What is Power Generation
Power generation is the process of generating electric
energy from other forms of energy.
The fundamental principles of electricity generation were
discovered during the 1820s and early 1830s by the British
scientist Michael Faraday. His basic method is still used today
electricity is generated by the movement of a loop of wire, or
disc of copper between the poles of a magnet.
History of Power Generation
In September of 1831, Michael Faraday
made the discovery of Electromagnetic
Induction
Faraday attached two wires to a
disc and rotated the disc
between the opposing poles of a
horseshoe magnet creating
an electric current
Methods of Generating Power
Static electricity
Electromagnetic induction
Electrochemistry
Photoelectric effect
Thermoelectric effect
Piezoelectric effect
Nuclear transformation
Power Generation in
Bangladesh
Present Structure of Power Sector
Apex Institution
 Power Division, Ministry of Power, Energy & Mineral Resources (MPEMR)
Regulator
 Bangladesh Energy Regulatory Commission (BERC)
Generation
 Bangladesh Power Development Board (BPDB)
 Ashuganj Power Station Company Ltd. (APSCL)
 Electricity Generation Company of Bangladesh (EGCB)
 North West Power Generation Company Ltd. (NWPGCL)
 Independent Power Producers (IPPs)
Transmission
Power Grid Company of Bangladesh Ltd (PGCB)
Distribution
Bangladesh Power Development Board (BPDB)
Dhaka Power Distribution Company (DPDC)
Dhaka Electric Supply Company Ltd (DESCO)
West Zone Power Distribution Company (WZPDC)
Rural Electrification Board (REB) through Rural Co-operatives
Present Power Scenario
Bangladesh’s Power Sector: At a Glance (FY 2011)
 Electricity Growth : 7.20 % in FY-2011 (Av. 7 % since 1990)
 Generation Capacity : 7119 MW (Oct., 2011)
 Total Consumers : 12.5 Million
 Transmission Lines : 8,600 km
 Distribution Lines : 2,78,000 km
 Per Capita Generation : 252 kWh (incl. Captive)
 Access to Electricity : 50 %
Present Generation Capacity (Oct., 2011)
Public Sector Generation Capacity (MW)
BPDB 2868
APSCL 659
EGCB 255
Subtotal 3782(53%)
Private Sector Generation Capacity (MW)
IPPs 1231
SIPPs (BPDB) 99
SIPPs (REB) 226
15 YR. Rental 168
3/5 YR. Rental 1613
Subtotal 3337(47%)
Total 7119
Demand Supply Situation
 Generation: 5000 – 5300 MW (Capacity- 7119 MW)
 Highest so far: 5244 MW ( August 29, 2011)
 Gas shortage causes 400 - 600 MW less Power Generation
 Peak Demand: 6000 MW (with DSM)
 Load shedding up to 800 MW during hot summer days (with
DSM)
 Shortage and unreliable power supply has constrained
economic growth
Age of Power Plants
Age Group (Years) Generation Capacity (MW)
40+ 208
31 –40 156
21 – 30 1268
11 – 20 1412
01 – 10 4075
Total 7119
Planning Perspective
Primary Fuel Supply Scenario
 Gas: No significant gas discovery in recent years; off – shore
and on – shore gas exploration initiatives & increased reserves
in present fields may change the present scenario
 Coal: Near term option; Indigenous or Imported; Base Load
 Oil: Volatile market; High price; For peaking duty
 LNG: Necessary to ensure secure and reliable gas supply
 Nuclear: Safe technology; No pollution; Expected to be future
Base Load option
Power Generation Projects up to 2016
Calendar Year Wise Projects Completion (From 2010 to 2016)
YEAR 2010
(MW)
Commi
ssioned
2011
(MW)
2012
(MW)
2013
(MW)
2014
(MW)
2015
(MW)
2016
(MW)
TOTA
L
(MW)
Public 255 851 838 1190 1270 450 1500 6204
Private 520 1343 1319 1034 1003 1900 1300 8549
Total 775 2194 2157 2224 2273 2350 2800 14773
Challenges
Enhanced Gas Exploration, Production
 Domestic coal development
 Coal Import (long term contract) and deep sea port for coal
handling
 LNG import
 Safe Nuclear Technology
Primary Fuel Supply
 Ensuring financing for Public and Private sector projects
 Availability of foreign currency
Project Financing
 Infrastructure development by Railway and R&H
 Dredging of river routes by BIWTA
 Capacity build up of BPC, Railway, R&H and BIWTA etc
Transportation of fuel and equipment
 Development of skilled manpower: adopt and operate new
technology
Human Resources Development
 Development of skilled manpower: adopt and operate new
technology
Thank You
Reference
http://www.constantenergy.co.uk/generation.aspx
http://www.usea.org/programs/eupp/BPDB_Generati
on_Partnership/Presentations/Overview_of_BPDB
 The Institution of Engineering & Technology: Michael
Faraday
 http://www.parliament.uk/edm/2010-12/2061

