UNDP supports Climate Mitigation through Renewable Energy:
Present status & Roadmap of Bangladesh
Dr. Md. Taibur Rahman
Deputy Chief, Bangladesh Planning Commission
Currently on Lien at UNDP Bangladesh
trsumon@gmail.com
taibur.Rahman@undp.org
Power Generation at a Glance
•Generation Capacity : 20,775 MW (Including all)
•Highest Generation : 11,623 MW (19/09/2018)
•Total Consumers : 32.2 Million
•Transmission Line : 11,353 Ckt. km
•Distribution Line : 4,89,000 km
•System Loss : 11.87% (June 2018)
•Distribution Loss : 9.60% (June 2018)
•Per Capita Generation : 464 KWh
•Access to Electricity : 92%
*With Captive & RE
Source: PowerCell
Source: BPDB & SREDA
RE: Status & Road Map by Dr. Md. Taibur Rahman
Present status of Renewable Energy (As on 24.01.2019)
58%
0.5%
41%
0.2%0%
RE Mix
Solar
Wind
Hydro
Biogas/Biomass to
Electricity
Technology wise details
RE: Status & Road Map by Dr. Md. Taibur Rahman
RE: Status & Road Map by Dr. Md. Taibur Rahman
Is RE only important for Climate mitigation??
• Though currently it is only 3% of the total generation, it
serves 13% of the total population
• It is crucial also from energy security perspective and
ensuring green growth
RE: Status & Road Map by Dr. Md. Taibur Rahman
RE Relevant existing policy framework
• National Energy Policy (2004)
• Renewable Energy Policy (2008)
• Policy Guideline for Enhancement of Private Participation (2008)
• Bangladesh Climate Change Strategy and Action Plan (2009)
• Perspective Plan of Bangladesh 2010-2021 (2012)
• Guidelines for the Implementation of Solar Power Development Program (2013)
• Intended Nationally Determined Contribution of Bangladesh (2015)
• Bangladesh Policy Roadmap for Renewable Energy (2015)
• Energy Efficiency and Conservation Master Plan up to 2030 (2015)
• Power Sector Master Plan (2016)
• Net Metering Guidelines (2018)
• Bangladesh Delta Plan RE: Status & Road Map by Dr. Md. Taibur Rahman
Target of Renewable Energy based Power Generation
• 10% by 2020 as per RE Policy 2008
• 10% by 2030 as per PSMP 2016
• 30% by 2041 as per Bangladesh Delta Plan 2100 approved in 2018
• 100% by 2050 as per the speech of Hon’ble Prime Minister at CoP 22 in 2016
• Reduction of Emission as per NDC:
• Voluntary: 5% in the Transport, energy and industry sector
• With International Support: 15%
RE: Status & Road Map by Dr. Md. Taibur Rahman
RE: Status & Road Map by Dr. Md. Taibur Rahman
Ongoing Activities (Page 1 of 2)
SL Activities Capacity Implementi
ng Agency
Expected
time
1. Unsolicited Solar Park:
• PPA signed on 9 projects (capacity 550 MW),
• LoI Issued on 7 projects (capacity 565 MW),
• Agreed in Principle on 3 projects (capacity 55 MW)
1170 MW BPDB &
Power Division
2020
2. Solar Park project by different utilities 700 MW Utilities 2020
3. 100% Renewable Energy based model upazilla:
▪ Monpura: 1 existing Minigrid and 2 proposed Minigrid
▪ Rangabali: BPDB will install a solar park.
0.8 MW
50MW
SREDA
BPDB
2018
-
4. Minigrid:
▪ 9 Solar Minigrid under construction by IDCOL (2 MWp)
▪ 6 more Solar Minigrid under processing for approval by
IDCOL (1.5 MWp)
3.5 MW IDCOL 2018-2019
5. 400 Solar Drinking Water System by REEEP program
(GIZ)
4 MW SREDA 2020
RE: Status & Road Map by Dr. Md. Taibur Rahman
Ongoing Activities (Page 2 of 2)
SL Activities Capacity Implementi
ng Agency
Expected
time
5. Solar Irrigation
▪ 2000 Solar Irrigation projects by BREB (Funded by ADB)
▪ 35 Solar Irrigation by RDA
7.5 MW
0.5 MW
BREB
RDA
2020
2020
6. Biomass to electricity ongoing pilot project at Keraniganj 1 MW BPDB -
7. Net Metering rooftop solar program 600 MW Distribution
Utilities &
SREDA
2020
8. Kushtia Solar park 50 MW SREDA 2020
9. Monpura Solar-Wind Hybrid Project 0.4 MW IDCOL/
NWPGCL
2020
10. Rajshahi waste to energy Project (slaughter house
based)
- SREDA 2020
Total 2587.7
RE: Status & Road Map by Dr. Md. Taibur Rahman
RE Road Map
SL Program 2018 2020
1. Solar Park 23 MW 700 MW
2. Solar Home System 233 MW 255 MW
3. Solar Minigrid/ Microgrid/ Nanogrid 4.1 MW 7MW
4. Solar Irrigation 22.5 MW 53 MW
5. Rooftop Solar Program-Net Metering 3.07 MW 600 MW
6. Rooftop Solar Program- Others (Including New Electricity connection) 30 MW 50 MW
7. Solar Drinking Water System 1.6 MW 6 MW
8. Solar Powered Telecom Tower 8 MW 15 MW
9. Solar Street Light 4.2MW 5 MW
10. Hydro Power Plant 230 MW 230 MW
11. Wind 2.9 MW 30 MW
12. Biomass (Biogas, Biomass, waste) to Electricity 1 MW 3 MW
13. Others (Vehicle, Aquaculture, Boat, picosystem) 1 MW 7 MW
Total 564 MW 1961 MW
RE: Status & Road Map by Dr. Md. Taibur Rahman
RE: Status & Road Map by Dr. Md. Taibur Rahman
Challenges & Way Forward
Topics Challenges Likely Solution
Utility Scale
Solar Park
1.Scarcity of suitable land
2.Difficulties to construct evacuation
facility through private Lands.
3.High cost and complexity of Land
procuring and its development
4.Still high tariff though deceasing
5.Lack of cooperation from other
government agencies.
1. Solar park can be installed in
neighboring countries and power can
be imported through cross border
agreement.
2. Government can manage and
develop land, evacuation system up
to plant area and go for tariff bidding.
3. Government should issue a circular
for avoiding complexities among
different agencies to establish solar
park.
Solar
Minigrid
1. Expansion of National Grid Clear policy/Guideline should be needed
to purchase electricity from Minigrid after
grid expansion in Minigrid area.
RE: Status & Road Map by Dr. Md. Taibur Rahman
Challenges & Way Forward
Topics Challenges Likely Solution
Solar
Irrigation
1. Grid expansion and give connection to
LLP and SLPLack of co-ordination
2. Lack of optimum utilization of solar
system due to absence of policy
support
1. Stop giving electric connection to LLP
or SLP and Clearly Demark the area
for solar irrigation system
2. Clear policy/Guideline need to
formulate to purchase excess
electricity from solar irrigation system.
Wind
Energy
1. Authentication of Data
2. Lack of co-ordination
3. High tariff
1. Establishing Central wind resource
data center in SREDA
2. Developing necessary guideline to
implement wind project.
3. Considering sustainability this sector
should be subsidized
Waste to
Energy
1. Generation cost is high
2. Lack of co-ordination between power
sector and City corporations
1. Considering adverse impact on
environment this sector should be
subsidized by power division and city
corporations.
RE: Status & Road Map by Dr. Md. Taibur Rahman
UNDP Supports Government with Development of Sustainable
Renewable Energy Power Generation (SREPGen) project since 2014
Specific Objective:
• Emission reductions of about 1.64 Mtons CO2
• Support SREDA to achieve 10% share of RE in the power generation
mix of Bangladesh by 2021
Budget: US$ 4.07 million (GEF)
Project Components:
• Component 1: RE policy and regulatory support program
• Component 2: (RE) Resource assessment support program (Solar,
Wind, Bio-mass)
Project Components-wise contribution so far and plan
Component 1: RE policy and regulatory support program
16
1.Assessment of base-level standard tariff for utility scale solar IPP projects considering the
local climatic, geographic and grid condition and power evacuation facilities;
2.Solutions for grid integration of solar irrigation pumps (SIP) and solar PV mini-grids
3.Template agreements for rooftop solar and its grid integration
4.Energy Net Metering Guideline and Handbook;
5.Regulations for standards for PV system and preferred PV system
6.Regulations for disposal of PV systems wastes (e.g. panels, batteries):
7.RE power generation action plan 2019-2041;
8.Capacity Building Need Assessment and training of 500 officials
• These very important policy documents will bring significant change in realizing
RE sector potential in Bangladesh once adopted by the government
Project Components-wise contribution so far and plan
Component 2: (RE) Resource assessment support program (Solar, Wind, Bio-mass)
17
1. National Solar Irradiance Study
2. Nation-wide Bio Mass Study
3. Wind resource assessment in Manpura:
Project Components-wise contribution so far and plan
Component 3: Diffusion of RE solutions to low-income households
18
• 5000 PVSL with 30 USD grant have been distributed
• Solar-Wind Hybrid mini-grid in South Sakuchia of Manpura Upazilla of Bhola
district with 279.5+100 = 379.5 kW capacity is under construction with
support from SREPGen.
• Another Solar mini-grid at Sadar Union of Manpura Upazilla of Bhola district
with 218 kW capacity is under construction with support from SREPGen.
Project Components-wise contribution so far and plan
Component 4: Renewable energy investment scale-up
19
1. Five solar boats have been developed and those are currently operational
with potential to convert 1.5 million diesel run boats in the country
2. Two Solar Charging Stations have been installed to charge Easy-bikes
3. Feasibility Study of Waste to energy in six municipalities
4. A pilot Waste to Energy (W2E) project has been planned.
5. Piloting Arsenic removing solar PV pumps.
6. Solar Ice Plant at Char Montaz of Rangabali is under construction
7. Grid Integration Piloting for Solar Irrigation Pump with potential to
install and convert 100000 SIP
Solar Power Plant (Mini-grid) and Ice Plant
20
Some Innovative Applications
21
Solar Boats
Solar Charging Station
Thanks to all
RE: Status & Road Map by Dr. Md. Taibur Rahman

