Plastic waste
management
Credits:
ANSHUL SHRIVASTAVA 17BCE10116
VIT-BHOPAL
INTRODUCTION
plastic waste is hazard to the environment.
plastic waste can be used in construction of
flexible pavement.
BASIC PROCESSES FOR PLASTIC
WASTE MANAGEMENT
1. Segregation
2. Cleaning process
3. Shredding process
4. Collection process
1. Segregation
plastic waste collected from various
sources must be separated from other
waste.
Maximum thickness of 60 microns.
2. cleaning process
Plastic waste get cleaned and dried.
3.shredding process
will be shredded or cut into small piece.
the different types of plastic wastes are mixed together.
4. Collection process
the plastic waste retaining in 2.36 mm is
collected.
CHARACTERISATION
OF WASTE PLASTICS
1. Binding property Plastic is a good binder.
2. THERMAL STUDY
USE OF
PLASTIC WASTE
IN
ROAD CONSTUCTION
ADVANTAGES OF
PLASTIC ROAD
• Use higher percentage of plastic waste.
• Reduce the need of bitumen by around 10%.
• Increase the strength and performance of the road and
Reduces the cost .
• Improvement in fatigue life of roads.
• Better resistance towards rain water and cold weather.
DISADVANTAGES OF
PLASTIC ROADS
Cleaning process : Toxins present in the
co-mingled plastic waste would start
leaching.
During the road laying process : the
presence of chlorine will definitely release
noxious HCL gas.
CONCLUSION
This innovative technology not only strengthens the
road construction but also increases the road life .
Help to improve the environment .
plastic road would be a boon for India’s hot and
extremely humid climate where durable and eco-
friendly roads are in demand.
VIT-BHOPAL

PLASTIC / POLYMER WASTE MANAGEMENT AND ITS USE IN ROAD CONSTRUCTION