Quantity 
Surveyor
What is a 
Quantity Surveyor? 
..and what do they do?
The Responsibilities of 
Quantity Surveyor
A Quantity Surveyor 
is.. 
A professional working 
within the construction 
industry concerned with 
building costs.
Roles of a Quantity Surveyor 
Basic Services 
1. Prepare preliminary cost estimates and plans of development projects. 
2. Prepare financial statement of regular intervals during construction period. 
3. Prepare & execute formal contract. 
4. Prepare Bill of Quantity or Specification document for tendering. 
5. Advice on cost estimates regarding design development project. 
6. Advice on procurement, tendering, contract procedures & arrangement. 
7. Organise calling of tenders. 
8. Evaluate tenders received in form of tender reports. 
9. Interim valuate work progress on site for interim payments. 
10. Settle final project accounts.
Supplementary 
Services 
1. Prepare feasibility project studies 
2. Estimate project or development expenditure & foresee income cash flows 
3. Evaluate contractors registered for prequalification. 
4. Compare cost studies on economics of project during design stage. 
5. Manage construction project. 
6. Look into costing and studies on economics of alternative design. 
7. Negotiate and agree/disagree on Schedule Rates. 
8. Evaluate or audit contract claims for arbitrations litigation cases. 
9. Evaluate or audit insurance claims for fire damaged buildings. 
10. Audit contracts & related budgets & expenditure.
Activities At Various Stages 
Pre- contract phase 
● Inception 
● Outline Proposal 
● Scheme Design 
● Detail Design 
● Tender 
Post- contract phase 
● Project Planning 
● Site Operation 
● Operation
Pre-Contract Phase 
● Scrutinize 
tender 
drawings & 
documents 
● Liaise with 
consultant to 
determine 
working scope 
● Costing, 
● Compiling 
pricing and 
analysis BOQ 
items cost. 
the Tender 
Bill of 
Quantities 
(BOQ) with 
description 
● Analyze and 
compare 
quotations 
received at bid 
stage 
● Compilation of 
tender & bid 
offer 
submissions.
Post Contract 
Phase 
Preparing and 
agreeing 
payments 
applications / 
valuations 
Maintain logs 
for claims and 
thereby 
agreeing 
variations/ 
change orders. 
Prepare and compile 
claim documents to 
the 
Engineer/Employer. 
Prepare & Compile 
“Final Accounts 
Payment 
application” 
Analyze and 
Recommend 
Subcontract 
payment 
application 
Visit Site to 
monitor progress 
Preparing 
Payment 
Application 
Attend progress 
meetings and 
provide updates 
of costs to 
Client
The Inter-relationships of 
a Quantity Surveyor
● Architect will design the building. 
● A QS will be cost adviser and monitor all financial 
matters to architect. 
● QS has experience on the type of work envisaged and 
usually the architect will be able to recommend a 
number of appropriate QSs to interview. 
The 
Relationship 
between 
Quantity 
Surveyor and 
Architect
The 
Relationship 
between 
Quantity 
Surveyor and 
Engineers. 
● Engineers design the 
structures and foundations. 
● They also supervise the work 
on site on behalf of the client. 
● After the designs are all 
done, the QS calculate the 
quantity of the materials to be 
used and prepare tenders 
and also supervise the 
monthly submission for 
payments. 
Types of Engineer in 
Construction Industry: 
1. Civil Engineer 
2. Electrical Engineer 
3. Mechanical Engineer
The 
Relationship 
Between 
Quantity 
Surveyors 
and 
Contractors 
Quantity 
Surveyor 
● Quantity Surveyors would be representing their 
employer’s interest either the client or the 
contractor. 
● They always look after contractors’ commercial 
and financial interests to make their employer in 
the more controversial contractual areas 
● Evaluate and monitor payment to contractors 
at various points of construction
The 
Relationship 
between 
Quantity 
Surveyor 
and the 
Suppliers. 
● As a part of a project, a contractor 
must endeavour to procure a 
supply chain in a timely manner. 
● The QS plays a vital role in this 
process because it requires a 
commercially-aware person to 
drive activities and ensure awards 
are placed on time and within the 
budget.
Example of Drawings
Typical Quantity Surveyor will be like: 
● Basically, Quantity Surveyors 
don’t draw. They READ 
drawings instead. 
