The document provides information about an assignment for a project planning and scheduling course. It includes 6 questions related to project management topics like project deliverables, budget estimation, cost of quality, ISO standards, and advantages of project management software. Students can get the assignment solved by a third party service for Rs. 125 per question by emailing or calling for assistance.
Dear students get fully solved SMU MBA assignments
Send your semester & Specialization name to our mail id :
“ help.mbaassignments@gmail.com ”
or
Call us at : 08263069601
Dear students get fully solved SMU MBA assignments
Send your semester & Specialization name to our mail id :
“ help.mbaassignments@gmail.com ”
or
Call us at : 08263069601
Dear students get fully solved SMU MBA assignments
Send your semester & Specialization name to our mail id :
“ help.mbaassignments@gmail.com ”
or
Call us at : 08263069601
A business case is an argument, usually documented, that is intended to convince a decision maker to approve some kind of action. The document itself is sometimes referred to as a business case.
The Book details on how to approach CMMI Implementation in an organization. It details out the various phases involved in CMMI Implementation and how to plan and execute them. It details on various aspects which we tend to overlook in CMMI Implementation.
Who Should Read?
• Organization looking forward to implement CMMI
• Top Management person, trying to understand how to go about
• SEPG, Program manager and Process Quality members
• Anyone who is interested in understanding the Implementation of CMMI
Why to Read?
• To get complete End to End understanding on CMMI Implementation Lifecycle
• Plan your budget, effort and resources for the program
• Set your expectations clear on CMMI Implementation
• Be aware of the different aspects in Implementation
How it’s different:
• Written from practitioners’ point of view
• Communicates the reality in practical implementation
Word of Caution:
• The book contains only samples and typical examples and they are not comprehensive and to be verified and validated on a particular context for applicability
Dear students get fully solved SMU MBA assignments
Send your semester & Specialization name to our mail id :
“ help.mbaassignments@gmail.com ”
or
Call us at : 08263069601
Dear students get fully solved SMU MBA assignments
Send your semester & Specialization name to our mail id :
“ help.mbaassignments@gmail.com ”
or
Call us at : 08263069601
Dear students get fully solved SMU MBA assignments
Send your semester & Specialization name to our mail id :
“ help.mbaassignments@gmail.com ”
or
Call us at : 08263069601
A business case is an argument, usually documented, that is intended to convince a decision maker to approve some kind of action. The document itself is sometimes referred to as a business case.
The Book details on how to approach CMMI Implementation in an organization. It details out the various phases involved in CMMI Implementation and how to plan and execute them. It details on various aspects which we tend to overlook in CMMI Implementation.
Who Should Read?
• Organization looking forward to implement CMMI
• Top Management person, trying to understand how to go about
• SEPG, Program manager and Process Quality members
• Anyone who is interested in understanding the Implementation of CMMI
Why to Read?
• To get complete End to End understanding on CMMI Implementation Lifecycle
• Plan your budget, effort and resources for the program
• Set your expectations clear on CMMI Implementation
• Be aware of the different aspects in Implementation
How it’s different:
• Written from practitioners’ point of view
• Communicates the reality in practical implementation
Word of Caution:
• The book contains only samples and typical examples and they are not comprehensive and to be verified and validated on a particular context for applicability
Integrating Organisational Change within IT Transition and TransformationNUS-ISS
Presented by Jamie Donoghue, Principal Consultant, UXC Consulting at ISS-UXC Seminar: Move IT from Cost to Value Centre using IT Service Management and COBIT on 25 July 2014.
Smu mba sem 3 PM spring 2016 assignments, smu solved assignments ,smu assignments ,smu mba assignments ,smu mba solved assignments ,smu mba spring 2016 assignments
Function Points for Estimation - Getting Developers on BoardDCG Software Value
in this report, David Herron discusses management approaches to implementing improved estimating practices using function points. All too often, such initiatives encounter resistance from the development teams – David considers how this resistance can be overcome.
