NED UNIVERSITY OF ENGINEERING AND TECHNOLOGY
PLANING/PRE-PLANING PHASE
DESIGN PHASE
PRE-CONSTRUCTUCTION
CONSTRUCTION PHASE
POST CONSTRUCTION/CLOSE OUT
PHASE
 CLIENT
 CONSULTANT
 CONTRUCTOR
 CLIENT IS AN IMPORTANT PERSON IN
CONSTRUCTION
 CLIENT IS THE ONE WHO INVEST MONEY
 CLIENT IS THE ONE WHO OWN THE PROJECT
 CLIENT LOOK AFTER PROJECT FROM STARTING TO
END
 CONSULTANT IS A PROFESSIONAL WHO PROVIDE
PROFESSIONAL OR EXPERT ADVICE
 CLIENT CONTACT WITH CONSULTANT DIRECTLY FOR
HIS/HER PROJECT.
 CONSULTANT IS A CONNECTING ROPE BETWEEN
CLIENT AND CONTRACTOR.
 CONSULTANT PREPARE DRAWINGS, DOCUMENTS AND
SPECIFICATIONS
 CONTRACTOR IS AN EXPERT OR PROFESSIONAL IN
CONSTRUCTION PROCESS WHO PLAY A LEADING ROLE
DURING CONSTRUCTION.
 CONTRACTOR IS IN DIRECT CONTACT WITH
CONSULTANT.
 CONTRACTOR COME INTO PLAY FROM THE INTIAL
STAGE UPTO THE LAST STAGE.
 CONTRACTOR CAN BE SOMETIMES CONSULTANT ALSO.
CLIENT
• IDEA
CONSULTANT
• DOCUMENTS
• DRAWINGS
• TENDER
NOTICE
CONTRACTOR
• PRIME
CONTRACTOR
• SUB
CONTRACTOR
PLANNING
 ANY CONSTRUCTION PROJECT STARTS WITH THE
DESIRE OF CLIENT/OWNER.
 MASTER PLAN CREATE AND SIGNED OFF BY
OWNER.
 MASTER PLAN INCLUDE FUNCTION, SIZE,
ECONOMIC REQUIREMENT OF PROJECT, ALSO
INCLUDE TIME DURATION AND ECONOMIC
FEASIBILITY (PROJECT BUDGET AND FINANCING).
 SITE SELECTION.
 CLIENT CONTACT CONSULTANT FOR DESIGNING
OF THE PROJECT.
 ARCHITECT/ENGINEER TAKES THE LEAD IN
DESIGN.
 ARCHITECT DESIGN 2D AND 3D DRAWINGS AND
SPECIFICATIONS OF THE PROJECT.
 HERE ARCHITECT PREPARES BILL OF QUANTITY.
 CONSTRUCTION PROCESS INITIATE WITH THE
AWARDING OF PROJECT TO THE CONTRACTOR.
 CONTRACTOR IN THIS PHASE IS A KEY PLAYER.
 CONSTRUCTION PROCESS CARRY ON UNLESS
THE HANDLING OF PROJECT TO OWNER.
 BIM is essentially "the process of generating and managing
information about a building during its entire life cycle".
“BIDDING IS AN OFFER (OFTEN COMPETITIVE) OF
SETTING A PRICE ONE IS WILLING TO PAY FOR
SOMETHING OR A DEMAND THAT SOMETHING BE
DONE. A PRICE OFFER IS CALLED A BID.”
 BOND
A TYPE OF SURETY BOND USED BY
INVESTORS IN CONSTRUCTION PROJECTS TO
PROTECT AGAINST AN ADVERSE EVENT THAT
CAUSES DISRUPTIONS, FAILURE TO
COMPLETE THE PROJECT DUE TO
INSOLVENCY OF THE BUILDER(S), OR THE
JOB'S FAILURE TO MEET CONTRACT
SPECIFICATIONS.
BID-BOND
SECURITY BOND
EARNEST MONEY
 BOQ
A BILL OF QUANTITIES (BOQ) IS A DOCUMENT USED
IN TENDERING IN THE CONSTRUCTION INDUSTRY IN
WHICH MATERIALS, PARTS, AND LABOR (AND THEIR
COSTS) ARE ITEMIZED.
 QUALITY ASSURANCE
ASSURANCE OF QUALITY OF MATERIAL ETC BY
SUPPLIER.
 CONTRACT
CONSTRUCTION CONTRACT IS SIMPLY MUTUAL
OR LEGALLY BINDING AGREEMENT BETWEEN
TWO PARTIES BASED ON CERTAIN POLICIES AND
CONDITIONS GENERALLY RECORDED IN
