This document discusses the stages and process of a Kaizen event. It begins by defining what a Kaizen is and explaining the typical stages: planning and preparation, the event itself, reporting out results, and follow up. The planning stage involves setting goals, selecting a team, collecting baseline data, and planning support. During the event, the standard work process is documented, improvement opportunities are identified and countermeasures planned. Results are measured and changes are verified and standardized. Follow up ensures improvements are sustained over time through continued reviews and assessments.
Hand in hand with 5S implementation is creating Visual Factory. Use of signage, demarcation lines, quality inspection points, easy to ready guages and dials
6 Sigma - Introduction, Techniques and ImplementationVarun Suresh
This presentation talks about what 6 sigma is, its evolution, How its implemented and the various techniques used in 6 sigma, the organizational Structure and its advantages and Disadvantages
16 big losses for manufacturing and servicesVishy Chandra
This presentation will provide information on what the 16 Big Losses are. The module will also introduce to a first-time connect of the 16 Big Losses to a service context.
The Training is a 1 day course covering impartation knowledge of Kaizen and its associated Tools and; -application of Lean concepts to lead Kaizen Workshop/s with Innovation Projects for Change in a World Class Manufacturing Environment.
This training aims to impart a systematic review on all the critical aspects of Lean use to; lead Kaizen workshop and presentation using Standardize Kaizen form and methodology with;
Innovation to be competitive in the Global Business Environment.
COURSE CONTENT
Kaizen, its definition and Principles
Kaizen definition, Innovation Definition
Kaizen vs Innovation
Characteristics of a Lean Factory
Cellular Factory Layout
Multi-skilled Operators
6S and Visual Control
Kanban and Supermarkets
Rapid Changeover
Total Quality Approach
Right-sized, flexible equipment
Water Strider
Moving Production Lines
Total Productive Maintenance
Continuous Improvement
The 3 Pillars of Kaizen
1. 6S (5+1S) Housekeeping
2. Waste Elimination
- Types of Waste CLOSEDMITT
- Valued-added vs Non-value
added
3. Standard Operation
Three factors that accounts the 3 Pillars Activities.
1. Visual management,
2. The role of the supervisor,
3. Importance of training and
creating a learning
organization.
Innovation & Workshop Projects
Types of Innovation in Kaizen. Why Innovation?
Degree of Innovation-the act of creating new products,
processes, ideas, etc...
Examples of Types of Innovation
Innovating Process using Typical Kaizen concepts (Lean
methods)
Phase 1: Pre-Planning for Innovation
Phase 2: Execution - Innovation Week
Role of Leader, Facilitator, Participant in Innovation
Projects
Innovation Projects Implementation using Kaizen Forms for:
Daily and Weekly Report Outs
Follow-up for further Innovation
This is a little presentation we used for our hourly employees when we rolled out lean. Not attached are the real life examples we discussed as part of the training.
Webinar held on July 15, 2009
Lean Fundamentals Overview
Presented by: Michael E. Parker
Description:
Utilizing my one-on-one training by lean experts from Toyota Motor Corporation (TMC) in Japan's Toyota City, you'll receive an overview on the main fundamentals that drive the lean management philosophy and learn how you can begin implementing these philosophies in your business. Whether you are a small business owner, entrepreneur, mid-level to senior-level manager or director, you will gain valuable insight on the critical business issues you are facing today and how to utilize lean management principles to recognize areas to reduce costs, add value and change your processes for the better.
We will discuss these key fundamentals of lean management:
o Cost Reduction Principle
o Lead-Time Reduction
o 7 Forms of Waste
o Just-In-Time
o Built-in-Quality (Jidoka)
o Level Scheduling (Heijunka)
o Pull Systems (Kanban)
o Kaizen
Lean Maintenance is gaining traction as a sound strategy to keep equipment running and productivity humming. The hardest part is getting started. On Thursday, March 20 at 1 p.m. CDT, Plant Engineering will present a Webcast that looks at the steps needed to implement a sound Lean Maintenance strategy on your plant floor and to begin to reap the benefits.
