Tutorial 2
Presentation
Professional Practice 1
TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 | WONG TIAN YI 0326891 | WONG SHER SHENG 0329950
Time
TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 | WONG TIAN YI 0326891 | WONG SHER SHENG 0329950
Scenario (a)
A fire occurs six (6) weeks before Chinese New Year.
Busy times of the year & could suffer a loss of profit (somewhere in the order of
RM500,000/day) if facilities are not able to cater for the holiday demand.
(Anticipated contract value: RM 20 million)
QualityCost
Time
Time is
prioritized
TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 | WONG TIAN YI 0326891 | WONG SHER SHENG 0329950
Scenario (a) Fire Damaged Airport
Developer
Works Packages
Contractors
Management
Contractor
Consultant
Team
Contractual Relationship & Coordination Coordination
CONSTRUCTION MANAGEMENT
• Management Contractor (M.C.) is appointed at early stage before full design is
completed
• All the works to be split into work packages
• Contract Sum as “basis of budgetary control” = Management Fees or Lump Sum
Fixed Fees based on estimated price cost of work packages
• To identity Sub-Contractor packages and draw up construction programme
• Contract cost plan is prepared by the QS based on specific set of drawings and
specification and upon agreement with the M.C.
TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 | WONG TIAN YI 0326891 | WONG SHER SHENG 0329950
Scenario (a) Fire Damaged Airport
TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 | WONG TIAN YI 0326891 | WONG SHER SHENG 0329950
Scenario (a) Fire Damaged Airport
Pros
 Shortened overall construction time
 Best possible price
 Budget control
 Expertise
 Good and early coordination and close link between Client, Consultants and M.C.
Cons (Eliminated)
 Uncertainty of final cost
 Variations and remeasurement
TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 | WONG TIAN YI 0326891 | WONG SHER SHENG 0329950
Scenario (b)
In the midst of a property boom, a developer purchases an old rice
mill and wishes to refurbish the building, converting it into high-
quality residential accommodation.
(Anticipated contracted value: RM 400 million)
What is Construction Management ?
Construction Management is a service that uses specialized, project management
techniques to manage the planning, design, and construction of a project, from its
beginning to its end.
Reason of choosing Construction Management
TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 | WONG TIAN YI 0326891 | WONG SHER SHENG 0329950
Design flexibility
- Client can change their
design anytime
Privity of Contract
- Protect client from unfair
situation
Cost Saving
- Client can select the work
contractor himself
Reduce Construction Time
- Overlapping the design and
construction time
Change
Design
@#!
Flows of Construction Management
TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 | WONG TIAN YI 0326891 | WONG SHER SHENG 0329950
Developer
Package
Contractor
Construction
Manager
Consultants
Contractual
Relationship
Coordination
TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 | WONG TIAN YI 0326891 | WONG SHER SHENG 0329950
Scenario (c)
The Selangor State Government is to develop a new community facility to provide
locally available social care.
(Anticipated contract value: RM 250 million)
Traditional procurement method
• Design work separate from construction
• Full documentation needed before tendering procedure begin
• Consultant appointed for design and cost control
• Contractor appointed through tendering for the construction works
Design BuildBid
Flows of Traditional Procurement Method
TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 | WONG TIAN YI 0326891 | WONG SHER SHENG 0329950
Developer
Nominated Sub
contractors
Consultants Main Contractor
Contractual
Relationship
Coordination
Domestic Sub
contractors
Why Traditional Procurement method
TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 | WONG TIAN YI 0326891 | WONG SHER SHENG 0329950
 Better quality work
 Consistent Construction Cost
 Commonly adopted in construction line
 Competitive fairness among contractor
TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 | WONG TIAN YI 0326891 | WONG SHER SHENG 0329950
Scenario (d)
Taylor’s University is considering building a multi-storey car park building in the
vicinity of the campus to overcome the serious shortage of car park spaces.
(Anticipated contract value: RM 50 million)
What is Build & Design?
The main contractor is appointed to design and construct the works
The client can have greater influence over the design, a concept design and outline
specification
Contractor is appointed to complete the design and carry out the construction.
The contractor may use their own in-house designers to design the building
Flow of Design & BUild Procurement method
TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 | WONG TIAN YI 0326891 | WONG SHER SHENG 0329950
Why Design & Build Procurement method
TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 | WONG TIAN YI 0326891 | WONG SHER SHENG 0329950
 Suitable for simple projects, where design quality is not
the main consideration.
 Employer’s financial commitment is capped
 It allows a fully integrated team to work together on the
project from the beginning.
 Design and build contracts can be awarded on a fixed
price, lump sum basis due to GMP ( Guarantee Maximum
Price )

