Environmental Legislation in India
• The Water (Prevention and Control of Pollution) Act, 1974
• The Air (Prevention and Control of Pollution) Act, 1981
• The Environment (Protection) Act, 1986
• Hazardous Wastes (Management & Handling) Rules, 1989
• Bio-medical Wastes (Management & Handling) Rules, 1998
• Municipal Solid Wastes (Management & Handling) Rules, 2000
Environmental Legislation in India
• Environment Protection Act, 1986 (Section 15)
Growth in MSW Generation
• The MSW generation in India is expected
to increase from 62 million MT in 2012
to 436 million MT per annum in 2050 @
5% annual growth rate
• The per capita generation in India
0.42kg/day which is relatively lower than
the levels of 2kg/day of US
• increasing urbanization and income
levels would result in increase in per
capita generation in India
• 40% of India’s population by 2030 would
reside in urban areas compared to 31%
in 2011
Swachh Bharat Mission
Driving Factors for Private Sector’s Participation
PPP
Business
Model
Legal
Obligation
of ULB
Government
Funding
Demand for
Outputs
Availability
of Financing
Increasing
MSW
Quantities
Improving
Quality of
MSW
Components of MSW
Integrated
MSW
Management
Primary
Collection
Street
Sweeping &
Drain Cleaning
Secondary
Storage &
Transportation
Transfer
Station and
Tertiary
Transport
Processing
Disposal
Technology Options – MSW Processing
MSW Quantity,
TPD
Technology Options
>1100 • IWP comprising – Biomethanation +Composting+RDF
• W to E plant for power, based on: gasification , pyrolysis,
incineration and mass burning.
• RDF to cement industry
• Plastic to fuel oil
550 to 1100 • IWP comprising -Biomethanation +Composting+RDF
• W to E plant for power, where wastes exceeds 500 TPD
based on: gasification , pyrolysis, incineration and mass
burning.
• RDF to cement industry
• Plastic to fuel oil
30 to 550 • IWP-BM, CC + RDF as feed stock to power plant / cement
industry. Plastic to fuel oil
< 30 • Biomethanation +Composting
Challenges for ULBs
• Funds – Capital as well as O&M Expenditure
• Technical Expertise – Design, Estimates, Supervision, Monitoring,
Environmental Protection
• Commercial Competence – Project Feasibility
• Bid Process Management – Bid Documents and Evaluation of
proposals technically and financially
• Skilled Manpower – to take up O&M
• Availability of Land – Extent & Suitability of Land, Cost of Land and
NIMBY
• Business Approach – Mostly Capital Budget not Profit Centre
What PPP Partner Offers
• Private Partner brings in Investment/Capital/Finance, Technology,
Sector Expertise, Skilled Manpower
• Private Partner Manages the project for 5 – 30 years
• Improvement of service levels (mostly linked with payments)
• Compliances with statutory requirements
• Protection of Environment
• Professional planning, execution and operations
• Transparency in payments
• Stakeholders can also monitor performance of concessionaire
Implementation Options
Components Options
Primary Collection NGOs
Local resources
BOT
BOOT
BOO BOT
BOOT
BOO
DFBOOT
Secondary Collection &
Transportation
O&M
BOT
BOOT
BOO
Transfer Station & Tertiary
Transportation
O&M
BOT
BOOT
O&M
BOT
BOOT
Processing EPC
O&M
DFBOOT
DFBOOT DFBOOT
Disposal EPC
O&M
DFBOOT
Street Sweeping & Drain
Cleaning
Manpower
O&M
Process of Engaging Private Partner
Requirements Options
Identification of Suitable Land Own
Consultant
Both by
same
consultant
Works by
same
consultant
Entire work
by same
consultant
Environmental Clearance Consultant
Preparation of DPR Consultant Consultant
Transaction Advisory & Bid
Process Management
Consultant Consultant Consultant
Risks and Mitigations
• Well Drafted Concession Agreement
• Political will at the highest levelPolitical Risk
• Accurate forecasting
• Considering economic factors in assessing the
payments like WPI
Economic Risk
• Stakeholder Consultation
• Strict Monitoring
• Campaigning
• Compliance
Social Risk
• Phase wise Planning
• Selection of already demonstrated technology for the
quantity and quality of waste considered
• Modular in nature
Technological Risk
Requirements for Successful PPP in MSW
• Guaranteed quantity of waste
• Size of the project
• Practical DPR is required with correct assumptions & projections
and implementable solution(s)
• Implementable concession agreement
• Availability of encumbrance free land before bidding itself
• Obtain environmental clearance before / during bidding
• Right supervision and monitoring
• Applicable penalty clauses
• Measurable service level bench marks
• Timely payments
• Timely release of funds
• Selection of suitable partner
Key Factors for Success of PPP in MSW
• Political will to take up and support the project
• Clarity on purpose and objectives of privatization
• Transparency in Selection
• Selection of private Operator through professionals
• Strict Enforcement of statutory and environmental legislations
• Public acceptance for better services
• Healthy relationship between client and concessionaire
• Treat private Operator as a partner (Bedrock of PPP)
• Respect Concession Agreement – Bible of the project
• Timely payments
Independent Engineer
• Independently review, monitor and where required by the
Agreement, to approve activities associated with the Design,
Construction, Operation and Maintenance of the Project
Facilities to ensure compliance by the Concessionaire
• Report to the Parties on the various physical, technical and
financial aspects of the Project based on inspections, site visits
and Tests
• Measures performance of the project at every stages
• Assist the Parties in arriving at an amicable settlement of
disputes, should the need arise
• Review matters related to safety and environment
management measures adopted by the Concessionaire for the
Project
Thank You

