Assignment
DRIVE FALL 2015
PROGRAM MBADS (SEM 3/SEM 5) MBAFLEX/ MBA (SEM3) PGDPMN(SEM 1)
SUBJECT CODE & NAME PM0011 – PROJECT PLANNING ANDSCHEDULING
BK ID B1937
CREDIT & MARKS 4 CREDITS & 60 MARKS
1 Write short note on:
1 Write short note on:
(A) Project deliverables
Deliverable is a term used in project management to describe a tangible or intangible object produced
as a result of the project that is intended to be delivered to a customer (either internal or external). A
deliverable could be a report, a document, a server upgrade or any other building block of an overall
project.
A deliverablemaybe composedof
B) Project Rating Index (PRI): The PDRI is intended to evaluate the completeness of scope definition,
specifically on industrial construction projects, at any point prior to the time a project is considered for
authorization to perform detailed design and construction. This paper will highlight the importance of
scope definition and its direct impact on project success, specifically focusing on how recent industry
trendsare changingthe traditional projectenvironment.
The PDRI was testedona
(C) Scope change control: A scope change is any modification to the agreed-upon project scope a
defined by the approved WBS. Scope changes often require adjustments to cost, time, quality, or other
project activities. These are fed back through the planning process, technical and planning documents
are updatedasneededand
D) Partnering
Establishing a long term win-win relationship based on mutual trust and teamwork, and on sharing of
both risks and rewards. Partnering arrangement can be between labor and management, subordinates
and the executive, suppliers and customers, and suppliers and suppliers. The objective is to focus on
whateach party doesbest,by
2 BudgetEstimation of ABC Company Ltd.
ABC Company Ltd., established in 1985, is engaged in the manufacturing of leather accessories. Over
the years, the company, which started out as a local firm,has made its mark as an international
corporation. However,the company is still working as a traditional set up.
The high quality and durability of products have increased the demand of the products in the market.
As the production of the organisation is being increased to meet the demand, the traditional set up is
creating hurdlesin the production process.
Organisation conflicts have arisen among the team members because of the unorganised hierarchical
structure of the company, which is affecting the output of the organisation. Now that the
management has decided to expand the business and opened up branches abroad, the company is
facing two more problems. The first problem is in budgeting as the company is unfamiliar with
international market conditions, strategy, and business policy while the second problem is conflicts at
the time of team formation due to lack of experience of and exposure to multinational work culture,
which has further affectedthe output of the company.
The company can estimate the budget through two methods, the bottom - up approach and the top -
down approach. The bottom -up approach is generally followed by the MNCs as it is more accurate
and reliable.
Mr.Parag has been appointed as the country head of the company and he has also been assigned the
responsibilityofincorporatingthe advanced projectset up in the organisation.
Questions:
Whichproject estimationapproach shouldbe usedby the company and why?
Bottom-up estimating(alsocalleddetail or resource-drivenestimating)
The estimator breaks a project into distinct line items, and then breaks those line items into smaller,
distinct line items, and so on, until he or she arrives at the component (or resource) level – the level of
detail atwhichthe price of the componentsisrelativelyconsistentacrossprojects.
Top-downestimating(also calledparametric estimating)
This approach typically relies on cost histories from past projects, and knowledge of the specific
parameters of those projects. Using the previous example, reviewing previous bridge projects to
determine that there are correlations between the cost of the bridge and key factors like size and the
primarymaterial usedgivesthe estimatorvaluable data.
In other words, all things being equal, if the new bridge is 10% larger than the previous bridge, its top-
