Presented By : Ernst de Villiers
January 2015
Mentor : Lukas Van de Merwe
Contents
• Eskom’s 5 Life Saving Rules
• Training Schedule
• Control Plant Maintenance (CPM)
DC
Telecontrol
Protection
• Network Engineering Design (NED)
 Electrification
2
Eskom’s 5 Life Saving Rules
• Open, isolate, test, earth, bond and/or insulate before touch
• Hook up at heights
• Buckle up during vehicle trips
• No one is to work under the influence of alcohol or/and drugs
• Having a valid worker’s permit
3
4
Training Schedule
Departments Visited Date
PPM Coastal 3 February 2014 – 14 March 2194
Standards Implementation 17 March 2014 – 4 April 2014
CNC Coastal 7 April 2014 – 9 May 2014
CPM – Metering 12 May 2014 – 4 July 2014
CPM- DC 7 July 2014 – 15 August 2014
CPM - Telecontrol 18 August 2014 – 10 October 2014
CPM - Protection 13 October 2014 - 23 December 2014
Project Engineering 15 January 2015 -
Training Scedule
5
Next Department Period
Project Engineering 15 January 2015 – 13 March 2015
Network Planning 16 March 2015 – 22 May 2015
Plant 25 May 2015 – 24 July 2015
Network Optimization 27 July 2015 – 26 October 2015
Maintenance and Operations Structure
6
Control Plant Maintenance
DC
7 July 2014 – 15 August 2014
Department Responsibilities
8
DC
DC Substation Supply
Battery Bank
Battery Charger
DC lights
Battery Bank
Commissioning
Tests
Installation
Sump Pumps
Substations
DC and AC Panels
Maintenance
Installations
Commissioning
Battery Banks
• DC batteries banks in substations are supplying the protection and
communication modules such as RTU’s and protection panels.
• Two types of batteries used in ECOU:
• Nickel-Cadmium
• Lead-Acid
9
Battery and Charger Maintenance
DPC 34-1039
Battery Capacity
• The ability of the battery to provide a required steady D.C. current for
a specified period of time, such that the voltage stays above a certain
minimum value.
Specific gravity
• In lead-acid batteries there is a change in the specific gravity of the
electrolyte during charge and discharge, and this forms a valuable
indication of the state of charge of the battery. The chemical reaction
during charge absorbs from, and releases water into, the electrolyte.
10
11
Capacity Discharge Test
A capacity discharge test is done to determine the ampere - hour capacity of
the battery according to the labelled specification.
Battery Specification – FCP 11 160Ah
In the figure below, is a lead acid battery part of the 110V battery bank at
Chaba substation.
2016-03-01 12
Capacity Discharge Test
Capacity Discharge Test
Initial Rating 1st Hour 2nd Hour 2.5 Hours Final Reading
1 2.18 1.97 1.93 1.90 1.86
2 2.18 1.98 1.93 1.91 1.89
3 2.17 1.98 1.93 1.91 1.86
4 2.17 1.98 1.93 1.90 1.86
5 2.17 1.97 1.89 1.92 1.87
6 2.17 1.98 1.94 1.91 1.86
7 2.17 1.98 1.93 1.92 1.86
8 2.17 1.98 1.94 1.91 1.84
9 2.18 1.97 1.94 1.92 1.86
10 2.17 1.97 1.93 1.90 1.88
11 2.17 1.98 1.94 1.91 1.86
12 2.18 1.98 1.94 1.92 1.86
13
Failing Voltage: 1.8
Test done: Ernst de Villiers
Discharge current rate: 38.2A
Battery information: Lead Acid
Type: FCP 11
Make: Chloride
Discharging
14
Discharging a cell over a short period of
time you don’t get 100% capacity.
According to this Graph, If a cell is
discharged over:
• 8 hours, you can get 100% performance
of the cell,
• 4 hours, you can get 80% performance
of the cell,
• 20 hours, you can get 120%
performance of the cell,
Battery Charging Process
15
16 16
Communications