More Related Content

What's hot

Solid Waste Management
Solid Waste ManagementSolid Waste Management
Solid Waste Management
Anayat Ali
 
Muncipal Solid Waste Management
Muncipal Solid Waste ManagementMuncipal Solid Waste Management
Project report on municipal solid waste management
Project report on  municipal solid waste management Project report on  municipal solid waste management
Project report on municipal solid waste management
MDZAFARHASIB
 
Municipal Solid waste Management in INDIA
Municipal Solid waste Management in INDIAMunicipal Solid waste Management in INDIA
Municipal Solid waste Management in INDIA
Ravi Varma reddy
 
Effects of disposal of solids waste
Effects of disposal of solids wasteEffects of disposal of solids waste
Effects of disposal of solids waste
Aravind Aravind
 
Solid waste management
Solid waste managementSolid waste management
Solid waste management
Prasanna R Kovath
 
Design of sewage treatment plant 2
Design of sewage treatment plant 2Design of sewage treatment plant 2
Design of sewage treatment plant 2
Shekhar Roy
 
Ppt on hazardous waste management
Ppt on hazardous waste managementPpt on hazardous waste management
Ppt on hazardous waste management
pk333329
 
Landfill design and operation
Landfill design and operationLandfill design and operation
Landfill design and operation
arushe143
 
Urban waste management
Urban waste managementUrban waste management
Urban waste management
DrSridevi NH
 
Solid waste management
Solid waste managementSolid waste management
Solid waste management
Bibhabasu Mohanty
 
West water treatment
West water treatmentWest water treatment
West water treatment
Mohammed Inzamamuddin
 
Sewage Treatment Plant Design Project
Sewage  Treatment  Plant  Design  ProjectSewage  Treatment  Plant  Design  Project
Sewage Treatment Plant Design Project
Anoop Shrestha
 
Solid waste management by tarun choudhary
Solid waste management by tarun choudharySolid waste management by tarun choudhary
Solid waste management by tarun choudhary
Subham Goyal
 
Waste management
Waste management Waste management
Waste management
rajvishal2000
 
Properties of solid waste
Properties of solid wasteProperties of solid waste
Properties of solid waste
Aditya Jain
 
Solid waste - Environmental Health
Solid waste - Environmental Health  Solid waste - Environmental Health
Solid waste - Environmental Health
Bakr Younis /Al-Azhar University – Gaza
 
Practical Approach to Waste Management
Practical Approach to Waste ManagementPractical Approach to Waste Management
Practical Approach to Waste Management
EMEX
 
Solid waste management ppt
Solid waste management pptSolid waste management ppt
Solid waste management ppt
Siddhi Vakharia
 
construction and demolition waste management
construction and demolition waste managementconstruction and demolition waste management
construction and demolition waste management
Konark Mehra
 

What's hot (20)

Solid Waste Management
Solid Waste ManagementSolid Waste Management
Solid Waste Management
 
Muncipal Solid Waste Management
Muncipal Solid Waste ManagementMuncipal Solid Waste Management
Muncipal Solid Waste Management
 
Project report on municipal solid waste management
Project report on  municipal solid waste management Project report on  municipal solid waste management
Project report on municipal solid waste management
 
Municipal Solid waste Management in INDIA
Municipal Solid waste Management in INDIAMunicipal Solid waste Management in INDIA
Municipal Solid waste Management in INDIA
 
Effects of disposal of solids waste
Effects of disposal of solids wasteEffects of disposal of solids waste
Effects of disposal of solids waste
 