● a Quantity Surveyor will study 
drawings and specifications 
about a new building normally 
provided by architects or 
engineers.
QS Read & 
Refer : 
Architectural 
Drawing 
Construction 
Drawing 
Contract 
Drawing 
To 
Produce 
Bill Of 
Quantity 
(BQ) 
Tender 
Drawing
Architectural Drawings 
● Sketch / 
Diagram / Plan 
use to design 
& construct 
● Show building 
elements & 
form for 
construction 
works
QSes use them for the estimation of 
cost and materials.
Construction Drawings: ● Contract documents 
that give 
representation of 
work 
● To work on the actual 
building of the design 
● Provide all 
information require in 
construction activities 
in writing & drawing 
form
QSes use them as a basis for cost control during 
the construction process.
Tender Drawings: 
● A formal invitation to 
suppliers to make an offer 
to the buyer for the supply 
of goods and services. 
● Sufficient details are 
described 
● Use for estimating & 
pricing the cost
Quantity surveyors check them to see that no substantial errors had 
been made. They then submit the detailed reports on the tenders to the 
client.
● A cross section drawing of a path 
showing width & specification 
detail for each construction layer 
● Include general arrangement 
drawings showing site location, the 
position on the site, means of 
access to the site, floor plan, 
elevation and section. 
Contract Drawings 
Formal agreement between the buying 
organisation and the supplier setting out what 
services and products the supplier is contracted 
to deliver and within the timeline and contract 
price.
Annotations of measurements, colors, and materials, 
was appended to the contract.
4 Stages of BQ Preparation: 
Taking 
Off 
Squaring Abstracting Billing 
Billing Direct
BQ Preparation Development 
Drawing Dimension 
Paper 
Billing 
Paper 
Bill Of 
Quantity 
Taking Off 
Squaring 
Direct 
Billing 
Measurement of Quantities
When a 3D model is complete with 
specifications, the bill of Quantities is 
able to be compiled instantaneously. 
Bills of Quantity: 
The bill of Quantity is a report ready by the expense 
expert (frequently an quantity surveyor) 
● gives particular measured amounts of the things of work 
recognized by the tender drawings and particulars in the 
delicate documents. 
● The amounts is measured in number, length, zone, 
volume, weight or time. 
● Requires the specific design and specifications that has 
been completely prepared.
Revit : BIM 
● BIM(Building information model) 
● Software used by QS to count and 
calculate the material directly by using 
example of design/build firm that uses an 
API(application programming interface) 
from Revit Autodesk. 
● Time, expense, and sustainability are 
crucial in today's construction industry. 
Books 
● Malaysia Standard Method of 
Measurement 2nd edition(SMM 2) 
● Contains specification, measurement, 
and describing the materials. 
● As reference.
>>> Bill and 
list of 
Materials
Reference; 
➔ http://ukurbahan-qs.blogspot.com/2010/10/current-roles-and-responsibilities-of.html 
➔ http://www.symm.co.uk/wp-content/uploads/2011/06/0410-CTH-ATM3-April10.pdf 
➔ http://www.tes.co.uk/article.aspx?storycode=9839 
➔ http://www.typesofengineers.org/types-of-engineers/ 
➔ http://www.rics.org/my/footer/glossary/quantity-surveying/ 
➔ http://drawing-materials.net/contractdr.html 
➔ http://www.designingbuildings.co.uk/wiki/Bill_of_quantities 
➔ https://www.bqsm.gov.my/index.php/en/?option=com_content&view=article&id=176&Itemid=572 
➔ http://rism.org.my/ContentPages/QS%20Division%20Background.aspx 
➔ http://www.bayt.com/en/job/quantity-surveyor-estimator-pre-%26-post-contract-in-qatar-1791085/ 
➔ http://www.careersinconstruction.com/article/the-role-of-a-quantity-surveyor/ 
➔ http://www.cadalyst.com/cad/building-design/1-2-3-revit-bim-and-cost-estimating-part-2-3384 
➔ http://www.suranga.net/publications/2013_bim_qto_automation.pdf 
➔ http://www.scribd.com/doc/27917455/BQ-and-Preparation-of-BQ 
➔ http://www.electrical-knowhow.com/2011/12/contract-construction-drawings.html 
➔ http://www.answers.com/Q/What_is_the_difference_between_tender_and_contract_drawing 
➔ Ivor H.Seeley(1997)Quantity surveying practice, London : Macmillan Press LTD 
➔ Construction Quantity Surveying
THE END!

