Conference Projects visualization: BIM and linear planning. Marriott Hotel (Warsaw), 16.10.2015.
Presentation given by Tony Banks - Engagement Director at Oracle Corporation.
Conference Manage Projects Effectively and with Passion. Marriott Hotel (Warsaw), 25.09.2012.
Presentation given by Michał Kostrzewa - ECEMEA Business Development Manager at Oracle Poland.
Crown Systems is an Oracle partner specializing in project management solutions. The presentation overviewed Oracle Primavera, a project portfolio management solution. It demonstrated Primavera's dashboards, portfolio management, planning and scheduling capabilities. Primavera allows multiple users to collaborate on multiple projects simultaneously using a centralized system with role-based security and real-time access. It provides powerful scheduling, resource management, reporting and analytics functions to optimize project performance and resource allocation across an enterprise project portfolio.
Primavera is a single integrated business management solution that allows organizations to have tight control over project costs, schedules, and resources through features like collaboration, reporting, resource management, and integration with other applications. It helps organizations respond quickly to changing project conditions, deliver ROI, course correct failing projects, and work productively through features such as robust reporting, mobile access, optimization of resources and funds, and improved collaboration.
This document summarizes an implementation of Oracle Primavera Analytics by Volantic. It introduces the technical lead and business development lead from Volantic and provides brief biographies. It then describes the key features and benefits of Primavera Analytics, including answering questions about project data, delivering personalized reports, analyzing performance, and enabling briefing books. The document outlines best practices for planning, executing, and managing an implementation including assessing needs, configuring environments, training, and providing support services. It provides an example client reference and contact information for Volantic.
Primavera P6 Analytics provides business intelligence capabilities for Oracle's Primavera P6 EPPM product. The latest release, version 3.2, expands support for asset-intensive industries and includes new features like schedule adherence metrics and resource/role hierarchies. It also provides access to Oracle Maps and supports the latest Oracle BI platform version.
Nageswararao Chandra has over 13 years of experience in business intelligence, ETL, data quality, data governance, and data migration projects. He has extensive experience working with tools like Informatica PowerCenter, Kalido DIW, and Cognos for reporting. Some of the key projects he has worked on include the BIGS project at British Petroleum for upgrading Informatica and Kalido versions, data migration implementations, and master data management projects. He is proficient in technologies like Oracle, SQL Server, Informatica, and Kalido and has experience across domains like oil and gas, telecommunications.
Primavera Integration - Greg Macpherson - Primavera Practice - Oaktongjmstleonards
The document discusses opportunities for integrating Oracle Primavera project management software with other systems. Key integration points include ERP systems for sharing cost, budget and time data; reporting and business intelligence tools; document management and workflow systems; and risk management applications. Common benefits of integration include automated data collection, a single source of truth for project data, and improved decision making. The document also explores emerging integration opportunities with building information modeling (BIM), mobile devices, and cloud-based systems.
Session: webMethods World; An Insider’s Tour with the webMethods Technology Team
Slides from webMethods World session with Subhash Ramachandran, member of Group Executive Board, Software AG, during the Apama & Terracotta World Session at Innovation World 2014 conference, Oct 13-15, 2014, at the Hyatt Regency New Orleans, produced by Software AG. Three days of vision, inspiration and insight. Innovation World is THE global event for digital leaders who are driven to leverage the Software AG Suite: Alfabet, Apama, ARIS, webMethods, Software AG Live, Terracotta and Adabas-Natural.
Conference Manage Projects Effectively and with Passion. Marriott Hotel (Warsaw), 25.09.2012.
Presentation given by Michał Kostrzewa - ECEMEA Business Development Manager at Oracle Poland.
Crown Systems is an Oracle partner specializing in project management solutions. The presentation overviewed Oracle Primavera, a project portfolio management solution. It demonstrated Primavera's dashboards, portfolio management, planning and scheduling capabilities. Primavera allows multiple users to collaborate on multiple projects simultaneously using a centralized system with role-based security and real-time access. It provides powerful scheduling, resource management, reporting and analytics functions to optimize project performance and resource allocation across an enterprise project portfolio.
Primavera is a single integrated business management solution that allows organizations to have tight control over project costs, schedules, and resources through features like collaboration, reporting, resource management, and integration with other applications. It helps organizations respond quickly to changing project conditions, deliver ROI, course correct failing projects, and work productively through features such as robust reporting, mobile access, optimization of resources and funds, and improved collaboration.
This document summarizes an implementation of Oracle Primavera Analytics by Volantic. It introduces the technical lead and business development lead from Volantic and provides brief biographies. It then describes the key features and benefits of Primavera Analytics, including answering questions about project data, delivering personalized reports, analyzing performance, and enabling briefing books. The document outlines best practices for planning, executing, and managing an implementation including assessing needs, configuring environments, training, and providing support services. It provides an example client reference and contact information for Volantic.
Primavera P6 Analytics provides business intelligence capabilities for Oracle's Primavera P6 EPPM product. The latest release, version 3.2, expands support for asset-intensive industries and includes new features like schedule adherence metrics and resource/role hierarchies. It also provides access to Oracle Maps and supports the latest Oracle BI platform version.