More Related Content

What's hot

Solar energy:potentiality and implementation problems in household and busine...
Solar energy:potentiality and implementation problems in household and busine...Solar energy:potentiality and implementation problems in household and busine...
Solar energy:potentiality and implementation problems in household and busine...
Rabiul Hasan Himo
 
Renewable energy prospects in Bangladesh
Renewable energy prospects in BangladeshRenewable energy prospects in Bangladesh
Renewable energy prospects in Bangladesh
Hasib Hossen
 
Future of solar Power Projects in India
Future of solar Power Projects in IndiaFuture of solar Power Projects in India
Future of solar Power Projects in India
Harish Sharma
 
Nuclear power-plant-in-bangladesh
Nuclear power-plant-in-bangladeshNuclear power-plant-in-bangladesh
Nuclear power-plant-in-bangladesh
Mariner Ahmed
 
Power generation and demand in bangladesh
Power generation and demand in bangladeshPower generation and demand in bangladesh
Power generation and demand in bangladeshGalib Ghani
 
Power sector in India
Power sector in IndiaPower sector in India
Power sector in India
Daya Kherwar
 
Renewable energy in pakistan
Renewable energy in pakistanRenewable energy in pakistan
Renewable energy in pakistan
fauzia samreen
 
Renewable Energy Sector Funding
Renewable Energy Sector FundingRenewable Energy Sector Funding
Renewable Energy Sector Funding
Resurgent India
 
