CHAPTER 1

 PHYSICAL DISTRIBUTION
MANAGEMENT:AN OVERVIEW
OBJECTIVES
• i-To utilize the available human and material
  resources to the maximum extent at
  industry/regional/national level
• ii-To minimize the in fructuous expenditure of
  resource and infrastructure facilities are provided
  on a liberal scale
• iiiExploit those areas of industrial development
  which have hitherto been considered
  inaccessible,making availability of new methods
  and resources
Important Logistic requirement
 of modern Industrial Enterprise
• i-Sufficient Land for an Industrial Plant
  ,considering future expansion,residence for
  workers staff/Executives
• ii-Enough availability of Water for Industrial Plant
  as well for Workers/Staff during initial and regular
  phases.
• Iii-Sufficient Electric supply during
  construction/operation stage as well as
  maintenance of the plant,colony and supporting
  staff population.
Important Logistic requirement
     of modern industrial
       enterprise(contd.)
• ivFull movement and storage infrastructure for
• a-Construction Equipment,Machinery and
  Materials
• bMain Plant machinery /equipment
• cRaw materials,spare parts and maintenance
  equipment.
• dFinished Products and by products
• eMovement of Personnel
Important Logistic requirement
      of Modern Industrial
        enterprise(contd.)
• vCommunication Links by
  telephone,telex,teleprinter etc for the supply of
  equipments/raw materials and distribution of
  finished products.
• vi-Streamlined government and financial
  institutional procedure for speedy issuances of
  various licenses.
• vii-Maintenance of Law and order.
• viii-Sufficient supply of Labor,technical/non-
  technical staff,skilled
  /unskilled,managerial/supervisory staff
MANAGEMENT A
           DEFINATION
• The term Management implies as a function or a
  process with an objective of to get things done and
  includes the sub functions of
  planning,organizing,staffing,coordinating,
• controlling,budgeting,reviewing etc.It is also
  viewed as a process of motivating others to work
  and influencing others or exercising authority over
  others in order to achieve objectives.
IMPORTANT OF LOGISTICS
     MANAGEMENT
• Logistic management is a field of management
  which primarily deals with the coordination of
  resources in an organization.these resources may
  be in the form of men,money,materials,machines
  and time and requires most efficient use of
  existing organization resources.many projects in
  developing countries do not succeed due to lack of
  attention in coordination logistic function.As such
  there are delays in completion of projects.
IMPORTANT OF LOGISTIC
   MANAGEMENT(CONTD.)
• Logistic management involves the co-ordination
  of many functions of the procurement of raw
  material,their handling and storage,the handling
  and storage of finished products and
  distribution.The problem becomes increasingly
  complex as the volume of business grows and
  distance between the procurement
  center,production center and market consumption
  of a product increases.
IMPORTANCE OF LOGISTIC
   MANAGEMENT(contd.)
• As the economy of a country develops
  ,there is increasing geographical
  specialization of the means of production
  and hence there is a need for better logistics
  management following the increasing
  temporal and spatial separation of
  production and market centers.It is
  imperative that greater attention is paid to
  logistic aspect of management.
IMPORTANCE OF LOGISTIC
   MANAGEMENT(contd.)
• Logistic management approach is a systematic
  approach.It is neither production oriented nor
  market oriented.Logistic management would
  investigate a problem and resolve the conflict on
  the basis of costs and benefits to the organization
  as a whole.
• Logistic management does away with the
  ambiguity in the definition of the responsibilities
  of individuals,units and departments in an
  organization.
BUSINESS LOGISTICS-
  PHYSICAL DISTRIBUTION
• Physical distribution management is specifically
  concerned with the flow of goods through the
  economic system.In the business firm,the
  logistician is concerned with the inbound
  movement of goods to supply the production
  processes of the firm.In this setting,the firm is the
  customer and anticipates a certain level of
  distribution services from the suppliers.The firm is
  a supplier of finished/semi-finished goods and the
  Logistician must provide a level of distribution
  service to the firm,s Customers.
TOUR OF MATERIAL
• i-Transportation-Transportation is an essential
  /important component of physical distribution and
  the expenditure is also a very significant
  component of physical distribution.
• ii-Inventory control-The total costs on inventory
  must be minimized in order to control the total
  costs,and maintains a minimal inventory level
  consistent with the needs of production and sales.
TOUR OF MATERIAL(contd.)
• iii-Packaging-It is essential that latest
  techniques and materials of packaging be
  known and used.The physical distribution
  has to work with sales and manufacturing
  departments in order to develop and use
  proper packaging and packaging material so
  as to make it cheap and yet carry it safely
  enough to the customer without damage.
TOUR OF MATERIAL(contd.)
• iv-Warehousing-The optimal location of a
  warehouse /s having regard to minimal
  transportation costs,customer service,level of
  inventories and company warehouse versus public
  warehouses are the issues to be decided.
• v-Material handling-The benefits of material
  handling are not only confined to the manufacturer
  but to the consignee as well.Along with marketing
  department c,the movement of goods can be
  arranged so as to avoid damage.
TOUR OF MATERIAL (contd.)
• vi-Location analysis-The plant location decision
  must be arrived considering various factors such
  as market area,existing transportation
  facilities/rates, and warehousing.
• vii-Order processing-Order processing is closely
  related to sales and production and the physical
  distribution department has to be careful about the
  need of interdepartmental coordination.credit
  check,paper processing,retrieval from
  warehouse,assembling and packing,dispatch by
  transporter ,Inventory levels and its information to
  production planning are the important functions.
