INTRODUCTION
❖ Dam is a solid barrier constructed at a
suitable location across a river valley to
store flowing water.
❖ A dam is a structure which prevents the
flow of water and accumulates it in a
reservoir.
❖ A barrier constructed across a waterway to
control the flow or raise the level of water.
PURPOSES
1. Flood control
2. Drinking and domestic water supply
3. Irrigation
4. Industrial water supply
5. Hydroelectric energy production
6. Retention and control of sediments
7. Inland navigation
8. Improvement of water quality
9. Fish Farming
10. Recreation facilities
ARCH DAM
❖ An arch dam is curved in plan, with its convexity towards the
upstream side. They transfers the water pressure and other forces
mainly
❖ An arch dam is quite suitable for narrow canyons with strong
flanks.
❖ The section of an arch dam is approximately triangular like a
gravity dam but the section is comparatively thinner.
❖ An arch dam is most suitable for narrow gorges.
❖ Since they are thinner than any other dam type, they require much
less construction material, making them economical and practical
in remote areas.
❖ The foundation or abutments for an arch dam must be very stable
and proportionate to the concrete. To the abutments by arch action.
Katse_ Dam
prevstill Dam.
CLASSIFICATION
Classified based on the ratio of the base
thickness to the structural height (b/h) as:
❖ Thin, -less than 0.2,
❖ Medium-thick, -between 0.2 and 0.3,
❖ Thick, -over 0.3.
Classified with respect to their structural height
are:[
❖ Low dams - up to 30
❖ Medium high dams - between 30–91 m
❖ High dams - over 91 m
There are two basic designs for an arch
dam: –
❖ Constant radius arch dams :- Radius of
curvature throughout the structure is constant
and upstream face is vertical.
❖ Variable-radius dams:- Which have both
upstream and downstream curves that
systematically decrease in radius below the
crest.
A dam that is double-curved in both its
horizontal and vertical planes may be called a
dome dam.
IDUKKI DAM, KERALA- FIRST ARCH DAM IN
INDIA
➢ Location:- Idukki, Kerala, India
➢ Purpose:- Power Generation, Flood Control
➢ Type of Dam:- Concrete, double curvature parabolic, thin arch.
➢ Height :- 168.91 m (554ft)
➢ Length :- 365.85 m (1,200ft)
➢ Dam volume:- 450,000 m3 (16,000,000cuft)
➢ Spillways:- Nil
➢ Reservoir Total capacity:- 1,996×106 m3 (1,618,184acre·ft)
➢ Active capacity :- 1,459×106 m3 (1,182,831acre·ft)
➢ Inactive capacity: - 536×106 m3 (434,542acre·ft)
➢ Catchment Area:- 649.3 km2 (251sqmi)
➢ Surface area :- 60 km2 (23sqmi)
➢ Normal elevation :- 732.62 km2 (283sqmi)
➢ Installed capacity:- 780 MW
IDUKKI DAM, KERALA
DIFFERENT PARAMETERS TO BECONSIDERED IN THE
DYNAMIC ANALYSIS OF ARCH DAM:-
❖Semi- unbounded size of reservoir.
❖ Foundation rock domains.
❖ Dam-water interaction.
❖ Wave absorption at the reservoir boundary.
❖ Water compressibility.
❖ Dam-foundation rock interaction.
❖ Variations in ground motion at dam-rock
interface.
❖ Material non-linearity.
DAM WATER INTERACTION
❖ Hydro dynamic effects are generally
important in the response of arch dam so
more than for gravity dams.
❖ Tensile stress in dam due to upstream
ground motion are more than doubled when
hydro dynamics effect are included.
RESERVOIR BOUNDARY ABSORPTION
❖ Partial absorption of hydrodynamic pressure
waves by the sediments invariably deposited at
the reservoir bottom and sides, or even by rock
underlying the reservoir.
❖ In general, assuming a non absorptive (rigid)
reservoir boundary leads to an unrealistically
large response for dam with impounding water,
practically due to vertical and cross stream
ground motion.
WATER COMPRESSIBILITY
❖ Westegards classical formula for the added
hydrodynamic mass, commonly used in dynamics
analysis of dam.
❖ Water compressibility would be significant in the
response most concrete dams because ( Es) is
generally much higher and ( f res. / f dam) is
corresponding smaller.
DAM–FOUNDATION ROCK INTERACTION
❖ In standard FEM foundation rock is assumed to
be mass-less .
❖ In which only flexibility is considered but inertial
and damping effect are ignored, is popular
because the foundation impedance matrix
(Frequency –dependent stiffness matrix) is very
difficult to determine.
LITERATURE REVIEW
➢ Anil K.Chopra ,2008–identified the limitations of the traditional design
procedures, the factors that should be considered in the dynamic analysis
are discussed, and procedures for earthquake response history analysis
are summarized.
➢ M. A. Hariri-Ardebili et al,2011- Reservoir fluctuation effects on seismic
response of concrete arch dams are investigated. Structure nonlinearity is originated
from material nonlinearity due to tensile cracking and compression crushing of mass
concrete .
➢ Violeta Mircevska atal.,2014- The magnitudes of the hydrodynamic pressures at the
dam-fluid interface depend on the amount of energy transmitted to the fluid by the
vibration of the reservoir boundaries. Although the reservoir topology can have a
considerable impact on the amount of generated energy.
LITERATURE REVIEW
➢ Feng and Wei.et.al.,2014- A comparative study on the performance
and ultimate bearing capacity of dams. A set of safety factors was
presented with regard to dam heel cracks and the ultimate bearing
capacity of a high arch dam.
➢ Masterarbeit .,2016- Developed a software based calculation of the
3D coordinates of double curved arch dams . To calculate these 3D
coordinates, it is possible to determine the geometry of double curved
arch dams and modify it for optimization purposes.
➢ Gao lin and shichun chi.,2017 - feasibility study of vibration control
systems applied to massive structure, a 292m high arch dam was
carried out. Seismic analyses of the arch dam including nonlinear
behavior of joint movements demonstrate, that installation of
viscoelastic dampers in the contraction joints can reduce the maximum
tensile stresses at major part of the dam to a great extent.
FINITE ELEMENT MODEL
REFERENCES
❖ Chopra, A. K., and Wang, J.-T. (2008). “Analysis and response of concrete arch
dams including dam-water foundation rock interaction to spatially varying
ground motions.”
❖ Varshney, R. S., Hydro Power Structures
❖ Wikipedia http://en.wikipedia.org/wiki/Dam
❖ http://www.idk.kerala.gov.in/index.php?option=com_content&view=article&id
=85 & Itemed=58
❖ Akköse, M., Bayraktar, A., and Dumanoğlu, A. A. (2016). “Reservoir water
level effects on nonlinear dynamic response of arch dams.” J. Fluids Struct.,
24(3), 418–435.
❖ M .A. Lotfollahi Yaghin and M.A. Hesari, “Dynamic Analysis of arch concrete
dam under Earthquake force with ABAQUS”, Journal of applied sciences
8:26482658,2008
THANK YOU!!!

