Q1. Write short note on:
 Project deliverables
 Project Rating Index(PRI)
 Scope change control
 Partnering
Answer. Project Deliverables:
In project management, a deliverable is a product or service that is given to your client. A
deliverable usually has a due date and is tangible, measurable and specific. A deliverable can be
given to either an external or internal customer and satisfies a milestone or due date that is
created and produced in the project plan. A deliverable can be a software product, a design
Q2. Budget Estimation of ABC Company Ltd.
ABC Company Ltd., established in 1985, is engaged in the manufacturing of leatheraccessories.
Over the years, the company, which started out as a local firm, has made its mark as an
international corporation. However, the company is still working as a traditional set up.
The high quality and durability of products have increased the demand of the products in the
market. As the production of the organisation is being increased tomeet the demand, the
traditional set up is creating hurdles in the production process.
Organisation conflicts have arisen among the team members because of the unorganized
hierarchical structure of the company, which is affecting the output of the organisation. Now
that the management has decided to expand the business and opened up branches abroad, the
company is facing two more problems. The first problem is in budgeting as the company is
unfamiliar with international market conditions, strategy, and business policy while the second
problem is conflicts at the time of team formation due to lack of experience of and exposure to
multinational work culture, which has further affected the output of the company.
The company can estimate the budget through two methods, the bottom - up approach and the
top - down approach. The bottom -up approach is generally followed by the MNCs as it is more
accurate and reliable.
Mr.Parag has been appointed as the country head of the company and he has also been
assigned the responsibility of incorporating the advanced project set up in the organisation.
Questions:
1. Which project estimation approach should be used by the company and why?
2. What type of project organisation structure should be used by the company and why?
Answer. 1. Bottom-up estimating (also called detail orresource-driven estimating)
The estimator breaks a project into distinct line items, and then breaks those line items into
smaller, distinct line items, and so on, until he or she arrives at the component (or resource) level
– the level of detail at which the price of the components is relatively consistent across projects.
Q3. What is the importance of operational feasibility? Explain the factors that affect operational
feasibility.
Answer. Operational feasibility is as important as technical feasibility (or any other kind of
feasibility for that matter), and yet it can be the first thing to get brushed under the carpet. The
conversation changes and that ‘intelligent system’ everyone was discussing is transformed back
into a mere ‘thing’: a deliverable to drop into the organisation. We’ll find out later if we can make
it happen; if we can weave it into departments and hearts as successfully as we can plug it into
software platforms.
Q4. Write short notes on
 Monte Carlo analysis
 Work break down structure
 Resource loading
 Definitive estimate (a method to estimate cost of a project).
Answer. Monte Carlo analysis:
Monte Carlo simulation is a method for exploring the sensitivity of a complex systemby varying
parameters within statistical constraints. These systems can include financial, physical, and
mathematical models that are simulated in a loop, with statistical uncertainty between
simulations. The results from the simulation are analyzed to determine the characteristics of the
system.
Q5. What do you understand by cost of quality? Elaborate on various types of costs of quality
associated with a project.
Answer. Cost of Quality:
The “cost of quality” isn’t the price of creating a quality product or service. It’s the cost of NOT
creating a quality product or service.
Every time work is redone, the cost of quality increases. Obvious examples include:
 The reworking of a manufactured item.
 The retesting of an assembly
 The rebuilding of a tool
 The correction of a bank statement
Q6. Explain some of ISO standards that should be considered by the project manager during
project execution.
List the advantages of project management software.
Answer. Some of ISO’s most well-known standards are management systemstandards. They
provide a model to follow when setting up and operating a management system. Like all ISO
standards, they are the result of international, expert consensus. Therefore, by implementing a
management system standard, organizations can benefit from global management experience
and good practice.
Winter-2015
Get solved assignments at nominal price of Rs.125 each.
Mail us at: subjects4u@gmail.com or contact at
09882243490

