1. PROFESSIONAL RESUME
N A M E : Yono.W Priono
BIRTH : Semarang, May 11, 1956
S E X : M a l e
RELIGION : Moslem
NATIONALITY : Indonesian
ADDRESS : Conocophillips Indonesia
Ratu Prabu 2 Building, 11th
Floor
Jl. TB. Simatupang Kav. 1B,
Jakarta 12560 – Indonesia
Phone: (62) (21) 78541186 (Direct)
HP : (62) 818 102800
Address E-mail : yono.priono@conocophillips.com
EDUCATION : Graduated from ‘Akademi Teknologi Nasional’ (ATENAS)-Bandung
(1983) in Mechanical Engineering.
SOFTWARE FAMILIARS - Computer Aided Design (Auto Cad), Release 2004, 2007, 2010
- Microsoft Office Excel 2010
- Microsoft Office Word 2010
EXPERIENCE SUMMARY
Over 25 years of experience knowledge in Oil and Gas Processing. Preparation of scope of work and
design drawings for EPC technical tender package of any projects, detail design review, field work
inspection and consulting.
WORK EXPERIENCES
January 2007 - Present : CONOCOPHILLIPS INDONESIA
Work under Development Engineering Departement.
PROJECT : SUBAN COMPRESSION PROJECT (FEL-2)
Install 5 (five) Train Compressor, Suction Scrubber and After Cooler
1 of 10
2. Install 4 (four) Trains Inlet Cooler and Inlet Separator
Install Utulities Facilities, Flare Stack, Flare K.O Drum,
new Power Control Room (PCR) and Diesel Engine Generator
Location : Existing Suban Gas Plant
POSITION : Piping Engineer
RESPONSIBILITIES : * Consolidate comments of FEL-2 deliverables related to piping
discipline, and also review and comment for other diciplines
(Civil, Proccess, Mechanical) from CEC Contractor (PT Tripatra
Engineering).
* Coordinate 1 person of contract Piping Designer.
PROJECT : CORRIDOR GAS MERCURY REMOVAL PROJECT (FEL-2)
Phase-1 : Provide 6 (six) options location of MRU
Phase-2 : Provide the best location of MRU both at Suban Gas Plant
and Grissik Central Gas Plant
POSITION : Piping Engineer
RESPONSIBILITIES : * Consolidate comments of FEL-2 deliverables related to piping
discipline, and also review and comment for other diciplines
(Civil, Proccess, Mechanical) from CEC Contractor (PT Singgar
Mulia).
* Review and comment 3D Model PDMS.
* Coordinate 1(one) person of contract Piping Designer.
PROJECT : WEST BELUT PROJECT (FEL-2)
Extend the existing East Cellar Deck (WHP-D), Tie-in 14” West
Belut pipeline and umbilical to N. Belut WHP-D.
Install new Multi Phase Meter, TUTU, Riser, Umbilical, Chemical
Skid and APU
POSITION : Piping Engineer
RESPONSIBILITIES : * Consolidate comments of FEL-2 deliverables related to piping
discipline, and also review and comment for other diciplines
(Proccess, Pipeline, Structural) from CEC Contractor (PT
Tripatra Engineering)
* Review and comment 3D Model PDMS.
* Coordinate 1 (one) person of contract Piping Designer.
2 of 10
3. PROJECT : SUBAN LONG TERM WATER DISPOSAL PROJECT (FEL-2/3)
Injected 10,000 Bbls of Suban water disposal to North Sambar Well
#1/2.
Install 3 ea Transfer Pumps at Suban Station, 3 ea Charge Pumps,
3 ea Injection Pumps, 3ea Filters and 5000 Bbls
Produced Water Tank at Dayung Station
POSITION : Piping Engineer
RESPONSIBILITIES : * Consolidate comments of FEL-2/3 deliverables related to piping
discipline, and also review and comment for other diciplines
(Civil, Proccess, Pipeline, Electrical, Mechanical) from CEC
Contractor (PT Singgar Mulia)
* Review and comment 3D Model PDMS.
* Coordinate 1 (one) person of contract Piping Designer.
PROJECT : SUMPAL COMPRESSION PROJECT ( FEL-2)
Install 3 ea Compressor packages, Inlet Cooler and inlet Separator
at the existing Sumpal Station
POSITION : Piping Engineer
RESPONSIBILITIES : * Consolidate comments of FEL-2 deliverables related to piping
discipline, and also review and comment for other diciplines
(Civil, Proccess, Electrical, Mechanical) from CEC Contractor
(PT Singgar Mulia)
* Review and comment 3D Model PDMS.
