Subhash Dhiman is a mechanical engineer with over 22 years of experience in piping design and engineering. He has worked on numerous projects in industries including refinery, petrochemical, oil and gas. Some of his responsibilities have included piping layout, material take-off sketches, detail engineering, squad checking, and coordinating between engineering disciplines. He is proficient in AutoCAD and has experience using 3D modeling software.
This is the slide deck from a workshop taught at the 2010 Museum Computer Network conference in Austin, TX. This hands-on, interactive workshop was led by Alon Salant of Carbon Five, a technology development and consulting firm, and Dana Mitroff Silvers of the San Francisco Museum of Modern Art.
California Association of Museums Conference
March 7, 2014
Speakers:
Susan Spero, JFK University
Dana Mitroff Silvers, Design Thinking for Museums
Karen Kienzle, Palo Alto Art Center
Brianna Cutts, Sibbett Group
ERP (Enterprise resource planning) can be defined as a software solution that addresses the enterprise needs taking the process view of the organization, to meet the organizational goals tightly integrating all functions of an enterprise It is an industry term for the broad set of activities supported by multi-module application software that help a manufacturer or other business manage the all the parts of its business.
I am a self-motivated individual. I put my all into everything I do to get the job done effectively and efficiently. I could say that challenging work and the pursuit of success drives me to deliver the best out of me. I always ensure that my clients get the best service which I can provide. I have always felt that it is important, both to me personally, and for my company that my clients are fully satisfied and provides a positive feedback. My drive to constantly develop my technical and interpersonal skills is the reason for my good reputation within my present organization and among all my clients.
CV of Karan Vinayak - piping design engineerKaran Vinayak
I have experience in the field of Oil and Gas, Chemical Process Plant and Water Transmission Network Pipeline. (Piping Layout, Piping GAD, isometric, Bill of Materials, Pipeline Profile, Alignment Sheet, Co-Ordinate Drawing). I have software skills in Autocad, Autoplant, PDMS and CAESAR-II. Currently I am working in Sharjah on UG Water Pipeline Projects.
I am technically qualified for job positions like Piping/Pipeline Designer, Piping/Pipeline Engineer, Piping Quantity Estimator etc.
1. BIO-DATA
SUBHASH DHIMAN sdhiman_13@yahoo.co.in
Phone No. 91-11-26045537
(M)- +91-9811377085
OBJECTIVE:- To pursue a challenging career where in job satisfaction result from effective
utilization of my expertise and thus contributes to the growth of the company.
TECHNICAL QUALIFICATION:- Diploma in Mechanical Engineering
from Rajasthan University.
I.T.I Draughtsman (MECH.) from ARAB KI
SARAI Nizamuddin (NEW DELHI)
EXPERIENCE 22+ Years Experience in Executing of
Engineering Detailed Drawings & Checking.
Fields of Experience Refinery, Petrochemical, Oil & Gas, Offshore
& Onshore Pipeline.
FROM April 2007 TO TILL DATE SKE&C (SK Engineering & Construction),
as Sr. Engineer (Piping)
Overall Experience :-
Experience in Piping layout transposition I & II , Sketch preparation for materiel take –off , Detail
Engineering, Nozzle orientation of vessel, drums and column, Preparation of Civil Info. Drgs. Rack, techno
Structure, stress Iso’s., Routing Study, Piping Support arrangement, Iso Checking as per Design
Guide, and P&ID, layout checking, Equipment and structure Squad checking, co-ordination with lead and inter
Discipline. Like Mechanical, Civil, Electrical and Instrumentation disciplines for completing the model
in all Aspects and checking of inter discipline documents. Co-ordination with lead/area leads to improve
design and quality for final deliverables.
Experience in cross county Pipeline Onshore, Offshore & Swamp, and Preparation of Procedure
drawings for Erection and allied items for various projects.
Work on Projects :-
Client : KUWAIT NATIONAL PETROLEUM COMPANY (K.N.P.C)
Project : Clean Fuel Project (CFP)
Job Responsibilities:-
: Presently Working in Clean fuel project (CFP) As a Checker for three areas Sulfur Recovey (SR) unit,
Sour Water Treatment (SWT) unit and Acid Gas Flare unit.
Work on Projects :-
Client : NGHI SON REFINERY AND PETROCHEMICAL Ltd. LIABILITY COMPANYN (NSRP) Vietnam
Project : Nghi Son Refinery and Petrochemical complex.