More Related Content

What's hot

Earthen dam
Earthen damEarthen dam
Spillways components and types
Spillways components and typesSpillways components and types
Spillways components and types
Rajkumar G
 
Gravity dam
Gravity damGravity dam
Dams and spillways
Dams and spillwaysDams and spillways
Vacuum dewatering
Vacuum dewateringVacuum dewatering
Vacuum dewatering
Aglaia Connect
 
Types of earth dams
Types of earth damsTypes of earth dams
Types of earth dams
saibabu48
 
Grouting
Grouting Grouting
Grouting
Chaitanya Raval
 
Grouting
GroutingGrouting
Grouting
astraeaeos
 
Gravity Dam
Gravity DamGravity Dam
Gravity dam
Gravity damGravity dam
Tunnelling
TunnellingTunnelling
Tunnelling
Usama Zia
 
Gallery in Concrete Gravity Dam
Gallery in Concrete Gravity DamGallery in Concrete Gravity Dam
Gallery in Concrete Gravity Dam
Manish Khandelwal
 
Dams pdf
Dams pdfDams pdf
Well Foundation
Well FoundationWell Foundation
Well Foundation
akjain_mkt
 
Earthen Dams
Earthen DamsEarthen Dams
Earthen Dams
GAURAV. H .TANDON
 
Earthen Dam
Earthen DamEarthen Dam
Reservoir sedimentation & its control
Reservoir sedimentation & its controlReservoir sedimentation & its control
Reservoir sedimentation & its control
ZahinRana
 
