SAP Portfolio and Project Management 6.0
February 25th 2014
Eddi Biasotto
Agenda

•

PPM 6.0 Timeline and Scope

•

Performance Optimizations HANA-specific and non-HANA

•

New financial KPIs for SAP Portfolio Management

•

Change calculation of Financial Planning Data during roll up

•

Integration and Object Links
• Integration to SAP‘s Environmental Compliance

•

Activated Switched in 6.0 Standard

•

Archiving and ILM Enablement

© 2013 SAP AG. All rights reserved.

Customer

2
Overview of SAP roadmap for EPPM

SAP Commercial Project
Management 1.0
RDS (R&D,IT,Capex,Analytics)
Portfolio Management

SAP PPM 6.0 on HANA

Resource
Management

Project
Management

SAP PS on HANA

Idea
Management*

Project
Connection

Mobile Scenarios
PPM IT in Solution Manager
Social Collaboration*

Solution today

*Consulting Solution
© 2013 SAP AG. All rights reserved.

Planned innovations

Future direction

Innovation covered in this session
Customer

3
SAP Portfolio and Project Management powered by HANA

Analytics

Mobile

Database &
Technology
Product Evolution for SAP PPM
SAP Portfolio and Project Management

SAP Portfolio
and Project
Management
5.0

SAP RPM 4.0
SAP RPM 4.5

SAP Portfolio
and Project
Management
5.0

SAP Portfolio
and Project
Management
6.0

SAP Portfolio
and Project
Management
6.x

Customer
Connection

PPM on HANA

PPM on HANA

cProjects
4.0/4.5

SAP Enterprise
Project Connection
1.0

SAP Enterprise
Project Connection
2.0

SAP Enterprise
Project Connection
2.0

SAP Enterprise
Project Connection
2.0

SAP
Project System

SAP ERP Project System

SAP ERP Project System

SAP ERP Project System

SAP ERP Project System

Business Suite
on HANA

Business Suite
on HANA

Business Suite
on HANA

2008
© 2013 SAP AG. All rights reserved.

2010

2012

2013

2014
Customer

5
Customer Engagement Initiative
Pain Points (Customer input)
Focus for PPM 6.0 for project, task,
item and initiative dashboards

Dashboards
-

Performance of project/item/initiative Dashboards for large portfolios

-

Adding of additional information (e.g. from accounting, Project System or PLM) not possible due to
performance impact

-

Authorization checks impact performance

Acceleration of Authorization
checks in dashboards

Extraction of Integration Data:
-

Runtime Extraction and Rollup

Rollup: Planned enhancements for Financial
and Capacity Rollup in Portfolio

Reporting
Realtime Analytics for
-

PPM and Integration data

-

Cross-Project and Portfolio reports

currently not possible due to performance impact

© 2013 SAP AG. All rights reserved.

Customer

6
Agenda

•

PPM 6.0 Timeline and Scope

•

Performance Optimizations HANA-specific and non-HANA

•

New financial KPIs for SAP Portfolio Management

•

Change calculation of Financial Planning Data during roll up

•

Integration and Object Links
• Integration to SAP‘s Environmental Compliance

•

Activated Switched in 6.0 Standard

•

Archiving and ILM Enablement

© 2013 SAP AG. All rights reserved.

Customer

7
Challenges in Portfolio and Project Management

Portfolio
Management

Project
Management

Resource
Management

Do the right things

Do the things right

Do more with less

Increasing number of
projects/proposals

Increased complexity
due to business
requirements including
constant change
requests

Limited availabiliity of
resources requires
efficient search for
resources

Decision Makers require
Intuitive realtime
analytics that trigger
alerts
Efficient response to
issues requires detailed
information from
source systems

© 2013 SAP AG. All rights reserved.

Increasing number of
tasks

Change requests force
project leads to
simulate impact
quickly

Customer

8
SAP’s In-Memory Data Management innovation
Providing real-time platform for enterprise applications
A common Database Approach for OLTP and OLAP
Using an In-Memory Column Database
Hasso Plattner

VS

Transact

© 2013 SAP AG. All rights reserved.