Solid waste management
Solid waste managementSolid waste management
Solid waste management
 
Design of sewage treatment plant 2
Design of sewage treatment plant 2Design of sewage treatment plant 2
Design of sewage treatment plant 2
 
Ppt on hazardous waste management
Ppt on hazardous waste managementPpt on hazardous waste management
Ppt on hazardous waste management
 
Landfill design and operation
Landfill design and operationLandfill design and operation
Landfill design and operation
 
Urban waste management
Urban waste managementUrban waste management
Urban waste management
 
Solid waste management
Solid waste managementSolid waste management
Solid waste management
 
West water treatment
West water treatmentWest water treatment
West water treatment
 
Sewage Treatment Plant Design Project
Sewage  Treatment  Plant  Design  ProjectSewage  Treatment  Plant  Design  Project
Sewage Treatment Plant Design Project
 
Solid waste management by tarun choudhary
Solid waste management by tarun choudharySolid waste management by tarun choudhary
Solid waste management by tarun choudhary
 
Waste management
Waste management Waste management
Waste management
 
Properties of solid waste
Properties of solid wasteProperties of solid waste
Properties of solid waste
 
Solid waste - Environmental Health
Solid waste - Environmental Health  Solid waste - Environmental Health
Solid waste - Environmental Health
 
Practical Approach to Waste Management
Practical Approach to Waste ManagementPractical Approach to Waste Management
Practical Approach to Waste Management
 
Solid waste management ppt
Solid waste management pptSolid waste management ppt
Solid waste management ppt
 
construction and demolition waste management
construction and demolition waste managementconstruction and demolition waste management
construction and demolition waste management
 

Viewers also liked

Master plan for Solid Waste Management in Mumbai, India
Master plan for Solid Waste Management in Mumbai, IndiaMaster plan for Solid Waste Management in Mumbai, India
Master plan for Solid Waste Management in Mumbai, India
Pratima Pandey
 
solid waste management
solid waste managementsolid waste management
solid waste management
Amit Nakli
 
Solid waste management ppt
Solid waste management pptSolid waste management ppt
Solid waste management ppt
Pallabi Priyadarsini
 
HRSC Techniques: High-Resolution Hydrogeologic Characterization
HRSC Techniques: High-Resolution Hydrogeologic CharacterizationHRSC Techniques: High-Resolution Hydrogeologic Characterization
HRSC Techniques: High-Resolution Hydrogeologic Characterization
ASC-HRSC
 
4 PPP lead municipal waste to biogas_Revised_Mahobul
4 PPP lead municipal waste to biogas_Revised_Mahobul4 PPP lead municipal waste to biogas_Revised_Mahobul
4 PPP lead municipal waste to biogas_Revised_Mahobul
Mahobul Islam Plabon
 
"waste to energy"
"waste to energy""waste to energy"
"waste to energy"
janbhi tripathy
 
Public private Partnership case study
Public private Partnership case studyPublic private Partnership case study
Public private Partnership case study
Rishabh Bhandari
 
Pro-poor public-private partnership (5Ps) by Hongpeng Liu, Chief of Energy Se...
Pro-poor public-private partnership (5Ps) by Hongpeng Liu, Chief of Energy Se...Pro-poor public-private partnership (5Ps) by Hongpeng Liu, Chief of Energy Se...
Pro-poor public-private partnership (5Ps) by Hongpeng Liu, Chief of Energy Se...
United Nations Office to Support the International Decade for Action 'Water for Life' 2005-2015
 
CLASE 2
CLASE 2CLASE 2
CLASE 2
cliovirtual
 
Solid waste management
Solid waste managementSolid waste management
Solid waste management
ranjeevsehrawatsingh
 
Presentation (Swm In India)
Presentation (Swm In India)Presentation (Swm In India)
Presentation (Swm In India)
zushy
 
SOLID WASTE MANAGEMENT THROUGH PUBLIC-PRIVATE PARTNERSHIP MODEL
SOLID WASTE MANAGEMENT THROUGH PUBLIC-PRIVATE PARTNERSHIP MODELSOLID WASTE MANAGEMENT THROUGH PUBLIC-PRIVATE PARTNERSHIP MODEL
SOLID WASTE MANAGEMENT THROUGH PUBLIC-PRIVATE PARTNERSHIP MODEL
IAEME Publication
 
Solid Waste Management System: A Study on Cox-Bazar Pourashava
Solid Waste Management System: A Study on Cox-Bazar PourashavaSolid Waste Management System: A Study on Cox-Bazar Pourashava
Solid Waste Management System: A Study on Cox-Bazar Pourashava
Kazi Mahfuzur Rahman
 