Nageswararao Chandra has over 13 years of experience in business intelligence, ETL, data quality, data governance, and data migration projects. He has extensive experience working with tools like Informatica PowerCenter, Kalido DIW, and Cognos for reporting. Some of the key projects he has worked on include the BIGS project at British Petroleum for upgrading Informatica and Kalido versions, data migration implementations, and master data management projects. He is proficient in technologies like Oracle, SQL Server, Informatica, and Kalido and has experience across domains like oil and gas, telecommunications.
Primavera Integration - Greg Macpherson - Primavera Practice - Oaktongjmstleonards
The document discusses opportunities for integrating Oracle Primavera project management software with other systems. Key integration points include ERP systems for sharing cost, budget and time data; reporting and business intelligence tools; document management and workflow systems; and risk management applications. Common benefits of integration include automated data collection, a single source of truth for project data, and improved decision making. The document also explores emerging integration opportunities with building information modeling (BIM), mobile devices, and cloud-based systems.
Session: webMethods World; An Insider’s Tour with the webMethods Technology Team
Slides from webMethods World session with Subhash Ramachandran, member of Group Executive Board, Software AG, during the Apama & Terracotta World Session at Innovation World 2014 conference, Oct 13-15, 2014, at the Hyatt Regency New Orleans, produced by Software AG. Three days of vision, inspiration and insight. Innovation World is THE global event for digital leaders who are driven to leverage the Software AG Suite: Alfabet, Apama, ARIS, webMethods, Software AG Live, Terracotta and Adabas-Natural.
Primavera vision & roadmap collaborate13 april 2013p6academy
The document outlines Oracle's product roadmap and future direction for its Primavera portfolio. It discusses trends in project and portfolio management and Oracle's vision to deliver an integrated multi-initiative solution. The roadmap focuses on delivering customer value through existing products like P6, Unifier, and Instantis while improving integration across scheduling, cost, and risk capabilities. Planned updates are described for enhanced mobile access, facilities management, and expanded analytics and reporting functions through 2013-2014.
Winning Strategies for Oracle Cloud Adoption: Should You Test Drive, Lease, o...Joseph Alaimo Jr
This document summarizes an agenda for a presentation on integrated business analytics solutions. It discusses Oracle's EPM, BI and big data technologies and how they can be used together. It then provides an overview of Edgewater Ranzal, the presenting company, including their experience, services, and recognition from Oracle. The agenda includes an introduction, a discussion of business analytics cloud architecture, approaches to cloud adoption and case studies, an analytics demo, and closing Q&A.
The latest Primavera Roadmap June 2015
The recognized standard for high-performance project management Primavera P6 Professional Project Management, handles large-scale, highly sophisticated and multifaceted projects. Organize projects of up to 100,000 activities with unlimited resources and an unlimited number of target plans.
ARIS World: Shaping the Future of ARIS 9 - All You Need to Know About the Upc...Software AG
Innovation World 2013 session.
Discover and shape the future of ARIS. Learn best practices from first Process Live (ARIS in the cloud) customers. Discuss the latest process improvement trends and how they impact your daily job.
Speakers:
Georg Simon
SVP, Product Marketing, Software AG
Joerg Klueckmann
Director, Product Marketing, Software AG
Fabian Erbach
Partner at Litmus Group Singapore
Primavera Analytics What’s New in Release 15.2 p6academy
Doug Larkin
Primavera Product Strategy
www.P6Academy.com
Webcast slides
1. Overview
2. New Features
3. Tested Configuration Updates
4. Wrap-up and Q&A
For more visit www.P6Academy.com
All rights Oracle.
SAP Portfolio and Project Management 6.0 enhances performance and analytics capabilities. Key updates include HANA-specific optimizations that accelerate dashboard access and authorization checks for projects and portfolios. New financial KPIs are added for portfolios, and currency conversion logic is changed for financial planning. Integrations are strengthened, including to environmental compliance. Activated switches in 6.0 improve functionality without custom code. Archiving and information lifecycle management capabilities are also added.
Turn the slides to explore how APIs force disparate systems, applications, and environments to work in cohesion and trigger continuous growth and innovation.
The document discusses a training course on SAP Portfolio and Project Management (PPM) 5.0 provided by KMR Software Services Pvt Ltd. The course content covers topics like portfolio management, project management, integration with other SAP modules, and includes configuration and use of features like portfolio structures, initiatives, financial planning, capacity planning, project planning, execution and evaluation. Contact details for the training provider are also listed.
SAP has been innovating business applications for over 40 years, with SAP HANA and S/4HANA representing its latest generation. S/4HANA offers a simplified data model, real-time analytics, and a modern user experience. It combines transactions and analytics on an in-memory platform for instant insight. S/4HANA reduces data footprints by 10x, process steps by 4x, and increases analytics and reporting speeds by 1800x.
