Operating	
  Systems	
  and	
  Technologies	
  
Introduction	
  	
  
	
  
Operating	
  System	
  viewpoints:	
  	
  
>User	
  View	
  	
  
>High	
  Level	
  View	
  (System	
  view)	
  
	
  
>User	
  View	
  
         -­‐Varies	
  interface	
  being	
  used.	
  
         If	
  a	
  personal	
  computer	
  	
  
	
       -­‐Easy	
  to	
  use	
  	
  
         -­‐High	
  performance	
  without	
  regard	
  to	
  the	
  effectiveness	
  of	
  the	
  system	
  is	
  low	
  or	
  not.	
  
         If	
  the	
  computer	
  connects	
  Internet	
  is	
  called	
  network	
  system	
  	
  
	
       -­‐Requires	
  sharing	
  of	
  system	
  resources	
  and	
  exchanging	
  information	
  between	
  them.	
  
	
       	
  
	
       The	
  operating	
  system	
  much	
  is	
  designed	
  system	
  resources	
  such	
  as	
  CPU,	
  I/O	
  devices	
  are	
  
used	
  most	
  effective.	
  
	
  
>High	
  Level	
  View	
  (System	
  view)	
  
	
       -­‐Resources	
  allocate	
  
	
       	
           Computer	
  system	
  has	
  many	
  resources	
  such	
  as	
  CPU	
  time,	
  memory	
  space,	
  file	
  
storage	
  space,	
  I/O	
  devices	
  that	
  may	
  required	
  to	
  solve	
  the	
  problem	
  
	
       -­‐Program	
  controller	
  	
  
	
       	
           Control	
  devices	
  –	
  transmit	
  information,	
  manage	
  the	
  execution	
  of	
  user	
  programs	
  
to	
  prevent	
  errors	
  and	
  improper	
  use	
  of	
  the	
  computer.	
  



       Input	
                                            Computer	
                                                 Output	
  
                                                                                                                                         	
  
Computer	
  system	
  –	
  overview	
  	
  
-­‐Motherboard	
  	
  
Motherboard	
  is	
  the	
  main	
  circuit	
  board	
  in	
  a	
  computer,	
  provides	
  a	
  way	
  for	
  hardware	
  in	
  a	
  
computer	
  to	
  communicate	
  with	
  each	
  other.	
  
-­‐Interconnect	
  between	
  computer	
  components	
  
                                                              	
  
       I/O	
                               CPU	
  
                                                              	
  
                                                              	
  
                                                              	
  
                          Memory	
  
	
  
                                                                                                                                                1	
  
-­‐CPU	
  Organization	
  
The	
  central	
  processing	
  unit	
  (CPU)	
  is	
  the	
  portion	
  of	
  a	
  computer	
  system	
  that	
  carries	
  out	
  the	
  
instructions	
  of	
  a	
  computer	
  program,	
  to	
  perform	
  the	
  basic	
  arithmetical,	
  logical,	
  and	
  
input/output	
  operations	
  of	
  the	
  system	
  
-­‐Memory	
  
Memory	
  is	
  an	
  organism's	
  ability	
  to	
  store,	
  retain,	
  and	
  recall	
  information	
  and	
  experiences	
  
-­‐Input/Output	
  	
  
Communication	
  between	
  an	
  information	
  processing	
  system	
  (such	
  as	
  a	
  computer),	
  and	
  the	
  
outside	
  world,	
  possibly	
  a	
  human,	
  or	
  another	
  information	
  processing	
  system.	
  Inputs	
  are	
  the	
  
signals	
  or	
  data	
  received	
  by	
  the	
  system,	
  and	
  outputs	
  are	
  the	
  signals	
  or	
  data	
  sent	
  from	
  it.	
  
	
  
	
  
Computer	
  System	
  Hierarchy	
  
                                            Electonic	
  
                                             Signal	
  
                                            Machine	
  
                                              code	
  
                                   Assembly	
  Language	
  

                                     Operating	
  System	
  

                                   High	
  Level	
  Language	
  

                                  Application	
  Software	
  	
  
                                                                                                       	
  
	
  
	
  
                                                	
  User	
  
	
  
	
  
A	
  brief	
  history	
  of	
  computers	
  
-­‐The	
  first	
  generation	
  –	
  Vacuum	
  Tubes	
  
-­‐The	
  second	
  generation	
  –	
  Transistors	
  
-­‐The	
  third	
  generation	
  –	
  Integrated	
  circuit	
  
-­‐The	
  fourth	
  generation	
  –	
  VLSI	
  
	
  
The	
  first	
  Generation	
  -­‐	
  Vacuum	
  Tubes	
  (1945	
  -­‐1955)	
  
ENIAC	
  (1943	
  -­‐	
  1946)	
  
                          • 	
  Intended	
  for	
  calculating	
  range	
  tables	
  of	
  aiming	
  artillery	
  
                          • 	
  Consisted	
  of	
  18000	
  tubes,	
  1500	
  relays,	
  weight	
  30	
  tons,	
  consumed	
  140	
  KW	
  

	
  
                                                                                                                                                2	
  
• 	
  Decimal	
  machine	
  
                   • 	
  Each	
  digit	
  represented	
  by	
  a	
  ring	
  of	
  10	
  vacuum	
  tubes.	
  
                   • Programmed	
  with	
  multi-­‐position	
  switches	
  and	
  jumper	
  cables.	
  
John	
  von	
  Neumann	
  (1945	
  -­‐1952)	
  more	
  lately	
  …	
  
                   • 	
  Originally	
  a	
  member	
  of	
  the	
  ENIAC	
  development	
  team.	
  
                   • 	
  First	
  to	
  use	
  binary	
  arithmetic	
  
                   • 	
  Architecture	
  consists	
  of:	
  Memory,	
  ALU,	
  Program	
  control,	
  Input,	
  Output	
  
                   • 	
  Stored-­‐program	
  concept	
  -­‐	
  main	
  memory	
  store	
  both	
  data	
  and	
  instructions	
  
	
  
The	
  Second	
  Generation	
  -­‐	
  Transistors	
  (1955	
  -­‐1965)	
  
Transistors	
  
                  • 	
  Transistor	
  was	
  invented	
  in	
  1948	
  at	
  Bell	
  Labs	
  
                  • 	
  DEC	
  PDP-­‐1,	
  first	
  affordable	
  microcomputer	
  ($120k),	
  performance	
  half	
  that	
  of	
  	
  
	
  	
  IBM	
  7090	
  (the	
  fastest	
  computer	
  in	
  the	
  world	
  at	
  that	
  time,	
  which	
  cost	
  millions)	
  
                  • 	
  PDP-­‐8,	
  cheap	
  ($16,000),	
  the	
  first	
  to	
  use	
  single	
  bus	
  
CDC	
  6600	
  (1964)	
  
                  • 	
  An	
  order	
  of	
  magnitude	
  faster	
  than	
  the	
  mighty	
  IBM	
  7094	
  
                  • 	
  First	
  highly	
  parallelized	
  machine	
  (up	
  to	
  10	
  instructions	
  in	
  parallel)	
  
Burroughs	
  B5000	
  
                  • 	
  First	
  to	
  emphasise	
  software	
  and	
  high	
  level	
  programming	
  languages	
  (Algol	
  60)	
  
	
  
The	
  Third	
  Generation	
  -­‐	
  Integrated	
  Circuits	
  (1965	
  -­‐1980)	
  
                •    	
  IBM	
  System/360	
  
                •    	
  Family	
  of	
  machines	
  with	
  same	
  assembly	
  language	
  
                •    	
  Designed	
  for	
  both	
  scientific	
  and	
  commercial	
  computing	
  
                •    	
  DEC	
  PDP-­‐11	
  
                •    	
  Very	
  popular	
  with	
  universities,	
  maintained	
  DEC's	
  lead	
  in	
  microcomputer	
  market	
  
             	
  
The	
  Fourth	
  Generation	
  -­‐	
  VLSI	
  (1980	
  -­‐	
  ?)	
  
                • 	
  Lead	
  to	
  PC	
  revolution	
  
                • 	
  High	
  performance,	
  low	
  cost	
  
	
  
Moore’s	
  Law	
  	
  
       • Transistor	
  density	
  on	
  a	
  microprocessor	
  will	
  double	
  every	
  18	
  to	
  24	
  months	
  
       • Computer	
  will	
  double	
  in	
  power	
  roughly	
  every	
  two	
  years,	
  but	
  cost	
  only	
  half	
  as	
  much	
  
	
  
Technology	
  Trends	
  
Processor	
  
        – Logic	
  Capacity	
  increases	
  about	
  30%	
  per	
  year	
  	
  

	
  
                                                                                                                                           3	
  
– Performance	
  increases	
  about	
  50%	
  per	
  year	
  (2x	
  every	
  1.5	
  years)	
  
Memory	
  (DRAM)	
  
                – Capacity	
  increases	
  about	
  60%	
  per	
  year	
  (4x	
  every	
  3	
  years)	
  
                – Performance	
  increases	
  3.4%	
  per	
  year	
  
Disk	
  
                – Capacity	
  increases	
  60%	
  per	
  year	
  
                – Performance	
  increases	
  3.4%	
  per	
  year	
  
Network	
  Bandwidth	
  
                – Bandwidth	
  increasing	
  more	
  than	
  100%	
  per	
  year!	
  
	
  
The	
  IAS	
  (von	
  Neumann)	
  Machine	
  
	
  *Key	
  concepts	
  of	
  von	
  Neumann	
  architecture	
  include	
  
-­‐Stored	
  program	
  concept	
  
-­‐Binary	
  representation	
  is	
  the	
  basis	
  for	
  storing	
  data	
  in	
  computer	
  memory	
  
-­‐Memory	
  is	
  addressed	
  linearly	
  
-­‐Memory	
  addressed	
  by	
  the	
  location	
  number	
  without	
  regard	
  to	
  the	
  contents	
  
-­‐Instructions	
  executed	
  in	
  sequence	
  unless	
  an	
  instruction	
  or	
  outside	
  events	
  cause	
  branch	
  
	
  
Main	
  memory	
  storing	
  programs	
  and	
  data	
  –	
  1000	
  storage	
  locations	
  
ALU	
  operating	
  on	
  binary	
  data	
  
Control	
  unit	
  interpreting	
  instructions	
  from	
  memory	
  and	
  executing	
  
Input	
  and	
  output	
  equipment	
  operated	
  by	
  control	
  unit	
  
	
  
Almost	
  all	
  of	
  today’s	
  computers	
  have	
  the	
  same	
  general	
  structure	
  as	
  the	
  IAS	
  -­‐	
  referred	
  to	
  as	
  	
  
von	
  Neumann	
  machines.	
  
