A WORLD IN FLAMES
Chapter 26
1931-1941
The Founders Intent
Wearehere
1791
Kings
Earls
Dukes
Lords
Rule of Law
Constitution
Equal Justice
Parliament
Queens
S
o
c
i
a
l
i
s
m
WoodrowWilson
French Revolution 1789 Nationalsozialismus
National Socialism (Nazi)
Communism
MaoTse-tung
China
60-80 million
killed
Total Government Control by Any
Other Name
 Dictatorship
 Despotism
 Tyranny
 Totalitarianism
 Absolutism
 Authoritarianism
 Monarchy
 Feudalism
Josef Stalin
USSR
25-50 million killed
Adolf Hitler
Germany
13 Million killed
Total Government Control by Any
Other Name
Pol Pot
Cambodia
1-2 million killed
Saddam Hussein
Iraq
1-1.5 million killed
FidelCastro
Cuba
1-1.5 million killed
Benito Mussolini
Italy
100,000+ killed
IdiAmin Dada
Uganda
500,000+ killed
Fascism
Fascism was an authoritarian political movement that developed in Italy
and other European countries after 1919 as another form of socialism to
the political and social changes brought about by World War I and the
spread of revolutionary socialism and communism. Its name was derived
from the fasces, an ancient Roman symbol of authority consisting of a
bundle of rods and an ax.
Fascist ideology, largely the work of the neo-idealist philosopher Giovanni
Gentile, emphasized the subordination of the individual to a “totalitarian”
state that was to control all aspects of national life. Violence as a creative
force was an important aspect of the Fascist philosophy. A special feature
of Italian fascism was the attempt to eliminate the class struggle from
history through nationalism and the corporate state.
Italian fascism was founded in Milan on 23 Mar 1919, by Benito Mussolini, a
former revolutionary socialist leader. His followers, mostly war veterans,
were organized along paramilitary lines and wore black shirts as uniforms.
The early Fascist program was a left wing group of ideas that emphasized
intense nationalism, productivism, antisocialism, elitism, and the need for
a strong leader.
Milizia Volontaria
per la Sicurezza
Nazionale, or
MVSN (Black
Shirts)
Hitler’s Rise to Power in Germany
Background
Germany’s defeat in World War I left the German people demoralized and without a strong
government.
Contributing Factors
Political problems
 TheWeimar Republic government was seen as weak and ineffective.
In 1919, Communist uprisings broke out in several German cities.
 Nazi critics feared that the Social Democrats would take over industry and break up large estates.
 Nationalists and militarists wanted to rebuild Germany’s army, which theTreaty ofVersailles forbade.
Economic crisis
 In 1923, hyperinflation drove Germany to near economic collapse. During the worldwide economic
depression that began in 1929, banks and businesses failed and unemployment soared in Germany.
Anti-Semitic policy
 Hitler and the Nazi Party blamed Germany’s problems on the Jews and claimed that the Germans were a
superior people—Aryan race. These racist ideas led to extreme nationalism.
Major Events
1923 Nazis fail in attempt to overthrow the Bavarian government. Hitler is jailed and writes Mein Kampf.
1924 Hitler becomes German chancellor. Third Reich is created, and Hitler transforms Germany into a
totalitarian state.
Sturmabteilung (SA)
(Brown Shirts)
Mein Kampf
One of the most important political tracts of the 20th century, Mein Kampf (My Battle or
Struggle, 1924 and 1926; Eng. Trans., 1939) is considered the bible of
Nationalsozialismus—Nazism. Written by Adolf Hitler while he served a sentence in
Landsberg Prison, the book presents Hitler’s major ideas on anti-Semitism, anti-
Communism, superiority of the Aryan race, German nationalism, the state’s superiority
over the individual, and Hitler’s feelings of hostility for freedom and miscegenation. The
importance of the book, which calls for German domination of Europe is derived from
the notoriety of its author rather than from his logical presentation of National Socialist
ideas.
The Stalin Years
Lenin died in 1924, and a struggle for leadership began between Joseph Stalin and Leon
Trotsky. As secretary of the Central Committee of the Communist party, Stalin stripped
Trotsky of power and exiled him in 1928.
Stalin continued Lenin’s New Economic Plan (NEP) until 1928. Fearing the entrenchment
of a capitalist class in agriculture, however, he initiated the First Five-Year Plan. The plan
called for rapid growth in heavy industry and collectivization of agriculture.
Rapid and forced collectivization of agriculture resulted in great inefficiencies, the
deportation of millions of the wealthier peasants, and confiscation of grain. Rather than
yield their livestock to the new collectives, many farmers slaughtered them. A man-made
famine resulted. In 1932, about 3 million people died of starvation in the Ukraine alone.
Nevertheless, when the First Five-Year Plan ended in 1932, the government announced
that great progress had been made. Peasant resistance had been smashed, and the
country was on the road to industrialization.
Stalin meanwhile tightened his grip on the government and the Red Army by means of a
series of purges. In 1935 and 1936, nearly 500,000 people were executed, imprisoned, or
forced into labor camps (gulags). He further consolidated his position through the Great
Purge trials of 1936-39. Through this system, Stalin eliminated his rivals. He
systematically employed the services of the secret police Komitet gosudarstvennoy
bezopasnosti (later known as the KGB) to root out “political criminals.”
The KGB
(Committee of
State Security)
Sword-and-Shield
emblem
Prelude to Dictatorship Venn Diagram
Benito
Mussolini-
Fascism
Josef Stalin-
Communism
Adolf
Hitler-
Nazism
Prelude to Dictatorship Quiz
1. Name a dictator and the amount of people
executed during their reign of terror.
2. Who was the founder of fascism and who
implemented Italian fascism?
3. Name one of the contributing factors that
led toAdolf Hitler’s rise to power.
4. What was the book that was considered
Hitler’s bible for Nazism?
5. What did Josef Stalin do to consolidate
power in government and the Red Army?
Why do wars occur?
 Countries are wronged by another
nation.
 Nations compete over natural
resources.
 Individuals demand greater political
and economic freedom.
We will study 3 aspects of WWII
 The war in Europe against
Germany and Italy
 The war in Asia with Japan
 The home front
What caused WWII in Europe?
 Germany wanted
back what she lost
fromWWI, and
revenge
 Appeasement –
Great Britain and
France gave Hitler
land w/o fighting for
it.
 Hitler was
racist/Anti-Semitic;
one reason he
invaded countries
was simply to kill the
Jews living there.
Treaty of Versailles – end of WWI
 The main points of
the Treaty [BRAT]
 1. Germany had
to accept the
Blame for
starting the war
 2. Germany paid
extremely high
Reparations for
the damage done
during the war.
Versailles (cont’d)
 3. Germany was
forbidden to have
submarines or an
air force. She
could have a navy
100,000 tons
displacement
(only six
battleships), and
an Army of just
100,000 men.
Versailles
 4. Germany
lost Territory
(land) in
Europe (see
map).
Germany’s
colonies were
given to
Britain and
France.
Depression in 1920s Europe
 Economy was bad in Europe
 WWI killed a lot of workers and
customers
 After years of humiliation and
starvation, Germans looked for a
strong leader.
NAZIs elected to power!
 Nazis promised to
build up their army
and get revenge for
WWI
 This is Adolf Hitler in
1933 with the
Sturmabteilung (SA).
His thugs to convince
the people his way
was right!!
Totalitarianism
Mussolini (Italy) Hitler (Germany)
Germany late 1930s
 Germany
escaped the
Depression
by
militarizing.
 This is Berlin
1936
Appeasement – Hitler wanted
land, Britain and France let
him have it without war
British Monarchs
Reign End Ruler
WETTIN (Saxony)
1901 Jan 22 -1910 EdwardVII
WINDSOR
1910 May 6 -1936 GeorgeV
1936 Jan 20 - Dec 10 abdicated EdwardVIII
1936 Dec 10 -1952 GeorgeVI
1952 Feb 6 - present Elizabeth II
Prelude to World War II Concept
Map
Progressivism
WorldWar II
America
Treaty ofVersailles
Hitler’s Solution toTreaty
Great Depression,Totalitarianism, Foreign Policy
Causes
Prelude to World War II Quiz
1. Name a reason countries go to war.
2. Name a cause of war in Europe.
3. What were the terms of theVersaillesTreaty
concerning the size of Germany’s military?
4. What was the name of Hitler’s paramilitary
thugs?
5. How did Germany escape the Great
Depression?
Hitler Rearms Germany and
European Appeasement
German chancellor Adolf Hitler abandoned the efforts of his predecessors to ease the
provisions of the Versailles Treaty through a policy of reconciliation with the World War I
victors. Instead, he unilaterally tore up the treaty. Hitler took Germany out of the League
of Nations in 1933 and began a massive program to build up the German army, navy, and
air force. In March 1935, he restored universal military service. The democracies did not
react, and Britain even concluded a naval agreement with Germany in 1935 that permitted
greater German naval strength than that allowed by the Versailles Treaty. In 1936, Hitler
sent troops into the demilitarized zone.
Almost immediately afterward, the Nazi regime began agitating on behalf of the Sudeten
Germans—who lived in pockets of western Czechoslovakia known as the Sudetenland—
claiming that they were a persecuted minority. The Czech government made numerous
concessions to the Sudeten Germans, but in September 1938, Hitler demanded the
immediate cession of the Sudetenland to Germany. On 29-30 Sep, Britain and France
(Czechoslovakia’s ally) agreed at the Munich Conference to yield to Hitler, who promised to
make no further territorial demands in Europe. Czechoslovakia was excluded from
participation at Munich. Unlike Austria, Czechoslovakia was democratic, and its president,
Eduard Benes, was prepared to resist Hitler, but the two western European democracies
insisted on submission.
World War II
(Overview)
World War II commenced as a localized conflict in eastern Europe and expanded until it
merged with a confrontation in the Far East to form a global war of immense
proportions. The war began in Europe on 1 Sep 1939, when Germany attacked Poland,
and ended on 2 Sep 1945, with the formal surrender of Japan aboard the U.S. battleship
USS Missouri in Tokyo Bay. Involving most of the world’s major powers as belligerents, it
also included many smaller states and had a great impact on neutral nations. The
victorious Allies included Great Britain and the Commonwealth, France, the United
States, the USSR, and China. The losing side comprised Germany, Italy, and Japan, as
well as smaller nations. The opponents clashed in two major areas: Europe, including
the coast of North Africa and the North Atlantic; and Asia, including the Central and
Southwest Pacific, China, Burma, and Japan. The belligerents fought over the central
issue of Axis expansion, which was halted at the cost of many millions of military and
civilian casualties.