Reservoir Planning
Reservoir PlanningReservoir Planning
Reservoir Planning
Malla Reddy University
 
seminar presentation report on spillway
 seminar presentation report on spillway seminar presentation report on spillway
seminar presentation report on spillway
manjeet singh
 

What's hot (20)

Gravity dam
Gravity damGravity dam
Gravity dam
 
Earthen dam
Earthen damEarthen dam
Earthen dam
 
Spillways components and types
Spillways components and typesSpillways components and types
Spillways components and types
 
Gravity dam
Gravity damGravity dam
Gravity dam
 
Dams and spillways
Dams and spillwaysDams and spillways
Dams and spillways
 
Vacuum dewatering
Vacuum dewateringVacuum dewatering
Vacuum dewatering
 
Types of earth dams
Types of earth damsTypes of earth dams
Types of earth dams
 
Grouting
Grouting Grouting
Grouting
 
Grouting
GroutingGrouting
Grouting
 
Gravity Dam
Gravity DamGravity Dam
Gravity Dam
 
Gravity dam
Gravity damGravity dam
Gravity dam
 
Tunnelling
TunnellingTunnelling
Tunnelling
 
Gallery in Concrete Gravity Dam
Gallery in Concrete Gravity DamGallery in Concrete Gravity Dam
Gallery in Concrete Gravity Dam
 
Dams pdf
Dams pdfDams pdf
Dams pdf
 
Well Foundation
Well FoundationWell Foundation
Well Foundation
 
Earthen Dams
Earthen DamsEarthen Dams
Earthen Dams
 
Earthen Dam
Earthen DamEarthen Dam
Earthen Dam
 
Reservoir sedimentation & its control
Reservoir sedimentation & its controlReservoir sedimentation & its control
Reservoir sedimentation & its control
 
Reservoir Planning
Reservoir PlanningReservoir Planning
Reservoir Planning
 
seminar presentation report on spillway
 seminar presentation report on spillway seminar presentation report on spillway
seminar presentation report on spillway
 

Similar to Seminer ppt

Dams, Types of dams
Dams, Types of damsDams, Types of dams
Dams, Types of dams
RAHUL SINHA
 
Arch dam.pptx
Arch dam.pptxArch dam.pptx
Arch dam.pptx
Vishal Chaudhari
 
Gravity dams
Gravity damsGravity dams
Gravity dams
Farhaan Bhat
 
Unit 6
Unit 6Unit 6
26901321007_SAPTADEEP DASGUPTA_CE(PE)701C.pdf
26901321007_SAPTADEEP DASGUPTA_CE(PE)701C.pdf26901321007_SAPTADEEP DASGUPTA_CE(PE)701C.pdf
26901321007_SAPTADEEP DASGUPTA_CE(PE)701C.pdf
RijuDasgupta
 
Hydraulic Model Studies for Evaluating the Performance of Energy Dissipater’s...
Hydraulic Model Studies for Evaluating the Performance of Energy Dissipater’s...Hydraulic Model Studies for Evaluating the Performance of Energy Dissipater’s...
Hydraulic Model Studies for Evaluating the Performance of Energy Dissipater’s...
IRJET Journal
 
Aahe ppt grp 5 (2).pptx
Aahe ppt grp 5 (2).pptxAahe ppt grp 5 (2).pptx
Aahe ppt grp 5 (2).pptx
akshitha1201
 
Role of Engineering Geology In Resevoirs,Dams & Tunneling.
Role of Engineering Geology In Resevoirs,Dams & Tunneling.Role of Engineering Geology In Resevoirs,Dams & Tunneling.
Role of Engineering Geology In Resevoirs,Dams & Tunneling.
kaustubhpetare
 
WS-D1-CEWRE_PPT.pdf
WS-D1-CEWRE_PPT.pdfWS-D1-CEWRE_PPT.pdf
WS-D1-CEWRE_PPT.pdf
ssuserca460e
 
class 5 types of dams and Merits Demerits .pdf
class 5 types of dams and Merits Demerits .pdfclass 5 types of dams and Merits Demerits .pdf
class 5 types of dams and Merits Demerits .pdf
johnjohn497573
 