.•Charge Fail – No charging operation
•DC earth fault - DC earth faults cause incorrect tripping of protection equipment.
17 17
Communications
.•Load Overvoltage - As soon as the voltage rises above the maximum tolerance
allowed by the load, an alarm is signalled and the charger is shut off electronically to
prevent damage to the load.
Some battery chargers are equipped with voltage dropping diodes as a form of
voltage regulation to decrease the voltage during an overvoltage. These diodes are
visible in the figure below.
2016-03-01 18
AC/DC Panels
Before the AC/DC panel are explained, the figure below illustrates the scope
of works for the DC department to see exactly where these panels fit into the
substation commission.
AC/DC Panels
19
Transformer Sump Pump
20
• .
Control Plant Maintenance
Telecontrol
18 August 2014 – 10 October 2014
Department Responsibilities
22
Telecontrol
Maintenance
Reclosers
RTU
IDF
Commissioning
Substation
Communications
Reclosers
Surveys
Recloser
Placement
Remote Terminal Unit
23
RTU Commissioning
24
Recloser Maintenance
25
Fort Murray Substation
26
UHF COMMUNICATION SURVEY
DMN 34-1997
27
Control Plant Maintenance
Protection
18 August 2014 – 10 October 2014
Power Transformer Testing
Tests performed on Spare TRFR for Duke S/S
29
Routine Tests Commissioning Tests
Voltage Ratio Vector Group
Positive Sequence
Impedance Test
Zero Sequence Impedance
Test
Winding Insulation Test Magnetisation Test
Winding Resistance Oil and Winding
Temperature Test
Routine Test - Turn Ratio
30
Primary
Voltage
Secondary
Voltage
Result - Turn Ratio
• Ratio is below the allowed error of 0.5%
31
• The purpose of impedance measurements is to detect shipping damage by
comparison with nameplate values and with diagnostic tests. Percent
impedance measurements will differ for each tap position.
• An Impedance test is useful for determining loose or high-resistance
connections. between test and nameplate values can indicate future failure
due to short –circuited windings or damaged core.
𝑍% =
𝑉 𝑀𝑒𝑎𝑠𝑢𝑟𝑒𝑑
1.73 𝑥 𝐼 𝑀𝑒𝑎𝑠𝑢𝑟𝑒𝑑
x
𝑅𝑎𝑡𝑒𝑑 𝑀𝑉𝐴
(𝑅𝑎𝑡𝑒𝑒 𝑉𝑜𝑙𝑡𝑎𝑔𝑒)2 x 100
32
Routine Test – Positive Sequence Impedance
Result - Positive Sequence Impedance
Tap Phase Voltage Current 𝒁 𝑪𝒂𝒍𝒄𝒖𝒍𝒂𝒕𝒆𝒅 𝒁 𝑪𝒐𝒓𝒆 Z %
1
Red 230.7 44.9 5.138
5.169 5.34White 236.7 45.8 5.168
Blue 236.6 45.5 5.2
5
Red 23.1.3 43.9 5.263
5.27 5.44White 237.4 45.2 5.252
Blue 237.5 44.9 5.29
17
Red 231.9 41.7 5.561
5.585 5.77White 237.9 42.6 5.582
Blue 237.8 42.4 5.608
33
• This test is done to provide an indication of the no-load current drawn by the
transformer; hence the magnetization current set up due to losses in the
electric circuit and losses in the magnetic circuit due to e.g. shorted core
laminations. The insulating varnish could be damaged by sustained high
current faults resulting in a heated core.
34
Commissioning Test – Magnetisation Test
35
Commissioning Test – Magnetisation Test
• The calculation of earth fault currents on the power system requires the zero-
sequence impedance of transformers to be known.
• The flow of zero-sequence current through a transformer occurs under earth
fault conditions and only if the transformer has a star winding with the neutral
point grounded and has a secondary/tertiary winding which is able to produce
balancing zero-sequence currents. If there is no secondary or tertiary winding
which produces the balancing zero-sequence currents, the zero-sequence
impedance of the transformer would be limited by the tank-delta effect.
