Farhan WAHID
Mechanical Engineer Mobile: 00966566797803 wahidfarhan@hotmail.com
Skype : farhan_wahid
Private & Confidential 1 | P a g e
OBJECTIVE
To obtain a challenging position in Mechanical Engineering field that utilizes my background skills in Building,
construction and maintenance of different mechanical sections with equipment selection and the installations.
Exceptional knowledge of methods, principles,procedures,objectives,and standard practices of Mechanical field
including safety standards, engaging clients, preparing proposals and Feasibility reports
PROFILE
Professional Experience
Senior Mechanical Engineer (Consultant )
January 2009 to present
Saudi Electricity Company
Experience (Makkah & Taif Saudi Arabia) |
 Installation of FPSP Fire Protective Signaling Panel FM-200 Portable Cylinders Fire Extinguishers in Sub
Stations
 Fm-200 Testing & Commissioning Pneumatic & Flow Test
 Integrity Test. with Liquid level Indicator Test
 Fire Alarm Test with All Trouble shooting
 SAS Singling Test
 FM-200 Flow Diagrams with Calculations
 Knowledge of codes and standards such as ASHRAE, SMACNA, ASME, ASTM, NFPA,
 Overall Work as per PTS (Project Technical Standard) Saudi Electricity Company
 Coordinate assigned engineering work & monitor work for compliance to applicable codes, accepted
engineering practices. Co-ordination Contractor work Flow
 Participating in Client meetings and resolving engineering and management project issues.
 Monitoring all sites issues
 Ensure effective communication and coordination between all disciplines and all other project
participants.
 Monitoring building systems and processes;
 To perform / review Cooling and Heating Load calculations and ventilation requirement, design
drawings, HVAC control- and fire protection systems.
 Attending a range of project group and technical meetings;
 Ensuring that the design and maintenance of building systems meets legislative and health and safety
requirements;
 Working on a variety of projects within a short period of time.
 Monitoring and mentioning problems of mechanical works during execution.
 Ensure that construction follow the good practices to avoid/eliminate re-works.
 To monitor the monthly, weekly and daily progress.
Mechanical Engineer October 2004 to 2009
Al Rashid Trading & Contracting Company (Riyadh Saudi Arabia)
 Responsible as a Contractor for the , project execution works on site with focus on all mechanical
engineering works HVAC, Plumbing and Fire Fighting components and systems
 Supervise and monitor project to ensure that projects are completed within defined time frame and
executed as per quality standards.
 Make sure that MSU has been submitted and approved by the client prior to execution.
Farhan Wahid
Private & Confidential 2 | P a g e
 Plan, schedule and inspect the maintenance and operation for Air Cooled Chiller, Ventilation Systems,
Domestic Water Pumps, Irrigation Pumps, Fire Pumps, Submersible Pump,AHU’s, FCU’s and related
equipment’s.
 Ensures that HVAC (Ducting & Accessories, CAV & VAV Boxes, VRF, AHU, Sound attenuators
 Fan, Ventilation system, Louvers, FCU, ACCU, CRAC Units), Above & Below Ground Drainage piping
(HDPE & PVC), Fire Services Piping (Fire Suppression stand pipes, Wet Pipe Sprinklers system, Novec
1230 clean agent system G.I & Black Steel), Chilled Water Piping (Black Steel), DX Units piping (Low
& High Pressure Copper Piping), Domestic Water Services (Boosted cold water & Hot water Copper
Tubing) systems & related parts of the system are properly sized & installed as per Saso standard,
 Clean Agent Extinguishing, CO2 Systems Fire Heat, Smoke,
 Fire/Life Safety Alarm and Suppression System Gas Monitoring, Detection, and Alarm systems
Structural Fire Protection Calculations
 Building and Fire Code Analyses, Design Coordination, and Equivalencies
 Planning of job with architects, interior designers and contractors from the start till end of the project.
 To review design of HVAC equipment including drawing, specifications/data sheets, material
requisition and bills of quantities.
 Responsible for the all Installation of ventilation system requirement, design drawings, HVAC control-
and fire protection systems.
 Performance and progress monitoring and expediting the projects as per work schedules.
 Evaluate project progress, reason of delay and effective in time completion methods.
 Ensure that Drawings and project schedules are well planned as per construction Request from
checklist.
