To,
The HRManager,
Respected Sir/Madam,
I am submitting herewith my resume for your perusal & favorable consideration for the post of Project
Engineer – HVACin your organization.
HVAC
PLUMBING & WATER SUPPLY
FIRE FIGHTING
PROJECT EXECUTION & FACILIY
A systematic, organized, hardworking team player with an analytical bent of mind with excellent
academic credentials. I’m a qualified Mechanical Engineer with expertise in handling complete MEP
system with an experience of 10 years in Commercial, Residential Buildings, Dubai Airport High Rise
Towers & Hotels, worked in BLUE STAR PVT.INDIA,Project Engineer-HVAC with E.T.A Dubai,
Project Engineer - MEP with M/s. Electro RAK, Ras Al Khaima - UAE, MEP ENGINEER-With SARA
Cont (Al Murad Group)Ajman,UAE. PROJECT ENGINEER-with MODULAR CONCEPT LLC,Dubai.
I am an innovative thinker, able to apply analysis and creativity to problem solving. I am a highly
personable, self-motivated and diligent individual with flexibility to adapt to new situations.
My core competencies in HVAC system.
Installation, Testing and Commissioning of HVAC Systems like DX System and
Chiller unit complete with accessories,fittings, insulation, Air Balancing etc.
HVAC engineering calculation & selection of Chiller, FAHU,AHU, FCU (Jet FANS) etc. (Duct, pipe,
pump head, louver sizing, ESP, Heat load & Hood,) & Preparation of method statements,As build
Drawings. Familiar with Plumbing & Water Supply, Fire Fighting & Air Compressor Line.
Coordinating with client, Consultant and Sub contractor as a Project Engineer.
Proficient in verbal and written communication skills and Documents Preparation.
Technical comparison of the materials and finalization the material with suppliers, Preparation and review
the technical submittals and materials procurement.
Participation & Schedule the Site Coordination meetings, Project progress meetings, monthly & weekly
meetings with client & consultant.
Monitoring the project expenses with budget value & providing timely reminders to the senior
management if any problem persists.
Ensuring the site execution as per Consultant’s Guideline & Project Specs, Invoicing of project on
monthly bases and variations.
I am confident in my credentials you would find a perfect fit for the said job. I would appreciate the
chance to meet with you in person to discuss as to how I could be a vital part of your organization.
Thanking you in anticipation.
Yours sincerely
PERWEZ AKHTAR
00971502228604
PERWEZ AKHTAR
Mobile: 971-502228604
Perwezakhtar@gmail.com
MEP PROJECT ENGINEER
Seeking a challenging position across the industry
 Dynamic & detailed oriented professional with a comprehensive experience of 10 years, currently
spearheading as Project Engineer.
 Expertise in the area of HVAC Execution, Testing & Commissioning.
 Use Engineering principles to provide efficient solutions to the development of processes.
 Ability to exercise tact, diplomacy, deal with people in a calm & effective manner in sometimes
sensitive situations to resolve client issues with effective negotiation, persuasion skills to establish,
maintain relationships with clients and vendors.
PROFESIONAL EXPERIENCE DETAILS.
MODULAR CONCEPT LLC DUBAI-UAE
MEP ROJECT ENGINEER. JUN 2015 – TO TILL DATE
SARA CONT(AL MURAD GROUP) AJMAN-UAE
MEP PROJECT ENGINEER. DEC 2014 - JUN 2015
M/S.ELECTRO RAK, RAS AL KHAIMAH-UAE.
MEP PROJECT ENGINEER. DEC 2012 - Nov 2014
BLUE STAR PVT, KOLKATA-INDIA.
HVAC SITE ENGINEER. NOV 2010 - SEP2012
EMIRATES TRADING AGENCY LLC DUBAI-UAE.
Mechanical Engineer–HVAC. OCT 2004 - OCT 2010
PROFESSIONAL SKILLS
 Involved in Installing, Facility Central Air condition and Refrigeration, Pumps, Split, Package,
VAV,CAV,VFD, VRF, DX, FAHU, FCU’s, AHU's, Fans, Chillers, Pressurization units, Car parking,
kitchen wood ventilation system, BTU meters & Chemical dosing system.
 Credentials of having guided the draftsman for preparing the shop drawing for the consultant
approval.
 Look after the preparation drawing and status report, material status and material submittals for
consultants/clients approval.
 Involved in planning the material and manpower requirement & work to be done as per the program.