	
  
The	
  structure	
  of	
  IAS	
                                   computer	
  
                              	
         Arithmetic	
  
      	
                                 And	
                                         	
           	
  
      	
                                 Logic	
  Unit	
                               	
  
      	
                                                                               	
           	
  
      Input	
                                                                          Main	
  	
   	
  
      Output	
                	
                                                       Memory	
  
      Equipment	
             	
  
                              	
        Program	
  	
  
                              	
        Control	
  Unit	
  
                              	
  
	
  
Some	
  Observations	
  Regarding	
  Computer	
  Architecture	
  
        • Between	
  1945	
  and	
  1951,	
  von	
  Neumann	
  architecture	
  
        • Other	
  experimental	
  architectures	
  have	
  been	
  developed	
  and	
  built	
  
        • von	
  Neumann	
  architecture	
  continues	
  to	
  be	
  the	
  standard	
  architecture	
  for	
  computer	
  
	
  
                                                                                                                                                        4	
  
• No	
  other	
  architecture	
  has	
  had	
  any	
  commercial	
  success	
  so	
  far	
  
       • It	
  is	
  significant	
  that	
  in	
  a	
  field	
  where	
  technological	
  changes	
  happens	
  almost	
  overnight,	
  
         the	
  architecture	
  of	
  computers	
  is	
  virtually	
  unchanged	
  since	
  1951	
  
	
  
How	
  Does	
  a	
  Computer	
  Work?	
  
Hardware	
  needs	
  software	
  
     • Software	
  is	
  a	
  program	
  that	
  consists	
  of	
  a	
  series	
  of	
  instructions	
  (and	
  data)	
  for	
  performing	
  
          some	
  designated	
  tasks.	
  
     • CPU	
  runs	
  a	
  program	
  by	
  executing	
  the	
  instructions	
  one	
  by	
  one.	
  	
  
     • A	
  program	
  is	
  stored	
  in	
  the	
  main	
  memory	
  when	
  it	
  is	
  executed.	
  
	
  
	
  
Five	
  Classic	
  Components	
  of	
  a	
  Computer	
  
             *Control	
  gives	
  directions	
  to	
  the	
  other	
  	
  	
  	
  	
  	
  	
  
             components	
  
             – Examples:	
  	
  Bus	
  controller,	
  memory	
  
                    management	
  unit	
  
             *Datapath	
  performs	
  arithmetic	
  and	
  logic	
  operations	
  	
  
             – Examples:	
  	
  Adders,	
  multipliers,	
  shifters	
  
             Memory	
  holds	
  data	
  and	
  instructions	
  
             – Examples:	
  	
  Cache,	
  main	
  memory,	
  disk	
  
	
           Input	
  writes	
  data	
  to	
  the	
  computer	
  (memory)	
  
             – Examples:	
  	
  Keyboard,	
  mouse,	
  joystick	
  
             Output	
  reads	
  data	
  from	
  the	
  computer	
  
             – Examples:	
  	
  Monitor,	
  sound	
  card	
  
	
  
The	
  Little	
  Man	
  Computer	
  (LMC):	
  Physical	
  Layout	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
                                                                                                                                             5	
  
• Computer	
  simulator	
  
       • 100	
  mailboxes	
  
             – address	
  00	
  -­‐	
  99	
  
             – Each	
  holds	
  3-­‐digit	
  decimal	
  number	
  
       • Calculator	
  
             – Enter	
  number	
  
             – Temporarily	
  hold	
  number	
  	
  
             – Add	
  and	
  Subtraction	
  
             – Display	
  3	
  digits	
  
       • Hand	
  counter	
  
             – Reset	
  button	
  
             – Instruction	
  counter	
  
       • Little	
  Man	
  
       • In/Out	
  Basket	
  
	
  
The	
  Little	
  Man	
  Computer:	
  Communication	
  with	
  outside	
  World	
  
>A	
  user	
  outside	
  the	
  mailroom	
  communicate	
  with	
  the	
  little	
  man	
  by	
  
                – Putting	
  a	
  3-­‐digit	
  into	
  the	
  in	
  basket	
  
                – Retrieving	
  a	
  3-­‐digit	
  from	
  the	
  out	
  basket	
  
>Apart	
  from	
  the	
  reset	
  button,	
  all	
  communication	
  between	
  the	
  LMC	
  and	
  the	
  outside	
  world	
  
takes	
  place	
  using	
  3-­‐digit	
  numbers	
  
	
  
The	
  Little	
  Man	
  Computer:	
  Operation	
  
      • A	
  small	
  group	
  of	
  instructions,	
  each	
  consists	
  of	
  a	
  single	
  digit	
  
      • The	
  first	
  digit	
  of	
  a	
  3-­‐digit	
  number	
  is	
  used	
  to	
  tell	
  the	
  Little	
  Man	
  which	
  operation	
  to	
  
         perform.	
  	
  
      • In	
  some	
  cases,	
  the	
  Little	
  Man	
  is	
  required	
  to	
  use	
  a	
  particular	
  mailbox	
  to	
  store	
  or	
  retrieve	
  
         data	
  
      • The	
  3	
  digits	
  can	
  be	
  used	
  to	
  give	
  instructions	
  to	
  the	
  Little	
  Man	
  according	
  to	
  Operation	
  
         Code	
  (Op-­‐Code)	
  
         3	
  instruction	
   25	
  mailbox	
  
                                       address	
  
         Operation	
  Code	
  	
  (Op-­‐Code)	
  
         	
  
The	
  Little	
  Man	
  Computer:	
  Instruction	
  Set	
  
           FORMAT	
                   	
  MEANING	
  
           000	
                      Stops	
  the	
  Computer	
  -­‐	
  the	
  Little	
  Man	
  rests.	
  
           1xx	
                      Adds	
  the	
  contents	
  of	
  mailbox	
  xx	
  to	
  the	
  calculator	
  display.	
  


	
  
                                                                                                                                                     6	
  
2xx	
                        Subtracts	
  the	
  contents	
  of	
  mailbox	
  xx	
  from	
  the	
  calculator	
  display.	
  
          3xx	
                        Stores	
  the	
  calculator	
  value	
  into	
  mailbox	
  xx.	
  
          4xx	
                        Stores	
  the	
  address	
  portion	
  of	
  the	
  calculator	
  value	
  (last	
  2	
  digits)	
  into	
  the	
  
                                       address	
  portion	
  of	
  the	
  instruction	
  in	
  mailbox	
  xx.	
  
          5xx	
                        Loads	
  the	
  contents	
  of	
  mailbox	
  xx	
  into	
  the	
  calculator.	
  
          6xx	
                        This	
  instruction	
  sets	
  the	
  instruction	
  counter	
  to	
  the	
  number	
  xx,	
  thus	
  
                                       effectively	
  branching	
  to	
  mailbox	
  xx	
  	
  
          7xx	
                        IF	
  the	
  calculator	
  value	
  is	
  zero,	
  THEN	
  set	
  the	
  instruction	
  counter	
  to	
  the	
  
                                       number	
  xx,	
  thus	
  effectively	
  branching	
  to	
  mailbox	
  xx.	
  	
  
          8xx	
                        IF	
  the	
  calculator	
  value	
  is	
  positive	
  (or	
  zero),	
  THEN	
  set	
  the	
  instruction	
  
                                       counter	
  to	
  the	
  number	
  xx,	
  thus	
  effectively	
  branching	
  to	
  mailbox	
  xx.	
  	
  
          901	
                        Read	
  a	
  number	
  from	
  the	
  IN	
  basket	
  and	
  key	
  it	
  into	
  the	
  calculator.	
  
          902	
                        Copy	
  the	
  number	
  in	
  the	
  calculator	
  onto	
  a	
  slip	
  of	
  paper	
  and	
  place	
  it	
  into	
  
                                       the	
  OUT	
  basket.	
  
         	
  
The	
  Little	
  Man	
  Computer:	
  Execute	
  Program	
  
         >To	
  run	
  an	
  LMC	
  program	
  we	
  must	
  carry	
  out	
  the	
  following	
  steps:	
  
       • 	
  Load	
  the	
  instructions	
  into	
  the	
  mailboxes,	
  starting	
  with	
  mailbox	
  00.	
  	
  
       • Place	
  the	
  data	
  to	
  be	
  used	
  by	
  the	
  program	
  in	
  the	
  IN	
  basket,	
  in	
  the	
  order	
  in	
  which	
  the	
  
         program	
  will	
  use	
  these	
  data.	
  	
  
       • Press	
  the	
  RESET	
  BUTTON	
  to	
  set	
  the	
  Instruction	
  Counter	
  to	
  00	
  and	
  to	
  also	
  wakeup	
  the	
  
         Little	
  Man.	
  	
  Then	
  	
  
         1.	
  The	
  Little	
  Man	
  looks	
  into	
  the	
  Instruction	
  Counter	
  
         2.	
  The	
  Little	
  Man	
  finds	
  the	
  mailbox	
  whose	
  address	
  has	
  the	
  value	
  in	
  the	
  Instruction	
  
         Counter	
  and	
  fetches	
  the	
  3-­‐digit	
  number	
  from	
  the	
  mailbox.	
  
         3.	
  The	
  Little	
  Man	
  goes	
  over	
  to	
  increase	
  the	
  instruction	
  counter	
  by	
  1	
  
         4.	
  The	
  Little	
  Man	
  executes	
  the	
  instruction	
  found	
  in	
  the	
  mailbox	
  
         5.	
  The	
  Little	
  Man	
  repeats	
  the	
  by	
  going	
  to	
  1	
  
         	
  
The	
  Little	
  Man	
  Computer:	
  Program	
  Example	
  
Write	
  a	
  LMC	
  program,	
  which	
  adds	
  two	
  numbers	
  together	
  
	
  
Mailbox	
               Code	
              Instruction	
  Description	
  
01	
               901	
                    INPUT	
  
02	
               399	
                    STORE	
  DATA	
  to	
  mailbox	
  no.	
  99	
  
03	
               INPUT	
                  ADD	
  the	
  1st	
  number	
  to	
  2nd	
  number	
  

	
  
                                                                                                                                                          7	
  
04	
                 902	
               OUTPUT	
  RESULT	
  
05	
                 000	
               The	
  Little	
  man	
  rest	
  
99	
  	
  Data	
  
	
  
The	
  Little	
  Man	
  Computer	
  (LMC)	
  -­‐	
  Three	
  main	
  aspects	
  
       1. Input/Output	
  	
  
                   • These	
  are	
  used	
  so	
  the	
  LMC	
  can	
  communicate	
  with	
  the	
  outside	
  world.	
  
       2. Central	
  Processing	
  Unit	
  	
  
                   • Contains	
  the	
  core	
  of	
  the	
  computer:	
  calculator,	
  reset	
  button,	
  instruction	
  counter	
  
                      and	
  the	
  little	
  man.	
  
       3. Memory	
  	
  
                   • The	
  mailboxes	
  from	
  00	
  -­‐	
  99	
  each	
  containing	
  one	
  3-­‐digit	
  number	
  representing	
  
                      instructions	
  or	
  data.	
  
	
  
Central	
  Processing	
  Unit	
  (CPU)	
  
CPU	
  is	
  A	
  hardware	
  device	
  (VLSI	
  chip)	
  that	
  integrates	
  millions	
  of	
  transistors	
  into	
  a	
  silicon	
  chip.	
  	