Seismic Forces and Stability Analysis of Gravity Dam.pdf
Seismic Forces and Stability Analysis of Gravity Dam.pdfSeismic Forces and Stability Analysis of Gravity Dam.pdf
Seismic Forces and Stability Analysis of Gravity Dam.pdf
Venkataraju Badanapuri
 
Eg unit v
Eg unit vEg unit v
Eg unit v
shaymaa17
 
E0365037045
E0365037045E0365037045
E0365037045
theijes
 
Diversion Works_Part4_Civil_Engineering.pdf
Diversion Works_Part4_Civil_Engineering.pdfDiversion Works_Part4_Civil_Engineering.pdf
Diversion Works_Part4_Civil_Engineering.pdf
adityajarwal2004
 
Infrastructure for water resource development_ Sushil Kumar (NWA)_2011
Infrastructure for water resource development_ Sushil Kumar (NWA)_2011Infrastructure for water resource development_ Sushil Kumar (NWA)_2011
Infrastructure for water resource development_ Sushil Kumar (NWA)_2011
India Water Portal
 
Gravity dam forces
Gravity dam forcesGravity dam forces
Gravity dam forces
saibabu48
 
damandtypesofdamwithsiteselection-170403160723 (1) (1).pptx
damandtypesofdamwithsiteselection-170403160723 (1) (1).pptxdamandtypesofdamwithsiteselection-170403160723 (1) (1).pptx
damandtypesofdamwithsiteselection-170403160723 (1) (1).pptx
abhijitsaha99
 
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...John Grover
 
ANIL KUMAR.pptx
ANIL KUMAR.pptxANIL KUMAR.pptx
ANIL KUMAR.pptx
129Anilkumar
 
Hydro-Electric Power Plant
Hydro-Electric Power PlantHydro-Electric Power Plant
Hydro-Electric Power Plant
AFAQAHMED JAMADAR
 

Similar to Seminer ppt (20)

Dams, Types of dams
Dams, Types of damsDams, Types of dams
Dams, Types of dams
 
Arch dam.pptx
Arch dam.pptxArch dam.pptx
Arch dam.pptx
 
Gravity dams
Gravity damsGravity dams
Gravity dams
 
Unit 6
Unit 6Unit 6
Unit 6
 
26901321007_SAPTADEEP DASGUPTA_CE(PE)701C.pdf
26901321007_SAPTADEEP DASGUPTA_CE(PE)701C.pdf26901321007_SAPTADEEP DASGUPTA_CE(PE)701C.pdf
26901321007_SAPTADEEP DASGUPTA_CE(PE)701C.pdf
 
Hydraulic Model Studies for Evaluating the Performance of Energy Dissipater’s...
Hydraulic Model Studies for Evaluating the Performance of Energy Dissipater’s...Hydraulic Model Studies for Evaluating the Performance of Energy Dissipater’s...
Hydraulic Model Studies for Evaluating the Performance of Energy Dissipater’s...
 
Aahe ppt grp 5 (2).pptx
Aahe ppt grp 5 (2).pptxAahe ppt grp 5 (2).pptx
Aahe ppt grp 5 (2).pptx
 
Role of Engineering Geology In Resevoirs,Dams & Tunneling.
Role of Engineering Geology In Resevoirs,Dams & Tunneling.Role of Engineering Geology In Resevoirs,Dams & Tunneling.
Role of Engineering Geology In Resevoirs,Dams & Tunneling.
 
WS-D1-CEWRE_PPT.pdf
WS-D1-CEWRE_PPT.pdfWS-D1-CEWRE_PPT.pdf
WS-D1-CEWRE_PPT.pdf
 
class 5 types of dams and Merits Demerits .pdf
class 5 types of dams and Merits Demerits .pdfclass 5 types of dams and Merits Demerits .pdf
class 5 types of dams and Merits Demerits .pdf
 
Seismic Forces and Stability Analysis of Gravity Dam.pdf
Seismic Forces and Stability Analysis of Gravity Dam.pdfSeismic Forces and Stability Analysis of Gravity Dam.pdf
Seismic Forces and Stability Analysis of Gravity Dam.pdf
 
Eg unit v
Eg unit vEg unit v
Eg unit v
 
E0365037045
E0365037045E0365037045
E0365037045
 
Diversion Works_Part4_Civil_Engineering.pdf
Diversion Works_Part4_Civil_Engineering.pdfDiversion Works_Part4_Civil_Engineering.pdf
Diversion Works_Part4_Civil_Engineering.pdf
 