Wind Energy in Bangladesh Present Scenario and Future Prospect.pptx
Wind Energy in Bangladesh Present Scenario and Future Prospect.pptxWind Energy in Bangladesh Present Scenario and Future Prospect.pptx
Wind Energy in Bangladesh Present Scenario and Future Prospect.pptx
MirMarufHossain1
 
Solar Policy in India (Article)
Solar Policy in India (Article) Solar Policy in India (Article)
Solar Policy in India (Article)
Arpit Kurel
 
India’s energy scenario in 2015 Nitish Sharma (Renewable Sources, Non - ren...
India’s energy scenario in 2015   Nitish Sharma (Renewable Sources, Non - ren...India’s energy scenario in 2015   Nitish Sharma (Renewable Sources, Non - ren...
India’s energy scenario in 2015 Nitish Sharma (Renewable Sources, Non - ren...
Nitish Sharma
 
Solar energy presentation(sayef amin 01924122222/01614122222/04475122222)
Solar energy presentation(sayef amin 01924122222/01614122222/04475122222)Solar energy presentation(sayef amin 01924122222/01614122222/04475122222)
Solar energy presentation(sayef amin 01924122222/01614122222/04475122222)
Asian Paint Bangladesh Ltd
 
Energy Sector of Bangladesh
Energy Sector of Bangladesh Energy Sector of Bangladesh
Energy Sector of Bangladesh
Md. Rasadul Islam
 
Prospects and Challenges of Solar Energy
Prospects and Challenges of Solar EnergyProspects and Challenges of Solar Energy
Prospects and Challenges of Solar Energy
Abhishek Ashok
 
Project on Solar Energy
Project on Solar EnergyProject on Solar Energy
Project on Solar Energy
gagneeshkaur
 
Environmental impacts of renewable energy generation systems (cost ghg emission)
Environmental impacts of renewable energy generation systems (cost ghg emission)Environmental impacts of renewable energy generation systems (cost ghg emission)
Environmental impacts of renewable energy generation systems (cost ghg emission)
Dr.Raja R
 
Prospects of renewable energy in bangladesh
Prospects of renewable energy in bangladeshProspects of renewable energy in bangladesh
Prospects of renewable energy in bangladesh
Nahidhasan117
 
Renewable energy sources
Renewable energy sourcesRenewable energy sources
Renewable energy sources
Arvind Kumar
 
Energy Policy in India
Energy Policy in IndiaEnergy Policy in India
Energy Policy in India
IOSR Journals
 
Current power scenario in india
Current power scenario in indiaCurrent power scenario in india
Current power scenario in india
Aneeshan Sain
 

What's hot (20)

Solar energy:potentiality and implementation problems in household and busine...
Solar energy:potentiality and implementation problems in household and busine...Solar energy:potentiality and implementation problems in household and busine...
Solar energy:potentiality and implementation problems in household and busine...
 
Renewable energy prospects in Bangladesh
Renewable energy prospects in BangladeshRenewable energy prospects in Bangladesh
Renewable energy prospects in Bangladesh
 
Future of solar Power Projects in India
Future of solar Power Projects in IndiaFuture of solar Power Projects in India
Future of solar Power Projects in India
 
Nuclear power-plant-in-bangladesh
Nuclear power-plant-in-bangladeshNuclear power-plant-in-bangladesh
Nuclear power-plant-in-bangladesh
 
Power generation and demand in bangladesh
Power generation and demand in bangladeshPower generation and demand in bangladesh
Power generation and demand in bangladesh
 
Power sector in India
Power sector in IndiaPower sector in India
Power sector in India
 
Renewable energy in pakistan
Renewable energy in pakistanRenewable energy in pakistan
Renewable energy in pakistan
 
Renewable Energy Sector Funding
Renewable Energy Sector FundingRenewable Energy Sector Funding
Renewable Energy Sector Funding
 
Wind Energy in Bangladesh Present Scenario and Future Prospect.pptx
Wind Energy in Bangladesh Present Scenario and Future Prospect.pptxWind Energy in Bangladesh Present Scenario and Future Prospect.pptx
Wind Energy in Bangladesh Present Scenario and Future Prospect.pptx
 
Solar Policy in India (Article)
Solar Policy in India (Article) Solar Policy in India (Article)
Solar Policy in India (Article)
 
India’s energy scenario in 2015 Nitish Sharma (Renewable Sources, Non - ren...
India’s energy scenario in 2015   Nitish Sharma (Renewable Sources, Non - ren...India’s energy scenario in 2015   Nitish Sharma (Renewable Sources, Non - ren...
India’s energy scenario in 2015 Nitish Sharma (Renewable Sources, Non - ren...
 
Solar energy presentation(sayef amin 01924122222/01614122222/04475122222)
Solar energy presentation(sayef amin 01924122222/01614122222/04475122222)Solar energy presentation(sayef amin 01924122222/01614122222/04475122222)
Solar energy presentation(sayef amin 01924122222/01614122222/04475122222)
 
Energy Sector of Bangladesh
Energy Sector of Bangladesh Energy Sector of Bangladesh
Energy Sector of Bangladesh
 
Prospects and Challenges of Solar Energy
Prospects and Challenges of Solar EnergyProspects and Challenges of Solar Energy
Prospects and Challenges of Solar Energy
 
Project on Solar Energy
Project on Solar EnergyProject on Solar Energy
Project on Solar Energy
 
Environmental impacts of renewable energy generation systems (cost ghg emission)
Environmental impacts of renewable energy generation systems (cost ghg emission)Environmental impacts of renewable energy generation systems (cost ghg emission)
Environmental impacts of renewable energy generation systems (cost ghg emission)
 
Prospects of renewable energy in bangladesh
Prospects of renewable energy in bangladeshProspects of renewable energy in bangladesh
Prospects of renewable energy in bangladesh
 
Renewable energy sources
Renewable energy sourcesRenewable energy sources
Renewable energy sources
 
Energy Policy in India
Energy Policy in IndiaEnergy Policy in India
Energy Policy in India
 
Current power scenario in india
Current power scenario in indiaCurrent power scenario in india
Current power scenario in india
 

Similar to Renewable Energy status and road-map of Bangladesh and support of UNDP-GEF

New and renewable energy policy and investment in thailand 05-jun-13
New and renewable energy policy and investment in thailand 05-jun-13New and renewable energy policy and investment in thailand 05-jun-13
New and renewable energy policy and investment in thailand 05-jun-13
Peerasak C.
 