Production &Marketing interface
    vs. physical distribution
•   Production activities
•    i-Production scheduling
•    ii-quality control
•   Production-Physical Distribution interface
•   iPlant location & Design
•   iiPurchasing
•   iiiProduct scheduling
Production & Marketing interface
    vs. Physical distribution
            (contd.)
•   Physical distribution activities
•   itransportation
•   iiMaterial handling
•   Marketing activities
•   iiiInventory control
•   iMarket research
•   iiPromotion
•   iii--Pricing
Production & Marketing interface
 vs. physical distribution(contd.)
• Marketing-Physical Distribution
  interface
• i-Fixing Customer service levels
• iiOrder processing
• iiiPackaging
• ivFixing channels of distribution.
Neglect of Physical Distribution
             function
• In India,the subject of physical distribution
  management has been neglected by
  Industry,business and Government , with
  consequent heavy losses in Production,the
  occurrence of scarcities and distortions in
  the distribution of goods and services,delays
  in Project schedules and uneven distribution
  of goods and services.
Neglect of physical distribution
        function(contd.)
• Examples
• i-For projects requiring substantial
  investments ,a serious and detailed study of
  the storage and distribution of the Product is
  required.Project execution takes several
  years since through study of market areas
  and directions of movement are not
  considered.
Neglect of physical distribution
        function(contd.)
• ii-The top executive of a Firm are unable to
  forecast accurately the future destinations of the
  finished products and movement of raw materials
  from the supply centers to the processing center.
• iii-Only technical/economic feasibility reports of
  project identify the sources of raw materials.Their
  movement/storage are rarely planned at the time
  of construction of the project.
Neglect of Physical distribution
        function(contd.)
• iv-The delay in moving Construction
  material/Machinery, raw materials usually delays
  the commissioning of the project.A better physical
  distribution in advance avoids these delays and
  ensures smooth running of the Plant.
• v-Lack of attention to the movement of
  intermediate products such as effluents,slag etc
  damage the environment and loss of
  production.This leads to pollution of rivers and
  open land and thus are losses to Society.
Neglect of Physical Distribution
        function(contd.)
• vi-Requirement of Spares/other maintenance
  material is normally overlooked at the
  commissioning stage.
• vii-The relative location of a Plant,the Suppliers
  depots and the Customer market largely determine
  the transit time for raw material's,Spare parts and
  finished products.Transit time concept is generally
  paid much less attention.
Neglect of physical Distribution
        function(contd.)
• ix-Existing bottlenecks in Transportation are
  generally ignored.this ignorance affects planning
  for production
  schedule,Inventories,Warehousing,Order
  processing.
• x-Serious traffic jams and Security requirements
  /Procedures are no considered.
• xi-Shortages,Delays and deficiencies are
Customer service- Oriented
           approach
• Past
• 1-Manufacturer is the king.
• 2-Shortages/deficits are part of the operation.
• 3-Manufacturer decides what is to be
  produced,how much and when.
• 4-In sellers market Manufacturer does not worry
  about selling.
• 5-There is general scarcity of goods
Customer Service-Oriented
         approach(contd.)
• 6-Whatever the manufacturer produces gets
  sold/has to be sold.
• 7-The Manufacturer does not have to worry about
  Customer demand.
• 8-Customer is always indebted to Manufacturer.
• 9-This has been general condition in developing
  countries as regards to Consumer
  products,Consumer durables,Industrial products
Customer Service-Oriented
         approach(contd.)
• Now
• 1-Economy takes an upswing.
• 2-Additional manufacturing facilities and
  additional mobilization of resources.
• 3-More goods and Services are produced.
• 4-Customer can choose from amongst the
  various goods and services.
Customer Service-Oriented
         approach(contd.)
• 5-Customer choice is exercised in respect of
  quality as well as quantity and at desired
  time.
• 6-The Buyer,s market prevails because
  there is a surplus availability of goods and
  services.
Requirements in changed market
         conditions
• 1-With the change in market condition,the
  manufacturer,s goals have also changed.
• 2-The Firm has now to determine the Customer,s
  needs.
• 3-Manufacturer has to device ways and means of
  satisfying customer.
• 4-While doing so ,he has to meet the desired level
  of Profit.
• 5-Hence a Firm can ill afford to neglect the
  Customer wants.
• 6-Firms must ascertain and introduce certain
Factors which influenced role of
       Business Logistics.
• 1-The development of Mass Communication
  media
• #-The manufacturer directlyindirectly deals with
  Customer
• #-Thus manufacturer becomes conscious of the
  need of customer as regard to Product
  requirementavailability
• #-Thus the customer cultivates a selective demand
  and discriminates between various brand names on
  the basis of quality,service level etc.
Factors which influenced role of
   Business Logistics(contd.)
• 2-Alternate mode of Transport
• #-This has facilitated more reliable transportation
  of goods.
• #-Depends on factors such as
  speed,safety,simplicity,cost etc.
• #-Hence Goods have to be made available in
  desired format desired placedesired time.
• #-Hence manufacturer attempts to satisfy
  customer by selecting right mode of transport,so
  that he can tackle rival manufacturer.
Factors which influenced role of
   Business Logistics.(contd.)
• 3-Rise in standard of living
• #-Economy is developing at a rapid space.
• #-Rise in the standardquality of living of masses
  co0vering market of wider areas.
• #-Consumption of goodsservices increases.
• #-A small increase in per capita income brings a
  substantial increase in volumes.
• #-Hence all round improvements are required in
  transportation,handling and storing.thus becoming
  a critical element of total operation.
Factors which influenced role of
   Business Logistics(contd.)