Analyze

Accelerate

Transactions + Analysis
directly in-memory

Customer

9
Challenges in SAP PPM today when reporting

OLAP

Financials(CO/PS)
aggregate

SAP PPM
Portfolio Data

Extract

Project Data

Resources (HR)

+ Aggregated Information
from Core Systems

Enrich data from
Core Systems

SAP PPM
+ SAP PS/CO
+ SAP PLM

Lack of granularity in reporting
…(PLM, CATS, PM…)
© 2013 SAP AG. All rights reserved.

Customer

10
Leveraging SAP HANA in PPM
Realtime Reporting based on System information directly in PPM

Virtual Data Models powered by SAP HANA
Virtual Data Model
Project System

© 2013 SAP AG. All rights reserved.

Virtual Data Model
Portfolio and Project
Management

Virtual Data Model

Virtual Data Model

CO

PLM

Customer

11
SAP Portfolio and Project Management 6.0
At a Glance
Why a release dedicated to performance?
•

Make SAP Portfolio and Project Management ready
for SAP‘s strategic innovation platform SAP HANA

•

Optimize code to handle more data and avoid performance
bottle necks

•

SAP HANA can help speed up interactive analysis of project portfolios

What are the consequences for customers?
•

SAP Portf. and Proj. Mgmt 6.0 is a normal release running on both
standard relational databases and SAP HANA

•

All customers can upgrade to PPM 6.0

•

Transactions + Analysis
directly in-memory

On all DB platforms, functionality is equal, but performance is different

© 2013 SAP AG. All rights reserved.

Customer

12
SAP Portfolio and Project Management
Scope PPM 6.0
Optimization for Project Management
• Faster access to information

SAP
Business Suite

Apps
BW

VDL
PPM
SRM
SCM
CRM
ERP

•
•

Project Dashboard
Task Dashboard

•

Update multiple Tasks
• Search
• Evaluations and Thresholds

HANA DB

Optimization for Portfolio Management
• Faster access to information
•
•

Apps
BW

SAP PPM

HANA DB

© 2013 SAP AG. All rights reserved.

Item and Initiative Dashboards
Metrics

•
•

Financial and Capacity Planning
Bucket Rollup
• Authorization Checks
Archiving for Portfolio Objects
Enhanced calculation for Financial KPIs
Customer

13
Performance Optimizations
PPM 5.0

User Interface

ABAP
Application
Server

PPM 6.0 – Ways of performance optimizations

User Interface

User Interface

ABAP
Opt.
Application
ABAP
Server
Code

ABAP
Application
Server

User Interface

ABAP
Application
Server

Views
HANA

Any DB

© 2013 SAP AG. All rights reserved.

Stored
Procedures
HANA

Any DB

Customer

14
HANA Optimization via Code Switch
User Interface

ABAP code contains switches to
call HANA specific logic in case A
HANA DB is installed

ABAP Application Server
IF DB=HANA
YES
HANA
specific
Logic

NO
Any DB
Logic (via
OpenSQL)

Business logic is the same – no
functional differences!
Two ways of optimizing via HANA
HANA Views
 Combines accesses to different tables
into a single view
 Includes calculations previously done in
ABAP, e.g. aggregations

HANA Stored Procedures
Views,
Stored Procedures

 Sophisticated scripts with business logic
transferred from ABAP to the database
layer

HANA
© 2013 SAP AG. All rights reserved.

Customer

15
Customer Example – Automotive Industry
Performance Results
Customer leveraging SAP HANA in a SAP Portfolio and Project Management
scenario
•

Project Management for R&D projects

•

Customer system contains approx. 8.000.000 project tasks

•

15.000 users using the system for confirmation of tasks
Open Task
Dashboard

Set Task
Status

Open Task

Save Tasks

Small Dashboard Large Dashboard XL Dashboard
(25 tasks)
(1500 tasks)
(~6400 tasks)

Before

30,4 s

86,3 s

timeout

Today

4,9 s

6,7s

10,2

Improvement

84%

92%

© 2013 SAP AG. All rights reserved.