The document is a summary of a webcast on P6 tips and tricks. It discusses common issues customers log in P6, including project privileges, import considerations, percent complete fields, and out of sequence activities. It then covers specific issues in P6 Release 8 for both the client and web, such as environment variable issues, HTML file problems, and Java errors. The goal is to help users avoid recurring issues and better understand how to troubleshoot problems.
Webinar: Are your Manufacturing apps ready to evolve to the Cloud?Jade Global
The World is Evolving. Are your Manufacturing apps ready to evolve to the Cloud?
According to IDC nearly 68% of the global manufacturing firms have already migrated to the Cloud.
The Cloud is transforming today’s manufacturing companies into service-oriented and collaborative businesses by enabling them to access large amounts of critical data in real time anywhere along their supply chains, and at a reduced cost.
Watch this on-demand webinar to learn how to:
• Determine the right time to migrate to the Cloud
• Understand the Oracle Cloud Manufacturing offerings
• Differentiate between Cloud Manufacturing and Oracle EBS
Know more: http://www.jadeglobal.com/webinars/manufacturing-systems-moving-cloud and email us at: marketing@jadeglobal.com
Follow us on:
https://www.facebook.com/jadeglobal/
https://www.linkedin.com/company/jade-global
https://twitter.com/JadeGlobal
How a Leading Brand Achieved Digital Transformation at a Global Scale - Jeff ...MuleSoft
With large enterprises, there is a greater demand on IT to rapidly deploy mission critical application across the globe, securely, reliably and with high availability. Please join us to learn the four essentials of an enterprise platform that is critical when deploying applications in a large enterprise. A representative from one of the largest brands in the world will share the enterprise grade solutions they were seeking and how Mulesoft was able to live up to the challenge.
Successfully Manage Cost and Schedule with Primavera Unifier and Primavera P6p6academy
Referenced: www.p6academy.com
Source: http://coll15.mapyourshow.com
The Unifier 10.1 release in conjunction with the P6 8.4 release introduces a more complete cost and schedule integration. Discover how the integration of these two products provides the enormous value to customers that utilizing both of these products. Learn how to: • Take a resource loaded P6 Project and assign costs to these resources within Unifier in order to create a cost loaded schedule. • Compare top-down estimates and budgets in Unifier to bottom-up costs from P6 within the Unifier Cost Sheet and Cash Flow. • Compare not only the current P6 Project but even the project baselines in order to see a historical impact on the project. • Use the data from P6 Projects and Baselines to track the Earned Value within Unifier.
The document summarizes Sunrun's migration from an on-premise data warehouse to a cloud data warehouse using Google Cloud Platform, Informatica, and Looker. It outlines a phased approach taken from 2017-2020 with the goals of reducing time to build data pipelines, achieving faster refresh cycles, and enabling self-service analytics. Key aspects included simplifying data integration using Informatica, building a robust cloud architecture, and accelerating development cycles. The presentation concludes by discussing future analytics capabilities such as data governance, real-time analytics, and machine learning.
Primavera Strategy and Roadmap within the Capital Infrastructure and Asset Lifecycle Management areas.
Products: Primavera Unifier, Primavera P6, Primavera EPPM, Primavera Portfolio Management
Title: Capital Infrastructure and Asset Lifecycle Management
Author: Guy Barlow Director, Industry Strategy
Primavera Global Business Unit
Date: 25 June 2015
Copyright Oracle
For more free articles and online training visit: www.p6academy.com
The document discusses Oracle Projects Integration, which provides functionality across the project management lifecycle, including project setup, planning, execution, control, reporting, and closeout. It also covers non-labor cost collection, capitalization, invoicing, and creating invoices in Oracle Projects to interface with Oracle Receivables.
Building a solid Project Management System with Primavera and other tools at ...p6academy
The European Schedules, with more than 200,000 activities require a robust Project Management tool to store scope and schedule, with risks and uncertainties. The latter are then analysed with Primavera Risk Analysis. A customised integrated reporting system is fed with information from Primavera. An in-house developed supplier contract management system integrates the document management system and Primavera, which also feeds into the reporting system. A number of tools have also been developed to consolidate processes. F4E has managed to integrate data from various systems where Primavera is the core Project Management system. It is constantly developing different management tools and techniques to increase the efficiency of its work.
Referenced: www.p6academy.com
Source: http://coll15.mapyourshow.com
Chain-Sys\'s repeatable R12 implementation sucess with Oracle EBS R12 + Oracle Business Accelerator and Appload Productivity suite. Assured high quality complex implementations in less than 100 man days.
The document outlines a project to integrate Millennium Inorganic Chemicals' end-to-end business processes using SAP NetWeaver Process Integration. The project will develop and test 20 interfaces between SAP R/3, SAP APO, and external partners. It will also define operating processes, knowledge transfer to staff, and deliver configuration documentation. The timeline runs from January 2008 to May 2008, with go-lives for interfaces with PolyOne and Sherwin Williams in April 2008. The project aims to reduce redundant applications and enable seamless integration across systems.