36
Commissioning Test – Zero-sequence Test
Oil and Winding Temperature Test
• The oil and winding temperature gauges provide protection against internal transformer
faults and overloading.
• Since the temperature of the winding is proportional to the square of current passing
through it, the winding temperature circuit makes use of a current transformer wired in
series with one phase of the transformer winding on the load side (usually the red
phase).
• The output of the feeds a heating element that is located in the pocket for the winding
temperature gauge’s probe.
37
38
Oil and Winding Temperature Test
DISSCAAD3
39
Oil and Winding Temperature Test
Ncora TRFR Scheme 3.3/22 kV
• Installation of single phase Diff relays
• Ringing of scheme
• Modifications
• SEL 351 and SEL 387 Relays
40
Current Transformers
Protection
Current Transformers
42
CT’s play a major role when it comes to
protection and relay schemes.
When current in a circuit is too high to
apply directly to recording instruments, a
current transformer produces a reduced
current accurately proportional to the
current in the circuit, which can be
conveniently connected to measuring and
recording instruments.
CT Primary Injection
43
Differential Protection
Differential Protection
45
This scheme is based on the principle that the input power to the power transformer under
normal conditions is equal to the output power.
Under normal conditions, no resultant current will flow into the differential relay current coil.
Whenever a fault occurs, within the protected zone, the current balance will no longer exist,
and relay contacts will close and release a trip signal to cause the certain circuit breakers to
operate in order to disconnect the faulty equipment/part
Diff Procedure – Peddie Substation
Normal Operation
• 𝐼1 − 𝐼2 = 0
Fault Operation
• 𝐼1 − 𝐼2 = 𝐼 𝑑
46
47
Diff Test Procedure – Peddie Substation
Normal Operation
𝐼1 − 𝐼2 = 0
Fault Operation
𝐼1 − 𝐼2 = 𝐼 𝑑
Diff Verification – Board Illustration
48
Restricted Earth Fault(REF)
Protection
Restricted Earth Fault (REF)
50
CT secondary of each phase of power transformer are connected together as
shown in the figure. Common terminals are connected to the secondary of a
Neutral Current Transformer or NCT.
Whenever there is an unbalancing in between three phases of the transformer,
a resultant unbalanced current flows through the close path connected to the
common terminals of the CT secondaries.
51
REF Test Procedure – Peddie Substation
HV REF
MV REF
Restricted Earth Fault(REF) - Board
Illustration
52
Network Engineering & Design
Manager: Clive Akol
Supivisor: Boifang Moumakwa
Asset Creation Structure
54
Khotana Project
• Khotana Electrification project consists of 36 villages with the total
number of connections of 3603.
• Ebongweni Village allocated to EIT with approximately 171
connections.
• Feeding from Idutywa/Butterworth 22kV network.
55
Khotana Project – Butterworh Area
56
• Preliminary Design:
The main purpose of the preliminary design is to determine the best
design alternative which will satisfy the conceptual design, costs and
need date defined by Planning in the Concept Release Approval form
and associated Planning Proposal report.
Containing:
• Scope of works
• System Configuration
• MV fault levels
• MV Voltage Intake Levels – Full load and light load
• Performance levels
57
Khotana Project - Needed
Thank you