  
       • Lies	
  at	
  the	
  heart	
  of	
  a	
  computer,	
  	
  
       • 	
  Executes	
  instructions	
  of	
  a	
  program,	
  	
  
       • 	
  Controls	
  all	
  operations	
  accordingly.	
  	
  	
  	
  	
  
            	
  
CPU	
  Architecture	
  




                                                                                                                              	
  
>Arithmetic	
  Logic	
  Unit	
  (ALU)	
  
   • Arithmetic	
  Logic	
  Unit	
  (ALU):	
  primarily	
  constructed	
  by	
  logic	
  gates	
  (full	
  adders)	
  
   • It	
  performs	
  
            – Basic	
  arithmetic	
  calculations:	
  	
  
	
  
                                                                                                                                                         8	
  
 	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  e.g.	
  adding(+),	
  subtracting(-­‐),	
  multiplying(x)	
  and	
  dividing(/).	
  	
  
                                                                    – Logic	
  operations:	
  	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  e.g.	
  OR,	
  AND,	
  NOT,	
  (Left	
  or	
  Right)	
  Shift,	
  etc.	
  	
  
                       • ALU	
  gets	
  control	
  signals	
  from	
  the	
  Control	
  Unit	
  to	
  carry	
  out	
  instructions	
  one	
  by	
  one.	
  	
  
>Control	
  Unit	
  
                       • One	
  of	
  the	
  most	
  important	
  parts	
  in	
  a	
  CPU.	
  	
  
                       • Consists	
  of	
  decoding,	
  timing	
  and	
  control	
  logic	
  circuits.	
  	
  	
  
                       • Main	
  functions:	
  
                                                                    – To	
  decode	
  instructions,	
  
                                                                    – To	
  create	
  control	
  signals,	
  which	
  tell	
  the	
  ALU	
  and	
  the	
  Registers	
  how	
  to	
  operate,	
  
                                                                                 what	
  to	
  operate	
  on,	
  and	
  what	
  to	
  do	
  with	
  the	
  result.	
  	
  
                                                                    – To	
  make	
  sure	
  everything	
  happens	
  in	
  the	
  right	
  place	
  at	
  the	
  right	
  time,	
  with	
  a	
  clock.	
  
>Registers	
  
                       • A	
  mini-­‐storage	
  area	
  built	
  with	
  flip-­‐flops	
  inside	
  CPU	
  	
  
                                                                    – PC	
  (Program	
  Counter):	
  Holds	
  address	
  of	
  instruction	
  being	
  executed.	
  	
  
                                                                    – IR	
  (Instruction	
  Register):	
  Holds	
  instruction	
  while	
  it's	
  decoded/executed.	
  
                                                                    – ACC	
  (Accumulator):	
  Result	
  of	
  ALU	
  operations	
  
                                                                    – MBR	
  (Memory	
  Buffer	
  Register):	
  Temporarily	
  holds	
  the	
  instruction/data	
  fetched	
  
                                                                                 from	
  the	
  memory	
  unit.	
  
                                                                    – MAR	
  (Memory	
  Address	
  Register):	
  holds	
  address.	
  
                       • ALU	
  can	
  retrieve	
  information	
  (instruction	
  or	
  data)	
  quickly.	
  
>System	
  BUS	
  Structure	
  
	
  	
  	
  	
  	
  	
  System	
  bus	
  consists	
  of	
  3	
  functional	
  groups	
  of	
  lines:	
  
                       • Data	
  bus	
  lines	
  
                       • Control	
  bus	
  lines	
  	
  
                       • Address	
  bus	
  lines	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
Data	
  Bus	
  
                       • Bi-­‐directional	
  path	
  for	
  transmitting	
  data	
  between	
  the	
  CPU	
  and	
  memory,	
  and	
  
                                              peripherals.	
  
                       • Width	
  of	
  data	
  bus:	
  number	
  of	
  bits	
  can	
  be	
  transferred	
  at	
  a	
  time	
  
                                                                    – E.g.	
  8,	
  16,	
  32,	
  or	
  64	
  lines,	
  each	
  for	
  one	
  bit	
  binary	
  data,	
  	
  
                       • The	
  width	
  of	
  data	
  bus	
  is	
  one	
  key	
  factors	
  in	
  determining	
  overall	
  system	
  performance.	
  
	
  
                                                                                                                                                                                                       9	
  
Address	
  Bus	
  
                       • A	
  ‘road’	
  for	
  conveying	
  addresses	
  to	
  memory	
  or	
  input/	
  output	
  devices.	
  
                       • The	
  number	
  of	
  address	
  lines,	
  or	
  width,	
  determines	
  maximum	
  capacity	
  of	
  addresses	
  a	
  
                                              CPU	
  can	
  access	
  to,	
  	
  
                                              i.e.	
  N	
  lines:	
  	
  2N	
  addressable	
  memory	
  (and	
  I/O)	
  units,	
  	
  
                                              e.g.8	
  address	
  lines:	
  28	
  =	
  256	
  addresses	
  from	
  00000000	
  to	
  11111111.	
  
Control	
  Bus	
  
                       • Carries	
  signals	
  to	
  control	
  the	
  activities	
  of	
  data/instruction	
  transfers	
  (read	
  or	
  write),	
  or	
  
                                              input/output	
  devices.	
  
                       • The	
  number	
  of	
  control	
  bus	
  lines	
  varies,	
  each	
  is	
  designed	
  to	
  perform	
  a	
  specific	
  control	
  
                                              task,	
  e.g.	
  	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  RD:	
  Read	
  signal	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  WR:	
  Write	
  signal	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  CLK:	
  system	
  clock	
  signal	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  RESET:	
  reset	
  control	
  signal	
  	
  
	
  
M68000	
  CPU	
  chip	
  
                       • 64	
  connection	
  pins	
  	
  
                                                                    – 16-­‐bit	
  Data	
  Bus	
  (32-­‐bit	
  internal).	
  
                                                                    – 24-­‐bit	
  address	
  bus	
  (for	
  16	
  MB).	
  
                                                                    – 21	
  control	
  pins,	
  e.g.	
  	
  	
  	
  	
  	
  	
  	
  ,	
  Halt,	
  etc.	
  
                                                                    – 3	
  pins	
  for	
  power	
  supply:	
  Vcc,	
  GNDx2.	
  	
  
	
  
>Instruction	
  execution	
  
CPU	
  performs	
  Fetch/Decode/Execute	
  cycle:	
  
                                                                    • Fetch	
  instruction	
  from	
  primary	
  memory	
  
                                                                    • Increment	
  Program	
  Counter	
  
                                                                    • Decode	
  	
  
                                                                    • Execute	
  instruction	
  	
  
                                                                    • Write	
  result	
  to	
  memory	
  	
  
Fetch	
  Time	
  depends	
  on	
  access	
  time	
  of	
  memory	
  and	
  activity	
  on	
  Bus	
  	
  
Decode/Execute	
  Time	
  depends	
  on	
  type	
  of	
  instruction	
  
	
  
Instruction	
  Execution	
  Cycle	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
                                                                                                                                                                10	
  
Summary	
  
                       • Most	
  of	
  modern	
  computer	
  systems	
  are	
  based	
  on	
  von	
  Neumann	
  architecture	
  	
  
                       • Computer	
  components:	
  CPU,	
  Memory	
  and	
  I/O	
  devices	
  	
  
                       • BUS	
  (Control	
  bus,	
  data	
  bus	
  and	
  address	
  bus)	
  links	
  computer	
  components	
  together	
  
                       • CPU	
  (Centre	
  Processing	
  Unit):	
  the	
  brain	
  of	
  a	
  computer.	
  	
  Consists	
  of:	
  ALU	
  (Arithmetic	
  and	
  
                                              Logic	
  Unit),	
  Registers,	
  Control	
  Unit,	
  Internal	
  bus	
  and	
  Bus	
  Interface	
  Unit.	
  	
  
                       • CPU	
  instruction	
  cycle	
  includes:	
  	
  Fetch	
  →	
  Decode	
  →	
  Execute.	
  
	
  
The	
  Little	
  Man	
  Computer:	
  Exercise	
  
Write	
  a	
  LMC	
  program	
  which	
  subtracts	
  the	
  second	
  input	
  number	
  from	
  the	
  first	
  input	
  number	
  
and	
  outputs	
  the	
  result.	
  (Assumption:	
  first	
  input	
  number	
  	
  >=	
  second	
  input	
  number)	
  
                                                                                                                  Mailbox	
                Code	
   Instruction	
  Description	
  
                                                                                                                  00	
                     901	
    INPUT	
  A	
  
                                                                                                                  01	
                     350	
    STORE	
  DATA	
  to	
  mailbox	
  no.	
  50	
  
                                                                                                                  02	
                     901	
    INPUT	
  B	
  
                                                                                                                  03	
                     339	
    STORE	
  DATA	
  to	
  mailbox	
  no.39	
  
                                                                                                                  04	
                     550	
    LOAD	
  the	
  first	
  number	
  
                                                                                                                  05	
                     239	
    SUBSTRACT	
  2nd	
  from	
  1st	
  	
  
                                                                                                                  06	
  	
                 902	
    OUTPUT	
  RESULT	
  
                                                                                                                  07	
                     000	
    The	
  little	
  man	
  rest	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  50	
  Data	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  39	
  Data	
  
	
  
Exercise	
  Computer	
  system	
  and	
  number	
  system	
  
Ex1:	
  Find	
  the	
  word	
  or	
  phrase	
  from	
  the	
  list	
  below	
  that	
  best	
  matches	
  the	
  description	
  in	
  the	
  
folloeing	
  question.	
  	