 Credentials of having attended project progress meeting & coordinating meeting with main
contractor, consultant and client.
 Inspection of materials received on site to ensure conformity with approval and project requirement.
 Expertise coordinating with consultant’s drawings for services like HVAC, Plumbing, Firefighting
installation taking of the quantities as per the site requirement.
 Execution of air and water balancing of HVAC services as per standers.
 External Static pressure (ESP) calculations for FAHU’s, AHU’s, FCU’s, Exhaust fans and stair case
pressurization fans.
 Involved in HVAC system designing–Duct Designing, Pipe sizing for CHW systems, heat loud and
Pump Head calculations.
 Extensive Knowledge of building load calculation programs such as HAP (ASHRAE).
 Good working knowledge in Electrical, Plumbing and Fire fighting system.
 Submission of RFI’s (Requests for Information) & FCR’s (Field Change Requests) to the
Consultant/Client for any queries in design or specifications.
 Prepare subcontractor request for quote technical bid documentation specific to the engineering
requirements as prescribed by the project performance work statement and targeted solutions.
 Extensive knowledge of BTU Meter (Energy) installation in chilled water network.
 Extensive experience in HVAC and managing HVAC projects.
 Reporting to DGM/ CHAIRMAN
 Preparation of material submittal for consultant approval.
 Coordinating with the supplier towards timely delivery of materials on site.
 Supervision of installation of HVAC items as per standard (ASHRAE).
 Participating in site meetings with client /consultant.
 Floating Request for Inspection of installations to Consultant and rectifying if any snag works /
comments.
 Coordination with HVAC works towards successful completion of project.
 Procure and manage project subcontractors and equipment vendors.
 Inspect the jobsite on a regular basis for contract compliance, workmanship & safety.
 Follow-up on any required warranty work and maintain contact with owner to insure customer
satisfaction.
 Manage large jobs with minimal supervision.
 Familiarity with calculations, layout and sizing of HVAC and Plumbing projects.
 Exceptional knowledge of the installation and commissioning of HVAC equipment’s outstanding
organizational skills.
 Skilled to perform pre-commissioning of the air and water balancing procedures.
 Inspected the material and escalated all issues to the consultants.
 Organized the working of the project, procured the major items such as Chillers, pumps and exhaust
fans, Jet fans.
 Scheduled the project & performed monthly audits and ensured that the project timeline was
maintained.
 Provided technical support to the Sales and Estimating team.
 Evaluated the engineering drawings and coordinated to install the required equipment’s.
 Assisted the customer and reviewed the work, gathered the customer’s requirement and obtained a
deadline for the project.
 Knowledge of overhauling all type of chiller compressor 30 TR- 200 TR (carrier, Trane & York).
 Extensive Knowledge of electromechanical, Electronic components and also having experience in
trouble shooting.
 Extensive Knowledge of Oil, Gas charging & pressure testing maintenance and trouble shooting.
 Extensive Knowledge of chilled water pressure equipment (Flow switch, Thermostatic switch,
Motorize valve etc.
 Extensive Knowledge of all type of chiller pumps, VFD, Testing commissioning.
 Reports Warranty etc. sort Out Customer dealing. Field activity Explain product features.
 Provide excellent customer service at all times and work as a part of team.
 Ensure that each customer’s needs are met, with the goal of increasing sales.
 Demonstrate and uphold the values and vision of the company.
 Technical problem solving and Trouble shooting.
 AMC preventive maintenance& ISO etc.
 Rise invoicing to the client against the amount of work completed.
 Site administration, handing skilled manpower .Proper utilization of Manpower.
 To organize daily work management at Site.
 Co-ordinate with workers.
 Budget monitoring throughout the project.
PROJECTS DETAILS
MODULAR CONCEPT LLC
Title : (B+G-15th
Floors) BRIGHT POINT WOMEN HOSPITAL
Client : NMC
Consultant : STH
Main cont : MODCON LLC, Dubai
Title :( B+G-4th
Floors) Plus Medical, Abu Dhabi
Client : Qemmet Al Shumookh properties LLC
Consultant : Al khalil Engineering
Main cont : MODCON LLC, Dubai
SARA CONT (AL MURAD GROUP)
Title : WAREHOUSE G+M
Client : COLOUR FLIM (IMPZ) JABEL ALI, DUBAI.
Consultant : AL HILAL CONSULTANT ENGINEERING
Main Cont : SARA CONT.
