• Organization overview
• Ongoing projects
Company Introduction
01
• Performed works
• Problems encountered
Training Experience
02
• Personal evaluation
• Suggestions
Conclusion
03
01.
Company Overview
Qserve group of companies
Prof. Chitra
Wedikkara
Quantity Surveying
&
Project Management
business unit
Qserve India Qserve Qatar
QSQ Outsource
Qserve UAE Qserve Sri Lanka
Education arm
CSCT Colombo
School of
Construction
Technology
QSQ Outsource (Pvt) Ltd
• Pre & Post contract management
• Cost management
• Claims management
• Value management
• Project management
• Contract administration
Services Provided:
Established in 1994
Qserve (Pvt) Ltd – Sri Lanka
- A Chartered Quantity Surveying Consultancy company
Third international operation
Established in 2010
Qserve Qatar
Royal Institution of Chartered Surveyors
(RICS)
Lanka Institute of Quantity Surveyors
(IQSSL)
Australian Institute of Quantity Surveyors
(AIQS)
Follows registered practice with:
Established in 2012
QSQ Outsource
•QSQ Outsource (Pvt) Ltd
• Reduce cost without compromising on quality.
• Minimize risk while encouraging innovation.
• Develop solutions that tap into the combined
creativity of all stakeholders concerned.
• Encourage team spirit between all stakeholders to
overcome potential problems.
• Establish innovative as well as traditional, time
tested systems, quality and cost control for the
management of Projects.
• Strike a balance between efficiency, quality and
value for money.
Mission
“Striving to be the most
diversified and valued Quantity
Surveying firm in Sri Lanka.”
Vision
•QSQ Outsource (Pvt) Ltd
According to the Shop and Office Ordinance,
• Annual leave
• Casual leave
• Medical leave
• Weekend holidays
• Mercantile holidays
Leave procedure
CV
Personal interview
Recruitment & Training
Employee management…
• Clean & safe work environment
• Site visit expenditures.
• Personal health insurance coverage.
• OT and other allowances.
Staff welfare
•QSQ Outsource (Pvt) Ltd
• Democratic leadership
• Team decision making
• Work delegation
Management & decision making
Management…
Ongoing Projects
Location: Pannala
Client: Magi Enterprises Lanka Private limited
Contractor: Satra Engineering Consortium (Pvt) Ltd
Proposed Factory Building and Premises
Location: Nugegoda
Client: Church Of The Four Square Gospel In Sri Lanka
Contractor: Kinwes (Pvt) Ltd
Proposed Church Building
Location: Colombo 07
Client: Dr. Fathima Shermoon Marleen
Contractor: Private Contractor
Proposed Residence at Barnes Place
Location: Galle
Client: Serenia Limited
Contractor: Access Project
Proposed Luxury Apartments
Proposed Apartments for
Serenia Limited – Talpe, Galle
Services provided by QSQ:
• Contract Administration
• Preparation of BOQ
• Tender action
• Contract Procedures
• Construction economics on financial management
• Bill certification
• Luxury mixed development Project comprising apartments and a 5-star boutique
hotel.
• Project consists of two towers and a service building comprising a Spa, Gym,
apartments, hotel rooms, swimming pools, Jacuzzi, lobbies and a car park.
Client: Main Contractor:
Site Health & Safety
• COVID 19 health considerations: Wearing masks,
washing hands, checking temperature when
entering the premises.
• Wearing of safety helmets was a must.
• Safety boots, safety belts, gloves, goggles and
face masks etc. were provided as per the
requirement.
• Warning boards, instruction boards and notices
were displayed.
02.
Training Experience
Experience Gained
 Contract Management
 Familiarization with drawings and taking off
 Tendering procedure
 Preparation of LOA
 Variation evaluation
 IPA evaluation & IPC preparation
 IPA preparation
 Joint-measurements
 Claims management & Construction disputes
 Cashflow forecast
 Material ordering & BOI approval
 Construction bonds
 Exposure to new construction techniques & concepts
 Documents & record keeping
Contract Management
Pre-Contract
Post-Contract
Familiarization with drawings & taking off
Reading Drawings
1. Architectural drawings
2. Structural Drawings
3. Services drawings
4. Finishes drawings
Taking off
Physical Through drawings
By hand Computerized
Tendering procedure
Preparing BOQ
Preparing IFB
Tender Addendum
final bidding
document
Bid evaluation &
Contractor selection
• Measurement sheet
• Query sheet
• Project Summary
• Bid Data
• Bid clarification & submission information
• Chapter 1 – Invitation for Bid (IFB)
• Chapter 2 – BOQ & Tender addendum
• Chapter 3 - Drawings & Specifications
Preparation of LOA
• Project & Contract package
• Bid reference