  
                                                                    a) Binary	
  number	
  >	
  III	
  Base	
  2	
  number	
  
                                                                    b) Bit	
  >	
  II	
  Binary	
  digit	
  
                                                                    c) Central	
  processor	
  >	
  I	
  Active	
  part	
  of	
  the	
  computer,	
  following	
  the	
  instructions	
  of	
  the	
  
                                                                                           programs	
  it	
  adds	
  numbers,	
  test	
  number,	
  and	
  so	
  on	
  
                                                                    d) Complier	
  >	
  VII	
  Program	
  that	
  translates	
  rom	
  a	
  higher-­‐level	
  notation	
  to	
  assembly	
  
                                                                                           language	
  or	
  machine	
  code	
  
                                                                    e) Integrated	
  circuit	
  >	
  IV	
  Integrate	
  dozens	
  to	
  hundreds	
  of	
  transistors	
  into	
  a	
  single	
  
                                                                                           chip	
  
                                                                    f) Memory	
  >	
  Locations	
  of	
  programs	
  when	
  they	
  are	
  running	
  containing	
  the	
  data	
  
                                                                                           needed	
  as	
  well	
  
                                                                    g) Operating	
  system	
  >	
  Program	
  that	
  manages	
  the	
  sources	
  of	
  a	
  computer	
  for	
  the	
  
                                                                                           benefit	
  of	
  the	
  programs	
  that	
  run	
  on	
  that	
  machine	
  	
  
                                                                    h) Semiconductor	
  >	
  Substance	
  that	
  does	
  not	
  conduct	
  electricity	
  well	
  
                                                                                           	
  

	
  
                                                                                                                                                                                                11	
  
Ex2:	
  Convert	
  the	
  following	
  binary	
  numbers	
  to	
  decimal	
  number	
  
 a.)	
  1001	
                              b.)	
  0.111	
                              c.)	
  0.11011	
  




       d.)	
  1.001	
                        e.)	
  111.1011	
                             f.)	
  100.01	
  




Ex3:	
  Convert	
  the	
  following	
  decimal	
  number	
  into	
  binary	
  number	
  
a.)	
  39	
                                                    b.)	
  12	
  




C.)	
  0.25	
                                                      d.1/8	
  




	
  
                                                                                                               12	
  
e.)	
  6.25	
                                                           f.)	
  33	
  




g.)	
  12.125	
                                                         h.)	
  39.125	
  




Ex:	
  Discuss	
  the	
  main	
  components	
  of	
  the	
  little	
  man	
  computer	
  and	
  respond	
  them	
  to	
  in	
  a	
  real	
  
computer	
  
-­‐Mailbox	
  ~=	
  the	
  numbering	
  system	
  >	
  memory	
  
-­‐Calculator	
  >	
  CPU/	
  Register	
  	
  
-­‐Little	
  man	
  >	
  Bus	
  system,	
  CPU	
  
-­‐Instruction	
  locations	
  (hand	
  counter)	
  >	
  program	
  computer	
  	
  
-­‐In/Put	
  basket	
  >	
  Input	
  /	
  Output	
  device	
  module	
  
-­‐Reset	
  button	
  >	
  Reset	
  power	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
                                                                                                                                           13	
  
Ex:	
  The	
  LMC	
  uses	
  a	
  3-­‐digit	
  mailbox	
  and	
  the	
  following	
  op-­‐code,	
  which	
  are	
  used	
  to	
  write	
  a	
  
program.	
  Output	
  largest	
  number	
  of	
  two	
  input	
  number	
  
	
  	
  
Mailbox	
                                           Code	
                                         Instruction	
  Description	
  
00	
                                                901	
                                          INPUT	
  A	
  
01	
                                                399	
                                          STORE	
  DATA	
  to	
  mailbox	
  
                                                                                                   no.99	
  
02	
                                                901	
                                          INPUT	
  B	
  
03	
                                                389	
                                          STORE	
  DATA	
  to	
  mailbox	
  
                                                                                                   no.89	
  
04	
                                                299	
                                          SUBSTRACT	
  the	
  A	
  to	
  B	
  (B-­‐A)	
  
05	
                                                820	
                                          If	
  B-­‐A	
  >	
  0	
  (go	
  to	
  20)	
  
06	
                                                599	
                                          LOAD	
  A	
  (A	
  is	
  bigger)	
  
07	
                                                621	
                                          JUMP	
  to	
  21	
  
07	
                                                902	
                                          OUTPUT	
  
08	
                                                000	
                                          STOP	
  
                       .	
                                                  .	
                                                     .	
  
                       .	
                                                  .	
                                                     .	
  
                       .	
                                                  .	
                                                     .	
  
                       .	
                                                  .	
                                                     .	
  
	
                                                  	
                                             	
  
20	
                                                589	
                                          LOAD	
  B	
  (B	
  is	
  bigger)	
  
21	
                                                902	
                                          OUTPUT	
  
22	
                                                000	
                                          STOP	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  

	
  
                                                                                                                                                14	
  
Ex:	
  The	
  LMC	
  uses	
  a	
  3-­‐digit	
  mailbox	
  and	
  the	
  following	
  op-­‐code,	
  which	
  are	
  used	
  to	
  write	
  a	
  
program.	
  Output	
  smallest	
  number	
  of	
  two	
  input	
  number	
  
	
  	
  
Mailbox	
                                           Code	
                                         Instruction	
  Description	
  
00	
                                                901	
                                          INPUT	
  A	
  
01	
                                                399	
                                          STORE	
  DATA	
  to	
  mailbox	
  
                                                                                                   no.99	
  
02	
                                                901	
                                          INPUT	
  B	
  
03	
                                                389	
                                          STORE	
  DATA	
  to	
  mailbox	
  
                                                                                                   no.89	
  
04	
                                                299	
                                          SUBSTRACT	
  the	
  A	
  to	
  B	
  (B-­‐A)	
  
05	
                                                820	
                                          If	
  B-­‐A	
  >	
  0	
  (go	
  to	
  20)	
  
06	
                                                599	
                                          LOAD	
  B	
  (B	
  is	
  smallest)	
  
07	
                                                621	
                                          JUMP	
  to	
  21	
  
                       .	
                                                  .	
                                                     .	
  
                       .	
                                                  .	
                                                     .	
  
                       .	
                                                  .	
                                                     .	
  
                       .	
                                                  .	
                                                     .	
  
	
                                                  	
                                             	
  
20	
                                                589	
                                          LOAD	
  A	
  (A	
  is	
  smallest)	
  
21	
                                                902	
                                          OUTPUT	
  
22	
                                                000	
                                          STOP	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  

	
  
                                                                                                                                                15	
  
Operating	
  Systems,	
  Processes	
  and	
  Inter-­‐Process	
  Communication	
  
                                                       	
  




                                                                                                                                         	
  
Recap…Computer	
  System	
  Components	
  
       • Hardware	
  –	
  provides	
  basic	
  computing	
  resources	
  (CPU,	
  memory,	
  I/O	
  devices).	
  
       • Operating	
  system	
  –	
  controls	
  and	
  coordinates	
  the	
  use	
  of	
  the	
  hardware	
  among	
  the	
  
         various	
  application	
  programs	
  for	
  the	
  various	
  users.	
  
       • Applications	
  programs	
  –	
  define	
  the	
  ways	
  in	
  which	
  the	
  system	
  resources	
  are	
  used	
  to	
  
         solve	
  the	
  computing	
  problems	
  of	
  the	
  users	
  (compilers,	
  database	
  systems,	
  video	
  games,	
  
         business	
  programs).	
  
       • Users	
  (people,	
  machines,	
  other	
  computers).	
  	
  
	
  
What	
  is	
  an	
  Operating	
  System	
  (OS)?	
  
       • A	
  program	
  that	
  acts	
  as	
  an	
  intermediary	
  between	
  an	
  application	
  program	
  (or	
  a	
  user)	
  and	
  
         the	
  computer	
  hardware	
  
               – Allocate	
  resources	
  (CPU,	
  Memory,	
  disk	
  space,	
  etc.)	
  between	
  programs	
  and	
  users	
  
                  efficiently	
  
               – Allow	
  the	
  user	
  to	
  conveniently	
  access	
  data	
  and	
  programs	
  
               – Protect	
  the	
  system	
  from	
  incorrect	
  or	
  malicious	
  programs	
  and	
  users	
  
       • Operating	
  system	
  goals:	
  
	
  
                                                                                                                                         16	
  
– Execute	
  user	
  programs	
  and	
  make	
  solving	
  user	
  problems	
  easier.	
  
            – Make	
  the	
  computer	
  system	
  convenient	
  to	
  use.	
  
       • Use	
  the	
  computer	
  hardware	
  in	
  an	
  efficient	
  manner	
  
	
  
What	
  is	
  an	
  OS?	
  
       • Definitions	
  
            – Resource	
  allocator	
  –	
  manages	
  and	
  allocates	
  resources	
  
            – Control	
  program	
  –	
  controls	
  the	
  execution	
  of	
  user	
  programs	
  and	
  operations	
  of	
  I/O	
  
                  devices	
  	
  
            – Kernel	
  –	
  the	
  one	
  program	
  running	
  at	
  all	
  times	
  (all	
  else	
  being	
  application	
  programs)	
  
       • Services	
  typically	
  provided	
  by	
  an	
  O.S.	
  
            – Program	
  Creation	
  (editor,	
  compiler)	
  
            – Program	
  Execution	
  
            – Access	
  to	
  I/O	
  devices	
  
            – Controlled	
  access	
  to	
  files	
  
            – System	
  Access	
  (logging	
  in)	
  
            – Error	
  detection/response	
  
       • O.S.	
  will	
  evolve	
  over	
  time	
  -­‐	
  Hardware	
  upgrades,	
  New	
  services	
  
	
  
OS	
  History	
  
       • Serial	
  Processing	
  
            – Sign-­‐up	
  sheet	
  for	
  computer	
  time	
  
            – Each	
  user	
  would	
  set	
  up	
  the	
  job,	
  run	
  it,	
  and	
  collect	
  output	
  
       • Simple	
  Batch	
  System	
  (mid	
  1950s)	
  
            – Try	
  to	
  improve	
  scheduling/setup	
  time	
  
            – Have	
  a	
  monitor	
  that	
  loads	
  jobs,	
  when	
  a	
  job	
  finishes	
  it	
  jumps	
  to	
  the	
  monitor	
  that	
  
                   loads	
  the	
  next	
  job.	
  
       • Multiprogrammed	
  Batch	
  System	
  
            – Several	
  programs	
  in	
  memory	
  at	
  one	
  time	
  
                      • One	
  program	
  can	
  do	
  I/O	
  while	
  another	
  computes	
  
            – Needs	
  memory	
  management,	
  scheduling	
  
       • Time-­‐Sharing	
  Systems	
  
            – Allow	
  several	
  users	
  to	
  interact	
  with	
  the	
  system	
  at	
  the	
  same	
  time	
  
            – Single-­‐user	
  multitasking	
  (windows	
  95)	
  
	
  




	
  
                                                                                                                                              17	
  
Compatible	
  
                                                                                                                           time	
  sharing	
  
                                                                                                                           system	
  
                                                                                                                           (CTSS)	
  –	
  
                                                                                                                           1962	
  
                                                                                                                           Switched	
  
                                                                                                                           users	
  every	
  
                                                                                                                           0.2	
  second	
  
                                                                                                                           Supported	
  up	
  
                                                                                                                           to	
  32	
  users	
  
                                                                                                                           MULTICS	
  
                                                                                                                           (1965)	
  
                                                                                                                           Intended	
  as	
  
                                                                                                                           the	
  computer	
  
       *Desirable	
  hardware	
  items:	
                                                                                  service	
  for	
  
       Memory	
  protection	
                                                                                              Boston	
  
       Timer	
                                                                                                             Strong	
  
       Privileged	
  instructions	
  (I/O)	
                                                                               influence	
  on	
  
       Interrupts	
                                                                                                        later	
  systems	
  
       	
                                                                                                           	
     Good	
  security,	
  
	
                                                                                                                         user	
  interface	
  
                                                                                                                           	
  
OS	
  Issues	
  
         • Process.	
  
              – Hard	
  to	
  define	
  formally,	
  but	
  think	
  of	
  a	
  running	
  program.	
  