M/S ELECTRO RAK PROJECT
Title : ROYAL BREEZE(1,2,3,4 & 5)
Client :M/S Al Hamra Village.
Consultant : M/S Davis Langdon & M/S Whit by Mohajer & Engineers.
Main cont : M/S Al Hamra Construction company.
Synopsis : It’s a P1,P2,+G+14th
Floors project .The project involves total capacity of the 1380 TR 2 Chiller
Every Block Except (Block RB 4, 3 Chiller) 4 FAHU,6 AHU,366 FCU,3 Primary & secondary
Pumps & 20 Car parking Exhaust Fans.
Title : Al Hamra Fort Hotel Refurbishment project.
Client : M/S Al Hamra Village.
Consultant : M/S Davis Langdon & M/S Whit by Mohajer & Engineers
Main cont : M/S Al Hamra Construction company.
Title : RAKIA ACCOMMODATION.
Client : M/S Al Hamra Village.
PROFESSIONAL EDUCATION
Degree : MBA, Operation & Industrial Management. (DISTANCE)
Institute : JIIT.
University : KSOU, INDIA.
Duration : 2013-2014.
Degree : B.Tech in Automobile Engineering. (DISTANCE)
Institute : Bharath Institute of Engineering & Research.
University : (AMIE) Association Member Institute of Engineering Universities.
Duration : 2006 – 2009.
Degree : Diploma in Mechanical Engineering. (REGULAR)
Institute : Al-Kabir Polytechnic, Jamshedpur.
University : State Board of Technical Education, Jharkhand.
Duration : 2001-2004.
CERTIFICATION DIPLOMA
Discipline : Diploma in Basic Electronic.(2000-2001)
Institute : Sharada Commercial Institute Pvt. Ltd-India.
Discipline : Diploma in MEP, REVIT&NAVIS
Institute : TAIBA ENGINEERING CONSULTANT (HYDRABAD)
Business Spoken English course from M/s. Al Karama Institute, Dubai, UAE
Consultant : Home of Architect Engineering
Main Cont : M/S Al Hamra Construction Company.
Synopsis : It’s a B1+G+12th
Floors (Block-A3, A4,A5,& A6) Project. The project involves total capacity of
1000 TR, 2 chiller,4 FAHU,6 AHU,270FCU,3 Primary & secondary pumps, jet Exhaust Fans each
Blocks.
EMIRATES TRADING AGANCY L.L.C, PROJECTS
Title : 11 Towers Tower ‘J’ (3B+G+M+4P+44F Residential)
Client : DUBAI PROPERTIES
Consultant
Main Cont
: M/s DAR & M/s IBA
: M/s Al Habtoor
Synopsis This project involves total capacity 2050TR, 8 FAHU’s,14 AHU’s,940 FCU’s,6 Primary Pumps &
6 Secondary Pumps.
Title : One Business Bay (3B+G+5P+30F Executive Tower).
Client : M/s Omniyat Properties.
Consultant
Main Cont
: M/s IBA & M/s SPEC.
: M/s Emirates Belbadi.
Synopsis This project involves total capacity1550TR, 4 HEX’s, 4 FAHU’s,3 AHU’s,802 FCU’s,5
CCU’s,6 Secondary Pumps & 79 Car Parking Exhaust Fans.
EDUCATIONAL QUALIFICATION
1999 – 2001 Higher Secondary (10+2) Burdwan University – India.
1998 – 1999 Secondary School West Bengal Board - India.
COMPUTER&SOFTWARE SKILLS
 Basic knowledge of computer fundamental & MS-Office application.
 Having experience in REVIT&NAVIS.
 HAP
 ELITE
 Mc QUAY DUCT&PIPE SIZER
 CAREER PSYCHOMETRIC CHART ANALYSER
 BETA TERMINAL DEVICE SELECTOR.
ACHIEVEMENTS
 Life time member (Associate Member of Institute of Motor Industry-AMIMI), Chennai-India, 2008.
 Life time member (Associate Member of Institute of Automobile Education-AMIAEI), Chennai-
India, 2009.
PERSONAL PROFILE
Date of Birth/Age : 6th Jan 1980.
Languages Known : English, Hindi/Urdu.
Nationality : Indian
Religion : Islam
Marital Status : Married
Passport Number : L9303736, INDIA.
Passport Expiry : 13th
May 2024.
Driving License : UAE (157694)
Visa Status : Employment
References : Available on request.