In-Memory Data Management Goes Mainstream - OpenSlava 2015Software AG
Manish Devgan's presentation from the OpenSlava 2015 Conference. The presentation will cover Ehcache and Terracotta Server, its recent milestones, and how it continues to help developers easily leverage in-memory storage for current and emerging workloads.
Watch the full presentation here: http://bit.ly/1MGwGUv
Conference Projects visualization: BIM and linear planning. Marriott Hotel (Warsaw), 16.10.2015.
Presentation given by Przemysław Nogaj - Territory Sales Executive at Autodesk.
Conference Projects visualization: BIM and linear planning. Marriott Hotel (Warsaw), 16.10.2015.
Presentation given by Dariusz Morawski - Project Director at DAT Computer Concepts.
Primavera vision & roadmap collaborate13 april 2013p6academy
The document outlines Oracle's product roadmap and future direction for its Primavera portfolio. It discusses trends in project and portfolio management and Oracle's vision to deliver an integrated multi-initiative solution. The roadmap focuses on delivering customer value through existing products like P6, Unifier, and Instantis while improving integration across scheduling, cost, and risk capabilities. Planned updates are described for enhanced mobile access, facilities management, and expanded analytics and reporting functions through 2013-2014.
Winning Strategies for Oracle Cloud Adoption: Should You Test Drive, Lease, o...Joseph Alaimo Jr
This document summarizes an agenda for a presentation on integrated business analytics solutions. It discusses Oracle's EPM, BI and big data technologies and how they can be used together. It then provides an overview of Edgewater Ranzal, the presenting company, including their experience, services, and recognition from Oracle. The agenda includes an introduction, a discussion of business analytics cloud architecture, approaches to cloud adoption and case studies, an analytics demo, and closing Q&A.
The latest Primavera Roadmap June 2015
The recognized standard for high-performance project management Primavera P6 Professional Project Management, handles large-scale, highly sophisticated and multifaceted projects. Organize projects of up to 100,000 activities with unlimited resources and an unlimited number of target plans.
ARIS World: Shaping the Future of ARIS 9 - All You Need to Know About the Upc...Software AG
Innovation World 2013 session.
Discover and shape the future of ARIS. Learn best practices from first Process Live (ARIS in the cloud) customers. Discuss the latest process improvement trends and how they impact your daily job.
Speakers:
Georg Simon
SVP, Product Marketing, Software AG
Joerg Klueckmann
Director, Product Marketing, Software AG
Fabian Erbach
Partner at Litmus Group Singapore
Primavera Analytics What’s New in Release 15.2 p6academy
Doug Larkin
Primavera Product Strategy
www.P6Academy.com
Webcast slides
1. Overview
2. New Features
3. Tested Configuration Updates
4. Wrap-up and Q&A
For more visit www.P6Academy.com
All rights Oracle.
SAP Portfolio and Project Management 6.0 enhances performance and analytics capabilities. Key updates include HANA-specific optimizations that accelerate dashboard access and authorization checks for projects and portfolios. New financial KPIs are added for portfolios, and currency conversion logic is changed for financial planning. Integrations are strengthened, including to environmental compliance. Activated switches in 6.0 improve functionality without custom code. Archiving and information lifecycle management capabilities are also added.
Turn the slides to explore how APIs force disparate systems, applications, and environments to work in cohesion and trigger continuous growth and innovation.
The document discusses a training course on SAP Portfolio and Project Management (PPM) 5.0 provided by KMR Software Services Pvt Ltd. The course content covers topics like portfolio management, project management, integration with other SAP modules, and includes configuration and use of features like portfolio structures, initiatives, financial planning, capacity planning, project planning, execution and evaluation. Contact details for the training provider are also listed.
SAP has been innovating business applications for over 40 years, with SAP HANA and S/4HANA representing its latest generation. S/4HANA offers a simplified data model, real-time analytics, and a modern user experience. It combines transactions and analytics on an in-memory platform for instant insight. S/4HANA reduces data footprints by 10x, process steps by 4x, and increases analytics and reporting speeds by 1800x.
The document is a summary of a webcast on P6 tips and tricks. It discusses common issues customers log in P6, including project privileges, import considerations, percent complete fields, and out of sequence activities. It then covers specific issues in P6 Release 8 for both the client and web, such as environment variable issues, HTML file problems, and Java errors. The goal is to help users avoid recurring issues and better understand how to troubleshoot problems.
Webinar: Are your Manufacturing apps ready to evolve to the Cloud?Jade Global
The World is Evolving. Are your Manufacturing apps ready to evolve to the Cloud?
According to IDC nearly 68% of the global manufacturing firms have already migrated to the Cloud.
The Cloud is transforming today’s manufacturing companies into service-oriented and collaborative businesses by enabling them to access large amounts of critical data in real time anywhere along their supply chains, and at a reduced cost.