The report can be downloaded here: http://www.softwarevalue.com/insights/publications/ta-archives/function-points-for-estimation-getting-the-developers-on-board/
To access more Trusted Advisor articles, visit: http://www.softwarevalue.com/insights/publications/#trustedadvisor
Smu mba sem 3 OM spring 2016 assignments, smu solved assignments ,smu assignments ,smu mba assignments ,smu mba solved assignments ,smu mba spring 2016 assignments
Dear students get fully solved assignments by professionals
Send your semester & Specialization name to our mail id :
stuffstudy5@gmail.com
or
call us at : 098153-33456
Dear students get fully solved assignments
Send your semester & Specialization name to our mail id :
“ help.mbaassignments@gmail.com ”
or
Call us at : 08263069601
(Prefer mailing. Call in emergency )
*Strategic Facility Planning, IFMA World Workplace Bob Sawhill, CFM
Bob Sawhill\’s presentation at IFMA\’s World Workplace Conference. Titled: Strategic Facility Planning: "Get out of the weeds, and align your workplace with your business’ needs"
A Framework for Synergy, Collaboration, Exploration, Creativity, Discovery & Innovation. A Team activity to balance need, function & cost.
bsauter@workbench20.com
www.workbench20.com
Integrating Organisational Change within IT Transition and TransformationNUS-ISS
Presented by Jamie Donoghue, Principal Consultant, UXC Consulting at ISS-UXC Seminar: Move IT from Cost to Value Centre using IT Service Management and COBIT on 25 July 2014.
Smu mba sem 3 PM spring 2016 assignments, smu solved assignments ,smu assignments ,smu mba assignments ,smu mba solved assignments ,smu mba spring 2016 assignments
Function Points for Estimation - Getting Developers on BoardDCG Software Value
in this report, David Herron discusses management approaches to implementing improved estimating practices using function points. All too often, such initiatives encounter resistance from the development teams – David considers how this resistance can be overcome.
The report can be downloaded here: http://www.softwarevalue.com/insights/publications/ta-archives/function-points-for-estimation-getting-the-developers-on-board/
To access more Trusted Advisor articles, visit: http://www.softwarevalue.com/insights/publications/#trustedadvisor
Smu mba sem 3 OM spring 2016 assignments, smu solved assignments ,smu assignments ,smu mba assignments ,smu mba solved assignments ,smu mba spring 2016 assignments
Dear students get fully solved assignments by professionals
Send your semester & Specialization name to our mail id :
stuffstudy5@gmail.com
or
call us at : 098153-33456
Dear students get fully solved assignments
Send your semester & Specialization name to our mail id :
“ help.mbaassignments@gmail.com ”
or
Call us at : 08263069601
(Prefer mailing. Call in emergency )
*Strategic Facility Planning, IFMA World Workplace Bob Sawhill, CFM
Bob Sawhill\’s presentation at IFMA\’s World Workplace Conference. Titled: Strategic Facility Planning: "Get out of the weeds, and align your workplace with your business’ needs"
A Framework for Synergy, Collaboration, Exploration, Creativity, Discovery & Innovation. A Team activity to balance need, function & cost.
bsauter@workbench20.com
www.workbench20.com
All about the data, this info-centric presentation will show you the stats that are driving "BIG LEAGUE" traffic, leads and sales in marketing. In addition, we'll discuss how rank is being influenced by social signals and content marketing. It's all really visually stunning.
https://whitefoxstudios.net/blog/michaelh_rley/visually-stunning-content-marketing-strategies
This presentation outlines Community Partnership and sponsorship opportunities with Loudoun Country Day School in Leesburg, Virginia, beginning with our Green and Blue Gala on April 29, 2017.
"Executive Coaching Revealed: What You Need To Know" provides information for those who are considering engaging in an executive coaching process. The whitepaper provides definitions, coaching models, and a roadmap for selecting the right coach.
This presentation shows how one can use animation tools to illustrate concepts in the engineering filed. It is a old presentation in 2005. However, it contains some interesting concepts.
Influence of Subsurface Heterogeneity on Detection of Landfill LeakageAmro Elfeki
Yenigul, N.B., Elfeki, A.M.M. (2002). Influence of Subsurface Heterogeneity on Detection of Landfill Leakage. Published at 14th International Conference Computational Methods in Water Resources “CMWR2002”, Developments in Water Science No. 47, Elsevier Publisher, The Netherlands, pp. 1323-1330. Eds. SM Hassanizadeh, RJ Schotting, WG Gray, and GF Pinder.