DECLARATION:
I hereby declare that the above furnished details are true to the best of my knowledge &belief.
Thanks & Best Regards.
Yours Faithfully,
PERWEZ AKHTAR.

cv PERWEZ

  • 1.
    To, The HRManager, Respected Sir/Madam, Iam submitting herewith my resume for your perusal & favorable consideration for the post of Project Engineer – HVACin your organization. HVAC PLUMBING & WATER SUPPLY FIRE FIGHTING PROJECT EXECUTION & FACILIY A systematic, organized, hardworking team player with an analytical bent of mind with excellent academic credentials. I’m a qualified Mechanical Engineer with expertise in handling complete MEP system with an experience of 10 years in Commercial, Residential Buildings, Dubai Airport High Rise Towers & Hotels, worked in BLUE STAR PVT.INDIA,Project Engineer-HVAC with E.T.A Dubai, Project Engineer - MEP with M/s. Electro RAK, Ras Al Khaima - UAE, MEP ENGINEER-With SARA Cont (Al Murad Group)Ajman,UAE. PROJECT ENGINEER-with MODULAR CONCEPT LLC,Dubai. I am an innovative thinker, able to apply analysis and creativity to problem solving. I am a highly personable, self-motivated and diligent individual with flexibility to adapt to new situations. My core competencies in HVAC system. Installation, Testing and Commissioning of HVAC Systems like DX System and Chiller unit complete with accessories,fittings, insulation, Air Balancing etc. HVAC engineering calculation & selection of Chiller, FAHU,AHU, FCU (Jet FANS) etc. (Duct, pipe, pump head, louver sizing, ESP, Heat load & Hood,) & Preparation of method statements,As build Drawings. Familiar with Plumbing & Water Supply, Fire Fighting & Air Compressor Line. Coordinating with client, Consultant and Sub contractor as a Project Engineer. Proficient in verbal and written communication skills and Documents Preparation. Technical comparison of the materials and finalization the material with suppliers, Preparation and review the technical submittals and materials procurement. Participation & Schedule the Site Coordination meetings, Project progress meetings, monthly & weekly meetings with client & consultant. Monitoring the project expenses with budget value & providing timely reminders to the senior management if any problem persists. Ensuring the site execution as per Consultant’s Guideline & Project Specs, Invoicing of project on monthly bases and variations. I am confident in my credentials you would find a perfect fit for the said job. I would appreciate the chance to meet with you in person to discuss as to how I could be a vital part of your organization. Thanking you in anticipation. Yours sincerely PERWEZ AKHTAR 00971502228604
  • 2.
    PERWEZ AKHTAR Mobile: 971-502228604 Perwezakhtar@gmail.com MEPPROJECT ENGINEER Seeking a challenging position across the industry  Dynamic & detailed oriented professional with a comprehensive experience of 10 years, currently spearheading as Project Engineer.  Expertise in the area of HVAC Execution, Testing & Commissioning.  Use Engineering principles to provide efficient solutions to the development of processes.  Ability to exercise tact, diplomacy, deal with people in a calm & effective manner in sometimes sensitive situations to resolve client issues with effective negotiation, persuasion skills to establish, maintain relationships with clients and vendors. PROFESIONAL EXPERIENCE DETAILS. MODULAR CONCEPT LLC DUBAI-UAE MEP ROJECT ENGINEER. JUN 2015 – TO TILL DATE SARA CONT(AL MURAD GROUP) AJMAN-UAE MEP PROJECT ENGINEER. DEC 2014 - JUN 2015 M/S.ELECTRO RAK, RAS AL KHAIMAH-UAE. MEP PROJECT ENGINEER. DEC 2012 - Nov 2014 BLUE STAR PVT, KOLKATA-INDIA. HVAC SITE ENGINEER. NOV 2010 - SEP2012 EMIRATES TRADING AGENCY LLC DUBAI-UAE. Mechanical Engineer–HVAC. OCT 2004 - OCT 2010 PROFESSIONAL SKILLS  Involved in Installing, Facility Central Air condition and Refrigeration, Pumps, Split, Package, VAV,CAV,VFD, VRF, DX, FAHU, FCU’s, AHU's, Fans, Chillers, Pressurization units, Car parking, kitchen wood ventilation system, BTU meters & Chemical dosing system.  Credentials of having guided the draftsman for preparing the shop drawing for the consultant approval.  Look after the preparation drawing and status report, material status and material submittals for consultants/clients approval.  Involved in planning the material and manpower requirement & work to be done as per the program.