More Related Content

What's hot

Anju drolia
Anju droliaAnju drolia
Anju droliaPMI2011
 
Mb0049 project management
Mb0049 project managementMb0049 project management
Mb0049 project management
consult4solutions
 
Day 1 1620 - 1705 - pearl 1 - deep kamal singh
Day 1   1620 - 1705 - pearl 1 - deep kamal singhDay 1   1620 - 1705 - pearl 1 - deep kamal singh
Day 1 1620 - 1705 - pearl 1 - deep kamal singhPMI2011
 
Final chakradhar purohith proposal milieu analysis (without account data un...
Final chakradhar purohith proposal milieu analysis (without account data   un...Final chakradhar purohith proposal milieu analysis (without account data   un...
Final chakradhar purohith proposal milieu analysis (without account data un...PMI2011
 
Presentation by vignesh swamidurai
Presentation by vignesh swamiduraiPresentation by vignesh swamidurai
Presentation by vignesh swamiduraiPMI_IREP_TP
 
Integrating Organisational Change within IT Transition and Transformation
Integrating Organisational Change within IT Transition and TransformationIntegrating Organisational Change within IT Transition and Transformation
Integrating Organisational Change within IT Transition and Transformation
NUS-ISS
 
Smu mba sem 3 pm summer 2015 assignments
Smu mba sem 3 pm summer 2015 assignmentsSmu mba sem 3 pm summer 2015 assignments
Smu mba sem 3 pm summer 2015 assignments
solved_assignments
 
Smu mba sem 3 pm spring 2016 assignments
Smu mba sem 3 pm spring 2016 assignmentsSmu mba sem 3 pm spring 2016 assignments
Smu mba sem 3 pm spring 2016 assignments
solved_assignments
 
Mb0044 production and operation management..
Mb0044   production and operation management..Mb0044   production and operation management..
Mb0044 production and operation management..smumbahelp
 
Key Result Areas and KPIs (Key Performance Indicators)
Key Result Areas and KPIs (Key Performance Indicators)Key Result Areas and KPIs (Key Performance Indicators)
Key Result Areas and KPIs (Key Performance Indicators)
Pawan Alamchandani
 
Day 0 Introduction to PM
Day 0   Introduction to PMDay 0   Introduction to PM
Day 0 Introduction to PM
Joyce Wong
 
Function Points for Estimation - Getting Developers on Board
Function Points for Estimation - Getting Developers on BoardFunction Points for Estimation - Getting Developers on Board
Function Points for Estimation - Getting Developers on Board
DCG Software Value
 
Chap 2 Organization Strategy
Chap 2 Organization StrategyChap 2 Organization Strategy
Chap 2 Organization Strategy
project management
 
Day 1 revision
Day 1  revisionDay 1  revision
Day 1 revision
Joyce Wong
 
Smu mba sem 3 om spring 2016 assignments
Smu mba sem 3 om spring 2016 assignmentsSmu mba sem 3 om spring 2016 assignments
Smu mba sem 3 om spring 2016 assignments
solved_assignments
 
Mu0018 – change management
Mu0018 – change managementMu0018 – change management
Mu0018 – change management
Study Stuff
 
Mb0049 project management
Mb0049   project managementMb0049   project management
Mb0049 project management
smumbahelp
 
*Strategic Facility Planning, IFMA World Workplace
*Strategic Facility Planning, IFMA World Workplace *Strategic Facility Planning, IFMA World Workplace
*Strategic Facility Planning, IFMA World Workplace
Bob Sawhill, CFM
 
SPM Evaluation
SPM EvaluationSPM Evaluation
SPM Evaluation
Kanchana Devi
 
Value Engineering
Value EngineeringValue Engineering
Value Engineering
Bruce Sauter
 

What's hot (20)

Anju drolia
Anju droliaAnju drolia
Anju drolia
 
Mb0049 project management
Mb0049 project managementMb0049 project management
Mb0049 project management
 
Day 1 1620 - 1705 - pearl 1 - deep kamal singh
Day 1   1620 - 1705 - pearl 1 - deep kamal singhDay 1   1620 - 1705 - pearl 1 - deep kamal singh
Day 1 1620 - 1705 - pearl 1 - deep kamal singh
 
Final chakradhar purohith proposal milieu analysis (without account data un...
Final chakradhar purohith proposal milieu analysis (without account data   un...Final chakradhar purohith proposal milieu analysis (without account data   un...
Final chakradhar purohith proposal milieu analysis (without account data un...
 