DOCUMENTATION FORM. THE TWO PARTIES
INVOLVED ARE OWNER AND CONTRACTOR.
 AN INVITATION IS BEING SEND TO THE BIDDERS IN
THE FORM OF TENDER NOTICE EITHER BY THE
SENDING AN INVITATION LETTER OR BY GIVING AN
ADVERTISEMENT IN THE NEWS PAPER OR ON THE
WEBSITE.
 THE INTERESTED BIDDERS MUST NEED TO DEPOSIT
SOME MONEY IN ORDER TO TAKE THE VOLUMES
FROM THE CLIENT OR CONSULTANT. THIS MONEY IS
USUALLY 25000 Rupees.
 NORMALLY PEC HAS 3 VOLUMES FOR BOQ.
 VOLUME 1
 VOLUME 2
 VOLUME 3
 BUT SOME FIRM USES VOLUME 4 AS WELL.
 VOLUME 4
 CONDITION OF CONTRACT
 INVITATION LETTER
 INSTRUCTION TO BIDDER
 BIDDING DATA
 IT HAS DIFFERENT APPENDIX'S AND APPENDIX D
IS OF BOQ.
 GCC IS ALSO THE PART OF V₁.
 TECHNICAL SPECIFICATIONS
 MATERIAL
 SOIL REPORT
 SECTION DETAIL
 DRAWINGS
 ARCHITECTURAL DRAWINGS
 STRUCTURAL DRAWINGS
 IT HAS EHS (ENVIRONMENTAL HEALTH SAFETY)
GUIDELINES
 WORK PERMIT SYSTEM
 PI (PROJECT INSTRUCTION)
 USUALLY THE LOWEST RESPONSIBLE BIDDER IS
AWARDED THE PROJECT.
NOC: NOC MEANS NO OBJECTION
CERTIFICATE. AN NOC DATE IS GIVEN TO THE
CONTRACTOR WHICH MEANS HE HAVE TO
START HIS WORK UPON THE NOC DATE.
 ACTING AS THE OWNER'S
REPRESENTATIVE OR AGENT
 PROJECT PLANNING AND
RECOMMENDATIONS ON PROJECT
DELIVERY
 CONSTRUCTABILITY REVIEWS
 VALUE ENGINEERING
 DEVELOPING SCHEDULES
 ESTABLISHING WORKING BUDGETS
 CONSULTING ON DESIGN, UTILITY AND
BUILDING COSTS
 REVIEWING CONTRACTOR
QUALIFICATIONS
 MONITORING CONTRACTOR AND
DESIGN TEAM PERFORMANCE
 CONSTRUCTION PHASE SERVICES
 QUALITY CONTROL
 LITIGATION SUPPORT
 CONTRACTOR IS RESPONSIBLE FOR
PROVIDING ALL OF THE MATERIAL, LABOR,
EQUIPMENT (SUCH AS ENGINEERING
VEHICLES AND TOOLS) AND SERVICES
NECESSARY FOR THE CONSTRUCTION OF THE
PROJECT.
 GENERAL CONTRACTOR HIRES
SPECIALIZED SUBCONTRACTORS TO PERFORM ALL
OR PORTIONS OF THE CONSTRUCTION WORK.
 HEALTH AND SAFETY
 RESPONSIBILITIES MAY INCLUDE APPLYING
FOR
 BUILDING PERMITS.
 SECURING THE PROPERTY.
 PROVIDING TEMPORARY UTILITIES ON SITE.
 MANAGING PERSONNEL ON SITE.
 PROVIDING SITE SURVEYING AND ENGINEERING.
 DISPOSING OR RECYCLING OF CONSTRUCTION
WASTE.
 MONITORING SCHEDULES AND CASH FLOWS.
 MAINTAINING ACCURATE RECORDS.
 A joint venture (JV) is a business agreement in which
the parties agree to develop, for a finite time, a new entity
and new assets by contributing equity.
 They exercise control over the enterprise and consequently
share revenues, expenses and assets.
 when two or more persons come together to form
a temporary partnership for the purpose of carrying out
a particular project, such partnership can also be called a
joint venture where the parties are "co-venturers".
Topographic survey:
It helps to locate the NSL with the MSL reference
Clearing and grubbing:
Clearing and grubbing process occur on the Natural Surface Level
(NSL) then to achieve NGL(Natural Ground Level) the compaction
of NSL is carried out.
FDT:
Field density test of the soil is then took place which is the
compaction of embankment layers and this test is done for each layer
separately.
Problems face by the contractor
during construction:
There might be a number of problems e.g.
•Strikes
•Shortage of fuel
•Equipment’s failure
•Weather conditions
•Any mishap on field
The contractor must need to report the consultant in case of any
work delay.
Project Inspector:
Meanwhile, member of the consultant always remain on site for the
quality assurance and monitoring of safety factors. The QA/QC and
EHS are also the contractor’s responsibility .Before the starting of
any new work the contractor is bound to have a consultant’s sign on
the check request. Without his permission no work can be started
on the field. He only signs the check request after all the test results
comes positive and when he is completely satisfied by the
contractor’s work.
The IPC Reports:
There might be a number of IPC reports. IPC stands for In-
term Payment Certificate. It’s the demand of money by the
contractor to the client after the completion of the amount of
work mentioned in the contract.
• Substantial completion
• Once the project is sufficiently complete, the contractor will ask
the architect to conduct a substantial completion inspection to
confirm that the work is complete in most respects.
• Contractor implies that the work is complete enough for the owner
to occupy the facility and start using it, even though there might be
cosmetic and minor work yet to be completed.
• Punch list
• List of incomplete portions of the work (to be completed)
• The punch list, which is prepared by the contractor, is used by the
engineer as a checklist to review all work, not merely the incomplete
portions of the work.
Post-Construction (Project
Closeout) Phase:
• Certificate of final completion:
• After the contractor carries out all the corrective work
identified during the substantial completion inspection and so
informs the architect, the architect (with the assistance of the
consultants) carries out the final inspection of the project.
• If the final inspection passes, certification for final payment is
issued by the architect, which entitles the contractor to receive
the final payment from the owner.
Record documents (As‐built documents)):
• Minor changes are often made during the construction of a
project.
• Changes must be recorded for the benefit of the owner should
the owner wish to alter or expand the building in the future.
Construction phases
Construction phases