Watch this on-demand webinar to learn how to:
• Determine the right time to migrate to the Cloud
• Understand the Oracle Cloud Manufacturing offerings
• Differentiate between Cloud Manufacturing and Oracle EBS
Know more: http://www.jadeglobal.com/webinars/manufacturing-systems-moving-cloud and email us at: marketing@jadeglobal.com
Follow us on:
https://www.facebook.com/jadeglobal/
https://www.linkedin.com/company/jade-global
https://twitter.com/JadeGlobal
How a Leading Brand Achieved Digital Transformation at a Global Scale - Jeff ...MuleSoft
With large enterprises, there is a greater demand on IT to rapidly deploy mission critical application across the globe, securely, reliably and with high availability. Please join us to learn the four essentials of an enterprise platform that is critical when deploying applications in a large enterprise. A representative from one of the largest brands in the world will share the enterprise grade solutions they were seeking and how Mulesoft was able to live up to the challenge.
Successfully Manage Cost and Schedule with Primavera Unifier and Primavera P6p6academy
Referenced: www.p6academy.com
Source: http://coll15.mapyourshow.com
The Unifier 10.1 release in conjunction with the P6 8.4 release introduces a more complete cost and schedule integration. Discover how the integration of these two products provides the enormous value to customers that utilizing both of these products. Learn how to: • Take a resource loaded P6 Project and assign costs to these resources within Unifier in order to create a cost loaded schedule. • Compare top-down estimates and budgets in Unifier to bottom-up costs from P6 within the Unifier Cost Sheet and Cash Flow. • Compare not only the current P6 Project but even the project baselines in order to see a historical impact on the project. • Use the data from P6 Projects and Baselines to track the Earned Value within Unifier.
The document summarizes Sunrun's migration from an on-premise data warehouse to a cloud data warehouse using Google Cloud Platform, Informatica, and Looker. It outlines a phased approach taken from 2017-2020 with the goals of reducing time to build data pipelines, achieving faster refresh cycles, and enabling self-service analytics. Key aspects included simplifying data integration using Informatica, building a robust cloud architecture, and accelerating development cycles. The presentation concludes by discussing future analytics capabilities such as data governance, real-time analytics, and machine learning.
Primavera Strategy and Roadmap within the Capital Infrastructure and Asset Lifecycle Management areas.
Products: Primavera Unifier, Primavera P6, Primavera EPPM, Primavera Portfolio Management
Title: Capital Infrastructure and Asset Lifecycle Management
Author: Guy Barlow Director, Industry Strategy
Primavera Global Business Unit
Date: 25 June 2015
Copyright Oracle
For more free articles and online training visit: www.p6academy.com
The document discusses Oracle Projects Integration, which provides functionality across the project management lifecycle, including project setup, planning, execution, control, reporting, and closeout. It also covers non-labor cost collection, capitalization, invoicing, and creating invoices in Oracle Projects to interface with Oracle Receivables.
Building a solid Project Management System with Primavera and other tools at ...p6academy
The European Schedules, with more than 200,000 activities require a robust Project Management tool to store scope and schedule, with risks and uncertainties. The latter are then analysed with Primavera Risk Analysis. A customised integrated reporting system is fed with information from Primavera. An in-house developed supplier contract management system integrates the document management system and Primavera, which also feeds into the reporting system. A number of tools have also been developed to consolidate processes. F4E has managed to integrate data from various systems where Primavera is the core Project Management system. It is constantly developing different management tools and techniques to increase the efficiency of its work.
Referenced: www.p6academy.com
Source: http://coll15.mapyourshow.com
Chain-Sys\'s repeatable R12 implementation sucess with Oracle EBS R12 + Oracle Business Accelerator and Appload Productivity suite. Assured high quality complex implementations in less than 100 man days.
The document outlines a project to integrate Millennium Inorganic Chemicals' end-to-end business processes using SAP NetWeaver Process Integration. The project will develop and test 20 interfaces between SAP R/3, SAP APO, and external partners. It will also define operating processes, knowledge transfer to staff, and deliver configuration documentation. The timeline runs from January 2008 to May 2008, with go-lives for interfaces with PolyOne and Sherwin Williams in April 2008. The project aims to reduce redundant applications and enable seamless integration across systems.
In-Memory Data Management Goes Mainstream - OpenSlava 2015Software AG
Manish Devgan's presentation from the OpenSlava 2015 Conference. The presentation will cover Ehcache and Terracotta Server, its recent milestones, and how it continues to help developers easily leverage in-memory storage for current and emerging workloads.
Watch the full presentation here: http://bit.ly/1MGwGUv
Conference Projects visualization: BIM and linear planning. Marriott Hotel (Warsaw), 16.10.2015.
Presentation given by Przemysław Nogaj - Territory Sales Executive at Autodesk.
Conference Projects visualization: BIM and linear planning. Marriott Hotel (Warsaw), 16.10.2015.
Presentation given by Dariusz Morawski - Project Director at DAT Computer Concepts.
Conference Projects visualization: BIM and linear planning. Marriott Hotel (Warsaw), 16.10.2015.
Presentation given by Anderw Willard - Director at Willmer Limited.
Conference Projects visualization: BIM and linear planning. Marriott Hotel (Warsaw), 16.10.2015.
