dust update (Mark Shepherd)
Airborne dust update (Mark Shepherd)Airborne dust update (Mark Shepherd)
Airborne dust update (Mark Shepherd)
 
Emergency planning (Matt U'Brien)
Emergency planning (Matt U'Brien)Emergency planning (Matt U'Brien)
Emergency planning (Matt U'Brien)
 
Electrical performance presentation (Craig Harris)
Electrical performance presentation (Craig Harris)Electrical performance presentation (Craig Harris)
Electrical performance presentation (Craig Harris)
 
Where do I stand for fire protection on mobile and transportable equipment an...
Where do I stand for fire protection on mobile and transportable equipment an...Where do I stand for fire protection on mobile and transportable equipment an...
Where do I stand for fire protection on mobile and transportable equipment an...
 

Recently uploaded

PPT Item # 4 - 434 College Blvd. (sign. review)
PPT Item # 4 - 434 College Blvd. (sign. review)PPT Item # 4 - 434 College Blvd. (sign. review)
PPT Item # 4 - 434 College Blvd. (sign. review)
ahcitycouncil
 
Spending in the 340B Drug Pricing Program, 2010 to 2021
Spending in the 340B Drug Pricing Program, 2010 to 2021Spending in the 340B Drug Pricing Program, 2010 to 2021
Spending in the 340B Drug Pricing Program, 2010 to 2021
Congressional Budget Office
 
G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024
Energy for One World
 
2024: The FAR - Federal Acquisition Regulations, Part 42
2024: The FAR - Federal Acquisition Regulations, Part 422024: The FAR - Federal Acquisition Regulations, Part 42
2024: The FAR - Federal Acquisition Regulations, Part 42
JSchaus & Associates
 
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
9d5c8i83
 
2024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 412024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 41
JSchaus & Associates
 
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRISTTRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
Cheong Man Keong
 
在线办理(英国UEA毕业证书)东英格利亚大学毕业证成绩单一模一样
在线办理(英国UEA毕业证书)东英格利亚大学毕业证成绩单一模一样在线办理(英国UEA毕业证书)东英格利亚大学毕业证成绩单一模一样
在线办理(英国UEA毕业证书)东英格利亚大学毕业证成绩单一模一样
3woawyyl
 
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
ii2sh2v
 
2024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 402024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 40
JSchaus & Associates
 
PPT Item # 7 - 231 Encino Avenue (sign. review)
PPT Item # 7 - 231 Encino Avenue (sign. review)PPT Item # 7 - 231 Encino Avenue (sign. review)
PPT Item # 7 - 231 Encino Avenue (sign. review)
ahcitycouncil
 
Indira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAYIndira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAY
narinav14
 
Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019
Partito democratico
 
How To Cultivate Community Affinity Throughout The Generosity Journey
How To Cultivate Community Affinity Throughout The Generosity JourneyHow To Cultivate Community Affinity Throughout The Generosity Journey
How To Cultivate Community Affinity Throughout The Generosity Journey
Aggregage
 
Item # 10 -- Historical Presv. Districts
Item # 10 -- Historical Presv. DistrictsItem # 10 -- Historical Presv. Districts
Item # 10 -- Historical Presv. Districts
ahcitycouncil
 
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
dj1cx4ex
 
AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024
Scalabrini Institute for Human Mobility in Africa
 
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
odmqk
 
一比一原版英国阿伯丁大学毕业证(AU毕业证书)学历如何办理
一比一原版英国阿伯丁大学毕业证(AU毕业证书)学历如何办理一比一原版英国阿伯丁大学毕业证(AU毕业证书)学历如何办理
一比一原版英国阿伯丁大学毕业证(AU毕业证书)学历如何办理
afsebu
 
ColombiaPresentation.pptx macroeconomics
ColombiaPresentation.pptx macroeconomicsColombiaPresentation.pptx macroeconomics
ColombiaPresentation.pptx macroeconomics
JuanFelipeHerrera4
 

Recently uploaded (20)