World War II
(Overview)
Action Eastern Europe Pearl Harbor
Attacker Germany Japan
Invaded Poland U.S. territory-
Hawaiian Islands
Means Blitzkrieg- land
warfare
Naval-air
Results Beginning ofWorld
War II
U.S. entry into
WorldWar II
German Attack on Poland
On 1 Sep, 1939, the German military machine struck decisively at Poland, in what was
known as a blitzkrieg (lightning war). High-speed panzer (tank) units pushed across the
borders, blasting holes in the Polish lines. From the skies, Luftwaffe (air force) bombers
destroyed the Polish air force, damaged communications lines, and prevented the Poles
from moving reinforcements, supplies, and ammunition to the front lines. Then German
foot soldiers moved forward to hold the conquered ground. Meanwhile, Britain and
France declared war on Germany on 3 Sep.
USA’s contribution was
production, not blood.
Lend Lease Act
 FDR sent war
materials to
Britain and the
USSR.
 This is a
Sherman tank
Lend-Lease
The U.S. Congress passed the Lend-Lease Act, at President Franklin D. Roosevelt’s
request, in March 1941. Designed to allow Britain and China to draw on the industrial
resources of the then-nonbelligerent United States in World War II, the measure
authorized the president to transfer, lease, or lend “any defense article” to “the
government of any country whose defense the President deems vital to the defense of
the United States.” The bill was opposed by isolationists, such as Sen. Burton K.
Wheeler of Montana, who termed it “the New Deal’s triple A foreign policy; it will plow
under every fourth American boy.” Still it passed the House by a vote of 260 to 5 and
the Senate, by 60 to 31. By 21 Aug 1945, when the program was terminated, almost $50
billion in Lend-Lease aid had been shipped to Britain, the USSR, China, and other Allied
nations. From September 1942, the United States received “reverse lend-lease” from
the British Commonwealth and the Free French in the form of $8 billion worth of goods
and services provided to U.S. forces overseas. Financial settlements were made after
the war, until 1972.
Atlantikwall: Fortress
Europa
 In no time,
Germany
conquered
most of
Europe
with tanks,
planes,
railroads.
Tough cold winters killed
many NAZI troops in USSR.
Russian people
are tough!
Stalin executed
the military
leaders causing
21 million
dead, yet no
surrender!
English
Channel
protected
England
 Britain
resisted
German
air force
WWII Quiz (European Involvement)
Venn Diagram
German Actions European/U.S.Actions
WWII Quiz (European Involvement)
1. Name the 2 countries that Germany invaded beforeWWII
started.
2. What was the lightning warfare that Germany developed?
3. What is the diplomatic term for “giving in?”
4. What is the U.S. policy to give European allies the
necessary armaments?
5. After Hitler conquered continental Europe, what defense
complex did he create?
MEANWHILE, IN ASIA. . .
Japan wanted China and the
USSR.
 Japan is an island, and
not a big one.
 They wanted more
living space and
natural resources for
their “superior”
people.
Japan wanted oil reserves
Japan wanted more
oil to invade
China.
 America
embargoed their
oil in Indonesia
 Japan considered
this an act of war.
Japan joins Axis Powers
 Germany was sick
of the U.S. helping
Britain with its
lend lease
program. Japan
agreed to attack
Pearl Harbor and
distract the U.S.
from the
European war.
MEANWHILE, IN THE USA. . .
US Isolationism
 Americans wanted
to stay out of
Europe’s wars.
 FDR wanted to
help Britain
anyway
USA had 2 oceans to protect
them (sort of).
AMERICA AND WORLD WAR II
1941-45
Japan attacks Pearl Harbor.
America enters WWII.
December 7, 1941
Axis Powers
 Germany and Italy declared war immediately
after Pearl Harbor.
 Germany, Italy and Japan made a deal to help
each other in case one was attacked.
Allied Powers
 The Allies were the USA, Great Britain, and
the Soviet Union (USSR).These are called the
“big three.”
 In addition British and French colonies and
U.S. territories of these countries.
 These included China, Canada, Australia,
France, Poland and others.
Causes…
 The U.S. demanded that Japan withdraw
from China and Indochina
 Japanese military thought that attacking the
U.S. would provide them an easy win, and a
territory with abundant land and resources to
rule once they were victorious. The Japanese
thought that the U.S. foreign policy of
isolationism was cowardice.
 The U.S. oil embargo against Japan was
hurting Japan’s economy
Pearl Harbor
The United States expected the first blow to be in the Philippines or Southeast Asia.
Japan had made plans for a devastating aerial strike against the U.S. Pacific Fleet at Pearl
Harbor, in the Hawaiian Islands. In late November, a powerful Japanese task force left the
Kuril Islands; on 2 Dec, it received a coded message issuing the attack order-Tora, Tora,
Tora (Tiger, Tiger, Tiger). The undetected Japanese force arrived off the Hawaiian Islands
on the morning of 7 Dec. In two successive waves more than 350 Japanese bombers,
torpedo planes, and fighters struck. Altogether, 18 U.S. ships were sunk or disabled. At
one stroke, U.S. naval power in the Pacific was crippled. Fortunately for the Americans,
their aircraft carriers were on missions elsewhere. The U.S. Navy and Marine Corps lost
2,117 men, the Army lost 218, and 68 civilians were killed. More than 1,200 were
wounded. About 200 aircraft were destroyed, most on the ground. The Japanese lost 29
planes.
The next day President Roosevelt told a joint session of Congress that 7 Dec was “a date
which will live in infamy.” Congress voted to declare war on Japan. On 11 Dec, Germany
and Italy declared war on the United States.
USS Arizona
USS Arizona
Major Combatants
Japan
- Fleet of 6 Aircraft Carriers under the
command of Admiral Nagumo and Admiral
Yamamoto
- Aerial Assault Force under the command of
Mitsuo Fuchida
United States
- Pearl Harbor Naval/Army Base under the
command of Admiral Husband E. Kimmel
and Lt. General Walter C. Short
Battle Sequence
 5 PHASE ATTACK BY JAPANESE…
(as noted by the U.S. Navy)
 PHASE 1: Combined torpedo plane and dive bomber
attacks lasting from 7:55 a.m. to 8:25 a.m.
 PHASE 2: Lull in attacks lasting from 8:25 - 8:40
a.m.
 PHASE 3: Horizontal bomber attacks from 8:40 –
9:15 a.m.
 PHASE 4: Dive bomber attacks between 9:15-9:45
a.m.
 PHASE 5: Warning of attacks and completion of raid
after 9:45 a.m.
Eyewitness Account
 Commander Mitsuo Fuchida
 “Veering right toward the west coast of the
island, we could see that the sky over Pearl
Harbor was clear. Presently the harbor itself
became visible across the central Oahu plain,
a film of morning mist hovering over it. I
peered intently through my binoculars at the
ships riding peacefully at anchor. One by one
I counted them. Yes, the battleships were
there all right, eight of them! But our last
lingering hope of finding any carriers present
was now gone. Not one was to be seen.”
Warfare Used During Attack
 Japan
- 81 Fighter Planes
- 135 Dive Bombers
- 104 Horizontal Bombers
- 40Torpedo Planes
- At least 5 Midget Submarines
Warfare (continued)
 United States
- 108 Fighter Planes (59 not available for flight)
- 35 Army Bombers (27 not available for flight)
- 993 Army/Navy Antiaircraft Guns
Casualties
Japan
- Less then 100 men
- 29 planes
- 5 midget submarines
United States
- 2,335 servicemen killed, 68 civilians killed, 1,178
wounded
- 188 planes
- 18 ships (8 battleships, 3 light cruisers, 3 destroyers,
4 other vessels)
USS Arizona Burning: 1,100+
servicemen died on the ship
Eyewitness Account
 Marine Corporal E.C. Nightingale
 “I was about three quarters of the way to the
first platform on the mast when it seemed as
though a bomb struck our quarterdeck. I
could hear shrapnel or fragments whistling
past me. As soon as I reached the first
platform, I saw Second Lieutenant Simonson
lying on his back with blood on his shirt
front. I bent over him…He was dead…”
Eyewitness Account
 Lt. Ruth Erickson, USN (Nurse)
 “The first patient came into our dressing
room at 8:25 a.m. with a large opening in
his abdomen and bleeding profusely. They
started an intravenous and transfusion. I
can still see the tremor of Dr. Brunson’s
hand as he picked up the needle. Everyone
was terrified. The patient died within the
hour.”
Effects/Outcome
 Japan dealt a seemingly crippling blow to the U.S.
Pacific fleet (U.S. Pacific Fleet aircraft carriers:
Lexington, Enterprise, & Saratoga were not in port)
 Japan began their quest for a Pacific empire
 The U.S. finally was forced to join World War II
(“The Sleeping Giant was awakened”)
 The U.S. & Great Britain declare war on Japan (Dec.
8, 1941)
 Germany & Italy declare war on the U.S. (Dec. 11,
1941)
December 8, 1941 FDR Speech
“Yesterday, Dec. 7, 1941 - A date which will live
in infamy – the United States of America was
suddenly and deliberately attacked by naval
and air forces of the Empire of Japan.”
WWII Asian Theater U.S.
Involvement and Pearl Harbor
Time Sequence
Causes Plan and Preparation Execution and Results
WWII Asian Theater and U.S.
Involvement Quiz
1. What were the Japanese after while setting up their
empire?
2. What was the understood U.S. policy concerning
foreign issues?
3. What happened on 7 Dec 1941?
4. Who were the major combatants in the attack on
Pearl Harbor?
5. What did FDR say 7 Dec 1941 was?
Resistance Movement against
Nazism
 Operation Walküre (Valkyrie)
 The 20 July plot of 1944 was an attempt to assassinate Adolf Hitler, Führer of the Third Reich, inside his
Wolf's Lair field headquarters near Rastenburg, East Prussia. The plot was the culmination of the efforts of
several groups in the German Resistance to overthrow the Nazi regime. The failure of both the assassination
and the military coup d'état which was planned to follow it led to the arrest of at least 7,000 people by the
Gestapo. According to records of the Führer Conferences on Naval Affairs, 4,980 people were executed,
resulting in the destruction of the organized resistance movement in Germany.
TheWolf's Lair conference
room soon after the explosion
Claus Philipp Maria Justinian
Schenk Graf von Stauffenberg was
a German army officer and Catholic
aristocrat who was one of the
leading members of the failed 20
July plot of 1944 to assassinate
Adolf Hitler and remove the Nazi
Party from power. Along with
Henning von Tresckow and Hans
Oster, he was one of the central
figures of the German Resistance
movement within the Wehrmacht.
For his involvement in the
movement he was shot shortly after
the failed attempt known as
OperationValkyrie.
Resistance Movement against
Nazism
 Die Weisse Rose (TheWhite Rose)
 A non-violent/intellectual resistance group in Nazi Germany, consisting of students from the University of
Munich and their philosophy professor. The group became known for an anonymous leaflet campaign,
lasting from June 1942 until February 1943, that called for active opposition to dictator Adolf Hitler's regime.