More Related Content

Similar to Pp presentation 1

Measurement Presentation
Measurement PresentationMeasurement Presentation
Measurement Presentation
seenyeeyong
 
Building Economics Report
Building Economics Report Building Economics Report
Building Economics Report
Lin Hui
 
Project Management (Group)
Project Management (Group)Project Management (Group)
Project Management (Group)
FabienFoo
 
Fast track projects experiences and overview by Rajesh Prasad
Fast track projects   experiences and overview by Rajesh PrasadFast track projects   experiences and overview by Rajesh Prasad
Fast track projects experiences and overview by Rajesh Prasad
Rajesh Prasad
 
M4ppt
M4pptM4ppt
M4ppt
Timun Loh
 
Highway Construction
Highway ConstructionHighway Construction
Highway Construction
iratequarrel2587
 
5026-Tunnel-Operations-WEB
5026-Tunnel-Operations-WEB5026-Tunnel-Operations-WEB
5026-Tunnel-Operations-WEBRichard Jackson
 
Industrial Training Presentation Construction
Industrial Training Presentation ConstructionIndustrial Training Presentation Construction
Industrial Training Presentation Construction
KaranJayalakshman1
 
Measurement 4 presentation
Measurement 4 presentationMeasurement 4 presentation
Measurement 4 presentation
Lin Hui
 
EDMA Maxcon Credential V1.7
EDMA Maxcon Credential V1.7EDMA Maxcon Credential V1.7
EDMA Maxcon Credential V1.7
toontam sukosit
 
HOW CV 20161129
HOW CV 20161129HOW CV 20161129
HOW CV 20161129Ling How
 
Assignment - Management Contracting
Assignment - Management ContractingAssignment - Management Contracting
Assignment - Management Contracting
Kai Yun Pang
 
Professional practice 1 report
Professional practice 1 reportProfessional practice 1 report
Professional practice 1 report
Ngo Jia Haur
 
CV_of_A_K_Choudhary_with_Photo
CV_of_A_K_Choudhary_with_PhotoCV_of_A_K_Choudhary_with_Photo
CV_of_A_K_Choudhary_with_PhotoAshok Choudhary
 
PPM BIM summer school presentation vasudeva
PPM BIM summer school presentation vasudevaPPM BIM summer school presentation vasudeva
PPM BIM summer school presentation vasudeva
Narendra Vasudeva
 
Project Management Project 1 Report
Project Management Project 1 Report Project Management Project 1 Report
Project Management Project 1 Report
Sharon Yu Jung Lim
 
Development Proposal
Development ProposalDevelopment Proposal
Development Proposal
dtan97
 

Similar to Pp presentation 1 (20)

Measurement Presentation
Measurement PresentationMeasurement Presentation
Measurement Presentation
 
Building Economics Report
Building Economics Report Building Economics Report
Building Economics Report
 
Project Management (Group)
Project Management (Group)Project Management (Group)
Project Management (Group)
 
Fast track projects experiences and overview by Rajesh Prasad
Fast track projects   experiences and overview by Rajesh PrasadFast track projects   experiences and overview by Rajesh Prasad
Fast track projects experiences and overview by Rajesh Prasad
 
M4ppt
M4pptM4ppt
M4ppt
 
Highway Construction
Highway ConstructionHighway Construction
Highway Construction
 
Company Profile
Company ProfileCompany Profile
Company Profile
 
5026-Tunnel-Operations-WEB
5026-Tunnel-Operations-WEB5026-Tunnel-Operations-WEB
5026-Tunnel-Operations-WEB
 
Industrial Training Presentation Construction
Industrial Training Presentation ConstructionIndustrial Training Presentation Construction
Industrial Training Presentation Construction
 
Measurement 4 presentation
Measurement 4 presentationMeasurement 4 presentation
Measurement 4 presentation
 
