ASSIGNMENT
DRIVE WINTER 2014
PROGRAM MBADS (SEM 4/SEM 6)
MBAFLEX/ MBA (SEM 4)
PGDOMN (SEM 2)
SUBJECT CODE & NAME OM 0017 – ADVANCED PRODUCTION PLANNING AND
CONTROL
CREDITS 4
BK ID B2010
MARKS 60
Note: Answer all questions. Kindly note that answers for 10 marks questions should be
approximately of 400 words. Each question is followed by evaluation scheme.
Q. 1. a. What is the importance of production planning and control?
Answer: The systemof productionplanningandcontrol servesasthe nervous systemof aplant. It is
a co-ordinating agency which co-ordinate the activities of engineering, purchasing, production,
sellingandstockcontrol departments. Anefficientsystemof productionplanning and control helps
inprovidingbetterandmore economicgoodstocustomersat lowerinvestment. Itis essential in all
plants irrespective of their nature and size.
The importance of production planning and control are summarized below:
b. What factors affect inventory planning and control?
Answer: Product Type:The type of product greatlyinfluencesthe inventorycontrol policiesassigned
to manage the product. For example, products with short shelf lives, such as perishable foods,
require a different policy than men’s dress shirts. Short shelf life products must rotate based on
expiration date. Although it seems like a first in/first out (FIFO) policy works in this case, if at any
time goods come into the warehouse out of expiration date sequence, a FIFO policy will fail to
manage the inventory properly.
c. What is the difference between batch and mass production?
Answer:In the simplest of terms batch production is a particular sized lot of parts produced to a
particular set of instructions. For example producing 50 medium green t-shirts would be a batch.
Producing white medium t-shirts all day would be mass production.
Mass Production - Productionof a particularcomponent or product in a production system that can
handle large volume of production but with very little
Q. 2. What is a master schedule? Explain.
Answer:A masterproductionschedule (MPS) isaplanforindividual commoditiesto produce in each
time periodsuchas production,staffing,inventory, etc. It is usually linked to manufacturing where
the plan indicates when and how much of each product will be demanded. This plan quantifies
significant processes, parts, and other resources in order to optimize production, to identify
bottlenecks, and to anticipate needs and
Q. 3. What are the different types of planning and scheduling tools? Explain.
Answer:KeyPlanningElementsare Scope of Work whichis transpired in Work Breakdown Structure
(WBS) and Method of Execution which is identified in the logic diagram. Let us understand both
these elements.
Work breakdownStructure: The PMBOK Guide definesaWBS as a deliverable, orientated grouping
of project elements that organizes and defines the total scope of the project. By using a WBS, it
allows the project team to plan a project by means of a hierarchical structure, by identifying the
elements and sub elements. A work package
Q. 4. a. What are the pillars of lean production?
Answer: Lean manufacturing or lean production, often simply "lean", is a systemic method for the
elimination of waste ("Muda") within a manufacturing process. Lean also takes into account waste
created through overburden ("Muri") and waste created through unevenness in work loads
("Mura").Workingfromthe perspectiveof the client who consumes a product or service, "value" is
any action or process that a customer would be willing to pay for.
Essentially,lean is centered on making obvious what adds value by reducing everything else. Lean
manufacturing is a management philosophy
b. What factors should be considered while implementing a production planning and control
system?
Answer:Many technical and systems changes have occurred in manufacturing industry over recent
years. The requirements being placed on companies by the market are also changing. Production
Planning and Control (PPC) is being asked to respond effectively to these internal and external
changes by providing a faster response and better control of resources and delivery performance.
The prime objective of production planning
Q. 5. Case Study: Planning and Scheduling at John Smith Pvt .Ltd
John Smith is a manufacturing organisation of apparels and accessories, specialising in both men
and women segments. The organisation started in the US and gradually extended its different
branches and merchandise to other nations as well. The organisation was not only favoured by
customers but was also loved by its employees for the work environment it provided. Employees
were not only paid well but were also provided good appraisals that motivated them to give their
best to the organisation.
Current planner Mr. Jackson had been working with the organisation for the past 15 years and
now wanted to take retirement from his work due to his age. The organisation bid him farewell