More Related Content

What's hot

TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...
TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...
TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...Jobin Abraham
 
Varipulse - Milton Roy
Varipulse - Milton RoyVaripulse - Milton Roy
Varipulse - Milton RoyVibropac
 
Three Point Starter: Diagram and Working Principle
Three Point Starter: Diagram and Working PrincipleThree Point Starter: Diagram and Working Principle
Three Point Starter: Diagram and Working PrincipleDr.Raja R
 
P&ID Symbols | Gaurav Singh Rajput
P&ID Symbols | Gaurav Singh Rajput P&ID Symbols | Gaurav Singh Rajput
P&ID Symbols | Gaurav Singh Rajput Gaurav Singh Rajput
 
Control Valve Types
Control Valve TypesControl Valve Types
Control Valve TypesBrannon Gant
 
V and inverted v curves of synchronous motor
V and inverted v curves of synchronous motorV and inverted v curves of synchronous motor
V and inverted v curves of synchronous motorkarthi1017
 
Lecture 7 ac waves
Lecture 7 ac wavesLecture 7 ac waves
Lecture 7 ac wavesMohamed Jama
 
دبلومه اعداد مهندس كنترول من البدايه حتي الاحتراف
دبلومه اعداد مهندس كنترول من البدايه حتي الاحتراف دبلومه اعداد مهندس كنترول من البدايه حتي الاحتراف
دبلومه اعداد مهندس كنترول من البدايه حتي الاحتراف Islam Hesham
 
Auto synch considerations methods
Auto synch considerations methodsAuto synch considerations methods
Auto synch considerations methodsmichaeljmack
 
Mathematical models of electric machines
Mathematical models of electric machinesMathematical models of electric machines
Mathematical models of electric machinesvijayabhaskar83
 
A.introduction tech.
A.introduction   tech.A.introduction   tech.
A.introduction tech.girlie22
 
Process control valve engineering
Process control valve engineeringProcess control valve engineering
Process control valve engineeringislam deif
 
Speed control of dc motors
Speed control of dc motorsSpeed control of dc motors
Speed control of dc motorsragulkncet
 

What's hot (20)

Chapter11
Chapter11Chapter11
Chapter11
 
TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...
TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...
TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...
 
Varipulse - Milton Roy
Varipulse - Milton RoyVaripulse - Milton Roy
Varipulse - Milton Roy
 
Three Point Starter: Diagram and Working Principle
Three Point Starter: Diagram and Working PrincipleThree Point Starter: Diagram and Working Principle
Three Point Starter: Diagram and Working Principle
 
P&ID Symbols | Gaurav Singh Rajput
P&ID Symbols | Gaurav Singh Rajput P&ID Symbols | Gaurav Singh Rajput
P&ID Symbols | Gaurav Singh Rajput
 
Control Valve Types
Control Valve TypesControl Valve Types
Control Valve Types
 
PLC Basic
PLC BasicPLC Basic
PLC Basic
 
V and inverted v curves of synchronous motor
V and inverted v curves of synchronous motorV and inverted v curves of synchronous motor
V and inverted v curves of synchronous motor
 
Lecture 7 ac waves
Lecture 7 ac wavesLecture 7 ac waves
Lecture 7 ac waves
 
Instrumentation
InstrumentationInstrumentation
Instrumentation
 
دبلومه اعداد مهندس كنترول من البدايه حتي الاحتراف
دبلومه اعداد مهندس كنترول من البدايه حتي الاحتراف دبلومه اعداد مهندس كنترول من البدايه حتي الاحتراف
دبلومه اعداد مهندس كنترول من البدايه حتي الاحتراف
 
Process control ch 1
Process control ch 1Process control ch 1
Process control ch 1
 
Auto synch considerations methods
Auto synch considerations methodsAuto synch considerations methods
Auto synch considerations methods
 
Mathematical models of electric machines
Mathematical models of electric machinesMathematical models of electric machines
Mathematical models of electric machines
 
A.introduction tech.
A.introduction   tech.A.introduction   tech.
A.introduction tech.
 
Control Valves Book.pdf
Control Valves Book.pdfControl Valves Book.pdf
Control Valves Book.pdf
 
Process control valve engineering
Process control valve engineeringProcess control valve engineering
Process control valve engineering
 
Speed control of dc motors
Speed control of dc motorsSpeed control of dc motors
Speed control of dc motors
 
Introduction to CTs and PTs
Introduction to CTs and PTsIntroduction to CTs and PTs
Introduction to CTs and PTs
 
Dc motor ppt
Dc motor pptDc motor ppt
Dc motor ppt
 

Similar to EIT_Presentation

REPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTREPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTRAJPRASAD RS
 
INSTALLATION OF 500MVA TRANSFORMER AT PGCIL
INSTALLATION OF 500MVA TRANSFORMER AT PGCIL INSTALLATION OF 500MVA TRANSFORMER AT PGCIL
INSTALLATION OF 500MVA TRANSFORMER AT PGCIL Rahul Akinapelli
 
Appraisal ppt ankur
Appraisal ppt ankurAppraisal ppt ankur
Appraisal ppt ankurAnkur Mishra
 