down cost estimate might be 10% higher. While this approach can be fast, it is less likely to uncover
potential cost-eatingdangerslike challengingsiteconditionsorfluctuationsinraw material costs.
The practical reality is that both approaches are likely to be used by most companies and on most
projects. Top-down may be the only approach possible for a conceptual estimate for an early-stage
project. And even later-stage estimates might involve a mix of items, some estimated top-down and
othersbottom-up.
2. Whattype of project organisationstructure should be usedby the company and why?
Answer:
 Flat Organizational Structure: Many small companies use a flat organizational structure, where
very few levels of management separate executives from analysts, secretaries and lower-level
employees. Flat organizations work best when a company hasless than 20 employees, especially
if the companyemploysone ortwo employeesperdepartment.
 Functional Organizational Structure: A functional organizational structure is centered on job
functions, such as marketing, research and development and finance. Small companies should
use a functional
3 What is the importance of operational feasibility? Explain the factors that affect operational
feasibility.
Answer: Operational feasibility is as important as technical feasibility (or any other kind of feasibility for
that matter), and yet it can be the first thing to get brushed under the carpet. The conversation changes
and that ‘intelligent system’ everyone was discussing is transformed back into a mere ‘thing’: a
deliverable to drop into the organisation. We’ll find out later if we can make it happen; if we can weave
it intodepartmentsandheartsassuccessfullyaswe canplugit intosoftware platforms.
Working Lean means minimising waste. And operational feasibility should surely be fed into product
developmentcycleslike anyothercritical
4 Write short noteson
(a) Monte Carlo analysis: A problem solving technique used to approximate the probability of certain
outcomes by running multiple trial runs, called simulations, using random variables. Monte Carlo
simulationis
(b) Work break down structure: A work breakdown structure (WBS), in project management and
systems engineering, is a deliverable-oriented decomposition of a project into smaller components. A
work breakdown structure element may be a product, data, service, or any combination thereof. A WBS
alsoprovidesthe necessary
(c)Resource loading: Resource loading mainly involves your manpower or employees. In resource
loading, each employee is assigned a task or a percentage of a project (X percent of the whole). Usually,
it's 25 percent of the whole. Then the employee is assigned other tasks until he or she reaches 100
percentbooked.Thiswouldthenmean
(d) Definitive estimate (amethodto estimate cost of a project):
"A definitive estimate is prepared from well defined data, specifications, drawings, etc. This category
covers all estimate ranges from a minimum to maximum definitive type. These estimates are used for
bidproposals,
5 What do you understand by cost of quality? Elaborate on various types of costs of quality associated
with a project.
Answer: The term “quality costs” has different meanings to different people. Some equate “quality
costs” with the costs of poor quality due to finding and correcting defective work. Others equate the
term with the costs to attain good quality. Others use the term to mean the costs of running the quality
department.Inmysite,the term"
6 Explain some of ISO standards that should be considered by the project manager during project
execution.Listthe advantages of projectmanagement software.
Answer: Management system standards: ISO management system standards provide a model to follow
when setting up and operating a management system. Like all our standards, they are the result of
international, expert consensus and therefore offer the benefit of global management experience and
good practice. These standards can be applied to any organisation, large or small, whatever the product
or service andregardlessof the sectorof activity.
Dear students get fully solved assignments by professionals
Send your semester & Specialization name to our mail id :
stuffstudy5@gmail.com
or
call us at : 098153-33456
(Prefer mailing. Call in emergency )