More Related Content

What's hot

Construction phases
Construction phasesConstruction phases
Construction phases
Meesum Zaidi
 
Bills of quantities
Bills of quantitiesBills of quantities
Bills of quantities
Ar.Vijay Kumar
 
Scope of civil engineering
Scope of civil engineering Scope of civil engineering
Scope of civil engineering
TPTRAMKUMAR
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor
温 庄壁
 
Future of civil engineering
Future of civil engineering Future of civil engineering
Future of civil engineering
IEI GSC
 
QUANTITY SURVEYOR magazine
QUANTITY SURVEYOR magazineQUANTITY SURVEYOR magazine
QUANTITY SURVEYOR magazine
Chong Chin Pin
 
Quantity surveying practise
Quantity surveying practiseQuantity surveying practise
Quantity surveying practise
Sasi Cool
 
An introduction to taking off building quantities
An introduction to taking off building quantities An introduction to taking off building quantities
An introduction to taking off building quantities
Arshad Mohanut
 
Introduction to civil engineering
Introduction to  civil engineeringIntroduction to  civil engineering
Introduction to civil engineeringSavitha Pradeep
 
Quantity Surveying
Quantity SurveyingQuantity Surveying
Quantity Surveyinggeddolan
 
MEASUREMENT PDF
MEASUREMENT PDFMEASUREMENT PDF
MEASUREMENT PDF
IDHAMUKI
 
Approximate estimate
Approximate estimateApproximate estimate
Approximate estimate
Ganesh Tatikonda
 
QUANTITY SURVEYING
QUANTITY SURVEYINGQUANTITY SURVEYING
QUANTITY SURVEYING
lizwi nyandu
 
Construction management
Construction managementConstruction management
Construction management
Usama Khalid
 
Conditions Of Contract
Conditions Of ContractConditions Of Contract
Conditions Of Contractguestdb5e498
 
Strategies in building procurement (summarized)
Strategies in building procurement (summarized)Strategies in building procurement (summarized)
Strategies in building procurement (summarized)
Michael Audu
 
Fidic contract
Fidic contract Fidic contract
Fidic contract
Yash Patel
 
Estimating & Costing - I
Estimating & Costing - IEstimating & Costing - I
Estimating & Costing - I
anbukkarasi dhuraisamy
 

What's hot (20)

Construction phases
Construction phasesConstruction phases
Construction phases
 
Bills of quantities
Bills of quantitiesBills of quantities
Bills of quantities
 
5.1 quantity take-off
5.1 quantity take-off5.1 quantity take-off
5.1 quantity take-off
 
Scope of civil engineering
Scope of civil engineering Scope of civil engineering
Scope of civil engineering
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor
 
Future of civil engineering
Future of civil engineering Future of civil engineering
Future of civil engineering
 
QUANTITY SURVEYOR magazine
QUANTITY SURVEYOR magazineQUANTITY SURVEYOR magazine
QUANTITY SURVEYOR magazine
 
Quantity surveying practise
Quantity surveying practiseQuantity surveying practise
Quantity surveying practise
 
An introduction to taking off building quantities
An introduction to taking off building quantities An introduction to taking off building quantities
An introduction to taking off building quantities
 
Introduction to civil engineering
Introduction to  civil engineeringIntroduction to  civil engineering
Introduction to civil engineering
 