* Coordinate 1 (one) person of contract Piping Designer.
PROJECT : SUMPAL EXPANSION PROJECT ( FEL-2)
Install 2ND
Train of Gas Processing Facilities.
Total 310 MMSCFD Sales gas delivered to Grissik Central Gas
Plant
POSITION : Piping Engineer
RESPONSIBILITIES : * Consolidator comments of FEL-2 deliverables related to piping
discipline, and also review and comment for other diciplines
(Civil, Proccess, Pipeline, Electrical, Mechanical) from CEC
contractor (PT Worley Parson Indonesia)
* Coordinate 2 (two) persons of contract Designer (Piping,
Electrical).
PROJECT : SUBAN #13, #14 and MODIFICATION SB #12 (FEL 2/3)
3 of 10
4. 12” flowlines of wells SB #13, #14 and modification of existing
Piping at well SB#2 to Suban Gas Plant
POSITION : Lead Designer
RESPONSIBILITIES : * Provide deliverables of FEL-2/3 deliverables of
disciplines Piping, Process, Civil, Electrical,
* Coordinate 2 (two) persons of contract Designer (Piping,
Electrical).
PROJECT : SUBAN 5 Th TRAIN PROJECT (FEL 2/3)
Total 825 MMSCFD sales gas from Suban Gas Plant delivered to
Grissik Central Gas Plant
POSITION : Lead Designer
RESPONSIBILITIES : * Consolidate comments of FEL-2 deliverables related to
piping discipline, and also review and comment for other
diciplines (Civil, Proccess, Electrical, Mechanical) from CEC
contractor (PT Worley Parson Indonesia)
* Review and comment 3D Model PDMS
* Coordinate 3 (three) persons of contract Designer (Piping,
Electrical, Civil).
PROJECT : CORRIDOR MERCURY REMOVAL (CMR)
Install 4 (ea) Guard Bed vessels & 4 (ea) K.O Drums at Glycol
Regeneration Package area, 4 (ea) Guard Bed Vessels at Fuel Gas
area, 2 (ea) Guard Bed Vessesl & 2 (ea) K.O Drums at Amine area.
POSITION : Lead Designer
RESPONSIBILITIES : * Provide deliverables design drawings (PFD, P&ID, Plot Plan,
Piping, Electrical, Civil,) for EPC Technical Bid Document
Package.
* Provide piping study and detail tie-ins to the existing piping at
Suban Gas Plant, isometric including Bill of Material (BOM).
* Coordinate 3 (three) persons of contract Designer (Piping,
Electrical, Civil).
PROJECT : NORTH BELUT PROJECT (EPCI)
CPP Platform located at Natuna Sea-Indonesia
4 of 10
5. Total 300 MMSCFD sales gas and 10,000 bbls condensate delivered
to Belanak FPSO.
POSITION : Lead Designer
RESPONSIBILITIES : * Participated in Piping review during Detailed Engineering at
Technip’s (EPC Contractor) office-Jakarta.
* Review and check 3D Model PDMS.
* Redesign of Fuel Gas Package skid (Piping layout and Model)
including Bill of Material (BOM).
March 2003 - 2005 : CONOCOPHILLIPS INDONESIA
Work under Onshore Gas Project Departement.
PROJECT : SUBAN PHASE II GAS PROJECT
Expansion the existing Suban Gas Plant, from 2 Trains to 4 Trains,
total of 700 MMSCFD sales gas delivered to Grissik Central Gas
Plant, and 10.000 bbls condensate delivered to Plaju Central Oil
Storage Facilities via Bajubang pipeline.
POSITION : Lead Designer
RESPONSIBILITIES : * Provide design drawings (PFD, P&ID, Plot Plan, Electrical, Civil,
Building, Pipelines ) for EPC Technical Bid Document Package.
* Provide piping study and detail tie-ins to the existing piping at
Suban Gas Plant, and Grissik Central Gas Plant.
* Participated in Piping review during Detailed Engineering at
Hyundai’s ( EPC Contractor ) Head Office in Seoul- Korea
* Final check the As Built drawings ( PFD, P&ID, Piping G.A.D,
Isometric, Pot Plan, Building, Pipeline & Flowlines Plan and
Profile).
* Maintain e-file Document Control Project System.
* Coordinate 3 (three) persons of Contract Designer (Piping, Civil,
Electrical).
Feb. 1996 - Feb. 2003 : GULF INDONESIA RESOURCES LTD
Work under Gas Project Departement.
