Project Management Fundamentals
Introductory concepts @ OxfordCambridge.Org all for free and free for all.
The information gathered here is under KeyPoints format and may be use:
- Either to give the reader an overview before deciding for a full scale study of the topic.
- Or act as a study guide for learners in expanding their knowledge on that given topic.

Some recommendations, perhaps:
- Identify each KeyPoint on which you feel a need to expand your knowledge,
- Choose a good book or academic magazine and info from the Internet.
- And then work towards gaining that knowledge, at your own pace.
Please enjoy!

Project – Program Management Skills

(This picture: Trinity College, Cambridge)

Contact Email

Design Copyright 1994-2014 © OxfordCambridge.Org
Project Management Fundamentals - Aim of publication.
Give an overview of the world of project management to
readers or learners who believe basic project management
understanding will help them perform their job
responsibilities more effectively.

Project – Program Management Skills

(This picture: Trinity College, Cambridge)

Contact Email

Design Copyright 1994-2014 © OxfordCambridge.Org
Project Management Fundamentals – Summary.
☺ In today's fast-paced business environment, successful
project management has its place on the organizational hallof-fame.

☺ All major corporations have recognized that the future of
their corporate success lies in their employees' abilities to
effectively manage overlapping, complex projects.

Project – Program Management Skills

(This picture: Harcourt Hill, West Oxford)

Contact Email

Design Copyright 1994-2014 © OxfordCambridge.Org
Project Management Fundamentals - Learning Objectives.
 After developing the KeyPoints outlined in this publication, you should mainly be able to:


recognize the benefits of managing various elements within the project management.



perform a PEST analysis.



perform a cost-benefit analysis.



acknowledge match work breakdown structure levels.



estimate work effort for project activities.



choose the appropriate team member.



determine whether to make or buy a product.



calculate a project's earned revenue.



identify management actions for controlling project scope creep.



identify the elements of a project wrap-up report.

Project – Program Management Skills

(This picture: Trinity College, Cambridge)

Contact Email

Design Copyright 1994-2014 © OxfordCambridge.Org
*** About the Structure and Flow of our Presentations ***

Project – Program Management Skills

(This picture: Harcourt Hill, West Oxford)

Contact Email

Design Copyright 1994-2014 © OxfordCambridge.Org
Project Management Fundamentals - Sections List.
 (Section 1) Project Initiation.
 (Section 2) Project Planning.
 (Section 3) Project Execution.
 (Section 4) Project Controlling.
 (Section 5) Project Closing.

Project – Program Management Skills

(This picture: Trinity College, Cambridge)

Contact Email

Design Copyright 1994-2014 © OxfordCambridge.Org
(Section 1) Project Initiation – Summary.
☺ In today's fast-paced business environment, major
organizations have recognized that the future of their
corporate success lies in managers' abilities to
effectively manage overlapping, complex projects.
☺ With this section introduce yourself to the generally
accepted knowledge and practices surrounding the field
of project management and equip yourself with skills
used during project initiation.

Project – Program Management Skills

(This picture: Harcourt Hill, West Oxford)

Contact Email

Design Copyright 1994-2014 © OxfordCambridge.Org
(Section 1) Project Initiation – HighPoints.
 Project Management Context.
 Establishing Project Parameters.

Project – Program Management Skills

(This picture: Trinity College, Cambridge)

Contact Email

Design Copyright 1994-2014 © OxfordCambridge.Org
(Section 1) HighPoints: Project Management Context.
☺ recognize the benefits of being able to manage various
elements within the project management context.
☺ recognize the common characteristics of project life
cycle graphs.
☺ choose the graphic representation of a project life cycle
that best depicts a project.
☺ identify strategies that ensure success with
stakeholders.
☺ use strategies that ensure success with stakeholders.

☺ match categories of organizational influences with their
effects on a project.
☺ identify examples of key external influences.
☺ perform a PEST analysis on a project.

Project – Program Management Skills

(This picture: Harcourt Hill, West Oxford)

Contact Email

Design Copyright 1994-2014 © OxfordCambridge.Org
(Section 1) HighPoints: Establishing Project Parameters.
☺ recognize the benefits of establishing project parameters.
☺ label project variables as assumptions, exclusions or
constraints.