More Related Content

What's hot

Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
AYM1979
 
Construction Documents
Construction DocumentsConstruction Documents
Construction Documents
Allan Berry
 

What's hot (20)

Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 
Bills of quantities
Bills of quantitiesBills of quantities
Bills of quantities
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
 
Construction Cost Control
Construction Cost ControlConstruction Cost Control
Construction Cost Control
 
Construction technology presentation
Construction technology presentationConstruction technology presentation
Construction technology presentation
 
Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction Management
 
Tenders and procedure of tendering
Tenders and procedure of tenderingTenders and procedure of tendering
Tenders and procedure of tendering
 
Construction contract
Construction contract Construction contract
Construction contract
 
Construction Documents
Construction DocumentsConstruction Documents
Construction Documents
 
Specification writing-I
Specification writing-ISpecification writing-I
Specification writing-I
 
Building project presentation
Building project presentationBuilding project presentation
Building project presentation
 
Introduction-construction management_Construction Management (2180611) (Semes...
Introduction-construction management_Construction Management (2180611) (Semes...Introduction-construction management_Construction Management (2180611) (Semes...
Introduction-construction management_Construction Management (2180611) (Semes...
 
Construction Project management
Construction Project management Construction Project management
Construction Project management
 
Construction planning & management
Construction planning & managementConstruction planning & management
Construction planning & management
 
Conditions of CPWD contract in INDIA
Conditions of CPWD contract in INDIAConditions of CPWD contract in INDIA
Conditions of CPWD contract in INDIA
 
Construction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project ManagementConstruction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project Management
 
Site organization in Construction
Site organization in ConstructionSite organization in Construction
Site organization in Construction
 
What is construction management & its Benefits?
What is construction management & its Benefits?What is construction management & its Benefits?
What is construction management & its Benefits?
 
Civil Engineering Measurment
Civil Engineering MeasurmentCivil Engineering Measurment
Civil Engineering Measurment
 
Procurement in construction
Procurement in constructionProcurement in construction
Procurement in construction
 

Viewers also liked

Construction Phase Mgmt Srvcs (2)
Construction Phase Mgmt Srvcs (2)Construction Phase Mgmt Srvcs (2)
Construction Phase Mgmt Srvcs (2)
Lee Maserian R.D.I.
 
Adb procurement guidelines icb-b1
Adb procurement guidelines   icb-b1Adb procurement guidelines   icb-b1
Adb procurement guidelines icb-b1
Joy Irman
 
Ankur Sood-Instrument engineer
Ankur Sood-Instrument engineerAnkur Sood-Instrument engineer
Ankur Sood-Instrument engineer
ankur sood
 
Procurment Management
Procurment ManagementProcurment Management
Procurment Management
wellanet
 
SMM7 Bill of Quantities
SMM7 Bill of QuantitiesSMM7 Bill of Quantities
SMM7 Bill of Quantities
Natalie Reid
 

Viewers also liked (19)

Construction Phase Mgmt Srvcs (2)
Construction Phase Mgmt Srvcs (2)Construction Phase Mgmt Srvcs (2)
Construction Phase Mgmt Srvcs (2)
 
Construction Management Services
Construction Management ServicesConstruction Management Services
Construction Management Services
 
Adb procurement guidelines icb-b1
Adb procurement guidelines   icb-b1Adb procurement guidelines   icb-b1
Adb procurement guidelines icb-b1
 
Ankur Sood-Instrument engineer
Ankur Sood-Instrument engineerAnkur Sood-Instrument engineer
Ankur Sood-Instrument engineer
 
CV of Viswanathan KK
CV of Viswanathan KKCV of Viswanathan KK
CV of Viswanathan KK
 
Mouneer ALjebn CV
Mouneer ALjebn CVMouneer ALjebn CV
Mouneer ALjebn CV
 
5 phases of project management
5 phases of project management5 phases of project management
5 phases of project management
 
Procurment Management
Procurment ManagementProcurment Management
Procurment Management
 
Epc presentation robert foxpresentation
Epc presentation robert foxpresentationEpc presentation robert foxpresentation
Epc presentation robert foxpresentation
 
5 phases of project management
5 phases of project management5 phases of project management
5 phases of project management
 
Project Procurment Management
Project Procurment ManagementProject Procurment Management
Project Procurment Management
 
Class 42 control valves - valve positioners, cavitation and flashing
Class 42   control valves - valve positioners, cavitation and flashingClass 42   control valves - valve positioners, cavitation and flashing
Class 42 control valves - valve positioners, cavitation and flashing
 
Class 37 inferential control, gain scheduling
Class 37   inferential control, gain schedulingClass 37   inferential control, gain scheduling
Class 37 inferential control, gain scheduling
 
Phases of a Project
Phases of a ProjectPhases of a Project
Phases of a Project
 
Types of contracts
Types of contractsTypes of contracts
Types of contracts
 
Bill Of Quantities
Bill Of QuantitiesBill Of Quantities
Bill Of Quantities
 
Structure engineers and green building
Structure engineers and green buildingStructure engineers and green building
Structure engineers and green building
 
SMM7 Bill of Quantities
SMM7 Bill of QuantitiesSMM7 Bill of Quantities
SMM7 Bill of Quantities
 