Customer

16
Agenda

•

PPM 6.0 Timeline and Scope

•

Performance Optimizations HANA-specific and non-HANA

•

New financial KPIs for SAP Portfolio Management

•

Change calculation of Financial Planning Data during roll up

•

Integration and Object Links
• Integration to SAP‘s Environmental Compliance

•

Activated Switched in 6.0 Standard

•

Archiving and ILM Enablement

© 2013 SAP AG. All rights reserved.

Customer

17
Overview

© 2013 SAP AG. All rights reserved.

Customer

18
Overview

© 2013 SAP AG. All rights reserved.

Customer

19
Bussines Context

© 2013 SAP AG. All rights reserved.

Customer

20
Benefits

© 2013 SAP AG. All rights reserved.

Customer

21
Fact Sheet

© 2013 SAP AG. All rights reserved.

Customer

22
Business Case in Portfolio Item
Revenues

Visualization of Planned/Actual Revenues on Financial Information tab
-

Planned Revenue (Total/YTD)

-

Actual Revenue (Total/YTD)
© 2013 SAP AG. All rights reserved.

Customer

23
Business Case in Portfolio Item
KPIs

N:

Total number of periods

i:

Discount rate (constant)

t:

Period the cashflow occurs

R(t): Net cashflow (revenue ./.
cost) in period t
NPV Calculation:
-

Based on Planned Values -> Planned NPV

-

Start Period = Planned Start of the Item

-

Discount Rate = defined in customizing (time dependent)

-

Calculation can be deactivated or adjusted via BADI method
© 2013 SAP AG. All rights reserved.

Customer

24
Enhanced Calculation for Financial KPIs
Portfolio Item and Initiative
Aggregated Values for
-

Planned
Revenue(Total/YTD)

-

Actual Revenue(Total/YTD)

based on Financial Planning
Calculation of
-

NPV

-

ROI

-

IRR

-

Payback Period

-

ECV

based on Financial Planning

© 2013 SAP AG. All rights reserved.

Customer

25
Agenda

•

PPM 6.0 Timeline and Scope

•

Performance Optimizations HANA-specific and non-HANA

•

New financial KPIs for SAP Portfolio Management

•

Change calculation of Financial Planning Data during roll up

•

Integration and Object Links
• Integration to SAP‘s Environmental Compliance

•

Activated Switched in 6.0 Standard

•

Archiving and ILM Enablement

© 2013 SAP AG. All rights reserved.

Customer

26
Changed Currency Conversion Logic (1/2)

© 2013 SAP AG. All rights reserved.

Customer

27
Changed Currency Conversion Logic (2/2)

© 2013 SAP AG. All rights reserved.

Customer

28
Agenda

•

PPM 6.0 Timeline and Scope

•

Performance Optimizations HANA-specific and non-HANA

•

New financial KPIs for SAP Portfolio Management

•

Change calculation of Financial Planning Data during roll up

•

Integration and Object Links
• Integration to SAP‘s Environmental Compliance

•

Activated Switched in 6.0 Standard

•

Archiving and ILM Enablement

© 2013 SAP AG. All rights reserved.

Customer

29
Overview

© 2013 SAP AG. All rights reserved.

Customer

30
Business Context

© 2013 SAP AG. All rights reserved.

Customer

31
Business Context

© 2013 SAP AG. All rights reserved.

Customer

32
Benefits

© 2013 SAP AG. All rights reserved.