Job Responsibilities:-
: Worked As a lead/Area lead of two units LPG Recovery unit(LRU) LPG Treated unit(LTU) for NSRP
2. Project.
: Involve in detail engineering/design and supervision for LRU/LTU unit.
: Prepared the BM sketch line wise of LRU/LTU unit for MTO as per P&ID
: Coordinating with lead / team member to the revised for final issue.
: Supervising, planning & scheduling the work for modular.
Work on Projects :- .
Client : OMAN REFINERIES AND PETROCHEMICALS COMPANYN SOHAR SULTANATE OF
OMANProject : Sohar Refinery Expension Project
Job Responsibilities:-
: Prepared the BM sketch line wise of DELAYED COOKER UNIT for MTO as per P&ID (PROPOSAL)
Work on Projects :-
EPC for Ruwais Refinery Expansion (RRE) Project for Takreer, Abu-Dhabi
Period : aug’12 to Jan’13: Deputed to Abu-Dhabi
Position : FE/Lead designer for propane feed unit (HMU)
Job Responsibilities:-
: Involved in detail engineering and design.
: Prepared stress information drawing and coordinating with lead to the revised for final issue.
: Involved in squad check of compressor, surge drum, exchanger and nozzle marking.
: Supervising, planning & scheduling the work for modular.
: Support marking as per stress and support Std.
: Coordinating with L/E, R/E and modular to update the model for 60 & 90% model review.
: Model Review for clash check & checking of Isometric in the SPR. (Smart Plant Review)
: Isometrics checking and final issue.
Work on Projects :-
JURONG AROMATICS COMPLEX PROJECT
Client: JURONG AROMATICS COPORATION Pte. Ltd. SINGAPORE
Job Responsibilities:-
: worked As a Area lead in SRU, TGTU Unit and Pipe Rack.
: Prepared of 1
ST
MTO ISO sketch for SRU and TGTU Unit.
: ISO Checking as per P&ID and Design guide and client instruction.
: Squad check of Vessels, Pumps, Columns etc.
: Model Review for clash check & checking of Isometric in the SPR. (Smart Plant Review)
NEW BOOSTER STATION BS-132 & ENHANCEMENTS AT BS-131
Client: KUWAIT OIL CO. (K.S.C.) KUWIAT.
(VISIT TO KUWAIT OIL CO. (K.S.C.) KUWIAT FOR SITE SURVEY)
Job Responsibilities:-
: Prepared of piping layout for HP & LP Flare KO drum and pumps Train I and train II.
: Prepared of piping layout for Oily water degassing drum and pumps Train I and train II.
: Site Survey for Tie-in points (Portion-3) more than 360 Tie-in in the plant. Process area and material
Change above ground and underground.
: Tie-in Sketch preparation from existing plant after site survey.
: Making BM sketch for 1
st
MTO as per line wise. Preparation of piping transposition 1 for the given unit.
3. : Model Review for clash check & checking of Isometric in the SPR. (Smart Plant Review)
THAI POLYPROPYLENE (THPP#3 PROJECT)
Client: THAI POLYPROPYLENE CO. LTD. RAYONG THAILAND.
Job Responsibilities:-
: Prepared of piping layout for monomer feed unit, Blow down system, Cooling tower and Pelletizing.
: Checking of Isometric as per P&ID, PMS, instrument hook-up, Equipment data sheet, piping designs
Guide and piping check list. Updating commented of isometrics.
: Development of detailed piping drawings for aboveground and underground,
: Review & checking of Isometric in the SPR. (Smart Plant Review)
CILACAP REFINERY RFCC PROJECT – CENTRAL JAVA, INDONESIA. (PROPOSAL)
CLIENT: TOYO ENGGINERING CO. TOKYO JAPAN
Job Responsibilities:-
: Worked as an area lead of storage tank area and Preparation of MTO as per P&ID.
: Prepared of piping layout for storage tank age area and pumps.
GREEN DIESEL PROJECT (GDP) RUWAIS REFINERY, ABU DHABI.
Client: Abu Dhabi Oil Refining Company
(VISIT TO Seoul KOREA )
ATC Reformer and Aromatics complex II project. (Proposal)
Client: The Aromatics (THAILAND) Public Complex Limited.
GC-20, KUWAIT.
Client: Kuwait Oil Co. K.S.C
Job Responsibilities:-
: I have been involved in ISO checking activities only as per latest GAD, PMS and P&ID.