☺ determine appropriate assumptions, exclusions, and
constraints for a project.
☺ perform a cost-benefit analysis.
☺ sequence the steps to performing a decision tree analysis.
☺ use decision tree analysis to choose the best among project
alternatives.
☺ sequence the steps for obtaining sponsor signoff for a
project charter.
☺ obtain sponsor sign-off for a project charter.

Project – Program Management Skills

(This picture: Harcourt Hill, West Oxford)

Contact Email

Design Copyright 1994-2014 © OxfordCambridge.Org
(Section 2) Project Planning – Summary.
☺ One of the most crucial activities that take place during
project management is planning.
☺ Projects are to fail if adequate attention is not given to
planning the scope, the timing of activities, and project costs.
☺ The more complex the project, the better the plan must be.
☺ Therefore, you have to grasp the fundamental skills required to
plan a project's scope, schedule, and budget.

Project – Program Management Skills

(This picture: Harcourt Hill, West Oxford)

Contact Email

Design Copyright 1994-2014 © OxfordCambridge.Org
(Section 2) Project Planning – HighPoints.
 Scope Planning.
 Project Costing and Scheduling.

Project – Program Management Skills

(This picture: Trinity College, Cambridge)

Contact Email

Design Copyright 1994-2014 © OxfordCambridge.Org
(Section 2) HighPoints: Scope Planning.
☺ recognize the benefit of learning how to plan the scope of
a project.
☺ discovery the components to be included in a project
scope statement.
☺ make recommendations to ensure a scope statement
effectively reflects a project.
☺ acknowledge work breakdown structure levels.

Project – Program Management Skills

(This picture: Harcourt Hill, West Oxford)

Contact Email

Design Copyright 1994-2014 © OxfordCambridge.Org
(Section 2) HighPoints: Project Costing and Scheduling.
☺ recognize the importance of project costing and scheduling.
☺ distinguish the factors that are used to estimate work effort
for project activities.

☺ estimate normalized work effort for specified activities in a
project.
☺ identify key considerations for estimating activity duration.
☺ estimate activity duration for a project activity.
☺ consider the types of dependencies.
☺ determine the changes required in a network diagram to
reflect the activities of a project.
☺ calculate early and late start and finish days for project
activity, using the critical path method.
☺ determine the effect of an event on a project's schedule.
☺ develop the cost baseline for a project.

Project – Program Management Skills

(This picture: Harcourt Hill, West Oxford)

Contact Email

Design Copyright 1994-2014 © OxfordCambridge.Org
(Section 3) Project Execution – Summary.
☺ Now you've developed the perfect plan, what next?
☺ The time has come to execute that plan.
☺ Project execution is the phase during which the actual work
of the project is carried out.
☺ A large part of the project manager's job during project
execution involves making sure the project team is
functioning well, that the team has the supplies needed to
do the job, and that project risks are kept to a minimum.
☺ Thus, equip yourself with the various skills that you will need
during project execution.

Project – Program Management Skills

(This picture: Harcourt Hill, West Oxford)

Contact Email

Design Copyright 1994-2014 © OxfordCambridge.Org
(Section 3) Project Execution – HighPoints
 Managing Your Project Team.
 Project Procurement.
 Project Risk Management.

Project – Program Management Skills

(This picture: Trinity College, Cambridge)

Contact Email

Design Copyright 1994-2014 © OxfordCambridge.Org
(Section 3) HighPoints: Managing Your Project Team.
☺ recognize the benefits of effectively managing a project team
during project execution.
☺ identify the key considerations that go into selecting project
team members.
☺ choose the appropriate team member for a specific project.
☺ know the activities that take place during a project kick-off
meeting.
☺ conduct an effective project kick-off meeting.
☺ sequence the agenda items for a status review meeting.
☺ conduct a status review meeting for a g project.

Project – Program Management Skills

(This picture: Harcourt Hill, West Oxford)

Contact Email

Design Copyright 1994-2014 © OxfordCambridge.Org
(Section 3) HighPoints: Project Procurement.
☺ recognize the benefit of controlling project procurement.
☺ acknowledge key considerations for performing a make-orbuy analysis.

☺ determine whether to make or buy a product for a given
project.
☺ identify the components of an effective advertisement to
solicit vendors.
☺ choose the most effective advertisement for soliciting
vendors for a project.

☺ calculate a score for a potential vendor.
☺ organize a list of prospective vendors from the most to the
least qualified, based on an evaluation criteria.