and Mr.Max was hired as the new planner for the organisation on the basis of his qualifications
and experience. After Mr. Max completed 1 year, the organisation observed dissatisfaction
Among its employees. The reason was that employees were not happy with the way production
was carried out. There was too much pressure on employees, and Mr. Max was accepting more
orders than the workers could manage.
This was demotivating workers and employees, and as a result , the company observed the
highest attrition rate in its history. The management immediately reacted to the situation and
called back Mr. Jackson as an external planning consultant to address the issue at the earliest,
Because management was losing its manpower, which was affecting the business.
Mr. Jackson paid a visit to the organisation and studied the records for the past 1 year. He also
Had a discussion with the new planner, Mr. Max, for the current appraisal system. On the basis of
his observations and discussions, Mr. Jackson made certain conclusions. He stated that Mr. Max
was not followingthe appropriate production process, because the number of orders accepted for
production was more than the resources available at the production unit. He also stated that the
problem was not completely Mr. Max’s fault, because the organisation did not train him on the
existing production process and neither did they make him aware of the competitors and the
market.
Question:
What is main issue inthe case study? Evaluate why thisissue was caused and provide a solution to
resolve it.
Describe the main issue in the case study.
To evaluate why the issue was caused
 Assess if the recruitment of the new planner was done correctly
 Discuss if the planner has the requisite skills and knowledge
 Argue if training the planner would have resolved the problem, would performance
measurement helped in identifying the issue
 Provide the solution from point of view evaluation made
Answer: Planning, for our purposes, can be thought of as determining all the small tasks that must
be carried out in order to accomplish a goal. Let's say your goal is to buy a gallon of milk. It may
soundlike asimple task,butif youbreak itdown, there are many small tasks involved: obtain keys,
obtainwallet, start car, drive to store, find and obtain milk, purchase milk, etc. Planning also takes
into account rules, called constraints, which control when certain tasks can or cannot happen. Two
(of many) constraints in this example are that you
Q. 6. Write short notes on:
a) Cost centre
Answer: Cost centers and profit centers are typically treated differently within an organization.
Because a cost center doesn't produce a profit directly from its activities, managers of cost centers
are responsible for keeping their costs in line or below budget. Examples of cost centers include
marketing, human resources and
b) Objectives of sales and operations planning
Answer:The concept of Sales and Operations Planning (S&OP) is a month-based business process
aimed at achieving a balance between a company’s overalldemand and supply (availability). An
effective S&OP process links together business planning and master planning within a company.
Business Planning is typically based on product families and monetary units. The annual budget
process that many companies work with is strongly connected to business planning. Sales and
operations planning is also often
c) Bills of Distribution (BOD)
Answer:The bill of distribution (BOD) specifies how a product is further distributed within your
enterprise following inward delivery from the supplier before being passed on to the customer.
Because the distributionroutesare firmlypredefinedbythe BOD, you can use the latter to carry out
spare parts planning without a time-consuming source determination process. Bills of distribution
define the sourcingstrategiesof several organizations.Inotherwords,a bill of distribution is library
of sourcing strategies. For instance, the sourcing strategy described in SR-C01 could apply to
differentorganizationsatdifferentperiods.Youcannotdothiswithsourcingrulesbecause you have
to apply the strategy to one org or all orgs.
d) Advanced scheduling
Answer:Advancedplanningandscheduling(alsoknownasAPS and advanced manufacturing) refers
to a manufacturing management process by which raw materials and production capacity are
optimallyallocatedtomeetdemand. APS is especially well-suited to environments where simpler
planning methods cannot adequately address complex trade-offs between competing priorities.
Productionschedulingisintrinsicallyverydifficult due to the (approximately) factorial dependence
of the size of the solution space on the number of items/products to be manufactured.
Dear students get fully solved assignments
Send your semester & Specialization name to our mail id :
“ help.mbaassignments@gmail.com ”
or
Call us at : 08263069601