Quantity Surveying
Quantity SurveyingQuantity Surveying
Quantity Surveying
 
MEASUREMENT PDF
MEASUREMENT PDFMEASUREMENT PDF
MEASUREMENT PDF
 
Approximate estimate
Approximate estimateApproximate estimate
Approximate estimate
 
QUANTITY SURVEYING
QUANTITY SURVEYINGQUANTITY SURVEYING
QUANTITY SURVEYING
 
Construction management
Construction managementConstruction management
Construction management
 
Conditions Of Contract
Conditions Of ContractConditions Of Contract
Conditions Of Contract
 
Strategies in building procurement (summarized)
Strategies in building procurement (summarized)Strategies in building procurement (summarized)
Strategies in building procurement (summarized)
 
Fidic contract
Fidic contract Fidic contract
Fidic contract
 
Civil
CivilCivil
Civil
 
Estimating & Costing - I
Estimating & Costing - IEstimating & Costing - I
Estimating & Costing - I
 

Similar to QSS

Qs(ici&itd)
Qs(ici&itd)Qs(ici&itd)
Qs(ici&itd)
Sysy Jnthn
 
ITD Presentation
ITD PresentationITD Presentation
ITD Presentation
masonsth
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor
LY97
 
Ici itd qs project 1
Ici itd qs project 1Ici itd qs project 1
Ici itd qs project 1
Daniel Tan
 
ICI ITD QS PROJECT 1 (1).pptx
ICI ITD QS PROJECT 1 (1).pptxICI ITD QS PROJECT 1 (1).pptx
ICI ITD QS PROJECT 1 (1).pptxmkyong1996
 
Quantity surveying drawing FNBE 2014
Quantity surveying drawing FNBE 2014Quantity surveying drawing FNBE 2014
Quantity surveying drawing FNBE 2014
Felix Vong
 
Preparation of bill sandeep
Preparation of bill sandeepPreparation of bill sandeep
Preparation of bill sandeep
Sandeep Yadav
 
NCIT civil Syllabus 2013-2014
NCIT civil Syllabus 2013-2014NCIT civil Syllabus 2013-2014
NCIT civil Syllabus 2013-2014
LAKSHITHA RAJAPAKSHA
 
Building Construction 4. offer tendering - site
Building Construction 4. offer   tendering - siteBuilding Construction 4. offer   tendering - site
Building Construction 4. offer tendering - siteHamdija Velagic
 
4. offer tendering - site
4. offer   tendering - site4. offer   tendering - site
4. offer tendering - siteAbdulaziz Kaya
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor
Syafiq Deen
 
Project Management Project 1 Report: Defining & Documenting A Project
Project Management Project 1 Report: Defining & Documenting A ProjectProject Management Project 1 Report: Defining & Documenting A Project
Project Management Project 1 Report: Defining & Documenting A Project
Nekumi Kida
 
1.Cost Estimation of Civil Structures Orientation.pptx
1.Cost Estimation of Civil Structures Orientation.pptx1.Cost Estimation of Civil Structures Orientation.pptx
1.Cost Estimation of Civil Structures Orientation.pptx
VenkataRamana602302
 
lecture ppt for contract administration and governing
lecture ppt for contract administration and governinglecture ppt for contract administration and governing
lecture ppt for contract administration and governing
2cd
 
qsqs-141129025329-conversion-gate01.pdf
qsqs-141129025329-conversion-gate01.pdfqsqs-141129025329-conversion-gate01.pdf
qsqs-141129025329-conversion-gate01.pdfrivenhau
 
PPT4 RIBA Plan of Work 2013 Power point slide
PPT4 RIBA Plan of Work 2013 Power point slidePPT4 RIBA Plan of Work 2013 Power point slide
PPT4 RIBA Plan of Work 2013 Power point slide
Sithick Mohamed .
 