Project – Program Management Skills

(This picture: Harcourt Hill, West Oxford)

Contact Email

Design Copyright 1994-2014 © OxfordCambridge.Org
(Section 3) HighPoints: Project Risk Management.
☺ recognize the benefit of managing project risks.
☺ consider risk severity classifications based on types of
risks.

☺ determine the highest risks for a project, in line with given
risk analysis data.

Project – Program Management Skills

(This picture: Harcourt Hill, West Oxford)

Contact Email

Design Copyright 1994-2014 © OxfordCambridge.Org
(Section 4) Project Controlling – Summary.
☺ Have you ever been involved in a project that felt more like a
runaway train than an organized work effort?
☺ A project can take on a life of its own if there aren't
adequate controls in place to help ensure that the project
adheres to the approved planning documents.
☺ Therefore, acquire the necessary skills for effectively
monitoring project performance, changes, and quality.

Project – Program Management Skills

(This picture: Harcourt Hill, West Oxford)

Contact Email

Design Copyright 1994-2014 © OxfordCambridge.Org
(Section 4) Project Controlling – HighPoints.
 Reporting Project Performance.
 Integrating Change Control.
 Controlling Quality.

Project – Program Management Skills

(This picture: Trinity College, Cambridge)

Contact Email

Design Copyright 1994-2014 © OxfordCambridge.Org
(Section 4) HighPoints: Reporting Project Performance.
☺ recognize the benefits of measuring and reporting project
performance.
☺ match elements of a variance analysis to their corresponding
formulas.
☺ perform a variance analysis related to project performance data.
☺ identify the factors to consider when calculating earned revenue
for a project.
☺ calculate a project's earned revenue for a specified reporting
period.

☺ deliver appropriate progress reports to stakeholders for a
specified project.

Project – Program Management Skills

(This picture: Harcourt Hill, West Oxford)

Contact Email

Design Copyright 1994-2014 © OxfordCambridge.Org
(Section 4) HighPoints: Integrating Change Control.
☺ recognize the benefit of controlling change during a project’s
life.
☺ identify management actions required to complete the steps
for controlling project scope creep.
☺ apply steps for controlling scope creep.
☺ identify the steps for managing corrective action.
☺ match types of risks with appropriate responses to each.
☺ determine the appropriate risk response for a project risk.

Project – Program Management Skills

(This picture: Harcourt Hill, West Oxford)

Contact Email

Design Copyright 1994-2014 © OxfordCambridge.Org
(Section 4) HighPoints: Controlling Quality.
☺ recognize the benefits of managing the quality of a product.
☺ identify questions to ask during a quality identification
interview with stakeholders.

☺ conduct a stakeholder interview to determine how
stakeholders define quality.
☺ identify the steps for implementing corrective action to
maintain quality.
☺ apply steps for implementing corrective action to maintain
quality.

Project – Program Management Skills

(This picture: Harcourt Hill, West Oxford)

Contact Email

Design Copyright 1994-2014 © OxfordCambridge.Org
(Section 5) Project Closing – Summary.
☺ Project closure is often overlooked as one of the key phases
of project management, resulting in a failure to recognize or
capitalize on various important things that happen during a
project's final phase.
☺ It may be that the success of your next project may depend
to some degree on how diligent you are in closing out your
current project.
☺ For that reason, it’s crucial to learn how to carry out many
key project closing activities.

Project – Program Management Skills

(This picture: Harcourt Hill, West Oxford)

Contact Email

Design Copyright 1994-2014 © OxfordCambridge.Org
(Section 5) Section5 Here – HighPoints.
 Closing Processes.
 Project Wrap-up.

Project – Program Management Skills

(This picture: Trinity College, Cambridge)

Contact Email

Design Copyright 1994-2014 © OxfordCambridge.Org
(Section 5) HighPoints: Closing Processes.
☺ recognize the benefits of properly closing out a project.
☺ identify the procedures that must be performed to conduct a
procurement audit.

☺ perform a procurement audit for a specified project.
☺ identify key elements of successful contract close-out.
☺ close out effectively a project contract.
☺ consider archiving guidelines when closing a project.