More Related Content

What's hot

Productivity and Total Quality Management unit 3
Productivity and Total Quality Management unit 3Productivity and Total Quality Management unit 3
Productivity and Total Quality Management unit 3Dr. Parveen Kaur Nagpal
 
Business Process Reengineering
Business Process ReengineeringBusiness Process Reengineering
Business Process ReengineeringMr. Murali
 
Questionnaire survey
Questionnaire surveyQuestionnaire survey
Questionnaire surveysiteoffice
 
Success And Failure of BPR in a Public Sector Industry
Success And Failure of BPR in a Public Sector IndustrySuccess And Failure of BPR in a Public Sector Industry
Success And Failure of BPR in a Public Sector Industryharikrishnanjl
 
Five Step Methodology To Implement Bpr
Five Step Methodology To Implement BprFive Step Methodology To Implement Bpr
Five Step Methodology To Implement BprRoy Antony Arnold G
 
Forum total quality manangemen
Forum total quality manangemenForum total quality manangemen
Forum total quality manangemenJudith Machisaca
 
Barriers to total quality management implementation By Mahr M.Haseeb Sultan
Barriers to total quality management implementation By Mahr M.Haseeb SultanBarriers to total quality management implementation By Mahr M.Haseeb Sultan
Barriers to total quality management implementation By Mahr M.Haseeb SultanMuhammad Haseeb Sultan
 
Sales & Operations Planning Process
Sales & Operations Planning ProcessSales & Operations Planning Process
Sales & Operations Planning ProcessHarshal Badgujar
 
Chapter 5 Process Management
Chapter 5 Process ManagementChapter 5 Process Management
Chapter 5 Process ManagementDr. John V. Padua
 
Total Quality Management TQM Day2 for E-Iidaman,
Total Quality Management TQM Day2 for E-Iidaman,  Total Quality Management TQM Day2 for E-Iidaman,
Total Quality Management TQM Day2 for E-Iidaman, Timothy Wooi
 
Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineeringCik Liana Omar
 
HP case study sloution
HP case study sloutionHP case study sloution
HP case study sloutionSurbhi Jindal
 
Business Process Re-Engineering
Business Process Re-EngineeringBusiness Process Re-Engineering
Business Process Re-EngineeringNirmal PR
 
Bpr case study by sims student
Bpr case study by sims studentBpr case study by sims student
Bpr case study by sims studentmrgauravkhadse
 
Benchmarking ppt
Benchmarking pptBenchmarking ppt
Benchmarking pptAMARAYYA
 

What's hot (20)

Performance measures
Performance measuresPerformance measures
Performance measures
 
Bpr Case Study
Bpr Case StudyBpr Case Study
Bpr Case Study
 
Productivity and Total Quality Management unit 3
Productivity and Total Quality Management unit 3Productivity and Total Quality Management unit 3
Productivity and Total Quality Management unit 3
 
Business Process Reengineering
Business Process ReengineeringBusiness Process Reengineering
Business Process Reengineering
 
Questionnaire survey
Questionnaire surveyQuestionnaire survey
Questionnaire survey
 
Success And Failure of BPR in a Public Sector Industry
Success And Failure of BPR in a Public Sector IndustrySuccess And Failure of BPR in a Public Sector Industry
Success And Failure of BPR in a Public Sector Industry
 
Chapter 4_OM
Chapter 4_OMChapter 4_OM
Chapter 4_OM
 
Five Step Methodology To Implement Bpr
Five Step Methodology To Implement BprFive Step Methodology To Implement Bpr
Five Step Methodology To Implement Bpr
 
Forum total quality manangemen
Forum total quality manangemenForum total quality manangemen
Forum total quality manangemen
 
Barriers to total quality management implementation By Mahr M.Haseeb Sultan
Barriers to total quality management implementation By Mahr M.Haseeb SultanBarriers to total quality management implementation By Mahr M.Haseeb Sultan
Barriers to total quality management implementation By Mahr M.Haseeb Sultan
 
Sales & Operations Planning Process
Sales & Operations Planning ProcessSales & Operations Planning Process
Sales & Operations Planning Process
 
Productivity
ProductivityProductivity
Productivity
 
Chapter 5 Process Management
Chapter 5 Process ManagementChapter 5 Process Management
Chapter 5 Process Management
 
Total Quality Management TQM Day2 for E-Iidaman,
Total Quality Management TQM Day2 for E-Iidaman,  Total Quality Management TQM Day2 for E-Iidaman,
Total Quality Management TQM Day2 for E-Iidaman,
 
Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineering
 
HP case study sloution
HP case study sloutionHP case study sloution
HP case study sloution
 
Business Process Re-Engineering
Business Process Re-EngineeringBusiness Process Re-Engineering
Business Process Re-Engineering
 
Bpr case study by sims student
Bpr case study by sims studentBpr case study by sims student
Bpr case study by sims student
 
004 benchmarking and productivity
004 benchmarking and productivity004 benchmarking and productivity
004 benchmarking and productivity
 
Benchmarking ppt
Benchmarking pptBenchmarking ppt
Benchmarking ppt
 

Viewers also liked

Positioning- Marketing Management
Positioning- Marketing ManagementPositioning- Marketing Management
Positioning- Marketing ManagementMd Killedar
 
Research aims and impact
Research  aims and impactResearch  aims and impact
Research aims and impactAbbeyAndJess
 
Aims and research
Aims and researchAims and research
Aims and researchmworth
 
Aggregate planning in class
Aggregate planning in classAggregate planning in class
Aggregate planning in classParmar Urvashi
 
Factors tht affect recruitment[ppt]
Factors tht affect recruitment[ppt]Factors tht affect recruitment[ppt]
Factors tht affect recruitment[ppt]Shubham Tandel
 
Positioning in Marketing
Positioning in MarketingPositioning in Marketing
Positioning in MarketingTrinity Dwarka
 
Aggregate planning and mps om
Aggregate planning and mps omAggregate planning and mps om
Aggregate planning and mps omfatuma ahmed
 
Ethical Decision Making Process
Ethical Decision Making ProcessEthical Decision Making Process
Ethical Decision Making ProcessCoky Fauzi Alfi
 
Recruitment & selection
Recruitment & selectionRecruitment & selection
Recruitment & selectionNISHA SHAH
 
Research Methodology
Research MethodologyResearch Methodology
Research Methodologysh_neha252
 
Slideshare.Com Powerpoint
Slideshare.Com PowerpointSlideshare.Com Powerpoint
Slideshare.Com Powerpointguested929b
 
Definition and types of research
Definition and types of researchDefinition and types of research
Definition and types of researchfadifm
 

Viewers also liked (17)

Positioning- Marketing Management
Positioning- Marketing ManagementPositioning- Marketing Management
Positioning- Marketing Management
 
Research aims and impact
Research  aims and impactResearch  aims and impact
Research aims and impact
 
Aims and research
Aims and researchAims and research
Aims and research
 
Decision Making
Decision MakingDecision Making
Decision Making
 
Marketing position
Marketing positionMarketing position
Marketing position
 
Aggregate Planning
Aggregate PlanningAggregate Planning
Aggregate Planning
 
Aggregate planning in class
Aggregate planning in classAggregate planning in class
Aggregate planning in class
 
Factors tht affect recruitment[ppt]
Factors tht affect recruitment[ppt]Factors tht affect recruitment[ppt]
Factors tht affect recruitment[ppt]
 
Ethical Decision Making in Business
Ethical Decision Making in BusinessEthical Decision Making in Business
Ethical Decision Making in Business
 
Positioning in Marketing
Positioning in MarketingPositioning in Marketing
Positioning in Marketing
 
Aggregate planning and mps om
Aggregate planning and mps omAggregate planning and mps om
Aggregate planning and mps om
 
Ethical Decision Making Process
Ethical Decision Making ProcessEthical Decision Making Process
Ethical Decision Making Process
 
Recruitment & selection
Recruitment & selectionRecruitment & selection
Recruitment & selection
 
Research methodology notes
Research methodology notesResearch methodology notes
Research methodology notes
 
Research Methodology
Research MethodologyResearch Methodology
Research Methodology
 
Slideshare.Com Powerpoint
Slideshare.Com PowerpointSlideshare.Com Powerpoint
Slideshare.Com Powerpoint
 
Definition and types of research
Definition and types of researchDefinition and types of research
Definition and types of research
 

Similar to Om0017 advanced production planning and control

Om0017 – advanced production and planning control
Om0017 – advanced production and planning controlOm0017 – advanced production and planning control
Om0017 – advanced production and planning controlsmumbahelp
 