Installation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of TransformersInstallation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of TransformersLiving Online
 
Michael Wood - Loader electric shocks, a case study
Michael Wood - Loader electric shocks, a case studyMichael Wood - Loader electric shocks, a case study
Michael Wood - Loader electric shocks, a case studyNSW Environment and Planning
 
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHHIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHShankar Singh
 
Adoption of Best Practices for Cable Testing and Condition Monitoring In The ...
Adoption of Best Practices for Cable Testing and Condition Monitoring In The ...Adoption of Best Practices for Cable Testing and Condition Monitoring In The ...
Adoption of Best Practices for Cable Testing and Condition Monitoring In The ...Thorne & Derrick International
 
Design_of_Power_Transformers.ppt
Design_of_Power_Transformers.pptDesign_of_Power_Transformers.ppt
Design_of_Power_Transformers.pptSelvaPriyaAEEE2020
 
Power-Transformer-Testing-Brochure-ENU.pdf
Power-Transformer-Testing-Brochure-ENU.pdfPower-Transformer-Testing-Brochure-ENU.pdf
Power-Transformer-Testing-Brochure-ENU.pdfNguyenXuanTung12
 
Site Verification: Tools and Best Practices to Accurately Meter Complex, High...
Site Verification: Tools and Best Practices to Accurately Meter Complex, High...Site Verification: Tools and Best Practices to Accurately Meter Complex, High...
Site Verification: Tools and Best Practices to Accurately Meter Complex, High...TESCO - The Eastern Specialty Company
 
'docslide.us_hv-testing.ppt
'docslide.us_hv-testing.ppt'docslide.us_hv-testing.ppt
'docslide.us_hv-testing.pptThien Phan Bản
 
Generator Protection
Generator ProtectionGenerator Protection
Generator ProtectionPriten Vasa
 
Case Study – How an Unchecked Capacitor can cause loss of revenue
Case Study – How an Unchecked Capacitor can cause loss of revenueCase Study – How an Unchecked Capacitor can cause loss of revenue
Case Study – How an Unchecked Capacitor can cause loss of revenueSystem Protection
 

Similar to EIT_Presentation (20)

REPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTREPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANT
 
INSTALLATION OF 500MVA TRANSFORMER AT PGCIL
INSTALLATION OF 500MVA TRANSFORMER AT PGCIL INSTALLATION OF 500MVA TRANSFORMER AT PGCIL
INSTALLATION OF 500MVA TRANSFORMER AT PGCIL
 
Appraisal ppt ankur
Appraisal ppt ankurAppraisal ppt ankur
Appraisal ppt ankur
 
Installation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of TransformersInstallation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of Transformers
 
Voltage Regulation
Voltage RegulationVoltage Regulation
Voltage Regulation
 
Michael Wood - Loader electric shocks, a case study
Michael Wood - Loader electric shocks, a case studyMichael Wood - Loader electric shocks, a case study
Michael Wood - Loader electric shocks, a case study
 
Executive summary
Executive summaryExecutive summary
Executive summary
 
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHHIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
 
Adoption of Best Practices for Cable Testing and Condition Monitoring In The ...
Adoption of Best Practices for Cable Testing and Condition Monitoring In The ...Adoption of Best Practices for Cable Testing and Condition Monitoring In The ...
Adoption of Best Practices for Cable Testing and Condition Monitoring In The ...
 
Design_of_Power_Transformers.ppt
Design_of_Power_Transformers.pptDesign_of_Power_Transformers.ppt
Design_of_Power_Transformers.ppt
 
Power-Transformer-Testing-Brochure-ENU.pdf
Power-Transformer-Testing-Brochure-ENU.pdfPower-Transformer-Testing-Brochure-ENU.pdf
Power-Transformer-Testing-Brochure-ENU.pdf
 
Site Verification: Tools and Best Practices to Accurately Meter Complex, High...
Site Verification: Tools and Best Practices to Accurately Meter Complex, High...Site Verification: Tools and Best Practices to Accurately Meter Complex, High...
Site Verification: Tools and Best Practices to Accurately Meter Complex, High...
 