• 4-The complexity in the management of
  Personnel
• #-The management of Personnel for every element
  of production require specialized skills,talent and
  competence.Applicable for BusinessPhysical
  distribution as well.
• #-More technical skills and greaterrational
  decision making skills are called for.
• #-Computers are used extensively .past experience
  is no longer valid,because change in the total
  operating conditions.as also various factors
  beyond the capabilities of a single individual.
Current model of provision of
          goodsservices
• Manager oriented model
• i-The chief Manager first determines the resources
  available with the organization.
• ii-He determines based on his judgment as also of
  lower level managers,the quality,type quantum
  and location etc of goods services which can be
  provided to Customer.
• iii-The constraints of organization are considered
  more important than the demand of the customer.
• iv-The management never considers that with
  slight change customer can be serviced better.
Current model of provision of
      goodsservices(contd.)
• v-This type of package service,devised keeping in
  view primarily the material and monetary
  constraints of the organizationChief Manager is
  offered to Customer as fait-accompli without any
  choice.
• vi-More and more time and effort are spent or
  justified the rejections and are often ill conceived.
Deficiencies of Manager oriented
             model
• i-Brings satisfaction to the Manager himself.
• ii-The Manager perceives that he has full authority
  over Customer.
• iii-He may be genuinely,although erroneously
  ,satisfied that he providing the goods and services
  with high degree of efficiency and effectiveness.
• iv-The customer in this process is least satisfied
  and has to accept whatever is offered.
Principal of need of maximum
     satisfaction to Customer
• As per this model,the Chief Manager undertakes
  following action
• i-He determines the level and quality of
  goodsservices as required by Customer.
• ii-Even if customer have extreme diverse
  characteristics,a common denominator with a
  certain commonly accepted level is determined
• iii-Thereafter resources available with the
  organization are assessed
Principal of need of maximum
 satisfaction to Customer(contd.)
• iv-The organizations roles and regulations are
  directed towards meeting customer requirements.
• v-If required available resources are re-organized
  in order to meet Customer
  requirements.Additional fee can also be levied.
• vi-Periodically feedback is obtained from
  Customer on satisfaction level.
• vii-If required quality and level of services are
  improved based on feedback from Customer.
Main features of Customer-
        oriented approach
• i-Orientation towards Customer is based on
  positive attitude.
• ii-The satisfaction of the needs of Customer
  triggers higher sales of the product as also
  other products.
• iii-If the product gives satisfaction to
  customer,He may come back for repeat
  purchase and recommend to others.
Main features of Customer
     oriented approach(contd.)
• iv-The customer is the starting as well as the end
  point of determining the required level of lead
  time,service and satisfaction.
• v-Better service to Customer need not cost more
  and organization,s resources can be better utilized
  in meeting customer expectations.
• vi-Though quality of service is dependent on the
  Product characteristics and after sales service ,the
  Customer is also interested in the qualitative
  behavior of the personnel,rendering the service.
Main features of Customer
     oriented approach(contd.)
• v-Specifies of better service desired by a customer
  are
• #-Lead time-should be short,dependable and
  consistent.
• #-Dependability-The customer should be
  confident that organization will not fail to supply
  of goods or render services at the right time and
  place.
• #-Communication-The Customer likes to know
  in case of non-deliveries in order o ensure his own
  planning.
Main features of customer
      oriented approach(contd.)
• vi-A customer desires a guaranteed
  qualityquantity of goodsservices from
  dealerssuppliers,who in turn need a guaranteed
  quality of goodsservices from the manufacturer.
• vii-It is necessary to ensure satisfaction to the
  distributor,agent,dealer,retailer and customer.only
  monetary benefit may not serve.
• viii-Standards of desired level of customer service
  have to be developed for planning,manufacturing
  and controlling the physical distribution in an
  organization.
Main features of customer
     oriented approach(contd.)
• ix-The total cost of physical distribution
  function has to betaken into account for
  determining customer service level
  requiring design of Physical distribution
  function to be integrated one.innovations
  have to be introduced as and when the
  possibility occur.
Total Cost Approach
• i-The cost of distribution involving all the the
  move store activities of the product may be 60%
  of the total cost.
• ii-The cost of distribution should take into account
  not only on the cost incurred on moving the
  product over different channels of distribution ut
  also on other activities.
• iii-These activities have become inevitable with
  the modern,customer oriented marketing
  approach.
Total Cost Approach(contd.)
• A reduction in costs of distribution in one or more
  areas by itself may not give desired results unless
  other costs are also required to be controlled.These
  include
• i-Inventory costs-these are the costs which are
  locked up in inventory of
  goods,insurance,occupation of
  space,pilferage,losses,damage etc.The total cost of
  inventory of any product amounts to almost 10 to
  30 % of the average level of inventory in the
  pipelinestock.
Total Cost Approach(contd.)
• ii-Warehousing costs -The warehousing of raw
  materials steps up the cost of their supply or of the
  cost of distribution of finished product.
• Aiming at zero stock out or zero loss of
  production levels , it becomes essential to have
  adequate warehousing capacity and involves
  higher fixed and operating costs of warehousing.In
  order to improve customer service ,it becomes
  necessary to increase number of
  warehouses,which results into decrease in the cost
  of transport.As such management has to arrive at
  the optimum number of warehouses.
Total Cost approach(contd.)
• iii-ProductionSupply costs-Production
  costs decrease with increase in volume of
  production.if the same product is made at
  several plants,various other costs such as
  cost of transportation,transit
  times,warehouses and inventory costs have
  to be considered.proper analysis has to be
  made of their effect on total cost of
  distribution.
Total Cost Approach(contd.)