Customer

33
Energy and Environmental Initiative Management
Manage, prioritize and execute on a large portfolio of efficiency initiatives

Portfolio Evaluations

Project Execution

 Describe capex and resource savings
 Dynamic calculation of cashflows, NPV, IRR and
Payback period with time dependent interest rates
 Compare and prioritize initiatives
 Orchestrate management approvals and budget
releases

 Manage tasks, roles, project budgets, etc.
 Compare planned with real impact on resource and
financial savings
 Sharing and collaborating on Best Practices

© 2013 SAP AG. All rights reserved.

Customer

34
Agenda

•

PPM 6.0 Timeline and Scope

•

Performance Optimizations HANA-specific and non-HANA

•

New financial KPIs for SAP Portfolio Management

•

Change calculation of Financial Planning Data during roll up

•

Integration and Object Links
• Integration to SAP‘s Environmental Compliance

•

Activated Switched in 6.0 Standard

•

Archiving and ILM Enablement

© 2013 SAP AG. All rights reserved.

Customer

35
Overview on Activated Switches

© 2013 SAP AG. All rights reserved.

Customer

36
Improvements Without Activation Badl or Switch

© 2013 SAP AG. All rights reserved.

Customer

37
Agenda

•

PPM 6.0 Timeline and Scope

•

Performance Optimizations HANA-specific and non-HANA

•

New financial KPIs for SAP Portfolio Management

•

Change calculation of Financial Planning Data during roll up

•

Integration and Object Links
• Integration to SAP‘s Environmental Compliance

•

Activated Switched in 6.0 Standard

•

Archiving and ILM Enablement

© 2013 SAP AG. All rights reserved.

Customer

38
Overview: Archiving in Portfolio Management PPM 6.0

© 2013 SAP AG. All rights reserved.

Customer

39
Overview: ILM Enablement in PPM 6.0

© 2013 SAP AG. All rights reserved.

Customer

40
Business Context: Archiving in PPM 6.0

© 2013 SAP AG. All rights reserved.

Customer

41
Business Context: ILM Enablement in PPM 6.0

© 2013 SAP AG. All rights reserved.

Customer

42
Benefits of Archiving in PPM 6.0

© 2013 SAP AG. All rights reserved.

Customer

43
Benefits of ILM Enablement in SAP PPM 6.0

© 2013 SAP AG. All rights reserved.