Presentation by vignesh swamidurai
Presentation by vignesh swamiduraiPresentation by vignesh swamidurai
Presentation by vignesh swamidurai
 
Integrating Organisational Change within IT Transition and Transformation
Integrating Organisational Change within IT Transition and TransformationIntegrating Organisational Change within IT Transition and Transformation
Integrating Organisational Change within IT Transition and Transformation
 
Smu mba sem 3 pm summer 2015 assignments
Smu mba sem 3 pm summer 2015 assignmentsSmu mba sem 3 pm summer 2015 assignments
Smu mba sem 3 pm summer 2015 assignments
 
Smu mba sem 3 pm spring 2016 assignments
Smu mba sem 3 pm spring 2016 assignmentsSmu mba sem 3 pm spring 2016 assignments
Smu mba sem 3 pm spring 2016 assignments
 
Mb0044 production and operation management..
Mb0044   production and operation management..Mb0044   production and operation management..
Mb0044 production and operation management..
 
Key Result Areas and KPIs (Key Performance Indicators)
Key Result Areas and KPIs (Key Performance Indicators)Key Result Areas and KPIs (Key Performance Indicators)
Key Result Areas and KPIs (Key Performance Indicators)
 
Day 0 Introduction to PM
Day 0   Introduction to PMDay 0   Introduction to PM
Day 0 Introduction to PM
 
Function Points for Estimation - Getting Developers on Board
Function Points for Estimation - Getting Developers on BoardFunction Points for Estimation - Getting Developers on Board
Function Points for Estimation - Getting Developers on Board
 
Chap 2 Organization Strategy
Chap 2 Organization StrategyChap 2 Organization Strategy
Chap 2 Organization Strategy
 
Day 1 revision
Day 1  revisionDay 1  revision
Day 1 revision
 
Smu mba sem 3 om spring 2016 assignments
Smu mba sem 3 om spring 2016 assignmentsSmu mba sem 3 om spring 2016 assignments
Smu mba sem 3 om spring 2016 assignments
 
Mu0018 – change management
Mu0018 – change managementMu0018 – change management
Mu0018 – change management
 
Mb0049 project management
Mb0049   project managementMb0049   project management
Mb0049 project management
 
*Strategic Facility Planning, IFMA World Workplace
*Strategic Facility Planning, IFMA World Workplace *Strategic Facility Planning, IFMA World Workplace
*Strategic Facility Planning, IFMA World Workplace
 
SPM Evaluation
SPM EvaluationSPM Evaluation
SPM Evaluation
 
Value Engineering
Value EngineeringValue Engineering
Value Engineering
 

Viewers also liked

Mediat2
Mediat2Mediat2
Mediat2
sarahlouise12
 
Big data
Big dataBig data
Big data
Mahmudul Alam
 
Visually Stunning Content Marketing Strategies
Visually Stunning Content Marketing StrategiesVisually Stunning Content Marketing Strategies
Visually Stunning Content Marketing Strategies
Michael Hurley
 
20161212-PLEDGE-Milowski-CT
20161212-PLEDGE-Milowski-CT20161212-PLEDGE-Milowski-CT
20161212-PLEDGE-Milowski-CTChris Milowski
 
LCDS Community Partnership 2017-18
LCDS Community Partnership 2017-18LCDS Community Partnership 2017-18
LCDS Community Partnership 2017-18
Aileen Hawkins
 