              – O.S.	
  needs	
  to	
  maintain	
  proper	
  synchronization	
  between	
  processes	
  (mutual	
  
                    exclusion,	
  avoiding	
  deadlock).	
  
         • Main	
  causes	
  of	
  errors:	
  
              – Improper	
  synchronization.	
  
                        • Must	
  wait	
  for	
  someone	
  else	
  to	
  finish.	
  
              – Failed	
  mutual	
  exclusion.	
  
                        • Assigning	
  two	
  passengers	
  to	
  the	
  same	
  seat.	
  
              – Nondeterminate	
  program	
  execution.	
  
                        • Output	
  depends	
  on	
  other	
  programs.	
  
                        • May	
  be	
  a	
  result	
  of	
  misused	
  common	
  memory.	
  
              – Deadlock.	
  
                        • Two	
  processors	
  each	
  waiting	
  for	
  the	
  other	
  to	
  do	
  something.	
  
         • Memory	
  management	
  
              – Isolate	
  processes	
  from	
  each	
  other	
  (shared	
  memory	
  may	
  be	
  allowed).	
  
              – Automatically	
  move	
  data	
  between	
  main	
  memory	
  and	
  disk.	
  
              – Support	
  long-­‐term	
  storage.	
  
	
  
         • Security	
  
              – Control	
  use	
  of	
  the	
  system,	
  access	
  to	
  files	
  and	
  other	
  resources.	
  
         • Scheduling	
  
	
  
                                                                                                                                      18	
  
– Resource	
  allocation	
  and	
  scheduling	
  
              – Fairness/priorities/efficiency	
  
       •   System	
  structure	
  
              – As	
  systems	
  grow	
  larger,	
  rely	
  on	
  modules,	
  layers	
  of	
  abstraction	
  
       •   Multithreading	
  
              – Allow	
  a	
  process	
  to	
  consist	
  of	
  one	
  or	
  more	
  threads	
  that	
  share	
  memory,	
  files,	
  etc.	
  
              – Helps	
  with	
  structuring	
  programs	
  
       •   Microkernel	
  
              – Assign	
  only	
  essential	
  functions	
  to	
  the	
  kernel	
  (memory,	
  communication)	
  
              – Other	
  items	
  run	
  as	
  user	
  processes	
  
       •   Symmetric	
  multiprocessing	
  (SMP)	
  
              – System	
  may	
  have	
  two	
  or	
  more	
  equivalent	
  processors	
  that	
  share	
  memory,	
  I/O	
  
       •   Distributed	
  operating	
  system	
  (clusters)	
  
              – Provide	
  illusion	
  of	
  a	
  single	
  system	
  from	
  several	
  entities	
  
	
  
*Process.	
  
          Hard	
  to	
  define	
  formally,	
  but	
  think	
  of	
  a	
  running	
  program.	
  
          Three	
  main	
  components:	
  	
  
                     Executable	
  program.	
  
                     Data	
  for	
  that	
  program.	
  
                     Context	
  (registers,	
  files,	
  etc.)	
  For	
  the	
  program.	
  
          O.S.	
  Needs	
  to	
  maintain	
  proper	
  synchronization	
  between	
  processes	
  (mutual	
  exclusion,	
  avoiding	
  
          deadlock).	
  
Main	
  causes	
  of	
  errors:	
  
          Improper	
  synchronization.	
  
                     Must	
  wait	
  for	
  someone	
  else	
  to	
  finish.	
  
          Failed	
  mutual	
  exclusion.	
  
                     Assigning	
  two	
  passengers	
  to	
  the	
  same	
  seat.	
  
          Nondeterminate	
  program	
  execution.	
  
                     Output	
  depends	
  on	
  other	
  programs.	
  
                     May	
  be	
  a	
  result	
  of	
  misused	
  common	
  memory.	
  
          Deadlock.	
  
                     Two	
  processors	
  each	
  waiting	
  for	
  the	
  other	
  to	
  do	
  something.	
  
Memory	
  management	
  
          Isolate	
  processes	
  from	
  each	
  other	
  (shared	
  memory	
  may	
  be	
  allowed).	
  
                     Should	
  allow	
  only	
  appropriate	
  accesses.	
  
                     Often	
  implemented	
  using	
  virtual	
  memory.	
  
          Automatically	
  move	
  data	
  between	
  main	
  memory	
  and	
  disk.	
  
          Support	
  modular	
  programs.	
  
          Support	
  long-­‐term	
  storage.	
  
Security	
  
          Control	
  use	
  of	
  the	
  system,	
  access	
  to	
  files	
  and	
  other	
  resources.	
  
          Areas	
  of	
  concern	
  by	
  O.S.	
  Developers:	
  
                     Access	
  control.	
  
                     Information	
  flow	
  control.	
  
	
  
                                                                                                                                                 19	
  
Certify	
  above	
  controls	
  are	
  correct.	
  
Scheduling	
  
      Resource	
  allocation	
  and	
  scheduling	
  
      Fairness/priorities/efficiency	
  
System	
  structure	
  
      As	
  systems	
  grow	
  larger,	
  rely	
  on	
  modules,	
  layers	
  of	
  abstraction	
  
      Electronic	
  circuits	
  
      Instruction	
  set	
  
      Procedures	
  
      Interrupts	
  
      Primitive	
  processes	
  
      Local	
  secondary	
  storage	
  
      Virtual	
  memory	
  
      Communications	
  
      File	
  system	
  
      Devices	
  
      Directories	
  
      User	
  process	
  
      Shell	
  
	
  
Process	
  
       • A	
  process	
  is	
  a	
  program	
  in	
  execution.	
  	
  A	
  process	
  needs	
  certain	
  resources,	
  including	
  CPU	
  
         time,	
  memory,	
  files,	
  and	
  I/O	
  devices,	
  to	
  accomplish	
  its	
  task.	
  
       • Three	
  main	
  components:	
  	
  
                     • Executable	
  program.	
  
                     • Data	
  for	
  that	
  program.	
  
                     • Context	
  (registers,	
  files,	
  etc.)	
  for	
  the	
  program.	
  
       • The	
  operating	
  system	
  is	
  responsible	
  for	
  the	
  following	
  activities	
  in	
  connection	
  with	
  
         process	
  management.	
  
               – Process	
  creation	
  and	
  deletion.	
  
               – Process	
  suspension	
  and	
  resumption.	
  
               – Provision	
  of	
  mechanisms	
  for:	
  
                     • process	
  synchronization	
  
                     • process	
  communication	
  
	
  
Hard	
  to	
  define	
  formally,	
  but	
  think	
  of	
  a	
  running	
  program.	
  
Three	
  main	
  components:	
  	
  
          Executable	
  program.	
  
          Data	
  for	
  that	
  program.	
  
          Context	
  (registers,	
  files,	
  etc.)	
  For	
  the	
  program.	
  
O.S.	
  Needs	
  to	
  maintain	
  proper	
  synchronization	
  between	
  processes	
  (mutual	
  exclusion,	
  avoiding	
  deadlock).	
  
	
  
An	
  operating	
  system	
  executes	
  a	
  variety	
  of	
  programs:	
  
          Batch	
  system	
  –	
  jobs	
  
          Time-­‐shared	
  systems	
  –	
  user	
  programs	
  or	
  tasks	
  
	
  
                                                                                                                                              20	
  
Textbook	
  uses	
  the	
  terms	
  job	
  and	
  process	
  almost	
  interchangeably.	
  
Process	
  –	
  a	
  program	
  in	
  execution;	
  process	
  execution	
  must	
  progress	
  in	
  sequential	
  fashion.	
  
	
  
A	
  process	
  includes:	
  
          program	
  counter	
  	
  
          stack	
  
          data	
  section	
                                                                                                                                                  	
  
	
                                                                                                                                                                           	
  
Process	
  Control	
  Block	
  
       • Identifiers	
  
            – Process,	
  Parent,	
  User	
  
       • Processor	
  State	
  




                                                                                                                                   	
  
                                                                                                                                   Information	
  associated	
  with	
  each	
  process	
  
            – User-­‐Visible	
  Registers	
  
            – Control/Status	
  Registers	
  
            – Stack	
  Pointers	
  (User,	
  System)	
  
       • Process	
  Control	
  Information	
  
            – Scheduling/state,	
  Priority	
  
            – Data	
  structure	
  info	
  (links)	
  
            – Interprocess	
  Communication	
  
            – Privilege	
  Information	
  
            – Memory	
  Management	
  
                     • User	
  Code	
  
                     • User	
  Data	
  
                     • System	
  Stack	
  
            – Resource	
  Ownership	
  and	
  Utilization	
  
	
  
Process	
  States	
  
                 • Two-­‐state	
  model:	
  
                        – Running	
  
                        – Not	
  Running	
  	
  
	
  	
  	
  	
     	
     	
  -­‐	
  may	
  be	
  held	
  in	
  a	
  queue	
  
                 • Requirements	
  
                        – Some	
  way	
  of	
  representing	
  a	
  
                          process	
  
                                      • Must	
  include	
  state	
  and	
  
                                         memory	
  use	
  
                        – Must	
  keep	
  track	
  of	
  processes	
  that	
  are	
  not	
  currently	
  running	
  
                        – Dispatcher	
  
                                      • Moves	
  processes	
  to	
  the	
  waiting	
  queue	
  
                                      • Remove	
  completed/aborted	
  processes	
  
                                      • Select	
  the	
  next	
  process	
  to	
  run	
  
	
  
                                                                                                                                                                                              21	
  
Five-­‐state	
  Model	
  
       • Processes	
  may	
  be	
  waiting	
  for	
  I/O	
  
       • Use	
  additional	
  states:	
  
              – Running:	
  currently	
  being	
  run	
  
              – Ready:	
  ready	
  to	
  run	
  
              – Blocked:	
  waiting	
  for	
  an	
  event	
  (I/O)	
  
              – New:	
  just	
  created,	
  not	
  yet	
  admitted	
  to	
  set	
  of	
  runnable	
  processes	
  
              – Exit:	
  completed/error	
  exit	
  
       • May	
  have	
  separate	
  waiting	
  queues	
  for	
  each	
  event	
  	
  
         	
  




                                                                                                                                         	
  
May	
  have	
  separate	
  waiting	
  queues	
  for	
  each	
  event	
  	
  
Transitions:	
  
Null	
  ®	
  New	
  –	
  Process	
  is	
  created	
  
New	
  ®	
  Ready	
  –	
  O.S.	
  is	
  ready	
  to	
  handle	
  another	
  process	
  (Memory,	
  CPU)	
  
Ready	
  ®	
  Running	
  –	
  Select	
  another	
  process	
  to	
  run	
  
Running	
  ®	
  Exit	
  –	
  Process	
  has	
  terminated	
  
Running	
  ®	
  Ready	
  –	
  End	
  of	
  time	
  slice	
  or	
  higher-­‐priority	
  process	
  is	
  ready	
  