PROJECT : SOUTH JAMBI “B” SHALLOW GAS PROJECT
Total 30 MMSCFD sales gas transport to Sakernan Metering
5 of 10
6. Custody, and 3000 bbls condensate transport to Tempino Central
Oil Storage Facilities.
POSITION : Lead Designer
RESPONSIBILITIES : * Provide design drawings (PFD, PID, Plot Plan, Piping,
Electrical, Civil, Building, Instrumentation, Pipeline) for EPC
Technical Bid Document Package.
* Participated in piping review during Detailed Engineering at P.T
Tripatra Engineering ( EPC Contractor ) office Jakarta.
* Provide design and detail drawings ( Piping, Civil, and Electrical
Isometric c/w BOM) for Condensate Off- Loading Facilities.
* Final check the As Built drawings ( PFD, P&ID, Piping G.A.D,
Building, Isometric, Pot Plan, Pipeline & Flowlines Plan and
Profile).
* Maintain e-file Document Control Project System.
* Coordinate 3 persons of contract Designer (Piping, Civil,
Electrical).
PROJECT : SUBAN PHASE I GAS PROJECT
Total 300 MMSCFD sales gas delivered to Grissik Central Gas Plant
and 5,000 bbls condensate delivered to Plaju Central Oil Storage
Facilities via Bajubang Pipeline.
POSITION : Lead Designer
RESPONSIBILITIES : * Provide design drawings (PFD, PID, Plot Plan, Electrical, Civil,
Pipeline) for EPC Technical Bid Document Package.
* Provide piping study and detail tie-ins point to the
existing piping at Grissik Central Gas Plant.
* Participated in piping review during Detailed Engineering at
Hyundai’s ( EPC Contractor ) Head Office in Seoul-Korea
* Final check As-Built drawings (PFD, PID, Piping G.A.D,
Isometric, Pipeline and Flowline Plan and Profile.)
* Maintain e-file Document Control Project System.
* Coordinate 3 persons of contract Designer.
PROJECT : SUMPAL GAS PROJECT
Total 150 MMSCFD sales gas delivered to Grissik Central Gas Plant
POSITION : Lead Designer
RESPONSIBILITIES : * Provide design drawings (PFD, PID, Plot Plan, Electrical, Civil,
Building, Pipeline) for EPC Technical Bid Document Package.
* Provide piping study and detail tie-ins point to the
existing piping at Grissik Central Gas Plant.
* Participated in piping review during detailed engineering at
6 of 10
7. Hyundai’s ( EPC Contractor ) Head Office in Seoul-Korea
* Final check As-Built drawings (PFD, P&ID, Piping G.A.D,
Isometric, Pipeline and Flowline Plan and Profile)
* Maintain e-file Document Control of Project System.
* Coordinate 3 persons of contract Designer (Piping, Civil,
Electrical).
PROJECT : PRE-TREATMENT GAS PROJECT
Installed 8 (ea) units Adsorber vessel and 2 (ea) units switching
valves skid at the existing Grissik Central Gas Plant
POSITION : Lead Designer
RESPONSIBILITIES : * Provide design drawings (PFD, PID, Plot Plan, Electrical, Civil,
Piping G.A.D) for EPC Technical Bid Document Package
* Provide piping plan & details tie-ins to the existing piping of
Grissik Central Gas Plant
* Participated in Piping review during Detail Engineering at PT
Rekayasa’s ( EPC Contractor ) Office Jakarta
* Final check As-Built drawings (PFD, P&ID, Piping G.A.D,
Isometric including BOM).
* Maintain e-file Document Control of Project System.
* Coordinate 4 persons of contract draftmen
PROJECT : GELAM COMPRESSION GAS PROJECT
Installed 2 (ea) units compressors at Gelam Gathering Station
POSITION : Lead Designer
RESPONSIBILITIES : * Provide design drawings (PFD, PID, Plot Plan, Electrical, Civil,
Building) for EPC Technical Bid Document Package
* Provide piping plan & details tie-ins to the existing piping of
Gelam Gathering Station
* Participated in piping review during detailed engineering at PT
Rekayasa’s ( EPC Contractor ) Office Jakarta
* Final Check for the As Built drawings (PFD, PID,
Piping G.A.D, Isometric including BOM)
* Maintain e-file Document Control of Project System.
* Coordinate 3 persons of contract Designer.
Nov. 1987 - Feb. 1996 : ASAMERA OIL LTD
Work under Facilities Engineering Departement.
PROJECT : CORRIDOR BLOCK GAS PROJECT
The project consist of : Grissik Central Gas Plant, Dayung
7 of 10
8. Gathering Station, Gelam Gathering Sstation, and
Letang/Tengah Gathering Station, and Permanent Camp.