Pm0017 project quality management
Pm0017 project quality managementPm0017 project quality management
Pm0017 project quality management
consult4solutions
 
Cornerstone Whitepaper: Executive Coaching Revealed
Cornerstone Whitepaper: Executive Coaching RevealedCornerstone Whitepaper: Executive Coaching Revealed
Cornerstone Whitepaper: Executive Coaching Revealed
Jeff Cicone
 
Nathalie Nasser_Curriculum Vitae
Nathalie Nasser_Curriculum VitaeNathalie Nasser_Curriculum Vitae
Nathalie Nasser_Curriculum VitaeNathalie Nasser
 
Vision
VisionVision
Vision
James Hall
 
Using Animation in Education
Using Animation in EducationUsing Animation in Education
Using Animation in Education
Amro Elfeki
 
Ib0011 international marketing
Ib0011 international marketingIb0011 international marketing
Ib0011 international marketing
consult4solutions
 
Mu0011–management and organisational development
Mu0011–management and organisational developmentMu0011–management and organisational development
Mu0011–management and organisational development
consult4solutions
 
Fis 2
Fis 2Fis 2
Présentation IceFire pour Aos Canada français
Présentation IceFire pour Aos Canada françaisPrésentation IceFire pour Aos Canada français
Présentation IceFire pour Aos Canada français
Martin Laplante
 
How Shree Krishna Builders got 50+ leads in less than ₹5,000? - Social Media ...
How Shree Krishna Builders got 50+ leads in less than ₹5,000? - Social Media ...How Shree Krishna Builders got 50+ leads in less than ₹5,000? - Social Media ...
How Shree Krishna Builders got 50+ leads in less than ₹5,000? - Social Media ...
Aadeep Bhatia
 
Influence of Subsurface Heterogeneity on Detection of Landfill Leakage
 Influence of Subsurface Heterogeneity on Detection of Landfill Leakage Influence of Subsurface Heterogeneity on Detection of Landfill Leakage
Influence of Subsurface Heterogeneity on Detection of Landfill Leakage
Amro Elfeki
 
Ambar lópez etapas_administración
Ambar lópez etapas_administraciónAmbar lópez etapas_administración
Ambar lópez etapas_administración
Ambar Lopez
 
Bài giảng Lập trình cơ bản - truongkinhtethucpham.com
Bài giảng Lập trình cơ bản - truongkinhtethucpham.comBài giảng Lập trình cơ bản - truongkinhtethucpham.com
Bài giảng Lập trình cơ bản - truongkinhtethucpham.com
mai_non
 
armaduras mecanica estatica
armaduras mecanica estatica armaduras mecanica estatica
armaduras mecanica estatica
cesarherrera1212
 
Cuaderno de trabajo: EXPERIENCIAS DE FE Y CUIDO EN LAS MIGRACIONES FORZADAS
Cuaderno de trabajo: EXPERIENCIAS DE FE Y CUIDO EN LAS MIGRACIONES FORZADASCuaderno de trabajo: EXPERIENCIAS DE FE Y CUIDO EN LAS MIGRACIONES FORZADAS
Cuaderno de trabajo: EXPERIENCIAS DE FE Y CUIDO EN LAS MIGRACIONES FORZADAS
MULTIMEDIA-RP
 

Viewers also liked (20)

Mediat2
Mediat2Mediat2
Mediat2
 
Big data
Big dataBig data
Big data
 
Visually Stunning Content Marketing Strategies
Visually Stunning Content Marketing StrategiesVisually Stunning Content Marketing Strategies
Visually Stunning Content Marketing Strategies
 
20161212-PLEDGE-Milowski-CT
20161212-PLEDGE-Milowski-CT20161212-PLEDGE-Milowski-CT
20161212-PLEDGE-Milowski-CT
 
LCDS Community Partnership 2017-18
LCDS Community Partnership 2017-18LCDS Community Partnership 2017-18
LCDS Community Partnership 2017-18
 