Solid waste management with animation
Solid waste management with animationSolid waste management with animation
Solid waste management with animation
Keshav Yadav
 
W2V India - Innovative technologies in solid waste management for Punjab
W2V India - Innovative technologies in solid waste management for PunjabW2V India - Innovative technologies in solid waste management for Punjab
W2V India - Innovative technologies in solid waste management for Punjab
w2vindia
 
Marpol
MarpolMarpol
Solid waste management
Solid waste managementSolid waste management
Solid waste management
Arnel Rivera
 
solid waste management garbage recycling waste water treatment specialized wa...
solid waste management garbage recycling waste water treatment specialized wa...solid waste management garbage recycling waste water treatment specialized wa...
solid waste management garbage recycling waste water treatment specialized wa...
ecoclean
 
Presentation Public Private Partnership (PPP)
Presentation Public Private Partnership (PPP) Presentation Public Private Partnership (PPP)
Presentation Public Private Partnership (PPP)
Khalid Rasulli
 
Municipal solid waste management in malaysia
Municipal solid waste management in malaysiaMunicipal solid waste management in malaysia
Municipal solid waste management in malaysia
Nurul Izyan
 

Viewers also liked (20)

Master plan for Solid Waste Management in Mumbai, India
Master plan for Solid Waste Management in Mumbai, IndiaMaster plan for Solid Waste Management in Mumbai, India
Master plan for Solid Waste Management in Mumbai, India
 
solid waste management
solid waste managementsolid waste management
solid waste management
 
Solid waste management ppt
Solid waste management pptSolid waste management ppt
Solid waste management ppt
 
HRSC Techniques: High-Resolution Hydrogeologic Characterization
HRSC Techniques: High-Resolution Hydrogeologic CharacterizationHRSC Techniques: High-Resolution Hydrogeologic Characterization
HRSC Techniques: High-Resolution Hydrogeologic Characterization
 
4 PPP lead municipal waste to biogas_Revised_Mahobul
4 PPP lead municipal waste to biogas_Revised_Mahobul4 PPP lead municipal waste to biogas_Revised_Mahobul
4 PPP lead municipal waste to biogas_Revised_Mahobul
 
"waste to energy"
"waste to energy""waste to energy"
"waste to energy"
 
Public private Partnership case study
Public private Partnership case studyPublic private Partnership case study
Public private Partnership case study
 
Pro-poor public-private partnership (5Ps) by Hongpeng Liu, Chief of Energy Se...
Pro-poor public-private partnership (5Ps) by Hongpeng Liu, Chief of Energy Se...Pro-poor public-private partnership (5Ps) by Hongpeng Liu, Chief of Energy Se...
Pro-poor public-private partnership (5Ps) by Hongpeng Liu, Chief of Energy Se...
 
CLASE 2
CLASE 2CLASE 2
CLASE 2
 
Solid waste management
Solid waste managementSolid waste management
Solid waste management
 
Presentation (Swm In India)
Presentation (Swm In India)Presentation (Swm In India)
Presentation (Swm In India)
 
SOLID WASTE MANAGEMENT THROUGH PUBLIC-PRIVATE PARTNERSHIP MODEL
SOLID WASTE MANAGEMENT THROUGH PUBLIC-PRIVATE PARTNERSHIP MODELSOLID WASTE MANAGEMENT THROUGH PUBLIC-PRIVATE PARTNERSHIP MODEL
SOLID WASTE MANAGEMENT THROUGH PUBLIC-PRIVATE PARTNERSHIP MODEL
 
Solid Waste Management System: A Study on Cox-Bazar Pourashava
Solid Waste Management System: A Study on Cox-Bazar PourashavaSolid Waste Management System: A Study on Cox-Bazar Pourashava
Solid Waste Management System: A Study on Cox-Bazar Pourashava
 
Solid waste management with animation
Solid waste management with animationSolid waste management with animation
Solid waste management with animation
 
W2V India - Innovative technologies in solid waste management for Punjab
W2V India - Innovative technologies in solid waste management for PunjabW2V India - Innovative technologies in solid waste management for Punjab
W2V India - Innovative technologies in solid waste management for Punjab
 
Marpol
MarpolMarpol
Marpol
 
Solid waste management
Solid waste managementSolid waste management
Solid waste management
 
solid waste management garbage recycling waste water treatment specialized wa...
solid waste management garbage recycling waste water treatment specialized wa...solid waste management garbage recycling waste water treatment specialized wa...
solid waste management garbage recycling waste water treatment specialized wa...
 