Ms 05 management of machines and materials
Ms 05 management of machines and materialsMs 05 management of machines and materials
Ms 05 management of machines and materialssmumbahelp
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and schedulingsmumbahelp
 
Bba501 production and operations management
Bba501  production and operations managementBba501  production and operations management
Bba501 production and operations managementsmumbahelp
 
Bba501 production and operations management (2)
Bba501   production and operations management (2)Bba501   production and operations management (2)
Bba501 production and operations management (2)smumbahelp
 
Om0017 advanced production and planning control
Om0017 advanced production and planning controlOm0017 advanced production and planning control
Om0017 advanced production and planning controlconsult4solutions
 
operational process.docx
operational process.docxoperational process.docx
operational process.docxwrite22
 
Pm0010 – interduction to project management
Pm0010 – interduction to project managementPm0010 – interduction to project management
Pm0010 – interduction to project managementsmumbahelp
 
Mb0044 production and operation management
Mb0044   production and operation managementMb0044   production and operation management
Mb0044 production and operation managementsmumbahelp
 
Mb0044 production and operation management
Mb0044   production and operation managementMb0044   production and operation management
Mb0044 production and operation managementsmumbahelp
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and schedulingsmumbahelp
 
Ms 05 management of machines and materials
Ms 05 management of machines and materialsMs 05 management of machines and materials
Ms 05 management of machines and materialssmumbahelp
 
Ms 53 production operations management
Ms   53  production operations managementMs   53  production operations management
Ms 53 production operations managementsmumbahelp
 
Pm0011 project planning and scheduling
Pm0011 project planning and schedulingPm0011 project planning and scheduling
Pm0011 project planning and schedulingconsult4solutions
 
How to Build a Business Case for ERP Replatforming
How to Build a Business Case for ERP ReplatformingHow to Build a Business Case for ERP Replatforming
How to Build a Business Case for ERP ReplatformingBlytheco
 
Work Out2008 1
Work Out2008 1Work Out2008 1
Work Out2008 1Kloretto
 
Mb0044 production and operation management
Mb0044   production and operation managementMb0044   production and operation management
Mb0044 production and operation managementsmumbahelp
 

Similar to Om0017 advanced production planning and control (20)

Om0017 – advanced production and planning control
Om0017 – advanced production and planning controlOm0017 – advanced production and planning control
Om0017 – advanced production and planning control
 
Ms 05 management of machines and materials
Ms 05 management of machines and materialsMs 05 management of machines and materials
Ms 05 management of machines and materials
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
 
Bba501 production and operations management
Bba501  production and operations managementBba501  production and operations management
Bba501 production and operations management
 
Bba501 production and operations management (2)
Bba501   production and operations management (2)Bba501   production and operations management (2)
Bba501 production and operations management (2)
 
Om0017 advanced production and planning control
Om0017 advanced production and planning controlOm0017 advanced production and planning control
Om0017 advanced production and planning control
 
operational process.docx
operational process.docxoperational process.docx
operational process.docx
 
Pm0010 – interduction to project management
Pm0010 – interduction to project managementPm0010 – interduction to project management
Pm0010 – interduction to project management
 
Mb0044 production and operation management
Mb0044   production and operation managementMb0044   production and operation management
Mb0044 production and operation management
 
Mb0044 production and operation management
Mb0044   production and operation managementMb0044   production and operation management
Mb0044 production and operation management
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
 
Ms 05 management of machines and materials
Ms 05 management of machines and materialsMs 05 management of machines and materials
Ms 05 management of machines and materials
 
Ms 53 production operations management
Ms   53  production operations managementMs   53  production operations management
Ms 53 production operations management
 
Pm0011 project planning and scheduling
Pm0011 project planning and schedulingPm0011 project planning and scheduling
Pm0011 project planning and scheduling
 
How to Build a Business Case for ERP Replatforming
How to Build a Business Case for ERP ReplatformingHow to Build a Business Case for ERP Replatforming
How to Build a Business Case for ERP Replatforming
 