Running	
  ®	
  Blocked	
  –	
  Process	
  is	
  waiting	
  for	
  an	
  event	
  (I/O,	
  Synchronization)	
  
Blocked	
  ®	
  Ready	
  –	
  The	
  event	
  a	
  process	
  is	
  waiting	
  for	
  has	
  occurred,	
  can	
  continue	
  
Ready	
  ®	
  Exit	
  –	
  Process	
  terminated	
  by	
  O.S.	
  or	
  parent	
  
Blocked	
  ®	
  Exit	
  –	
  Same	
  reasons	
  
	
  
Creating	
  a	
  Process	
  
       • Assign	
  a	
  unique	
  process	
  ID	
  
       • Allocate	
  memory	
  for	
  the	
  process	
  
       • Initialize	
  the	
  process	
  control	
  block	
  
             – Process	
  ID,	
  parent	
  ID	
  
             – Set	
  program	
  counter	
  and	
  stack	
  pointer	
  to	
  appropriate	
  values	
  
	
  
                                                                                                                                22	
  
– State	
  usually	
  set	
  to	
  Ready	
  
       • Set	
  links	
  so	
  it	
  is	
  in	
  the	
  appropriate	
  queue	
  
       • Create	
  other	
  data	
  structures	
  
            – Memory,	
  files,	
  accounting	
  
       • Reasons	
  to	
  create	
  a	
  process	
  
            – Submit	
  a	
  new	
  batch	
  job/Start	
  program	
  
            – User	
  logs	
  on	
  to	
  the	
  system	
  
            – Device	
  driver	
  or	
  Daemon	
  
            – OS	
  creates	
  on	
  behalf	
  of	
  a	
  user	
  
                   	
  
Switching	
  Processes	
  
       • We	
  will	
  often	
  switch	
  between	
  the	
  various	
  processes	
  in	
  the	
  system	
  
            – External	
  Interrupt	
  -­‐	
  time	
  slice	
  expired,	
  I/O	
  interrupt	
  	
  
            – Internal	
  trap,	
  e.	
  g.,	
  invalid	
  operation	
  
            – Supervisor	
  call	
  
       • Steps	
  to	
  take	
  to	
  switch	
  processes	
  
            – Save	
  the	
  current	
  processor	
  state	
  (registers,	
  flags,	
  etc.)	
  
            – Set	
  the	
  program	
  counter	
  to	
  the	
  address	
  of	
  the	
  appropriate	
  routine	
  
            – Update	
  state	
  of	
  current	
  process	
  from	
  Running	
  to	
  Blocked/Ready/Exit	
  
            – Move	
  the	
  control	
  block	
  to	
  the	
  appropriate	
  queue	
  
            – Select	
  another	
  process	
  to	
  execute	
  
            – Move	
  the	
  control	
  block	
  from	
  the	
  appropriate	
  queue	
  
            – Update	
  the	
  control	
  block	
  of	
  the	
  selected	
  process	
  to	
  running	
  
            – Update	
  necessary	
  memory-­‐management	
  structures	
  
            – Restore	
  the	
  context	
  (registers,	
  etc.)	
  of	
  the	
  newly	
  selected	
  process	
  
	
  
Suspending	
  a	
  Process	
  
     • May	
  suspend	
  a	
  process	
  by	
  swapping	
  part	
  or	
  all	
  of	
  it	
  to	
  disk	
  
          – Most	
  useful	
  if	
  we	
  are	
  waiting	
  for	
  an	
  event	
  that	
  will	
  not	
  arrive	
  soon	
  (printer,	
  
               keyboard)	
  
          – If	
  not	
  done	
  well,	
  can	
  slow	
  system	
  down	
  by	
  increasing	
  disk	
  I/O	
  activity	
  
               	
  
               	
  
               	
  
	
  
	
  
	
  
	
  
     • Reasons	
  to	
  Suspend	
  
          – Manage	
  Resources	
  
          – Timing	
  (backup	
  at	
  midnight	
  process)	
  
	
  
                                                                                                                                           23	
  
– User	
  request	
  (debugging,	
  background)	
  
                – Parent	
  process	
  (synchronization,	
  errors)	
  
	
  
New	
  Transitions:	
  
          Blocked	
  ®	
  Blocked	
  Suspend	
  –	
  Swap	
  out	
  a	
  blocked	
  process	
  to	
  free	
  memory	
  
          Blocked	
  Suspend	
  ®	
  Ready	
  Suspend	
  –	
  Event	
  occurs	
  (O.S.	
  must	
  track	
  expected	
  event)	
  
          Ready	
  Suspend	
  ®	
  Ready	
  –	
  Activate	
  a	
  process	
  (higher	
  priority,	
  memory	
  available)	
  
          Ready	
  ®	
  Ready	
  Suspend	
  –	
  Need	
  to	
  free	
  memory	
  for	
  higher-­‐priority	
  processes	
  
          New	
  ®	
  Ready	
  or	
  Ready	
  Suspend	
  –	
  Can	
  choose	
  where	
  to	
  put	
  new	
  processes	
  
          Blocked	
  Suspend	
  ®	
  Blocked	
  –	
  Reload	
  process	
  expecting	
  event	
  soon	
  
          Running	
  ®	
  Ready	
  Suspend	
  –	
  Preempt	
  for	
  higher-­‐priority	
  process	
  
Key	
  States:	
  
          Ready	
  –	
  In	
  memory,	
  ready	
  to	
  execute	
  
          Blocked	
  –	
  In	
  memory,	
  waiting	
  for	
  an	
  event	
  
          Blocked	
  Suspend	
  –	
  On	
  disk,	
  waiting	
  for	
  an	
  event	
  
          Ready	
  Suspend	
  –	
  On	
  disk,	
  ready	
  to	
  execute	
  
	
  
Terminating	
  a	
  Process	
  
       • Need	
  some	
  way	
  to	
  indicate	
  a	
  process	
  is	
  finished	
  (system	
  call	
  or	
  instruction)	
  
       • Program	
  may	
  fail	
  
            – Protection	
  error	
  
            – Address	
  Error	
  
            – Invalid	
  data	
  operation	
  
            – Invalid	
  or	
  privileged	
  instruction	
  
            – I/O	
  Failure	
  
            – Parent	
  process	
  request	
  
            – Operator	
  intervention	
  (control-­‐C)	
  
	
  
Inter-­‐process	
  Communication	
  (IPC)	
                              	
  
       • Mechanism	
  for	
  processes	
  to	
  communicate	
  and	
  to	
  synchronize	
  their	
  actions.	
  
       • Message	
  system	
  –	
  processes	
  communicate	
  with	
  each	
  other	
  without	
  resorting	
  to	
  shared	
  
         variables.	
  
       • IPC	
  facility	
  provides	
  two	
  operations:	
  
                – send(message)	
  –	
  message	
  size	
  fixed	
  or	
  variable	
  	
  
                – receive(message)	
  
       • If	
  P	
  and	
  Q	
  wish	
  to	
  communicate,	
  they	
  need	
  to:	
  
                – establish	
  a	
  communication	
  link	
  between	
  them	
  
                – exchange	
  messages	
  via	
  send/receive	
  
       • Implementation	
  of	
  communication	
  link	
  
                – physical	
  (e.g.,	
  shared	
  memory,	
  hardware	
  bus)	
  
                – logical	
  (e.g.,	
  logical	
  properties)	
  
	
  

	
  
                                                                                                                                    24	
  
Direct	
  Communication	
  
       • Processes	
  must	
  name	
  each	
  other	
  explicitly:	
  
            – send	
  (P,	
  message)	
  –	
  send	
  a	
  message	
  to	
  process	
  P	
  
            – receive(Q,	
  message)	
  –	
  receive	
  a	
  message	
  from	
  process	
  Q	
  
       • Properties	
  of	
  communication	
  link	
  
            – Links	
  are	
  established	
  automatically.	
  
            – A	
  link	
  is	
  associated	
  with	
  exactly	
  one	
  pair	
  of	
  communicating	
  processes.	
  
            – Between	
  each	
  pair	
  there	
  exists	
  exactly	
  one	
  link.	
  
            – The	
  link	
  may	
  be	
  unidirectional,	
  but	
  is	
  usually	
  bi-­‐directional.	
  
	
  
Indirect	
  Communication	
  
       • Messages	
  are	
  directed	
  and	
  received	
  from	
  mailboxes	
  (also	
  referred	
  to	
  as	
  ports).	
  
            – Each	
  mailbox	
  has	
  a	
  unique	
  id.	
  
            – Processes	
  can	
  communicate	
  only	
  if	
  they	
  share	
  a	
  mailbox.	
  
       • Operations	
  
            – create	
  a	
  new	
  mailbox	
  
            – send	
  and	
  receive	
  messages	
  through	
  mailbox	
  
            – destroy	
  a	
  mailbox	
  
       • Properties	
  of	
  communication	
  link	
  
            – Link	
  established	
  only	
  if	
  processes	
  share	
  a	
  common	
  mailbox	
  
            – A	
  link	
  may	
  be	
  associated	
  with	
  many	
  processes.	
  
            – Each	
  pair	
  of	
  processes	
  may	
  share	
  several	
  communication	
  links.	
  
            – Link	
  may	
  be	
  unidirectional	
  or	
  bi-­‐directional.	
  
       • Mailbox	
  sharing	
  
            – P1,	
  P2,	
  and	
  P3	
  share	
  mailbox	
  A.	
  
            – P1,	
  sends;	
  P2	
  and	
  P3	
  receive.	
  
            – Who	
  gets	
  the	
  message?	
  
       • Solutions	
  
            – Allow	
  a	
  link	
  to	
  be	
  associated	
  with	
  at	
  most	
  two	
  processes.	
  
            – Allow	
  only	
  one	
  process	
  at	
  a	
  time	
  to	
  execute	
  a	
  receive	
  operation.	
  
            – Allow	
  the	
  system	
  to	
  select	
  arbitrarily	
  the	
  receiver.	
  	
  Sender	
  is	
  notified	
  who	
  the	
  
                receiver	
  was.	
  
	
                                                                                  Primitives	
  are	
  defined	
  as:	
  
       Operations	
                                                                 	
     send(A,	
  message)	
  –	
  send	
  a	
  
                 	
                                                                 message	
  to	
  mailbox	
  A	
  
             create	
  a	
  new	
  mailbox	
  
	
                                                                                  	
     receive(A,	
  message)	
  –	
  receive	
  a	
  
             send	
  and	
  receive	
  messages	
  through	
  mailbox	
  
	
           destroy	
  a	
  mailbox	
                                              message	
  from	
  mailbox	
  A	
  
	
                                                                                  	
  
Client-­‐Server	
  Communication	
  –Sockets	
  
       • A	
  socket	
  is	
  defined	
  as	
  an	
  endpoint	
  for	
  communication.	
  
       • Concatenation	
  of	
  IP	
  address	
  and	
  port	
  
	
  
                                                                                                                                             25	
  
• The	
  socket	
  161.25.19.8:1625	
  refers	
  to	
  port	
  1625	
  on	
  host	
  161.25.19.8	
  
       • Communication	
  consists	
  between	
  a	
  pair	
  of	
  sockets.	
  