The six core members of the group were arrested by the Gestapo (German secret police) and they were
executed by decapitation in 1943. The text of their sixth leaflet was smuggled by Helmuth James Graf von
Moltke out of Germany through Scandinavia to the United Kingdom, and in July 1943 copies of it were
dropped over Germany by Allied planes, retitled "The Manifesto of the Students of Munich.” Another
member, Hans Conrad Leipelt, who helped distribute Leaflet 6 in Hamburg, was executed on January 29,
1945 for his participation.Today, the members of the White Rose are honored in Germany amongst its
greatest heroes, since they opposed theThird Reich in the face of certain death.
Members of theWhite Rose, Munich 1942. From left: Hans
Scholl, his sister Sophie Scholl, and Christoph Probst.
Resistance Movement against
Nazism
 Dietrich Bonhöffer
 Bonhoeffer went into hiding for the next two years; he traveled secretly from one eastern
German village to another to help his students in their small illegal parishes. In January 1938,
he was banned from Berlin, and in September 1940, he was forbidden to speak in public.
 In the midst of political turmoil, Bonhoeffer continued to question the proper role of a
Christian in Nazi Germany. When German synagogues and Jewish businesses were burned
and demolished on Kristallnacht, November 9, 1938, Bonhoeffer immediately left for Berlin,
despite having been banned by the Gestapo, to investigate the destruction. After his return,
when his students were discussing the theological significance of Kristallnacht, Bonhoeffer
rejected the theory that Kristallnacht had resulted from "the curse which had haunted the
Jews since Jesus' death on the cross." Instead, Bonhoeffer called the pogrom an example of
the "sheer violence" of Nazism's "godless face.”
 The Confessing Church resistance expanded its efforts to help "non-Aryan" refugees leave
the country. One member of the resistance movement was the passionate anti-Nazi, Hans
von Dohnanyi, a lawyer married to Bonhoeffer's sister. In early 1939, Dohnanyi was
transferred from the Justice Department to the Armed Forces High Command Office of
Military Intelligence, and used his new post to inform Bonhoeffer that war was imminent.
Bonhoeffer, knowing that he would never fight in Hitler’s
Resistance Movement against
Nazism
Who stands firm? Only the one for whom the final
standard is not his reason, his principles, his conscience,
his freedom, his virtue, but who is ready to sacrifice all
these, when in faith and sole allegiance to God he is
called to obedient and responsible action: the responsible
person, whose life will be nothing but an answer to God's
question and call.
— Dietrich Bonhöffer
Resistance Movement against
Nazism
 Dietrich Bonhöffer (cont’d)
army, left the country in June 1939 for a teaching position at Union Seminary in NewYork.
 But upon arrival in the United States, Bonhoeffer realized that he had been mistaken, that if
he did not lead his people during the difficult years of war and turmoil, then he could not
partake in the postwar revival of German Christan life. His place, he decided, was in
Germany; he returned only a month after his departure, in July 1939. He undertook a more
active effort to undermine the regime. With international contacts in the ecumenical
movement, he became a crucial leader in the German underground movement.
 In October 1940, despite previous Gestapo tracking, Bonhoeffer gained employment as an
agent for Hans von Dohnanyi's Office of Military Intelligence, supposedly working for the
expansion of Nazism. In reality, he worked for the expansion of the anti-Nazi resistance.
During his 1941 and 1942 visits to Italy, Switzerland, and the Scandinavian countries, he
attempted to gain foreign support for the resistance movement. Bonhöffer was hanged
naked with other Nazi political prisoners at Flossenburg concentration camp two weeks
before its liberation by the U.S. 98th and 99th Infantry divisions.
Resistance Movement
against Nazism
 Oskar Schindler
 An ethnic German industrialist born in Moravia. He is credited with saving almost
1,200 Jews during the Holocaust by employing them in his enamelware and
ammunitions factories, which were located in what is now Poland and the Czech
Republic respectively. He is the subject of the novel Schindler's Ark, and the film
based on it, Schindler's List.
 As the Red Army drew nearer to Auschwitz concentration camp and the other
easternmost concentration camps, the SS began evacuating the remaining
prisoners westward. Schindler persuaded the SS officials to allow him to move his
1,100 Jewish workers to Brněnec (German: Brünnlitz) in the German-speaking
Sudetenland province (currently in the Czech Republic), thus sparing the Jews
from certain death in the extermination camps. In Brněnec, he gained another
former Jewish factory, where he was supposed to produce shells and hand
grenades for the war effort. However, during the months that this factory was
running, he would secretly not allow a single weapon produced to be up to
standards, and thus not fit for use in war. Hence Schindler made no money; rather,
his previously earned fortune grew steadily smaller as he bribed officials and cared
for his workers
"He who saves a single
soul, saves the world
entire" The Jewish
Inscription on
Schindler’s ring given to
him by the Jews at
Brunnlitz.
Resistance Movement against
Nazism
Martin Niemöller was a German pastor and theologian
born in Lippstadt, Germany, in 1892. Niemöller was an
anti-Communist and supported Hitler's rise to power at
first. But when Hitler insisted on the supremacy of the
state over religion, Niemöller became disillusioned. He
became the leader of a group of German clergymen
opposed to Hitler. Unlike Niemöller, they gave in to the
Nazis' threats. In 1937 he was arrested and eventually
confined in the Sachsenhausen and Dachau concentration
camps. His crime was "not being enthusiastic enough
about the Nazi movement." Niemöller was released in
1945 by the Allies. He continued his career in Germany as
a clergyman and as a leading voice of penance and
reconciliation for the German people after World War II.
His statement, sometimes presented as a poem, is well-
known, frequently quoted, and is a popular model for
describing the dangers of political apathy, as it often
begins with specific and targeted fear and hatred which
soon escalates out of control.
Resistance Movement against
Nazism
FirstThey came…

First they came for the communists,
and I
didn't speak out because I wasn't a
communist.

Then they came for the trade
unionists,
and I didn't speak out because I
wasn't a trade unionist.

Then they came for
the Jews,
and I didn't speak out because I
wasn't a Jew.

Then they came for me
and
there was no one left to speak out for me.
- Pastor Martin Niemöller
Resistance Movement against
Nazism Graphic Organizer
OperationWalküre
Pastor Martin NiemöllerDietrich Bonöffer
DieWeiße Rose
Oskar Schindler
Fate
Nazi Resistance Quiz
1. What was the plot to blow Hitler up at hisWolf’s Lair?
2. What was the organization of university students that
resisted Hitler’s Nazism?
3. Who questioned a Christian’s role in the fight against
Nazism?
1. What industrialist smuggled Jews out of concentration
camps into his personal industries?
2. Who wrote the poem, “FirstThey Came . . . ?”
WWII Timeline Quiz
1. What event precipitated the end ofWorld
War II?
A.TheYalta Conference
B.The unconditional surrender of Germany
C.Hitler commits suicide
D.Atomic bombs are dropped on Hiroshima and
Nagasaki
War Production
Roosevelt had begun establishing mobilization agencies in 1939, but none had sufficient
power or authority to bring order out of the chaos generated as industry converted to
war production. He therefore created the War Production Board in January 1942 to
coordinate mobilization, and in 1943 an Office of War Mobilization was established to
supervise the host of defense agencies that had sprung up in Washington, D.C.
Gradually, a priorities system was devised to supply defense plants with raw materials; a
synthetic rubber industry was developed from scratch; rationing conserved scarce
resources; and the Office of Price Administration kept inflation under control.
Hailed at the time as a production miracle, this increase was about equal to what the
country would have produced in peacetime before the depression, assuming full
employment. War production might have risen even higher if regulation of civilian
consumption and industry had been stricter.
Scientists, under the direction of the Office of Scientific Research and Development,
played a more important role in production than in any previous war, making gains in
rocketry, radar and sonar, and other areas. Among the new inventions was the proximity
fuse, which contained a tiny radio that detonated an artillery shell in the vicinity of its
target, making a direct hit unnecessary. Of greatest importance was the atomic bomb,
developed by scientists in secrecy and first tested on 6 Jul 1945.
The military was segregated, but black Americans
served. The Redball Express which was the
supply line from the front to the rear would not
have existed without black Americans.
Tuskegee Airmen
Women in the Forces
Women in Forces
Women's Army Auxiliary Corps (later the
Women's Army Corps orWAC),
Women Accepted forVolunteer Military
Services (WAVES).
Women Airforce Service Pilots (WASP)
How did USA pay for this
war? Our budget was on
credit
Internment Camps- How did they
get started?
 FDR made the statement
“We don’t want any
more BlackToms”—the
incident that happened
in NY harbor prior to
WWI. (Ch. 9)
 Because of the fear of
saboteurs and terrorists
German and Japanese
Americans were rounded
up and placed into
internment camps
Internment of Japanese and
German Americans
 USA was afraid if Japan
or Germany were to
attack the coasts,
Japanese and German
Americans would help
them.
 The Government
ordered them to move
to camps.
 Japanese family tagged
and documented for
transport
CrystalCity,Texas Family Internment Camp, inaccurately
stated that only Japanese American civilian prisoners
were held at this site duringWorldWar II. A Texas
HistoricalCommission marker now clarifies that German
and Japanese Latin Americans and at least one Italian
LatinAmerican family were housed here, too, as were
German and Japanese American families.
Joint Japanese and German American work crewCrystal
City Women sewing in CrystalCityInternee men at lunch, CrystalCityFt. Lincoln, Bismarck, ND in 1941
U.S. Internment Camps
Internment camp
World War II largely obliterated feminist activism on any continent. The war did open
employment opportunities for women—from working in factories (“Rosie the Riveter”
became an American icon) to playing professional baseball– but these doors of
opportunity were largely closed after the war, when women routinely lost their jobs to
men discharged from military service. This turn of events angered many women, but few
were willing to mount any organized protest.
Shortly after the outbreak of hostilities between Japan and the United States (7 Dec 1941),
when more than 100,000 Japanese and Japanese-Americans on the West Coast were taken
into custody and placed in camps in the interior.
Rationing is a government policy consisting of the planned and restrictive allocation of
scarce resources and consumer goods, that was practiced during World War II. Informal
rationing, which precedes the imposition of formal controls, may consist of admonitions to
consumers to reduce their consumption or of independent action taken by suppliers in
allocating scarce supplies. Rationing by quantity may limit the hours during which the
commodity is available or may assign quotas of a commodity to all known and approved
claimants. Point rationing assigns a point value to each commodity and allocates a certain
number of points to each consumer.
The Home Front
Women in workforce
People rationed goods for
war use.
American Involvement and
Home Front Graphic Organizer
War Effort
War Production
Home FrontInternment CampsWorkforce
WomenBlackAmericans
War Budget
Home Front Quiz
1. What did FDR create to coordinate America’s mobilization for WWII?
2. What segment of the population joined the war production to fill in
for the men at war?