Assignment 1 pom
Assignment 1   pomAssignment 1   pom
Assignment 1 pom
 
Work Out2008 1
Work Out2008 1Work Out2008 1
Work Out2008 1
 
Mb0044 production and operation management
Mb0044   production and operation managementMb0044   production and operation management
Mb0044 production and operation management
 
Mgt3059 week 1 to 3
Mgt3059 week 1 to 3Mgt3059 week 1 to 3
Mgt3059 week 1 to 3
 
Erp
ErpErp
Erp
 

Om0017 advanced production planning and control

  • 1. Dear students get fully solved assignments Send your semester & Specialization name to our mail id : “ help.mbaassignments@gmail.com ” or Call us at : 08263069601 ASSIGNMENT DRIVE WINTER 2014 PROGRAM MBADS (SEM 4/SEM 6) MBAFLEX/ MBA (SEM 4) PGDOMN (SEM 2) SUBJECT CODE & NAME OM 0017 – ADVANCED PRODUCTION PLANNING AND CONTROL CREDITS 4 BK ID B2010 MARKS 60 Note: Answer all questions. Kindly note that answers for 10 marks questions should be approximately of 400 words. Each question is followed by evaluation scheme. Q. 1. a. What is the importance of production planning and control? Answer: The systemof productionplanningandcontrol servesasthe nervous systemof aplant. It is a co-ordinating agency which co-ordinate the activities of engineering, purchasing, production, sellingandstockcontrol departments. Anefficientsystemof productionplanning and control helps inprovidingbetterandmore economicgoodstocustomersat lowerinvestment. Itis essential in all plants irrespective of their nature and size. The importance of production planning and control are summarized below: b. What factors affect inventory planning and control? Answer: Product Type:The type of product greatlyinfluencesthe inventorycontrol policiesassigned to manage the product. For example, products with short shelf lives, such as perishable foods, require a different policy than men’s dress shirts. Short shelf life products must rotate based on expiration date. Although it seems like a first in/first out (FIFO) policy works in this case, if at any time goods come into the warehouse out of expiration date sequence, a FIFO policy will fail to manage the inventory properly. c. What is the difference between batch and mass production? Answer:In the simplest of terms batch production is a particular sized lot of parts produced to a particular set of instructions. For example producing 50 medium green t-shirts would be a batch. Producing white medium t-shirts all day would be mass production. Mass Production - Productionof a particularcomponent or product in a production system that can handle large volume of production but with very little
  • 2. Q. 2. What is a master schedule? Explain. Answer:A masterproductionschedule (MPS) isaplanforindividual commoditiesto produce in each time periodsuchas production,staffing,inventory, etc. It is usually linked to manufacturing where the plan indicates when and how much of each product will be demanded. This plan quantifies significant processes, parts, and other resources in order to optimize production, to identify bottlenecks, and to anticipate needs and Q. 3. What are the different types of planning and scheduling tools? Explain. Answer:KeyPlanningElementsare Scope of Work whichis transpired in Work Breakdown Structure (WBS) and Method of Execution which is identified in the logic diagram. Let us understand both these elements. Work breakdownStructure: The PMBOK Guide definesaWBS as a deliverable, orientated grouping of project elements that organizes and defines the total scope of the project. By using a WBS, it allows the project team to plan a project by means of a hierarchical structure, by identifying the elements and sub elements. A work package Q. 4. a. What are the pillars of lean production? Answer: Lean manufacturing or lean production, often simply "lean", is a systemic method for the elimination of waste ("Muda") within a manufacturing process. Lean also takes into account waste created through overburden ("Muri") and waste created through unevenness in work loads ("Mura").Workingfromthe perspectiveof the client who consumes a product or service, "value" is any action or process that a customer would be willing to pay for. Essentially,lean is centered on making obvious what adds value by reducing everything else. Lean manufacturing is a management philosophy b. What factors should be considered while implementing a production planning and control system? Answer:Many technical and systems changes have occurred in manufacturing industry over recent years. The requirements being placed on companies by the market are also changing. Production Planning and Control (PPC) is being asked to respond effectively to these internal and external changes by providing a faster response and better control of resources and delivery performance. The prime objective of production planning Q. 5. Case Study: Planning and Scheduling at John Smith Pvt .Ltd John Smith is a manufacturing organisation of apparels and accessories, specialising in both men and women segments. The organisation started in the US and gradually extended its different branches and merchandise to other nations as well. The organisation was not only favoured by customers but was also loved by its employees for the work environment it provided. Employees were not only paid well but were also provided good appraisals that motivated them to give their best to the organisation.
