Single Stage Design and Build Method & Construction Project Management
                                 John Constance
                MSc in Project Management, University of Liverpool

Introduction

When design concept drawings are produced this indicates that a design brief has been
implemented and additional data has been prepared (RIBA 2007). The design concept
drawings include completed structural and building services systems, specifications and
the design initial cost plan.

The use of the GC/Works/1 Single Stage Design and Build methodology indicates that
the number of tenderers are restricted and narrowed down to an approved list based
derived from applicants experience, general skills, financial capacity, integrity, and their
demonstrated competence and quality assurance approach.

Considering the two factors, this paper reviews the strengths and limitations of single
stage design and build methodology and the major challenges it imposes on project
managers for construction during design work; and how these challenges and their
associated risks can be mitigated.

Design Concept Drawings

According to the USACE (2008) Engineering Guide Design manual, the design concept
comes immediately after the special consideration of function, sustainability, technical
codes and standards, construction classification, accessibility standards, site adaptation
and alternative design and recommendations are completed and approved by the client.

With this information the designer can then produce construction drawings that will
include a cover information, perspective and architectural plans including floors, fire
protection code compliance, demolition, etc. and elevations and sections. With this
information the designer can now proceed to produce intermediate plans and a final
design.

However, during this stage it is important the construction project manager ensure that
a monitoring and controlling system is in place to produce the design information (CIOB,
2010, p.44). Selecting a design team leader can do this and there should be meeting of
the design team and other consultants to review all characteristics of the project. There
should also be a design management plan to show roles and responsibilities, drawing
type size and format, and schedules, computer aided design interdependencies, an IT
data transfer system, the impact of design resources to the productivity achieved, design
changes procedure and their predictive effects, and design performance review.

Fewings (2005, p.234) advised that design management be done to ensure that building
design information be the best quality and be constructed at the right time and delivered
to the right people. This is important for the construction project manage so as to have
the design team fully prepared for the issuance of the tender.
GC/Works/1 Single Stage Design and Build Methodology

In the single stage design and build methodology the contractor is not involved in the
project planning at the initial stage. Therefore offers are submitted with less information,
making the firm price only as wholesome as the design information. Also, any change
undermines certainty achieved with a lump-sum tender, and if cost assessment or the
contractorโ€™s working method is incorrect, the risk transfer may have little value, and the
tenderers will take pricing risk due to the competitive pressure, and the approach offers
reduced scope for a shared objective or for a contractorโ€™s contribution to the design
development.

Notwithstanding, with this approach there is cost certainty, risk allocation in the contract
is well defined, pricing is competitive, the cost of tendering simplifies tendering process,
with a complete, well-documented design there is a clear delineation of design and
construction obligations, and timescales are identified creating less opportunity for
extended negotiation (Simon Rawlinson, 2008)

Challenges and associated risk mitigation measures

    โ€ข   Ensuring all problems are identified - this can effect in delay, design changes, co-
        ordination hitches โ€“ ensure the design concept is detailed and well defined and
        involves all professional disciplines early on.
    โ€ข   Managing the design process including co-ordination and responsibility to
        produce certainty โ€“ this can lead to poor design programming and tracking and
        product โ€“ thoroughly apply design-stage reviews and freezes considering cost
        management procedures (Sundaram, 2008), all the elements of green design
        (Kubba, 2010, p.305), value management (CIOB, 2008, p.28), and the most
        technically advanced and applicable suite of construction design codes (British
        Standards Institute, 2009)
    โ€ข   Ensuring tender documents are complete or unambiguous โ€“ this can lead to
        errors or blunders in the contractorโ€™s offer โ€“ make sure the tender documents are
        in accordance to the code of procedure for single stage selective tendering
        (1996, NJCC)
    โ€ข   Selecting the spot-on contractor โ€“ poor selection can lead to poor delivery and
        unsatisfied client โ€“ invest in pre-bid conferences and mid-tender consultation
        using quality criteria and maybe e-tendering software (Simon Rawlinson, 2008)
    โ€ข   Mitigating contractorโ€™s risk โ€“ while this creates competitive pricing it tends to
        leave the contractorโ€™s exposure open-ended - limit the contractorโ€™s risk and
        minimise work design during construction, and permit the contractor as much
        discretion over specialists selection
_____________________________________________________________________________________

References

British Standards Institute (2009) BSI structural Eurocode companion [Online] Available from:
http://www.bsigroup.com/upload/Standards%20&%20Publications/BrochureDownload/pdfs/BSI
%20EurocodesBro2010.pdf (Accessed: 4 March 2011).