Learning objectives:
-The value of Lean Maintenance as a plant-floor strategy and the history of lean
-The steps and tools needed to get started down the road to Lean
-Getting plant-floor buy-in from line workers
-Incorporating technology into Lean maintenance
Hand in hand with 5S implementation is creating Visual Factory. Use of signage, demarcation lines, quality inspection points, easy to ready guages and dials
6 Sigma - Introduction, Techniques and ImplementationVarun Suresh
This presentation talks about what 6 sigma is, its evolution, How its implemented and the various techniques used in 6 sigma, the organizational Structure and its advantages and Disadvantages
16 big losses for manufacturing and servicesVishy Chandra
This presentation will provide information on what the 16 Big Losses are. The module will also introduce to a first-time connect of the 16 Big Losses to a service context.
The Training is a 1 day course covering impartation knowledge of Kaizen and its associated Tools and; -application of Lean concepts to lead Kaizen Workshop/s with Innovation Projects for Change in a World Class Manufacturing Environment.
This training aims to impart a systematic review on all the critical aspects of Lean use to; lead Kaizen workshop and presentation using Standardize Kaizen form and methodology with;
Innovation to be competitive in the Global Business Environment.
COURSE CONTENT
Kaizen, its definition and Principles
Kaizen definition, Innovation Definition
Kaizen vs Innovation
Characteristics of a Lean Factory
Cellular Factory Layout
Multi-skilled Operators
6S and Visual Control
Kanban and Supermarkets
Rapid Changeover
Total Quality Approach
Right-sized, flexible equipment
Water Strider
Moving Production Lines
Total Productive Maintenance
Continuous Improvement
The 3 Pillars of Kaizen
1. 6S (5+1S) Housekeeping
2. Waste Elimination
- Types of Waste CLOSEDMITT
- Valued-added vs Non-value
added
3. Standard Operation
Three factors that accounts the 3 Pillars Activities.
1. Visual management,
2. The role of the supervisor,
3. Importance of training and
creating a learning
organization.
Innovation & Workshop Projects
Types of Innovation in Kaizen. Why Innovation?
Degree of Innovation-the act of creating new products,
processes, ideas, etc...
Examples of Types of Innovation
Innovating Process using Typical Kaizen concepts (Lean
methods)
Phase 1: Pre-Planning for Innovation
Phase 2: Execution - Innovation Week
Role of Leader, Facilitator, Participant in Innovation
Projects
Innovation Projects Implementation using Kaizen Forms for:
Daily and Weekly Report Outs
Follow-up for further Innovation
This is a little presentation we used for our hourly employees when we rolled out lean. Not attached are the real life examples we discussed as part of the training.
Webinar held on July 15, 2009
Lean Fundamentals Overview
Presented by: Michael E. Parker
Description:
Utilizing my one-on-one training by lean experts from Toyota Motor Corporation (TMC) in Japan's Toyota City, you'll receive an overview on the main fundamentals that drive the lean management philosophy and learn how you can begin implementing these philosophies in your business. Whether you are a small business owner, entrepreneur, mid-level to senior-level manager or director, you will gain valuable insight on the critical business issues you are facing today and how to utilize lean management principles to recognize areas to reduce costs, add value and change your processes for the better.
We will discuss these key fundamentals of lean management:
o Cost Reduction Principle
o Lead-Time Reduction
o 7 Forms of Waste
o Just-In-Time
o Built-in-Quality (Jidoka)
o Level Scheduling (Heijunka)
o Pull Systems (Kanban)
o Kaizen
Lean Maintenance is gaining traction as a sound strategy to keep equipment running and productivity humming. The hardest part is getting started. On Thursday, March 20 at 1 p.m. CDT, Plant Engineering will present a Webcast that looks at the steps needed to implement a sound Lean Maintenance strategy on your plant floor and to begin to reap the benefits.
Learning objectives:
-The value of Lean Maintenance as a plant-floor strategy and the history of lean
-The steps and tools needed to get started down the road to Lean
-Getting plant-floor buy-in from line workers
-Incorporating technology into Lean maintenance
This Slideshare presentation is a partial preview of the full business document. To view and download the full document, please go here:
http://flevy.com/browse/business-document/kaizen-event-guide-311
A Kaizen Event is a rapid, focused application of Lean methods to reduce waste so as to improve cost, quality, delivery, speed, flexibility and responsiveness to internal/external customer needs.