'docslide.us_hv-testing.ppt
'docslide.us_hv-testing.ppt'docslide.us_hv-testing.ppt
'docslide.us_hv-testing.ppt
 
Fusing Metering Voltages for High Capacity Circuits
Fusing Metering Voltages for High Capacity CircuitsFusing Metering Voltages for High Capacity Circuits
Fusing Metering Voltages for High Capacity Circuits
 
TESCO Tuesday: Meter Testing in the Field
TESCO Tuesday: Meter Testing in the FieldTESCO Tuesday: Meter Testing in the Field
TESCO Tuesday: Meter Testing in the Field
 
Generator Protection
Generator ProtectionGenerator Protection
Generator Protection
 
Case Study – How an Unchecked Capacitor can cause loss of revenue
Case Study – How an Unchecked Capacitor can cause loss of revenueCase Study – How an Unchecked Capacitor can cause loss of revenue
Case Study – How an Unchecked Capacitor can cause loss of revenue
 
MV Switchgear from IEEE
MV Switchgear from IEEEMV Switchgear from IEEE
MV Switchgear from IEEE
 
Power factor correction
Power factor correctionPower factor correction
Power factor correction
 
Fundamentals of Microprocessor-based Relaying
Fundamentals of Microprocessor-based RelayingFundamentals of Microprocessor-based Relaying
Fundamentals of Microprocessor-based Relaying
 