More Related Content

What's hot

Power Grid and development in India
Power Grid and development in IndiaPower Grid and development in India
Power Grid and development in IndiaSandipan Chakraborty
 
Power sector in India
Power sector in IndiaPower sector in India
Power sector in IndiaDaya Kherwar
 
Single phase Transformer
Single phase Transformer  Single phase Transformer
Single phase Transformer johny renoald
 
Renewable Energy status and road-map of Bangladesh and support of UNDP-GEF
Renewable Energy status and road-map of Bangladesh and support of UNDP-GEFRenewable Energy status and road-map of Bangladesh and support of UNDP-GEF
Renewable Energy status and road-map of Bangladesh and support of UNDP-GEFDr. Md. Taibur Rahman
 
Renewable Energy & Overview in Bangladesh
Renewable Energy & Overview in BangladeshRenewable Energy & Overview in Bangladesh
Renewable Energy & Overview in BangladeshShadrul Alam
 
PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substationIshank Ranjan
 
National Transmission And Dispatch Company (NTDC)
National Transmission And Dispatch Company (NTDC)National Transmission And Dispatch Company (NTDC)
National Transmission And Dispatch Company (NTDC)Aneel-k Suthar
 
Fixed and variable speed turbine
Fixed and variable speed turbineFixed and variable speed turbine
Fixed and variable speed turbineSonuKumarBairwa
 
Automatic power factor correction
Automatic power factor correctionAutomatic power factor correction
Automatic power factor correctionVIKAS KUMAR MANJHI
 
A dual active bridge dc-dc converter for application in a smart user network
A dual active bridge dc-dc converter for application in a smart user networkA dual active bridge dc-dc converter for application in a smart user network
A dual active bridge dc-dc converter for application in a smart user networkAlessandro Burgio
 
Solar plant ppt by ritesh kumawat
Solar plant ppt by ritesh kumawatSolar plant ppt by ritesh kumawat
Solar plant ppt by ritesh kumawatRitesh Kumawat
 
Switching characteristics of power electronic devices
Switching characteristics of power electronic devicesSwitching characteristics of power electronic devices
Switching characteristics of power electronic devicesSunny Purani
 
Nuclear power-plant-in-bangladesh
Nuclear power-plant-in-bangladeshNuclear power-plant-in-bangladesh
Nuclear power-plant-in-bangladeshMariner Ahmed
 
Principles of Electromechanical Energy Conversion
Principles of Electromechanical Energy ConversionPrinciples of Electromechanical Energy Conversion
Principles of Electromechanical Energy ConversionYimam Alemu
 
Bangladesh Energy Crisis Solutions
Bangladesh Energy Crisis SolutionsBangladesh Energy Crisis Solutions
Bangladesh Energy Crisis Solutionsshawkat haider
 
Power electronics in Wind Turbine Systems
Power electronics in Wind Turbine SystemsPower electronics in Wind Turbine Systems
Power electronics in Wind Turbine SystemsManasa K
 

What's hot (20)

Power Grid and development in India
Power Grid and development in IndiaPower Grid and development in India
Power Grid and development in India
 
Power sector in India
Power sector in IndiaPower sector in India
Power sector in India
 
Single phase Transformer
Single phase Transformer  Single phase Transformer
Single phase Transformer
 
Renewable Energy status and road-map of Bangladesh and support of UNDP-GEF
Renewable Energy status and road-map of Bangladesh and support of UNDP-GEFRenewable Energy status and road-map of Bangladesh and support of UNDP-GEF
Renewable Energy status and road-map of Bangladesh and support of UNDP-GEF
 