CV ref
CV refCV ref
CV ref
 
EDMA Maxcon Credential V1.7
EDMA Maxcon Credential V1.7EDMA Maxcon Credential V1.7
EDMA Maxcon Credential V1.7
 
HOW CV 20161129
HOW CV 20161129HOW CV 20161129
HOW CV 20161129
 
Pp
Pp Pp
Pp
 
Assignment - Management Contracting
Assignment - Management ContractingAssignment - Management Contracting
Assignment - Management Contracting
 
Professional practice 1 report
Professional practice 1 reportProfessional practice 1 report
Professional practice 1 report
 
CV_of_A_K_Choudhary_with_Photo
CV_of_A_K_Choudhary_with_PhotoCV_of_A_K_Choudhary_with_Photo
CV_of_A_K_Choudhary_with_Photo
 
PPM BIM summer school presentation vasudeva
PPM BIM summer school presentation vasudevaPPM BIM summer school presentation vasudeva
PPM BIM summer school presentation vasudeva
 
Project Management Project 1 Report
Project Management Project 1 Report Project Management Project 1 Report
Project Management Project 1 Report
 
Development Proposal
Development ProposalDevelopment Proposal
Development Proposal
 

More from w ss

Est 22222
Est 22222Est 22222
Est 22222
w ss
 
Course outline august 2015 qsb 2813 software application for qs
Course outline august 2015 qsb 2813 software application for qsCourse outline august 2015 qsb 2813 software application for qs
Course outline august 2015 qsb 2813 software application for qs
w ss
 
Structure project brief march 2018 (updated)
Structure project brief march 2018 (updated)Structure project brief march 2018 (updated)
Structure project brief march 2018 (updated)
w ss
 
Assignment brief qsb2134 tender
Assignment brief qsb2134 tenderAssignment brief qsb2134 tender
Assignment brief qsb2134 tender
w ss
 
Evaluation brief qsb2134 tender
Evaluation brief qsb2134 tenderEvaluation brief qsb2134 tender
Evaluation brief qsb2134 tender
w ss
 
Management science
Management scienceManagement science
Management science
w ss
 
Ctiii steel framing system [ cold form structures + composite floor slab ]
Ctiii steel framing system  [ cold form structures + composite floor slab ]Ctiii steel framing system  [ cold form structures + composite floor slab ]
Ctiii steel framing system [ cold form structures + composite floor slab ]
w ss
 
Steel framing system report
Steel framing system reportSteel framing system report
Steel framing system report
w ss
 
Group assignment brief ct3-aug2017
Group assignment brief ct3-aug2017Group assignment brief ct3-aug2017
Group assignment brief ct3-aug2017
w ss
 
Site surveying 2 done
Site surveying 2   done Site surveying 2   done
Site surveying 2 done
w ss
 
Site surveying 1 - done
Site surveying 1 - done Site surveying 1 - done
Site surveying 1 - done
w ss
 
Final presentation
Final presentationFinal presentation
Final presentation
w ss
 
Site surveying 1 - done
Site surveying 1 - done Site surveying 1 - done
Site surveying 1 - done
w ss
 
Building services assignment
Building services assignmentBuilding services assignment
Building services assignment
w ss
 
Group project bs1
Group project bs1 Group project bs1
Group project bs1
w ss
 
M2 project assignment mar 2017
M2 project assignment mar 2017M2 project assignment mar 2017
M2 project assignment mar 2017
w ss
 
Assignment 1 bld60204 mac2017
Assignment 1 bld60204 mac2017Assignment 1 bld60204 mac2017
Assignment 1 bld60204 mac2017
w ss
 
Assignment 2 bld60204 sketching
Assignment 2 bld60204 sketchingAssignment 2 bld60204 sketching
Assignment 2 bld60204 sketching
w ss
 
Aluminium formwork(t 4 a)
Aluminium formwork(t 4 a)Aluminium formwork(t 4 a)
Aluminium formwork(t 4 a)
w ss
 
Flooring presentation(t 4 b)
Flooring presentation(t 4 b)Flooring presentation(t 4 b)
Flooring presentation(t 4 b)
w ss
 

More from w ss (20)

Est 22222
Est 22222Est 22222
Est 22222
 
Course outline august 2015 qsb 2813 software application for qs
Course outline august 2015 qsb 2813 software application for qsCourse outline august 2015 qsb 2813 software application for qs
Course outline august 2015 qsb 2813 software application for qs
 