Project – Program Management Skills

(This picture: Harcourt Hill, West Oxford)

Contact Email

Design Copyright 1994-2014 © OxfordCambridge.Org
(Section 5) HighPoints: Project Wrap-up.
☺ recognize the benefits of wrapping up a project.
☺ identify the essential elements of a project wrap-up report.
☺ develop a project wrap-up report designed for external project
stakeholders.
☺ identify the common goals of effective internal project wrap-up
meetings.
☺ conduct an internal project wrap-up meeting with a project team.
☺ identify the criteria upon which to determine the level of
success of a project.
☺ determine the level of success of a specified project.

Project – Program Management Skills

(This picture: Harcourt Hill, West Oxford)

Contact Email

Design Copyright 1994-2014 © OxfordCambridge.Org
Project Management Fundamentals – Conclusion.
☺ At this point you should be familiar with the following:


recognizing the common characteristics of project life cycle.



using strategies to ensure success with stakeholders.



performing a cost-benefit analysis.



obtaining sponsor sign-off for a project charter.



learning how to plan the scope of a project.



recognizing the importance of project costing and scheduling.



calculating early and late start and finish days using the critical
path method.



selecting project team members.



controlling project procurement.



managing project risks.



controlling change during the life of a project.



implementing corrective action to maintain quality.



closing out properly a project.

Project – Program Management Skills

(This picture: Harcourt Hill, West Oxford)

Contact Email

Design Copyright 1994-2014 © OxfordCambridge.Org
Project – Program Management Skills

(This picture: Harcourt Hill, West Oxford)

Contact Email

Design Copyright 1994-2014 © OxfordCambridge.Org
Project – Program Management Skills

(This picture: Trinity College, Cambridge)

Contact Email

Design Copyright 1994-2014 © OxfordCambridge.Org
OxfordCambridge.Net

Project – Program Management Skills

(This picture: Trinity College, Cambridge)

Contact Email

Design Copyright 1994-2014 © OxfordCambridge.Org
We shall always be on SlideShare!

Project – Program Management Skills

(This picture: Trinity College, Cambridge)