80 instrumentation interview questions with answers
80 instrumentation interview questions with answers80 instrumentation interview questions with answers
80 instrumentation interview questions with answers
 

Similar to Construction phases

Rev207 matrixexcelfile
Rev207 matrixexcelfileRev207 matrixexcelfile
Rev207 matrixexcelfile
jbonvier
 
Sxsw 2011 construction enviroment
Sxsw 2011 construction enviromentSxsw 2011 construction enviroment
Sxsw 2011 construction enviroment
juwes
 
Construction Management Jump StartChapter 5Project Sta.docx
Construction Management Jump StartChapter 5Project Sta.docxConstruction Management Jump StartChapter 5Project Sta.docx
Construction Management Jump StartChapter 5Project Sta.docx
melvinjrobinson2199
 
4. offer tendering - site
4. offer   tendering - site4. offer   tendering - site
4. offer tendering - site
Abdulaziz Kaya
 
Royce_Brown Resume-82115
Royce_Brown Resume-82115Royce_Brown Resume-82115
Royce_Brown Resume-82115
Royce Brown
 

Similar to Construction phases (20)

MODULE 5.pptx
MODULE 5.pptxMODULE 5.pptx
MODULE 5.pptx
 
Rev207 matrixexcelfile
Rev207 matrixexcelfileRev207 matrixexcelfile
Rev207 matrixexcelfile
 
Sxsw 2011 construction enviroment
Sxsw 2011 construction enviromentSxsw 2011 construction enviroment
Sxsw 2011 construction enviroment
 
The Architecture Profession
The Architecture ProfessionThe Architecture Profession
The Architecture Profession
 
Construction Management Jump StartChapter 5Project Sta.docx
Construction Management Jump StartChapter 5Project Sta.docxConstruction Management Jump StartChapter 5Project Sta.docx
Construction Management Jump StartChapter 5Project Sta.docx
 
4. offer tendering - site
4. offer   tendering - site4. offer   tendering - site
4. offer tendering - site
 
TURNKEY PROJECT.pptx
TURNKEY PROJECT.pptxTURNKEY PROJECT.pptx
TURNKEY PROJECT.pptx
 
Matrix207
Matrix207Matrix207
Matrix207
 
QUANTITY SURVEYING
QUANTITY SURVEYINGQUANTITY SURVEYING
QUANTITY SURVEYING
 
Project Phase, Project Teams & Construction Phase.pdf
Project Phase, Project Teams & Construction Phase.pdfProject Phase, Project Teams & Construction Phase.pdf
Project Phase, Project Teams & Construction Phase.pdf
 
landscape
landscapelandscape
landscape
 
ESTIMATING.pdf
ESTIMATING.pdfESTIMATING.pdf
ESTIMATING.pdf
 
Qsx
QsxQsx
Qsx
 
Qs(ici&itd)
Qs(ici&itd)Qs(ici&itd)
Qs(ici&itd)
 
Royce_Brown Resume-82115
Royce_Brown Resume-82115Royce_Brown Resume-82115
Royce_Brown Resume-82115
 
QSS
QSSQSS
QSS
 
Qs(ici&itd) (1)
Qs(ici&itd) (1)Qs(ici&itd) (1)
Qs(ici&itd) (1)
 
Qs(ici&itd)
Qs(ici&itd)Qs(ici&itd)
Qs(ici&itd)
 
Chapter 1 [compatibility mode]
Chapter 1 [compatibility mode]Chapter 1 [compatibility mode]
Chapter 1 [compatibility mode]
 
Chapter 1 [compatibility mode]
Chapter 1 [compatibility mode]Chapter 1 [compatibility mode]
Chapter 1 [compatibility mode]
 

More from Meesum Zaidi

Effect Of Lightweight Blocks On High Rise Commercial & Residential Building W...
Effect Of Lightweight Blocks On High Rise Commercial & Residential Building W...Effect Of Lightweight Blocks On High Rise Commercial & Residential Building W...
Effect Of Lightweight Blocks On High Rise Commercial & Residential Building W...
Meesum Zaidi
 

More from Meesum Zaidi (10)

Effect Of Lightweight Blocks On High Rise Commercial & Residential Building W...
Effect Of Lightweight Blocks On High Rise Commercial & Residential Building W...Effect Of Lightweight Blocks On High Rise Commercial & Residential Building W...
Effect Of Lightweight Blocks On High Rise Commercial & Residential Building W...
 