• iv-Channel of Distribution costs-A critical
  assessment of the channels of of distribution calls
  for examination of the use of or creation of
  adequate facilities for storage at the Plant or in
  field warehouses or with the Distributor or
  Stockist.
• This will necessitate a total systems approach in
  selection of channels of distribution.
Total Cost Approach(contd.)
• v-Communication and Data processing costs-
  An effective distribution system requires
  continuous monitoring of order pricing,Inventory
  control,accounts receivable,dispatches etc.
• An increased number of distribution points though
  improves Customer service but involves higher
  costs.As such optimal number of distribution
  points which will keep the distribution costs to a
  minimum and improving customer service ,will e
  desirable.
Total Cost Approach(contd.)
• vi-Transportation costs-The cost of
  transport varies generally with speed with
  which the goods are transported.This also
  affects Transit inventory.As such beside
  speed and inventory,cost of packaging is
  also to be considered,while selecting
  particular mode of transport and carrier.
Total Cost Approach(contd.)
• vii-Material handling costs-A suitable
  material handling system should be
  designed to reduce the cost of material
  handling to a minimum.a total cost
  approach would require a consideration of
  of not only the material handling system but
  other relevant factors affecting the cost of
  transport,customer satisfaction,inventory
  etc.
Total Cost Approach(contd.)
• viii-Packaging costs-Decision on packaging are
  affected by mode of transport and material
  handling equipment.a total cost approach would
  make it necessary for us to select a packaging
  version which takes into account other distribution
  factors
• ix-Customer service costs-All factors which
  affect customer service and volume of sales have
  to be taken into consideration to evaluate the total
  cost of distribution.
Total Cost Approach-
             Conclusions
• i-The real impact of distribution costs on profits is
  much higher than perceived.
• ii-Many of these costs are nobody,s responsibility
  because of compartmentalization of the
  management function.
• iii-Costs incurred in these are do not respond to
  cost cutting methods because of fragmented
  approach to analysis.requires comprehensive
  integrated approach taking into consideration all
  relevant factors.
Total Cost Approach-
         Conclusions (contd.)
• iv-The effect of high distribution costs should not
  be restricted to high level,across the board analysis
  A right approach by management would tap the
  real potential.
• v-Before applying total cost approach,it is
  essential to examine various costs associated with
  distribution function.by studying the total system
  in depth before taking decisions.
Total Cost Approach-
          Conclusions(contd.)
• vi-Normally Firms keep data for production and
  finance decisions.hence it becomes difficult to
  separate and identify the physical distribution
  costs,which is an essential requirement for
  assessing distribution costs.Even these data,s
  which are necessary for analyzing are kept
  confidential.
• vii-To make accounting easier ,various costs are
  added as administrative heads.To analyze the
  problem,it is essential to have these data available
Steps required to identify
          distribution costs
• i-Separate and identify distribution costs
  element wise.
• ii-accounting centers will need to be
  developed to help identifyanalyze
  distribution costs.
• iii-Analyze the the results of the changes in
  the performance.
Steps required to identify
      distribution costs(contd.)
• iv-Some of the changes which may become
  necessary after application of total cost approach-
  examples
• a-Company,s distribution pattern may be changed
  by making appropriate shifts in
  Productionwarehouse loads.
• b-Shifting of some equipments at nominal cost
• c-savings may be achieved by persuading
  Customer to change mode of transport.
• d-Add additional warehouse capacity to ensure
  better customer service and also add profits.
Steps required to identify
      distribution costs(contd.)
• v-The various suggestions as given,may be acted
  upon only after an across-the-board analysis and
  with the active involvement of Top management.
• vi-The top management must be prepared to
  undertake such time consuming study.
• vii-The study so made must outline the profit goal
  expected from the various alternatives and
  convince the management to implement the
  changes with determination.
Neglect Of Physical Distribution
           function
• i-Low level of professional management
  duo to lack of management development.
• ii-Evan with high level of development in
  other areas ,the development of Physical
  Distribution subject has been delayed.
• iii-Top managers have focused on
  manufacturing and finance issues with little
  attention on Physical Distribution.
Neglect of Physical Distribution
        function(contd.)
• iv-Physical distribution costs are usually
  hidden,requiring higher order management
  skills,which are normally are lacking.
• v-In India,due to localized nature of
  business,physical distribution function has not
  developed and has remain rather obscure.The
  operations of organizations are relatively at low-
  level,problems are of minor nature and do not call
  for specialized skills.
Neglect of Physical Distribution
        function(contd.)
• vi-Even in large scale organizations,physical
  distribution function has not received adequate
  attention,because the bottlenecks in
  operation,giving rise to shortagesscarcities has
  not been appreciated.Even there is a lack of
  awareness.
• vii-Accounting methods have not been developed
  to evaluate advise management on the cost of
  such shortagesscarcities.
Neglect of Physical Distribution
        function(contd.)
• viii-Manufacturers intentionally create
  artificial shortages in order to sell premium
  goods at premium.
• ix-Because of low development of the
  economic system,alternate modes of
  operations are not available to
  organizations.
Neglect of Physical Distribution
        function(contd.)
• x-Because of low level of development ,not
  many alternatives are known to
  management nor they are able to work with
  new experiments.
• xi-Even Managers do not feel the urge to
  develop alternate methods ,since with
  existing operations,they are able to generate
  enough profits.
Neglect of Physical Distribution
        function(contd.)
• xii-In most organizations,the costs are distributed
  rather than computed and allocated accurately.As
  such few individuals are able to asses the real
  costs and are unable to make rational decisions.
• xiii-Due to low level of knowledge ,the intricate
  inter-relationship which exist between the
  variables involved in Physical distribution are
  generally understood.