Customer

44
Thank you!

Contact information:
Eddi Biasotto
Solution Management
Eddi.biasotto@espedia.it

SAP PPM 6.0 powered by HANA

  • 1.
    SAP Portfolio andProject Management 6.0 February 25th 2014 Eddi Biasotto
  • 2.
    Agenda • PPM 6.0 Timelineand Scope • Performance Optimizations HANA-specific and non-HANA • New financial KPIs for SAP Portfolio Management • Change calculation of Financial Planning Data during roll up • Integration and Object Links • Integration to SAP‘s Environmental Compliance • Activated Switched in 6.0 Standard • Archiving and ILM Enablement © 2013 SAP AG. All rights reserved. Customer 2
  • 3.
    Overview of SAProadmap for EPPM SAP Commercial Project Management 1.0 RDS (R&D,IT,Capex,Analytics) Portfolio Management SAP PPM 6.0 on HANA Resource Management Project Management SAP PS on HANA Idea Management* Project Connection Mobile Scenarios PPM IT in Solution Manager Social Collaboration* Solution today *Consulting Solution © 2013 SAP AG. All rights reserved. Planned innovations Future direction Innovation covered in this session Customer 3
  • 4.
    SAP Portfolio andProject Management powered by HANA Analytics Mobile Database & Technology
  • 5.
    Product Evolution forSAP PPM SAP Portfolio and Project Management SAP Portfolio and Project Management 5.0 SAP RPM 4.0 SAP RPM 4.5 SAP Portfolio and Project Management 5.0 SAP Portfolio and Project Management 6.0 SAP Portfolio and Project Management 6.x Customer Connection PPM on HANA PPM on HANA cProjects 4.0/4.5 SAP Enterprise Project Connection 1.0 SAP Enterprise Project Connection 2.0 SAP Enterprise Project Connection 2.0 SAP Enterprise Project Connection 2.0 SAP Project System SAP ERP Project System SAP ERP Project System SAP ERP Project System SAP ERP Project System Business Suite on HANA Business Suite on HANA Business Suite on HANA 2008 © 2013 SAP AG. All rights reserved. 2010 2012 2013 2014 Customer 5
  • 6.
    Customer Engagement Initiative PainPoints (Customer input) Focus for PPM 6.0 for project, task, item and initiative dashboards Dashboards - Performance of project/item/initiative Dashboards for large portfolios - Adding of additional information (e.g. from accounting, Project System or PLM) not possible due to performance impact - Authorization checks impact performance Acceleration of Authorization checks in dashboards Extraction of Integration Data: - Runtime Extraction and Rollup Rollup: Planned enhancements for Financial and Capacity Rollup in Portfolio Reporting Realtime Analytics for - PPM and Integration data - Cross-Project and Portfolio reports currently not possible due to performance impact © 2013 SAP AG. All rights reserved. Customer 6
  • 7.
    Agenda • PPM 6.0 Timelineand Scope • Performance Optimizations HANA-specific and non-HANA • New financial KPIs for SAP Portfolio Management • Change calculation of Financial Planning Data during roll up • Integration and Object Links • Integration to SAP‘s Environmental Compliance • Activated Switched in 6.0 Standard • Archiving and ILM Enablement © 2013 SAP AG. All rights reserved. Customer 7
  • 8.
    Challenges in Portfolioand Project Management Portfolio Management Project Management Resource Management Do the right things Do the things right Do more with less Increasing number of projects/proposals Increased complexity due to business requirements including constant change requests Limited availabiliity of resources requires efficient search for resources Decision Makers require Intuitive realtime analytics that trigger alerts Efficient response to issues requires detailed information from source systems © 2013 SAP AG. All rights reserved. Increasing number of tasks Change requests force project leads to simulate impact quickly Customer 8
  • 9.
    SAP’s In-Memory DataManagement innovation Providing real-time platform for enterprise applications A common Database Approach for OLTP and OLAP Using an In-Memory Column Database Hasso Plattner VS Transact © 2013 SAP AG. All rights reserved. Analyze Accelerate Transactions + Analysis directly in-memory Customer 9
  • 10.
    Challenges in SAPPPM today when reporting OLAP Financials(CO/PS) aggregate SAP PPM Portfolio Data Extract Project Data Resources (HR) + Aggregated Information from Core Systems Enrich data from Core Systems SAP PPM + SAP PS/CO + SAP PLM Lack of granularity in reporting …(PLM, CATS, PM…) © 2013 SAP AG. All rights reserved. Customer 10