Soil Classification
Soil ClassificationSoil Classification
Soil Classification
 
Physics 10th(freebooks.pk)
Physics 10th(freebooks.pk)Physics 10th(freebooks.pk)
Physics 10th(freebooks.pk)
 
Aci reinforcement limits
Aci reinforcement limitsAci reinforcement limits
Aci reinforcement limits
 
Stream flow
Stream flow Stream flow
Stream flow
 
SEAPAGE
SEAPAGESEAPAGE
SEAPAGE
 
Air pollution in lahore slideshare
Air pollution in lahore slideshareAir pollution in lahore slideshare
Air pollution in lahore slideshare
 
Built operate transfer case studies in local construction Sector in Pakistan
Built operate transfer case studies in local construction Sector in PakistanBuilt operate transfer case studies in local construction Sector in Pakistan
Built operate transfer case studies in local construction Sector in Pakistan
 
Surfer
SurferSurfer
Surfer
 
Concrete
ConcreteConcrete
Concrete
 

Recently uploaded

scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
HenryBriggs2
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
Health
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 

Recently uploaded (20)

scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdf
 

Construction phases

  • 1. NED UNIVERSITY OF ENGINEERING AND TECHNOLOGY
  • 2.
  • 3.
  • 6.  CLIENT IS AN IMPORTANT PERSON IN CONSTRUCTION  CLIENT IS THE ONE WHO INVEST MONEY  CLIENT IS THE ONE WHO OWN THE PROJECT  CLIENT LOOK AFTER PROJECT FROM STARTING TO END
  • 7.  CONSULTANT IS A PROFESSIONAL WHO PROVIDE PROFESSIONAL OR EXPERT ADVICE  CLIENT CONTACT WITH CONSULTANT DIRECTLY FOR HIS/HER PROJECT.  CONSULTANT IS A CONNECTING ROPE BETWEEN CLIENT AND CONTRACTOR.  CONSULTANT PREPARE DRAWINGS, DOCUMENTS AND SPECIFICATIONS
  • 8.  CONTRACTOR IS AN EXPERT OR PROFESSIONAL IN CONSTRUCTION PROCESS WHO PLAY A LEADING ROLE DURING CONSTRUCTION.  CONTRACTOR IS IN DIRECT CONTACT WITH CONSULTANT.  CONTRACTOR COME INTO PLAY FROM THE INTIAL STAGE UPTO THE LAST STAGE.  CONTRACTOR CAN BE SOMETIMES CONSULTANT ALSO.
  • 9. CLIENT • IDEA CONSULTANT • DOCUMENTS • DRAWINGS • TENDER NOTICE CONTRACTOR • PRIME CONTRACTOR • SUB CONTRACTOR
  • 10. PLANNING  ANY CONSTRUCTION PROJECT STARTS WITH THE DESIRE OF CLIENT/OWNER.  MASTER PLAN CREATE AND SIGNED OFF BY OWNER.
  • 11.  MASTER PLAN INCLUDE FUNCTION, SIZE, ECONOMIC REQUIREMENT OF PROJECT, ALSO INCLUDE TIME DURATION AND ECONOMIC FEASIBILITY (PROJECT BUDGET AND FINANCING).  SITE SELECTION.
  • 12.
  • 13.  CLIENT CONTACT CONSULTANT FOR DESIGNING OF THE PROJECT.  ARCHITECT/ENGINEER TAKES THE LEAD IN DESIGN.  ARCHITECT DESIGN 2D AND 3D DRAWINGS AND SPECIFICATIONS OF THE PROJECT.  HERE ARCHITECT PREPARES BILL OF QUANTITY.
  • 14.  CONSTRUCTION PROCESS INITIATE WITH THE AWARDING OF PROJECT TO THE CONTRACTOR.  CONTRACTOR IN THIS PHASE IS A KEY PLAYER.  CONSTRUCTION PROCESS CARRY ON UNLESS THE HANDLING OF PROJECT TO OWNER.
  • 15.  BIM is essentially "the process of generating and managing information about a building during its entire life cycle".
  • 16.
  • 17. “BIDDING IS AN OFFER (OFTEN COMPETITIVE) OF SETTING A PRICE ONE IS WILLING TO PAY FOR SOMETHING OR A DEMAND THAT SOMETHING BE DONE. A PRICE OFFER IS CALLED A BID.”