3. What was theWWI terrorist attack that sparked internment camps
and why did the USA intern the German and Japanese Americans?
4. What was the black American U.S. Army Air Corps squadron that was
highly decorated duringWWII?
5. What did the government do to ensure essential food, commodities
and fuel went to the war effort?
D-Day- Operation Overlord
As they prepared for a cross-Channel assault on France, the Western Allies built up on British
soil one of the largest and most powerful invasion forces in history. For two months before
the landing, while troops, equipment, and supplies poured into Britain, the Allied air forces
bombed railroads, bridges, airfields, and fortifications, in France and Belgium and continued
their attacks on German industrial centers.
Postponed by delays in gathering the necessary landing equipment and by weather and tidal
conditions, Operation Overlord, with Eisenhower in command, began on 6 Jun 1944,
afterward known as D-Day (Normandy Invasion). Throughout the preceding night,
paratroopers were dropped behind German coastal defenses to sever communications and
seize key defense posts. Hundreds of warships and innumerable small craft supported the
invasion.
Between 0630 and 0730, waves of Allied troops moved ashore between Cherbourg and Le
Havre in history’s largest amphibious operation, involving approximately 5,000 ships of all
kinds. About 11,000 Allied aircraft operated over the invasion area. More than 150,000
troops disembarked at Normandy on D-Day. Because all major ports in the north were
mined and fortified, the Allies improvised two artificial harbors, with pontoons, breakwaters,
and sunken ships. One of the harbors was destroyed by a severe Atlantic gale, but the other
worked perfectly. Twenty pipelines below the Channel were used to bring in critical
D-Day- Operation Overlord
(cont’d)
supplies of gasoline for the tanks.
The Germans had anticipated an Allied invasion of western Europe at about this time
but were surprised by its location. GEN Gerd von Rundstedt, commander of German
forces in the west had expected the Allies to take the shortest water route and land at
Pas de Calais. A British intelligence operation called Ultra, having broken key German
ciphers (Enigma), learned of his misapprehension. To capitalize on the situation, the
Allies stationed a phantom army in Kent, England commanded by LTG George S. Patton
(the most feared American general by the Germans) that reinforced Rundstedt’s
mistaken opinion. It may also have influenced Hitler to decide against sending panzer
divisions to Normandy, a decision that greatly facilitated the landing and the
establishment of beachheads.
Yet the Germans struck back vigorously. For more than a month, they resisted while
Allied forces were being built up on the crowded beaches. The defenders were under a
severe handicap, however, because Hitler had been forced to send many of his troops
from France to the eastern front, where the Soviets were on the offensive.
European Theater Quiz
1. Where did the Allies decide to attack Hitler’s
Atlantikwall: Fortress Europa?
2. What was the military operational name for D-Day?
3. What was the date of D-Day?
4. What was the name of the meeting that planned the
end of the war with Germany?
5. What was the name of the day that Germany
defeated?
Midway- the Turning Point
against Japan
The Japanese quickly rallied their forces after the defeat at the Coral Sea. The Naval
General Staff, seeking to stretch Japan’s outer perimeter eastward and destroy what was
left of the U.S. Navy in the Pacific, decided to strike at the island of Midway. About 1,100
mi. northwest of Pearl Harbor, Midway was regarded as the sentry for Hawaii. The
Japanese hoped to make it a key outpost of their new perimeter. The Naval Command
organized the largest naval operation in its history, assembling a task force of 200 ships
and 600 planes.
Counting on total surprise, Japanese strategists were certain that this huge force was
more than enough to destroy what remained of the U.S. fleet in the Pacific. Its
effectiveness was undermined, however, by U.S. intelligence, which consistently broke
Japanese codes and ciphers during the war, giving the Americans advance warning of
every step taken by the task force.
On the afternoon of 3 Jun 1942, a patrol plane sighted the Japanese force approaching
Midway. The next day a hundred Japanese bombers took off from their carriers and
headed for Midway. In wait for the invaders was a strong force of American torpedo
planes and fighters. The U.S. aircraft rose from the decks of the Hornet, Yorktown, and
Enterprise and sank 4 Japanese carriers. Appalled by the loss of his carriers, ADM
Yamamoto Isoroku turned back his great armada.
Midway- the Turning Point
against Japan (cont’d)
U.S. planes pursued the retiring ships, inflicting great damage. Within 4 days, Japanese
losses, in addition to the 4 aircraft carriers, included 2 heavy cruisers and 3 destroyers
heavily damaged and 322 planes (280 on sinking carriers). The Americans paid a heavy
price, also, losing the carrier Yorktown, a destroyer, and 147 aircraft. Midway remained in
American hands, and the Japanese fleet was so severely damaged that Japan’s war effort
changed from an offensive thrust to a holding operation.
Battle for Midway Island
 If won,
Japanese
could have
bombed
Hawaii more
from here.
 Major turning
point
Battle for Iwo Jima
 Island hopping became a
fact of the war with
Japan.
 Island Hopping is the
process of attacking
Pacific islands held by
the Japanese empire
with the ultimate goal
being the island of Japan
 Died: 6800 US 20000
Japanese.
 This flag raising was a
serious morale boost to
soldiers on the island.
Kamikaze attacks
This plane dropped an atom bomb
on Hiroshima and Nagasaki
Atomic bomb
Designation Mk-I "Little Boy” Mk-III "Fat Man"
Width 28 in. 60.25 in.
Length 120 in. 128 in.
Weight 8,900 lb. 10,300 lb.
Yield 15 - 16 Kt 21 Kt
In essence, the Little Boy
design consisted of a gun
that fired one mass of
uranium 235 at another
mass of uranium 235, thus
creating a supercritical
mass. A crucial requirement
was that the pieces be
brought together in a time
shorter than the time
between spontaneous
fissions. Once the two
pieces of uranium are
brought together, the
initiator introduces a burst
of neutrons and the chain
reaction begins, continuing
until the energy released
becomes so great that the
bomb simply blows itself
apart.
Hiroshima and Nagasaki 1945
Victims in Hiroshima
Why drop the Atomic Bomb?
 The Japanese had shown they would fight to
the last man, woman and child.
 The atomic bomb saved as many as 1 million
U.S. lives, and possibly many millions of
Japanese.
 HarryTruman said he dropped the bomb to
end the war.
Japan surrenders 15 Aug 1945
Victory over Japan Day (VJ Day)
Pacific Theater
Pacific Theater Quiz
1. What cities were nuclear bombed?
The Assassination of a War Hero
General George S. Patton, perhaps the most popular of the American generals,
immediately opposed the total or partial application of the Morgenthau Plan (the
imposed starvation of the German populace) in his sector of occupation. Soon, he had a
run-in with another general of higher rank: General Eisenhower. It's well-known what
extremely violent debates they had about how the civilian population of Germany was to
be treated. Patton was SENTENCEDTO DEATH by the directors of the scenario.
Patton’s desire to invade the USSR after WWII was not popular either. He did not trust
the Russians and realized that we needed eliminate a threat that would haunt us until
1989 when the Cold War ended with the collapse of the USSR. The communist infiltrated
administration of Roosevelt had given the final invasion of the German capital to the
Russians by withholding Patton’s poised army.
On the 21st of April 1945, his airplane on which he was being transported to General
Headquarters of the Third Army in Feldfield (England) was attacked by what was assumed
to be a German fighter-bomber, but it turned out to be a "Spitfire" piloted by an inexpert
Polish pilot. Patton's plane was shot up, but was miraculously able to land. On the 3rd of
May, some days before the end of the war, the General's jeep was charged by an ox-
drawn cart, leaving Patton with light injuries.
The Assassination of a War Hero
(cont’d)
October 13, 1945 was when the collision with the truck occurred. When Patton appeared to be
getting better from the accident, the "heart attack" occurred. The fact is that after October 13
only the doctors saw Patton, forbidding any other visitors.
Until recently, it was only speculation that Patton had been assassinated. Now it is known for a
fact. And it is know for a very simple reason. Because an agent of the well-known OSS (Office
of Strategic Services, forerunner for the Central Intelligence Agency, CIA) or American military
spy, a certain Douglas Bazata, a Jew of Lebanese origin, announced it in front of 450 invited
guests; high ranking, ex-members of the OSS, in the Hilton Hotel in Washington, the 25th of
September, 1979. Bazata said, word-for-word:
"For divers political reasons, many extremely high-ranking persons hated Patton. I know who
killed him. Because I am the one who was hired to do it. Ten thousand dollars. General William
[“Wild Bill”] Donovan himself, director of the O.S.S, entrusted me with the mission. I set up the
accident. Since he didn't die in the accident, he was kept in isolation in the hospital, where he
was killed with an injection."
The tragic fate of Patton convinced other colleagues and their honorable compatriots of the
uselessness of fighting against the WAR POWERS. And if any doubts remained, the "Morgan
case" was enough to dissipate them.
Audie Leon
Murphy
- Company B, 15th Regiment,Third
Division,WorldWar II
-The Most Decorated Soldier in
American History
World War II Military
Casualities
 USSR 22 million
 China 11 million
 Germany 7 million
 Poland 7 million
 U.S. 0.5 million
 Great Britain 0.3 million
 Japan 1.5 million
Nürnberg Trials
Former Nazi leaders were indicted and tried as war criminals by the International Military
Tribunal. The indictment lodged against them contained four counts: (1) crimes against
peace—i.e., the planning, initiating, and waging of wars of aggression in violation of
international treaties and agreements; (2) crimes against humanity—i.e., exterminations,
deportations, and genocide; (3) war crimes—i.e., violations of the laws of war; and (4) “a
common plan or conspiracy to commit” the criminal acts listed in the first three counts.
After 216 court sessions, on 1 Oct 1946, the verdict on 22 of the original 24 defendants was
handed down. (Robert Ley committed suicide while in prison, and Gustav Krupp von
Bohlen und Halbach’s mental and physical condition prevented his being tried.) Three of
the defendants were acquitted; Hjalmar Schacht, Franz von Papen, and Hans Fritzsche.
Four were sentenced to terms of imprisonment ranging from 10 to 20 years: Karl Dönitz,
Baldur von Schirach, Albert Speer, and Konstantin von Neurath. Three were sentenced to
life imprisonment: Rudolf Hess, Walther Funk, and Erich Räder. Twelve of the defendants
were sentenced to death by hanging. Ten of them, Hans Frank, Wilhelm Frick, Julius
Streicher, Alfred Rosenberg, Ernst Kaltenbrunner, Joachim von Ribbentrop, Fritz Sauckel,
Alfred Jodl, Wilhelm Keitel, and Arthur Seyss-Inquart, were hanged on 16 Oct 1946. Martin
Boormann was tried and condemned to death in absentia, and Hermann Göring
committed suicide before he could be executed.