Pm0017 project quality management
Pm0017 project quality managementPm0017 project quality management
Pm0017 project quality management
 
Cornerstone Whitepaper: Executive Coaching Revealed
Cornerstone Whitepaper: Executive Coaching RevealedCornerstone Whitepaper: Executive Coaching Revealed
Cornerstone Whitepaper: Executive Coaching Revealed
 
Nathalie Nasser_Curriculum Vitae
Nathalie Nasser_Curriculum VitaeNathalie Nasser_Curriculum Vitae
Nathalie Nasser_Curriculum Vitae
 
Vision
VisionVision
Vision
 
Using Animation in Education
Using Animation in EducationUsing Animation in Education
Using Animation in Education
 
Ib0011 international marketing
Ib0011 international marketingIb0011 international marketing
Ib0011 international marketing
 
Mu0011–management and organisational development
Mu0011–management and organisational developmentMu0011–management and organisational development
Mu0011–management and organisational development
 
Fis 2
Fis 2Fis 2
Fis 2
 
Présentation IceFire pour Aos Canada français
Présentation IceFire pour Aos Canada françaisPrésentation IceFire pour Aos Canada français
Présentation IceFire pour Aos Canada français
 
How Shree Krishna Builders got 50+ leads in less than ₹5,000? - Social Media ...
How Shree Krishna Builders got 50+ leads in less than ₹5,000? - Social Media ...How Shree Krishna Builders got 50+ leads in less than ₹5,000? - Social Media ...
How Shree Krishna Builders got 50+ leads in less than ₹5,000? - Social Media ...
 
Influence of Subsurface Heterogeneity on Detection of Landfill Leakage
 Influence of Subsurface Heterogeneity on Detection of Landfill Leakage Influence of Subsurface Heterogeneity on Detection of Landfill Leakage
Influence of Subsurface Heterogeneity on Detection of Landfill Leakage
 
Ambar lópez etapas_administración
Ambar lópez etapas_administraciónAmbar lópez etapas_administración
Ambar lópez etapas_administración
 
Bài giảng Lập trình cơ bản - truongkinhtethucpham.com
Bài giảng Lập trình cơ bản - truongkinhtethucpham.comBài giảng Lập trình cơ bản - truongkinhtethucpham.com
Bài giảng Lập trình cơ bản - truongkinhtethucpham.com
 
armaduras mecanica estatica
armaduras mecanica estatica armaduras mecanica estatica
armaduras mecanica estatica
 
Cuaderno de trabajo: EXPERIENCIAS DE FE Y CUIDO EN LAS MIGRACIONES FORZADAS
Cuaderno de trabajo: EXPERIENCIAS DE FE Y CUIDO EN LAS MIGRACIONES FORZADASCuaderno de trabajo: EXPERIENCIAS DE FE Y CUIDO EN LAS MIGRACIONES FORZADAS
Cuaderno de trabajo: EXPERIENCIAS DE FE Y CUIDO EN LAS MIGRACIONES FORZADAS
 

Similar to Pm0011 project planning and scheduling

Pm0011 project planning and scheduling
Pm0011 project planning and schedulingPm0011 project planning and scheduling
Pm0011 project planning and scheduling
consult4solutions
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
smumbahelp
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
Study Stuff
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
smumbahelp
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
smumbahelp
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
smumbahelp
 
Project management 3rd sem - smu mba solved assignments
Project management  3rd   sem - smu mba solved assignmentsProject management  3rd   sem - smu mba solved assignments
Project management 3rd sem - smu mba solved assignments
smumbahelp
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
smumbahelp
 
Ms 05 management of machines and materials
Ms 05 management of machines and materialsMs 05 management of machines and materials
Ms 05 management of machines and materials
smumbahelp
 