More Related Content

What's hot

Presentation by dhruba jyoti chaudhuri
Presentation by dhruba jyoti chaudhuriPresentation by dhruba jyoti chaudhuri
Presentation by dhruba jyoti chaudhuriPMI_IREP_TP
 
Vardarajan sethuraman
Vardarajan sethuramanVardarajan sethuraman
Vardarajan sethuramanPMI2011
 
Presentation by vignesh swamidurai
Presentation by vignesh swamiduraiPresentation by vignesh swamidurai
Presentation by vignesh swamiduraiPMI_IREP_TP
 
Contract review
Contract reviewContract review
Contract reviewnethisip13
 
Tavant Whitepaper-MeasuringProjectSuccess-Final
Tavant Whitepaper-MeasuringProjectSuccess-FinalTavant Whitepaper-MeasuringProjectSuccess-Final
Tavant Whitepaper-MeasuringProjectSuccess-FinalSEKHAR KOMMURI
 
Quality function deployment
Quality function deploymentQuality function deployment
Quality function deploymentPreeti Mishra
 
5 immutable principles and 5 processes in 60 seconds
5 immutable principles and 5 processes in 60 seconds5 immutable principles and 5 processes in 60 seconds
5 immutable principles and 5 processes in 60 secondsGlen Alleman
 
Microsoft Abbreviations Dictionary
Microsoft Abbreviations DictionaryMicrosoft Abbreviations Dictionary
Microsoft Abbreviations DictionaryIAMCP MENTORING
 
Day 1 1620 - 1705 - pearl 1 - deep kamal singh
Day 1   1620 - 1705 - pearl 1 - deep kamal singhDay 1   1620 - 1705 - pearl 1 - deep kamal singh
Day 1 1620 - 1705 - pearl 1 - deep kamal singhPMI2011
 
Governance of mega and giga programs
Governance of mega and giga programsGovernance of mega and giga programs
Governance of mega and giga programsBob Prieto
 
Project Management Toolkit
Project Management ToolkitProject Management Toolkit
Project Management ToolkitBrian Klempke
 
1. bussiness process diagonistic tool for cpm
1. bussiness process diagonistic tool for cpm1. bussiness process diagonistic tool for cpm
1. bussiness process diagonistic tool for cpmJyoti Trivedi
 
IRJET- A Review Paper on Quantifay the Different Constraints for Delays in In...
IRJET- A Review Paper on Quantifay the Different Constraints for Delays in In...IRJET- A Review Paper on Quantifay the Different Constraints for Delays in In...
IRJET- A Review Paper on Quantifay the Different Constraints for Delays in In...IRJET Journal
 
in-the-firing-line-en-1603221-2
in-the-firing-line-en-1603221-2in-the-firing-line-en-1603221-2
in-the-firing-line-en-1603221-2Yasser Mahmud
 

What's hot (19)

Presentation by dhruba jyoti chaudhuri
Presentation by dhruba jyoti chaudhuriPresentation by dhruba jyoti chaudhuri
Presentation by dhruba jyoti chaudhuri
 
kanbarasu
kanbarasukanbarasu
kanbarasu
 
Vardarajan sethuraman
Vardarajan sethuramanVardarajan sethuraman
Vardarajan sethuraman
 
Presentation by vignesh swamidurai
Presentation by vignesh swamiduraiPresentation by vignesh swamidurai
Presentation by vignesh swamidurai
 
Contract review
Contract reviewContract review
Contract review
 
Tavant Whitepaper-MeasuringProjectSuccess-Final
Tavant Whitepaper-MeasuringProjectSuccess-FinalTavant Whitepaper-MeasuringProjectSuccess-Final
Tavant Whitepaper-MeasuringProjectSuccess-Final
 
Qfd dfss
Qfd dfssQfd dfss
Qfd dfss
 
Quality function deployment
Quality function deploymentQuality function deployment
Quality function deployment
 
Evolve methodology
Evolve methodologyEvolve methodology
Evolve methodology
 
5 immutable principles and 5 processes in 60 seconds
5 immutable principles and 5 processes in 60 seconds5 immutable principles and 5 processes in 60 seconds
5 immutable principles and 5 processes in 60 seconds
 
Old Bottle New Wine - Lean Management In Construction
Old Bottle New Wine - Lean Management In ConstructionOld Bottle New Wine - Lean Management In Construction
Old Bottle New Wine - Lean Management In Construction
 
Microsoft Abbreviations Dictionary
Microsoft Abbreviations DictionaryMicrosoft Abbreviations Dictionary
Microsoft Abbreviations Dictionary
 
Quality function development
Quality function developmentQuality function development
Quality function development
 