Neglect of Physical Distribution
        function(contd.)
• xiv-In general there is a lack of a system approach
  to problems,because the managers focus on
  individual subject rather than on more difficult
  approach,leading to neglect of interfaces,thereby
  avoiding development of smooth systems.
• xv-individuals focus attention on individual
  performances and have not realized importance of
  time and ensure completing a given task within a
  specified time.
“Like” us on Facebook: 
   p //                 /
http://www.facebook.com/welearnindia 

“Follow” us on Twitter:
http://twitter.com/WeLearnIndia
http://twitter com/WeLearnIndia

Watch informative videos on Youtube: 
http://www.youtube.com/WelingkarDLP

Physical Distribution Management Overview

  • 1.
    CHAPTER 1 PHYSICALDISTRIBUTION MANAGEMENT:AN OVERVIEW
  • 2.
    OBJECTIVES • i-To utilizethe available human and material resources to the maximum extent at industry/regional/national level • ii-To minimize the in fructuous expenditure of resource and infrastructure facilities are provided on a liberal scale • iiiExploit those areas of industrial development which have hitherto been considered inaccessible,making availability of new methods and resources
  • 3.
    Important Logistic requirement of modern Industrial Enterprise • i-Sufficient Land for an Industrial Plant ,considering future expansion,residence for workers staff/Executives • ii-Enough availability of Water for Industrial Plant as well for Workers/Staff during initial and regular phases. • Iii-Sufficient Electric supply during construction/operation stage as well as maintenance of the plant,colony and supporting staff population.
  • 4.
    Important Logistic requirement of modern industrial enterprise(contd.) • ivFull movement and storage infrastructure for • a-Construction Equipment,Machinery and Materials • bMain Plant machinery /equipment • cRaw materials,spare parts and maintenance equipment. • dFinished Products and by products • eMovement of Personnel
  • 5.
    Important Logistic requirement of Modern Industrial enterprise(contd.) • vCommunication Links by telephone,telex,teleprinter etc for the supply of equipments/raw materials and distribution of finished products. • vi-Streamlined government and financial institutional procedure for speedy issuances of various licenses. • vii-Maintenance of Law and order. • viii-Sufficient supply of Labor,technical/non- technical staff,skilled /unskilled,managerial/supervisory staff
  • 6.
    MANAGEMENT A DEFINATION • The term Management implies as a function or a process with an objective of to get things done and includes the sub functions of planning,organizing,staffing,coordinating, • controlling,budgeting,reviewing etc.It is also viewed as a process of motivating others to work and influencing others or exercising authority over others in order to achieve objectives.
  • 7.
    IMPORTANT OF LOGISTICS MANAGEMENT • Logistic management is a field of management which primarily deals with the coordination of resources in an organization.these resources may be in the form of men,money,materials,machines and time and requires most efficient use of existing organization resources.many projects in developing countries do not succeed due to lack of attention in coordination logistic function.As such there are delays in completion of projects.
  • 8.
    IMPORTANT OF LOGISTIC MANAGEMENT(CONTD.) • Logistic management involves the co-ordination of many functions of the procurement of raw material,their handling and storage,the handling and storage of finished products and distribution.The problem becomes increasingly complex as the volume of business grows and distance between the procurement center,production center and market consumption of a product increases.
  • 9.
    IMPORTANCE OF LOGISTIC MANAGEMENT(contd.) • As the economy of a country develops ,there is increasing geographical specialization of the means of production and hence there is a need for better logistics management following the increasing temporal and spatial separation of production and market centers.It is imperative that greater attention is paid to logistic aspect of management.
  • 10.
    IMPORTANCE OF LOGISTIC MANAGEMENT(contd.) • Logistic management approach is a systematic approach.It is neither production oriented nor market oriented.Logistic management would investigate a problem and resolve the conflict on the basis of costs and benefits to the organization as a whole. • Logistic management does away with the ambiguity in the definition of the responsibilities of individuals,units and departments in an organization.
  • 11.
    BUSINESS LOGISTICS- PHYSICAL DISTRIBUTION • Physical distribution management is specifically concerned with the flow of goods through the economic system.In the business firm,the logistician is concerned with the inbound movement of goods to supply the production processes of the firm.In this setting,the firm is the customer and anticipates a certain level of distribution services from the suppliers.The firm is a supplier of finished/semi-finished goods and the Logistician must provide a level of distribution service to the firm,s Customers.
  • 12.
    TOUR OF MATERIAL •i-Transportation-Transportation is an essential /important component of physical distribution and the expenditure is also a very significant component of physical distribution. • ii-Inventory control-The total costs on inventory must be minimized in order to control the total costs,and maintains a minimal inventory level consistent with the needs of production and sales.
  • 13.
    TOUR OF MATERIAL(contd.) •iii-Packaging-It is essential that latest techniques and materials of packaging be known and used.The physical distribution has to work with sales and manufacturing departments in order to develop and use proper packaging and packaging material so as to make it cheap and yet carry it safely enough to the customer without damage.
  • 14.
    TOUR OF MATERIAL(contd.) •iv-Warehousing-The optimal location of a warehouse /s having regard to minimal transportation costs,customer service,level of inventories and company warehouse versus public warehouses are the issues to be decided. • v-Material handling-The benefits of material handling are not only confined to the manufacturer but to the consignee as well.Along with marketing department c,the movement of goods can be arranged so as to avoid damage.
  • 15.