Bài giảng Lập trình cơ bản - truongkinhtethucpham.commai_non
Tài liệu này trình bày tổng quan về ngôn ngữ lập trình C - ngôn ngữ lập trình cơ bản mà hầu như những ai học về công nghệ thông tin cũng cần phải biết đến nó.
Dear students get fully solved assignments
Send your semester & Specialization name to our mail id :
“ help.mbaassignments@gmail.com ”
or
Call us at : 08263069601
Dear students get fully solved assignments by professionals
Send your semester & Specialization name to our mail id :
stuffstudy5@gmail.com
or
call us at : 098153-33456
Dear students get fully solved assignments
Send your semester & Specialization name to our mail id :
“ help.mbaassignments@gmail.com ”
or
Call us at : 08263069601
(Prefer mailing. Call in emergency )
Dear students get fully solved assignments
Send your semester & Specialization name to our mail id :
“ help.mbaassignments@gmail.com ”
or
Call us at : 08263069601
Dear students get fully solved assignments
Send your semester & Specialization name to our mail id :
“ help.mbaassignments@gmail.com ”
or
Call us at : 08263069601
Project management 3rd sem - smu mba solved assignmentssmumbahelp
Dear students get fully solved assignments
Send your semester & Specialization name to our mail id :
“ help.mbaassignments@gmail.com ”
or
Call us at : 08263069601
Dear students get fully solved assignments
Send your semester & Specialization name to our mail id :
help.mbaassignments@gmail.com
or
call us at : 08263069601
Ms 05 management of machines and materialssmumbahelp
Dear students get fully solved assignments
Send your semester & Specialization name to our mail id :
help.mbaassignments@gmail.com
or
call us at : 08263069601
BUSN350Week 3 Business Problem and RequirementsBusiness.docxhumphrieskalyn
BUSN350
Week 3: Business Problem and Requirements
Business Analysis
The basic idea of business analysis is simple. It is the practice of identifying and clarifying a problem or issue within a company, then working with the various stakeholders to define and implement an acceptable solution. However, actually conducting a business analysis can be quite complex and time-consuming.
Starting Point
The first step in the process is to identify a problem, an issue, or some other business need. Let's say that you are the owner of a small motorcycle dealership. In addition to selling bikes, your store does repairs and maintenance, sells riding gear, and custom orders parts for your customers. You have received numerous complaints from the staff and customers about the accuracy of your inventory system. The problem is the inventory system often shows parts and merchandise as being in stock, when none are actually available. This often means that a repair job is not finished on schedule, which really irritates your customers.
Milestone 1 Assignment Requirements
In a 5-8 page paper using APA format, please describe the following:
1. Introduction– Briefly describe the organization and business process to provide contextfor your project.
2. Business problem– Identify and describe a business problem for your project.
a. Create a flowchart of the current business process using Visio.
b. If you do not have Visio installed on your computer, you can access this application via the iLab tab in the Course Home unit.
3. Identify stakeholders– Provide a stakeholder tracking matrix based on eachstakeholder’s position and responsibilities, the level of their involvement and their importance to the project.
Example of a stakeholder matrix:
Role
Responsibilities
Level of Involvement
Importance
Project Manager
(Business)
Project Manager
(Implementation partner)
Business Analyst
Page 1 of 4
BUSN350
Role
Responsibilities
Level of Involvement
Importance
Department Manager
Work Group Supervisor
External Business Partner
SME 1
SME 2
SME 3
Level of Involvement – What level of involvement and how much time will be expected of each stakeholder?
Importance – How important is the stakeholder in the requirements elicitation process? Are they required in order to document all of the critical project requirements, or are they optional in that they can add clarity to processes that may further refine requirements?
4. Conduct elicitationusing one of the methods listed and provide the documented resultsfrom your activity in the Appendix of your paper:
Surveys – develop a set of 5-8 multiple choice questions pertaining to the business problem that will enable you to document a list of requirements for your project, administer the survey to elicit responses from 10 participants
Interviews – develop a set of 5-8 open-ended questions pertaining to the ...
How to Reach Peak Performance With the Product Management Organizational Heal...Aggregage
The degree of maturity of your product management organization can directly drive your ability to satisfy customers and become more profitable. Our Product Management Organizational Health Checklist and on-demand webinar can help.