Chartered Institute of Building (2010) Code of practice for project management for construction and
development 4th ed. Oxford: Wiley-Blackwell
Fewings, P. (2005) Construction project management: an integrated approach. London: Taylor & Francis

Kubba, S. (2010) โ€˜Elements of green design and constructionโ€™. In: Green construction project
management and cost oversight. Oxford: Architectural Press, pp.28-70

NJCC (1996) Code of Procedure for Single Stage Selective Tendering Published for the NJCC by RIBA
Publications, Finsbury Mission, 39 Moreland Street, London EC1V 8BB RlBA Publications is a division of
RlBA Companies Ltd ยฉ 1996 NJCC Printed by The Broadwater Press Ltd, Welwyn Garden City, Herts

Outline Plan of Work 2007 Work Stage Sequences by Procurement Method, Royal Institute of British
Architects ยฉ RIBA 2007

Simon Rawlinson (2008) Procurement single-stage tendering 21.11.2008 building magazine (Online)
Available from: http://www.building.co.uk/data/procurement-single-stage-tendering/3127871.article

Sundaram, V. (2008) โ€˜Essentials of design phase cost management and budget controlโ€™, Cost
Engineering, 50 (2), pp.24-28.

USACE (2008) Engineering Guidance Design Manual, Seventh Edition, US Army Corps of Engineer and
Support Center, Huntsville, Huntsville, Alabama

More Related Content

What's hot

Value Management Group Assignment
Value Management Group AssignmentValue Management Group Assignment
Value Management Group Assignment
Arissa Loh
ย 
Lecture 1 introduction to construction procurement process.
Lecture 1   introduction to construction procurement process.Lecture 1   introduction to construction procurement process.
Lecture 1 introduction to construction procurement process.Aszahari Aie
ย 
Value Management Assignment (Report)
Value Management Assignment (Report)Value Management Assignment (Report)
Value Management Assignment (Report)
Pang Khai Shuen
ย 
Procurement Methods and their Application.
Procurement Methods and their Application.Procurement Methods and their Application.
Procurement Methods and their Application.Lilian Nwachukwu
ย 
Pp group assignment
Pp group assignmentPp group assignment
Pp group assignment
wendyteosy
ย 
Procurement Methods
Procurement MethodsProcurement Methods
Procurement MethodsLilian Nwachukwu
ย 
Assignmenr for pp2 final account
Assignmenr for pp2 final accountAssignmenr for pp2 final account
Assignmenr for pp2 final account
ahmong4
ย 
Quantity Surveyor presentation
Quantity Surveyor presentationQuantity Surveyor presentation
Quantity Surveyor presentation
cynfang Fong
ย 
Tender evaluation procedure
Tender evaluation procedureTender evaluation procedure
Tender evaluation procedure
ayushida
ย 
Excavation 2014a-Lecture2
Excavation 2014a-Lecture2Excavation 2014a-Lecture2
Excavation 2014a-Lecture2Anne Allan
ย 
Construction Contract in Malaysia
Construction Contract in MalaysiaConstruction Contract in Malaysia
Construction Contract in Malaysia
Dayat Mohamad
ย 
Lecture 2 tender process n documentation
Lecture 2 tender process n documentationLecture 2 tender process n documentation
Lecture 2 tender process n documentation
ArchDuty
ย 
Assignment - Management Contracting
Assignment - Management ContractingAssignment - Management Contracting
Assignment - Management Contracting
Kai Yun Pang
ย 
Conditions Of Contract
Conditions Of ContractConditions Of Contract
Conditions Of Contractguestdb5e498
ย 
Payments in the construction industry
Payments in the construction industryPayments in the construction industry
Payments in the construction industry
Kheng Hoe Advocates
ย 
Tendering in construction introduction
Tendering in construction introductionTendering in construction introduction
Tendering in construction introduction
Daniel Ross
ย 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1
Sow Wei Henn
ย 
Stakeholderโ€™s Involvement in Construction Industry
Stakeholderโ€™s Involvement in Construction IndustryStakeholderโ€™s Involvement in Construction Industry
Stakeholderโ€™s Involvement in Construction Industry
Akshika Mahanama
ย 
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAMDIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAMAnep Botak
ย 
Professional practce assignment report
Professional practce assignment reportProfessional practce assignment report
Professional practce assignment report
Syafiq Zariful
ย 