Renewable Energy & Overview in Bangladesh
Renewable Energy & Overview in BangladeshRenewable Energy & Overview in Bangladesh
Renewable Energy & Overview in Bangladesh
 
PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substation
 
National Transmission And Dispatch Company (NTDC)
National Transmission And Dispatch Company (NTDC)National Transmission And Dispatch Company (NTDC)
National Transmission And Dispatch Company (NTDC)
 
Phasor Measurement Unit (PMU)
 Phasor Measurement Unit (PMU) Phasor Measurement Unit (PMU)
Phasor Measurement Unit (PMU)
 
Fixed and variable speed turbine
Fixed and variable speed turbineFixed and variable speed turbine
Fixed and variable speed turbine
 
Automatic power factor correction
Automatic power factor correctionAutomatic power factor correction
Automatic power factor correction
 
Fundamentals of Solar PV System
Fundamentals of Solar PV SystemFundamentals of Solar PV System
Fundamentals of Solar PV System
 
A dual active bridge dc-dc converter for application in a smart user network
A dual active bridge dc-dc converter for application in a smart user networkA dual active bridge dc-dc converter for application in a smart user network
A dual active bridge dc-dc converter for application in a smart user network
 
Solar plant ppt by ritesh kumawat
Solar plant ppt by ritesh kumawatSolar plant ppt by ritesh kumawat
Solar plant ppt by ritesh kumawat
 
Switching characteristics of power electronic devices
Switching characteristics of power electronic devicesSwitching characteristics of power electronic devices
Switching characteristics of power electronic devices
 
Nuclear power-plant-in-bangladesh
Nuclear power-plant-in-bangladeshNuclear power-plant-in-bangladesh
Nuclear power-plant-in-bangladesh
 
Electrical energy meter
Electrical energy meterElectrical energy meter
Electrical energy meter
 
Principles of Electromechanical Energy Conversion
Principles of Electromechanical Energy ConversionPrinciples of Electromechanical Energy Conversion
Principles of Electromechanical Energy Conversion
 
Power quality improvement using UPQC
Power quality improvement using UPQCPower quality improvement using UPQC
Power quality improvement using UPQC
 
Bangladesh Energy Crisis Solutions
Bangladesh Energy Crisis SolutionsBangladesh Energy Crisis Solutions
Bangladesh Energy Crisis Solutions
 
Power electronics in Wind Turbine Systems
Power electronics in Wind Turbine SystemsPower electronics in Wind Turbine Systems
Power electronics in Wind Turbine Systems
 

Similar to Power genaration in bangladesh

CASA-1000 Kyrgyzstan & Tajikistan to Afghanistan & Pakistan
CASA-1000 Kyrgyzstan & Tajikistan to Afghanistan & PakistanCASA-1000 Kyrgyzstan & Tajikistan to Afghanistan & Pakistan
CASA-1000 Kyrgyzstan & Tajikistan to Afghanistan & PakistanPower System Operation
 
Mohammad Hossain - Bangladesh Presentation.pdf
Mohammad Hossain - Bangladesh Presentation.pdfMohammad Hossain - Bangladesh Presentation.pdf
Mohammad Hossain - Bangladesh Presentation.pdfZahirulIslam153424
 
New Energy Conference-Mohammad Abu Zarour from NEPCO
New Energy Conference-Mohammad Abu Zarour from NEPCONew Energy Conference-Mohammad Abu Zarour from NEPCO
New Energy Conference-Mohammad Abu Zarour from NEPCOEDAMA
 
presentation-by-pgcil-development-of-transmission-system-in-india-foir-worksh...
presentation-by-pgcil-development-of-transmission-system-in-india-foir-worksh...presentation-by-pgcil-development-of-transmission-system-in-india-foir-worksh...
presentation-by-pgcil-development-of-transmission-system-in-india-foir-worksh...WondererBack
 
Pakistan wind-power- arif alauddin
Pakistan wind-power- arif alauddinPakistan wind-power- arif alauddin
Pakistan wind-power- arif alauddinIPPAI
 
FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR ...
FEASIBILITY STUDY OF ORKNEY’S WINDFARM  DEVELOPMENT FOR SELF-SUFFICIENT FOR  ...FEASIBILITY STUDY OF ORKNEY’S WINDFARM  DEVELOPMENT FOR SELF-SUFFICIENT FOR  ...
FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR ...AEIJjournal2
 
FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...
FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...
FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...AEIJjournal2
 
FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...
FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...
FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...AEIJjournal2
 
FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...
FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...
FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...aeijjournal
 
FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...
FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...
FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...AEIJjournal2
 
Factors influencing the demand on Renewable Energy with a focus on Solar Ther...
Factors influencing the demand on Renewable Energy with a focus on Solar Ther...Factors influencing the demand on Renewable Energy with a focus on Solar Ther...
Factors influencing the demand on Renewable Energy with a focus on Solar Ther...Sekem Energy
 
Energy sector of pakistan
Energy sector of pakistanEnergy sector of pakistan
Energy sector of pakistanOwais Hassan
 
Engineering the power system of the future
Engineering the power system of the futureEngineering the power system of the future
Engineering the power system of the futureemmaroche
 
Power industries and solar pv power plant in pakistan
Power industries and solar pv power plant in pakistanPower industries and solar pv power plant in pakistan
Power industries and solar pv power plant in pakistanIBRAR AHMAD
 
The SAARC Grid: Policy, Regulatory, Infra-structure, Contractual Issues in C...
The SAARC Grid:Policy, Regulatory, Infra-structure, Contractual Issues in C...The SAARC Grid:Policy, Regulatory, Infra-structure, Contractual Issues in C...
The SAARC Grid: Policy, Regulatory, Infra-structure, Contractual Issues in C...IPPAI
 
Renewables Energy in India.ppt
Renewables Energy in India.pptRenewables Energy in India.ppt
Renewables Energy in India.pptssuser66426c
 
Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...
Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...
Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...Er. Abhushan Neupane
 

Similar to Power genaration in bangladesh (20)

CASA-1000 Kyrgyzstan & Tajikistan to Afghanistan & Pakistan
CASA-1000 Kyrgyzstan & Tajikistan to Afghanistan & PakistanCASA-1000 Kyrgyzstan & Tajikistan to Afghanistan & Pakistan
CASA-1000 Kyrgyzstan & Tajikistan to Afghanistan & Pakistan
 
presentation
presentationpresentation
presentation
 
Mohammad Hossain - Bangladesh Presentation.pdf
Mohammad Hossain - Bangladesh Presentation.pdfMohammad Hossain - Bangladesh Presentation.pdf
Mohammad Hossain - Bangladesh Presentation.pdf
 
New Energy Conference-Mohammad Abu Zarour from NEPCO
New Energy Conference-Mohammad Abu Zarour from NEPCONew Energy Conference-Mohammad Abu Zarour from NEPCO
New Energy Conference-Mohammad Abu Zarour from NEPCO
 
presentation-by-pgcil-development-of-transmission-system-in-india-foir-worksh...
presentation-by-pgcil-development-of-transmission-system-in-india-foir-worksh...presentation-by-pgcil-development-of-transmission-system-in-india-foir-worksh...
presentation-by-pgcil-development-of-transmission-system-in-india-foir-worksh...
 
Pakistan wind-power- arif alauddin
Pakistan wind-power- arif alauddinPakistan wind-power- arif alauddin
Pakistan wind-power- arif alauddin
 
FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR ...
FEASIBILITY STUDY OF ORKNEY’S WINDFARM  DEVELOPMENT FOR SELF-SUFFICIENT FOR  ...FEASIBILITY STUDY OF ORKNEY’S WINDFARM  DEVELOPMENT FOR SELF-SUFFICIENT FOR  ...
FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR ...
 
FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...
FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...
FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...
 
FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...
FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...
FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...
 
FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...
FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...
FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...
 
FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...
FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...
FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...
 
Factors influencing the demand on Renewable Energy with a focus on Solar Ther...
Factors influencing the demand on Renewable Energy with a focus on Solar Ther...Factors influencing the demand on Renewable Energy with a focus on Solar Ther...
Factors influencing the demand on Renewable Energy with a focus on Solar Ther...
 