    TOUR OF MATERIAL(contd.) • vi-Location analysis-The plant location decision must be arrived considering various factors such as market area,existing transportation facilities/rates, and warehousing. • vii-Order processing-Order processing is closely related to sales and production and the physical distribution department has to be careful about the need of interdepartmental coordination.credit check,paper processing,retrieval from warehouse,assembling and packing,dispatch by transporter ,Inventory levels and its information to production planning are the important functions.
  • 16.
    Production &Marketing interface vs. physical distribution • Production activities • i-Production scheduling • ii-quality control • Production-Physical Distribution interface • iPlant location & Design • iiPurchasing • iiiProduct scheduling
  • 17.
    Production & Marketinginterface vs. Physical distribution (contd.) • Physical distribution activities • itransportation • iiMaterial handling • Marketing activities • iiiInventory control • iMarket research • iiPromotion • iii--Pricing
  • 18.
    Production & Marketinginterface vs. physical distribution(contd.) • Marketing-Physical Distribution interface • i-Fixing Customer service levels • iiOrder processing • iiiPackaging • ivFixing channels of distribution.
  • 19.
    Neglect of PhysicalDistribution function • In India,the subject of physical distribution management has been neglected by Industry,business and Government , with consequent heavy losses in Production,the occurrence of scarcities and distortions in the distribution of goods and services,delays in Project schedules and uneven distribution of goods and services.
  • 20.
    Neglect of physicaldistribution function(contd.) • Examples • i-For projects requiring substantial investments ,a serious and detailed study of the storage and distribution of the Product is required.Project execution takes several years since through study of market areas and directions of movement are not considered.
  • 21.
    Neglect of physicaldistribution function(contd.) • ii-The top executive of a Firm are unable to forecast accurately the future destinations of the finished products and movement of raw materials from the supply centers to the processing center. • iii-Only technical/economic feasibility reports of project identify the sources of raw materials.Their movement/storage are rarely planned at the time of construction of the project.
  • 22.
    Neglect of Physicaldistribution function(contd.) • iv-The delay in moving Construction material/Machinery, raw materials usually delays the commissioning of the project.A better physical distribution in advance avoids these delays and ensures smooth running of the Plant. • v-Lack of attention to the movement of intermediate products such as effluents,slag etc damage the environment and loss of production.This leads to pollution of rivers and open land and thus are losses to Society.
  • 23.
    Neglect of PhysicalDistribution function(contd.) • vi-Requirement of Spares/other maintenance material is normally overlooked at the commissioning stage. • vii-The relative location of a Plant,the Suppliers depots and the Customer market largely determine the transit time for raw material's,Spare parts and finished products.Transit time concept is generally paid much less attention.
  • 24.
    Neglect of physicalDistribution function(contd.) • ix-Existing bottlenecks in Transportation are generally ignored.this ignorance affects planning for production schedule,Inventories,Warehousing,Order processing. • x-Serious traffic jams and Security requirements /Procedures are no considered. • xi-Shortages,Delays and deficiencies are
  • 25.
    Customer service- Oriented approach • Past • 1-Manufacturer is the king. • 2-Shortages/deficits are part of the operation. • 3-Manufacturer decides what is to be produced,how much and when. • 4-In sellers market Manufacturer does not worry about selling. • 5-There is general scarcity of goods
  • 26.
    Customer Service-Oriented approach(contd.) • 6-Whatever the manufacturer produces gets sold/has to be sold. • 7-The Manufacturer does not have to worry about Customer demand. • 8-Customer is always indebted to Manufacturer. • 9-This has been general condition in developing countries as regards to Consumer products,Consumer durables,Industrial products
  • 27.
    Customer Service-Oriented approach(contd.) • Now • 1-Economy takes an upswing. • 2-Additional manufacturing facilities and additional mobilization of resources. • 3-More goods and Services are produced. • 4-Customer can choose from amongst the various goods and services.
  • 28.
    Customer Service-Oriented approach(contd.) • 5-Customer choice is exercised in respect of quality as well as quantity and at desired time. • 6-The Buyer,s market prevails because there is a surplus availability of goods and services.
  • 29.
    Requirements in changedmarket conditions • 1-With the change in market condition,the manufacturer,s goals have also changed. • 2-The Firm has now to determine the Customer,s needs. • 3-Manufacturer has to device ways and means of satisfying customer. • 4-While doing so ,he has to meet the desired level of Profit. • 5-Hence a Firm can ill afford to neglect the Customer wants. • 6-Firms must ascertain and introduce certain
  • 30.
    Factors which influencedrole of Business Logistics. • 1-The development of Mass Communication media • #-The manufacturer directlyindirectly deals with Customer • #-Thus manufacturer becomes conscious of the need of customer as regard to Product requirementavailability • #-Thus the customer cultivates a selective demand and discriminates between various brand names on the basis of quality,service level etc.
  • 31.
    Factors which influencedrole of Business Logistics(contd.) • 2-Alternate mode of Transport • #-This has facilitated more reliable transportation of goods. • #-Depends on factors such as speed,safety,simplicity,cost etc. • #-Hence Goods have to be made available in desired format desired placedesired time. • #-Hence manufacturer attempts to satisfy customer by selecting right mode of transport,so that he can tackle rival manufacturer.
  • 32.
    Factors which influencedrole of Business Logistics.(contd.) • 3-Rise in standard of living • #-Economy is developing at a rapid space. • #-Rise in the standardquality of living of masses co0vering market of wider areas. • #-Consumption of goodsservices increases. • #-A small increase in per capita income brings a substantial increase in volumes. • #-Hence all round improvements are required in transportation,handling and storing.thus becoming a critical element of total operation.
  • 33.