PP1 Project 1 Project implementation
PP1 Project 1 Project implementationPP1 Project 1 Project implementation
PP1 Project 1 Project implementation
Teo Kean Hui
 

Similar to QSS (20)

Qsx
QsxQsx
Qsx
 
Qs(ici&itd)
Qs(ici&itd)Qs(ici&itd)
Qs(ici&itd)
 
ITD Presentation
ITD PresentationITD Presentation
ITD Presentation
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor
 
Ici itd qs project 1
Ici itd qs project 1Ici itd qs project 1
Ici itd qs project 1
 
ICI ITD QS PROJECT 1 (1).pptx
ICI ITD QS PROJECT 1 (1).pptxICI ITD QS PROJECT 1 (1).pptx
ICI ITD QS PROJECT 1 (1).pptx
 
Quantity surveying drawing FNBE 2014
Quantity surveying drawing FNBE 2014Quantity surveying drawing FNBE 2014
Quantity surveying drawing FNBE 2014
 
Preparation of bill sandeep
Preparation of bill sandeepPreparation of bill sandeep
Preparation of bill sandeep
 
NCIT civil Syllabus 2013-2014
NCIT civil Syllabus 2013-2014NCIT civil Syllabus 2013-2014
NCIT civil Syllabus 2013-2014
 
Building Construction 4. offer tendering - site
Building Construction 4. offer   tendering - siteBuilding Construction 4. offer   tendering - site
Building Construction 4. offer tendering - site
 
4. offer tendering - site
4. offer   tendering - site4. offer   tendering - site
4. offer tendering - site
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor
 
Project Management Project 1 Report: Defining & Documenting A Project
Project Management Project 1 Report: Defining & Documenting A ProjectProject Management Project 1 Report: Defining & Documenting A Project
Project Management Project 1 Report: Defining & Documenting A Project
 
1.Cost Estimation of Civil Structures Orientation.pptx
1.Cost Estimation of Civil Structures Orientation.pptx1.Cost Estimation of Civil Structures Orientation.pptx
1.Cost Estimation of Civil Structures Orientation.pptx
 
RESUME
RESUMERESUME
RESUME
 
lecture ppt for contract administration and governing
lecture ppt for contract administration and governinglecture ppt for contract administration and governing
lecture ppt for contract administration and governing
 
qsqs-141129025329-conversion-gate01.pdf
qsqs-141129025329-conversion-gate01.pdfqsqs-141129025329-conversion-gate01.pdf
qsqs-141129025329-conversion-gate01.pdf
 
QS.pdf
QS.pdfQS.pdf
QS.pdf
 
PPT4 RIBA Plan of Work 2013 Power point slide
PPT4 RIBA Plan of Work 2013 Power point slidePPT4 RIBA Plan of Work 2013 Power point slide
PPT4 RIBA Plan of Work 2013 Power point slide
 
PP1 Project 1 Project implementation
PP1 Project 1 Project implementationPP1 Project 1 Project implementation
PP1 Project 1 Project implementation
 

More from qayyum23

Construction technology 5
Construction technology 5Construction technology 5
Construction technology 5
qayyum23
 
Ct4 presentation
Ct4 presentationCt4 presentation
Ct4 presentation
qayyum23
 
Ct individual
Ct individualCt individual
Ct individual
qayyum23
 
Ct2 presentation
Ct2 presentationCt2 presentation
Ct2 presentation
qayyum23
 
Titas
TitasTitas
Titas
qayyum23
 
Eng 150611095502-lva1-app6892
Eng 150611095502-lva1-app6892Eng 150611095502-lva1-app6892
Eng 150611095502-lva1-app6892
qayyum23
 
Englishreport 150611070251-lva1-app6892
Englishreport 150611070251-lva1-app6892Englishreport 150611070251-lva1-app6892
Englishreport 150611070251-lva1-app6892
qayyum23
 
English essay
English essayEnglish essay
English essay
qayyum23
 
Enbe final project report
Enbe final project reportEnbe final project report
Enbe final project report
qayyum23
 
ICI final project report
ICI final project reportICI final project report
ICI final project report
qayyum23
 