 Update and give timely feed back to the construction manager about the projects daily and weekly
progress.
 Resolve all safety issues.
 Check the all parameter after installation system at site.
 Planning and Implementation of day-to-day working of projects.
 Monitoring safety performances and emergency work permit procedures.
 Reporting unsafe condition to Foreman and Job Supervisor.
Professional Skills
 Coordinated the successful simultaneous development of several projects.
 Ensuring that the project objectives are accomplished in accordance with the outlined priorities.
 Delegating responsibilities and designed time/project schedules.
 Negotiating contracts so that it meets our specific engineering/Process requirements.
 Reviewing project status during the operational phase.
 Preparing weekly project status to client.
 Managing drawing approval processes.
 Team player understands the benefits of working collaboratively to achieve company goals.
 Follows company processes and procedures whilst maintaining safety at all times.
 Flexible and open to changing work environments – able to work in remote areas; with experience in shift
work.
 Hardworking with positive attitude.
 Computer literate – Microsoft Word, Excel, Internet and email.
TRAINING & LICENSES
CertificateOHS Awareness URIL 2012
ISO 14000 (Environmental Management System)ISO
Farhan Wahid
Private & Confidential 3 | P a g e
9001 (Quality Management System)
Internal Auditor for QMS-9000 & EMS-14000 14001,
Statistical Techniques- an introduction
Supervisor Skills,TimeManagement
CertificateRisk Management URIL 2012
Certificatein Fire Fighting URIL 2011
Certificatein Leadership Development URIL 2008
CertificateIn Safety Awareness ValiantTraining, 2007
B.E Mechanical Engineeringand Management Q.U.E.S.T Nawabshah 2006
Drivers License 2315498218 ( Class) Kingdom of Saudi Arabia Current
Major Achievements
 Appreciation letter from Saudi Electricity of on Best performance
 Interpersonal Skills during site visit found 130 defects from different sites
Technology Skills
Programming Auto-Cad (intermediate level)
Web Skills Familiarwith Internet, browsing,Email..
Ms Office Word, Excel, PowerPoint,
OperatingSystem Windows8
Languages English,Urdu, Sindhi,Hindi,
REFERENCES
Provided upon Request

Updated NEW SECCC1

  • 1.
    Farhan WAHID Mechanical EngineerMobile: 00966566797803 wahidfarhan@hotmail.com Skype : farhan_wahid Private & Confidential 1 | P a g e OBJECTIVE To obtain a challenging position in Mechanical Engineering field that utilizes my background skills in Building, construction and maintenance of different mechanical sections with equipment selection and the installations. Exceptional knowledge of methods, principles,procedures,objectives,and standard practices of Mechanical field including safety standards, engaging clients, preparing proposals and Feasibility reports PROFILE Professional Experience Senior Mechanical Engineer (Consultant ) January 2009 to present Saudi Electricity Company Experience (Makkah & Taif Saudi Arabia) |  Installation of FPSP Fire Protective Signaling Panel FM-200 Portable Cylinders Fire Extinguishers in Sub Stations  Fm-200 Testing & Commissioning Pneumatic & Flow Test  Integrity Test. with Liquid level Indicator Test  Fire Alarm Test with All Trouble shooting  SAS Singling Test  FM-200 Flow Diagrams with Calculations  Knowledge of codes and standards such as ASHRAE, SMACNA, ASME, ASTM, NFPA,  Overall Work as per PTS (Project Technical Standard) Saudi Electricity Company  Coordinate assigned engineering work & monitor work for compliance to applicable codes, accepted engineering practices. Co-ordination Contractor work Flow  Participating in Client meetings and resolving engineering and management project issues.  Monitoring all sites issues  Ensure effective communication and coordination between all disciplines and all other project participants.  Monitoring building systems and processes;  To perform / review Cooling and Heating Load calculations and ventilation requirement, design drawings, HVAC control- and fire protection systems.  Attending a range of project group and technical meetings;  Ensuring that the design and maintenance of building systems meets legislative and health and safety requirements;  Working on a variety of projects within a short period of time.  Monitoring and mentioning problems of mechanical works during execution.  Ensure that construction follow the good practices to avoid/eliminate re-works.  To monitor the monthly, weekly and daily progress. Mechanical Engineer October 2004 to 2009 Al Rashid Trading & Contracting Company (Riyadh Saudi Arabia)  Responsible as a Contractor for the , project execution works on site with focus on all mechanical engineering works HVAC, Plumbing and Fire Fighting components and systems  Supervise and monitor project to ensure that projects are completed within defined time frame and executed as per quality standards.  Make sure that MSU has been submitted and approved by the client prior to execution.