Presentation given by Alan Sharp - Business Area Director – Civil Engineering & Construction Division at Trimble Navigation Ltd.
Conference Projects visualization: BIM and linear planning. Marriott Hotel (Warsaw), 16.10.2015.
Presentation given by Łukasz Tonecki - Sales Director at DAT Computer Concepts.
Opening speech of "Projects visualization: BIM and linear planning" ConferenceDAT Computer Concepts
Conference Projects visualization: BIM and linear planning. Marriott Hotel (Warsaw), 16.10.2015.
Presentation given by Iwona Bogucka - Managing Director at DAT Computer Concepts.
Keynote presentation for the Pivotal Cloud Platform Roadshow. Introduces the market drivers for the Cloud Foundry Platform as a Service, discusses open source softwared (Cloud Foundry is OSS) and introduces the fundamentals of the platform.
The document provides an overview of Oracle Instantis, a complete project portfolio management solution. It describes key features such as automated reporting, user-configurable dashboards, integrated modules for strategy, process, and survey management, and dynamic ad-hoc reporting. Instantis supports the full project lifecycle from planning to execution to measurement across IT, new product development, and process improvement initiatives. It offers quick deployment, ease of use, and a quick ROI.
The document discusses Oracle's new approach to business analytics and visualization. It notes that traditional corporate BI systems are viewed as inflexible and analytics are only for a privileged few. However, it argues there is still hope as analytics can provide a 10x ROI. The new approach involves visual analytics embedded in every Oracle solution across mobile, cloud, on-premises and big data to provide a single, integrated platform that allows business users to easily access, blend and scale insights from various data sources.
This document provides an overview of a presentation on mobile business and Oracle's Mobile Cloud Service. It discusses how developing mobile applications and backends can be complicated due to issues like client development tools, integration, security, and supporting multiple environments. It introduces Oracle Mobile Cloud Service as a way to simplify mobile development by providing consumer-style frontends and enterprise-grade backends, and demonstrates how it can be used to support three example mobile applications.
Enterprises are discovering the move to a mobile world not only presents new opportunities but also unique challenges. Oracle has identified numerous pain points amongst its customers in making the move to mobile, and to address these issues, no matter where the customer is in their mobile adoption, has a solution to meet their mobile development needs.
The document discusses Oracle's modern cloud strategy and offerings. It summarizes Oracle's transition to focus on providing a complete cloud platform and applications that deliver speed, standardization, data-driven insights, personalized experiences, and connectivity across the entire business. It highlights key customer benefits like improved efficiency, security, and innovation along with Oracle's commitment to customer success.
Rolta was invited to co-present our OneView™ Enterprise Suite with a specific use case on IoT Analytics. The Rolta CTO, Rajesh Ramachandran, co-presented with SAP and during SAP’s portion of the presentation, they highlighted Rolta as the key partner for Industry IoT.
01 sap inside_track_sapintegrationstrategyshetkars
1) SAP's integration strategy focuses on APIs and prepackaged integration content, flexible deployment models across cloud and on-premise, a rich integration technology portfolio, and a holistic methodology and governance approach.
2) Key building blocks of the strategy include pre-defined integration content to accelerate projects, a choice of integration technologies, and the SAP Integration Solution Advisor methodology to simplify integration.
3) Going forward, SAP aims to provide additional guidance to help customers transition their integration landscapes, including guidance for SAP S/4HANA integration, integration monitoring, and usage of SAP Cloud Platform Integration and SAP Data Hub.
This document discusses the history and future of Vanenburg Software over 35 years, including investments in other companies. It focuses on the transition to third platform technologies like mobile, cloud, big data and IoT. Mature enterprise platform as a service (PaaS) solutions are said to increase agility and reduce costs, allowing businesses to develop applications and launch new products faster. The rise of mobility and third platform approaches will drive most future IT developments.
Software AG Live - Boosting Business Performance in the Cloud - Joerg Klueckm...Software AG South Africa
The document discusses Software AG Live, a cloud platform that provides solutions for improving business processes, managing IT portfolios, developing applications, and integrating systems in the cloud. It highlights several specific Software AG Live solutions including Process Live for collaborative process analysis, Portfolios Live for portfolio management, AgileApps Live for creating situational apps, and Integration Live for integrating cloud and on-premise applications. The key benefits mentioned are the ability to start work immediately, flexibly support changing business needs, and ensure consistent customer experiences across channels to improve customer satisfaction.
According to a Forrester research, the traditional 3-tier web architecture does not deliver anymore. Instead, a 4-tier engagement platform is what's required in a mobile-centric world. And further to that, application developers and enterprise architects needs a new mindset in and must relentlessly adhere to loosely coupled services and tiers, a distributed deployment and development model, and dynamically composed services to support contextual experiences.
This is where MuleSoft's Anypoint Platform fits very well to provide the necessary aggregation tier of the 4-tier engagement platform to serve the needs of the new mobile-centric world.
Oracle Primavera - Seven Steps to Managing Successful ProjectsOracle Primavera
Risk, delivery, cost and management are omnipresent in any large-scale project. Ensuring that each of these factors works in unison is key.