Structure project brief march 2018 (updated)
Structure project brief march 2018 (updated)Structure project brief march 2018 (updated)
Structure project brief march 2018 (updated)
 
Assignment brief qsb2134 tender
Assignment brief qsb2134 tenderAssignment brief qsb2134 tender
Assignment brief qsb2134 tender
 
Evaluation brief qsb2134 tender
Evaluation brief qsb2134 tenderEvaluation brief qsb2134 tender
Evaluation brief qsb2134 tender
 
Management science
Management scienceManagement science
Management science
 
Ctiii steel framing system [ cold form structures + composite floor slab ]
Ctiii steel framing system  [ cold form structures + composite floor slab ]Ctiii steel framing system  [ cold form structures + composite floor slab ]
Ctiii steel framing system [ cold form structures + composite floor slab ]
 
Steel framing system report
Steel framing system reportSteel framing system report
Steel framing system report
 
Group assignment brief ct3-aug2017
Group assignment brief ct3-aug2017Group assignment brief ct3-aug2017
Group assignment brief ct3-aug2017
 
Site surveying 2 done
Site surveying 2   done Site surveying 2   done
Site surveying 2 done
 
Site surveying 1 - done
Site surveying 1 - done Site surveying 1 - done
Site surveying 1 - done
 
Final presentation
Final presentationFinal presentation
Final presentation
 
Site surveying 1 - done
Site surveying 1 - done Site surveying 1 - done
Site surveying 1 - done
 
Building services assignment
Building services assignmentBuilding services assignment
Building services assignment
 
Group project bs1
Group project bs1 Group project bs1
Group project bs1
 
M2 project assignment mar 2017
M2 project assignment mar 2017M2 project assignment mar 2017
M2 project assignment mar 2017
 
Assignment 1 bld60204 mac2017
Assignment 1 bld60204 mac2017Assignment 1 bld60204 mac2017
Assignment 1 bld60204 mac2017
 
Assignment 2 bld60204 sketching
Assignment 2 bld60204 sketchingAssignment 2 bld60204 sketching
Assignment 2 bld60204 sketching
 
Aluminium formwork(t 4 a)
Aluminium formwork(t 4 a)Aluminium formwork(t 4 a)
Aluminium formwork(t 4 a)
 
Flooring presentation(t 4 b)
Flooring presentation(t 4 b)Flooring presentation(t 4 b)
Flooring presentation(t 4 b)
 

Recently uploaded

Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
TechSoup
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
The basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptxThe basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptx
heathfieldcps1
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
camakaiclarkmusic
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
EduSkills OECD
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
beazzy04
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
Celine George
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
Peter Windle
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
joachimlavalley1
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
Anna Sz.
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
BhavyaRajput3
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
DhatriParmar
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
Vikramjit Singh
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
MysoreMuleSoftMeetup
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
RaedMohamed3
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
vaibhavrinwa19
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
JosvitaDsouza2
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
Balvir Singh
 
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th SemesterGuidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Atul Kumar Singh
 

Recently uploaded (20)

Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
The basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptxThe basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptx
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
 
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th SemesterGuidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th Semester
 