Financing clean energy projects in nepal: A practitioner’s perspective
Financing clean energy projects in nepal: A practitioner’s perspectiveFinancing clean energy projects in nepal: A practitioner’s perspective
Financing clean energy projects in nepal: A practitioner’s perspective
Kushal Gurung
 
India’s solar policies
India’s solar policiesIndia’s solar policies
India’s solar policies
Naresh Goud
 
Bhutan Country Presentation at ACEF 2014
Bhutan Country Presentation at ACEF 2014Bhutan Country Presentation at ACEF 2014
Bhutan Country Presentation at ACEF 2014
Energy for All | Asian Development Bank
 
Powering sri lanka towards sustainability (Cabraal 03 Apr17)
Powering sri lanka towards sustainability (Cabraal 03 Apr17)Powering sri lanka towards sustainability (Cabraal 03 Apr17)
Powering sri lanka towards sustainability (Cabraal 03 Apr17)
Private Consultants
 
Iceland Capstone Project
Iceland Capstone ProjectIceland Capstone Project
Iceland Capstone ProjectDaniel Liu
 
Quaid‑e‑Azam Solar Park 1.pptx
Quaid‑e‑Azam Solar Park 1.pptxQuaid‑e‑Azam Solar Park 1.pptx
Quaid‑e‑Azam Solar Park 1.pptx
FarooqCheema7
 
Overview of solar power generation in india
Overview of solar power generation in indiaOverview of solar power generation in india
Overview of solar power generation in india
Binit Das
 
finalpresentation2.pptx
finalpresentation2.pptxfinalpresentation2.pptx
finalpresentation2.pptx
NiveditaJha38
 
Solar policys in india and state comparison
Solar policys in india and state comparison Solar policys in india and state comparison
Solar policys in india and state comparison Nilesh Dayalapwar
 
Acceleration the utilization of Renewable Energy
Acceleration the utilization of Renewable Energy Acceleration the utilization of Renewable Energy
Acceleration the utilization of Renewable Energy
Sampe Purba
 
Prospect of Developments of the Clean Energy in Indonesia
Prospect of Developments of the Clean Energy in IndonesiaProspect of Developments of the Clean Energy in Indonesia
Prospect of Developments of the Clean Energy in Indonesia
BadariahYosiyana
 
Kigali | Sep-15 | Republic of Rwanda Off-grid rural electrification
Kigali | Sep-15 | Republic of Rwanda Off-grid rural electrificationKigali | Sep-15 | Republic of Rwanda Off-grid rural electrification
Kigali | Sep-15 | Republic of Rwanda Off-grid rural electrification
Smart Villages
 
Draft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsDraft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsSanman Rajput
 
21PESGM2656.pptx
21PESGM2656.pptx21PESGM2656.pptx
21PESGM2656.pptx
SUBRATAMUKHOPADHYAY9
 
Solar Power Technology in India by S Kumar
Solar Power Technology in India by S Kumar Solar Power Technology in India by S Kumar
Solar Power Technology in India by S Kumar
Private Consultants
 
Indonesia ina002 1366765311
Indonesia ina002 1366765311Indonesia ina002 1366765311
Indonesia ina002 1366765311Nurul Yakin
 
Jawaharlal nehru national solar mission
Jawaharlal nehru national solar missionJawaharlal nehru national solar mission
Jawaharlal nehru national solar mission
Dileep V Raj
 

Similar to Renewable Energy status and road-map of Bangladesh and support of UNDP-GEF (20)

New and renewable energy policy and investment in thailand 05-jun-13
New and renewable energy policy and investment in thailand 05-jun-13New and renewable energy policy and investment in thailand 05-jun-13
New and renewable energy policy and investment in thailand 05-jun-13
 
Financing clean energy projects in nepal: A practitioner’s perspective
Financing clean energy projects in nepal: A practitioner’s perspectiveFinancing clean energy projects in nepal: A practitioner’s perspective
Financing clean energy projects in nepal: A practitioner’s perspective
 
India’s solar policies
India’s solar policiesIndia’s solar policies
India’s solar policies
 
Bhutan Country Presentation at ACEF 2014
Bhutan Country Presentation at ACEF 2014Bhutan Country Presentation at ACEF 2014
Bhutan Country Presentation at ACEF 2014
 
Powering sri lanka towards sustainability (Cabraal 03 Apr17)
Powering sri lanka towards sustainability (Cabraal 03 Apr17)Powering sri lanka towards sustainability (Cabraal 03 Apr17)
Powering sri lanka towards sustainability (Cabraal 03 Apr17)
 
Iceland Capstone Project
Iceland Capstone ProjectIceland Capstone Project
Iceland Capstone Project
 
Quaid‑e‑Azam Solar Park 1.pptx
Quaid‑e‑Azam Solar Park 1.pptxQuaid‑e‑Azam Solar Park 1.pptx
Quaid‑e‑Azam Solar Park 1.pptx
 
Overview of solar power generation in india
Overview of solar power generation in indiaOverview of solar power generation in india
Overview of solar power generation in india
 
finalpresentation2.pptx
finalpresentation2.pptxfinalpresentation2.pptx
finalpresentation2.pptx
 
Solar policys in india and state comparison
Solar policys in india and state comparison Solar policys in india and state comparison
Solar policys in india and state comparison
 
Acceleration the utilization of Renewable Energy
Acceleration the utilization of Renewable Energy Acceleration the utilization of Renewable Energy
Acceleration the utilization of Renewable Energy
 