Nuremberg Trials – Hitler's most trusted party
officials, government ministers, military leaders,
and powerful industrialists brought to trial for
crimes against humanity, crimes against the peace
and war crimes by U.S. Supreme Court Justice Robert
Jackson.
Post War Quiz
1. What war hero was assassinated by the
predecessor of the CIA—theOSS?
2. What was the importance of Midway Island
battle?
3. What was island hopping?
4. What legal proceedings were held afterWWII to
try Nazis for war crimes?

Presentation26

  • 1.
    A WORLD INFLAMES Chapter 26 1931-1941
  • 2.
    The Founders Intent Wearehere 1791 Kings Earls Dukes Lords Ruleof Law Constitution Equal Justice Parliament Queens S o c i a l i s m WoodrowWilson French Revolution 1789 Nationalsozialismus National Socialism (Nazi) Communism
  • 3.
    MaoTse-tung China 60-80 million killed Total GovernmentControl by Any Other Name  Dictatorship  Despotism  Tyranny  Totalitarianism  Absolutism  Authoritarianism  Monarchy  Feudalism Josef Stalin USSR 25-50 million killed Adolf Hitler Germany 13 Million killed
  • 4.
    Total Government Controlby Any Other Name Pol Pot Cambodia 1-2 million killed Saddam Hussein Iraq 1-1.5 million killed FidelCastro Cuba 1-1.5 million killed Benito Mussolini Italy 100,000+ killed IdiAmin Dada Uganda 500,000+ killed
  • 5.
    Fascism Fascism was anauthoritarian political movement that developed in Italy and other European countries after 1919 as another form of socialism to the political and social changes brought about by World War I and the spread of revolutionary socialism and communism. Its name was derived from the fasces, an ancient Roman symbol of authority consisting of a bundle of rods and an ax. Fascist ideology, largely the work of the neo-idealist philosopher Giovanni Gentile, emphasized the subordination of the individual to a “totalitarian” state that was to control all aspects of national life. Violence as a creative force was an important aspect of the Fascist philosophy. A special feature of Italian fascism was the attempt to eliminate the class struggle from history through nationalism and the corporate state. Italian fascism was founded in Milan on 23 Mar 1919, by Benito Mussolini, a former revolutionary socialist leader. His followers, mostly war veterans, were organized along paramilitary lines and wore black shirts as uniforms. The early Fascist program was a left wing group of ideas that emphasized intense nationalism, productivism, antisocialism, elitism, and the need for a strong leader. Milizia Volontaria per la Sicurezza Nazionale, or MVSN (Black Shirts)
  • 6.
    Hitler’s Rise toPower in Germany Background Germany’s defeat in World War I left the German people demoralized and without a strong government. Contributing Factors Political problems  TheWeimar Republic government was seen as weak and ineffective. In 1919, Communist uprisings broke out in several German cities.  Nazi critics feared that the Social Democrats would take over industry and break up large estates.  Nationalists and militarists wanted to rebuild Germany’s army, which theTreaty ofVersailles forbade. Economic crisis  In 1923, hyperinflation drove Germany to near economic collapse. During the worldwide economic depression that began in 1929, banks and businesses failed and unemployment soared in Germany. Anti-Semitic policy  Hitler and the Nazi Party blamed Germany’s problems on the Jews and claimed that the Germans were a superior people—Aryan race. These racist ideas led to extreme nationalism. Major Events 1923 Nazis fail in attempt to overthrow the Bavarian government. Hitler is jailed and writes Mein Kampf. 1924 Hitler becomes German chancellor. Third Reich is created, and Hitler transforms Germany into a totalitarian state.
  • 7.
    Sturmabteilung (SA) (Brown Shirts) MeinKampf One of the most important political tracts of the 20th century, Mein Kampf (My Battle or Struggle, 1924 and 1926; Eng. Trans., 1939) is considered the bible of Nationalsozialismus—Nazism. Written by Adolf Hitler while he served a sentence in Landsberg Prison, the book presents Hitler’s major ideas on anti-Semitism, anti- Communism, superiority of the Aryan race, German nationalism, the state’s superiority over the individual, and Hitler’s feelings of hostility for freedom and miscegenation. The importance of the book, which calls for German domination of Europe is derived from the notoriety of its author rather than from his logical presentation of National Socialist ideas.
  • 8.
    The Stalin Years Lenindied in 1924, and a struggle for leadership began between Joseph Stalin and Leon Trotsky. As secretary of the Central Committee of the Communist party, Stalin stripped Trotsky of power and exiled him in 1928. Stalin continued Lenin’s New Economic Plan (NEP) until 1928. Fearing the entrenchment of a capitalist class in agriculture, however, he initiated the First Five-Year Plan. The plan called for rapid growth in heavy industry and collectivization of agriculture. Rapid and forced collectivization of agriculture resulted in great inefficiencies, the deportation of millions of the wealthier peasants, and confiscation of grain. Rather than yield their livestock to the new collectives, many farmers slaughtered them. A man-made famine resulted. In 1932, about 3 million people died of starvation in the Ukraine alone. Nevertheless, when the First Five-Year Plan ended in 1932, the government announced that great progress had been made. Peasant resistance had been smashed, and the country was on the road to industrialization. Stalin meanwhile tightened his grip on the government and the Red Army by means of a series of purges. In 1935 and 1936, nearly 500,000 people were executed, imprisoned, or forced into labor camps (gulags). He further consolidated his position through the Great Purge trials of 1936-39. Through this system, Stalin eliminated his rivals. He systematically employed the services of the secret police Komitet gosudarstvennoy bezopasnosti (later known as the KGB) to root out “political criminals.” The KGB (Committee of State Security) Sword-and-Shield emblem
  • 9.
    Prelude to DictatorshipVenn Diagram Benito Mussolini- Fascism Josef Stalin- Communism Adolf Hitler- Nazism
  • 10.
    Prelude to DictatorshipQuiz 1. Name a dictator and the amount of people executed during their reign of terror. 2. Who was the founder of fascism and who implemented Italian fascism? 3. Name one of the contributing factors that led toAdolf Hitler’s rise to power. 4. What was the book that was considered Hitler’s bible for Nazism? 5. What did Josef Stalin do to consolidate power in government and the Red Army?
  • 11.
    Why do warsoccur?  Countries are wronged by another nation.  Nations compete over natural resources.  Individuals demand greater political and economic freedom.
  • 12.
    We will study3 aspects of WWII  The war in Europe against Germany and Italy  The war in Asia with Japan  The home front
  • 13.
    What caused WWIIin Europe?  Germany wanted back what she lost fromWWI, and revenge  Appeasement – Great Britain and France gave Hitler land w/o fighting for it.  Hitler was racist/Anti-Semitic; one reason he invaded countries was simply to kill the Jews living there.
  • 14.
    Treaty of Versailles– end of WWI  The main points of the Treaty [BRAT]  1. Germany had to accept the Blame for starting the war  2. Germany paid extremely high Reparations for the damage done during the war.
  • 15.
    Versailles (cont’d)  3.Germany was forbidden to have submarines or an air force. She could have a navy 100,000 tons displacement (only six battleships), and an Army of just 100,000 men.
  • 16.
    Versailles  4. Germany lostTerritory (land) in Europe (see map). Germany’s colonies were given to Britain and France.
  • 17.
    Depression in 1920sEurope  Economy was bad in Europe  WWI killed a lot of workers and customers  After years of humiliation and starvation, Germans looked for a strong leader.
  • 18.
    NAZIs elected topower!  Nazis promised to build up their army and get revenge for WWI  This is Adolf Hitler in 1933 with the Sturmabteilung (SA). His thugs to convince the people his way was right!!
  • 19.
  • 20.
    Germany late 1930s Germany escaped the Depression by militarizing.  This is Berlin 1936
  • 21.
    Appeasement – Hitlerwanted land, Britain and France let him have it without war
  • 22.
    British Monarchs Reign EndRuler WETTIN (Saxony) 1901 Jan 22 -1910 EdwardVII WINDSOR 1910 May 6 -1936 GeorgeV 1936 Jan 20 - Dec 10 abdicated EdwardVIII 1936 Dec 10 -1952 GeorgeVI 1952 Feb 6 - present Elizabeth II
  • 23.
    Prelude to WorldWar II Concept Map Progressivism WorldWar II America Treaty ofVersailles Hitler’s Solution toTreaty Great Depression,Totalitarianism, Foreign Policy Causes
  • 24.
    Prelude to WorldWar II Quiz 1. Name a reason countries go to war. 2. Name a cause of war in Europe. 3. What were the terms of theVersaillesTreaty concerning the size of Germany’s military? 4. What was the name of Hitler’s paramilitary thugs? 5. How did Germany escape the Great Depression?
  • 25.
    Hitler Rearms Germanyand European Appeasement German chancellor Adolf Hitler abandoned the efforts of his predecessors to ease the provisions of the Versailles Treaty through a policy of reconciliation with the World War I victors. Instead, he unilaterally tore up the treaty. Hitler took Germany out of the League of Nations in 1933 and began a massive program to build up the German army, navy, and air force. In March 1935, he restored universal military service. The democracies did not react, and Britain even concluded a naval agreement with Germany in 1935 that permitted greater German naval strength than that allowed by the Versailles Treaty. In 1936, Hitler sent troops into the demilitarized zone. Almost immediately afterward, the Nazi regime began agitating on behalf of the Sudeten Germans—who lived in pockets of western Czechoslovakia known as the Sudetenland— claiming that they were a persecuted minority. The Czech government made numerous concessions to the Sudeten Germans, but in September 1938, Hitler demanded the immediate cession of the Sudetenland to Germany. On 29-30 Sep, Britain and France (Czechoslovakia’s ally) agreed at the Munich Conference to yield to Hitler, who promised to make no further territorial demands in Europe. Czechoslovakia was excluded from participation at Munich. Unlike Austria, Czechoslovakia was democratic, and its president, Eduard Benes, was prepared to resist Hitler, but the two western European democracies insisted on submission.
  • 26.
    World War II (Overview) WorldWar II commenced as a localized conflict in eastern Europe and expanded until it merged with a confrontation in the Far East to form a global war of immense proportions. The war began in Europe on 1 Sep 1939, when Germany attacked Poland, and ended on 2 Sep 1945, with the formal surrender of Japan aboard the U.S. battleship USS Missouri in Tokyo Bay. Involving most of the world’s major powers as belligerents, it also included many smaller states and had a great impact on neutral nations. The victorious Allies included Great Britain and the Commonwealth, France, the United States, the USSR, and China. The losing side comprised Germany, Italy, and Japan, as well as smaller nations. The opponents clashed in two major areas: Europe, including the coast of North Africa and the North Atlantic; and Asia, including the Central and Southwest Pacific, China, Burma, and Japan. The belligerents fought over the central issue of Axis expansion, which was halted at the cost of many millions of military and civilian casualties.
  • 27.