Pp presentation 1

  • 1. Tutorial 2 Presentation Professional Practice 1 TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 | WONG TIAN YI 0326891 | WONG SHER SHENG 0329950 Time
  • 2. TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 | WONG TIAN YI 0326891 | WONG SHER SHENG 0329950 Scenario (a) A fire occurs six (6) weeks before Chinese New Year. Busy times of the year & could suffer a loss of profit (somewhere in the order of RM500,000/day) if facilities are not able to cater for the holiday demand. (Anticipated contract value: RM 20 million) QualityCost Time Time is prioritized
  • 3. TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 | WONG TIAN YI 0326891 | WONG SHER SHENG 0329950 Scenario (a) Fire Damaged Airport Developer Works Packages Contractors Management Contractor Consultant Team Contractual Relationship & Coordination Coordination
  • 4. CONSTRUCTION MANAGEMENT • Management Contractor (M.C.) is appointed at early stage before full design is completed • All the works to be split into work packages • Contract Sum as “basis of budgetary control” = Management Fees or Lump Sum Fixed Fees based on estimated price cost of work packages • To identity Sub-Contractor packages and draw up construction programme • Contract cost plan is prepared by the QS based on specific set of drawings and specification and upon agreement with the M.C. TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 | WONG TIAN YI 0326891 | WONG SHER SHENG 0329950 Scenario (a) Fire Damaged Airport
  • 5. TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 | WONG TIAN YI 0326891 | WONG SHER SHENG 0329950 Scenario (a) Fire Damaged Airport Pros  Shortened overall construction time  Best possible price  Budget control  Expertise  Good and early coordination and close link between Client, Consultants and M.C. Cons (Eliminated)  Uncertainty of final cost  Variations and remeasurement
  • 6. TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 | WONG TIAN YI 0326891 | WONG SHER SHENG 0329950 Scenario (b) In the midst of a property boom, a developer purchases an old rice mill and wishes to refurbish the building, converting it into high- quality residential accommodation. (Anticipated contracted value: RM 400 million) What is Construction Management ? Construction Management is a service that uses specialized, project management techniques to manage the planning, design, and construction of a project, from its beginning to its end.
  • 7. Reason of choosing Construction Management TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 | WONG TIAN YI 0326891 | WONG SHER SHENG 0329950 Design flexibility - Client can change their design anytime Privity of Contract - Protect client from unfair situation Cost Saving - Client can select the work contractor himself Reduce Construction Time - Overlapping the design and construction time Change Design @#!
  • 8. Flows of Construction Management TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 | WONG TIAN YI 0326891 | WONG SHER SHENG 0329950 Developer Package Contractor Construction Manager Consultants Contractual Relationship Coordination
  • 9. TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 | WONG TIAN YI 0326891 | WONG SHER SHENG 0329950 Scenario (c) The Selangor State Government is to develop a new community facility to provide locally available social care. (Anticipated contract value: RM 250 million) Traditional procurement method • Design work separate from construction • Full documentation needed before tendering procedure begin • Consultant appointed for design and cost control • Contractor appointed through tendering for the construction works Design BuildBid
  • 10. Flows of Traditional Procurement Method TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 | WONG TIAN YI 0326891 | WONG SHER SHENG 0329950 Developer Nominated Sub contractors Consultants Main Contractor Contractual Relationship Coordination Domestic Sub contractors
  • 11. Why Traditional Procurement method TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 | WONG TIAN YI 0326891 | WONG SHER SHENG 0329950  Better quality work  Consistent Construction Cost  Commonly adopted in construction line  Competitive fairness among contractor
  • 12. TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 | WONG TIAN YI 0326891 | WONG SHER SHENG 0329950 Scenario (d) Taylor’s University is considering building a multi-storey car park building in the vicinity of the campus to overcome the serious shortage of car park spaces. (Anticipated contract value: RM 50 million) What is Build & Design? The main contractor is appointed to design and construct the works The client can have greater influence over the design, a concept design and outline specification Contractor is appointed to complete the design and carry out the construction. The contractor may use their own in-house designers to design the building
  • 13. Flow of Design & BUild Procurement method TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 | WONG TIAN YI 0326891 | WONG SHER SHENG 0329950
  • 14. Why Design & Build Procurement method TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 | WONG TIAN YI 0326891 | WONG SHER SHENG 0329950  Suitable for simple projects, where design quality is not the main consideration.  Employer’s financial commitment is capped  It allows a fully integrated team to work together on the project from the beginning.  Design and build contracts can be awarded on a fixed price, lump sum basis due to GMP ( Guarantee Maximum Price )

Editor's Notes

  1. The type of procurement I chose for this scenario is construction management and its based on the cost, time and design risk. So, what is construction management ? It is a service that use to manage the planning, design and construction of a project and basically this construction management will not take physical construction but to split the work to packages which is similar to the management contracting. The advantages of construction management is design flexibility because the design is not fixed like how traditional procurement method so the client can change their design anytime. Cost saving because the client can select the work contractor himself, cost saving because he might know some of the trade contractor since he is a developer and also construction manager is appointed in the early stage hence the construction manager can reduce the cost of proposal. Reduce construction time by overlapping the design and construction this basically mean they construct while they designing it. Lastly, privity of contract between the client and work contractor this contract protect client from unfair situation