Assignment 1 LASA 2—Company Analysis ReportReview the following.docxtrippettjettie
Assignment 1: LASA 2—Company Analysis Report
Review the following scenario:
Assume that you have recently been hired as the director of continuous improvement of a company. You are an outside hire with limited history of the firm and personal capital at the firm, and you are responsible for lean production, total quality management (TQM), six sigma, and best practice implementation.
Lean production means doing more with less, such as less inventory, fewer workers, or less space. A recent trade in quality management is lean six sigma (also known as lean sigma) that integrates six sigma and lean production.
The capacity for which you were hired has existed for three years with a direct line of report to the vice-president of operations and dotted line of report to the head of information technology (IT), the chief information officer (CIO), and the director of internal controls and audit. You are the second person to fill in this position. You have a team of internal consultants; half of your team has six sigma black belt or equivalent capabilities with the remainder having a solid understanding of operations and IT. You also have a budget for two external vendor resources.
You have taken six months to familiarize yourself with the organization and its people, mission, goals, strategy, and structure. In this time, you have also evaluated current operations. At the end of this period, you are assigned to deliver a report identifying the three most promising avenues for achieving best practices within the company. You have already been told that the company suffers from both aging and complex information systems and that your recommendation must include a major upgrade of those systems. The executive officers anticipate major investments in IT over the next several years. Your best practice implementations, coupled with new technology, must be measurable in terms of speed, quality, productivity, and efficiency or other key performance indicators that you identify in your report.
For this assignment, you will choose a company with which you are familiar. You are encouraged to choose a company for which you currently work or have worked, but you may choose some other firm if you believe it will be a compelling analysis.
You may choose one area of the company, such as a manufacturing plant or product design, to focus on if you can make a strong case. Your recommendations should have the following features.
· Repeatable: If you “fix” three things in a manufacturing plant, you should be able to tackle the “next” three in iteration.
· Scalable: If they work in one plant, they should work in all of them.
· Replicable: Your process for improvement should be repeatable in different, disparate parts of the organization.
This is a key initiative at the “C” level, and your recommendation will reach the board of directors.
Your paper must include the following sections:
1. Strategic Overview: (1 page)
Provide a brief description of the following elements:
a. ...
[Insert project title, e.g. Cosmo Inc.”] Project Scope State.docxgerardkortney
[Insert project title, e.g. “Cosmo Inc.”]: Project Scope Statement[Insert learner name]Capella UniversityProject Scope Statement
Note: Any work not explicitly included in the Project Scope Statement is implicitly excluded from the project.
Project Name
Prepared By
Date
(MM/DD/YYYY)Version History (insert rows as needed):VersionDateComments
1.0
1. Executive Summary
Provide below a brief overview of this project (for example, project purpose and justification).
Note: In any instance where there is a discrepancy between the Project Charter and the Project Scope Statement, the latter is considered authoritative.2. Business Objectives2.1 Product Description (
Solution
)
2.2 Business Objectives
3. Project Description
For each area below, provide sufficient detail to define this project adequately.3.1 Project Scope
Includes (list deliverables):
Does not include:
3.2 Dependencies (External and Internal)
3.3 Assumptions
3.4 Constraints
4. Project MilestonesTarget Date
Project Start
Project Complete
5. Project Approach
Briefly describe how each of the following will be handled. Provide links to relevant documents as appropriate. 5.1 Change Management
5.2 Communication Management
5.3 Quality Management
5.4 Resource Management
5.5 Critical Success Factors
5.6 Risk Management
5.7 Project Organization
6. AuthorizationsThe Project Scope Statement is approved by the:
Project Sponsor
Project Manager
Project performance baseline changes will be approved by the:
Project Sponsor
Project Manager
Project deliverables will be approved and accepted by the:
Project Sponsor
Key Stakeholders
7. Project Scope Statement ApprovalProject Name
Project Manager
The purpose of this document is to provide a vehicle for documenting the initial planning efforts for the project. It is used to reach a satisfactory level of mutual agreement between the Project Manager and the Project Sponsors and Owners with respect to the objectives and scope of the project before significant resources are committed and expenses incurred.