BUSN350Week 3 Business Problem and RequirementsBusiness.docx
BUSN350Week 3 Business Problem and RequirementsBusiness.docxBUSN350Week 3 Business Problem and RequirementsBusiness.docx
BUSN350Week 3 Business Problem and RequirementsBusiness.docx
humphrieskalyn
 
How to Reach Peak Performance With the Product Management Organizational Heal...
How to Reach Peak Performance With the Product Management Organizational Heal...How to Reach Peak Performance With the Product Management Organizational Heal...
How to Reach Peak Performance With the Product Management Organizational Heal...
Aggregage
 
Assignment 1 LASA 2—Company Analysis ReportReview the following.docx
Assignment 1 LASA 2—Company Analysis ReportReview the following.docxAssignment 1 LASA 2—Company Analysis ReportReview the following.docx
Assignment 1 LASA 2—Company Analysis ReportReview the following.docx
trippettjettie
 
Responses to Questions on the Webinar World class EA - Governor's Approach to...
Responses to Questions on the Webinar World class EA - Governor's Approach to...Responses to Questions on the Webinar World class EA - Governor's Approach to...
Responses to Questions on the Webinar World class EA - Governor's Approach to...
Sriram Sabesan
 
[Insert project title, e.g. Cosmo Inc.”] Project Scope State.docx
[Insert project title, e.g. Cosmo Inc.”] Project Scope State.docx[Insert project title, e.g. Cosmo Inc.”] Project Scope State.docx
[Insert project title, e.g. Cosmo Inc.”] Project Scope State.docx
gerardkortney
 
Om0017 advanced production planning and control
Om0017   advanced production planning and controlOm0017   advanced production planning and control
Om0017 advanced production planning and control
smumbahelp
 
Chandrashekhar resume
Chandrashekhar resumeChandrashekhar resume
Chandrashekhar resume
Chandrashekhar Potula
 
Om0017 advanced production planning and control
Om0017   advanced production planning and controlOm0017   advanced production planning and control
Om0017 advanced production planning and control
smumbahelp
 
Om0017 advanced production planning and control
Om0017   advanced production planning and controlOm0017   advanced production planning and control
Om0017 advanced production planning and control
Study Stuff
 
Bt0092, software project management
Bt0092, software project managementBt0092, software project management
Bt0092, software project management
smumbahelp
 
Various National Agencies Directly Involved in the Issuance of Public Fiscal
Various National Agencies Directly Involved in the Issuance of Public FiscalVarious National Agencies Directly Involved in the Issuance of Public Fiscal
Various National Agencies Directly Involved in the Issuance of Public Fiscal
MarieTaylaran1
 

Similar to Pm0011 project planning and scheduling (20)

Pm0011 project planning and scheduling
Pm0011 project planning and schedulingPm0011 project planning and scheduling
Pm0011 project planning and scheduling
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
 
Project management 3rd sem - smu mba solved assignments
Project management  3rd   sem - smu mba solved assignmentsProject management  3rd   sem - smu mba solved assignments
Project management 3rd sem - smu mba solved assignments
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
 
Ms 05 management of machines and materials
Ms 05 management of machines and materialsMs 05 management of machines and materials
Ms 05 management of machines and materials
 
BUSN350Week 3 Business Problem and RequirementsBusiness.docx
BUSN350Week 3 Business Problem and RequirementsBusiness.docxBUSN350Week 3 Business Problem and RequirementsBusiness.docx
BUSN350Week 3 Business Problem and RequirementsBusiness.docx
 
How to Reach Peak Performance With the Product Management Organizational Heal...
How to Reach Peak Performance With the Product Management Organizational Heal...How to Reach Peak Performance With the Product Management Organizational Heal...
How to Reach Peak Performance With the Product Management Organizational Heal...
 