English essayx
English essayxEnglish essayx
English essayx
qayyum23
 
ITDOUTLINE
ITDOUTLINEITDOUTLINE
ITDOUTLINE
qayyum23
 
ITD02
ITD02ITD02
ITD02
qayyum23
 
ITD 02
ITD 02ITD 02
ITD 02
qayyum23
 
ITD1
ITD1ITD1
ITD1
qayyum23
 

More from qayyum23 (16)

Construction technology 5
Construction technology 5Construction technology 5
Construction technology 5
 
Ct4 presentation
Ct4 presentationCt4 presentation
Ct4 presentation
 
Ct individual
Ct individualCt individual
Ct individual
 
Ct2 presentation
Ct2 presentationCt2 presentation
Ct2 presentation
 
Titas
TitasTitas
Titas
 
Eng 150611095502-lva1-app6892
Eng 150611095502-lva1-app6892Eng 150611095502-lva1-app6892
Eng 150611095502-lva1-app6892
 
Englishreport 150611070251-lva1-app6892
Englishreport 150611070251-lva1-app6892Englishreport 150611070251-lva1-app6892
Englishreport 150611070251-lva1-app6892
 
English essay
English essayEnglish essay
English essay
 
Enbe final project report
Enbe final project reportEnbe final project report
Enbe final project report
 
ICI final project report
ICI final project reportICI final project report
ICI final project report
 
English essayx
English essayxEnglish essayx
English essayx
 
ITDOUTLINE
ITDOUTLINEITDOUTLINE
ITDOUTLINE
 
ITD03
ITD03ITD03
ITD03
 
ITD02
ITD02ITD02
ITD02
 
ITD 02
ITD 02ITD 02
ITD 02
 
ITD1
ITD1ITD1
ITD1
 

Recently uploaded

Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
Tamralipta Mahavidyalaya
 
The Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve ThomasonThe Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve Thomason
Steve Thomason
 
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
Nguyen Thanh Tu Collection
 
How to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS ModuleHow to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS Module
Celine George
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
Vikramjit Singh
 
PART A. Introduction to Costumer Service
PART A. Introduction to Costumer ServicePART A. Introduction to Costumer Service
PART A. Introduction to Costumer Service
PedroFerreira53928
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
TechSoup
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
EverAndrsGuerraGuerr
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
Jisc
 
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdfESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
Fundacja Rozwoju Społeczeństwa Przedsiębiorczego
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
Celine George
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
Delapenabediema
 
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxMARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
bennyroshan06
 
Introduction to Quality Improvement Essentials
Introduction to Quality Improvement EssentialsIntroduction to Quality Improvement Essentials
Introduction to Quality Improvement Essentials
Excellence Foundation for South Sudan
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
RaedMohamed3
 
How to Break the cycle of negative Thoughts
How to Break the cycle of negative ThoughtsHow to Break the cycle of negative Thoughts
How to Break the cycle of negative Thoughts
Col Mukteshwar Prasad
 
Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
Atul Kumar Singh
 
Sectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdfSectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdf
Vivekanand Anglo Vedic Academy
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
Pavel ( NSTU)
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 

Recently uploaded (20)

Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
 
The Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve ThomasonThe Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve Thomason
 
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
 
How to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS ModuleHow to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS Module
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
 
PART A. Introduction to Costumer Service
PART A. Introduction to Costumer ServicePART A. Introduction to Costumer Service
PART A. Introduction to Costumer Service
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
 
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdfESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
 
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxMARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
 
Introduction to Quality Improvement Essentials
Introduction to Quality Improvement EssentialsIntroduction to Quality Improvement Essentials
Introduction to Quality Improvement Essentials
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
 
How to Break the cycle of negative Thoughts
How to Break the cycle of negative ThoughtsHow to Break the cycle of negative Thoughts
How to Break the cycle of negative Thoughts
 
Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
 
Sectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdfSectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdf
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
 