• Contract value in number and words
• Performance security
• Signatures of the Employer & Contractor, with a witness for each
• Essential Terms and Provisions
• Contract data
Variation evaluation
1. Change to the quantity of any work
2. Changes to the quality of work
3. Changes to level/ dimensions
4. Omission of any work
5. Additional work
IPA evaluation
IPC preparation
IPA preparation
Additions:
• Work done for the period of evaluation.
• Approved variations.
• Day works
• Material at site
• Claims if available.
Deductions:
• Advance recovery
• Retention
• Client paid material/ Direct payments
Previous Current Cumulative
xxx xx xxxxx
Claims management &
Construction disputes
EOT cost claim
Common types of Contractual claims identified;
• Delay claims
• Price acceleration claims
• Extra work or variation claims
• Damage claims & Loss of profit claims
 Actual incurred costs were approved where the Contractor had provided satisfactory supportings.
 Fair and reasonable rates were granted where the Contractor had not sufficiently proven the claimed
cost.
Cashflow forecast
Material ordering & BOI approval
1. Marking drawings
2. Quantity sheets & Proforma Invoice
3. Complete BOI document
 Quantity reconciliation
Construction bonds
• Advance payment guarantee
• Performance guarantee
Bond extension
Exposure to new construction
techniques & concepts
• Chemical anchoring
• Barra Emulsion
• Water bar & Wall kicker
• Mock-up construction
Documents & record keeping
Folder management
• Contract Documents
• Variation Orders
• Bonds & Guarantees
• BOI approvals
Record keeping
• Bonds & guarantees
• Variation summary
• Variation approvals
• Payment certificate status
03.
Conclusion
Personal evaluation
S
W T
O
STRENGTHS
• Theoretical knowledge.
• Was able to keep a good relationship with
everyone.
• Friendly and effective communication ability.
• Decision making by applying my knowledge.
• Ability to learn from anyone.
• Ability to learn computer software and its usage
efficiently with the existing understandings.
Personal evaluation
S
W T
O
WEAKNESS
• Lacked ability to take risks at the start of my
training period.
• Lacked practical knowledge about the current
market rates.
• Lacked experience on unit conversion.
• Skipped proofreading/ rechecking prepared
documents at the beginning of my training.
Personal evaluation
S
W T
O
OPPORTUNITIES & PERSONAL GAINS
• Work in different types of projects with different
people.
• Work under experienced experts.
• Share knowledge with other trainees.
• Learned how to handle stressful situations.
• Understand how the relationships between the
Project parties are handled and keeping good
communication to obtain the maximum output.
• Maintaining the ethics, rules of conduct &
professional standards of the career.
• Managing the Clients and Contractors or Contract
parties with fair and successful negotiations.
• Working with a team in different situations.
• Understand both parties of a contract with
consulting.
Personal evaluation
S
W T
O
THREATS & MISSED OPPORTUNITIES
• Quantity Surveying is a competitive profession
with more institutions producing graduates.
• 6 month training was limited to extract expected
level of knowledge.
• Exposure to site experience was limited due to
COVID situation.
• Didn’t get opportunity to take part in Contractor’s
organization.
• Surveying and setting out
• Preparation of Project program
• Preparation of the final accounts
• Preparation of monthly & daily progress
reports
• Preparation of the feasibility reports
• Preparation of sub bills
Observed Suggestions
For Trainees
Contents Title
Text Here
Contents Title
Text Here
$100
For Organization
Contents Title
Text Here
Contents
Contents
Contents
For Trainees For Organization
Contents
For Programme
• Revise former subject modules
prior to and during training.
• Maintain a good behavior and
attitude.
• Keep the working area clean.
• Clear any doubts at the time of
arising.
• Take advice from the seniors or
even juniors without hesitating.
• Readily accept risks &
challenges.
• Arrange brainstorming sessions.
• Increasing the staff: since
QSQ outsource was handling
large Projects with a range of
works.
• Allowing the pre-Contract &
post-Contract teams to
perform collaboratively.
• Students shall be updated on
new software packages and
industry practices before the
training.
• Provide opportunity for
students to work in both
Contractor & consultant
aspects during their training
period with a slight extension
of the training period.
Thank You
Insert the Sub Title of Your Presentation