This presentation guide provides a step-by-step guidance to the planning, preparation and conducting a Kaizen Event. It includes post-event follow up activites as well as templates for Kaizen charter and presentation to management and other stakeholders.
This event guide can be used together with the Kaizen training presentation.
Number of slides: 98
CONTENTS:
Introduction
- What is Kaizen?
- 10 rules of Kaizen
- What is the purpose of Kaizen?
- Value
- Types of waste
- What is a Kaizen event?
- Benefts of Kaizen and Kaizen events
Kaizen events -what are they? Driving Performance ImprovementPhilip Lowe
Kaizen Events are a easy way to get started improving your business. With a focus on Action and implementation teams that are dedicated to solving a problem. Freeing up people from usual day to day responsibilities generates focus, dedication and enthusiasm that can be built upon every month to continually generate results. We have been involved in kaizen events that have generated benefits up to $20 Million for a weeks work! Usually 4 weeks is allowed to prepare for a Kaizen Event and 4 Weeks after the event to finalise any outstanding actions.
Overview of 3 day Lean & Kaizen Course ContentTimothy Wooi
Objectives of the course is to equip participants with tools
and knowledge on Lean Manufacturing in a competitive World Class Business requirements.
Upon completion of the 3 day course,participants will be equip with knowledge allowing them to lead Kaizen workshops.
COURSE
The training is an intensive 3 days course covering all aspects of Lean Manufacturing in a World Class (WCM) environment.
The training course covers understanding of world class
requirements and using tools associated with WCM to perform Kaizen events to eliminate waste so as to be competitive in the fast changing business world. The training includes a mix of workshop exercises, group
and simulations using tools to give participants a real understanding to apply concepts in real work place to eliminate Waste to be Competitive.
For details email timothywooi2@gmail.com.
The 5S workplace organization system applies a set of basic management principles that many companies widely adopt to maximize productivity and organization. As a cornerstone of Lean management, 5S improves workplace morale, safety and efficiency.
In this training presentation, you will learn how to mobilize and align your management team to launch or improve a 5S and Visual Management implementation in your organization. The presentation covers 5S and Visual Management best practices, step-by-step implementation guidance, and the best ways to integrate lean 5S into the organization's culture to achieve sustainable world-class excellence.
LEARNING OBJECTIVES
1. Understand the benefits of working in a clean and neat environment
2. Define the 5S principles, and identify visual tools
3. Explain how to apply the 5S principles and visual tools to enhance workplace organization
4. Learn how to kick start and launch a 5S initiative
5. Define the critical success factors for 5S implementation
CONTENTS
Introduction & Overview
5S Lays the Foundation for a Lean Enterprise
5S Establishes a Baseline for Kaizen Activities
5S as a Cornerstone of Employee Engagement
5S Helps to Eliminate Waste
What is 5S?
What is the Purpose of 5S?
Benefits of 5S
5S Principles - Step by Step
How to Conduct a Red Tagging Exercise
5S Visual Management
5S Applications
5S Implementation
Starting & Launching 5S
5S Audit System & Maturity Levels
Supporting Lean Tools for 5S
Critical Success Factors
To download this complete presentation, please go to: http://www.oeconsulting.com.sg
CHAPTER 1 SEMESTER V PREVENTIVE-PEDIATRICS.pdfSachin Sharma
This content provides an overview of preventive pediatrics. It defines preventive pediatrics as preventing disease and promoting children's physical, mental, and social well-being to achieve positive health. It discusses antenatal, postnatal, and social preventive pediatrics. It also covers various child health programs like immunization, breastfeeding, ICDS, and the roles of organizations like WHO, UNICEF, and nurses in preventive pediatrics.