What's hot (20)

Value Management Group Assignment
Value Management Group AssignmentValue Management Group Assignment
Value Management Group Assignment
ย 
Lecture 1 introduction to construction procurement process.
Lecture 1   introduction to construction procurement process.Lecture 1   introduction to construction procurement process.
Lecture 1 introduction to construction procurement process.
ย 
Value Management Assignment (Report)
Value Management Assignment (Report)Value Management Assignment (Report)
Value Management Assignment (Report)
ย 
Procurement Methods and their Application.
Procurement Methods and their Application.Procurement Methods and their Application.
Procurement Methods and their Application.
ย 
Pp group assignment
Pp group assignmentPp group assignment
Pp group assignment
ย 
Procurement Methods
Procurement MethodsProcurement Methods
Procurement Methods
ย 
Assignmenr for pp2 final account
Assignmenr for pp2 final accountAssignmenr for pp2 final account
Assignmenr for pp2 final account
ย 
Quantity Surveyor presentation
Quantity Surveyor presentationQuantity Surveyor presentation
Quantity Surveyor presentation
ย 
Tender evaluation procedure
Tender evaluation procedureTender evaluation procedure
Tender evaluation procedure
ย 
Excavation 2014a-Lecture2
Excavation 2014a-Lecture2Excavation 2014a-Lecture2
Excavation 2014a-Lecture2
ย 
Construction Contract in Malaysia
Construction Contract in MalaysiaConstruction Contract in Malaysia
Construction Contract in Malaysia
ย 
Lecture 2 tender process n documentation
Lecture 2 tender process n documentationLecture 2 tender process n documentation
Lecture 2 tender process n documentation
ย 
Assignment - Management Contracting
Assignment - Management ContractingAssignment - Management Contracting
Assignment - Management Contracting
ย 
Conditions Of Contract
Conditions Of ContractConditions Of Contract
Conditions Of Contract
ย 
Payments in the construction industry
Payments in the construction industryPayments in the construction industry
Payments in the construction industry
ย 
Tendering in construction introduction
Tendering in construction introductionTendering in construction introduction
Tendering in construction introduction
ย 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1
ย 
Stakeholderโ€™s Involvement in Construction Industry
Stakeholderโ€™s Involvement in Construction IndustryStakeholderโ€™s Involvement in Construction Industry
Stakeholderโ€™s Involvement in Construction Industry
ย 
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAMDIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
ย 
Professional practce assignment report
Professional practce assignment reportProfessional practce assignment report
Professional practce assignment report
ย 

Similar to Single stage design and build method & construction project management