	
  
                                                         	
  
                    Socket	
                                    	
                              Socket	
  
              (146.86.5.2/1625)	
                                                          (161.25.19.8/80)	
  
                                                                	
                         	
                                         	
  

           Host	
  X	
  (146.86.5.20)	
           	
                                     Web	
  sever	
  (161.25.19.8/80)	
  
                                                  	
  
Client-­‐Server	
  Communication	
  -­‐Remote	
  Procedure	
  Calls	
  
       • Remote	
  procedure	
  call	
  (RPC)	
  abstracts	
  procedure	
  calls	
  between	
  processes	
  on	
  networked	
  
         systems.	
  
       • Stubs	
  –	
  client-­‐side	
  proxy	
  for	
  the	
  actual	
  procedure	
  on	
  the	
  server.	
  
       • The	
  client-­‐side	
  stub	
  locates	
  the	
  server	
  and	
  marshalls	
  the	
  parameters.	
  
       • The	
  server-­‐side	
  stub	
  receives	
  this	
  message,	
  unpacks	
  the	
  marshalled	
  parameters,	
  and	
  
         peforms	
  the	
  procedure	
  on	
  the	
  server.	
  
	
  
	
  Client-­‐Server	
  Communication	
  -­‐Remote	
  Method	
  Invocation	
  
       • Remote	
  Method	
  Invocation	
  (RMI)	
  is	
  a	
  Java	
  mechanism	
  similar	
  to	
  RPCs.	
  
       • RMI	
  allows	
  a	
  Java	
  program	
  on	
  one	
  machine	
  to	
  invoke	
  a	
  method	
  on	
  a	
  remote	
  object.	
  




                                                                                                            	
  
Summary	
  
       •     OS	
  provides	
  an	
  interface	
  between	
  a	
  user	
  of	
  a	
  computer,	
  an	
  application	
  program	
  and	
  the	
  computer	
  
             hardware	
  
       •     OS	
  have	
  evolved	
  over	
  the	
  years	
  
       •     Process	
  is	
  set	
  of	
  instructions	
  and	
  data	
  and	
  is	
  usually	
  represented	
  by	
  states	
  
       •     OS	
  needs	
  to	
  maintain	
  proper	
  synchronization	
  between	
  processes	
  
       •     Processes	
  use	
  different	
  ways	
  of	
  communication	
  to	
  synchronize	
  their	
  actions	
  
                                                                                  	
  
                                                                                  	
  
                                                                                  	
  
                                                                                  	
  
	
  
                                                                                                                                                               26	
  
Process	
  and	
  CPU	
  Scheduling	
  
Recap	
  …	
  Process	
  …	
  Queues	
  
       • Process	
  –	
  a	
  program	
  in	
  execution;	
  process	
  execution	
  must	
  progress	
  in	
  sequential	
  
         fashion.	
  
       • As	
  a	
  process	
  executes,	
  it	
  changes	
  state	
  
       • PCB	
  -­‐	
  Information	
  associated	
  with	
  each	
  process	
  
       • Queues	
  	
  
               – Job	
  queue	
  –	
  set	
  of	
  all	
  processes	
  in	
  the	
  system.	
  
               – Ready	
  queue	
  –	
  set	
  of	
  all	
  processes	
  residing	
  in	
  main	
  memory,	
  ready	
  and	
  waiting	
  to	
  
                        execute.	
  
               – Device	
  queues	
  –	
  set	
  of	
  processes	
  waiting	
  for	
  an	
  I/O	
  device.	
  
               – Process	
  migration	
  between	
  the	
  various	
  queues.	
  
               – Starvation	
  –	
  indefinite	
  delay	
  of	
  a	
  process	
  due	
  queue	
  of	
  processes	
  
               – CPU	
  burst	
  –	
  processing	
  time	
  of	
  a	
  process	
  
	
                                                                                                CPU–I/O	
  Burst	
  Cycle	
  
CPU–I/O	
  Burst	
  Cycle	
  
       • Process	
  execution	
  consists	
  of	
  a	
  cycle	
  of	
  CPU	
  	
  
         execution	
  and	
  I/O	
  wait.	
  	
  
       • Maximum	
  CPU	
  utilization	
  obtained	
  with	
  	
  
         Multiprogramming	
  
	
  
Process	
  Types	
  
       • Processes	
  can	
  be	
  described	
  as	
  either:	
  
            – I/O-­‐bound	
  process	
  –	
  spends	
  more	
  time	
  	
  
               doing	
  I/O	
  than	
  computations,	
  	
  
               many	
  short	
  CPU	
  bursts.	
  
            – CPU-­‐bound	
  process	
  –	
  spends	
  more	
  time	
  	
  
               doing	
  computations;	
  	
  
               few	
  very	
  long	
  CPU	
  bursts.	
  
       • Process	
  can	
  be	
  of	
  two	
  types:	
  
            – Non	
  preemptive	
  –	
  once	
  CPU	
  given	
  to	
  the	
  
               	
  process	
  it	
  cannot	
  be	
  released	
  until	
  it	
  	
  
               completes	
  its	
  CPU	
  burst.	
  
            – Preemptive	
  –	
  the	
  process	
  which	
  can	
  be	
  
               	
  released	
  to	
  before	
  it	
  completes	
  its	
  	
  
               CPU	
  burst.	
  	
  
	
  
	
  
	
  
	
  
	
  
                                                                                                                                            27	
  
Process	
  Scheduling	
  
       • Decide	
  what	
  processes	
  should	
  be	
  executed	
  by	
  processor	
  
       • Long-­‐term	
  scheduler	
  (or	
  job	
  scheduler)	
  	
  
            – deals	
  with	
  creating	
  a	
  new	
  process	
  
            – selects	
  which	
  processes	
  should	
  be	
  brought	
  into	
  the	
  ready	
  queue.	
  	
  
            – is	
  invoked	
  infrequently	
  (seconds,	
  minutes)	
  ⇒	
  (may	
  be	
  slow).	
  	
  
       • Medium-­‐term	
  scheduler	
  
            – deals	
  with	
  swapping	
  processes	
  in/out	
  
       • Short-­‐term	
  scheduler	
  (or	
  CPU	
  scheduler)	
  	
  
            – selects	
  which	
  process	
  should	
  be	
  executed	
  next	
  and	
  allocates	
  CPU	
  
            – is	
  invoked	
  very	
  frequently	
  (milliseconds)	
  ⇒	
  (must	
  be	
  fast).	
  
            – Invoked	
  on:	
  
                     • clock	
  or	
  I/O	
  interrupt	
  
                     • system	
  call,	
  signal	
  
	
  
Representation	
  of	
  Process	
  Scheduling	
  




                                                                                                 	
  
	
  
CPU	
  Scheduler	
  
       • Selects	
  from	
  among	
  the	
  processes	
  in	
  memory	
  that	
  are	
  ready	
  to	
  execute,	
  and	
  allocates	
  
         the	
  CPU	
  to	
  one	
  of	
  them.	
  
       • CPU	
  scheduling	
  decisions	
  may	
  take	
  place	
  when	
  a	
  process:	
  
         1.	
      Switches	
  from	
  running	
  to	
  waiting	
  state.	
  
         2.	
      Switches	
  from	
  running	
  to	
  ready	
  state.	
  
         3.	
      Switches	
  from	
  waiting	
  to	
  ready.	
  
         4.	
      Terminates.	
  
       • Scheduling	
  under	
  1	
  and	
  4	
  is	
  non	
  preemptive.	
  
       • All	
  other	
  scheduling	
  is	
  preemptive.	
  

	
  
                                                                                                                                          28	
  
Dispatcher	
  
       • Dispatcher	
  module	
  gives	
  control	
  of	
  the	
  CPU	
  to	
  the	
  process	
  selected	
  by	
  the	
  short-­‐term	
  
         scheduler;	
  this	
  involves:	
  
            – switching	
  context	
  
            – switching	
  to	
  user	
  mode	
  
            – jumping	
  to	
  the	
  proper	
  location	
  in	
  the	
  user	
  program	
  to	
  restart	
  that	
  program	
  
       • Dispatch	
  latency	
  –	
  time	
  it	
  takes	
  for	
  the	
  dispatcher	
  to	
  stop	
  one	
  process	
  and	
  start	
  another	
  
         running.	
  
	
  
Scheduling	
  Criteria	
  
       • CPU	
  utilization	
  	
  
            – keep	
  the	
  CPU	
  as	
  busy	
  as	
  possible	
  
       • Throughput	
  	
  
            – number	
  of	
  processes	
  that	
  complete	
  their	
  execution	
  per	
  time	
  unit	
  
       • Turnaround	
  time	
  	
  
            – amount	
  of	
  time	
  to	
  execute	
  a	
  particular	
  process	
  
       • Waiting	
  time	
  	
  
            – amount	
  of	
  time	
  a	
  process	
  has	
  been	
  waiting	
  in	
  the	
  ready	
  queue	
  
       • Response	
  time	
  	
  
            – amount	
  of	
  time	
  it	
  takes	
  from	
  when	
  a	
  request	
  was	
  submitted	
  until	
  the	
  first	
  
                 response	
  is	
  produced	
  
	
  
Scheduling	
  Algorithms	
  
       •   First-­‐Come,	
  First-­‐Served	
  (FCFS)	
  Scheduling	
  
       •   Shortest-­‐Job-­‐First	
  (SJR)	
  Scheduling	
  	
  
       •   Shortest-­‐Remaining-­‐Time-­‐First	
  (SRTF)	
  	
  
       •   Round	
  Robin	
  (RR)	
  
       •   Highest	
  Response	
  Ratio	
  Next	
  
       •   Feedback	
  
	
  
First-­‐Come,	
  First-­‐Served	
  (FCFS)	
  Scheduling	
  
Process:	
  	
   P1	
  	
   P2	
  	
  	
   P3	
  	
                                    Waiting	
  Time	
  	
  
Burst	
  Time:	
  	
   24	
   	
  3	
  	
   	
  3	
                                    =Complete	
  time	
  –	
  Arrived	
  time	
  –	
  Burst	
  time	
  
                                                                                       Waiting	
  time	
   >	
                 P1=24-­‐0-­‐24=0	
  
	
                                                                                     	
                       	
    	
       P2=27-­‐0-­‐3=24	
  
     • Suppose	
  that	
  the	
  processes	
  arrive	
  in	
  the	
  order:	
  P1,	
  P	
  2,	
  P3	
  	
  	
   	
    	
       P3=30-­‐0-­‐3=27	
  
         The	
  Gantt	
  chart	
  for	
  the	
  schedule	
  is:	
                      	
                                             	
            	
  
         	
                                                         P1	
               	
  
                                                                                    P2	
                             P3	
  
                                                                                       	
  
         	
                                P1=24	
  
                                                      	
  
                                                                           P2=3	
      	
   P3=3	
                    CPU	
  Time	
  
         	
     0	
                                                                    	
  
	
              P1=24	
                                             24	
            27	
  
                                                                                       	
                            30	
  
                  P2=3	
                                          P2=3	
                 P3=3	
  
                                                                                          	
         	
     	
   	
      Average	
  waiting	
  time	
  =	
  	
  
	
                P3=3	
                                          P3=3	
                  	
         	
          	
      (0+24+27)/3=17	
  
                                                                                          	
                                                   29	
  
                                                                                          =	
  
• Suppose	
  that	
  the	
  processes	
  arrive	
  in	
  the	
  order	
  P2	
  ,	
  P3	
  ,	
  P1	
  .	
  