CHAPTER 1 SEMESTER V - ROLE OF PEADIATRIC NURSE.pdfSachin Sharma
Pediatric nurses play a vital role in the health and well-being of children. Their responsibilities are wide-ranging, and their objectives can be categorized into several key areas:
1. Direct Patient Care:
Objective: Provide comprehensive and compassionate care to infants, children, and adolescents in various healthcare settings (hospitals, clinics, etc.).
This includes tasks like:
Monitoring vital signs and physical condition.
Administering medications and treatments.
Performing procedures as directed by doctors.
Assisting with daily living activities (bathing, feeding).
Providing emotional support and pain management.
2. Health Promotion and Education:
Objective: Promote healthy behaviors and educate children, families, and communities about preventive healthcare.
This includes tasks like:
Administering vaccinations.
Providing education on nutrition, hygiene, and development.
Offering breastfeeding and childbirth support.
Counseling families on safety and injury prevention.
3. Collaboration and Advocacy:
Objective: Collaborate effectively with doctors, social workers, therapists, and other healthcare professionals to ensure coordinated care for children.
Objective: Advocate for the rights and best interests of their patients, especially when children cannot speak for themselves.
This includes tasks like:
Communicating effectively with healthcare teams.
Identifying and addressing potential risks to child welfare.
Educating families about their child's condition and treatment options.
4. Professional Development and Research:
Objective: Stay up-to-date on the latest advancements in pediatric healthcare through continuing education and research.
Objective: Contribute to improving the quality of care for children by participating in research initiatives.
This includes tasks like:
Attending workshops and conferences on pediatric nursing.
Participating in clinical trials related to child health.
Implementing evidence-based practices into their daily routines.
By fulfilling these objectives, pediatric nurses play a crucial role in ensuring the optimal health and well-being of children throughout all stages of their development.
Medical Technology Tackles New Health Care Demand - Research Report - March 2...pchutichetpong
M Capital Group (“MCG”) predicts that with, against, despite, and even without the global pandemic, the medical technology (MedTech) industry shows signs of continuous healthy growth, driven by smaller, faster, and cheaper devices, growing demand for home-based applications, technological innovation, strategic acquisitions, investments, and SPAC listings. MCG predicts that this should reflects itself in annual growth of over 6%, well beyond 2028.
According to Chris Mouchabhani, Managing Partner at M Capital Group, “Despite all economic scenarios that one may consider, beyond overall economic shocks, medical technology should remain one of the most promising and robust sectors over the short to medium term and well beyond 2028.”
There is a movement towards home-based care for the elderly, next generation scanning and MRI devices, wearable technology, artificial intelligence incorporation, and online connectivity. Experts also see a focus on predictive, preventive, personalized, participatory, and precision medicine, with rising levels of integration of home care and technological innovation.
The average cost of treatment has been rising across the board, creating additional financial burdens to governments, healthcare providers and insurance companies. According to MCG, cost-per-inpatient-stay in the United States alone rose on average annually by over 13% between 2014 to 2021, leading MedTech to focus research efforts on optimized medical equipment at lower price points, whilst emphasizing portability and ease of use. Namely, 46% of the 1,008 medical technology companies in the 2021 MedTech Innovator (“MTI”) database are focusing on prevention, wellness, detection, or diagnosis, signaling a clear push for preventive care to also tackle costs.
In addition, there has also been a lasting impact on consumer and medical demand for home care, supported by the pandemic. Lockdowns, closure of care facilities, and healthcare systems subjected to capacity pressure, accelerated demand away from traditional inpatient care. Now, outpatient care solutions are driving industry production, with nearly 70% of recent diagnostics start-up companies producing products in areas such as ambulatory clinics, at-home care, and self-administered diagnostics.
Defecation
Normal defecation begins with movement in the left colon, moving stool toward the anus. When stool reaches the rectum, the distention causes relaxation of the internal sphincter and an awareness of the need to defecate. At the time of defecation, the external sphincter relaxes, and abdominal muscles contract, increasing intrarectal pressure and forcing the stool out
The Valsalva maneuver exerts pressure to expel faeces through a voluntary contraction of the abdominal muscles while maintaining forced expiration against a closed airway. Patients with cardiovascular disease, glaucoma, increased intracranial pressure, or a new surgical wound are at greater risk for cardiac dysrhythmias and elevated blood pressure with the Valsalva maneuver and need to avoid straining to pass the stool.