Prospect of Developments of the Clean Energy in Indonesia
Prospect of Developments of the Clean Energy in IndonesiaProspect of Developments of the Clean Energy in Indonesia
Prospect of Developments of the Clean Energy in Indonesia
 
Kigali | Sep-15 | Republic of Rwanda Off-grid rural electrification
Kigali | Sep-15 | Republic of Rwanda Off-grid rural electrificationKigali | Sep-15 | Republic of Rwanda Off-grid rural electrification
Kigali | Sep-15 | Republic of Rwanda Off-grid rural electrification
 
Draft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsDraft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projects
 
BOOK
BOOKBOOK
BOOK
 
21PESGM2656.pptx
21PESGM2656.pptx21PESGM2656.pptx
21PESGM2656.pptx
 
Solar Power Technology in India by S Kumar
Solar Power Technology in India by S Kumar Solar Power Technology in India by S Kumar
Solar Power Technology in India by S Kumar
 
Indonesia ina002 1366765311
Indonesia ina002 1366765311Indonesia ina002 1366765311
Indonesia ina002 1366765311
 
WBPDCL EEA
WBPDCL EEAWBPDCL EEA
WBPDCL EEA
 
Jawaharlal nehru national solar mission
Jawaharlal nehru national solar missionJawaharlal nehru national solar mission
Jawaharlal nehru national solar mission
 

More from Dr. Md. Taibur Rahman

Flow of External Resources in Bangladesh
Flow of External Resources in BangladeshFlow of External Resources in Bangladesh
Flow of External Resources in Bangladesh
Dr. Md. Taibur Rahman
 
Development Planning and Project Approval Process TA
Development Planning and Project Approval Process TADevelopment Planning and Project Approval Process TA
Development Planning and Project Approval Process TA
Dr. Md. Taibur Rahman
 
M&E of development projects and role of imed dr taibur
M&E of development projects and role of imed dr taiburM&E of development projects and role of imed dr taibur
M&E of development projects and role of imed dr taibur
Dr. Md. Taibur Rahman
 
Bangladesh Delta Plan 2100
Bangladesh Delta Plan 2100Bangladesh Delta Plan 2100
Bangladesh Delta Plan 2100
Dr. Md. Taibur Rahman
 
Ldc graduation of Bangladesh: Issues and Challenges by Dr. Md. Taibur Rahman
Ldc graduation of Bangladesh: Issues and Challenges by Dr. Md. Taibur RahmanLdc graduation of Bangladesh: Issues and Challenges by Dr. Md. Taibur Rahman
Ldc graduation of Bangladesh: Issues and Challenges by Dr. Md. Taibur Rahman
Dr. Md. Taibur Rahman
 
Scenarios of Bangladesh Delta Plan 2100 by Dr. Taibur Rahman
Scenarios of Bangladesh Delta Plan 2100 by Dr. Taibur RahmanScenarios of Bangladesh Delta Plan 2100 by Dr. Taibur Rahman
Scenarios of Bangladesh Delta Plan 2100 by Dr. Taibur Rahman
Dr. Md. Taibur Rahman
 
Adaptive Delta Management Approach and Bangladesh Delta Plan 2100
Adaptive Delta Management Approach and Bangladesh Delta Plan 2100Adaptive Delta Management Approach and Bangladesh Delta Plan 2100
Adaptive Delta Management Approach and Bangladesh Delta Plan 2100
Dr. Md. Taibur Rahman
 

More from Dr. Md. Taibur Rahman (7)

Flow of External Resources in Bangladesh
Flow of External Resources in BangladeshFlow of External Resources in Bangladesh
Flow of External Resources in Bangladesh
 
Development Planning and Project Approval Process TA
Development Planning and Project Approval Process TADevelopment Planning and Project Approval Process TA
Development Planning and Project Approval Process TA
 
M&E of development projects and role of imed dr taibur
M&E of development projects and role of imed dr taiburM&E of development projects and role of imed dr taibur
M&E of development projects and role of imed dr taibur
 
Bangladesh Delta Plan 2100
Bangladesh Delta Plan 2100Bangladesh Delta Plan 2100
Bangladesh Delta Plan 2100
 
Ldc graduation of Bangladesh: Issues and Challenges by Dr. Md. Taibur Rahman
Ldc graduation of Bangladesh: Issues and Challenges by Dr. Md. Taibur RahmanLdc graduation of Bangladesh: Issues and Challenges by Dr. Md. Taibur Rahman
Ldc graduation of Bangladesh: Issues and Challenges by Dr. Md. Taibur Rahman
 
Scenarios of Bangladesh Delta Plan 2100 by Dr. Taibur Rahman
Scenarios of Bangladesh Delta Plan 2100 by Dr. Taibur RahmanScenarios of Bangladesh Delta Plan 2100 by Dr. Taibur Rahman
Scenarios of Bangladesh Delta Plan 2100 by Dr. Taibur Rahman
 
Adaptive Delta Management Approach and Bangladesh Delta Plan 2100
Adaptive Delta Management Approach and Bangladesh Delta Plan 2100Adaptive Delta Management Approach and Bangladesh Delta Plan 2100
Adaptive Delta Management Approach and Bangladesh Delta Plan 2100
 

Recently uploaded

ppt on beauty of the nature by Palak.pptx
ppt on  beauty of the nature by Palak.pptxppt on  beauty of the nature by Palak.pptx
ppt on beauty of the nature by Palak.pptx
RaniJaiswal16
 
alhambra case study Islamic gardens part-2.pptx
alhambra case study Islamic gardens part-2.pptxalhambra case study Islamic gardens part-2.pptx
alhambra case study Islamic gardens part-2.pptx
CECOS University Peshawar, Pakistan
 
AGRICULTURE Hydrophonic FERTILISER PPT.pptx
AGRICULTURE Hydrophonic FERTILISER PPT.pptxAGRICULTURE Hydrophonic FERTILISER PPT.pptx
AGRICULTURE Hydrophonic FERTILISER PPT.pptx
BanitaDsouza
 