Infrastructure for water resource development_ Sushil Kumar (NWA)_2011
Infrastructure for water resource development_ Sushil Kumar (NWA)_2011Infrastructure for water resource development_ Sushil Kumar (NWA)_2011
Infrastructure for water resource development_ Sushil Kumar (NWA)_2011
 
Gravity dam forces
Gravity dam forcesGravity dam forces
Gravity dam forces
 
damandtypesofdamwithsiteselection-170403160723 (1) (1).pptx
damandtypesofdamwithsiteselection-170403160723 (1) (1).pptxdamandtypesofdamwithsiteselection-170403160723 (1) (1).pptx
damandtypesofdamwithsiteselection-170403160723 (1) (1).pptx
 
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
 
ANIL KUMAR.pptx
ANIL KUMAR.pptxANIL KUMAR.pptx
ANIL KUMAR.pptx
 
Hydro-Electric Power Plant
Hydro-Electric Power PlantHydro-Electric Power Plant
Hydro-Electric Power Plant
 

Recently uploaded

block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 

Recently uploaded (20)

block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 

Seminer ppt

  • 1. SESMIC RESPONSE PREDICTION OF CONCRETE ARCH DAM Manish Sharma Dr. Md.Imteyaz Ansari M.tech student Assistant Professor Department of Civil Engineering Jamia Millia Islamia (A Central University), New Delhi, India 110025
  • 2. CONTENTS ❖ Introduction ❖ Purposes ❖ Classifications ❖ Literature Review ❖ Modeling ❖ References
  • 3. INTRODUCTION ❖ Dam is a solid barrier constructed at a suitable location across a river valley to store flowing water. ❖ A dam is a structure which prevents the flow of water and accumulates it in a reservoir. ❖ A barrier constructed across a waterway to control the flow or raise the level of water.
  • 4. PURPOSES 1. Flood control 2. Drinking and domestic water supply 3. Irrigation 4. Industrial water supply 5. Hydroelectric energy production 6. Retention and control of sediments 7. Inland navigation 8. Improvement of water quality 9. Fish Farming 10. Recreation facilities
  • 5. ARCH DAM ❖ An arch dam is curved in plan, with its convexity towards the upstream side. They transfers the water pressure and other forces mainly ❖ An arch dam is quite suitable for narrow canyons with strong flanks. ❖ The section of an arch dam is approximately triangular like a gravity dam but the section is comparatively thinner. ❖ An arch dam is most suitable for narrow gorges. ❖ Since they are thinner than any other dam type, they require much less construction material, making them economical and practical in remote areas. ❖ The foundation or abutments for an arch dam must be very stable and proportionate to the concrete. To the abutments by arch action.
  • 6.
  • 8. CLASSIFICATION Classified based on the ratio of the base thickness to the structural height (b/h) as: ❖ Thin, -less than 0.2, ❖ Medium-thick, -between 0.2 and 0.3, ❖ Thick, -over 0.3. Classified with respect to their structural height are:[ ❖ Low dams - up to 30 ❖ Medium high dams - between 30–91 m ❖ High dams - over 91 m
  • 9. There are two basic designs for an arch dam: – ❖ Constant radius arch dams :- Radius of curvature throughout the structure is constant and upstream face is vertical. ❖ Variable-radius dams:- Which have both upstream and downstream curves that systematically decrease in radius below the crest. A dam that is double-curved in both its horizontal and vertical planes may be called a dome dam.
  • 10. IDUKKI DAM, KERALA- FIRST ARCH DAM IN INDIA ➢ Location:- Idukki, Kerala, India ➢ Purpose:- Power Generation, Flood Control ➢ Type of Dam:- Concrete, double curvature parabolic, thin arch. ➢ Height :- 168.91 m (554ft) ➢ Length :- 365.85 m (1,200ft) ➢ Dam volume:- 450,000 m3 (16,000,000cuft) ➢ Spillways:- Nil ➢ Reservoir Total capacity:- 1,996×106 m3 (1,618,184acre·ft) ➢ Active capacity :- 1,459×106 m3 (1,182,831acre·ft) ➢ Inactive capacity: - 536×106 m3 (434,542acre·ft) ➢ Catchment Area:- 649.3 km2 (251sqmi) ➢ Surface area :- 60 km2 (23sqmi) ➢ Normal elevation :- 732.62 km2 (283sqmi) ➢ Installed capacity:- 780 MW