Normal defecation is painless, resulting in passage of soft, formed stool
CONSTIPATION
Constipation is a symptom, not a disease. Improper diet, reduced fluid intake, lack of exercise, and certain medications can cause constipation. For example, patients receiving opiates for pain after surgery often require a stool softener or laxative to prevent constipation. The signs of constipation include infrequent bowel movements (less than every 3 days), difficulty passing stools, excessive straining, inability to defecate at will, and hard feaces
IMPACTION
Fecal impaction results from unrelieved constipation. It is a collection of hardened feces wedged in the rectum that a person cannot expel. In cases of severe impaction the mass extends up into the sigmoid colon.
DIARRHEA
Diarrhea is an increase in the number of stools and the passage of liquid, unformed feces. It is associated with disorders affecting digestion, absorption, and secretion in the GI tract. Intestinal contents pass through the small and large intestine too quickly to allow for the usual absorption of fluid and nutrients. Irritation within the colon results in increased mucus secretion. As a result, feces become watery, and the patient is unable to control the urge to defecate. Normally an anal bag is safe and effective in long-term treatment of patients with fecal incontinence at home, in hospice, or in the hospital. Fecal incontinence is expensive and a potentially dangerous condition in terms of contamination and risk of skin ulceration
HEMORRHOIDS
Hemorrhoids are dilated, engorged veins in the lining of the rectum. They are either external or internal.
FLATULENCE
As gas accumulates in the lumen of the intestines, the bowel wall stretches and distends (flatulence). It is a common cause of abdominal fullness, pain, and cramping. Normally intestinal gas escapes through the mouth (belching) or the anus (passing of flatus)
FECAL INCONTINENCE
Fecal incontinence is the inability to control passage of feces and gas from the anus. Incontinence harms a patient’s body image
PREPARATION AND GIVING OF LAXATIVESACCORDING TO POTTER AND PERRY,
An enema is the instillation of a solution into the rectum and sig
One of the most developed cities of India, the city of Chennai is the capital of Tamilnadu and many people from different parts of India come here to earn their bread and butter. Being a metropolitan, the city is filled with towering building and beaches but the sad part as with almost every Indian city
How many patients does case series should have In comparison to case reports.pdfpubrica101
Pubrica’s team of researchers and writers create scientific and medical research articles, which may be important resources for authors and practitioners. Pubrica medical writers assist you in creating and revising the introduction by alerting the reader to gaps in the chosen study subject. Our professionals understand the order in which the hypothesis topic is followed by the broad subject, the issue, and the backdrop.
https://pubrica.com/academy/case-study-or-series/how-many-patients-does-case-series-should-have-in-comparison-to-case-reports/
R3 Stem Cells and Kidney Repair A New Horizon in Nephrology.pptxR3 Stem Cell
R3 Stem Cells and Kidney Repair: A New Horizon in Nephrology" explores groundbreaking advancements in the use of R3 stem cells for kidney disease treatment. This insightful piece delves into the potential of these cells to regenerate damaged kidney tissue, offering new hope for patients and reshaping the future of nephrology.
We understand the unique challenges pickleball players face and are committed to helping you stay healthy and active. In this presentation, we’ll explore the three most common pickleball injuries and provide strategies for prevention and treatment.
4. Content:
• What is a Kaizen?
• Why Kaizen?
• Stages of Kaizen
• Planning and Preparation
• Event
• Report out
• Follow-up
5. Planning and Preparation
There are 4 basic steps:
• Set goals.
• Select the team.
• Collect baseline data.
• Plan to support the Kaizen activity.
6. Set Goals
to reduce ventilator associated
pneumonia from 30 per 1000
ventilator days to be below 10 per
1000 ventilator days
7. Select the Team
• Team size should be based on the area(s) being kaizened.