Sustainable Rain water harvesting in india.ppt
Sustainable Rain water harvesting in india.pptSustainable Rain water harvesting in india.ppt
Sustainable Rain water harvesting in india.ppt
chaitaliambole
 
Daan Park Hydrangea flower season I like it
Daan Park Hydrangea flower season I like itDaan Park Hydrangea flower season I like it
Daan Park Hydrangea flower season I like it
a0966109726
 
Environmental Science Book By Dr. Y.K. Singh
Environmental Science Book By Dr. Y.K. SinghEnvironmental Science Book By Dr. Y.K. Singh
Environmental Science Book By Dr. Y.K. Singh
AhmadKhan917612
 
Alert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
Alert-driven Community-based Forest monitoring: A case of the Peruvian AmazonAlert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
Alert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
CIFOR-ICRAF
 
Navigating the complex landscape of AI governance
Navigating the complex landscape of AI governanceNavigating the complex landscape of AI governance
Navigating the complex landscape of AI governance
Piermenotti Mauro
 
UNDERSTANDING WHAT GREEN WASHING IS!.pdf
UNDERSTANDING WHAT GREEN WASHING IS!.pdfUNDERSTANDING WHAT GREEN WASHING IS!.pdf
UNDERSTANDING WHAT GREEN WASHING IS!.pdf
JulietMogola
 
International+e-Commerce+Platform-www.cfye-commerce.shop
International+e-Commerce+Platform-www.cfye-commerce.shopInternational+e-Commerce+Platform-www.cfye-commerce.shop
International+e-Commerce+Platform-www.cfye-commerce.shop
laozhuseo02
 
NRW Board Paper - DRAFT NRW Recreation Strategy
NRW Board Paper - DRAFT NRW Recreation StrategyNRW Board Paper - DRAFT NRW Recreation Strategy
NRW Board Paper - DRAFT NRW Recreation Strategy
Robin Grant
 
Celebrating World-environment-day-2024.pdf
Celebrating  World-environment-day-2024.pdfCelebrating  World-environment-day-2024.pdf
Celebrating World-environment-day-2024.pdf
rohankumarsinghrore1
 
Summary of the Climate and Energy Policy of Australia
Summary of the Climate and Energy Policy of AustraliaSummary of the Climate and Energy Policy of Australia
Summary of the Climate and Energy Policy of Australia
yasmindemoraes1
 
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for..."Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...
MMariSelvam4
 
How about Huawei mobile phone-www.cfye-commerce.shop
How about Huawei mobile phone-www.cfye-commerce.shopHow about Huawei mobile phone-www.cfye-commerce.shop
How about Huawei mobile phone-www.cfye-commerce.shop
laozhuseo02
 
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business VenturesWillie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
greendigital
 
DRAFT NRW Recreation Strategy - People and Nature thriving together
DRAFT NRW Recreation Strategy - People and Nature thriving togetherDRAFT NRW Recreation Strategy - People and Nature thriving together
DRAFT NRW Recreation Strategy - People and Nature thriving together
Robin Grant
 
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdfPresentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
Innovation and Technology for Development Centre
 
Sustainable farming practices in India .pptx
Sustainable farming  practices in India .pptxSustainable farming  practices in India .pptx
Sustainable farming practices in India .pptx
chaitaliambole
 
Artificial Reefs by Kuddle Life Foundation - May 2024
Artificial Reefs by Kuddle Life Foundation - May 2024Artificial Reefs by Kuddle Life Foundation - May 2024
Artificial Reefs by Kuddle Life Foundation - May 2024
punit537210
 

Recently uploaded (20)

ppt on beauty of the nature by Palak.pptx
ppt on  beauty of the nature by Palak.pptxppt on  beauty of the nature by Palak.pptx
ppt on beauty of the nature by Palak.pptx
 
alhambra case study Islamic gardens part-2.pptx
alhambra case study Islamic gardens part-2.pptxalhambra case study Islamic gardens part-2.pptx
alhambra case study Islamic gardens part-2.pptx
 
AGRICULTURE Hydrophonic FERTILISER PPT.pptx
AGRICULTURE Hydrophonic FERTILISER PPT.pptxAGRICULTURE Hydrophonic FERTILISER PPT.pptx
AGRICULTURE Hydrophonic FERTILISER PPT.pptx
 
Sustainable Rain water harvesting in india.ppt
Sustainable Rain water harvesting in india.pptSustainable Rain water harvesting in india.ppt
Sustainable Rain water harvesting in india.ppt
 
Daan Park Hydrangea flower season I like it
Daan Park Hydrangea flower season I like itDaan Park Hydrangea flower season I like it
Daan Park Hydrangea flower season I like it
 
Environmental Science Book By Dr. Y.K. Singh
Environmental Science Book By Dr. Y.K. SinghEnvironmental Science Book By Dr. Y.K. Singh
Environmental Science Book By Dr. Y.K. Singh
 
Alert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
Alert-driven Community-based Forest monitoring: A case of the Peruvian AmazonAlert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
Alert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
 
Navigating the complex landscape of AI governance
Navigating the complex landscape of AI governanceNavigating the complex landscape of AI governance
Navigating the complex landscape of AI governance
 
UNDERSTANDING WHAT GREEN WASHING IS!.pdf
UNDERSTANDING WHAT GREEN WASHING IS!.pdfUNDERSTANDING WHAT GREEN WASHING IS!.pdf
UNDERSTANDING WHAT GREEN WASHING IS!.pdf
 
International+e-Commerce+Platform-www.cfye-commerce.shop
International+e-Commerce+Platform-www.cfye-commerce.shopInternational+e-Commerce+Platform-www.cfye-commerce.shop
International+e-Commerce+Platform-www.cfye-commerce.shop
 
NRW Board Paper - DRAFT NRW Recreation Strategy
NRW Board Paper - DRAFT NRW Recreation StrategyNRW Board Paper - DRAFT NRW Recreation Strategy
NRW Board Paper - DRAFT NRW Recreation Strategy
 
Celebrating World-environment-day-2024.pdf
Celebrating  World-environment-day-2024.pdfCelebrating  World-environment-day-2024.pdf
Celebrating World-environment-day-2024.pdf
 
Summary of the Climate and Energy Policy of Australia
Summary of the Climate and Energy Policy of AustraliaSummary of the Climate and Energy Policy of Australia
Summary of the Climate and Energy Policy of Australia
 
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for..."Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...
 