Assignment 1 LASA 2—Company Analysis ReportReview the following.docx
Assignment 1 LASA 2—Company Analysis ReportReview the following.docxAssignment 1 LASA 2—Company Analysis ReportReview the following.docx
Assignment 1 LASA 2—Company Analysis ReportReview the following.docx
 
Responses to Questions on the Webinar World class EA - Governor's Approach to...
Responses to Questions on the Webinar World class EA - Governor's Approach to...Responses to Questions on the Webinar World class EA - Governor's Approach to...
Responses to Questions on the Webinar World class EA - Governor's Approach to...
 
[Insert project title, e.g. Cosmo Inc.”] Project Scope State.docx
[Insert project title, e.g. Cosmo Inc.”] Project Scope State.docx[Insert project title, e.g. Cosmo Inc.”] Project Scope State.docx
[Insert project title, e.g. Cosmo Inc.”] Project Scope State.docx
 
Om0017 advanced production planning and control
Om0017   advanced production planning and controlOm0017   advanced production planning and control
Om0017 advanced production planning and control
 
Chandrashekhar resume
Chandrashekhar resumeChandrashekhar resume
Chandrashekhar resume
 
Om0017 advanced production planning and control
Om0017   advanced production planning and controlOm0017   advanced production planning and control
Om0017 advanced production planning and control
 
Om0017 advanced production planning and control
Om0017   advanced production planning and controlOm0017   advanced production planning and control
Om0017 advanced production planning and control
 
Bt0092, software project management
Bt0092, software project managementBt0092, software project management
Bt0092, software project management
 
Various National Agencies Directly Involved in the Issuance of Public Fiscal
Various National Agencies Directly Involved in the Issuance of Public FiscalVarious National Agencies Directly Involved in the Issuance of Public Fiscal
Various National Agencies Directly Involved in the Issuance of Public Fiscal
 

Recently uploaded

Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
Atul Kumar Singh
 
Template Jadual Bertugas Kelas (Boleh Edit)
Template Jadual Bertugas Kelas (Boleh Edit)Template Jadual Bertugas Kelas (Boleh Edit)
Template Jadual Bertugas Kelas (Boleh Edit)
rosedainty
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
Special education needs
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
How to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS ModuleHow to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS Module
Celine George
 
PART A. Introduction to Costumer Service
PART A. Introduction to Costumer ServicePART A. Introduction to Costumer Service
PART A. Introduction to Costumer Service
PedroFerreira53928
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
Delapenabediema
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
Jisc
 
How to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERPHow to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERP
Celine George
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
siemaillard
 
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxMARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
bennyroshan06
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
Sandy Millin
 
Basic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumersBasic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumers
PedroFerreira53928
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
Tamralipta Mahavidyalaya
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
BhavyaRajput3
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
Celine George
 
How to Break the cycle of negative Thoughts
How to Break the cycle of negative ThoughtsHow to Break the cycle of negative Thoughts
How to Break the cycle of negative Thoughts
Col Mukteshwar Prasad
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
Vikramjit Singh
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
EugeneSaldivar
 

Recently uploaded (20)

Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
 
Template Jadual Bertugas Kelas (Boleh Edit)
Template Jadual Bertugas Kelas (Boleh Edit)Template Jadual Bertugas Kelas (Boleh Edit)
Template Jadual Bertugas Kelas (Boleh Edit)
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
 
How to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS ModuleHow to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS Module
 
PART A. Introduction to Costumer Service
PART A. Introduction to Costumer ServicePART A. Introduction to Costumer Service
PART A. Introduction to Costumer Service
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
 
How to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERPHow to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERP
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxMARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
 
Basic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumersBasic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumers
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
 
How to Break the cycle of negative Thoughts
How to Break the cycle of negative ThoughtsHow to Break the cycle of negative Thoughts
How to Break the cycle of negative Thoughts
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
 