Day 1 1620 - 1705 - pearl 1 - deep kamal singh
Day 1   1620 - 1705 - pearl 1 - deep kamal singhDay 1   1620 - 1705 - pearl 1 - deep kamal singh
Day 1 1620 - 1705 - pearl 1 - deep kamal singh
 
Governance of mega and giga programs
Governance of mega and giga programsGovernance of mega and giga programs
Governance of mega and giga programs
 
Project Management Toolkit
Project Management ToolkitProject Management Toolkit
Project Management Toolkit
 
1. bussiness process diagonistic tool for cpm
1. bussiness process diagonistic tool for cpm1. bussiness process diagonistic tool for cpm
1. bussiness process diagonistic tool for cpm
 
IRJET- A Review Paper on Quantifay the Different Constraints for Delays in In...
IRJET- A Review Paper on Quantifay the Different Constraints for Delays in In...IRJET- A Review Paper on Quantifay the Different Constraints for Delays in In...
IRJET- A Review Paper on Quantifay the Different Constraints for Delays in In...
 
in-the-firing-line-en-1603221-2
in-the-firing-line-en-1603221-2in-the-firing-line-en-1603221-2
in-the-firing-line-en-1603221-2
 

Similar to Get fully solved assignments by professionals for MBA programs

Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and schedulingsmumbahelp
 
Pm0011 project planning and scheduling
Pm0011 project planning and schedulingPm0011 project planning and scheduling
Pm0011 project planning and schedulingconsult4solutions
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and schedulingsmumbahelp
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and schedulingsmumbahelp
 
[Insert project title, e.g. Cosmo Inc.”] Project Scope State.docx
[Insert project title, e.g. Cosmo Inc.”] Project Scope State.docx[Insert project title, e.g. Cosmo Inc.”] Project Scope State.docx
[Insert project title, e.g. Cosmo Inc.”] Project Scope State.docxgerardkortney
 
Pm0011 project planning and scheduling
Pm0011 project planning and schedulingPm0011 project planning and scheduling
Pm0011 project planning and schedulingconsult4solutions
 
MBA 6951, Managing Complex Projects 1 Course Learning.docx
MBA 6951, Managing Complex Projects 1 Course Learning.docxMBA 6951, Managing Complex Projects 1 Course Learning.docx
MBA 6951, Managing Complex Projects 1 Course Learning.docxAASTHA76
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"David Pedreno
 
How to Reach Peak Performance With the Product Management Organizational Heal...
How to Reach Peak Performance With the Product Management Organizational Heal...How to Reach Peak Performance With the Product Management Organizational Heal...
How to Reach Peak Performance With the Product Management Organizational Heal...Aggregage
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"David Pedreno
 
Assignment 1AgileProjectCharterTemplateExample.pdfC Examp.docx
Assignment 1AgileProjectCharterTemplateExample.pdfC Examp.docxAssignment 1AgileProjectCharterTemplateExample.pdfC Examp.docx
Assignment 1AgileProjectCharterTemplateExample.pdfC Examp.docxtrippettjettie
 
Bhadale group of companies general framework-level-2
Bhadale group of companies  general framework-level-2Bhadale group of companies  general framework-level-2
Bhadale group of companies general framework-level-2Vijayananda Mohire
 
Pm0011 project planning and scheduling
Pm0011   project planning and schedulingPm0011   project planning and scheduling
Pm0011 project planning and schedulingsmumbahelp
 
Enterprise IT Projects: Agile Release Planning Strategies
Enterprise IT Projects: Agile Release Planning StrategiesEnterprise IT Projects: Agile Release Planning Strategies
Enterprise IT Projects: Agile Release Planning StrategiesKaali Dass PMP, PhD.
 