Presentation Public Private Partnership (PPP)
Presentation Public Private Partnership (PPP) Presentation Public Private Partnership (PPP)
Presentation Public Private Partnership (PPP)
 
Municipal solid waste management in malaysia
Municipal solid waste management in malaysiaMunicipal solid waste management in malaysia
Municipal solid waste management in malaysia
 

Similar to Public Private Partnership in Municipal Solid Waste Management in India

Guy Duke
Guy DukeGuy Duke
Getting AD Projects to a Financial Close
Getting AD Projects to a Financial CloseGetting AD Projects to a Financial Close
Getting AD Projects to a Financial Close
Iona Capital
 
introduction to public private partnership
introduction to public private partnershipintroduction to public private partnership
introduction to public private partnership
HayJirenyaa
 
CHINA MARKET OUTLOOK: CHINA EUROPE WATER PLATFORM BUSINESS PROGRAM
CHINA MARKET OUTLOOK: CHINA EUROPE WATER PLATFORM BUSINESS PROGRAMCHINA MARKET OUTLOOK: CHINA EUROPE WATER PLATFORM BUSINESS PROGRAM
CHINA MARKET OUTLOOK: CHINA EUROPE WATER PLATFORM BUSINESS PROGRAM
iQHub
 
Financial Model and Future Operations Plan - Business Case Submission 09
Financial Model and Future Operations Plan - Business Case Submission 09Financial Model and Future Operations Plan - Business Case Submission 09
Financial Model and Future Operations Plan - Business Case Submission 09
National Management Olympiad
 
Miramar commission mtg 3 20-12 solid waste disposal
Miramar commission mtg 3 20-12 solid waste disposal Miramar commission mtg 3 20-12 solid waste disposal
Miramar commission mtg 3 20-12 solid waste disposal
Sandy Gutner
 
Workshop to enhance Pro-poor Policy Formulation and Implementation at Country...
Workshop to enhance Pro-poor Policy Formulation and Implementation at Country...Workshop to enhance Pro-poor Policy Formulation and Implementation at Country...
Workshop to enhance Pro-poor Policy Formulation and Implementation at Country...
FAO
 
UKCIF- Deploying the 300million GBP for Infrastructure
UKCIF- Deploying the 300million GBP for InfrastructureUKCIF- Deploying the 300million GBP for Infrastructure
UKCIF- Deploying the 300million GBP for Infrastructure
Caribbean Development Bank
 
UKCIF - Deploying GBP300 million for Infrastructure
UKCIF - Deploying GBP300 million for InfrastructureUKCIF - Deploying GBP300 million for Infrastructure
UKCIF - Deploying GBP300 million for Infrastructure
Caribbean Development Bank
 
RPN 2022 Manila: Session 4.5 Lindsey Scannell US CLDP.pdf
RPN 2022 Manila: Session 4.5 Lindsey Scannell US CLDP.pdfRPN 2022 Manila: Session 4.5 Lindsey Scannell US CLDP.pdf
RPN 2022 Manila: Session 4.5 Lindsey Scannell US CLDP.pdf
OECD Environment
 
Coastal Road Project
Coastal Road ProjectCoastal Road Project
Coastal Road Project
Ekonnect Knowledge Foundation
 
RE-DELAYS: Documenting and analising the cost of regulatory delays
RE-DELAYS: Documenting and analising the cost of regulatory delaysRE-DELAYS: Documenting and analising the cost of regulatory delays
RE-DELAYS: Documenting and analising the cost of regulatory delays
IEA_RETD
 
Grievance Redressal Mechanism - Training Slides .pdf
Grievance Redressal Mechanism - Training Slides .pdfGrievance Redressal Mechanism - Training Slides .pdf
Grievance Redressal Mechanism - Training Slides .pdf
sadiaahmed91
 
Realizing the promise of REDD: New approaches in voluntary carbon standards f...
Realizing the promise of REDD: New approaches in voluntary carbon standards f...Realizing the promise of REDD: New approaches in voluntary carbon standards f...
Realizing the promise of REDD: New approaches in voluntary carbon standards f...
CIFOR-ICRAF
 
Presentation buro cite english
Presentation buro cite english Presentation buro cite english
Presentation buro cite english
Buro CITE
 
Magus Consulting Pvt Ltd Corporate Profile
Magus Consulting Pvt Ltd   Corporate ProfileMagus Consulting Pvt Ltd   Corporate Profile
Magus Consulting Pvt Ltd Corporate Profile
marblegalery
 