Pm0011 project planning and scheduling

  • 1. Winter-2015 Get solved assignments at nominal price of Rs.125 each. Mail us at: subjects4u@gmail.com or contact at 09882243490 Master of Business Administration - MBA Semester 3 PM0011-Project Planning and Scheduling (Book ID: B1937) Assignment (60 Marks) Note: Answers for 10 marks questions should be approximately of 400 words. Each question is followed by evaluation scheme. Each Question carries 10 marks 6 X 10=60. Q1. Write short note on:  Project deliverables  Project Rating Index(PRI)  Scope change control  Partnering Answer. Project Deliverables: In project management, a deliverable is a product or service that is given to your client. A deliverable usually has a due date and is tangible, measurable and specific. A deliverable can be given to either an external or internal customer and satisfies a milestone or due date that is created and produced in the project plan. A deliverable can be a software product, a design Q2. Budget Estimation of ABC Company Ltd. ABC Company Ltd., established in 1985, is engaged in the manufacturing of leatheraccessories. Over the years, the company, which started out as a local firm, has made its mark as an international corporation. However, the company is still working as a traditional set up. The high quality and durability of products have increased the demand of the products in the market. As the production of the organisation is being increased tomeet the demand, the traditional set up is creating hurdles in the production process. Organisation conflicts have arisen among the team members because of the unorganized hierarchical structure of the company, which is affecting the output of the organisation. Now that the management has decided to expand the business and opened up branches abroad, the company is facing two more problems. The first problem is in budgeting as the company is
  • 2. unfamiliar with international market conditions, strategy, and business policy while the second problem is conflicts at the time of team formation due to lack of experience of and exposure to multinational work culture, which has further affected the output of the company. The company can estimate the budget through two methods, the bottom - up approach and the top - down approach. The bottom -up approach is generally followed by the MNCs as it is more accurate and reliable. Mr.Parag has been appointed as the country head of the company and he has also been assigned the responsibility of incorporating the advanced project set up in the organisation. Questions: 1. Which project estimation approach should be used by the company and why? 2. What type of project organisation structure should be used by the company and why? Answer. 1. Bottom-up estimating (also called detail orresource-driven estimating) The estimator breaks a project into distinct line items, and then breaks those line items into smaller, distinct line items, and so on, until he or she arrives at the component (or resource) level – the level of detail at which the price of the components is relatively consistent across projects. Q3. What is the importance of operational feasibility? Explain the factors that affect operational feasibility. Answer. Operational feasibility is as important as technical feasibility (or any other kind of feasibility for that matter), and yet it can be the first thing to get brushed under the carpet. The conversation changes and that ‘intelligent system’ everyone was discussing is transformed back into a mere ‘thing’: a deliverable to drop into the organisation. We’ll find out later if we can make it happen; if we can weave it into departments and hearts as successfully as we can plug it into software platforms. Q4. Write short notes on  Monte Carlo analysis  Work break down structure  Resource loading  Definitive estimate (a method to estimate cost of a project). Answer. Monte Carlo analysis: Monte Carlo simulation is a method for exploring the sensitivity of a complex systemby varying parameters within statistical constraints. These systems can include financial, physical, and mathematical models that are simulated in a loop, with statistical uncertainty between
  • 3. simulations. The results from the simulation are analyzed to determine the characteristics of the system. Q5. What do you understand by cost of quality? Elaborate on various types of costs of quality associated with a project. Answer. Cost of Quality: The “cost of quality” isn’t the price of creating a quality product or service. It’s the cost of NOT creating a quality product or service. Every time work is redone, the cost of quality increases. Obvious examples include:  The reworking of a manufactured item.  The retesting of an assembly  The rebuilding of a tool  The correction of a bank statement Q6. Explain some of ISO standards that should be considered by the project manager during project execution. List the advantages of project management software. Answer. Some of ISO’s most well-known standards are management systemstandards. They provide a model to follow when setting up and operating a management system. Like all ISO standards, they are the result of international, expert consensus. Therefore, by implementing a management system standard, organizations can benefit from global management experience and good practice. Winter-2015 Get solved assignments at nominal price of Rs.125 each. Mail us at: subjects4u@gmail.com or contact at 09882243490