How about Huawei mobile phone-www.cfye-commerce.shop
How about Huawei mobile phone-www.cfye-commerce.shopHow about Huawei mobile phone-www.cfye-commerce.shop
How about Huawei mobile phone-www.cfye-commerce.shop
 
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business VenturesWillie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
 
DRAFT NRW Recreation Strategy - People and Nature thriving together
DRAFT NRW Recreation Strategy - People and Nature thriving togetherDRAFT NRW Recreation Strategy - People and Nature thriving together
DRAFT NRW Recreation Strategy - People and Nature thriving together
 
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdfPresentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
 
Sustainable farming practices in India .pptx
Sustainable farming  practices in India .pptxSustainable farming  practices in India .pptx
Sustainable farming practices in India .pptx
 
Artificial Reefs by Kuddle Life Foundation - May 2024
Artificial Reefs by Kuddle Life Foundation - May 2024Artificial Reefs by Kuddle Life Foundation - May 2024
Artificial Reefs by Kuddle Life Foundation - May 2024
 

Renewable Energy status and road-map of Bangladesh and support of UNDP-GEF

  • 1. UNDP supports Climate Mitigation through Renewable Energy: Present status & Roadmap of Bangladesh Dr. Md. Taibur Rahman Deputy Chief, Bangladesh Planning Commission Currently on Lien at UNDP Bangladesh trsumon@gmail.com taibur.Rahman@undp.org
  • 2. Power Generation at a Glance •Generation Capacity : 20,775 MW (Including all) •Highest Generation : 11,623 MW (19/09/2018) •Total Consumers : 32.2 Million •Transmission Line : 11,353 Ckt. km •Distribution Line : 4,89,000 km •System Loss : 11.87% (June 2018) •Distribution Loss : 9.60% (June 2018) •Per Capita Generation : 464 KWh •Access to Electricity : 92% *With Captive & RE Source: PowerCell Source: BPDB & SREDA RE: Status & Road Map by Dr. Md. Taibur Rahman
  • 3. Present status of Renewable Energy (As on 24.01.2019) 58% 0.5% 41% 0.2%0% RE Mix Solar Wind Hydro Biogas/Biomass to Electricity Technology wise details RE: Status & Road Map by Dr. Md. Taibur Rahman
  • 4. RE: Status & Road Map by Dr. Md. Taibur Rahman
  • 5. Is RE only important for Climate mitigation?? • Though currently it is only 3% of the total generation, it serves 13% of the total population • It is crucial also from energy security perspective and ensuring green growth RE: Status & Road Map by Dr. Md. Taibur Rahman
  • 6. RE Relevant existing policy framework • National Energy Policy (2004) • Renewable Energy Policy (2008) • Policy Guideline for Enhancement of Private Participation (2008) • Bangladesh Climate Change Strategy and Action Plan (2009) • Perspective Plan of Bangladesh 2010-2021 (2012) • Guidelines for the Implementation of Solar Power Development Program (2013) • Intended Nationally Determined Contribution of Bangladesh (2015) • Bangladesh Policy Roadmap for Renewable Energy (2015) • Energy Efficiency and Conservation Master Plan up to 2030 (2015) • Power Sector Master Plan (2016) • Net Metering Guidelines (2018) • Bangladesh Delta Plan RE: Status & Road Map by Dr. Md. Taibur Rahman
  • 7. Target of Renewable Energy based Power Generation • 10% by 2020 as per RE Policy 2008 • 10% by 2030 as per PSMP 2016 • 30% by 2041 as per Bangladesh Delta Plan 2100 approved in 2018 • 100% by 2050 as per the speech of Hon’ble Prime Minister at CoP 22 in 2016 • Reduction of Emission as per NDC: • Voluntary: 5% in the Transport, energy and industry sector • With International Support: 15% RE: Status & Road Map by Dr. Md. Taibur Rahman
  • 8. RE: Status & Road Map by Dr. Md. Taibur Rahman
  • 9. Ongoing Activities (Page 1 of 2) SL Activities Capacity Implementi ng Agency Expected time 1. Unsolicited Solar Park: • PPA signed on 9 projects (capacity 550 MW), • LoI Issued on 7 projects (capacity 565 MW), • Agreed in Principle on 3 projects (capacity 55 MW) 1170 MW BPDB & Power Division 2020 2. Solar Park project by different utilities 700 MW Utilities 2020 3. 100% Renewable Energy based model upazilla: ▪ Monpura: 1 existing Minigrid and 2 proposed Minigrid ▪ Rangabali: BPDB will install a solar park. 0.8 MW 50MW SREDA BPDB 2018 - 4. Minigrid: ▪ 9 Solar Minigrid under construction by IDCOL (2 MWp) ▪ 6 more Solar Minigrid under processing for approval by IDCOL (1.5 MWp) 3.5 MW IDCOL 2018-2019 5. 400 Solar Drinking Water System by REEEP program (GIZ) 4 MW SREDA 2020 RE: Status & Road Map by Dr. Md. Taibur Rahman
  • 10. Ongoing Activities (Page 2 of 2) SL Activities Capacity Implementi ng Agency Expected time 5. Solar Irrigation ▪ 2000 Solar Irrigation projects by BREB (Funded by ADB) ▪ 35 Solar Irrigation by RDA 7.5 MW 0.5 MW BREB RDA 2020 2020 6. Biomass to electricity ongoing pilot project at Keraniganj 1 MW BPDB - 7. Net Metering rooftop solar program 600 MW Distribution Utilities & SREDA 2020 8. Kushtia Solar park 50 MW SREDA 2020 9. Monpura Solar-Wind Hybrid Project 0.4 MW IDCOL/ NWPGCL 2020 10. Rajshahi waste to energy Project (slaughter house based) - SREDA 2020 Total 2587.7 RE: Status & Road Map by Dr. Md. Taibur Rahman