  • 11.
    Leveraging SAP HANAin PPM Realtime Reporting based on System information directly in PPM Virtual Data Models powered by SAP HANA Virtual Data Model Project System © 2013 SAP AG. All rights reserved. Virtual Data Model Portfolio and Project Management Virtual Data Model Virtual Data Model CO PLM Customer 11
  • 12.
    SAP Portfolio andProject Management 6.0 At a Glance Why a release dedicated to performance? • Make SAP Portfolio and Project Management ready for SAP‘s strategic innovation platform SAP HANA • Optimize code to handle more data and avoid performance bottle necks • SAP HANA can help speed up interactive analysis of project portfolios What are the consequences for customers? • SAP Portf. and Proj. Mgmt 6.0 is a normal release running on both standard relational databases and SAP HANA • All customers can upgrade to PPM 6.0 • Transactions + Analysis directly in-memory On all DB platforms, functionality is equal, but performance is different © 2013 SAP AG. All rights reserved. Customer 12
  • 13.
    SAP Portfolio andProject Management Scope PPM 6.0 Optimization for Project Management • Faster access to information SAP Business Suite Apps BW VDL PPM SRM SCM CRM ERP • • Project Dashboard Task Dashboard • Update multiple Tasks • Search • Evaluations and Thresholds HANA DB Optimization for Portfolio Management • Faster access to information • • Apps BW SAP PPM HANA DB © 2013 SAP AG. All rights reserved. Item and Initiative Dashboards Metrics • • Financial and Capacity Planning Bucket Rollup • Authorization Checks Archiving for Portfolio Objects Enhanced calculation for Financial KPIs Customer 13
  • 14.
    Performance Optimizations PPM 5.0 UserInterface ABAP Application Server PPM 6.0 – Ways of performance optimizations User Interface User Interface ABAP Opt. Application ABAP Server Code ABAP Application Server User Interface ABAP Application Server Views HANA Any DB © 2013 SAP AG. All rights reserved. Stored Procedures HANA Any DB Customer 14
  • 15.
    HANA Optimization viaCode Switch User Interface ABAP code contains switches to call HANA specific logic in case A HANA DB is installed ABAP Application Server IF DB=HANA YES HANA specific Logic NO Any DB Logic (via OpenSQL) Business logic is the same – no functional differences! Two ways of optimizing via HANA HANA Views  Combines accesses to different tables into a single view  Includes calculations previously done in ABAP, e.g. aggregations HANA Stored Procedures Views, Stored Procedures  Sophisticated scripts with business logic transferred from ABAP to the database layer HANA © 2013 SAP AG. All rights reserved. Customer 15
  • 16.
    Customer Example –Automotive Industry Performance Results Customer leveraging SAP HANA in a SAP Portfolio and Project Management scenario • Project Management for R&D projects • Customer system contains approx. 8.000.000 project tasks • 15.000 users using the system for confirmation of tasks Open Task Dashboard Set Task Status Open Task Save Tasks Small Dashboard Large Dashboard XL Dashboard (25 tasks) (1500 tasks) (~6400 tasks) Before 30,4 s 86,3 s timeout Today 4,9 s 6,7s 10,2 Improvement 84% 92% © 2013 SAP AG. All rights reserved. Customer 16
  • 17.
    Agenda • PPM 6.0 Timelineand Scope • Performance Optimizations HANA-specific and non-HANA • New financial KPIs for SAP Portfolio Management • Change calculation of Financial Planning Data during roll up • Integration and Object Links • Integration to SAP‘s Environmental Compliance • Activated Switched in 6.0 Standard • Archiving and ILM Enablement © 2013 SAP AG. All rights reserved. Customer 17
  • 18.
    Overview © 2013 SAPAG. All rights reserved. Customer 18
  • 19.
    Overview © 2013 SAPAG. All rights reserved. Customer 19
  • 20.
    Bussines Context © 2013SAP AG. All rights reserved. Customer 20
  • 21.
    Benefits © 2013 SAPAG. All rights reserved. Customer 21
  • 22.
    Fact Sheet © 2013SAP AG. All rights reserved. Customer 22
  • 23.
    Business Case inPortfolio Item Revenues Visualization of Planned/Actual Revenues on Financial Information tab - Planned Revenue (Total/YTD) - Actual Revenue (Total/YTD) © 2013 SAP AG. All rights reserved. Customer 23
  • 24.