PPT Item # 4 - 434 College Blvd. (sign. review)
PPT Item # 4 - 434 College Blvd. (sign. review)PPT Item # 4 - 434 College Blvd. (sign. review)
PPT Item # 4 - 434 College Blvd. (sign. review)
 
Spending in the 340B Drug Pricing Program, 2010 to 2021
Spending in the 340B Drug Pricing Program, 2010 to 2021Spending in the 340B Drug Pricing Program, 2010 to 2021
Spending in the 340B Drug Pricing Program, 2010 to 2021
 
G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024
 
2024: The FAR - Federal Acquisition Regulations, Part 42
2024: The FAR - Federal Acquisition Regulations, Part 422024: The FAR - Federal Acquisition Regulations, Part 42
2024: The FAR - Federal Acquisition Regulations, Part 42
 
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
 
2024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 412024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 41
 
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRISTTRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
 
在线办理(英国UEA毕业证书)东英格利亚大学毕业证成绩单一模一样
在线办理(英国UEA毕业证书)东英格利亚大学毕业证成绩单一模一样在线办理(英国UEA毕业证书)东英格利亚大学毕业证成绩单一模一样
在线办理(英国UEA毕业证书)东英格利亚大学毕业证成绩单一模一样
 
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
 
2024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 402024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 40
 
PPT Item # 7 - 231 Encino Avenue (sign. review)
PPT Item # 7 - 231 Encino Avenue (sign. review)PPT Item # 7 - 231 Encino Avenue (sign. review)
PPT Item # 7 - 231 Encino Avenue (sign. review)
 
Indira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAYIndira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAY
 
Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019
 
How To Cultivate Community Affinity Throughout The Generosity Journey
How To Cultivate Community Affinity Throughout The Generosity JourneyHow To Cultivate Community Affinity Throughout The Generosity Journey
How To Cultivate Community Affinity Throughout The Generosity Journey
 
Item # 10 -- Historical Presv. Districts
Item # 10 -- Historical Presv. DistrictsItem # 10 -- Historical Presv. Districts
Item # 10 -- Historical Presv. Districts
 
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
 
AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024
 
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
 
一比一原版英国阿伯丁大学毕业证(AU毕业证书)学历如何办理
一比一原版英国阿伯丁大学毕业证(AU毕业证书)学历如何办理一比一原版英国阿伯丁大学毕业证(AU毕业证书)学历如何办理
一比一原版英国阿伯丁大学毕业证(AU毕业证书)学历如何办理
 
ColombiaPresentation.pptx macroeconomics
ColombiaPresentation.pptx macroeconomicsColombiaPresentation.pptx macroeconomics
ColombiaPresentation.pptx macroeconomics
 