A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1
Pang Khai Shuen
ย 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
AYM1979
ย 
PP1 report
PP1 reportPP1 report
PP1 report
Doreen Yeo
ย 
A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1
Pang Khai Shuen
ย 
CE-545_Fall 2015_TPG_03_Final_Report
CE-545_Fall 2015_TPG_03_Final_ReportCE-545_Fall 2015_TPG_03_Final_Report
CE-545_Fall 2015_TPG_03_Final_ReportMuhammad Daniyal
ย 
043 integrating risk management
043 integrating risk management043 integrating risk management
043 integrating risk management
drdej19
ย 
043 Integrating Risk Management
043 Integrating Risk Management043 Integrating Risk Management
043 Integrating Risk Management
Dr Fereidoun Dejahang
ย 
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
World-Academic Journal
ย 
Cost Based Consultant Evaluation and Selection under FIDIC QCBS 1st Edt - Wit...
Cost Based Consultant Evaluation and Selection under FIDIC QCBS 1st Edt - Wit...Cost Based Consultant Evaluation and Selection under FIDIC QCBS 1st Edt - Wit...
Cost Based Consultant Evaluation and Selection under FIDIC QCBS 1st Edt - Wit...
ssusered96e2
ย 
Construction project management
Construction project managementConstruction project management
Construction project management
saif hasan
ย 
BIM from an FM perspective
BIM from an FM perspectiveBIM from an FM perspective
BIM from an FM perspective
British Institute of Facilities Management
ย 
Review Application of value engineering in construction project.
Review Application of value engineering in construction project.Review Application of value engineering in construction project.
Review Application of value engineering in construction project.
IRJET Journal
ย 
An Integrated BIM System To Track The Time And Cost Of Construction Projects ...
An Integrated BIM System To Track The Time And Cost Of Construction Projects ...An Integrated BIM System To Track The Time And Cost Of Construction Projects ...
An Integrated BIM System To Track The Time And Cost Of Construction Projects ...
Nat Rice
ย 
CCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdf
CCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdfCCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdf
CCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdf
ChassyTesoro1
ย 
IRJET- Application of Decision Making Tool in Sustainable Construction
IRJET- Application of Decision Making Tool in Sustainable ConstructionIRJET- Application of Decision Making Tool in Sustainable Construction
IRJET- Application of Decision Making Tool in Sustainable Construction
IRJET Journal
ย 
Giving construction a new face with enhanced project quality and reduced rewo...
Giving construction a new face with enhanced project quality and reduced rewo...Giving construction a new face with enhanced project quality and reduced rewo...
Giving construction a new face with enhanced project quality and reduced rewo...
BIMEngus1
ย 
Project delay and_cost_overrun-libre
Project delay and_cost_overrun-libreProject delay and_cost_overrun-libre
Project delay and_cost_overrun-libreUTHM
ย 
H1303055462
H1303055462H1303055462
H1303055462
IOSR Journals
ย 
Project Planning: Advanced Techniques and Process Waste Removals โ€“ A Review
Project Planning: Advanced Techniques and Process Waste Removals โ€“ A ReviewProject Planning: Advanced Techniques and Process Waste Removals โ€“ A Review
Project Planning: Advanced Techniques and Process Waste Removals โ€“ A Review
IRJET Journal
ย 
IRJET- A Review Paper on Quantifay the Different Constraints for Delays in In...
IRJET- A Review Paper on Quantifay the Different Constraints for Delays in In...IRJET- A Review Paper on Quantifay the Different Constraints for Delays in In...
IRJET- A Review Paper on Quantifay the Different Constraints for Delays in In...
IRJET Journal
ย 

Similar to Single stage design and build method & construction project management (20)