    Factors which influencedrole of Business Logistics(contd.) • 4-The complexity in the management of Personnel • #-The management of Personnel for every element of production require specialized skills,talent and competence.Applicable for BusinessPhysical distribution as well. • #-More technical skills and greaterrational decision making skills are called for. • #-Computers are used extensively .past experience is no longer valid,because change in the total operating conditions.as also various factors beyond the capabilities of a single individual.
  • 34.
    Current model ofprovision of goodsservices • Manager oriented model • i-The chief Manager first determines the resources available with the organization. • ii-He determines based on his judgment as also of lower level managers,the quality,type quantum and location etc of goods services which can be provided to Customer. • iii-The constraints of organization are considered more important than the demand of the customer. • iv-The management never considers that with slight change customer can be serviced better.
  • 35.
    Current model ofprovision of goodsservices(contd.) • v-This type of package service,devised keeping in view primarily the material and monetary constraints of the organizationChief Manager is offered to Customer as fait-accompli without any choice. • vi-More and more time and effort are spent or justified the rejections and are often ill conceived.
  • 36.
    Deficiencies of Manageroriented model • i-Brings satisfaction to the Manager himself. • ii-The Manager perceives that he has full authority over Customer. • iii-He may be genuinely,although erroneously ,satisfied that he providing the goods and services with high degree of efficiency and effectiveness. • iv-The customer in this process is least satisfied and has to accept whatever is offered.
  • 37.
    Principal of needof maximum satisfaction to Customer • As per this model,the Chief Manager undertakes following action • i-He determines the level and quality of goodsservices as required by Customer. • ii-Even if customer have extreme diverse characteristics,a common denominator with a certain commonly accepted level is determined • iii-Thereafter resources available with the organization are assessed
  • 38.
    Principal of needof maximum satisfaction to Customer(contd.) • iv-The organizations roles and regulations are directed towards meeting customer requirements. • v-If required available resources are re-organized in order to meet Customer requirements.Additional fee can also be levied. • vi-Periodically feedback is obtained from Customer on satisfaction level. • vii-If required quality and level of services are improved based on feedback from Customer.
  • 39.
    Main features ofCustomer- oriented approach • i-Orientation towards Customer is based on positive attitude. • ii-The satisfaction of the needs of Customer triggers higher sales of the product as also other products. • iii-If the product gives satisfaction to customer,He may come back for repeat purchase and recommend to others.
  • 40.
    Main features ofCustomer oriented approach(contd.) • iv-The customer is the starting as well as the end point of determining the required level of lead time,service and satisfaction. • v-Better service to Customer need not cost more and organization,s resources can be better utilized in meeting customer expectations. • vi-Though quality of service is dependent on the Product characteristics and after sales service ,the Customer is also interested in the qualitative behavior of the personnel,rendering the service.
  • 41.
    Main features ofCustomer oriented approach(contd.) • v-Specifies of better service desired by a customer are • #-Lead time-should be short,dependable and consistent. • #-Dependability-The customer should be confident that organization will not fail to supply of goods or render services at the right time and place. • #-Communication-The Customer likes to know in case of non-deliveries in order o ensure his own planning.
  • 42.
    Main features ofcustomer oriented approach(contd.) • vi-A customer desires a guaranteed qualityquantity of goodsservices from dealerssuppliers,who in turn need a guaranteed quality of goodsservices from the manufacturer. • vii-It is necessary to ensure satisfaction to the distributor,agent,dealer,retailer and customer.only monetary benefit may not serve. • viii-Standards of desired level of customer service have to be developed for planning,manufacturing and controlling the physical distribution in an organization.
  • 43.
    Main features ofcustomer oriented approach(contd.) • ix-The total cost of physical distribution function has to betaken into account for determining customer service level requiring design of Physical distribution function to be integrated one.innovations have to be introduced as and when the possibility occur.
  • 44.
    Total Cost Approach •i-The cost of distribution involving all the the move store activities of the product may be 60% of the total cost. • ii-The cost of distribution should take into account not only on the cost incurred on moving the product over different channels of distribution ut also on other activities. • iii-These activities have become inevitable with the modern,customer oriented marketing approach.
  • 45.
    Total Cost Approach(contd.) •A reduction in costs of distribution in one or more areas by itself may not give desired results unless other costs are also required to be controlled.These include • i-Inventory costs-these are the costs which are locked up in inventory of goods,insurance,occupation of space,pilferage,losses,damage etc.The total cost of inventory of any product amounts to almost 10 to 30 % of the average level of inventory in the pipelinestock.
  • 46.
    Total Cost Approach(contd.) •ii-Warehousing costs -The warehousing of raw materials steps up the cost of their supply or of the cost of distribution of finished product. • Aiming at zero stock out or zero loss of production levels , it becomes essential to have adequate warehousing capacity and involves higher fixed and operating costs of warehousing.In order to improve customer service ,it becomes necessary to increase number of warehouses,which results into decrease in the cost of transport.As such management has to arrive at the optimum number of warehouses.
  • 47.
    Total Cost approach(contd.) •iii-ProductionSupply costs-Production costs decrease with increase in volume of production.if the same product is made at several plants,various other costs such as cost of transportation,transit times,warehouses and inventory costs have to be considered.proper analysis has to be made of their effect on total cost of distribution.
  • 48.
    Total Cost Approach(contd.) •iv-Channel of Distribution costs-A critical assessment of the channels of of distribution calls for examination of the use of or creation of adequate facilities for storage at the Plant or in field warehouses or with the Distributor or Stockist. • This will necessitate a total systems approach in selection of channels of distribution.
  • 49.