POSITION : Lead Designer
RESPONSIBILITIES : * Provide assistance to Sr. Project Engineers during
implementation of Facilities EPC Project.
* Participated in piping review during detailed engineering at
JGC’s ( EPC Contractor ) Office Jakarta.
* Final check for the As Built drawings (PFD, PID, Plot
Plans, Piping G.A.D, Well site and Flowlines Gathering System,
Isometric, Civil, Building, Pipeline & Flowline Plan and Profile)
* Maintain e-file Document Control of Project System.
* Coordinate 4 persons of contract Draftmen.
PROJECT : CENTRAL RAMBA COMPRESSOR STATION
Total 15 MMSCFD gas to be injected to 25 wells, to lift up the oil
production.
POSITION : Lead Designer
RESPONSIBILITIES : * Provide design drawings (PFD, PID, Plot Plan, Piping G.A.D,
Isometric) and Issued to the Field Construction Group.
* Provide piping plan & details tie-ins to the existing piping of
Central Ramba Production Facilities.
* Coordinate 4 persons contract Draftmen
RAMBA CONDENSATE RECOVERY UNIT
Total 5,000 bbls condensate delivered Plaju Central Oil Storage
Facilities via Bajubang Pipeline.
RESPONSIBILITIES : * Provide design drawings (PFD, PID, Plot Plan, Piping G.A.D,
Isometric) and Issued to the Field Construction Group.
* Provide piping details tie-ins to the existing piping of the
Central Ramba Compressor Station.
* Provide Material Take Off (MTO).
* Coordinate contract draftmen.
WEST RAMBA COMPRESSOR
Installed 2 (ea) unit Compressors at the existing West Ramba
Production Facilities.
8 of 10
9. RESPONSIBILITIES : * Provide design drawings (PFD, PID, Plot Plan, Piping G.A.D,
Isometric) and Issued to the Field Construction Group.
* Provide piping details tie-ins to the existing piping of the
West Ramba Production Facilities.
* Provide Material Take Off (MTO).
* Coordinate 4 persons contract Draftmen.
BENTAYAN PILOT EXPANSION
Expand the existing Facilities from capacity 8,000 BOPD to 17,000
BOPD
RESPONSIBILITIES : * Provide design drawings (PFD, PID, Plot Plan, Piping G.A.D,
Isometric) and Issued to the Field Construction Group.
* Provide piping details tie-ins to the existing piping of the
Bentayan Production Facilities.
* Provide Material Take Off (MTO).
* Coordinate 4 persons contract Draftmen.
RAMBA ‘B’ WATER FLOOD
Water Injection Facilities
RESPONSIBILITIES : * Provide design drawings (PFD, PID, Plot Plan, Piping G.A.D,
Isometric) and Issued to the Field Construction Group.
* Provide Material Take Off (MTO).
* Coordinate 4 persons contract Draftmen.
RAWA DEVELOPMENT
Consist of 3 ( three ) production facilities :
- Rawa Production Facilities ( 10,000 BOPD )
- Supat Production Facilities ( 10,000 BOPD )
- S. Rawa/Keri Production Facilities ( 10,000 BOPD)
RESPONSIBILITIES : * Provide design drawings (PFD, PID, Plot Plan, Piping G.A.D,
Isometric) and Issued to the Field Construction Group.
* Provide Material Take Off (MTO)
* Provide Material Field Requisition
* Coordinate 4 persons contract Draftmen.
Feb 1984 – Nov. 1987 : P.T TRIPATRA ENGINEERING
Assigned to Asamera Oil Ltd., as Piping Designer, worked in Ramba
field ( South Sumatra ) under Project and Construction Departement.
PROJECT : CENTRAL RAMBA PRODUCTION FACILITIES
9 of 10
10. Capacity : 40,000 BOPD
RAMBA DOCK FACILITIES
RAMBA CAMP FACILITIES
BOOSTER PUMP STATION
3 (ea) Booster Pump Station ( Km 77 ; Km 52 ; Km 27 ) a long from
Ramba Production Facilities to Plaju Central Oil Storage Facilities.
NORTH RAMBA PRODUCTION FACILITIES
Capacity : 5000 BOPD
POSITION : Piping Designer
RESPONSIBILITIES : * Provide design drawings (PFD, PID, Plot Plan, Piping G.A.D,
Isometric) and Issued to the Field Construction Group.
* Provide piping details tie-ins to the existing piping of
Bentayan Production Facilities.
* Provide Material Take Off (MTO)
I certify that statement mentioned above is correct.
Yono W. Priono
10 of 10