  • 2.
    Farhan Wahid Private &Confidential 2 | P a g e  Plan, schedule and inspect the maintenance and operation for Air Cooled Chiller, Ventilation Systems, Domestic Water Pumps, Irrigation Pumps, Fire Pumps, Submersible Pump,AHU’s, FCU’s and related equipment’s.  Ensures that HVAC (Ducting & Accessories, CAV & VAV Boxes, VRF, AHU, Sound attenuators  Fan, Ventilation system, Louvers, FCU, ACCU, CRAC Units), Above & Below Ground Drainage piping (HDPE & PVC), Fire Services Piping (Fire Suppression stand pipes, Wet Pipe Sprinklers system, Novec 1230 clean agent system G.I & Black Steel), Chilled Water Piping (Black Steel), DX Units piping (Low & High Pressure Copper Piping), Domestic Water Services (Boosted cold water & Hot water Copper Tubing) systems & related parts of the system are properly sized & installed as per Saso standard,  Clean Agent Extinguishing, CO2 Systems Fire Heat, Smoke,  Fire/Life Safety Alarm and Suppression System Gas Monitoring, Detection, and Alarm systems Structural Fire Protection Calculations  Building and Fire Code Analyses, Design Coordination, and Equivalencies  Planning of job with architects, interior designers and contractors from the start till end of the project.  To review design of HVAC equipment including drawing, specifications/data sheets, material requisition and bills of quantities.  Responsible for the all Installation of ventilation system requirement, design drawings, HVAC control- and fire protection systems.  Performance and progress monitoring and expediting the projects as per work schedules.  Evaluate project progress, reason of delay and effective in time completion methods.  Ensure that Drawings and project schedules are well planned as per construction Request from checklist.  Update and give timely feed back to the construction manager about the projects daily and weekly progress.  Resolve all safety issues.  Check the all parameter after installation system at site.  Planning and Implementation of day-to-day working of projects.  Monitoring safety performances and emergency work permit procedures.  Reporting unsafe condition to Foreman and Job Supervisor. Professional Skills  Coordinated the successful simultaneous development of several projects.  Ensuring that the project objectives are accomplished in accordance with the outlined priorities.  Delegating responsibilities and designed time/project schedules.  Negotiating contracts so that it meets our specific engineering/Process requirements.  Reviewing project status during the operational phase.  Preparing weekly project status to client.  Managing drawing approval processes.  Team player understands the benefits of working collaboratively to achieve company goals.  Follows company processes and procedures whilst maintaining safety at all times.  Flexible and open to changing work environments – able to work in remote areas; with experience in shift work.  Hardworking with positive attitude.  Computer literate – Microsoft Word, Excel, Internet and email. TRAINING & LICENSES CertificateOHS Awareness URIL 2012 ISO 14000 (Environmental Management System)ISO
  • 3.
    Farhan Wahid Private &Confidential 3 | P a g e 9001 (Quality Management System) Internal Auditor for QMS-9000 & EMS-14000 14001, Statistical Techniques- an introduction Supervisor Skills,TimeManagement CertificateRisk Management URIL 2012 Certificatein Fire Fighting URIL 2011 Certificatein Leadership Development URIL 2008 CertificateIn Safety Awareness ValiantTraining, 2007 B.E Mechanical Engineeringand Management Q.U.E.S.T Nawabshah 2006 Drivers License 2315498218 ( Class) Kingdom of Saudi Arabia Current Major Achievements  Appreciation letter from Saudi Electricity of on Best performance  Interpersonal Skills during site visit found 130 defects from different sites Technology Skills Programming Auto-Cad (intermediate level) Web Skills Familiarwith Internet, browsing,Email.. Ms Office Word, Excel, PowerPoint, OperatingSystem Windows8 Languages English,Urdu, Sindhi,Hindi, REFERENCES Provided upon Request