Significant incident review 415 v arc flash - Michael Wood

  • 1. • CMOC - Northparkes Mines • Introduction – Northparkes & CMOC • LV Board Explosion – Incident Investigation Findings – Likely Root Causes – Actions Taken – Key Learnings Michael Wood, Senior Electrical Engineer, Northparkes Mines
  • 2. Introduction 2 UNDERGROUND COPPER AND GOLD MINE JOINT VENTURE OPERATION – 80% CHINA MOLYBDENUM CO., LTD 20% SUMITOMO GROUP (JAPAN) Joint Venture Operation 80% China Molybdenum Co., Ltd 20% Sumitomo Group Underground Copper & Gold Mine
  • 4. Introduction 4 LIFT 1 E48 LIFT 2 LOADING STATION CRUSHER 0 200 40 0 60 0 80 0 1000 m E26 EXTRACTION LEVEL HOIST
  • 7. Introduction 7 • Secondary Crushing Station in foreground • 2.2km curved overland conveyor in centre of picture • Stockpiles, Mills and tails dams in background
  • 9. CMOC’s portfolio High quality and diversified asset portfolio with strong leverage to China and emerging economies Sandaozhuang (100%) Molybdenum / Tungsten Shangfanggou (55%) Molybdenum / Iron East Gobi Project (65%) Molybdenum Moly Roaster & FeMo plants Shanghai Regional Office Luoyang City HQ BeijingXinjiang CHINA Henan Province Sydney Northparkes (80%) Copper / gold Sydney Regional Office AUSTRALIA DRCKinshasa Phoenix, AZ, USA  Overseas HQ BRAZIL Nióbio Brasil Limitada & Fosfatos Brasil Limitada (100%) Niobium and Phosphates – Tenke Fungurume Copper and Cobalt
  • 10. Incident Details – LV board explosion • Date and Time of Incident: 13/03/17 - 10:56 AM • Incident Location: 142SW001 415V Switch Room • Who was involved: No personnel directly involved • Summary of Incident: Electrical fault inside the switchboard resulted in an arc flash damaging the equipment 10
  • 11. Background Information 11 Electrical Arc Fault Arc Flash A B C Ia Ib Ic If Electrical System Damage to Equipment
  • 13. Incident Details • Mine control operator reported a loss of network communications to the surface material handling equipment. Occurred the same time as a lightning storm. • Fire alarm and fire suppression equipment in the E26 switch room had operated. • 415V Switchboard in the E26 Switch room showed evidence of arc flash and damage to the equipment. • Scene preserved, the NSW Resource Regulator was notified, all clear given to commence investigation and rectification work 13
  • 14. Incident Details • The arc flash event was contained inside the 415V Switchboard and the fault was interrupted by the air circuit breaker (ACB) • The switchboard supplies electrical power to the winder excitation circuit and surface conveyor CV01. • The repair took 44 hours to complete as ACB and busbar components were replaced and busbar fabricated offsite. • All electrical equipment around the area was checked for condition, electrical protection and fire systems were reinstated. 14
  • 15. Photographs 15 Switchboard with panel cover still in place – arc flash contained Damage from arc flash inside the compartment Evidence of arcing originates in this location
  • 16. 16
  • 17. 17
  • 18. 18
  • 19. 19
  • 20. 20
  • 21. 21
  • 22. 22
  • 23. 23
  • 24. 24
  • 25. 25
  • 26. 26
  • 27. 27
  • 28. Photographs 28 Compartment - after repair New busbar showing method of installation and insulation between phases
  • 29. What Actions did we take 29 Root Cause/Contributing Factor Actions Dust/Moisture Ingress Reseal board to reinstate IP rating. Dust/Moisture Ingress Plug opening of the switch room wall on cable entering the room. Dust/Moisture Ingress Review and update long term online / offline maintenance tactics of switchboards Voltage Rise Evaluate lightning protection requirement on new installation Voltage Rise Evaluate and review lightning protection state of existing installations Dust/Moisture Ingress (Others) Inspect E26 HV switchboard to confirm IP rating Dust/Moisture Ingress (Others) Audit site switchboards for sealing condition (IP rating) Voltage Rise (Others) Test switchboard’s transformer oil and excitation transformer oil for sign of voltage stress Voltage Rise Replace arc flash sensors (potential damage by heat) and reinstate full functionality Voltage Rise Review and audit status of installed arc flash system
  • 30. Is This a Trend? • Occurrences of equipment damage from lightning strikes in the life of the mine? – 1 occurrence over > 20 years, lightning strike on headframe damaged underground radio network 30
  • 31. Conclusion – Key Learnings • Investigate thoroughly to determine the root cause • Ensure protection systems are effective and maintained • Apply learnings across the business not just at incident site • Good team effort to ensure a safe and timely recovery • Engage external expertise where required to assist (OEM’s, Consultants, RR) • But wait there is more…………………… 31
  • 32. AS4730 – Winder Brakes & Control Systems Standards out for public comment 6/11/17 to 8/1/18 • DR AS/NZS 4730.1:2017 : Mining - Winding equipment - Winder control systems • DR AS/NZS 4730.2:2017 : Mining - Winding equipment - Braking systems Have a look on the SAI Global website and have your say 32