EIT_Presentation

  • 1. EIT Evaluation 2 Presented By : Ernst de Villiers January 2015 Mentor : Lukas Van de Merwe
  • 2. Contents • Eskom’s 5 Life Saving Rules • Training Schedule • Control Plant Maintenance (CPM) DC Telecontrol Protection • Network Engineering Design (NED)  Electrification 2
  • 3. Eskom’s 5 Life Saving Rules • Open, isolate, test, earth, bond and/or insulate before touch • Hook up at heights • Buckle up during vehicle trips • No one is to work under the influence of alcohol or/and drugs • Having a valid worker’s permit 3
  • 4. 4 Training Schedule Departments Visited Date PPM Coastal 3 February 2014 – 14 March 2194 Standards Implementation 17 March 2014 – 4 April 2014 CNC Coastal 7 April 2014 – 9 May 2014 CPM – Metering 12 May 2014 – 4 July 2014 CPM- DC 7 July 2014 – 15 August 2014 CPM - Telecontrol 18 August 2014 – 10 October 2014 CPM - Protection 13 October 2014 - 23 December 2014 Project Engineering 15 January 2015 -
  • 5. Training Scedule 5 Next Department Period Project Engineering 15 January 2015 – 13 March 2015 Network Planning 16 March 2015 – 22 May 2015 Plant 25 May 2015 – 24 July 2015 Network Optimization 27 July 2015 – 26 October 2015
  • 7. Control Plant Maintenance DC 7 July 2014 – 15 August 2014
  • 8. Department Responsibilities 8 DC DC Substation Supply Battery Bank Battery Charger DC lights Battery Bank Commissioning Tests Installation Sump Pumps Substations DC and AC Panels Maintenance Installations Commissioning
  • 9. Battery Banks • DC batteries banks in substations are supplying the protection and communication modules such as RTU’s and protection panels. • Two types of batteries used in ECOU: • Nickel-Cadmium • Lead-Acid 9
  • 10. Battery and Charger Maintenance DPC 34-1039 Battery Capacity • The ability of the battery to provide a required steady D.C. current for a specified period of time, such that the voltage stays above a certain minimum value. Specific gravity • In lead-acid batteries there is a change in the specific gravity of the electrolyte during charge and discharge, and this forms a valuable indication of the state of charge of the battery. The chemical reaction during charge absorbs from, and releases water into, the electrolyte. 10
  • 11. 11 Capacity Discharge Test A capacity discharge test is done to determine the ampere - hour capacity of the battery according to the labelled specification. Battery Specification – FCP 11 160Ah In the figure below, is a lead acid battery part of the 110V battery bank at Chaba substation.
  • 13. Capacity Discharge Test Initial Rating 1st Hour 2nd Hour 2.5 Hours Final Reading 1 2.18 1.97 1.93 1.90 1.86 2 2.18 1.98 1.93 1.91 1.89 3 2.17 1.98 1.93 1.91 1.86 4 2.17 1.98 1.93 1.90 1.86 5 2.17 1.97 1.89 1.92 1.87 6 2.17 1.98 1.94 1.91 1.86 7 2.17 1.98 1.93 1.92 1.86 8 2.17 1.98 1.94 1.91 1.84 9 2.18 1.97 1.94 1.92 1.86 10 2.17 1.97 1.93 1.90 1.88 11 2.17 1.98 1.94 1.91 1.86 12 2.18 1.98 1.94 1.92 1.86 13 Failing Voltage: 1.8 Test done: Ernst de Villiers Discharge current rate: 38.2A Battery information: Lead Acid Type: FCP 11 Make: Chloride
  • 14. Discharging 14 Discharging a cell over a short period of time you don’t get 100% capacity. According to this Graph, If a cell is discharged over: • 8 hours, you can get 100% performance of the cell, • 4 hours, you can get 80% performance of the cell, • 20 hours, you can get 120% performance of the cell,
  • 16. 16 16 Communications .•Charge Fail – No charging operation •DC earth fault - DC earth faults cause incorrect tripping of protection equipment.
  • 17. 17 17 Communications .•Load Overvoltage - As soon as the voltage rises above the maximum tolerance allowed by the load, an alarm is signalled and the charger is shut off electronically to prevent damage to the load. Some battery chargers are equipped with voltage dropping diodes as a form of voltage regulation to decrease the voltage during an overvoltage. These diodes are visible in the figure below.
  • 18. 2016-03-01 18 AC/DC Panels Before the AC/DC panel are explained, the figure below illustrates the scope of works for the DC department to see exactly where these panels fit into the substation commission.
  • 21. Control Plant Maintenance Telecontrol 18 August 2014 – 10 October 2014
  • 28. Control Plant Maintenance Protection 18 August 2014 – 10 October 2014
  • 29. Power Transformer Testing Tests performed on Spare TRFR for Duke S/S 29 Routine Tests Commissioning Tests Voltage Ratio Vector Group Positive Sequence Impedance Test Zero Sequence Impedance Test Winding Insulation Test Magnetisation Test Winding Resistance Oil and Winding Temperature Test
  • 30. Routine Test - Turn Ratio 30 Primary Voltage Secondary Voltage
  • 31. Result - Turn Ratio • Ratio is below the allowed error of 0.5% 31
  • 32. • The purpose of impedance measurements is to detect shipping damage by comparison with nameplate values and with diagnostic tests. Percent impedance measurements will differ for each tap position. • An Impedance test is useful for determining loose or high-resistance connections. between test and nameplate values can indicate future failure due to short –circuited windings or damaged core. 𝑍% = 𝑉 𝑀𝑒𝑎𝑠𝑢𝑟𝑒𝑑 1.73 𝑥 𝐼 𝑀𝑒𝑎𝑠𝑢𝑟𝑒𝑑 x 𝑅𝑎𝑡𝑒𝑑 𝑀𝑉𝐴 (𝑅𝑎𝑡𝑒𝑒 𝑉𝑜𝑙𝑡𝑎𝑔𝑒)2 x 100 32 Routine Test – Positive Sequence Impedance