More Related Content

Similar to 00. Presentation QS0005.pptx

CV of Electrical Engineer - Projects with 7+ years experience in Project mana...
CV of Electrical Engineer - Projects with 7+ years experience in Project mana...CV of Electrical Engineer - Projects with 7+ years experience in Project mana...
CV of Electrical Engineer - Projects with 7+ years experience in Project mana...
sudhakar k
 
riyasdeen - qs
riyasdeen - qsriyasdeen - qs
riyasdeen - qs
Nilabdeen Riyasdeen
 
Turnover Engineer
Turnover EngineerTurnover Engineer
Turnover Engineer
Manish Kumar.G
 
SANPPT
SANPPTSANPPT
Company profile
Company profileCompany profile
Company profile
ZIyeeTan
 
Primer Taller Gold Standard en Colombia :Cookstove project financing GS. Por...
Primer Taller Gold Standard en Colombia :Cookstove project financing  GS. Por...Primer Taller Gold Standard en Colombia :Cookstove project financing  GS. Por...
Primer Taller Gold Standard en Colombia :Cookstove project financing GS. Por...
Fundación Natura Colombia
 
resume-.PDF (2)
resume-.PDF (2)resume-.PDF (2)
resume-.PDF (2)
nishit dalal
 
PK_CV - 1
PK_CV - 1PK_CV - 1
PK_CV - 1
Pankaj K Thakur
 
QUANTITY SURVEYOR magazine
QUANTITY SURVEYOR magazineQUANTITY SURVEYOR magazine
QUANTITY SURVEYOR magazine
Chong Chin Pin
 
Андрій Просов "Fixed Price Agile Projects: Challenges for Project Manager" Kh...
Андрій Просов "Fixed Price Agile Projects: Challenges for Project Manager" Kh...Андрій Просов "Fixed Price Agile Projects: Challenges for Project Manager" Kh...
Андрій Просов "Fixed Price Agile Projects: Challenges for Project Manager" Kh...
Lviv Startup Club
 
Resume for Dhanalakshmi ttt
Resume for Dhanalakshmi  tttResume for Dhanalakshmi  ttt
Resume for Dhanalakshmi ttt
Dhana Lakshmi
 
CV - Sudheesh - Senior Document Controller
CV - Sudheesh - Senior Document ControllerCV - Sudheesh - Senior Document Controller
CV - Sudheesh - Senior Document Controller
Sudheesh Narayanan
 
Project management for waste water treatment project
Project management for waste water treatment projectProject management for waste water treatment project
Project management for waste water treatment project
vivek dwivedi
 
CV-Resume New[1]
CV-Resume New[1]CV-Resume New[1]
CV-Resume New[1]
Muhammad Malik
 
UCM-CV
UCM-CVUCM-CV
Clear Construction QLD - Capability Statement3
Clear Construction QLD - Capability Statement3Clear Construction QLD - Capability Statement3
Clear Construction QLD - Capability Statement3
Benjamin Leavy
 
1. Project vs. product procurement QSCM.pptx
1. Project vs. product procurement QSCM.pptx1. Project vs. product procurement QSCM.pptx
1. Project vs. product procurement QSCM.pptx
PRAVINBANKAR9
 
IGNATIOUS RESUME
IGNATIOUS RESUMEIGNATIOUS RESUME
IGNATIOUS RESUME
Ignatious Francis
 
Munsif CV
Munsif CVMunsif CV
Munsif CV
Mohamed Munsif
 
Resume for Dhanalakshmi ttt
Resume for Dhanalakshmi  tttResume for Dhanalakshmi  ttt
Resume for Dhanalakshmi ttt
Dhana Lakshmi
 

Similar to 00. Presentation QS0005.pptx (20)

CV of Electrical Engineer - Projects with 7+ years experience in Project mana...
CV of Electrical Engineer - Projects with 7+ years experience in Project mana...CV of Electrical Engineer - Projects with 7+ years experience in Project mana...
CV of Electrical Engineer - Projects with 7+ years experience in Project mana...
 