JUNE 1992 TO April 2007 PUNJ LLOYD LIMITED, NEW DELHI,
as Sr. Designer (Piping)
(HVEC) (HIGH VALUE ENGINEERING
CENTER)
Overall Experience :-
Piping GA, Piping Isometric & Overall Plot Plan, Storage tanks, Underground tanks,
Cryogenic tank drawings etc. Also I have been involved in preparation MTO’s for Piping, valves, Pipeline
Onshore, Offshore & Swamp, Procedure drawings and allied items for various projects.
I had done project in Batam Indonesia Pipeline from South Sumatra to Singapore, one of the links for
Grissik – Sakaran – Batam – Singapore pipeline. The pipeline traversed through 5 islands and was laid
10 km offshore, 8.5 km swamp & 12 km onshore and worked at site office as piping engineer.
Work on Projects :-
TANKSTORE PROJECT, SINGAPORE
Job Responsibilities:-
: Prepared of Site Grading, Strom Water Layout, Waste Water and Fire Water Layout and Detail
Engineering Drawings for Tank store project Singapore.
4. : Deputed to Peciko-4/EPSC-3 PROJECT AT SENIPAH KUTAI KERTANEGARA INDONESIA
Client: TOTAL E & P INDONESIA.
Deputed to TUNU FIELD DEVELOPMENT PROJECT PHASE 9 – EPSC2 and UHB#16 PHASE-3
(UPHEVEL BUCKLING PROJECT) AT SAMARINDA INDONESIA for TOTAL E & P INDONESIA AND
PT. KOMARTIM.
Job Responsibilities:-
Deputed to Batam Indonesia for Gas Transmission And Distribution Project Panaran Pemping
Extension
Client: PT. PERUSAHAAN GAS NEGARA, INDONESIA.
Job Responsibilities:-
: Prepared of site modification works of pig launcher/receiver terminals and preparation of Procedure
Drawings for Erection for pipeline Offshore and Onshore. Preparation of as Built drawings for piping,
Civil, structure, instrumentation, electrical and pipeline.
Deputed to Duri Indonesia for Central Gathering Station Area (CGS-10)
Client: CALTEX PACIFIC INDONESIA.
Job Responsibilities:-
: Prepared of drawings for new addition work in the plant. Work done in the site office tie-in, control
Valve assembly, accesses platform, cross over, drain pit, drainage system and instrument items.
: Prepared of proposal MTO for Wellheads as per P&ID.
Dabhol LNG Regasification Facility (ENRON, MAHATASHATRA)
Baku Tbilisi Ceyhan Crude Oil Pipeline Project (BOTAS)
Guru Govind Singh Refinery Bathinda (PUNJAB)
Dharmsi Morarji Chemical Co. Limited.(GUJARAT)
Gas Booster Station (INDONESIA).
Grand Bahamas LNG Terminal (BAHAMAS)
Reliance Industrial Infrastructural Ltd. (BOMBAY)
Gas Compressor Plant at South Santhal/ Kalol for (ONGC)
Oil India Limited (RAJASTHAN)
MATHURA refinery, GUJARAT refinery & HALDIA refinery
FROM 1991 TO 1992 Supervisor / DRAFTSMAN in M/s KINETICS
TECHNOLOGY INDIA LTD. NEW DELHI.
Job Responsibilities:-
Supervision of flue gas duct and piping fabrication as well as erection (under IBR) at Nestle site –
PANIPAT (HARYANA)
FROM 1989 TO 1991 Draughtsman & Supervisor in M/S
MUNDRATECH SERVICES (P) LTD. NEW
DELHI.
Job Responsibilities:-
Preparation of the detail drawings For self cleaner air filtration system and supervision of the same item
as per detailed drawings.
Job Responsibilities in Pipeline :-
Prepared of alignment sheet and HDD (Horizontal Direction Drilling), for offshore, onshore and swampy
areas For PT. PERUSAHAAN GAS NEGARA, INDONESIA, TOTAL E & P INDONESIE AND PT.
5. KOMARTIM INDONESIA.
SKILLS AND SOFTWARE PROFICIENCY
Excel, Word User
3D – SPR User
PDS Learner
Auto cad Proficient
Micro station Learner
PERSONAL DETAILS:-
NAME : SUBHASH DHIMAN
DATE OF BIRTH : 13
th
March, 1966
NATIONALITY : Indian
PASSPORT NO. : L-5445491
LANGUAGE KNOWN : English, Hindi, Punjabi
PLACE: NEW DELHI
DATE : ……………