  • 18.  BOND A TYPE OF SURETY BOND USED BY INVESTORS IN CONSTRUCTION PROJECTS TO PROTECT AGAINST AN ADVERSE EVENT THAT CAUSES DISRUPTIONS, FAILURE TO COMPLETE THE PROJECT DUE TO INSOLVENCY OF THE BUILDER(S), OR THE JOB'S FAILURE TO MEET CONTRACT SPECIFICATIONS.
  • 20.  BOQ A BILL OF QUANTITIES (BOQ) IS A DOCUMENT USED IN TENDERING IN THE CONSTRUCTION INDUSTRY IN WHICH MATERIALS, PARTS, AND LABOR (AND THEIR COSTS) ARE ITEMIZED.
  • 21.  QUALITY ASSURANCE ASSURANCE OF QUALITY OF MATERIAL ETC BY SUPPLIER.  CONTRACT CONSTRUCTION CONTRACT IS SIMPLY MUTUAL OR LEGALLY BINDING AGREEMENT BETWEEN TWO PARTIES BASED ON CERTAIN POLICIES AND CONDITIONS GENERALLY RECORDED IN DOCUMENTATION FORM. THE TWO PARTIES INVOLVED ARE OWNER AND CONTRACTOR.
  • 22.
  • 23.
  • 24.  AN INVITATION IS BEING SEND TO THE BIDDERS IN THE FORM OF TENDER NOTICE EITHER BY THE SENDING AN INVITATION LETTER OR BY GIVING AN ADVERTISEMENT IN THE NEWS PAPER OR ON THE WEBSITE.  THE INTERESTED BIDDERS MUST NEED TO DEPOSIT SOME MONEY IN ORDER TO TAKE THE VOLUMES FROM THE CLIENT OR CONSULTANT. THIS MONEY IS USUALLY 25000 Rupees.
  • 25.  NORMALLY PEC HAS 3 VOLUMES FOR BOQ.  VOLUME 1  VOLUME 2  VOLUME 3  BUT SOME FIRM USES VOLUME 4 AS WELL.  VOLUME 4
  • 26.  CONDITION OF CONTRACT  INVITATION LETTER  INSTRUCTION TO BIDDER  BIDDING DATA  IT HAS DIFFERENT APPENDIX'S AND APPENDIX D IS OF BOQ.  GCC IS ALSO THE PART OF V₁.
  • 27.  TECHNICAL SPECIFICATIONS  MATERIAL  SOIL REPORT  SECTION DETAIL
  • 28.  DRAWINGS  ARCHITECTURAL DRAWINGS  STRUCTURAL DRAWINGS
  • 29.  IT HAS EHS (ENVIRONMENTAL HEALTH SAFETY) GUIDELINES  WORK PERMIT SYSTEM  PI (PROJECT INSTRUCTION)
  • 30.  USUALLY THE LOWEST RESPONSIBLE BIDDER IS AWARDED THE PROJECT. NOC: NOC MEANS NO OBJECTION CERTIFICATE. AN NOC DATE IS GIVEN TO THE CONTRACTOR WHICH MEANS HE HAVE TO START HIS WORK UPON THE NOC DATE.
  • 31.
  • 32.  ACTING AS THE OWNER'S REPRESENTATIVE OR AGENT  PROJECT PLANNING AND RECOMMENDATIONS ON PROJECT DELIVERY  CONSTRUCTABILITY REVIEWS  VALUE ENGINEERING  DEVELOPING SCHEDULES
  • 33.
  • 34.  ESTABLISHING WORKING BUDGETS  CONSULTING ON DESIGN, UTILITY AND BUILDING COSTS  REVIEWING CONTRACTOR QUALIFICATIONS  MONITORING CONTRACTOR AND DESIGN TEAM PERFORMANCE  CONSTRUCTION PHASE SERVICES  QUALITY CONTROL  LITIGATION SUPPORT
  • 35.
  • 36.  CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL OF THE MATERIAL, LABOR, EQUIPMENT (SUCH AS ENGINEERING VEHICLES AND TOOLS) AND SERVICES NECESSARY FOR THE CONSTRUCTION OF THE PROJECT.
  • 37.  GENERAL CONTRACTOR HIRES SPECIALIZED SUBCONTRACTORS TO PERFORM ALL OR PORTIONS OF THE CONSTRUCTION WORK.  HEALTH AND SAFETY
  • 38.  RESPONSIBILITIES MAY INCLUDE APPLYING FOR  BUILDING PERMITS.  SECURING THE PROPERTY.  PROVIDING TEMPORARY UTILITIES ON SITE.  MANAGING PERSONNEL ON SITE.
  • 39.  PROVIDING SITE SURVEYING AND ENGINEERING.  DISPOSING OR RECYCLING OF CONSTRUCTION WASTE.  MONITORING SCHEDULES AND CASH FLOWS.  MAINTAINING ACCURATE RECORDS.
  • 40.  A joint venture (JV) is a business agreement in which the parties agree to develop, for a finite time, a new entity and new assets by contributing equity.  They exercise control over the enterprise and consequently share revenues, expenses and assets.  when two or more persons come together to form a temporary partnership for the purpose of carrying out a particular project, such partnership can also be called a joint venture where the parties are "co-venturers".