    Business Case inPortfolio Item KPIs N: Total number of periods i: Discount rate (constant) t: Period the cashflow occurs R(t): Net cashflow (revenue ./. cost) in period t NPV Calculation: - Based on Planned Values -> Planned NPV - Start Period = Planned Start of the Item - Discount Rate = defined in customizing (time dependent) - Calculation can be deactivated or adjusted via BADI method © 2013 SAP AG. All rights reserved. Customer 24
  • 25.
    Enhanced Calculation forFinancial KPIs Portfolio Item and Initiative Aggregated Values for - Planned Revenue(Total/YTD) - Actual Revenue(Total/YTD) based on Financial Planning Calculation of - NPV - ROI - IRR - Payback Period - ECV based on Financial Planning © 2013 SAP AG. All rights reserved. Customer 25
  • 26.
    Agenda • PPM 6.0 Timelineand Scope • Performance Optimizations HANA-specific and non-HANA • New financial KPIs for SAP Portfolio Management • Change calculation of Financial Planning Data during roll up • Integration and Object Links • Integration to SAP‘s Environmental Compliance • Activated Switched in 6.0 Standard • Archiving and ILM Enablement © 2013 SAP AG. All rights reserved. Customer 26
  • 27.
    Changed Currency ConversionLogic (1/2) © 2013 SAP AG. All rights reserved. Customer 27
  • 28.
    Changed Currency ConversionLogic (2/2) © 2013 SAP AG. All rights reserved. Customer 28
  • 29.
    Agenda • PPM 6.0 Timelineand Scope • Performance Optimizations HANA-specific and non-HANA • New financial KPIs for SAP Portfolio Management • Change calculation of Financial Planning Data during roll up • Integration and Object Links • Integration to SAP‘s Environmental Compliance • Activated Switched in 6.0 Standard • Archiving and ILM Enablement © 2013 SAP AG. All rights reserved. Customer 29
  • 30.
    Overview © 2013 SAPAG. All rights reserved. Customer 30
  • 31.
    Business Context © 2013SAP AG. All rights reserved. Customer 31
  • 32.
    Business Context © 2013SAP AG. All rights reserved. Customer 32
  • 33.
    Benefits © 2013 SAPAG. All rights reserved. Customer 33
  • 34.
    Energy and EnvironmentalInitiative Management Manage, prioritize and execute on a large portfolio of efficiency initiatives Portfolio Evaluations Project Execution  Describe capex and resource savings  Dynamic calculation of cashflows, NPV, IRR and Payback period with time dependent interest rates  Compare and prioritize initiatives  Orchestrate management approvals and budget releases  Manage tasks, roles, project budgets, etc.  Compare planned with real impact on resource and financial savings  Sharing and collaborating on Best Practices © 2013 SAP AG. All rights reserved. Customer 34
  • 35.
    Agenda • PPM 6.0 Timelineand Scope • Performance Optimizations HANA-specific and non-HANA • New financial KPIs for SAP Portfolio Management • Change calculation of Financial Planning Data during roll up • Integration and Object Links • Integration to SAP‘s Environmental Compliance • Activated Switched in 6.0 Standard • Archiving and ILM Enablement © 2013 SAP AG. All rights reserved. Customer 35
  • 36.
    Overview on ActivatedSwitches © 2013 SAP AG. All rights reserved. Customer 36
  • 37.
    Improvements Without ActivationBadl or Switch © 2013 SAP AG. All rights reserved. Customer 37
  • 38.
    Agenda • PPM 6.0 Timelineand Scope • Performance Optimizations HANA-specific and non-HANA • New financial KPIs for SAP Portfolio Management • Change calculation of Financial Planning Data during roll up • Integration and Object Links • Integration to SAP‘s Environmental Compliance • Activated Switched in 6.0 Standard • Archiving and ILM Enablement © 2013 SAP AG. All rights reserved. Customer 38
  • 39.
    Overview: Archiving inPortfolio Management PPM 6.0 © 2013 SAP AG. All rights reserved. Customer 39
  • 40.
    Overview: ILM Enablementin PPM 6.0 © 2013 SAP AG. All rights reserved. Customer 40
  • 41.
    Business Context: Archivingin PPM 6.0 © 2013 SAP AG. All rights reserved. Customer 41
  • 42.
    Business Context: ILMEnablement in PPM 6.0 © 2013 SAP AG. All rights reserved. Customer 42
  • 43.
    Benefits of Archivingin PPM 6.0 © 2013 SAP AG. All rights reserved. Customer 43
  • 44.
    Benefits of ILMEnablement in SAP PPM 6.0 © 2013 SAP AG. All rights reserved. Customer 44
  • 45.
    Thank you! Contact information: EddiBiasotto Solution Management Eddi.biasotto@espedia.it