Contact Email

Design Copyright 1994-2014 © OxfordCambridge.Org

Project Management Fundamentals

  • 1.
    Project – ProgramManagement Skills (This picture: Trinity College, Cambridge) Contact Email Design Copyright 1994-2014 © OxfordCambridge.Org
  • 2.
    Project – ProgramManagement Skills (This picture: Trinity College, Cambridge) Contact Email Design Copyright 1994-2014 © OxfordCambridge.Org
  • 3.
    Project Management Fundamentals Introductoryconcepts @ OxfordCambridge.Org all for free and free for all. The information gathered here is under KeyPoints format and may be use: - Either to give the reader an overview before deciding for a full scale study of the topic. - Or act as a study guide for learners in expanding their knowledge on that given topic. Some recommendations, perhaps: - Identify each KeyPoint on which you feel a need to expand your knowledge, - Choose a good book or academic magazine and info from the Internet. - And then work towards gaining that knowledge, at your own pace. Please enjoy! Project – Program Management Skills (This picture: Trinity College, Cambridge) Contact Email Design Copyright 1994-2014 © OxfordCambridge.Org
  • 4.
    Project Management Fundamentals- Aim of publication. Give an overview of the world of project management to readers or learners who believe basic project management understanding will help them perform their job responsibilities more effectively. Project – Program Management Skills (This picture: Trinity College, Cambridge) Contact Email Design Copyright 1994-2014 © OxfordCambridge.Org
  • 5.
    Project Management Fundamentals– Summary. ☺ In today's fast-paced business environment, successful project management has its place on the organizational hallof-fame. ☺ All major corporations have recognized that the future of their corporate success lies in their employees' abilities to effectively manage overlapping, complex projects. Project – Program Management Skills (This picture: Harcourt Hill, West Oxford) Contact Email Design Copyright 1994-2014 © OxfordCambridge.Org
  • 6.
    Project Management Fundamentals- Learning Objectives.  After developing the KeyPoints outlined in this publication, you should mainly be able to:  recognize the benefits of managing various elements within the project management.  perform a PEST analysis.  perform a cost-benefit analysis.  acknowledge match work breakdown structure levels.  estimate work effort for project activities.  choose the appropriate team member.  determine whether to make or buy a product.  calculate a project's earned revenue.  identify management actions for controlling project scope creep.  identify the elements of a project wrap-up report. Project – Program Management Skills (This picture: Trinity College, Cambridge) Contact Email Design Copyright 1994-2014 © OxfordCambridge.Org
  • 7.
    *** About theStructure and Flow of our Presentations *** Project – Program Management Skills (This picture: Harcourt Hill, West Oxford) Contact Email Design Copyright 1994-2014 © OxfordCambridge.Org
  • 8.
    Project Management Fundamentals- Sections List.  (Section 1) Project Initiation.  (Section 2) Project Planning.  (Section 3) Project Execution.  (Section 4) Project Controlling.  (Section 5) Project Closing. Project – Program Management Skills (This picture: Trinity College, Cambridge) Contact Email Design Copyright 1994-2014 © OxfordCambridge.Org
  • 9.
    (Section 1) ProjectInitiation – Summary. ☺ In today's fast-paced business environment, major organizations have recognized that the future of their corporate success lies in managers' abilities to effectively manage overlapping, complex projects. ☺ With this section introduce yourself to the generally accepted knowledge and practices surrounding the field of project management and equip yourself with skills used during project initiation. Project – Program Management Skills (This picture: Harcourt Hill, West Oxford) Contact Email Design Copyright 1994-2014 © OxfordCambridge.Org
  • 10.
    (Section 1) ProjectInitiation – HighPoints.  Project Management Context.  Establishing Project Parameters. Project – Program Management Skills (This picture: Trinity College, Cambridge) Contact Email Design Copyright 1994-2014 © OxfordCambridge.Org
  • 11.
    (Section 1) HighPoints:Project Management Context. ☺ recognize the benefits of being able to manage various elements within the project management context. ☺ recognize the common characteristics of project life cycle graphs. ☺ choose the graphic representation of a project life cycle that best depicts a project. ☺ identify strategies that ensure success with stakeholders. ☺ use strategies that ensure success with stakeholders. ☺ match categories of organizational influences with their effects on a project. ☺ identify examples of key external influences. ☺ perform a PEST analysis on a project. Project – Program Management Skills (This picture: Harcourt Hill, West Oxford) Contact Email Design Copyright 1994-2014 © OxfordCambridge.Org
  • 12.
    (Section 1) HighPoints:Establishing Project Parameters. ☺ recognize the benefits of establishing project parameters. ☺ label project variables as assumptions, exclusions or constraints. ☺ determine appropriate assumptions, exclusions, and constraints for a project. ☺ perform a cost-benefit analysis. ☺ sequence the steps to performing a decision tree analysis. ☺ use decision tree analysis to choose the best among project alternatives. ☺ sequence the steps for obtaining sponsor signoff for a project charter. ☺ obtain sponsor sign-off for a project charter. Project – Program Management Skills (This picture: Harcourt Hill, West Oxford) Contact Email Design Copyright 1994-2014 © OxfordCambridge.Org