I have reviewed the information contained in this Project Scope Statement and agree:NameRoleSignatureDate
The signatures above indicate an understanding of the purpose and content of this document by those signing it. By signing this document, they agree to this as the formal Project Scope Statement document.
References
2
PM5018 Business Case
PM5018 Business CaseCosmo, Inc.
Cosmo, Inc. is a leader in the development and distribution of wearable technology, including fitness coaching, nutritional coaching, and lifestyle advising products. The company holds a 33-percent market share in the wearable technology category. After doing marketing analysis, senior leadership realizes the onset of competition could negatively impact future earnings.
CEO and President Harold Living tells his leadership Cosmo, Inc. needs a new marketing strategy to not only increase market share but to maintain current le.
Om0017 advanced production planning and controlsmumbahelp
Dear students get fully solved assignments
Send your semester & Specialization name to our mail id :
“ help.mbaassignments@gmail.com ”
or
Call us at : 08263069601
Om0017 advanced production planning and controlsmumbahelp
Dear students get fully solved assignments
Send your semester & Specialization name to our mail id :
“ help.mbaassignments@gmail.com ”
or
Call us at : 08263069601
Om0017 advanced production planning and controlStudy Stuff
Dear students get fully solved assignments by professionals
Send your semester & Specialization name to our mail id :
stuffstudy5@gmail.com
or
call us at : 098153-33456
Dear students get fully solved assignments
Send your semester & Specialization name to our mail id :
help.mbaassignments@gmail.com
or
call us at : 08263069601
How to Split Bills in the Odoo 17 POS ModuleCeline George
Bills have a main role in point of sale procedure. It will help to track sales, handling payments and giving receipts to customers. Bill splitting also has an important role in POS. For example, If some friends come together for dinner and if they want to divide the bill then it is possible by POS bill splitting. This slide will show how to split bills in odoo 17 POS.
Read| The latest issue of The Challenger is here! We are thrilled to announce that our school paper has qualified for the NATIONAL SCHOOLS PRESS CONFERENCE (NSPC) 2024. Thank you for your unwavering support and trust. Dive into the stories that made us stand out!
How to Create Map Views in the Odoo 17 ERPCeline George
The map views are useful for providing a geographical representation of data. They allow users to visualize and analyze the data in a more intuitive manner.
2024.06.01 Introducing a competency framework for languag learning materials ...Sandy Millin
http://sandymillin.wordpress.com/iateflwebinar2024
Published classroom materials form the basis of syllabuses, drive teacher professional development, and have a potentially huge influence on learners, teachers and education systems. All teachers also create their own materials, whether a few sentences on a blackboard, a highly-structured fully-realised online course, or anything in between. Despite this, the knowledge and skills needed to create effective language learning materials are rarely part of teacher training, and are mostly learnt by trial and error.
Knowledge and skills frameworks, generally called competency frameworks, for ELT teachers, trainers and managers have existed for a few years now. However, until I created one for my MA dissertation, there wasn’t one drawing together what we need to know and do to be able to effectively produce language learning materials.
This webinar will introduce you to my framework, highlighting the key competencies I identified from my research. It will also show how anybody involved in language teaching (any language, not just English!), teacher training, managing schools or developing language learning materials can benefit from using the framework.
Model Attribute Check Company Auto PropertyCeline George
In Odoo, the multi-company feature allows you to manage multiple companies within a single Odoo database instance. Each company can have its own configurations while still sharing common resources such as products, customers, and suppliers.
We all have good and bad thoughts from time to time and situation to situation. We are bombarded daily with spiraling thoughts(both negative and positive) creating all-consuming feel , making us difficult to manage with associated suffering. Good thoughts are like our Mob Signal (Positive thought) amidst noise(negative thought) in the atmosphere. Negative thoughts like noise outweigh positive thoughts. These thoughts often create unwanted confusion, trouble, stress and frustration in our mind as well as chaos in our physical world. Negative thoughts are also known as “distorted thinking”.
Unit 8 - Information and Communication Technology (Paper I).pdfThiyagu K
This slides describes the basic concepts of ICT, basics of Email, Emerging Technology and Digital Initiatives in Education. This presentations aligns with the UGC Paper I syllabus.
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
Pm0011 project planning and scheduling
1. Winter-2015
Get solved assignments at nominal price of Rs.125 each.