  • 3.
     Credentials ofhaving attended project progress meeting & coordinating meeting with main contractor, consultant and client.  Inspection of materials received on site to ensure conformity with approval and project requirement.  Expertise coordinating with consultant’s drawings for services like HVAC, Plumbing, Firefighting installation taking of the quantities as per the site requirement.  Execution of air and water balancing of HVAC services as per standers.  External Static pressure (ESP) calculations for FAHU’s, AHU’s, FCU’s, Exhaust fans and stair case pressurization fans.  Involved in HVAC system designing–Duct Designing, Pipe sizing for CHW systems, heat loud and Pump Head calculations.  Extensive Knowledge of building load calculation programs such as HAP (ASHRAE).  Good working knowledge in Electrical, Plumbing and Fire fighting system.  Submission of RFI’s (Requests for Information) & FCR’s (Field Change Requests) to the Consultant/Client for any queries in design or specifications.  Prepare subcontractor request for quote technical bid documentation specific to the engineering requirements as prescribed by the project performance work statement and targeted solutions.  Extensive knowledge of BTU Meter (Energy) installation in chilled water network.  Extensive experience in HVAC and managing HVAC projects.  Reporting to DGM/ CHAIRMAN  Preparation of material submittal for consultant approval.  Coordinating with the supplier towards timely delivery of materials on site.  Supervision of installation of HVAC items as per standard (ASHRAE).  Participating in site meetings with client /consultant.  Floating Request for Inspection of installations to Consultant and rectifying if any snag works / comments.  Coordination with HVAC works towards successful completion of project.  Procure and manage project subcontractors and equipment vendors.  Inspect the jobsite on a regular basis for contract compliance, workmanship & safety.  Follow-up on any required warranty work and maintain contact with owner to insure customer satisfaction.  Manage large jobs with minimal supervision.  Familiarity with calculations, layout and sizing of HVAC and Plumbing projects.  Exceptional knowledge of the installation and commissioning of HVAC equipment’s outstanding organizational skills.  Skilled to perform pre-commissioning of the air and water balancing procedures.  Inspected the material and escalated all issues to the consultants.  Organized the working of the project, procured the major items such as Chillers, pumps and exhaust fans, Jet fans.  Scheduled the project & performed monthly audits and ensured that the project timeline was maintained.  Provided technical support to the Sales and Estimating team.  Evaluated the engineering drawings and coordinated to install the required equipment’s.  Assisted the customer and reviewed the work, gathered the customer’s requirement and obtained a deadline for the project.  Knowledge of overhauling all type of chiller compressor 30 TR- 200 TR (carrier, Trane & York).  Extensive Knowledge of electromechanical, Electronic components and also having experience in trouble shooting.  Extensive Knowledge of Oil, Gas charging & pressure testing maintenance and trouble shooting.
  • 4.
     Extensive Knowledgeof chilled water pressure equipment (Flow switch, Thermostatic switch, Motorize valve etc.  Extensive Knowledge of all type of chiller pumps, VFD, Testing commissioning.  Reports Warranty etc. sort Out Customer dealing. Field activity Explain product features.  Provide excellent customer service at all times and work as a part of team.  Ensure that each customer’s needs are met, with the goal of increasing sales.  Demonstrate and uphold the values and vision of the company.  Technical problem solving and Trouble shooting.  AMC preventive maintenance& ISO etc.  Rise invoicing to the client against the amount of work completed.  Site administration, handing skilled manpower .Proper utilization of Manpower.  To organize daily work management at Site.  Co-ordinate with workers.  Budget monitoring throughout the project. PROJECTS DETAILS MODULAR CONCEPT LLC Title : (B+G-15th Floors) BRIGHT POINT WOMEN HOSPITAL Client : NMC Consultant : STH Main cont : MODCON LLC, Dubai Title :( B+G-4th Floors) Plus Medical, Abu Dhabi Client : Qemmet Al Shumookh properties LLC Consultant : Al khalil Engineering Main cont : MODCON LLC, Dubai SARA CONT (AL MURAD GROUP) Title : WAREHOUSE G+M Client : COLOUR FLIM (IMPZ) JABEL ALI, DUBAI. Consultant : AL HILAL CONSULTANT ENGINEERING Main Cont : SARA CONT. M/S ELECTRO RAK PROJECT Title : ROYAL BREEZE(1,2,3,4 & 5) Client :M/S Al Hamra Village. Consultant : M/S Davis Langdon & M/S Whit by Mohajer & Engineers. Main cont : M/S Al Hamra Construction company. Synopsis : It’s a P1,P2,+G+14th Floors project .The project involves total capacity of the 1380 TR 2 Chiller Every Block Except (Block RB 4, 3 Chiller) 4 FAHU,6 AHU,366 FCU,3 Primary & secondary Pumps & 20 Car parking Exhaust Fans. Title : Al Hamra Fort Hotel Refurbishment project. Client : M/S Al Hamra Village. Consultant : M/S Davis Langdon & M/S Whit by Mohajer & Engineers Main cont : M/S Al Hamra Construction company. Title : RAKIA ACCOMMODATION. Client : M/S Al Hamra Village.