  • 13.
    (Section 2) ProjectPlanning – Summary. ☺ One of the most crucial activities that take place during project management is planning. ☺ Projects are to fail if adequate attention is not given to planning the scope, the timing of activities, and project costs. ☺ The more complex the project, the better the plan must be. ☺ Therefore, you have to grasp the fundamental skills required to plan a project's scope, schedule, and budget. Project – Program Management Skills (This picture: Harcourt Hill, West Oxford) Contact Email Design Copyright 1994-2014 © OxfordCambridge.Org
  • 14.
    (Section 2) ProjectPlanning – HighPoints.  Scope Planning.  Project Costing and Scheduling. Project – Program Management Skills (This picture: Trinity College, Cambridge) Contact Email Design Copyright 1994-2014 © OxfordCambridge.Org
  • 15.
    (Section 2) HighPoints:Scope Planning. ☺ recognize the benefit of learning how to plan the scope of a project. ☺ discovery the components to be included in a project scope statement. ☺ make recommendations to ensure a scope statement effectively reflects a project. ☺ acknowledge work breakdown structure levels. Project – Program Management Skills (This picture: Harcourt Hill, West Oxford) Contact Email Design Copyright 1994-2014 © OxfordCambridge.Org
  • 16.
    (Section 2) HighPoints:Project Costing and Scheduling. ☺ recognize the importance of project costing and scheduling. ☺ distinguish the factors that are used to estimate work effort for project activities. ☺ estimate normalized work effort for specified activities in a project. ☺ identify key considerations for estimating activity duration. ☺ estimate activity duration for a project activity. ☺ consider the types of dependencies. ☺ determine the changes required in a network diagram to reflect the activities of a project. ☺ calculate early and late start and finish days for project activity, using the critical path method. ☺ determine the effect of an event on a project's schedule. ☺ develop the cost baseline for a project. Project – Program Management Skills (This picture: Harcourt Hill, West Oxford) Contact Email Design Copyright 1994-2014 © OxfordCambridge.Org
  • 17.
    (Section 3) ProjectExecution – Summary. ☺ Now you've developed the perfect plan, what next? ☺ The time has come to execute that plan. ☺ Project execution is the phase during which the actual work of the project is carried out. ☺ A large part of the project manager's job during project execution involves making sure the project team is functioning well, that the team has the supplies needed to do the job, and that project risks are kept to a minimum. ☺ Thus, equip yourself with the various skills that you will need during project execution. Project – Program Management Skills (This picture: Harcourt Hill, West Oxford) Contact Email Design Copyright 1994-2014 © OxfordCambridge.Org
  • 18.
    (Section 3) ProjectExecution – HighPoints  Managing Your Project Team.  Project Procurement.  Project Risk Management. Project – Program Management Skills (This picture: Trinity College, Cambridge) Contact Email Design Copyright 1994-2014 © OxfordCambridge.Org
  • 19.
    (Section 3) HighPoints:Managing Your Project Team. ☺ recognize the benefits of effectively managing a project team during project execution. ☺ identify the key considerations that go into selecting project team members. ☺ choose the appropriate team member for a specific project. ☺ know the activities that take place during a project kick-off meeting. ☺ conduct an effective project kick-off meeting. ☺ sequence the agenda items for a status review meeting. ☺ conduct a status review meeting for a g project. Project – Program Management Skills (This picture: Harcourt Hill, West Oxford) Contact Email Design Copyright 1994-2014 © OxfordCambridge.Org
  • 20.
    (Section 3) HighPoints:Project Procurement. ☺ recognize the benefit of controlling project procurement. ☺ acknowledge key considerations for performing a make-orbuy analysis. ☺ determine whether to make or buy a product for a given project. ☺ identify the components of an effective advertisement to solicit vendors. ☺ choose the most effective advertisement for soliciting vendors for a project. ☺ calculate a score for a potential vendor. ☺ organize a list of prospective vendors from the most to the least qualified, based on an evaluation criteria. Project – Program Management Skills (This picture: Harcourt Hill, West Oxford) Contact Email Design Copyright 1994-2014 © OxfordCambridge.Org
  • 21.
    (Section 3) HighPoints:Project Risk Management. ☺ recognize the benefit of managing project risks. ☺ consider risk severity classifications based on types of risks. ☺ determine the highest risks for a project, in line with given risk analysis data. Project – Program Management Skills (This picture: Harcourt Hill, West Oxford) Contact Email Design Copyright 1994-2014 © OxfordCambridge.Org
  • 22.
    (Section 4) ProjectControlling – Summary. ☺ Have you ever been involved in a project that felt more like a runaway train than an organized work effort? ☺ A project can take on a life of its own if there aren't adequate controls in place to help ensure that the project adheres to the approved planning documents. ☺ Therefore, acquire the necessary skills for effectively monitoring project performance, changes, and quality. Project – Program Management Skills (This picture: Harcourt Hill, West Oxford) Contact Email Design Copyright 1994-2014 © OxfordCambridge.Org
  • 23.