Magus Consulting Pvt Ltd Corporate Profile
Magus Consulting Pvt Ltd   Corporate ProfileMagus Consulting Pvt Ltd   Corporate Profile
Magus Consulting Pvt Ltd Corporate Profile
marblegalery
 
Bokamoso ba rona-agri-briefing-presentation
Bokamoso ba rona-agri-briefing-presentationBokamoso ba rona-agri-briefing-presentation
Bokamoso ba rona-agri-briefing-presentation
MokaraneMorganMotsep
 
Public Procurement and Contract - Theory and practice in Nepal_2013
Public Procurement and Contract - Theory and practice in Nepal_2013Public Procurement and Contract - Theory and practice in Nepal_2013
Public Procurement and Contract - Theory and practice in Nepal_2013
Department of Urban Development and Building Construction (DUDBC)
 
World Bank Group’s Support to Renewable Energy Development
World Bank Group’s Support to Renewable Energy DevelopmentWorld Bank Group’s Support to Renewable Energy Development
World Bank Group’s Support to Renewable Energy Development
Mirzo Ibragimov
 

Similar to Public Private Partnership in Municipal Solid Waste Management in India (20)

Guy Duke
Guy DukeGuy Duke
Guy Duke
 
Getting AD Projects to a Financial Close
Getting AD Projects to a Financial CloseGetting AD Projects to a Financial Close
Getting AD Projects to a Financial Close
 
introduction to public private partnership
introduction to public private partnershipintroduction to public private partnership
introduction to public private partnership
 
CHINA MARKET OUTLOOK: CHINA EUROPE WATER PLATFORM BUSINESS PROGRAM
CHINA MARKET OUTLOOK: CHINA EUROPE WATER PLATFORM BUSINESS PROGRAMCHINA MARKET OUTLOOK: CHINA EUROPE WATER PLATFORM BUSINESS PROGRAM
CHINA MARKET OUTLOOK: CHINA EUROPE WATER PLATFORM BUSINESS PROGRAM
 
Financial Model and Future Operations Plan - Business Case Submission 09
Financial Model and Future Operations Plan - Business Case Submission 09Financial Model and Future Operations Plan - Business Case Submission 09
Financial Model and Future Operations Plan - Business Case Submission 09
 
Miramar commission mtg 3 20-12 solid waste disposal
Miramar commission mtg 3 20-12 solid waste disposal Miramar commission mtg 3 20-12 solid waste disposal
Miramar commission mtg 3 20-12 solid waste disposal
 
Workshop to enhance Pro-poor Policy Formulation and Implementation at Country...
Workshop to enhance Pro-poor Policy Formulation and Implementation at Country...Workshop to enhance Pro-poor Policy Formulation and Implementation at Country...
Workshop to enhance Pro-poor Policy Formulation and Implementation at Country...
 
UKCIF- Deploying the 300million GBP for Infrastructure
UKCIF- Deploying the 300million GBP for InfrastructureUKCIF- Deploying the 300million GBP for Infrastructure
UKCIF- Deploying the 300million GBP for Infrastructure
 
UKCIF - Deploying GBP300 million for Infrastructure
UKCIF - Deploying GBP300 million for InfrastructureUKCIF - Deploying GBP300 million for Infrastructure
UKCIF - Deploying GBP300 million for Infrastructure
 
RPN 2022 Manila: Session 4.5 Lindsey Scannell US CLDP.pdf
RPN 2022 Manila: Session 4.5 Lindsey Scannell US CLDP.pdfRPN 2022 Manila: Session 4.5 Lindsey Scannell US CLDP.pdf
RPN 2022 Manila: Session 4.5 Lindsey Scannell US CLDP.pdf
 
Coastal Road Project
Coastal Road ProjectCoastal Road Project
Coastal Road Project
 
RE-DELAYS: Documenting and analising the cost of regulatory delays
RE-DELAYS: Documenting and analising the cost of regulatory delaysRE-DELAYS: Documenting and analising the cost of regulatory delays
RE-DELAYS: Documenting and analising the cost of regulatory delays
 
Grievance Redressal Mechanism - Training Slides .pdf
Grievance Redressal Mechanism - Training Slides .pdfGrievance Redressal Mechanism - Training Slides .pdf
Grievance Redressal Mechanism - Training Slides .pdf
 
Realizing the promise of REDD: New approaches in voluntary carbon standards f...
Realizing the promise of REDD: New approaches in voluntary carbon standards f...Realizing the promise of REDD: New approaches in voluntary carbon standards f...
Realizing the promise of REDD: New approaches in voluntary carbon standards f...
 