Presentation1
Presentation1Presentation1
Presentation1
 
Jw workshop
Jw workshopJw workshop
Jw workshop
 
Energy sector of pakistan
Energy sector of pakistanEnergy sector of pakistan
Energy sector of pakistan
 
Engineering the power system of the future
Engineering the power system of the futureEngineering the power system of the future
Engineering the power system of the future
 
Power industries and solar pv power plant in pakistan
Power industries and solar pv power plant in pakistanPower industries and solar pv power plant in pakistan
Power industries and solar pv power plant in pakistan
 
The SAARC Grid: Policy, Regulatory, Infra-structure, Contractual Issues in C...
The SAARC Grid:Policy, Regulatory, Infra-structure, Contractual Issues in C...The SAARC Grid:Policy, Regulatory, Infra-structure, Contractual Issues in C...
The SAARC Grid: Policy, Regulatory, Infra-structure, Contractual Issues in C...
 
Renewables Energy in India.ppt
Renewables Energy in India.pptRenewables Energy in India.ppt
Renewables Energy in India.ppt
 
Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...
Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...
Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...
 

More from Md. Atiqur Rahman

PCA Based Face Recognition System
PCA Based Face Recognition SystemPCA Based Face Recognition System
PCA Based Face Recognition SystemMd. Atiqur Rahman
 
Face Recognition Proposal Presentation
Face Recognition Proposal PresentationFace Recognition Proposal Presentation
Face Recognition Proposal PresentationMd. Atiqur Rahman
 
Optical Fiber Communication & Bangladesh
Optical Fiber Communication & BangladeshOptical Fiber Communication & Bangladesh
Optical Fiber Communication & BangladeshMd. Atiqur Rahman
 
Switchgear Equipment in a Substation
Switchgear Equipment in a SubstationSwitchgear Equipment in a Substation
Switchgear Equipment in a SubstationMd. Atiqur Rahman
 
Function of commercial banks in bangladesh
Function of commercial banks in bangladeshFunction of commercial banks in bangladesh
Function of commercial banks in bangladeshMd. Atiqur Rahman
 

More from Md. Atiqur Rahman (8)

PCA Based Face Recognition System
PCA Based Face Recognition SystemPCA Based Face Recognition System
PCA Based Face Recognition System
 
Face Recognition Proposal Presentation
Face Recognition Proposal PresentationFace Recognition Proposal Presentation
Face Recognition Proposal Presentation
 
Aminoglycosides
AminoglycosidesAminoglycosides
Aminoglycosides
 
Optical Fiber Communication & Bangladesh
Optical Fiber Communication & BangladeshOptical Fiber Communication & Bangladesh
Optical Fiber Communication & Bangladesh
 
Collective bargaining
Collective bargainingCollective bargaining
Collective bargaining
 
Switchgear Equipment in a Substation
Switchgear Equipment in a SubstationSwitchgear Equipment in a Substation
Switchgear Equipment in a Substation
 
Function of commercial banks in bangladesh
Function of commercial banks in bangladeshFunction of commercial banks in bangladesh
Function of commercial banks in bangladesh
 
Cyber crime
Cyber crimeCyber crime
Cyber crime
 

Recently uploaded

Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operationalssuser3e220a
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfPatidar M
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfErwinPantujan2
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfPrerana Jadhav
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfVanessa Camilleri
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataBabyAnnMotar
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
Multi Domain Alias In the Odoo 17 ERP Module
Multi Domain Alias In the Odoo 17 ERP ModuleMulti Domain Alias In the Odoo 17 ERP Module
Multi Domain Alias In the Odoo 17 ERP ModuleCeline George
 
Using Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea DevelopmentUsing Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea Developmentchesterberbo7
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxlancelewisportillo
 

Recently uploaded (20)

Mattingly "AI & Prompt Design: Large Language Models"
Mattingly "AI & Prompt Design: Large Language Models"Mattingly "AI & Prompt Design: Large Language Models"
Mattingly "AI & Prompt Design: Large Language Models"
 
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptxINCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operational
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdf
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
Paradigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTAParadigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTA
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdf
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped data
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
Multi Domain Alias In the Odoo 17 ERP Module
Multi Domain Alias In the Odoo 17 ERP ModuleMulti Domain Alias In the Odoo 17 ERP Module
Multi Domain Alias In the Odoo 17 ERP Module
 
Using Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea DevelopmentUsing Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea Development
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
 