  • 5.
    PROFESSIONAL EDUCATION Degree :MBA, Operation & Industrial Management. (DISTANCE) Institute : JIIT. University : KSOU, INDIA. Duration : 2013-2014. Degree : B.Tech in Automobile Engineering. (DISTANCE) Institute : Bharath Institute of Engineering & Research. University : (AMIE) Association Member Institute of Engineering Universities. Duration : 2006 – 2009. Degree : Diploma in Mechanical Engineering. (REGULAR) Institute : Al-Kabir Polytechnic, Jamshedpur. University : State Board of Technical Education, Jharkhand. Duration : 2001-2004. CERTIFICATION DIPLOMA Discipline : Diploma in Basic Electronic.(2000-2001) Institute : Sharada Commercial Institute Pvt. Ltd-India. Discipline : Diploma in MEP, REVIT&NAVIS Institute : TAIBA ENGINEERING CONSULTANT (HYDRABAD) Business Spoken English course from M/s. Al Karama Institute, Dubai, UAE Consultant : Home of Architect Engineering Main Cont : M/S Al Hamra Construction Company. Synopsis : It’s a B1+G+12th Floors (Block-A3, A4,A5,& A6) Project. The project involves total capacity of 1000 TR, 2 chiller,4 FAHU,6 AHU,270FCU,3 Primary & secondary pumps, jet Exhaust Fans each Blocks. EMIRATES TRADING AGANCY L.L.C, PROJECTS Title : 11 Towers Tower ‘J’ (3B+G+M+4P+44F Residential) Client : DUBAI PROPERTIES Consultant Main Cont : M/s DAR & M/s IBA : M/s Al Habtoor Synopsis This project involves total capacity 2050TR, 8 FAHU’s,14 AHU’s,940 FCU’s,6 Primary Pumps & 6 Secondary Pumps. Title : One Business Bay (3B+G+5P+30F Executive Tower). Client : M/s Omniyat Properties. Consultant Main Cont : M/s IBA & M/s SPEC. : M/s Emirates Belbadi. Synopsis This project involves total capacity1550TR, 4 HEX’s, 4 FAHU’s,3 AHU’s,802 FCU’s,5 CCU’s,6 Secondary Pumps & 79 Car Parking Exhaust Fans.
  • 6.
    EDUCATIONAL QUALIFICATION 1999 –2001 Higher Secondary (10+2) Burdwan University – India. 1998 – 1999 Secondary School West Bengal Board - India. COMPUTER&SOFTWARE SKILLS  Basic knowledge of computer fundamental & MS-Office application.  Having experience in REVIT&NAVIS.  HAP  ELITE  Mc QUAY DUCT&PIPE SIZER  CAREER PSYCHOMETRIC CHART ANALYSER  BETA TERMINAL DEVICE SELECTOR. ACHIEVEMENTS  Life time member (Associate Member of Institute of Motor Industry-AMIMI), Chennai-India, 2008.  Life time member (Associate Member of Institute of Automobile Education-AMIAEI), Chennai- India, 2009. PERSONAL PROFILE Date of Birth/Age : 6th Jan 1980. Languages Known : English, Hindi/Urdu. Nationality : Indian Religion : Islam Marital Status : Married Passport Number : L9303736, INDIA. Passport Expiry : 13th May 2024. Driving License : UAE (157694) Visa Status : Employment References : Available on request. DECLARATION: I hereby declare that the above furnished details are true to the best of my knowledge &belief. Thanks & Best Regards. Yours Faithfully, PERWEZ AKHTAR.