Mail us at: subjects4u@gmail.com or contact at
09882243490
Master of Business Administration - MBA Semester 3
PM0011-Project Planning and Scheduling
(Book ID: B1937)
Assignment (60 Marks)
Note: Answers for 10 marks questions should be approximately of 400 words. Each question is
followed by evaluation scheme. Each Question carries 10 marks 6 X 10=60.
Q1. Write short note on:
Project deliverables
Project Rating Index(PRI)
Scope change control
Partnering
Answer. Project Deliverables:
In project management, a deliverable is a product or service that is given to your client. A
deliverable usually has a due date and is tangible, measurable and specific. A deliverable can be
given to either an external or internal customer and satisfies a milestone or due date that is
created and produced in the project plan. A deliverable can be a software product, a design
Q2. Budget Estimation of ABC Company Ltd.
ABC Company Ltd., established in 1985, is engaged in the manufacturing of leatheraccessories.
Over the years, the company, which started out as a local firm, has made its mark as an
international corporation. However, the company is still working as a traditional set up.
The high quality and durability of products have increased the demand of the products in the
market. As the production of the organisation is being increased tomeet the demand, the
traditional set up is creating hurdles in the production process.
Organisation conflicts have arisen among the team members because of the unorganized
hierarchical structure of the company, which is affecting the output of the organisation. Now
that the management has decided to expand the business and opened up branches abroad, the
company is facing two more problems. The first problem is in budgeting as the company is
2. unfamiliar with international market conditions, strategy, and business policy while the second
problem is conflicts at the time of team formation due to lack of experience of and exposure to
multinational work culture, which has further affected the output of the company.
The company can estimate the budget through two methods, the bottom - up approach and the
top - down approach. The bottom -up approach is generally followed by the MNCs as it is more
accurate and reliable.
Mr.Parag has been appointed as the country head of the company and he has also been
assigned the responsibility of incorporating the advanced project set up in the organisation.
Questions:
1. Which project estimation approach should be used by the company and why?
2. What type of project organisation structure should be used by the company and why?
Answer. 1. Bottom-up estimating (also called detail orresource-driven estimating)
The estimator breaks a project into distinct line items, and then breaks those line items into
smaller, distinct line items, and so on, until he or she arrives at the component (or resource) level
– the level of detail at which the price of the components is relatively consistent across projects.
Q3. What is the importance of operational feasibility? Explain the factors that affect operational
feasibility.
Answer. Operational feasibility is as important as technical feasibility (or any other kind of
feasibility for that matter), and yet it can be the first thing to get brushed under the carpet. The
conversation changes and that ‘intelligent system’ everyone was discussing is transformed back
into a mere ‘thing’: a deliverable to drop into the organisation. We’ll find out later if we can make
it happen; if we can weave it into departments and hearts as successfully as we can plug it into
software platforms.
Q4. Write short notes on
Monte Carlo analysis
Work break down structure
Resource loading
Definitive estimate (a method to estimate cost of a project).
Answer. Monte Carlo analysis:
Monte Carlo simulation is a method for exploring the sensitivity of a complex systemby varying
parameters within statistical constraints. These systems can include financial, physical, and
mathematical models that are simulated in a loop, with statistical uncertainty between
3. simulations. The results from the simulation are analyzed to determine the characteristics of the
system.
Q5. What do you understand by cost of quality? Elaborate on various types of costs of quality
associated with a project.
Answer. Cost of Quality:
The “cost of quality” isn’t the price of creating a quality product or service. It’s the cost of NOT
creating a quality product or service.
Every time work is redone, the cost of quality increases. Obvious examples include:
The reworking of a manufactured item.
The retesting of an assembly
The rebuilding of a tool
The correction of a bank statement
Q6. Explain some of ISO standards that should be considered by the project manager during
project execution.
List the advantages of project management software.
Answer. Some of ISO’s most well-known standards are management systemstandards. They
provide a model to follow when setting up and operating a management system. Like all ISO
standards, they are the result of international, expert consensus. Therefore, by implementing a
management system standard, organizations can benefit from global management experience
and good practice.
Winter-2015
Get solved assignments at nominal price of Rs.125 each.
Mail us at: subjects4u@gmail.com or contact at
09882243490