riyasdeen - qs
riyasdeen - qsriyasdeen - qs
riyasdeen - qs
 
Turnover Engineer
Turnover EngineerTurnover Engineer
Turnover Engineer
 
SANPPT
SANPPTSANPPT
SANPPT
 
Company profile
Company profileCompany profile
Company profile
 
Primer Taller Gold Standard en Colombia :Cookstove project financing GS. Por...
Primer Taller Gold Standard en Colombia :Cookstove project financing  GS. Por...Primer Taller Gold Standard en Colombia :Cookstove project financing  GS. Por...
Primer Taller Gold Standard en Colombia :Cookstove project financing GS. Por...
 
resume-.PDF (2)
resume-.PDF (2)resume-.PDF (2)
resume-.PDF (2)
 
PK_CV - 1
PK_CV - 1PK_CV - 1
PK_CV - 1
 
QUANTITY SURVEYOR magazine
QUANTITY SURVEYOR magazineQUANTITY SURVEYOR magazine
QUANTITY SURVEYOR magazine
 
Андрій Просов "Fixed Price Agile Projects: Challenges for Project Manager" Kh...
Андрій Просов "Fixed Price Agile Projects: Challenges for Project Manager" Kh...Андрій Просов "Fixed Price Agile Projects: Challenges for Project Manager" Kh...
Андрій Просов "Fixed Price Agile Projects: Challenges for Project Manager" Kh...
 
Resume for Dhanalakshmi ttt
Resume for Dhanalakshmi  tttResume for Dhanalakshmi  ttt
Resume for Dhanalakshmi ttt
 
CV - Sudheesh - Senior Document Controller
CV - Sudheesh - Senior Document ControllerCV - Sudheesh - Senior Document Controller
CV - Sudheesh - Senior Document Controller
 
Project management for waste water treatment project
Project management for waste water treatment projectProject management for waste water treatment project
Project management for waste water treatment project
 
CV-Resume New[1]
CV-Resume New[1]CV-Resume New[1]
CV-Resume New[1]
 
UCM-CV
UCM-CVUCM-CV
UCM-CV
 
Clear Construction QLD - Capability Statement3
Clear Construction QLD - Capability Statement3Clear Construction QLD - Capability Statement3
Clear Construction QLD - Capability Statement3
 
1. Project vs. product procurement QSCM.pptx
1. Project vs. product procurement QSCM.pptx1. Project vs. product procurement QSCM.pptx
1. Project vs. product procurement QSCM.pptx
 
IGNATIOUS RESUME
IGNATIOUS RESUMEIGNATIOUS RESUME
IGNATIOUS RESUME
 
Munsif CV
Munsif CVMunsif CV
Munsif CV
 
Resume for Dhanalakshmi ttt
Resume for Dhanalakshmi  tttResume for Dhanalakshmi  ttt
Resume for Dhanalakshmi ttt
 

Recently uploaded

spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
AI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptxAI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptx
architagupta876
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
ecqow
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
Nada Hikmah
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
Design and optimization of ion propulsion drone
Design and optimization of ion propulsion droneDesign and optimization of ion propulsion drone
Design and optimization of ion propulsion drone
bjmsejournal
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
Anant Corporation
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
21UME003TUSHARDEB
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...
bijceesjournal
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
abbyasa1014
 
BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
LAXMAREDDY22
 
People as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimalaPeople as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimala
riddhimaagrawal986
 
integral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdfintegral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdf
gaafergoudaay7aga
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
Atif Razi
 
CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1
PKavitha10
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
RamonNovais6
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
ElakkiaU
 

Recently uploaded (20)

spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
AI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptxAI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptx
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
Design and optimization of ion propulsion drone
Design and optimization of ion propulsion droneDesign and optimization of ion propulsion drone
Design and optimization of ion propulsion drone
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
 
BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
 
People as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimalaPeople as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimala
 
integral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdfintegral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdf
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
 
CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
 

00. Presentation QS0005.pptx

  • 1. National Apprentice & Industrial Training Authority Presentation on Industrial Training At QSQ Outsource (Pvt) Ltd - Pitakotte • Name : WDBJ Jeewananda • Student Number : D/QS/18/0005 • Program : Bachelor of Science • Field : Quantity surveying • Period : 06 Months (21.12.2020 – 30.06.2021)
  • 2. Presentation Contents • Organization overview • Ongoing projects Company Introduction 01 • Performed works • Problems encountered Training Experience 02 • Personal evaluation • Suggestions Conclusion 03
  • 4. Qserve group of companies Prof. Chitra Wedikkara Quantity Surveying & Project Management business unit Qserve India Qserve Qatar QSQ Outsource Qserve UAE Qserve Sri Lanka Education arm CSCT Colombo School of Construction Technology
  • 5. QSQ Outsource (Pvt) Ltd • Pre & Post contract management • Cost management • Claims management • Value management • Project management • Contract administration Services Provided: Established in 1994 Qserve (Pvt) Ltd – Sri Lanka - A Chartered Quantity Surveying Consultancy company Third international operation Established in 2010 Qserve Qatar Royal Institution of Chartered Surveyors (RICS) Lanka Institute of Quantity Surveyors (IQSSL) Australian Institute of Quantity Surveyors (AIQS) Follows registered practice with: Established in 2012 QSQ Outsource
  • 6. •QSQ Outsource (Pvt) Ltd • Reduce cost without compromising on quality. • Minimize risk while encouraging innovation. • Develop solutions that tap into the combined creativity of all stakeholders concerned. • Encourage team spirit between all stakeholders to overcome potential problems. • Establish innovative as well as traditional, time tested systems, quality and cost control for the management of Projects. • Strike a balance between efficiency, quality and value for money. Mission “Striving to be the most diversified and valued Quantity Surveying firm in Sri Lanka.” Vision
  • 7. •QSQ Outsource (Pvt) Ltd According to the Shop and Office Ordinance, • Annual leave • Casual leave • Medical leave • Weekend holidays • Mercantile holidays Leave procedure CV Personal interview Recruitment & Training Employee management… • Clean & safe work environment • Site visit expenditures. • Personal health insurance coverage. • OT and other allowances. Staff welfare
  • 8. •QSQ Outsource (Pvt) Ltd • Democratic leadership • Team decision making • Work delegation Management & decision making Management…
  • 9. Ongoing Projects Location: Pannala Client: Magi Enterprises Lanka Private limited Contractor: Satra Engineering Consortium (Pvt) Ltd Proposed Factory Building and Premises Location: Nugegoda Client: Church Of The Four Square Gospel In Sri Lanka Contractor: Kinwes (Pvt) Ltd Proposed Church Building Location: Colombo 07 Client: Dr. Fathima Shermoon Marleen Contractor: Private Contractor Proposed Residence at Barnes Place Location: Galle Client: Serenia Limited Contractor: Access Project Proposed Luxury Apartments
  • 10. Proposed Apartments for Serenia Limited – Talpe, Galle Services provided by QSQ: • Contract Administration • Preparation of BOQ • Tender action • Contract Procedures • Construction economics on financial management • Bill certification • Luxury mixed development Project comprising apartments and a 5-star boutique hotel. • Project consists of two towers and a service building comprising a Spa, Gym, apartments, hotel rooms, swimming pools, Jacuzzi, lobbies and a car park. Client: Main Contractor:
  • 11. Site Health & Safety • COVID 19 health considerations: Wearing masks, washing hands, checking temperature when entering the premises. • Wearing of safety helmets was a must. • Safety boots, safety belts, gloves, goggles and face masks etc. were provided as per the requirement. • Warning boards, instruction boards and notices were displayed.
  • 13. Experience Gained  Contract Management  Familiarization with drawings and taking off  Tendering procedure  Preparation of LOA  Variation evaluation  IPA evaluation & IPC preparation  IPA preparation  Joint-measurements  Claims management & Construction disputes  Cashflow forecast  Material ordering & BOI approval  Construction bonds  Exposure to new construction techniques & concepts  Documents & record keeping
  • 15. Familiarization with drawings & taking off Reading Drawings 1. Architectural drawings 2. Structural Drawings 3. Services drawings 4. Finishes drawings Taking off Physical Through drawings By hand Computerized
  • 16. Tendering procedure Preparing BOQ Preparing IFB Tender Addendum final bidding document Bid evaluation & Contractor selection • Measurement sheet • Query sheet • Project Summary • Bid Data • Bid clarification & submission information • Chapter 1 – Invitation for Bid (IFB) • Chapter 2 – BOQ & Tender addendum • Chapter 3 - Drawings & Specifications