The Retail Store Where convenience, quali.docx
The Retail Store  Where convenience, quali.docxThe Retail Store  Where convenience, quali.docx
The Retail Store Where convenience, quali.docxarnoldmeredith47041
 
Course ProjectPart 1 – Building Your Project PlanYou and your
Course ProjectPart 1 – Building Your Project PlanYou and your Course ProjectPart 1 – Building Your Project PlanYou and your
Course ProjectPart 1 – Building Your Project PlanYou and your CruzIbarra161
 
Business Case Templatewww.ProjectManagementDocs.comBusines.docx
Business Case Templatewww.ProjectManagementDocs.comBusines.docxBusiness Case Templatewww.ProjectManagementDocs.comBusines.docx
Business Case Templatewww.ProjectManagementDocs.comBusines.docxhumphrieskalyn
 
Business Case Templatewww.ProjectManagementDocs.comBusines.docx
Business Case Templatewww.ProjectManagementDocs.comBusines.docxBusiness Case Templatewww.ProjectManagementDocs.comBusines.docx
Business Case Templatewww.ProjectManagementDocs.comBusines.docxRAHUL126667
 

Similar to Get fully solved assignments by professionals for MBA programs (20)

Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
 
Pm0011 project planning and scheduling
Pm0011 project planning and schedulingPm0011 project planning and scheduling
Pm0011 project planning and scheduling
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
 
[Insert project title, e.g. Cosmo Inc.”] Project Scope State.docx
[Insert project title, e.g. Cosmo Inc.”] Project Scope State.docx[Insert project title, e.g. Cosmo Inc.”] Project Scope State.docx
[Insert project title, e.g. Cosmo Inc.”] Project Scope State.docx
 
Pm0011 project planning and scheduling
Pm0011 project planning and schedulingPm0011 project planning and scheduling
Pm0011 project planning and scheduling
 
MBA 6951, Managing Complex Projects 1 Course Learning.docx
MBA 6951, Managing Complex Projects 1 Course Learning.docxMBA 6951, Managing Complex Projects 1 Course Learning.docx
MBA 6951, Managing Complex Projects 1 Course Learning.docx
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"
 
How to Reach Peak Performance With the Product Management Organizational Heal...
How to Reach Peak Performance With the Product Management Organizational Heal...How to Reach Peak Performance With the Product Management Organizational Heal...
How to Reach Peak Performance With the Product Management Organizational Heal...
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"
 
Assignment 1AgileProjectCharterTemplateExample.pdfC Examp.docx
Assignment 1AgileProjectCharterTemplateExample.pdfC Examp.docxAssignment 1AgileProjectCharterTemplateExample.pdfC Examp.docx
Assignment 1AgileProjectCharterTemplateExample.pdfC Examp.docx
 
Bhadale group of companies general framework-level-2
Bhadale group of companies  general framework-level-2Bhadale group of companies  general framework-level-2
Bhadale group of companies general framework-level-2
 
Chandrashekhar resume
Chandrashekhar resumeChandrashekhar resume
Chandrashekhar resume
 
Analysis Phase
Analysis PhaseAnalysis Phase
Analysis Phase
 
Pm0011 project planning and scheduling
Pm0011   project planning and schedulingPm0011   project planning and scheduling
Pm0011 project planning and scheduling
 
Enterprise IT Projects: Agile Release Planning Strategies
Enterprise IT Projects: Agile Release Planning StrategiesEnterprise IT Projects: Agile Release Planning Strategies
Enterprise IT Projects: Agile Release Planning Strategies
 
The Retail Store Where convenience, quali.docx
The Retail Store  Where convenience, quali.docxThe Retail Store  Where convenience, quali.docx
The Retail Store Where convenience, quali.docx
 
Course ProjectPart 1 – Building Your Project PlanYou and your
Course ProjectPart 1 – Building Your Project PlanYou and your Course ProjectPart 1 – Building Your Project PlanYou and your
Course ProjectPart 1 – Building Your Project PlanYou and your
 
Business Case Templatewww.ProjectManagementDocs.comBusines.docx
Business Case Templatewww.ProjectManagementDocs.comBusines.docxBusiness Case Templatewww.ProjectManagementDocs.comBusines.docx
Business Case Templatewww.ProjectManagementDocs.comBusines.docx
 