  • 41. Topographic survey: It helps to locate the NSL with the MSL reference Clearing and grubbing: Clearing and grubbing process occur on the Natural Surface Level (NSL) then to achieve NGL(Natural Ground Level) the compaction of NSL is carried out. FDT: Field density test of the soil is then took place which is the compaction of embankment layers and this test is done for each layer separately.
  • 42. Problems face by the contractor during construction: There might be a number of problems e.g. •Strikes •Shortage of fuel •Equipment’s failure •Weather conditions •Any mishap on field The contractor must need to report the consultant in case of any work delay.
  • 43. Project Inspector: Meanwhile, member of the consultant always remain on site for the quality assurance and monitoring of safety factors. The QA/QC and EHS are also the contractor’s responsibility .Before the starting of any new work the contractor is bound to have a consultant’s sign on the check request. Without his permission no work can be started on the field. He only signs the check request after all the test results comes positive and when he is completely satisfied by the contractor’s work. The IPC Reports: There might be a number of IPC reports. IPC stands for In- term Payment Certificate. It’s the demand of money by the contractor to the client after the completion of the amount of work mentioned in the contract.
  • 44. • Substantial completion • Once the project is sufficiently complete, the contractor will ask the architect to conduct a substantial completion inspection to confirm that the work is complete in most respects. • Contractor implies that the work is complete enough for the owner to occupy the facility and start using it, even though there might be cosmetic and minor work yet to be completed. • Punch list • List of incomplete portions of the work (to be completed) • The punch list, which is prepared by the contractor, is used by the engineer as a checklist to review all work, not merely the incomplete portions of the work.
  • 45. Post-Construction (Project Closeout) Phase: • Certificate of final completion: • After the contractor carries out all the corrective work identified during the substantial completion inspection and so informs the architect, the architect (with the assistance of the consultants) carries out the final inspection of the project. • If the final inspection passes, certification for final payment is issued by the architect, which entitles the contractor to receive the final payment from the owner.
  • 46. Record documents (As‐built documents)): • Minor changes are often made during the construction of a project. • Changes must be recorded for the benefit of the owner should the owner wish to alter or expand the building in the future.

Editor's Notes

  1. GCC is also the part of V₁ but is not provided to bidder because every 1 has its own GCC copy… no one can change or overwrite it. In order to customize the GCC, PCC forms on the same format as GCC.