QSS

  • 1. Introduction to Construction industry(ICI) & Introduction to drawing(ITD) Group name : Beauties and the Beasts. Tutor ICI/ITD: Mdm.Has/Ms.Suffina Members : Abdul Qayyum Shahmie Allester Shaun Atiqah Syasya Janatan Chong Kit Yee Chong Jia Yi Cheok Jian Shuang
  • 3. What is a Quantity Surveyor? ..and what do they do?
  • 4. The Responsibilities of Quantity Surveyor
  • 5. A Quantity Surveyor is.. A professional working within the construction industry concerned with building costs.
  • 6. Roles of a Quantity Surveyor Basic Services 1. Prepare preliminary cost estimates and plans of development projects. 2. Prepare financial statement of regular intervals during construction period. 3. Prepare & execute formal contract. 4. Prepare Bill of Quantity or Specification document for tendering. 5. Advice on cost estimates regarding design development project. 6. Advice on procurement, tendering, contract procedures & arrangement. 7. Organise calling of tenders. 8. Evaluate tenders received in form of tender reports. 9. Interim valuate work progress on site for interim payments. 10. Settle final project accounts.
  • 7. Supplementary Services 1. Prepare feasibility project studies 2. Estimate project or development expenditure & foresee income cash flows 3. Evaluate contractors registered for prequalification. 4. Compare cost studies on economics of project during design stage. 5. Manage construction project. 6. Look into costing and studies on economics of alternative design. 7. Negotiate and agree/disagree on Schedule Rates. 8. Evaluate or audit contract claims for arbitrations litigation cases. 9. Evaluate or audit insurance claims for fire damaged buildings. 10. Audit contracts & related budgets & expenditure.
  • 8. Activities At Various Stages Pre- contract phase ● Inception ● Outline Proposal ● Scheme Design ● Detail Design ● Tender Post- contract phase ● Project Planning ● Site Operation ● Operation
  • 9. Pre-Contract Phase ● Scrutinize tender drawings & documents ● Liaise with consultant to determine working scope ● Costing, ● Compiling pricing and analysis BOQ items cost. the Tender Bill of Quantities (BOQ) with description ● Analyze and compare quotations received at bid stage ● Compilation of tender & bid offer submissions.
  • 10. Post Contract Phase Preparing and agreeing payments applications / valuations Maintain logs for claims and thereby agreeing variations/ change orders. Prepare and compile claim documents to the Engineer/Employer. Prepare & Compile “Final Accounts Payment application” Analyze and Recommend Subcontract payment application Visit Site to monitor progress Preparing Payment Application Attend progress meetings and provide updates of costs to Client
  • 11. The Inter-relationships of a Quantity Surveyor
  • 12. ● Architect will design the building. ● A QS will be cost adviser and monitor all financial matters to architect. ● QS has experience on the type of work envisaged and usually the architect will be able to recommend a number of appropriate QSs to interview. The Relationship between Quantity Surveyor and Architect
  • 13. The Relationship between Quantity Surveyor and Engineers. ● Engineers design the structures and foundations. ● They also supervise the work on site on behalf of the client. ● After the designs are all done, the QS calculate the quantity of the materials to be used and prepare tenders and also supervise the monthly submission for payments. Types of Engineer in Construction Industry: 1. Civil Engineer 2. Electrical Engineer 3. Mechanical Engineer
  • 14. The Relationship Between Quantity Surveyors and Contractors Quantity Surveyor ● Quantity Surveyors would be representing their employer’s interest either the client or the contractor. ● They always look after contractors’ commercial and financial interests to make their employer in the more controversial contractual areas ● Evaluate and monitor payment to contractors at various points of construction
  • 15. The Relationship between Quantity Surveyor and the Suppliers. ● As a part of a project, a contractor must endeavour to procure a supply chain in a timely manner. ● The QS plays a vital role in this process because it requires a commercially-aware person to drive activities and ensure awards are placed on time and within the budget.