Business Case Templatewww.ProjectManagementDocs.comBusines.docx
Business Case Templatewww.ProjectManagementDocs.comBusines.docxBusiness Case Templatewww.ProjectManagementDocs.comBusines.docx
Business Case Templatewww.ProjectManagementDocs.comBusines.docx
 

Recently uploaded

CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxJiesonDelaCerna
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaVirag Sontakke
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...M56BOOKSTORE PRODUCT/SERVICE
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxsocialsciencegdgrohi
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxAvyJaneVismanos
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...jaredbarbolino94
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 

Recently uploaded (20)

CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptx
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of India
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptx
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 

Get fully solved assignments by professionals for MBA programs

  • 1. Dear students get fully solved assignments by professionals Send your semester & Specialization name to our mail id : stuffstudy5@gmail.com or call us at : 098153-33456 (Prefer mailing. Call in emergency ) Assignment DRIVE FALL 2015 PROGRAM MBADS (SEM 3/SEM 5) MBAFLEX/ MBA (SEM3) PGDPMN(SEM 1) SUBJECT CODE & NAME PM0011 – PROJECT PLANNING ANDSCHEDULING BK ID B1937 CREDIT & MARKS 4 CREDITS & 60 MARKS 1 Write short note on: 1 Write short note on: (A) Project deliverables Deliverable is a term used in project management to describe a tangible or intangible object produced as a result of the project that is intended to be delivered to a customer (either internal or external). A deliverable could be a report, a document, a server upgrade or any other building block of an overall project. A deliverablemaybe composedof
  • 2. B) Project Rating Index (PRI): The PDRI is intended to evaluate the completeness of scope definition, specifically on industrial construction projects, at any point prior to the time a project is considered for authorization to perform detailed design and construction. This paper will highlight the importance of scope definition and its direct impact on project success, specifically focusing on how recent industry trendsare changingthe traditional projectenvironment. The PDRI was testedona (C) Scope change control: A scope change is any modification to the agreed-upon project scope a defined by the approved WBS. Scope changes often require adjustments to cost, time, quality, or other project activities. These are fed back through the planning process, technical and planning documents are updatedasneededand D) Partnering Establishing a long term win-win relationship based on mutual trust and teamwork, and on sharing of both risks and rewards. Partnering arrangement can be between labor and management, subordinates and the executive, suppliers and customers, and suppliers and suppliers. The objective is to focus on whateach party doesbest,by 2 BudgetEstimation of ABC Company Ltd. ABC Company Ltd., established in 1985, is engaged in the manufacturing of leather accessories. Over the years, the company, which started out as a local firm,has made its mark as an international corporation. However,the company is still working as a traditional set up. The high quality and durability of products have increased the demand of the products in the market. As the production of the organisation is being increased to meet the demand, the traditional set up is creating hurdlesin the production process. Organisation conflicts have arisen among the team members because of the unorganised hierarchical structure of the company, which is affecting the output of the organisation. Now that the management has decided to expand the business and opened up branches abroad, the company is facing two more problems. The first problem is in budgeting as the company is unfamiliar with international market conditions, strategy, and business policy while the second problem is conflicts at the time of team formation due to lack of experience of and exposure to multinational work culture, which has further affectedthe output of the company. The company can estimate the budget through two methods, the bottom - up approach and the top - down approach. The bottom -up approach is generally followed by the MNCs as it is more accurate and reliable.