    World War II (Overview) ActionEastern Europe Pearl Harbor Attacker Germany Japan Invaded Poland U.S. territory- Hawaiian Islands Means Blitzkrieg- land warfare Naval-air Results Beginning ofWorld War II U.S. entry into WorldWar II
  • 28.
    German Attack onPoland On 1 Sep, 1939, the German military machine struck decisively at Poland, in what was known as a blitzkrieg (lightning war). High-speed panzer (tank) units pushed across the borders, blasting holes in the Polish lines. From the skies, Luftwaffe (air force) bombers destroyed the Polish air force, damaged communications lines, and prevented the Poles from moving reinforcements, supplies, and ammunition to the front lines. Then German foot soldiers moved forward to hold the conquered ground. Meanwhile, Britain and France declared war on Germany on 3 Sep.
  • 29.
  • 30.
    Lend Lease Act FDR sent war materials to Britain and the USSR.  This is a Sherman tank
  • 31.
    Lend-Lease The U.S. Congresspassed the Lend-Lease Act, at President Franklin D. Roosevelt’s request, in March 1941. Designed to allow Britain and China to draw on the industrial resources of the then-nonbelligerent United States in World War II, the measure authorized the president to transfer, lease, or lend “any defense article” to “the government of any country whose defense the President deems vital to the defense of the United States.” The bill was opposed by isolationists, such as Sen. Burton K. Wheeler of Montana, who termed it “the New Deal’s triple A foreign policy; it will plow under every fourth American boy.” Still it passed the House by a vote of 260 to 5 and the Senate, by 60 to 31. By 21 Aug 1945, when the program was terminated, almost $50 billion in Lend-Lease aid had been shipped to Britain, the USSR, China, and other Allied nations. From September 1942, the United States received “reverse lend-lease” from the British Commonwealth and the Free French in the form of $8 billion worth of goods and services provided to U.S. forces overseas. Financial settlements were made after the war, until 1972.
  • 33.
    Atlantikwall: Fortress Europa  Inno time, Germany conquered most of Europe with tanks, planes, railroads.
  • 34.
    Tough cold winterskilled many NAZI troops in USSR. Russian people are tough! Stalin executed the military leaders causing 21 million dead, yet no surrender!
  • 35.
  • 36.
    WWII Quiz (EuropeanInvolvement) Venn Diagram German Actions European/U.S.Actions
  • 37.
    WWII Quiz (EuropeanInvolvement) 1. Name the 2 countries that Germany invaded beforeWWII started. 2. What was the lightning warfare that Germany developed? 3. What is the diplomatic term for “giving in?” 4. What is the U.S. policy to give European allies the necessary armaments? 5. After Hitler conquered continental Europe, what defense complex did he create?
  • 38.
  • 39.
    Japan wanted Chinaand the USSR.  Japan is an island, and not a big one.  They wanted more living space and natural resources for their “superior” people.
  • 40.
    Japan wanted oilreserves Japan wanted more oil to invade China.  America embargoed their oil in Indonesia  Japan considered this an act of war.
  • 41.
    Japan joins AxisPowers  Germany was sick of the U.S. helping Britain with its lend lease program. Japan agreed to attack Pearl Harbor and distract the U.S. from the European war.
  • 42.
  • 43.
    US Isolationism  Americanswanted to stay out of Europe’s wars.  FDR wanted to help Britain anyway
  • 44.
    USA had 2oceans to protect them (sort of).
  • 45.
    AMERICA AND WORLDWAR II 1941-45
  • 46.
    Japan attacks PearlHarbor. America enters WWII. December 7, 1941
  • 47.
    Axis Powers  Germanyand Italy declared war immediately after Pearl Harbor.  Germany, Italy and Japan made a deal to help each other in case one was attacked.
  • 48.
    Allied Powers  TheAllies were the USA, Great Britain, and the Soviet Union (USSR).These are called the “big three.”  In addition British and French colonies and U.S. territories of these countries.  These included China, Canada, Australia, France, Poland and others.
  • 49.
    Causes…  The U.S.demanded that Japan withdraw from China and Indochina  Japanese military thought that attacking the U.S. would provide them an easy win, and a territory with abundant land and resources to rule once they were victorious. The Japanese thought that the U.S. foreign policy of isolationism was cowardice.  The U.S. oil embargo against Japan was hurting Japan’s economy
  • 50.
    Pearl Harbor The UnitedStates expected the first blow to be in the Philippines or Southeast Asia. Japan had made plans for a devastating aerial strike against the U.S. Pacific Fleet at Pearl Harbor, in the Hawaiian Islands. In late November, a powerful Japanese task force left the Kuril Islands; on 2 Dec, it received a coded message issuing the attack order-Tora, Tora, Tora (Tiger, Tiger, Tiger). The undetected Japanese force arrived off the Hawaiian Islands on the morning of 7 Dec. In two successive waves more than 350 Japanese bombers, torpedo planes, and fighters struck. Altogether, 18 U.S. ships were sunk or disabled. At one stroke, U.S. naval power in the Pacific was crippled. Fortunately for the Americans, their aircraft carriers were on missions elsewhere. The U.S. Navy and Marine Corps lost 2,117 men, the Army lost 218, and 68 civilians were killed. More than 1,200 were wounded. About 200 aircraft were destroyed, most on the ground. The Japanese lost 29 planes. The next day President Roosevelt told a joint session of Congress that 7 Dec was “a date which will live in infamy.” Congress voted to declare war on Japan. On 11 Dec, Germany and Italy declared war on the United States.
  • 51.
  • 52.
  • 53.
    Major Combatants Japan - Fleetof 6 Aircraft Carriers under the command of Admiral Nagumo and Admiral Yamamoto - Aerial Assault Force under the command of Mitsuo Fuchida United States - Pearl Harbor Naval/Army Base under the command of Admiral Husband E. Kimmel and Lt. General Walter C. Short
  • 54.
    Battle Sequence  5PHASE ATTACK BY JAPANESE… (as noted by the U.S. Navy)  PHASE 1: Combined torpedo plane and dive bomber attacks lasting from 7:55 a.m. to 8:25 a.m.  PHASE 2: Lull in attacks lasting from 8:25 - 8:40 a.m.  PHASE 3: Horizontal bomber attacks from 8:40 – 9:15 a.m.  PHASE 4: Dive bomber attacks between 9:15-9:45 a.m.  PHASE 5: Warning of attacks and completion of raid after 9:45 a.m.
  • 57.
    Eyewitness Account  CommanderMitsuo Fuchida  “Veering right toward the west coast of the island, we could see that the sky over Pearl Harbor was clear. Presently the harbor itself became visible across the central Oahu plain, a film of morning mist hovering over it. I peered intently through my binoculars at the ships riding peacefully at anchor. One by one I counted them. Yes, the battleships were there all right, eight of them! But our last lingering hope of finding any carriers present was now gone. Not one was to be seen.”
  • 58.
    Warfare Used DuringAttack  Japan - 81 Fighter Planes - 135 Dive Bombers - 104 Horizontal Bombers - 40Torpedo Planes - At least 5 Midget Submarines
  • 59.
    Warfare (continued)  UnitedStates - 108 Fighter Planes (59 not available for flight) - 35 Army Bombers (27 not available for flight) - 993 Army/Navy Antiaircraft Guns
  • 60.
    Casualties Japan - Less then100 men - 29 planes - 5 midget submarines United States - 2,335 servicemen killed, 68 civilians killed, 1,178 wounded - 188 planes - 18 ships (8 battleships, 3 light cruisers, 3 destroyers, 4 other vessels)
  • 61.
    USS Arizona Burning:1,100+ servicemen died on the ship
  • 62.
    Eyewitness Account  MarineCorporal E.C. Nightingale  “I was about three quarters of the way to the first platform on the mast when it seemed as though a bomb struck our quarterdeck. I could hear shrapnel or fragments whistling past me. As soon as I reached the first platform, I saw Second Lieutenant Simonson lying on his back with blood on his shirt front. I bent over him…He was dead…”
  • 63.
    Eyewitness Account  Lt.Ruth Erickson, USN (Nurse)  “The first patient came into our dressing room at 8:25 a.m. with a large opening in his abdomen and bleeding profusely. They started an intravenous and transfusion. I can still see the tremor of Dr. Brunson’s hand as he picked up the needle. Everyone was terrified. The patient died within the hour.”
  • 64.
    Effects/Outcome  Japan dealta seemingly crippling blow to the U.S. Pacific fleet (U.S. Pacific Fleet aircraft carriers: Lexington, Enterprise, & Saratoga were not in port)  Japan began their quest for a Pacific empire  The U.S. finally was forced to join World War II (“The Sleeping Giant was awakened”)  The U.S. & Great Britain declare war on Japan (Dec. 8, 1941)  Germany & Italy declare war on the U.S. (Dec. 11, 1941)
  • 65.
    December 8, 1941FDR Speech “Yesterday, Dec. 7, 1941 - A date which will live in infamy – the United States of America was suddenly and deliberately attacked by naval and air forces of the Empire of Japan.”
  • 66.
    WWII Asian TheaterU.S. Involvement and Pearl Harbor Time Sequence Causes Plan and Preparation Execution and Results
  • 67.
    WWII Asian Theaterand U.S. Involvement Quiz 1. What were the Japanese after while setting up their empire? 2. What was the understood U.S. policy concerning foreign issues? 3. What happened on 7 Dec 1941? 4. Who were the major combatants in the attack on Pearl Harbor? 5. What did FDR say 7 Dec 1941 was?
  • 68.
    Resistance Movement against Nazism Operation Walküre (Valkyrie)  The 20 July plot of 1944 was an attempt to assassinate Adolf Hitler, Führer of the Third Reich, inside his Wolf's Lair field headquarters near Rastenburg, East Prussia. The plot was the culmination of the efforts of several groups in the German Resistance to overthrow the Nazi regime. The failure of both the assassination and the military coup d'état which was planned to follow it led to the arrest of at least 7,000 people by the Gestapo. According to records of the Führer Conferences on Naval Affairs, 4,980 people were executed, resulting in the destruction of the organized resistance movement in Germany. TheWolf's Lair conference room soon after the explosion Claus Philipp Maria Justinian Schenk Graf von Stauffenberg was a German army officer and Catholic aristocrat who was one of the leading members of the failed 20 July plot of 1944 to assassinate Adolf Hitler and remove the Nazi Party from power. Along with Henning von Tresckow and Hans Oster, he was one of the central figures of the German Resistance movement within the Wehrmacht. For his involvement in the movement he was shot shortly after the failed attempt known as OperationValkyrie.
  • 69.