  • 12. DIFFERENT PARAMETERS TO BECONSIDERED IN THE DYNAMIC ANALYSIS OF ARCH DAM:- ❖Semi- unbounded size of reservoir. ❖ Foundation rock domains. ❖ Dam-water interaction. ❖ Wave absorption at the reservoir boundary. ❖ Water compressibility. ❖ Dam-foundation rock interaction. ❖ Variations in ground motion at dam-rock interface. ❖ Material non-linearity.
  • 13. DAM WATER INTERACTION ❖ Hydro dynamic effects are generally important in the response of arch dam so more than for gravity dams. ❖ Tensile stress in dam due to upstream ground motion are more than doubled when hydro dynamics effect are included.
  • 14. RESERVOIR BOUNDARY ABSORPTION ❖ Partial absorption of hydrodynamic pressure waves by the sediments invariably deposited at the reservoir bottom and sides, or even by rock underlying the reservoir. ❖ In general, assuming a non absorptive (rigid) reservoir boundary leads to an unrealistically large response for dam with impounding water, practically due to vertical and cross stream ground motion.
  • 15. WATER COMPRESSIBILITY ❖ Westegards classical formula for the added hydrodynamic mass, commonly used in dynamics analysis of dam. ❖ Water compressibility would be significant in the response most concrete dams because ( Es) is generally much higher and ( f res. / f dam) is corresponding smaller.
  • 16. DAM–FOUNDATION ROCK INTERACTION ❖ In standard FEM foundation rock is assumed to be mass-less . ❖ In which only flexibility is considered but inertial and damping effect are ignored, is popular because the foundation impedance matrix (Frequency –dependent stiffness matrix) is very difficult to determine.
  • 17. LITERATURE REVIEW ➢ Anil K.Chopra ,2008–identified the limitations of the traditional design procedures, the factors that should be considered in the dynamic analysis are discussed, and procedures for earthquake response history analysis are summarized. ➢ M. A. Hariri-Ardebili et al,2011- Reservoir fluctuation effects on seismic response of concrete arch dams are investigated. Structure nonlinearity is originated from material nonlinearity due to tensile cracking and compression crushing of mass concrete . ➢ Violeta Mircevska atal.,2014- The magnitudes of the hydrodynamic pressures at the dam-fluid interface depend on the amount of energy transmitted to the fluid by the vibration of the reservoir boundaries. Although the reservoir topology can have a considerable impact on the amount of generated energy.
  • 18. LITERATURE REVIEW ➢ Feng and Wei.et.al.,2014- A comparative study on the performance and ultimate bearing capacity of dams. A set of safety factors was presented with regard to dam heel cracks and the ultimate bearing capacity of a high arch dam. ➢ Masterarbeit .,2016- Developed a software based calculation of the 3D coordinates of double curved arch dams . To calculate these 3D coordinates, it is possible to determine the geometry of double curved arch dams and modify it for optimization purposes. ➢ Gao lin and shichun chi.,2017 - feasibility study of vibration control systems applied to massive structure, a 292m high arch dam was carried out. Seismic analyses of the arch dam including nonlinear behavior of joint movements demonstrate, that installation of viscoelastic dampers in the contraction joints can reduce the maximum tensile stresses at major part of the dam to a great extent.
  • 20. REFERENCES ❖ Chopra, A. K., and Wang, J.-T. (2008). “Analysis and response of concrete arch dams including dam-water foundation rock interaction to spatially varying ground motions.” ❖ Varshney, R. S., Hydro Power Structures ❖ Wikipedia http://en.wikipedia.org/wiki/Dam ❖ http://www.idk.kerala.gov.in/index.php?option=com_content&view=article&id =85 & Itemed=58 ❖ Akköse, M., Bayraktar, A., and Dumanoğlu, A. A. (2016). “Reservoir water level effects on nonlinear dynamic response of arch dams.” J. Fluids Struct., 24(3), 418–435. ❖ M .A. Lotfollahi Yaghin and M.A. Hesari, “Dynamic Analysis of arch concrete dam under Earthquake force with ABAQUS”, Journal of applied sciences 8:26482658,2008