  • 17. Typical Quantity Surveyor will be like: ● Basically, Quantity Surveyors don’t draw. They READ drawings instead. ● a Quantity Surveyor will study drawings and specifications about a new building normally provided by architects or engineers.
  • 18. QS Read & Refer : Architectural Drawing Construction Drawing Contract Drawing To Produce Bill Of Quantity (BQ) Tender Drawing
  • 19. Architectural Drawings ● Sketch / Diagram / Plan use to design & construct ● Show building elements & form for construction works
  • 20. QSes use them for the estimation of cost and materials.
  • 21. Construction Drawings: ● Contract documents that give representation of work ● To work on the actual building of the design ● Provide all information require in construction activities in writing & drawing form
  • 22. QSes use them as a basis for cost control during the construction process.
  • 23. Tender Drawings: ● A formal invitation to suppliers to make an offer to the buyer for the supply of goods and services. ● Sufficient details are described ● Use for estimating & pricing the cost
  • 24. Quantity surveyors check them to see that no substantial errors had been made. They then submit the detailed reports on the tenders to the client.
  • 25.
  • 26. ● A cross section drawing of a path showing width & specification detail for each construction layer ● Include general arrangement drawings showing site location, the position on the site, means of access to the site, floor plan, elevation and section. Contract Drawings Formal agreement between the buying organisation and the supplier setting out what services and products the supplier is contracted to deliver and within the timeline and contract price.
  • 27. Annotations of measurements, colors, and materials, was appended to the contract.
  • 28. 4 Stages of BQ Preparation: Taking Off Squaring Abstracting Billing Billing Direct
  • 29. BQ Preparation Development Drawing Dimension Paper Billing Paper Bill Of Quantity Taking Off Squaring Direct Billing Measurement of Quantities
  • 30. When a 3D model is complete with specifications, the bill of Quantities is able to be compiled instantaneously. Bills of Quantity: The bill of Quantity is a report ready by the expense expert (frequently an quantity surveyor) ● gives particular measured amounts of the things of work recognized by the tender drawings and particulars in the delicate documents. ● The amounts is measured in number, length, zone, volume, weight or time. ● Requires the specific design and specifications that has been completely prepared.
  • 31. Revit : BIM ● BIM(Building information model) ● Software used by QS to count and calculate the material directly by using example of design/build firm that uses an API(application programming interface) from Revit Autodesk. ● Time, expense, and sustainability are crucial in today's construction industry. Books ● Malaysia Standard Method of Measurement 2nd edition(SMM 2) ● Contains specification, measurement, and describing the materials. ● As reference.
  • 32. >>> Bill and list of Materials
  • 33. Reference; ➔ http://ukurbahan-qs.blogspot.com/2010/10/current-roles-and-responsibilities-of.html ➔ http://www.symm.co.uk/wp-content/uploads/2011/06/0410-CTH-ATM3-April10.pdf ➔ http://www.tes.co.uk/article.aspx?storycode=9839 ➔ http://www.typesofengineers.org/types-of-engineers/ ➔ http://www.rics.org/my/footer/glossary/quantity-surveying/ ➔ http://drawing-materials.net/contractdr.html ➔ http://www.designingbuildings.co.uk/wiki/Bill_of_quantities ➔ https://www.bqsm.gov.my/index.php/en/?option=com_content&view=article&id=176&Itemid=572 ➔ http://rism.org.my/ContentPages/QS%20Division%20Background.aspx ➔ http://www.bayt.com/en/job/quantity-surveyor-estimator-pre-%26-post-contract-in-qatar-1791085/ ➔ http://www.careersinconstruction.com/article/the-role-of-a-quantity-surveyor/ ➔ http://www.cadalyst.com/cad/building-design/1-2-3-revit-bim-and-cost-estimating-part-2-3384 ➔ http://www.suranga.net/publications/2013_bim_qto_automation.pdf ➔ http://www.scribd.com/doc/27917455/BQ-and-Preparation-of-BQ ➔ http://www.electrical-knowhow.com/2011/12/contract-construction-drawings.html ➔ http://www.answers.com/Q/What_is_the_difference_between_tender_and_contract_drawing ➔ Ivor H.Seeley(1997)Quantity surveying practice, London : Macmillan Press LTD ➔ Construction Quantity Surveying