Discover the seven steps that can help you achieve this.
The document discusses how a cloud native platform can help remove barriers between development and operations teams. It outlines key elements of such a platform including rapid provisioning, deployment, scaling, monitoring, and upgrading applications without downtime. The platform aims to enable continuous delivery and deployment through shared tools and an integrated culture between Dev and Ops.
The next generation of ap is luis weir.cwin18.telfordCapgemini
Luis Weir, CTO of Capgemini UK's Oracle practice, discusses the role of APIs and microservices in digital transformation. He argues that technology alone does not drive disruption but lack of adaptability to customer needs. Weir outlines the API value chain and how organizations can move from tactical to strategic use of APIs. Case studies of Cargill and IKEA demonstrate how a next-generation API platform unlocked data and enabled their digital supply chains.
Cardtronics, the global leader in ATM deployment and management, decided to retire its on-premises Hyperion solution to gain the operational efficiencies, features, and functionality provided by a best-in-class cloud solution.
Cardtronics chose Oracle EPM Cloud including Financial Consolidation and Close, Planning, Management Reporting, Account Reconciliation, Enterprise Data Management, as well as Oracle Analytics Cloud.
In this video, project owner Richard Ng, director, financial systems, Cardtronics, discusses the migration to Oracle EPM Cloud including:
Multi-release 18-month deployment schedule across multiple countries
Benefits of a global Chart of Accounts for ERP and EPM
Seamless integration across ERP Cloud, HCM Cloud, and EPM Cloud
Competing with Software: It Takes a Platform -- Devops @ EMC Worldcornelia davis
Presentation at Devops @ EMC World event, 3 May 2015
In Mark Andreessen’s 2010 piece for the Wall Street Journal, in which he declared “Software is Eating the World,” he talked about well established, large enterprises loosing footing to small, nimble startup companies who are far better at bringing software to their consumers. In fact, it’s not as much that these upstarts are better at meeting customer demands, rather they are the cause of the increased expectations, providing consumers with things they didn’t even know they wanted. What are the factors behind their success? New development and operational approaches including extreme agile & test driven development, continuous delivery and devops practices all play a significant role, and while a part of the difference is cultural, tools matter. In this session we’ll look at why a software-driven enterprise needs platform. Google has one. Facebook has one. Netflix has one. Your enterprise needs one.
AMIS Oracle OpenWorld & CodeOne Review - Pillar 2 - SaaS and Standard Applica...Lucas Jellema
SaaS is a crucial part of Oracle's portfolio. In SaaS - Oracle claims leadership in all horizontal business applications markets except in Sales / CRM where it acknowledges Salesforce as the leader. It has the broadest portfolio of any vendor and the largest marketshares. It is now seriously modernizing the applications - around themes such as machine learning & digital assistant, smart UI, blockchain and Internet of Things. For the first time, Oracle starts to wean customers away from Applications Unlimited (EBS, Peoplesoft, Siebel, JDEdwards) and towards Fusion Applications in the cloud. This presentation introduces the Soar offer to move and improve from on premises Apps to SaaS. It also discusses the innovations announced by Oracle in its major suites. As presented on November 5th 2018 at AMIS HQ, Nieuwegein, The Netherlands.
The annual review session by the AMIS team on their findings, interpretations and opinions regarding news, trends, announcements and roadmaps around Oracle's product portfolio.
Telcos are facing mounting pressure to dramatically increase speed to market and cut costs. But how?
What if you could go to market in half the time using prebuilt libraries of telco offerings—and leveraging the cloud to lower costs?
In this presentation, find out how Capgemini’s end-to-end solution for telcos uses a hybrid cloud and the Oracle Communications Rapid Offer Design and Order Delivery (Oracle Communications RODOD) stack to provide a competitive edge in today’s tough, dynamic environment.
Learn how to accelerate digital transformation, increase agility, and simplify business to better respond to customer expectations and address growth opportunities. See a concrete demonstration of the solution and its best-in-class CX capabilities, processes, and deployment and run services.
First presented at Oracle OpenWorld 2015.
Similar to Oracle Primavera for Engineering and Construction (20)
Открой прекрасную Польшу и стань экспертом TILOS
Предлагаем Вашему вниманию программу Обучение и Путешествие, ознакомиться с полным описанием этой программы можно в презентации ниже.
Вы получите прекрасный опыт, экспертные навыки и знания в области планирования и реализации линейных проектов.
Если у вас есть какие-либо вопросы, не стесняйтесь спрашивать - контакт в последнем слайде.
Conference Manage Projects Effectively and with Passion. Marriott Hotel (Warsaw), 25.09.2012.
Presentation given by Krzysztof Pilarczyk - Consultant at DAT Computer Concepts.
Conference Manage Projects Effectively and with Passion. Marriott Hotel (Warsaw), 25.09.2012.
Presentation given by dr Stanisław Gasik - Project Management Expert.