Presentation buro cite english
Presentation buro cite english Presentation buro cite english
Presentation buro cite english
 
Magus Consulting Pvt Ltd Corporate Profile
Magus Consulting Pvt Ltd   Corporate ProfileMagus Consulting Pvt Ltd   Corporate Profile
Magus Consulting Pvt Ltd Corporate Profile
 
Magus Consulting Pvt Ltd Corporate Profile
Magus Consulting Pvt Ltd   Corporate ProfileMagus Consulting Pvt Ltd   Corporate Profile
Magus Consulting Pvt Ltd Corporate Profile
 
Bokamoso ba rona-agri-briefing-presentation
Bokamoso ba rona-agri-briefing-presentationBokamoso ba rona-agri-briefing-presentation
Bokamoso ba rona-agri-briefing-presentation
 
Public Procurement and Contract - Theory and practice in Nepal_2013
Public Procurement and Contract - Theory and practice in Nepal_2013Public Procurement and Contract - Theory and practice in Nepal_2013
Public Procurement and Contract - Theory and practice in Nepal_2013
 
World Bank Group’s Support to Renewable Energy Development
World Bank Group’s Support to Renewable Energy DevelopmentWorld Bank Group’s Support to Renewable Energy Development
World Bank Group’s Support to Renewable Energy Development
 

Recently uploaded

The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdfThe 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
thesiliconleaders
 
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
Zodiac Signs and Food Preferences_ What Your Sign Says About Your TasteZodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
my Pandit
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
techboxsqauremedia
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
fisherameliaisabella
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
agatadrynko
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Lviv Startup Club
 
In the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptxIn the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptx
Adani case
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
Aggregage
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
FelixPerez547899
 
Part 2 Deep Dive: Navigating the 2024 Slowdown
Part 2 Deep Dive: Navigating the 2024 SlowdownPart 2 Deep Dive: Navigating the 2024 Slowdown
Part 2 Deep Dive: Navigating the 2024 Slowdown
jeffkluth1
 
Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024
Kirill Klimov
 
Best Forex Brokers Comparison in INDIA 2024
Best Forex Brokers Comparison in INDIA 2024Best Forex Brokers Comparison in INDIA 2024
Best Forex Brokers Comparison in INDIA 2024
Top Forex Brokers Review
 
BeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdfBeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdf
DerekIwanaka1
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
ecamare2
 
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
bosssp10
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
 
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Holger Mueller
 
buy old yahoo accounts buy yahoo accounts
buy old yahoo accounts buy yahoo accountsbuy old yahoo accounts buy yahoo accounts
buy old yahoo accounts buy yahoo accounts
Susan Laney
 

Recently uploaded (20)

The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdfThe 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
 
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
Zodiac Signs and Food Preferences_ What Your Sign Says About Your TasteZodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
 
In the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptxIn the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptx
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
 
Part 2 Deep Dive: Navigating the 2024 Slowdown
Part 2 Deep Dive: Navigating the 2024 SlowdownPart 2 Deep Dive: Navigating the 2024 Slowdown
Part 2 Deep Dive: Navigating the 2024 Slowdown
 
Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024
 
Best Forex Brokers Comparison in INDIA 2024
Best Forex Brokers Comparison in INDIA 2024Best Forex Brokers Comparison in INDIA 2024
Best Forex Brokers Comparison in INDIA 2024
 
BeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdfBeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdf
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
 
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
 
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
 
buy old yahoo accounts buy yahoo accounts
buy old yahoo accounts buy yahoo accountsbuy old yahoo accounts buy yahoo accounts
buy old yahoo accounts buy yahoo accounts
 