A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1
ย 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
ย 
PP1 report
PP1 reportPP1 report
PP1 report
ย 
A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1
ย 
CE-545_Fall 2015_TPG_03_Final_Report
CE-545_Fall 2015_TPG_03_Final_ReportCE-545_Fall 2015_TPG_03_Final_Report
CE-545_Fall 2015_TPG_03_Final_Report
ย 
043 integrating risk management
043 integrating risk management043 integrating risk management
043 integrating risk management
ย 
043 Integrating Risk Management
043 Integrating Risk Management043 Integrating Risk Management
043 Integrating Risk Management
ย 
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
ย 
Cost Based Consultant Evaluation and Selection under FIDIC QCBS 1st Edt - Wit...
Cost Based Consultant Evaluation and Selection under FIDIC QCBS 1st Edt - Wit...Cost Based Consultant Evaluation and Selection under FIDIC QCBS 1st Edt - Wit...
Cost Based Consultant Evaluation and Selection under FIDIC QCBS 1st Edt - Wit...
ย 
Construction project management
Construction project managementConstruction project management
Construction project management
ย 
BIM from an FM perspective
BIM from an FM perspectiveBIM from an FM perspective
BIM from an FM perspective
ย 
Review Application of value engineering in construction project.
Review Application of value engineering in construction project.Review Application of value engineering in construction project.
Review Application of value engineering in construction project.
ย 
An Integrated BIM System To Track The Time And Cost Of Construction Projects ...
An Integrated BIM System To Track The Time And Cost Of Construction Projects ...An Integrated BIM System To Track The Time And Cost Of Construction Projects ...
An Integrated BIM System To Track The Time And Cost Of Construction Projects ...
ย 
CCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdf
CCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdfCCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdf
CCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdf
ย 
IRJET- Application of Decision Making Tool in Sustainable Construction
IRJET- Application of Decision Making Tool in Sustainable ConstructionIRJET- Application of Decision Making Tool in Sustainable Construction
IRJET- Application of Decision Making Tool in Sustainable Construction
ย 
Giving construction a new face with enhanced project quality and reduced rewo...
Giving construction a new face with enhanced project quality and reduced rewo...Giving construction a new face with enhanced project quality and reduced rewo...
Giving construction a new face with enhanced project quality and reduced rewo...
ย 
Project delay and_cost_overrun-libre
Project delay and_cost_overrun-libreProject delay and_cost_overrun-libre
Project delay and_cost_overrun-libre
ย 
H1303055462
H1303055462H1303055462
H1303055462
ย 
Project Planning: Advanced Techniques and Process Waste Removals โ€“ A Review
Project Planning: Advanced Techniques and Process Waste Removals โ€“ A ReviewProject Planning: Advanced Techniques and Process Waste Removals โ€“ A Review
Project Planning: Advanced Techniques and Process Waste Removals โ€“ A Review
ย 
IRJET- A Review Paper on Quantifay the Different Constraints for Delays in In...
IRJET- A Review Paper on Quantifay the Different Constraints for Delays in In...IRJET- A Review Paper on Quantifay the Different Constraints for Delays in In...
IRJET- A Review Paper on Quantifay the Different Constraints for Delays in In...
ย 

Recently uploaded

Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
ย 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
ย 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
KaiNexus
ย 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
Ben Wann
ย 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
DerekIwanaka1
ย 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
HumanResourceDimensi1
ย 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
ย 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
BBPMedia1
ย 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
ย 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
ย 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
BBPMedia1
ย 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
ย 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
Ben Wann
ย 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
ย 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Navpack & Print
ย 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
ย 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
Sam H
ย 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
agatadrynko
ย 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
Falcon Invoice Discounting
ย 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
Bojamma2
ย 

Recently uploaded (20)

Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
ย 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
ย 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
ย 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
ย 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
ย 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
ย 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
ย 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
ย 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
ย 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
ย 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
ย 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
ย 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
ย 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
ย 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
ย 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
ย 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
ย 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ย 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
ย 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
ย 