Mit kroplówki wzmacniającej: O kredytowym nawadnianiu terminalnie chorych gos...DAT Computer Concepts
Conference Manage Projects Effectively and with Passion. Marriott Hotel (Warsaw), 25.09.2012.
Presentation given by Prof. Krzysztof Rybiński - Rector at Vistula University.
Conference Manage Projects Effectively and with Passion. Marriott Hotel (Warsaw), 25.09.2012.
Presentation given by Dariusz Morawski - Project Director at DAT Computer Concepts.
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELgerogepatton
As digital technology becomes more deeply embedded in power systems, protecting the communication
networks of Smart Grids (SG) has emerged as a critical concern. Distributed Network Protocol 3 (DNP3)
represents a multi-tiered application layer protocol extensively utilized in Supervisory Control and Data
Acquisition (SCADA)-based smart grids to facilitate real-time data gathering and control functionalities.
Robust Intrusion Detection Systems (IDS) are necessary for early threat detection and mitigation because
of the interconnection of these networks, which makes them vulnerable to a variety of cyberattacks. To
solve this issue, this paper develops a hybrid Deep Learning (DL) model specifically designed for intrusion
detection in smart grids. The proposed approach is a combination of the Convolutional Neural Network
(CNN) and the Long-Short-Term Memory algorithms (LSTM). We employed a recent intrusion detection
dataset (DNP3), which focuses on unauthorized commands and Denial of Service (DoS) cyberattacks, to
train and test our model. The results of our experiments show that our CNN-LSTM method is much better
at finding smart grid intrusions than other deep learning algorithms used for classification. In addition,
our proposed approach improves accuracy, precision, recall, and F1 score, achieving a high detection
accuracy rate of 99.50%.
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsVictor Morales
K8sGPT is a tool that analyzes and diagnoses Kubernetes clusters. This presentation was used to share the requirements and dependencies to deploy K8sGPT in a local environment.
ACEP Magazine edition 4th launched on 05.06.2024Rahul
This document provides information about the third edition of the magazine "Sthapatya" published by the Association of Civil Engineers (Practicing) Aurangabad. It includes messages from current and past presidents of ACEP, memories and photos from past ACEP events, information on life time achievement awards given by ACEP, and a technical article on concrete maintenance, repairs and strengthening. The document highlights activities of ACEP and provides a technical educational article for members.
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesChristina Lin
Traditionally, dealing with real-time data pipelines has involved significant overhead, even for straightforward tasks like data transformation or masking. However, in this talk, we’ll venture into the dynamic realm of WebAssembly (WASM) and discover how it can revolutionize the creation of stateless streaming pipelines within a Kafka (Redpanda) broker. These pipelines are adept at managing low-latency, high-data-volume scenarios.
Introduction- e - waste – definition - sources of e-waste– hazardous substances in e-waste - effects of e-waste on environment and human health- need for e-waste management– e-waste handling rules - waste minimization techniques for managing e-waste – recycling of e-waste - disposal treatment methods of e- waste – mechanism of extraction of precious metal from leaching solution-global Scenario of E-waste – E-waste in India- case studies.
Understanding Inductive Bias in Machine LearningSUTEJAS
This presentation explores the concept of inductive bias in machine learning. It explains how algorithms come with built-in assumptions and preferences that guide the learning process. You'll learn about the different types of inductive bias and how they can impact the performance and generalizability of machine learning models.
The presentation also covers the positive and negative aspects of inductive bias, along with strategies for mitigating potential drawbacks. We'll explore examples of how bias manifests in algorithms like neural networks and decision trees.
By understanding inductive bias, you can gain valuable insights into how machine learning models work and make informed decisions when building and deploying them.
Adaptive synchronous sliding control for a robot manipulator based on neural ...IJECEIAES
Robot manipulators have become important equipment in production lines, medical fields, and transportation. Improving the quality of trajectory tracking for
robot hands is always an attractive topic in the research community. This is a
challenging problem because robot manipulators are complex nonlinear systems
and are often subject to fluctuations in loads and external disturbances. This
article proposes an adaptive synchronous sliding control scheme to improve trajectory tracking performance for a robot manipulator. The proposed controller
ensures that the positions of the joints track the desired trajectory, synchronize
the errors, and significantly reduces chattering. First, the synchronous tracking
errors and synchronous sliding surfaces are presented. Second, the synchronous
tracking error dynamics are determined. Third, a robust adaptive control law is
designed,the unknown components of the model are estimated online by the neural network, and the parameters of the switching elements are selected by fuzzy
logic. The built algorithm ensures that the tracking and approximation errors
are ultimately uniformly bounded (UUB). Finally, the effectiveness of the constructed algorithm is demonstrated through simulation and experimental results.
Simulation and experimental results show that the proposed controller is effective with small synchronous tracking errors, and the chattering phenomenon is
significantly reduced.
1. 16.10.2015
Marriott Hotel - Warszawa
Wizualizacja projektów:
BIM i planowanie liniowe
Project visualization:
BIM and linear planning
Oracle Primavera for Engineering
and Construction
Tony Banks
Engagement Director
Oracle Corporation