    (Section 4) ProjectControlling – HighPoints.  Reporting Project Performance.  Integrating Change Control.  Controlling Quality. Project – Program Management Skills (This picture: Trinity College, Cambridge) Contact Email Design Copyright 1994-2014 © OxfordCambridge.Org
  • 24.
    (Section 4) HighPoints:Reporting Project Performance. ☺ recognize the benefits of measuring and reporting project performance. ☺ match elements of a variance analysis to their corresponding formulas. ☺ perform a variance analysis related to project performance data. ☺ identify the factors to consider when calculating earned revenue for a project. ☺ calculate a project's earned revenue for a specified reporting period. ☺ deliver appropriate progress reports to stakeholders for a specified project. Project – Program Management Skills (This picture: Harcourt Hill, West Oxford) Contact Email Design Copyright 1994-2014 © OxfordCambridge.Org
  • 25.
    (Section 4) HighPoints:Integrating Change Control. ☺ recognize the benefit of controlling change during a project’s life. ☺ identify management actions required to complete the steps for controlling project scope creep. ☺ apply steps for controlling scope creep. ☺ identify the steps for managing corrective action. ☺ match types of risks with appropriate responses to each. ☺ determine the appropriate risk response for a project risk. Project – Program Management Skills (This picture: Harcourt Hill, West Oxford) Contact Email Design Copyright 1994-2014 © OxfordCambridge.Org
  • 26.
    (Section 4) HighPoints:Controlling Quality. ☺ recognize the benefits of managing the quality of a product. ☺ identify questions to ask during a quality identification interview with stakeholders. ☺ conduct a stakeholder interview to determine how stakeholders define quality. ☺ identify the steps for implementing corrective action to maintain quality. ☺ apply steps for implementing corrective action to maintain quality. Project – Program Management Skills (This picture: Harcourt Hill, West Oxford) Contact Email Design Copyright 1994-2014 © OxfordCambridge.Org
  • 27.
    (Section 5) ProjectClosing – Summary. ☺ Project closure is often overlooked as one of the key phases of project management, resulting in a failure to recognize or capitalize on various important things that happen during a project's final phase. ☺ It may be that the success of your next project may depend to some degree on how diligent you are in closing out your current project. ☺ For that reason, it’s crucial to learn how to carry out many key project closing activities. Project – Program Management Skills (This picture: Harcourt Hill, West Oxford) Contact Email Design Copyright 1994-2014 © OxfordCambridge.Org
  • 28.
    (Section 5) Section5Here – HighPoints.  Closing Processes.  Project Wrap-up. Project – Program Management Skills (This picture: Trinity College, Cambridge) Contact Email Design Copyright 1994-2014 © OxfordCambridge.Org
  • 29.
    (Section 5) HighPoints:Closing Processes. ☺ recognize the benefits of properly closing out a project. ☺ identify the procedures that must be performed to conduct a procurement audit. ☺ perform a procurement audit for a specified project. ☺ identify key elements of successful contract close-out. ☺ close out effectively a project contract. ☺ consider archiving guidelines when closing a project. Project – Program Management Skills (This picture: Harcourt Hill, West Oxford) Contact Email Design Copyright 1994-2014 © OxfordCambridge.Org
  • 30.
    (Section 5) HighPoints:Project Wrap-up. ☺ recognize the benefits of wrapping up a project. ☺ identify the essential elements of a project wrap-up report. ☺ develop a project wrap-up report designed for external project stakeholders. ☺ identify the common goals of effective internal project wrap-up meetings. ☺ conduct an internal project wrap-up meeting with a project team. ☺ identify the criteria upon which to determine the level of success of a project. ☺ determine the level of success of a specified project. Project – Program Management Skills (This picture: Harcourt Hill, West Oxford) Contact Email Design Copyright 1994-2014 © OxfordCambridge.Org
  • 31.
    Project Management Fundamentals– Conclusion. ☺ At this point you should be familiar with the following:  recognizing the common characteristics of project life cycle.  using strategies to ensure success with stakeholders.  performing a cost-benefit analysis.  obtaining sponsor sign-off for a project charter.  learning how to plan the scope of a project.  recognizing the importance of project costing and scheduling.  calculating early and late start and finish days using the critical path method.  selecting project team members.  controlling project procurement.  managing project risks.  controlling change during the life of a project.  implementing corrective action to maintain quality.  closing out properly a project. Project – Program Management Skills (This picture: Harcourt Hill, West Oxford) Contact Email Design Copyright 1994-2014 © OxfordCambridge.Org
  • 32.
    Project – ProgramManagement Skills (This picture: Harcourt Hill, West Oxford) Contact Email Design Copyright 1994-2014 © OxfordCambridge.Org
  • 33.
    Project – ProgramManagement Skills (This picture: Trinity College, Cambridge) Contact Email Design Copyright 1994-2014 © OxfordCambridge.Org
  • 34.
    OxfordCambridge.Net Project – ProgramManagement Skills (This picture: Trinity College, Cambridge) Contact Email Design Copyright 1994-2014 © OxfordCambridge.Org
  • 35.
    We shall alwaysbe on SlideShare! Project – Program Management Skills (This picture: Trinity College, Cambridge) Contact Email Design Copyright 1994-2014 © OxfordCambridge.Org