  • 17. Preparation of LOA • Project & Contract package • Bid reference • Contract value in number and words • Performance security • Signatures of the Employer & Contractor, with a witness for each • Essential Terms and Provisions • Contract data
  • 18. Variation evaluation 1. Change to the quantity of any work 2. Changes to the quality of work 3. Changes to level/ dimensions 4. Omission of any work 5. Additional work
  • 19. IPA evaluation IPC preparation IPA preparation Additions: • Work done for the period of evaluation. • Approved variations. • Day works • Material at site • Claims if available. Deductions: • Advance recovery • Retention • Client paid material/ Direct payments Previous Current Cumulative xxx xx xxxxx
  • 20. Claims management & Construction disputes EOT cost claim Common types of Contractual claims identified; • Delay claims • Price acceleration claims • Extra work or variation claims • Damage claims & Loss of profit claims  Actual incurred costs were approved where the Contractor had provided satisfactory supportings.  Fair and reasonable rates were granted where the Contractor had not sufficiently proven the claimed cost.
  • 22. Material ordering & BOI approval 1. Marking drawings 2. Quantity sheets & Proforma Invoice 3. Complete BOI document  Quantity reconciliation
  • 23. Construction bonds • Advance payment guarantee • Performance guarantee Bond extension
  • 24. Exposure to new construction techniques & concepts • Chemical anchoring • Barra Emulsion • Water bar & Wall kicker • Mock-up construction
  • 25. Documents & record keeping Folder management • Contract Documents • Variation Orders • Bonds & Guarantees • BOI approvals Record keeping • Bonds & guarantees • Variation summary • Variation approvals • Payment certificate status
  • 27. Personal evaluation S W T O STRENGTHS • Theoretical knowledge. • Was able to keep a good relationship with everyone. • Friendly and effective communication ability. • Decision making by applying my knowledge. • Ability to learn from anyone. • Ability to learn computer software and its usage efficiently with the existing understandings.
  • 28. Personal evaluation S W T O WEAKNESS • Lacked ability to take risks at the start of my training period. • Lacked practical knowledge about the current market rates. • Lacked experience on unit conversion. • Skipped proofreading/ rechecking prepared documents at the beginning of my training.
  • 29. Personal evaluation S W T O OPPORTUNITIES & PERSONAL GAINS • Work in different types of projects with different people. • Work under experienced experts. • Share knowledge with other trainees. • Learned how to handle stressful situations. • Understand how the relationships between the Project parties are handled and keeping good communication to obtain the maximum output. • Maintaining the ethics, rules of conduct & professional standards of the career. • Managing the Clients and Contractors or Contract parties with fair and successful negotiations. • Working with a team in different situations. • Understand both parties of a contract with consulting.
  • 30. Personal evaluation S W T O THREATS & MISSED OPPORTUNITIES • Quantity Surveying is a competitive profession with more institutions producing graduates. • 6 month training was limited to extract expected level of knowledge. • Exposure to site experience was limited due to COVID situation. • Didn’t get opportunity to take part in Contractor’s organization. • Surveying and setting out • Preparation of Project program • Preparation of the final accounts • Preparation of monthly & daily progress reports • Preparation of the feasibility reports • Preparation of sub bills
  • 31. Observed Suggestions For Trainees Contents Title Text Here Contents Title Text Here $100 For Organization Contents Title Text Here Contents Contents Contents For Trainees For Organization Contents For Programme • Revise former subject modules prior to and during training. • Maintain a good behavior and attitude. • Keep the working area clean. • Clear any doubts at the time of arising. • Take advice from the seniors or even juniors without hesitating. • Readily accept risks & challenges. • Arrange brainstorming sessions. • Increasing the staff: since QSQ outsource was handling large Projects with a range of works. • Allowing the pre-Contract & post-Contract teams to perform collaboratively. • Students shall be updated on new software packages and industry practices before the training. • Provide opportunity for students to work in both Contractor & consultant aspects during their training period with a slight extension of the training period.
  • 32. Thank You Insert the Sub Title of Your Presentation

Editor's Notes

  1. Many overseas & local projects are completed & currently ongoing, Main local projects (to show variety of projects handled) which were given services of pre & post contract
  2. Exposure to new construction techniques & concepts