Public Private Partnership in Municipal Solid Waste Management in India

  • 1. Public Private Partnership in Municipal Solid Waste Management in India Bashir Ahmed Shirazi Expert in Urban Infrastructure and Waste Management bashir.shirazi@gmail.com
  • 2. Environmental Legislation in India • The Water (Prevention and Control of Pollution) Act, 1974 • The Air (Prevention and Control of Pollution) Act, 1981 • The Environment (Protection) Act, 1986 • Hazardous Wastes (Management & Handling) Rules, 1989 • Bio-medical Wastes (Management & Handling) Rules, 1998 • Municipal Solid Wastes (Management & Handling) Rules, 2000
  • 3. Environmental Legislation in India • Environment Protection Act, 1986 (Section 15)
  • 4. Growth in MSW Generation • The MSW generation in India is expected to increase from 62 million MT in 2012 to 436 million MT per annum in 2050 @ 5% annual growth rate • The per capita generation in India 0.42kg/day which is relatively lower than the levels of 2kg/day of US • increasing urbanization and income levels would result in increase in per capita generation in India • 40% of India’s population by 2030 would reside in urban areas compared to 31% in 2011
  • 6. Driving Factors for Private Sector’s Participation PPP Business Model Legal Obligation of ULB Government Funding Demand for Outputs Availability of Financing Increasing MSW Quantities Improving Quality of MSW
  • 7. Components of MSW Integrated MSW Management Primary Collection Street Sweeping & Drain Cleaning Secondary Storage & Transportation Transfer Station and Tertiary Transport Processing Disposal
  • 8. Technology Options – MSW Processing MSW Quantity, TPD Technology Options >1100 • IWP comprising – Biomethanation +Composting+RDF • W to E plant for power, based on: gasification , pyrolysis, incineration and mass burning. • RDF to cement industry • Plastic to fuel oil 550 to 1100 • IWP comprising -Biomethanation +Composting+RDF • W to E plant for power, where wastes exceeds 500 TPD based on: gasification , pyrolysis, incineration and mass burning. • RDF to cement industry • Plastic to fuel oil 30 to 550 • IWP-BM, CC + RDF as feed stock to power plant / cement industry. Plastic to fuel oil < 30 • Biomethanation +Composting
  • 9. Challenges for ULBs • Funds – Capital as well as O&M Expenditure • Technical Expertise – Design, Estimates, Supervision, Monitoring, Environmental Protection • Commercial Competence – Project Feasibility • Bid Process Management – Bid Documents and Evaluation of proposals technically and financially • Skilled Manpower – to take up O&M • Availability of Land – Extent & Suitability of Land, Cost of Land and NIMBY • Business Approach – Mostly Capital Budget not Profit Centre
  • 10. What PPP Partner Offers • Private Partner brings in Investment/Capital/Finance, Technology, Sector Expertise, Skilled Manpower • Private Partner Manages the project for 5 – 30 years • Improvement of service levels (mostly linked with payments) • Compliances with statutory requirements • Protection of Environment • Professional planning, execution and operations • Transparency in payments • Stakeholders can also monitor performance of concessionaire
  • 11. Implementation Options Components Options Primary Collection NGOs Local resources BOT BOOT BOO BOT BOOT BOO DFBOOT Secondary Collection & Transportation O&M BOT BOOT BOO Transfer Station & Tertiary Transportation O&M BOT BOOT O&M BOT BOOT Processing EPC O&M DFBOOT DFBOOT DFBOOT Disposal EPC O&M DFBOOT Street Sweeping & Drain Cleaning Manpower O&M
  • 12. Process of Engaging Private Partner Requirements Options Identification of Suitable Land Own Consultant Both by same consultant Works by same consultant Entire work by same consultant Environmental Clearance Consultant Preparation of DPR Consultant Consultant Transaction Advisory & Bid Process Management Consultant Consultant Consultant
  • 13. Risks and Mitigations • Well Drafted Concession Agreement • Political will at the highest levelPolitical Risk • Accurate forecasting • Considering economic factors in assessing the payments like WPI Economic Risk • Stakeholder Consultation • Strict Monitoring • Campaigning • Compliance Social Risk • Phase wise Planning • Selection of already demonstrated technology for the quantity and quality of waste considered • Modular in nature Technological Risk
  • 14. Requirements for Successful PPP in MSW • Guaranteed quantity of waste • Size of the project • Practical DPR is required with correct assumptions & projections and implementable solution(s) • Implementable concession agreement • Availability of encumbrance free land before bidding itself • Obtain environmental clearance before / during bidding • Right supervision and monitoring • Applicable penalty clauses • Measurable service level bench marks • Timely payments • Timely release of funds • Selection of suitable partner
  • 15. Key Factors for Success of PPP in MSW • Political will to take up and support the project • Clarity on purpose and objectives of privatization • Transparency in Selection • Selection of private Operator through professionals • Strict Enforcement of statutory and environmental legislations • Public acceptance for better services • Healthy relationship between client and concessionaire • Treat private Operator as a partner (Bedrock of PPP) • Respect Concession Agreement – Bible of the project • Timely payments
  • 16. Independent Engineer • Independently review, monitor and where required by the Agreement, to approve activities associated with the Design, Construction, Operation and Maintenance of the Project Facilities to ensure compliance by the Concessionaire • Report to the Parties on the various physical, technical and financial aspects of the Project based on inspections, site visits and Tests • Measures performance of the project at every stages • Assist the Parties in arriving at an amicable settlement of disputes, should the need arise • Review matters related to safety and environment management measures adopted by the Concessionaire for the Project