    Total Cost Approach(contd.) •v-Communication and Data processing costs- An effective distribution system requires continuous monitoring of order pricing,Inventory control,accounts receivable,dispatches etc. • An increased number of distribution points though improves Customer service but involves higher costs.As such optimal number of distribution points which will keep the distribution costs to a minimum and improving customer service ,will e desirable.
  • 50.
    Total Cost Approach(contd.) •vi-Transportation costs-The cost of transport varies generally with speed with which the goods are transported.This also affects Transit inventory.As such beside speed and inventory,cost of packaging is also to be considered,while selecting particular mode of transport and carrier.
  • 51.
    Total Cost Approach(contd.) •vii-Material handling costs-A suitable material handling system should be designed to reduce the cost of material handling to a minimum.a total cost approach would require a consideration of of not only the material handling system but other relevant factors affecting the cost of transport,customer satisfaction,inventory etc.
  • 52.
    Total Cost Approach(contd.) •viii-Packaging costs-Decision on packaging are affected by mode of transport and material handling equipment.a total cost approach would make it necessary for us to select a packaging version which takes into account other distribution factors • ix-Customer service costs-All factors which affect customer service and volume of sales have to be taken into consideration to evaluate the total cost of distribution.
  • 53.
    Total Cost Approach- Conclusions • i-The real impact of distribution costs on profits is much higher than perceived. • ii-Many of these costs are nobody,s responsibility because of compartmentalization of the management function. • iii-Costs incurred in these are do not respond to cost cutting methods because of fragmented approach to analysis.requires comprehensive integrated approach taking into consideration all relevant factors.
  • 54.
    Total Cost Approach- Conclusions (contd.) • iv-The effect of high distribution costs should not be restricted to high level,across the board analysis A right approach by management would tap the real potential. • v-Before applying total cost approach,it is essential to examine various costs associated with distribution function.by studying the total system in depth before taking decisions.
  • 55.
    Total Cost Approach- Conclusions(contd.) • vi-Normally Firms keep data for production and finance decisions.hence it becomes difficult to separate and identify the physical distribution costs,which is an essential requirement for assessing distribution costs.Even these data,s which are necessary for analyzing are kept confidential. • vii-To make accounting easier ,various costs are added as administrative heads.To analyze the problem,it is essential to have these data available
  • 56.
    Steps required toidentify distribution costs • i-Separate and identify distribution costs element wise. • ii-accounting centers will need to be developed to help identifyanalyze distribution costs. • iii-Analyze the the results of the changes in the performance.
  • 57.
    Steps required toidentify distribution costs(contd.) • iv-Some of the changes which may become necessary after application of total cost approach- examples • a-Company,s distribution pattern may be changed by making appropriate shifts in Productionwarehouse loads. • b-Shifting of some equipments at nominal cost • c-savings may be achieved by persuading Customer to change mode of transport. • d-Add additional warehouse capacity to ensure better customer service and also add profits.
  • 58.
    Steps required toidentify distribution costs(contd.) • v-The various suggestions as given,may be acted upon only after an across-the-board analysis and with the active involvement of Top management. • vi-The top management must be prepared to undertake such time consuming study. • vii-The study so made must outline the profit goal expected from the various alternatives and convince the management to implement the changes with determination.
  • 59.
    Neglect Of PhysicalDistribution function • i-Low level of professional management duo to lack of management development. • ii-Evan with high level of development in other areas ,the development of Physical Distribution subject has been delayed. • iii-Top managers have focused on manufacturing and finance issues with little attention on Physical Distribution.
  • 60.
    Neglect of PhysicalDistribution function(contd.) • iv-Physical distribution costs are usually hidden,requiring higher order management skills,which are normally are lacking. • v-In India,due to localized nature of business,physical distribution function has not developed and has remain rather obscure.The operations of organizations are relatively at low- level,problems are of minor nature and do not call for specialized skills.
  • 61.
    Neglect of PhysicalDistribution function(contd.) • vi-Even in large scale organizations,physical distribution function has not received adequate attention,because the bottlenecks in operation,giving rise to shortagesscarcities has not been appreciated.Even there is a lack of awareness. • vii-Accounting methods have not been developed to evaluate advise management on the cost of such shortagesscarcities.
  • 62.
    Neglect of PhysicalDistribution function(contd.) • viii-Manufacturers intentionally create artificial shortages in order to sell premium goods at premium. • ix-Because of low development of the economic system,alternate modes of operations are not available to organizations.
  • 63.
    Neglect of PhysicalDistribution function(contd.) • x-Because of low level of development ,not many alternatives are known to management nor they are able to work with new experiments. • xi-Even Managers do not feel the urge to develop alternate methods ,since with existing operations,they are able to generate enough profits.
  • 64.
    Neglect of PhysicalDistribution function(contd.) • xii-In most organizations,the costs are distributed rather than computed and allocated accurately.As such few individuals are able to asses the real costs and are unable to make rational decisions. • xiii-Due to low level of knowledge ,the intricate inter-relationship which exist between the variables involved in Physical distribution are generally understood.
  • 65.
    Neglect of PhysicalDistribution function(contd.) • xiv-In general there is a lack of a system approach to problems,because the managers focus on individual subject rather than on more difficult approach,leading to neglect of interfaces,thereby avoiding development of smooth systems. • xv-individuals focus attention on individual performances and have not realized importance of time and ensure completing a given task within a specified time.
  • 66.
    “Like” us on Facebook:  p // / http://www.facebook.com/welearnindia  “Follow” us on Twitter: http://twitter.com/WeLearnIndia http://twitter com/WeLearnIndia Watch informative videos on Youtube:  http://www.youtube.com/WelingkarDLP