  • 3. Mr.Parag has been appointed as the country head of the company and he has also been assigned the responsibilityofincorporatingthe advanced projectset up in the organisation. Questions: Whichproject estimationapproach shouldbe usedby the company and why? Bottom-up estimating(alsocalleddetail or resource-drivenestimating) The estimator breaks a project into distinct line items, and then breaks those line items into smaller, distinct line items, and so on, until he or she arrives at the component (or resource) level – the level of detail atwhichthe price of the componentsisrelativelyconsistentacrossprojects. Top-downestimating(also calledparametric estimating) This approach typically relies on cost histories from past projects, and knowledge of the specific parameters of those projects. Using the previous example, reviewing previous bridge projects to determine that there are correlations between the cost of the bridge and key factors like size and the primarymaterial usedgivesthe estimatorvaluable data. In other words, all things being equal, if the new bridge is 10% larger than the previous bridge, its top- down cost estimate might be 10% higher. While this approach can be fast, it is less likely to uncover potential cost-eatingdangerslike challengingsiteconditionsorfluctuationsinraw material costs. The practical reality is that both approaches are likely to be used by most companies and on most projects. Top-down may be the only approach possible for a conceptual estimate for an early-stage project. And even later-stage estimates might involve a mix of items, some estimated top-down and othersbottom-up. 2. Whattype of project organisationstructure should be usedby the company and why? Answer:  Flat Organizational Structure: Many small companies use a flat organizational structure, where very few levels of management separate executives from analysts, secretaries and lower-level employees. Flat organizations work best when a company hasless than 20 employees, especially if the companyemploysone ortwo employeesperdepartment.  Functional Organizational Structure: A functional organizational structure is centered on job functions, such as marketing, research and development and finance. Small companies should use a functional 3 What is the importance of operational feasibility? Explain the factors that affect operational feasibility. Answer: Operational feasibility is as important as technical feasibility (or any other kind of feasibility for that matter), and yet it can be the first thing to get brushed under the carpet. The conversation changes
  • 4. and that ‘intelligent system’ everyone was discussing is transformed back into a mere ‘thing’: a deliverable to drop into the organisation. We’ll find out later if we can make it happen; if we can weave it intodepartmentsandheartsassuccessfullyaswe canplugit intosoftware platforms. Working Lean means minimising waste. And operational feasibility should surely be fed into product developmentcycleslike anyothercritical 4 Write short noteson (a) Monte Carlo analysis: A problem solving technique used to approximate the probability of certain outcomes by running multiple trial runs, called simulations, using random variables. Monte Carlo simulationis (b) Work break down structure: A work breakdown structure (WBS), in project management and systems engineering, is a deliverable-oriented decomposition of a project into smaller components. A work breakdown structure element may be a product, data, service, or any combination thereof. A WBS alsoprovidesthe necessary (c)Resource loading: Resource loading mainly involves your manpower or employees. In resource loading, each employee is assigned a task or a percentage of a project (X percent of the whole). Usually, it's 25 percent of the whole. Then the employee is assigned other tasks until he or she reaches 100 percentbooked.Thiswouldthenmean (d) Definitive estimate (amethodto estimate cost of a project): "A definitive estimate is prepared from well defined data, specifications, drawings, etc. This category covers all estimate ranges from a minimum to maximum definitive type. These estimates are used for bidproposals, 5 What do you understand by cost of quality? Elaborate on various types of costs of quality associated with a project. Answer: The term “quality costs” has different meanings to different people. Some equate “quality costs” with the costs of poor quality due to finding and correcting defective work. Others equate the term with the costs to attain good quality. Others use the term to mean the costs of running the quality department.Inmysite,the term"
  • 5. 6 Explain some of ISO standards that should be considered by the project manager during project execution.Listthe advantages of projectmanagement software. Answer: Management system standards: ISO management system standards provide a model to follow when setting up and operating a management system. Like all our standards, they are the result of international, expert consensus and therefore offer the benefit of global management experience and good practice. These standards can be applied to any organisation, large or small, whatever the product or service andregardlessof the sectorof activity. Dear students get fully solved assignments by professionals Send your semester & Specialization name to our mail id : stuffstudy5@gmail.com or call us at : 098153-33456 (Prefer mailing. Call in emergency )