  • 33. Result - Positive Sequence Impedance Tap Phase Voltage Current 𝒁 𝑪𝒂𝒍𝒄𝒖𝒍𝒂𝒕𝒆𝒅 𝒁 𝑪𝒐𝒓𝒆 Z % 1 Red 230.7 44.9 5.138 5.169 5.34White 236.7 45.8 5.168 Blue 236.6 45.5 5.2 5 Red 23.1.3 43.9 5.263 5.27 5.44White 237.4 45.2 5.252 Blue 237.5 44.9 5.29 17 Red 231.9 41.7 5.561 5.585 5.77White 237.9 42.6 5.582 Blue 237.8 42.4 5.608 33
  • 34. • This test is done to provide an indication of the no-load current drawn by the transformer; hence the magnetization current set up due to losses in the electric circuit and losses in the magnetic circuit due to e.g. shorted core laminations. The insulating varnish could be damaged by sustained high current faults resulting in a heated core. 34 Commissioning Test – Magnetisation Test
  • 35. 35 Commissioning Test – Magnetisation Test
  • 36. • The calculation of earth fault currents on the power system requires the zero- sequence impedance of transformers to be known. • The flow of zero-sequence current through a transformer occurs under earth fault conditions and only if the transformer has a star winding with the neutral point grounded and has a secondary/tertiary winding which is able to produce balancing zero-sequence currents. If there is no secondary or tertiary winding which produces the balancing zero-sequence currents, the zero-sequence impedance of the transformer would be limited by the tank-delta effect. 36 Commissioning Test – Zero-sequence Test
  • 37. Oil and Winding Temperature Test • The oil and winding temperature gauges provide protection against internal transformer faults and overloading. • Since the temperature of the winding is proportional to the square of current passing through it, the winding temperature circuit makes use of a current transformer wired in series with one phase of the transformer winding on the load side (usually the red phase). • The output of the feeds a heating element that is located in the pocket for the winding temperature gauge’s probe. 37
  • 38. 38 Oil and Winding Temperature Test DISSCAAD3
  • 39. 39 Oil and Winding Temperature Test
  • 40. Ncora TRFR Scheme 3.3/22 kV • Installation of single phase Diff relays • Ringing of scheme • Modifications • SEL 351 and SEL 387 Relays 40
  • 42. Current Transformers 42 CT’s play a major role when it comes to protection and relay schemes. When current in a circuit is too high to apply directly to recording instruments, a current transformer produces a reduced current accurately proportional to the current in the circuit, which can be conveniently connected to measuring and recording instruments.
  • 45. Differential Protection 45 This scheme is based on the principle that the input power to the power transformer under normal conditions is equal to the output power. Under normal conditions, no resultant current will flow into the differential relay current coil. Whenever a fault occurs, within the protected zone, the current balance will no longer exist, and relay contacts will close and release a trip signal to cause the certain circuit breakers to operate in order to disconnect the faulty equipment/part
  • 46. Diff Procedure – Peddie Substation Normal Operation • 𝐼1 − 𝐼2 = 0 Fault Operation • 𝐼1 − 𝐼2 = 𝐼 𝑑 46
  • 47. 47 Diff Test Procedure – Peddie Substation Normal Operation 𝐼1 − 𝐼2 = 0 Fault Operation 𝐼1 − 𝐼2 = 𝐼 𝑑
  • 48. Diff Verification – Board Illustration 48
  • 50. Restricted Earth Fault (REF) 50 CT secondary of each phase of power transformer are connected together as shown in the figure. Common terminals are connected to the secondary of a Neutral Current Transformer or NCT. Whenever there is an unbalancing in between three phases of the transformer, a resultant unbalanced current flows through the close path connected to the common terminals of the CT secondaries.
  • 51. 51 REF Test Procedure – Peddie Substation HV REF MV REF
  • 52. Restricted Earth Fault(REF) - Board Illustration 52
  • 53. Network Engineering & Design Manager: Clive Akol Supivisor: Boifang Moumakwa
  • 55. Khotana Project • Khotana Electrification project consists of 36 villages with the total number of connections of 3603. • Ebongweni Village allocated to EIT with approximately 171 connections. • Feeding from Idutywa/Butterworth 22kV network. 55
  • 56. Khotana Project – Butterworh Area 56
  • 57. • Preliminary Design: The main purpose of the preliminary design is to determine the best design alternative which will satisfy the conceptual design, costs and need date defined by Planning in the Concept Release Approval form and associated Planning Proposal report. Containing: • Scope of works • System Configuration • MV fault levels • MV Voltage Intake Levels – Full load and light load • Performance levels 57 Khotana Project - Needed

Editor's Notes

  1. NB – Reactor: Current Limiting
  2. CT – VT for output measurement REV Swittch