  • 11. RE Road Map SL Program 2018 2020 1. Solar Park 23 MW 700 MW 2. Solar Home System 233 MW 255 MW 3. Solar Minigrid/ Microgrid/ Nanogrid 4.1 MW 7MW 4. Solar Irrigation 22.5 MW 53 MW 5. Rooftop Solar Program-Net Metering 3.07 MW 600 MW 6. Rooftop Solar Program- Others (Including New Electricity connection) 30 MW 50 MW 7. Solar Drinking Water System 1.6 MW 6 MW 8. Solar Powered Telecom Tower 8 MW 15 MW 9. Solar Street Light 4.2MW 5 MW 10. Hydro Power Plant 230 MW 230 MW 11. Wind 2.9 MW 30 MW 12. Biomass (Biogas, Biomass, waste) to Electricity 1 MW 3 MW 13. Others (Vehicle, Aquaculture, Boat, picosystem) 1 MW 7 MW Total 564 MW 1961 MW RE: Status & Road Map by Dr. Md. Taibur Rahman
  • 12. RE: Status & Road Map by Dr. Md. Taibur Rahman
  • 13. Challenges & Way Forward Topics Challenges Likely Solution Utility Scale Solar Park 1.Scarcity of suitable land 2.Difficulties to construct evacuation facility through private Lands. 3.High cost and complexity of Land procuring and its development 4.Still high tariff though deceasing 5.Lack of cooperation from other government agencies. 1. Solar park can be installed in neighboring countries and power can be imported through cross border agreement. 2. Government can manage and develop land, evacuation system up to plant area and go for tariff bidding. 3. Government should issue a circular for avoiding complexities among different agencies to establish solar park. Solar Minigrid 1. Expansion of National Grid Clear policy/Guideline should be needed to purchase electricity from Minigrid after grid expansion in Minigrid area. RE: Status & Road Map by Dr. Md. Taibur Rahman
  • 14. Challenges & Way Forward Topics Challenges Likely Solution Solar Irrigation 1. Grid expansion and give connection to LLP and SLPLack of co-ordination 2. Lack of optimum utilization of solar system due to absence of policy support 1. Stop giving electric connection to LLP or SLP and Clearly Demark the area for solar irrigation system 2. Clear policy/Guideline need to formulate to purchase excess electricity from solar irrigation system. Wind Energy 1. Authentication of Data 2. Lack of co-ordination 3. High tariff 1. Establishing Central wind resource data center in SREDA 2. Developing necessary guideline to implement wind project. 3. Considering sustainability this sector should be subsidized Waste to Energy 1. Generation cost is high 2. Lack of co-ordination between power sector and City corporations 1. Considering adverse impact on environment this sector should be subsidized by power division and city corporations. RE: Status & Road Map by Dr. Md. Taibur Rahman
  • 15. UNDP Supports Government with Development of Sustainable Renewable Energy Power Generation (SREPGen) project since 2014 Specific Objective: • Emission reductions of about 1.64 Mtons CO2 • Support SREDA to achieve 10% share of RE in the power generation mix of Bangladesh by 2021 Budget: US$ 4.07 million (GEF) Project Components: • Component 1: RE policy and regulatory support program • Component 2: (RE) Resource assessment support program (Solar, Wind, Bio-mass)
  • 16. Project Components-wise contribution so far and plan Component 1: RE policy and regulatory support program 16 1.Assessment of base-level standard tariff for utility scale solar IPP projects considering the local climatic, geographic and grid condition and power evacuation facilities; 2.Solutions for grid integration of solar irrigation pumps (SIP) and solar PV mini-grids 3.Template agreements for rooftop solar and its grid integration 4.Energy Net Metering Guideline and Handbook; 5.Regulations for standards for PV system and preferred PV system 6.Regulations for disposal of PV systems wastes (e.g. panels, batteries): 7.RE power generation action plan 2019-2041; 8.Capacity Building Need Assessment and training of 500 officials • These very important policy documents will bring significant change in realizing RE sector potential in Bangladesh once adopted by the government
  • 17. Project Components-wise contribution so far and plan Component 2: (RE) Resource assessment support program (Solar, Wind, Bio-mass) 17 1. National Solar Irradiance Study 2. Nation-wide Bio Mass Study 3. Wind resource assessment in Manpura:
  • 18. Project Components-wise contribution so far and plan Component 3: Diffusion of RE solutions to low-income households 18 • 5000 PVSL with 30 USD grant have been distributed • Solar-Wind Hybrid mini-grid in South Sakuchia of Manpura Upazilla of Bhola district with 279.5+100 = 379.5 kW capacity is under construction with support from SREPGen. • Another Solar mini-grid at Sadar Union of Manpura Upazilla of Bhola district with 218 kW capacity is under construction with support from SREPGen.
  • 19. Project Components-wise contribution so far and plan Component 4: Renewable energy investment scale-up 19 1. Five solar boats have been developed and those are currently operational with potential to convert 1.5 million diesel run boats in the country 2. Two Solar Charging Stations have been installed to charge Easy-bikes 3. Feasibility Study of Waste to energy in six municipalities 4. A pilot Waste to Energy (W2E) project has been planned. 5. Piloting Arsenic removing solar PV pumps. 6. Solar Ice Plant at Char Montaz of Rangabali is under construction 7. Grid Integration Piloting for Solar Irrigation Pump with potential to install and convert 100000 SIP
  • 20. Solar Power Plant (Mini-grid) and Ice Plant 20
  • 21. Some Innovative Applications 21 Solar Boats Solar Charging Station
  • 22. Thanks to all RE: Status & Road Map by Dr. Md. Taibur Rahman