    Resistance Movement against Nazism Die Weisse Rose (TheWhite Rose)  A non-violent/intellectual resistance group in Nazi Germany, consisting of students from the University of Munich and their philosophy professor. The group became known for an anonymous leaflet campaign, lasting from June 1942 until February 1943, that called for active opposition to dictator Adolf Hitler's regime. The six core members of the group were arrested by the Gestapo (German secret police) and they were executed by decapitation in 1943. The text of their sixth leaflet was smuggled by Helmuth James Graf von Moltke out of Germany through Scandinavia to the United Kingdom, and in July 1943 copies of it were dropped over Germany by Allied planes, retitled "The Manifesto of the Students of Munich.” Another member, Hans Conrad Leipelt, who helped distribute Leaflet 6 in Hamburg, was executed on January 29, 1945 for his participation.Today, the members of the White Rose are honored in Germany amongst its greatest heroes, since they opposed theThird Reich in the face of certain death. Members of theWhite Rose, Munich 1942. From left: Hans Scholl, his sister Sophie Scholl, and Christoph Probst.
  • 70.
    Resistance Movement against Nazism Dietrich Bonhöffer  Bonhoeffer went into hiding for the next two years; he traveled secretly from one eastern German village to another to help his students in their small illegal parishes. In January 1938, he was banned from Berlin, and in September 1940, he was forbidden to speak in public.  In the midst of political turmoil, Bonhoeffer continued to question the proper role of a Christian in Nazi Germany. When German synagogues and Jewish businesses were burned and demolished on Kristallnacht, November 9, 1938, Bonhoeffer immediately left for Berlin, despite having been banned by the Gestapo, to investigate the destruction. After his return, when his students were discussing the theological significance of Kristallnacht, Bonhoeffer rejected the theory that Kristallnacht had resulted from "the curse which had haunted the Jews since Jesus' death on the cross." Instead, Bonhoeffer called the pogrom an example of the "sheer violence" of Nazism's "godless face.”  The Confessing Church resistance expanded its efforts to help "non-Aryan" refugees leave the country. One member of the resistance movement was the passionate anti-Nazi, Hans von Dohnanyi, a lawyer married to Bonhoeffer's sister. In early 1939, Dohnanyi was transferred from the Justice Department to the Armed Forces High Command Office of Military Intelligence, and used his new post to inform Bonhoeffer that war was imminent. Bonhoeffer, knowing that he would never fight in Hitler’s
  • 71.
    Resistance Movement against Nazism Whostands firm? Only the one for whom the final standard is not his reason, his principles, his conscience, his freedom, his virtue, but who is ready to sacrifice all these, when in faith and sole allegiance to God he is called to obedient and responsible action: the responsible person, whose life will be nothing but an answer to God's question and call. — Dietrich Bonhöffer
  • 72.
    Resistance Movement against Nazism Dietrich Bonhöffer (cont’d) army, left the country in June 1939 for a teaching position at Union Seminary in NewYork.  But upon arrival in the United States, Bonhoeffer realized that he had been mistaken, that if he did not lead his people during the difficult years of war and turmoil, then he could not partake in the postwar revival of German Christan life. His place, he decided, was in Germany; he returned only a month after his departure, in July 1939. He undertook a more active effort to undermine the regime. With international contacts in the ecumenical movement, he became a crucial leader in the German underground movement.  In October 1940, despite previous Gestapo tracking, Bonhoeffer gained employment as an agent for Hans von Dohnanyi's Office of Military Intelligence, supposedly working for the expansion of Nazism. In reality, he worked for the expansion of the anti-Nazi resistance. During his 1941 and 1942 visits to Italy, Switzerland, and the Scandinavian countries, he attempted to gain foreign support for the resistance movement. Bonhöffer was hanged naked with other Nazi political prisoners at Flossenburg concentration camp two weeks before its liberation by the U.S. 98th and 99th Infantry divisions.
  • 73.
    Resistance Movement against Nazism Oskar Schindler  An ethnic German industrialist born in Moravia. He is credited with saving almost 1,200 Jews during the Holocaust by employing them in his enamelware and ammunitions factories, which were located in what is now Poland and the Czech Republic respectively. He is the subject of the novel Schindler's Ark, and the film based on it, Schindler's List.  As the Red Army drew nearer to Auschwitz concentration camp and the other easternmost concentration camps, the SS began evacuating the remaining prisoners westward. Schindler persuaded the SS officials to allow him to move his 1,100 Jewish workers to Brněnec (German: Brünnlitz) in the German-speaking Sudetenland province (currently in the Czech Republic), thus sparing the Jews from certain death in the extermination camps. In Brněnec, he gained another former Jewish factory, where he was supposed to produce shells and hand grenades for the war effort. However, during the months that this factory was running, he would secretly not allow a single weapon produced to be up to standards, and thus not fit for use in war. Hence Schindler made no money; rather, his previously earned fortune grew steadily smaller as he bribed officials and cared for his workers "He who saves a single soul, saves the world entire" The Jewish Inscription on Schindler’s ring given to him by the Jews at Brunnlitz.
  • 74.
    Resistance Movement against Nazism MartinNiemöller was a German pastor and theologian born in Lippstadt, Germany, in 1892. Niemöller was an anti-Communist and supported Hitler's rise to power at first. But when Hitler insisted on the supremacy of the state over religion, Niemöller became disillusioned. He became the leader of a group of German clergymen opposed to Hitler. Unlike Niemöller, they gave in to the Nazis' threats. In 1937 he was arrested and eventually confined in the Sachsenhausen and Dachau concentration camps. His crime was "not being enthusiastic enough about the Nazi movement." Niemöller was released in 1945 by the Allies. He continued his career in Germany as a clergyman and as a leading voice of penance and reconciliation for the German people after World War II. His statement, sometimes presented as a poem, is well- known, frequently quoted, and is a popular model for describing the dangers of political apathy, as it often begins with specific and targeted fear and hatred which soon escalates out of control.
  • 75.
    Resistance Movement against Nazism FirstTheycame… 
First they came for the communists,
and I didn't speak out because I wasn't a communist.

Then they came for the trade unionists,
and I didn't speak out because I wasn't a trade unionist.

Then they came for the Jews,
and I didn't speak out because I wasn't a Jew.

Then they came for me
and there was no one left to speak out for me. - Pastor Martin Niemöller
  • 76.
    Resistance Movement against NazismGraphic Organizer OperationWalküre Pastor Martin NiemöllerDietrich Bonöffer DieWeiße Rose Oskar Schindler Fate
  • 77.
    Nazi Resistance Quiz 1.What was the plot to blow Hitler up at hisWolf’s Lair? 2. What was the organization of university students that resisted Hitler’s Nazism? 3. Who questioned a Christian’s role in the fight against Nazism? 1. What industrialist smuggled Jews out of concentration camps into his personal industries? 2. Who wrote the poem, “FirstThey Came . . . ?”
  • 79.
    WWII Timeline Quiz 1.What event precipitated the end ofWorld War II? A.TheYalta Conference B.The unconditional surrender of Germany C.Hitler commits suicide D.Atomic bombs are dropped on Hiroshima and Nagasaki
  • 80.
    War Production Roosevelt hadbegun establishing mobilization agencies in 1939, but none had sufficient power or authority to bring order out of the chaos generated as industry converted to war production. He therefore created the War Production Board in January 1942 to coordinate mobilization, and in 1943 an Office of War Mobilization was established to supervise the host of defense agencies that had sprung up in Washington, D.C. Gradually, a priorities system was devised to supply defense plants with raw materials; a synthetic rubber industry was developed from scratch; rationing conserved scarce resources; and the Office of Price Administration kept inflation under control. Hailed at the time as a production miracle, this increase was about equal to what the country would have produced in peacetime before the depression, assuming full employment. War production might have risen even higher if regulation of civilian consumption and industry had been stricter. Scientists, under the direction of the Office of Scientific Research and Development, played a more important role in production than in any previous war, making gains in rocketry, radar and sonar, and other areas. Among the new inventions was the proximity fuse, which contained a tiny radio that detonated an artillery shell in the vicinity of its target, making a direct hit unnecessary. Of greatest importance was the atomic bomb, developed by scientists in secrecy and first tested on 6 Jul 1945.
  • 81.
    The military wassegregated, but black Americans served. The Redball Express which was the supply line from the front to the rear would not have existed without black Americans.
  • 82.
  • 83.
  • 84.
    Women in Forces Women'sArmy Auxiliary Corps (later the Women's Army Corps orWAC), Women Accepted forVolunteer Military Services (WAVES). Women Airforce Service Pilots (WASP)
  • 85.
    How did USApay for this war? Our budget was on credit
  • 86.
    Internment Camps- Howdid they get started?  FDR made the statement “We don’t want any more BlackToms”—the incident that happened in NY harbor prior to WWI. (Ch. 9)  Because of the fear of saboteurs and terrorists German and Japanese Americans were rounded up and placed into internment camps
  • 87.
    Internment of Japaneseand German Americans  USA was afraid if Japan or Germany were to attack the coasts, Japanese and German Americans would help them.  The Government ordered them to move to camps.  Japanese family tagged and documented for transport CrystalCity,Texas Family Internment Camp, inaccurately stated that only Japanese American civilian prisoners were held at this site duringWorldWar II. A Texas HistoricalCommission marker now clarifies that German and Japanese Latin Americans and at least one Italian LatinAmerican family were housed here, too, as were German and Japanese American families. Joint Japanese and German American work crewCrystal City Women sewing in CrystalCityInternee men at lunch, CrystalCityFt. Lincoln, Bismarck, ND in 1941
  • 88.
  • 89.
  • 90.
    World War IIlargely obliterated feminist activism on any continent. The war did open employment opportunities for women—from working in factories (“Rosie the Riveter” became an American icon) to playing professional baseball– but these doors of opportunity were largely closed after the war, when women routinely lost their jobs to men discharged from military service. This turn of events angered many women, but few were willing to mount any organized protest. Shortly after the outbreak of hostilities between Japan and the United States (7 Dec 1941), when more than 100,000 Japanese and Japanese-Americans on the West Coast were taken into custody and placed in camps in the interior. Rationing is a government policy consisting of the planned and restrictive allocation of scarce resources and consumer goods, that was practiced during World War II. Informal rationing, which precedes the imposition of formal controls, may consist of admonitions to consumers to reduce their consumption or of independent action taken by suppliers in allocating scarce supplies. Rationing by quantity may limit the hours during which the commodity is available or may assign quotas of a commodity to all known and approved claimants. Point rationing assigns a point value to each commodity and allocates a certain number of points to each consumer. The Home Front
  • 91.
  • 92.
  • 93.
    American Involvement and HomeFront Graphic Organizer War Effort War Production Home FrontInternment CampsWorkforce WomenBlackAmericans War Budget
  • 94.
    Home Front Quiz 1.What did FDR create to coordinate America’s mobilization for WWII? 2. What segment of the population joined the war production to fill in for the men at war? 3. What was theWWI terrorist attack that sparked internment camps and why did the USA intern the German and Japanese Americans? 4. What was the black American U.S. Army Air Corps squadron that was highly decorated duringWWII? 5. What did the government do to ensure essential food, commodities and fuel went to the war effort?