Single stage design and build method & construction project management

  • 1. Single Stage Design and Build Method & Construction Project Management John Constance MSc in Project Management, University of Liverpool Introduction When design concept drawings are produced this indicates that a design brief has been implemented and additional data has been prepared (RIBA 2007). The design concept drawings include completed structural and building services systems, specifications and the design initial cost plan. The use of the GC/Works/1 Single Stage Design and Build methodology indicates that the number of tenderers are restricted and narrowed down to an approved list based derived from applicants experience, general skills, financial capacity, integrity, and their demonstrated competence and quality assurance approach. Considering the two factors, this paper reviews the strengths and limitations of single stage design and build methodology and the major challenges it imposes on project managers for construction during design work; and how these challenges and their associated risks can be mitigated. Design Concept Drawings According to the USACE (2008) Engineering Guide Design manual, the design concept comes immediately after the special consideration of function, sustainability, technical codes and standards, construction classification, accessibility standards, site adaptation and alternative design and recommendations are completed and approved by the client. With this information the designer can then produce construction drawings that will include a cover information, perspective and architectural plans including floors, fire protection code compliance, demolition, etc. and elevations and sections. With this information the designer can now proceed to produce intermediate plans and a final design. However, during this stage it is important the construction project manager ensure that a monitoring and controlling system is in place to produce the design information (CIOB, 2010, p.44). Selecting a design team leader can do this and there should be meeting of the design team and other consultants to review all characteristics of the project. There should also be a design management plan to show roles and responsibilities, drawing type size and format, and schedules, computer aided design interdependencies, an IT data transfer system, the impact of design resources to the productivity achieved, design changes procedure and their predictive effects, and design performance review. Fewings (2005, p.234) advised that design management be done to ensure that building design information be the best quality and be constructed at the right time and delivered to the right people. This is important for the construction project manage so as to have the design team fully prepared for the issuance of the tender.
  • 2. GC/Works/1 Single Stage Design and Build Methodology In the single stage design and build methodology the contractor is not involved in the project planning at the initial stage. Therefore offers are submitted with less information, making the firm price only as wholesome as the design information. Also, any change undermines certainty achieved with a lump-sum tender, and if cost assessment or the contractorโ€™s working method is incorrect, the risk transfer may have little value, and the tenderers will take pricing risk due to the competitive pressure, and the approach offers reduced scope for a shared objective or for a contractorโ€™s contribution to the design development. Notwithstanding, with this approach there is cost certainty, risk allocation in the contract is well defined, pricing is competitive, the cost of tendering simplifies tendering process, with a complete, well-documented design there is a clear delineation of design and construction obligations, and timescales are identified creating less opportunity for extended negotiation (Simon Rawlinson, 2008) Challenges and associated risk mitigation measures โ€ข Ensuring all problems are identified - this can effect in delay, design changes, co- ordination hitches โ€“ ensure the design concept is detailed and well defined and involves all professional disciplines early on. โ€ข Managing the design process including co-ordination and responsibility to produce certainty โ€“ this can lead to poor design programming and tracking and product โ€“ thoroughly apply design-stage reviews and freezes considering cost management procedures (Sundaram, 2008), all the elements of green design (Kubba, 2010, p.305), value management (CIOB, 2008, p.28), and the most technically advanced and applicable suite of construction design codes (British Standards Institute, 2009) โ€ข Ensuring tender documents are complete or unambiguous โ€“ this can lead to errors or blunders in the contractorโ€™s offer โ€“ make sure the tender documents are in accordance to the code of procedure for single stage selective tendering (1996, NJCC) โ€ข Selecting the spot-on contractor โ€“ poor selection can lead to poor delivery and unsatisfied client โ€“ invest in pre-bid conferences and mid-tender consultation using quality criteria and maybe e-tendering software (Simon Rawlinson, 2008) โ€ข Mitigating contractorโ€™s risk โ€“ while this creates competitive pricing it tends to leave the contractorโ€™s exposure open-ended - limit the contractorโ€™s risk and minimise work design during construction, and permit the contractor as much discretion over specialists selection _____________________________________________________________________________________ References British Standards Institute (2009) BSI structural Eurocode companion [Online] Available from: http://www.bsigroup.com/upload/Standards%20&%20Publications/BrochureDownload/pdfs/BSI %20EurocodesBro2010.pdf (Accessed: 4 March 2011). Chartered Institute of Building (2010) Code of practice for project management for construction and development 4th ed. Oxford: Wiley-Blackwell
  • 3. Fewings, P. (2005) Construction project management: an integrated approach. London: Taylor & Francis Kubba, S. (2010) โ€˜Elements of green design and constructionโ€™. In: Green construction project management and cost oversight. Oxford: Architectural Press, pp.28-70 NJCC (1996) Code of Procedure for Single Stage Selective Tendering Published for the NJCC by RIBA Publications, Finsbury Mission, 39 Moreland Street, London EC1V 8BB RlBA Publications is a division of RlBA Companies Ltd ยฉ 1996 NJCC Printed by The Broadwater Press Ltd, Welwyn Garden City, Herts Outline Plan of Work 2007 Work Stage Sequences by Procurement Method, Royal Institute of British Architects ยฉ RIBA 2007 Simon Rawlinson (2008) Procurement single-stage tendering 21.11.2008 building magazine (Online) Available from: http://www.building.co.uk/data/procurement-single-stage-tendering/3127871.article Sundaram, V. (2008) โ€˜Essentials of design phase cost management and budget controlโ€™, Cost Engineering, 50 (2), pp.24-28. USACE (2008) Engineering Guidance Design Manual, Seventh Edition, US Army Corps of Engineer and Support Center, Huntsville, Huntsville, Alabama