  • 3. Current planner Mr. Jackson had been working with the organisation for the past 15 years and now wanted to take retirement from his work due to his age. The organisation bid him farewell and Mr.Max was hired as the new planner for the organisation on the basis of his qualifications and experience. After Mr. Max completed 1 year, the organisation observed dissatisfaction Among its employees. The reason was that employees were not happy with the way production was carried out. There was too much pressure on employees, and Mr. Max was accepting more orders than the workers could manage. This was demotivating workers and employees, and as a result , the company observed the highest attrition rate in its history. The management immediately reacted to the situation and called back Mr. Jackson as an external planning consultant to address the issue at the earliest, Because management was losing its manpower, which was affecting the business. Mr. Jackson paid a visit to the organisation and studied the records for the past 1 year. He also Had a discussion with the new planner, Mr. Max, for the current appraisal system. On the basis of his observations and discussions, Mr. Jackson made certain conclusions. He stated that Mr. Max was not followingthe appropriate production process, because the number of orders accepted for production was more than the resources available at the production unit. He also stated that the problem was not completely Mr. Max’s fault, because the organisation did not train him on the existing production process and neither did they make him aware of the competitors and the market. Question: What is main issue inthe case study? Evaluate why thisissue was caused and provide a solution to resolve it. Describe the main issue in the case study. To evaluate why the issue was caused  Assess if the recruitment of the new planner was done correctly  Discuss if the planner has the requisite skills and knowledge  Argue if training the planner would have resolved the problem, would performance measurement helped in identifying the issue  Provide the solution from point of view evaluation made Answer: Planning, for our purposes, can be thought of as determining all the small tasks that must be carried out in order to accomplish a goal. Let's say your goal is to buy a gallon of milk. It may soundlike asimple task,butif youbreak itdown, there are many small tasks involved: obtain keys, obtainwallet, start car, drive to store, find and obtain milk, purchase milk, etc. Planning also takes into account rules, called constraints, which control when certain tasks can or cannot happen. Two (of many) constraints in this example are that you Q. 6. Write short notes on: a) Cost centre Answer: Cost centers and profit centers are typically treated differently within an organization. Because a cost center doesn't produce a profit directly from its activities, managers of cost centers
  • 4. are responsible for keeping their costs in line or below budget. Examples of cost centers include marketing, human resources and b) Objectives of sales and operations planning Answer:The concept of Sales and Operations Planning (S&OP) is a month-based business process aimed at achieving a balance between a company’s overalldemand and supply (availability). An effective S&OP process links together business planning and master planning within a company. Business Planning is typically based on product families and monetary units. The annual budget process that many companies work with is strongly connected to business planning. Sales and operations planning is also often c) Bills of Distribution (BOD) Answer:The bill of distribution (BOD) specifies how a product is further distributed within your enterprise following inward delivery from the supplier before being passed on to the customer. Because the distributionroutesare firmlypredefinedbythe BOD, you can use the latter to carry out spare parts planning without a time-consuming source determination process. Bills of distribution define the sourcingstrategiesof several organizations.Inotherwords,a bill of distribution is library of sourcing strategies. For instance, the sourcing strategy described in SR-C01 could apply to differentorganizationsatdifferentperiods.Youcannotdothiswithsourcingrulesbecause you have to apply the strategy to one org or all orgs. d) Advanced scheduling Answer:Advancedplanningandscheduling(alsoknownasAPS and advanced manufacturing) refers to a manufacturing management process by which raw materials and production capacity are optimallyallocatedtomeetdemand. APS is especially well-suited to environments where simpler planning methods cannot adequately address complex trade-offs between competing priorities. Productionschedulingisintrinsicallyverydifficult due to the (approximately) factorial dependence of the size of the solution space on the number of items/products to be manufactured. Dear students get fully solved assignments Send your semester & Specialization name to our mail id : “ help.mbaassignments@gmail.com ” or Call us at : 08263069601