Power genaration in bangladesh

  • 1.
  • 2. Presented by Md. Atiqur Rahman Department of Electrical & Electronic Engineering Leading University
  • 3. What is Power Generation Power generation is the process of generating electric energy from other forms of energy. The fundamental principles of electricity generation were discovered during the 1820s and early 1830s by the British scientist Michael Faraday. His basic method is still used today electricity is generated by the movement of a loop of wire, or disc of copper between the poles of a magnet.
  • 4. History of Power Generation In September of 1831, Michael Faraday made the discovery of Electromagnetic Induction Faraday attached two wires to a disc and rotated the disc between the opposing poles of a horseshoe magnet creating an electric current
  • 5. Methods of Generating Power Static electricity Electromagnetic induction Electrochemistry Photoelectric effect Thermoelectric effect Piezoelectric effect Nuclear transformation
  • 7. Present Structure of Power Sector Apex Institution  Power Division, Ministry of Power, Energy & Mineral Resources (MPEMR) Regulator  Bangladesh Energy Regulatory Commission (BERC) Generation  Bangladesh Power Development Board (BPDB)  Ashuganj Power Station Company Ltd. (APSCL)  Electricity Generation Company of Bangladesh (EGCB)  North West Power Generation Company Ltd. (NWPGCL)  Independent Power Producers (IPPs)
  • 8. Transmission Power Grid Company of Bangladesh Ltd (PGCB) Distribution Bangladesh Power Development Board (BPDB) Dhaka Power Distribution Company (DPDC) Dhaka Electric Supply Company Ltd (DESCO) West Zone Power Distribution Company (WZPDC) Rural Electrification Board (REB) through Rural Co-operatives
  • 10. Bangladesh’s Power Sector: At a Glance (FY 2011)  Electricity Growth : 7.20 % in FY-2011 (Av. 7 % since 1990)  Generation Capacity : 7119 MW (Oct., 2011)  Total Consumers : 12.5 Million  Transmission Lines : 8,600 km  Distribution Lines : 2,78,000 km  Per Capita Generation : 252 kWh (incl. Captive)  Access to Electricity : 50 %
  • 11. Present Generation Capacity (Oct., 2011) Public Sector Generation Capacity (MW) BPDB 2868 APSCL 659 EGCB 255 Subtotal 3782(53%) Private Sector Generation Capacity (MW) IPPs 1231 SIPPs (BPDB) 99 SIPPs (REB) 226 15 YR. Rental 168 3/5 YR. Rental 1613 Subtotal 3337(47%) Total 7119
  • 12. Demand Supply Situation  Generation: 5000 – 5300 MW (Capacity- 7119 MW)  Highest so far: 5244 MW ( August 29, 2011)  Gas shortage causes 400 - 600 MW less Power Generation  Peak Demand: 6000 MW (with DSM)  Load shedding up to 800 MW during hot summer days (with DSM)  Shortage and unreliable power supply has constrained economic growth
  • 13. Age of Power Plants Age Group (Years) Generation Capacity (MW) 40+ 208 31 –40 156 21 – 30 1268 11 – 20 1412 01 – 10 4075 Total 7119
  • 15. Primary Fuel Supply Scenario  Gas: No significant gas discovery in recent years; off – shore and on – shore gas exploration initiatives & increased reserves in present fields may change the present scenario  Coal: Near term option; Indigenous or Imported; Base Load  Oil: Volatile market; High price; For peaking duty  LNG: Necessary to ensure secure and reliable gas supply  Nuclear: Safe technology; No pollution; Expected to be future Base Load option
  • 16. Power Generation Projects up to 2016 Calendar Year Wise Projects Completion (From 2010 to 2016) YEAR 2010 (MW) Commi ssioned 2011 (MW) 2012 (MW) 2013 (MW) 2014 (MW) 2015 (MW) 2016 (MW) TOTA L (MW) Public 255 851 838 1190 1270 450 1500 6204 Private 520 1343 1319 1034 1003 1900 1300 8549 Total 775 2194 2157 2224 2273 2350 2800 14773
  • 17. Challenges Enhanced Gas Exploration, Production  Domestic coal development  Coal Import (long term contract) and deep sea port for coal handling  LNG import  Safe Nuclear Technology Primary Fuel Supply  Ensuring financing for Public and Private sector projects  Availability of foreign currency
  • 18. Project Financing  Infrastructure development by Railway and R&H  Dredging of river routes by BIWTA  Capacity build up of BPC, Railway, R&H and BIWTA etc Transportation of fuel and equipment  Development of skilled manpower: adopt and operate new technology Human Resources Development  Development of skilled manpower: adopt and operate new technology