• A trained Facilitator and a Team Leader for each Team
• Every team member should be chosen for a specific reason
•Management
•“Different Set of Eyes”
•Customers and Suppliers (internal or external)
•Experts (people who actually do the work)
•Change Agents and “CAVE Men”
8. Data collection
• We need objective evaluation of the process
before and after the improvement
so what will we do
We collect data
9. Data collection
What we will collect ???
• Base line data before
initiation of the
project: process as it is
collect data of the current
status
• Results after
Improvement: collect
base line data and compare
to know the project
effectiveness.
How will we collect it ???
• Data Sheet or Work
Sheet: Form for recording
data requires subsequent
processing for analysis and
interpretation.
• Checklists: Form for
recording data; designed to
facilitate interpretation
directly from form
• Survey: Form for getting
input from a large group
10. How do we present it
10,580
8,773
4,4145,030
6,768
4,420
CRP VIT-D HBA1C
2016 2017
71 63 53
7 8 8 9 8 7
JAN FEB MAR APR MAY JUN JUL AUG SEP
BREAST FEEDING MOTHERS STATUS
rejection
82%
91%
75%
80%
85%
90%
95%
Before After
% of
compliance to
antibiotic…> 11 days
16%
< 12 days
84%
11. Plan to Support Kaizen
• Top management support to cover Kaizen needs
• Set clear goals and expectations with time frames
• Empower employee
While the goal of a Kaizen is to work around the process, interruptions are
inevitable as improvements are implemented. Success requires action prior
to the Kaizen. Items to consider:
12. Content:
• What is a Kaizen?
• Stages of Kaizen
• Planning and Preparation
• Event
• Report out
• Follow-up
13. The Standard Work elements of a Kaizen are:
Document
Reality
Plan
Countermeasures
Identify
Waste
Reality
Check
Make Changes Verify Change
Measure
Results
Make this
the Standard
Celebrate
Do It
Again
Results:
A new way of work
Start
Stages of the Kaizen
14.
15. Content:
• What is a Kaizen?
• Stages of Kaizen
• Planning and Preparation
• Event
• Report out
• Follow-up
16. After the kaizen, the focus must be placed on ensuring that the improvements
continue.
This is done by:
• Regular reviews by. GEMBA
• walkthroughs
• assessments
Follow-up
18. “You never get a
second chance to
create a first
impression.”
First Impressions
19. 5S
1. Sort - All unneeded tools, parts and supplies are
removed from the area
2. Set in Order (store) - A place for everything and everything is
in its place
3. Shine - The area is cleaned as the work is performed
4. Standardize - Cleaning and identification methods are
consistently applied
5. Sustain - 5S is a habit and is continually improved
Also - Work areas are safe and free of hazardous or dangerous
conditions
20. SORT
NECESSARY UNNECESSARY
CATEGORIZE
NECESSARY ITEMS:
* RARELY USED
* OCCASIONALLY USED
* FREQUENTLY USED
RED TAG STRATEGY
ATTACH TO ALL
UNNECESSARY ITEMS
DISCARD
UNNECESSARY
ITEMS
RED TAG
Category 1. Raw material 6. Dies and jigs
2. In-process stock 7. Tools and supplies
3. Semi-finished goods 8. Measuring devices
4. Finished goods 9. Documents
5. Equipment 10.Other
Item name
and number
Quantity Units $ Value
Reason 1. Not needed 6. Other
2. Defective
3. Not needed soon
4. Scrap material
5. Use unknown
Disposal by: Department/Business Unit/Product Center
Disposal method:
1. Discard
2. Return
3. Move to red-tag storagesite
4. Move to separatestorage site
5. Other
Disposal
complete
(signature )
Posting date: Disposal date:
9
24. Check Item
Consistent with the
entire system
Visual aids or visual
control systems
Visual Workplace
Action
Follow 5S Audit Sheet and all other visual controls
Perform regular, scheduled audits
Submit improvement suggestions
Stick to the guidelines
Produce signs, charts, graphs, paint equipment,
color coding systems
Implement standard method for cleaning and
maintenance
Create an environment in which anyone can know
in five minutes or less the who, what, when, how
and why of any work area: Without talking to
anyone, without opening a file drawer, without
opening a book or without turning on a computer
5S Guidelines
5S Review Schedule