  • 95.
    D-Day- Operation Overlord Asthey prepared for a cross-Channel assault on France, the Western Allies built up on British soil one of the largest and most powerful invasion forces in history. For two months before the landing, while troops, equipment, and supplies poured into Britain, the Allied air forces bombed railroads, bridges, airfields, and fortifications, in France and Belgium and continued their attacks on German industrial centers. Postponed by delays in gathering the necessary landing equipment and by weather and tidal conditions, Operation Overlord, with Eisenhower in command, began on 6 Jun 1944, afterward known as D-Day (Normandy Invasion). Throughout the preceding night, paratroopers were dropped behind German coastal defenses to sever communications and seize key defense posts. Hundreds of warships and innumerable small craft supported the invasion. Between 0630 and 0730, waves of Allied troops moved ashore between Cherbourg and Le Havre in history’s largest amphibious operation, involving approximately 5,000 ships of all kinds. About 11,000 Allied aircraft operated over the invasion area. More than 150,000 troops disembarked at Normandy on D-Day. Because all major ports in the north were mined and fortified, the Allies improvised two artificial harbors, with pontoons, breakwaters, and sunken ships. One of the harbors was destroyed by a severe Atlantic gale, but the other worked perfectly. Twenty pipelines below the Channel were used to bring in critical
  • 96.
    D-Day- Operation Overlord (cont’d) suppliesof gasoline for the tanks. The Germans had anticipated an Allied invasion of western Europe at about this time but were surprised by its location. GEN Gerd von Rundstedt, commander of German forces in the west had expected the Allies to take the shortest water route and land at Pas de Calais. A British intelligence operation called Ultra, having broken key German ciphers (Enigma), learned of his misapprehension. To capitalize on the situation, the Allies stationed a phantom army in Kent, England commanded by LTG George S. Patton (the most feared American general by the Germans) that reinforced Rundstedt’s mistaken opinion. It may also have influenced Hitler to decide against sending panzer divisions to Normandy, a decision that greatly facilitated the landing and the establishment of beachheads. Yet the Germans struck back vigorously. For more than a month, they resisted while Allied forces were being built up on the crowded beaches. The defenders were under a severe handicap, however, because Hitler had been forced to send many of his troops from France to the eastern front, where the Soviets were on the offensive.
  • 97.
    European Theater Quiz 1.Where did the Allies decide to attack Hitler’s Atlantikwall: Fortress Europa? 2. What was the military operational name for D-Day? 3. What was the date of D-Day? 4. What was the name of the meeting that planned the end of the war with Germany? 5. What was the name of the day that Germany defeated?
  • 98.
    Midway- the TurningPoint against Japan The Japanese quickly rallied their forces after the defeat at the Coral Sea. The Naval General Staff, seeking to stretch Japan’s outer perimeter eastward and destroy what was left of the U.S. Navy in the Pacific, decided to strike at the island of Midway. About 1,100 mi. northwest of Pearl Harbor, Midway was regarded as the sentry for Hawaii. The Japanese hoped to make it a key outpost of their new perimeter. The Naval Command organized the largest naval operation in its history, assembling a task force of 200 ships and 600 planes. Counting on total surprise, Japanese strategists were certain that this huge force was more than enough to destroy what remained of the U.S. fleet in the Pacific. Its effectiveness was undermined, however, by U.S. intelligence, which consistently broke Japanese codes and ciphers during the war, giving the Americans advance warning of every step taken by the task force. On the afternoon of 3 Jun 1942, a patrol plane sighted the Japanese force approaching Midway. The next day a hundred Japanese bombers took off from their carriers and headed for Midway. In wait for the invaders was a strong force of American torpedo planes and fighters. The U.S. aircraft rose from the decks of the Hornet, Yorktown, and Enterprise and sank 4 Japanese carriers. Appalled by the loss of his carriers, ADM Yamamoto Isoroku turned back his great armada.
  • 99.
    Midway- the TurningPoint against Japan (cont’d) U.S. planes pursued the retiring ships, inflicting great damage. Within 4 days, Japanese losses, in addition to the 4 aircraft carriers, included 2 heavy cruisers and 3 destroyers heavily damaged and 322 planes (280 on sinking carriers). The Americans paid a heavy price, also, losing the carrier Yorktown, a destroyer, and 147 aircraft. Midway remained in American hands, and the Japanese fleet was so severely damaged that Japan’s war effort changed from an offensive thrust to a holding operation.
  • 100.
    Battle for MidwayIsland  If won, Japanese could have bombed Hawaii more from here.  Major turning point
  • 101.
    Battle for IwoJima  Island hopping became a fact of the war with Japan.  Island Hopping is the process of attacking Pacific islands held by the Japanese empire with the ultimate goal being the island of Japan  Died: 6800 US 20000 Japanese.  This flag raising was a serious morale boost to soldiers on the island.
  • 102.
  • 103.
    This plane droppedan atom bomb on Hiroshima and Nagasaki
  • 104.
    Atomic bomb Designation Mk-I"Little Boy” Mk-III "Fat Man" Width 28 in. 60.25 in. Length 120 in. 128 in. Weight 8,900 lb. 10,300 lb. Yield 15 - 16 Kt 21 Kt In essence, the Little Boy design consisted of a gun that fired one mass of uranium 235 at another mass of uranium 235, thus creating a supercritical mass. A crucial requirement was that the pieces be brought together in a time shorter than the time between spontaneous fissions. Once the two pieces of uranium are brought together, the initiator introduces a burst of neutrons and the chain reaction begins, continuing until the energy released becomes so great that the bomb simply blows itself apart.
  • 105.
  • 106.
  • 107.
    Why drop theAtomic Bomb?  The Japanese had shown they would fight to the last man, woman and child.  The atomic bomb saved as many as 1 million U.S. lives, and possibly many millions of Japanese.  HarryTruman said he dropped the bomb to end the war.
  • 108.
    Japan surrenders 15Aug 1945 Victory over Japan Day (VJ Day)
  • 109.
  • 110.
    Pacific Theater Quiz 1.What cities were nuclear bombed?
  • 111.
    The Assassination ofa War Hero General George S. Patton, perhaps the most popular of the American generals, immediately opposed the total or partial application of the Morgenthau Plan (the imposed starvation of the German populace) in his sector of occupation. Soon, he had a run-in with another general of higher rank: General Eisenhower. It's well-known what extremely violent debates they had about how the civilian population of Germany was to be treated. Patton was SENTENCEDTO DEATH by the directors of the scenario. Patton’s desire to invade the USSR after WWII was not popular either. He did not trust the Russians and realized that we needed eliminate a threat that would haunt us until 1989 when the Cold War ended with the collapse of the USSR. The communist infiltrated administration of Roosevelt had given the final invasion of the German capital to the Russians by withholding Patton’s poised army. On the 21st of April 1945, his airplane on which he was being transported to General Headquarters of the Third Army in Feldfield (England) was attacked by what was assumed to be a German fighter-bomber, but it turned out to be a "Spitfire" piloted by an inexpert Polish pilot. Patton's plane was shot up, but was miraculously able to land. On the 3rd of May, some days before the end of the war, the General's jeep was charged by an ox- drawn cart, leaving Patton with light injuries.
  • 112.
    The Assassination ofa War Hero (cont’d) October 13, 1945 was when the collision with the truck occurred. When Patton appeared to be getting better from the accident, the "heart attack" occurred. The fact is that after October 13 only the doctors saw Patton, forbidding any other visitors. Until recently, it was only speculation that Patton had been assassinated. Now it is known for a fact. And it is know for a very simple reason. Because an agent of the well-known OSS (Office of Strategic Services, forerunner for the Central Intelligence Agency, CIA) or American military spy, a certain Douglas Bazata, a Jew of Lebanese origin, announced it in front of 450 invited guests; high ranking, ex-members of the OSS, in the Hilton Hotel in Washington, the 25th of September, 1979. Bazata said, word-for-word: "For divers political reasons, many extremely high-ranking persons hated Patton. I know who killed him. Because I am the one who was hired to do it. Ten thousand dollars. General William [“Wild Bill”] Donovan himself, director of the O.S.S, entrusted me with the mission. I set up the accident. Since he didn't die in the accident, he was kept in isolation in the hospital, where he was killed with an injection." The tragic fate of Patton convinced other colleagues and their honorable compatriots of the uselessness of fighting against the WAR POWERS. And if any doubts remained, the "Morgan case" was enough to dissipate them.
  • 113.
    Audie Leon Murphy - CompanyB, 15th Regiment,Third Division,WorldWar II -The Most Decorated Soldier in American History
  • 114.
    World War IIMilitary Casualities  USSR 22 million  China 11 million  Germany 7 million  Poland 7 million  U.S. 0.5 million  Great Britain 0.3 million  Japan 1.5 million
  • 115.
    Nürnberg Trials Former Nazileaders were indicted and tried as war criminals by the International Military Tribunal. The indictment lodged against them contained four counts: (1) crimes against peace—i.e., the planning, initiating, and waging of wars of aggression in violation of international treaties and agreements; (2) crimes against humanity—i.e., exterminations, deportations, and genocide; (3) war crimes—i.e., violations of the laws of war; and (4) “a common plan or conspiracy to commit” the criminal acts listed in the first three counts. After 216 court sessions, on 1 Oct 1946, the verdict on 22 of the original 24 defendants was handed down. (Robert Ley committed suicide while in prison, and Gustav Krupp von Bohlen und Halbach’s mental and physical condition prevented his being tried.) Three of the defendants were acquitted; Hjalmar Schacht, Franz von Papen, and Hans Fritzsche. Four were sentenced to terms of imprisonment ranging from 10 to 20 years: Karl Dönitz, Baldur von Schirach, Albert Speer, and Konstantin von Neurath. Three were sentenced to life imprisonment: Rudolf Hess, Walther Funk, and Erich Räder. Twelve of the defendants were sentenced to death by hanging. Ten of them, Hans Frank, Wilhelm Frick, Julius Streicher, Alfred Rosenberg, Ernst Kaltenbrunner, Joachim von Ribbentrop, Fritz Sauckel, Alfred Jodl, Wilhelm Keitel, and Arthur Seyss-Inquart, were hanged on 16 Oct 1946. Martin Boormann was tried and condemned to death in absentia, and Hermann Göring committed suicide before he could be executed.
  • 116.
    Nuremberg Trials –Hitler's most trusted party officials, government ministers, military leaders, and powerful industrialists brought to trial for crimes against humanity, crimes against the peace and war crimes by U.S. Supreme Court Justice Robert Jackson.
  • 117.
    Post War Quiz 1.What war hero was assassinated by the predecessor of the CIA—theOSS? 2. What was the importance of Midway Island battle? 3. What was island hopping? 4. What legal proceedings were held afterWWII to try Nazis for war crimes?