         The	
  Gantt	
  chart	
  for	
  the	
  schedule	
  is:	
  
         	
                        P2	
                    P3	
                                                     P1	
  
         	
     P2=3	
                    	
  
                                               P3=3	
                      P1=24	
                                     CPU	
  Time	
  
         	
  
	
               0	
                   3	
                  6	
                                                30	
  
	
               P2=3	
                P3=3	
               P1=24	
                                            	
  
                 P3=3	
                P1=24	
                       Waiting	
  Time	
  	
  
	
                                                                   =Complete	
  time	
  –	
  Arrived	
  time	
  –	
  Burst	
  time	
  
                 P1=24	
  
	
                                                                   Waiting	
  time	
   >	
       P1=30-­‐0-­‐24=6	
  
     • Processes	
  queued	
  in	
  order	
  of	
  arrival	
   	
                 	
       	
      P2=3-­‐0-­‐3=0	
  
     • Runs	
  until	
  finished	
  or	
  blocks	
  on	
  I/O	
      	
           	
       	
      P3=6-­‐0-­‐3=3	
  
                                                                     Average	
  waiting	
  time	
  =	
  (6+0+3)/3=3	
  
     • Tends	
  to	
  penalize	
  short	
  processes	
               	
  
           – Have	
  to	
  wait	
  for	
  earlier	
  long	
  processes	
  
                                                                     	
  
     • Convoy	
  effect	
  short	
  process	
  behind	
  long	
  process	
  
                                                                     	
  
     • Favors	
  processor-­‐bound	
  processes	
                    	
  
           – 	
  I/O	
  processes	
  block	
  quickly	
              	
  
                                                                     	
  
	
                                                                   	
  
	
                                                                   	
  
Shortest-­‐Job-­‐First	
  (SJR)	
  Scheduling	
                      	
  
     • Associate	
  with	
  each	
  process	
  the	
  length	
  	
  of	
  its	
  next	
  CPU	
  burst.	
  	
  Use	
  these	
  lengths	
  to	
  
                                                                     	
  
            schedule	
  the	
  process	
  with	
  the	
  shortest	
  time.	
  
       •    Two	
  types:	
  
               – Nonpreemtive	
  version	
  
                           • Select	
  process	
  with	
  shortest	
  expected	
  running	
  time	
  	
  
                                     – once	
  CPU	
  given	
  to	
  the	
  process	
  it	
  cannot	
  be	
  preempted	
  until	
  
                                           completes	
  its	
  CPU	
  burst.	
  	
  
                           • Short	
  processes	
  may	
  still	
  wait	
  if	
  a	
  long	
  process	
  has	
  just	
  started	
  	
  
               – Peemtive	
  version	
  
                           • Select	
  process	
  with	
  shortest	
  expected	
  running	
  (or	
  remaining)	
  time	
  	
  
                           • May	
  switch	
  processes	
  when	
  a	
  new	
  process	
  arrives	
  
                                     – if	
  a	
  new	
  process	
  arrives	
  with	
  CPU	
  burst	
  length	
  less	
  than	
  remaining	
  
                                           time	
  of	
  current	
  executing	
  process,	
  preempt	
  	
  
                           • Also	
  called	
  Shortest-­‐Remaining-­‐Time-­‐First	
  (SRTF)	
  Scheduling	
  
       •    Difficult	
  to	
  estimate	
  required	
  time	
  
               – Can	
  only	
  estimate	
  the	
  length	
  of	
  Next	
  CPU	
  Burst	
  
               – Can	
  estimate	
  from	
  previous	
  runs	
  
       •    Tends	
  to	
  be	
  less	
  predictable	
  
       •    Can	
  starve	
  long	
  processes	
  
               – notpreemtive	
  SJR	
  is	
  better	
  than	
  SRTF	
  (preemtive	
  SRJ)	
  in	
  this	
  regard	
  	
  
       •    Short	
  processes	
  may	
  still	
  wait	
  if	
  a	
  long	
  process	
  has	
  just	
  started	
  	
  
               – SRTF	
  is	
  better	
  than	
  nonpreemptive	
  SRJ	
  in	
  this	
  regard	
  	
  
	
  
                                                                                                                                                  30	
  
Examples	
  of	
  SJF	
  
Process	
             Arrival	
  Time	
  	
              Burst	
  Time	
  
P1	
   	
             0.0	
   	
              	
         7	
  
P2	
   	
             2.0	
   	
              	
         4	
  
P3	
   	
             4.0	
   	
              	
         1	
  
P4	
   	
             5.0	
   	
              	
         4	
  
SJF	
  (non-­‐preemptive)	
   	
                                                  P3	
                     P2	
                P4	
  
                                                                      P1	
  
	
                                                                                	
  
	
       P1	
                P1	
           P1	
               P1	
        P3=1	
          P2=4	
                   P4=4	
          CPU	
  Time	
  
	
  
0	
                  2	
                4	
        5	
                7	
         8	
                      12	
                16	
  
	
  
P1=7	
               P2=4	
             P3=1	
   P4=4	
               P2=4	
   P2=4	
                      P4=4	
  
	
                                                                    P3=1	
   P4=4	
  
Waiting	
  time	
                                                     P4=4	
  
P1=7-­‐0-­‐7=0	
  
P2=12-­‐2-­‐4=6	
  
P3=8-­‐4-­‐1=3	
  
P4=16-­‐5-­‐4=7	
  
Average	
  waiting	
  time	
  (AWT)	
  =	
  (0+6+3+7)/4=4	
  
SJF	
  (preemptive)	
  
                                                          P3	
  
	
                                                                         P2	
                     P4	
                            	
  
                                                                                                                               P1	
  
	
  
                                                                                       P4=4	
                     P1=5	
  
	
   P1=2	
                    P2=2	
   P3=1	
   P2=2	
  
	
  
0	
                  2	
                    4	
           5	
              7	
                      11	
                       16	
  
	
  
P1=7	
               P1=5	
                 P1=5	
   P1=5	
                P1=5	
                   P1=5	
                     	
  
	
                   P2=4	
                 P2=2          P2=2             P4=4	
                   	
  
Waiting	
  time	
                           P3=1	
   P4=4	
  
P1=16-­‐0-­‐7=9	
  
P2=7-­‐2-­‐4=1	
  
P3=5-­‐4-­‐1=0	
  
P4=11-­‐5-­‐4=2	
  
Average	
  waiting	
  time	
  (AWT)	
  =	
  (9+1+0+2)/4=3	
  
	
  
Priority	
  Scheduling	
  
      • A	
  priority	
  number	
  (integer)	
  is	
  associated	
  with	
  each	
  process	
  
      • The	
  CPU	
  is	
  allocated	
  to	
  the	
  process	
  with	
  the	
  highest	
  priority	
  (smallest	
  integer	
  ≡	
  highest	
  
          priority).	
  
                – Preemptive	
  
                – nonpreemptive	
  
      • SJF	
  is	
  a	
  priority	
  scheduling	
  where	
  priority	
  is	
  the	
  predicted	
  next	
  CPU	
  burst	
  time.	
  
      • Problem	
  ≡	
  Starvation	
  –	
  low	
  priority	
  processes	
  may	
  never	
  execute.	
  
      • Solution	
  ≡	
  Aging	
  –	
  as	
  time	
  progresses	
  increase	
  the	
  priority	
  of	
  the	
  process.	
  
	
  
                                                                                                                                                31	
  
Round	
  Robin	
  (RR)	
  
                    • Each	
  process	
  gets	
  a	
  small	
  unit	
  of	
  CPU	
  time	
  (time	
  quantum),	
  usually	
  10-­‐100	
  milliseconds.	
  	
  
                       After	
  this	
  time	
  has	
  elapsed,	
  the	
  process	
  is	
  preempted	
  and	
  added	
  to	
  the	
  end	
  of	
  the	
  ready	
  
                       queue.	
  
                    • If	
  there	
  are	
  n	
  processes	
  in	
  the	
  ready	
  queue	
  and	
  the	
  time	
  quantum	
  is	
  q,	
  then	
  each	
  
                       process	
  gets	
  1/n	
  of	
  the	
  CPU	
  time	
  in	
  chunks	
  of	
  at	
  most	
  q	
  time	
  units	
  at	
  once.	
  	
  No	
  process	
  
                       waits	
  more	
  than	
  (n-­‐1)q	
  time	
  units.	
  
                    • Performance	
  
                             – q	
  large	
  ⇒	
  FIFO	
  
                             – q	
  small	
  ⇒	
  q	
  must	
  be	
  large	
  with	
  	
  
	
  	
  	
  	
  	
  respect	
  to	
  context	
  switch,	
  	
  
	
  	
  	
  	
  	
  otherwise	
  overhead	
  is	
  too	
  high.	
  
	
  
Example	
  of	
  RR	
  
Process	
  	
             	
  	
  	
  P1	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  P2	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  P3	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  P4	
  
Burst	
  Time	
  	
  	
  	
  	
  	
  53	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  17	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  24	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  68	
  
Time	
  Quantum	
  =	
  20	
  	
                                                                                       	
                                                                    	
                                                	
  	
                          	
  	
         	
  
   • The	
  Gantt	
  chart	
  is:	
  	
  
                                                                                                     P2	
                                                                                                                                                                                                         P3	
                 P1	
                   P4	
  
         	
  
	
   P1=20	
   P2=17	
                                                                                                                 P3=20	
                                                                                P4=20	
                                                     P1=20	
      P3=4	
                                         	
  
                                                                                                                                                                                                                                                                                                                   P4=20	
   P1=13	
   P4=20	
   P4=8	
  
	
   	
              	
                                                                                                                	
                                                                                     	
                                                          	
                       	
        	
          	
      	
  
0	
           20	
                                                                                                                    37	
                                                       57	
                                                                          77	
                   97	
      101	
       121	
     134	
   154	
   162	
  
	
  
P1=53	
   P2=17	
                                                                                                                     P3=24	
                                                    P4=68	
                                                                       P1=33	
                P3=4	
   P4=48	
   P1=13	
   P4=28	
   P4=8	
   	
  
	
  
P2=17	
   P3=24	
                                                                                                                     P4=68	
                                                    P1=33	
                                                                       P3=4	
                 P4=48	
   P1=13	
   P4=28	
  
P3=24	
   P4=68	
                                                                                                                     P1=33	
                                                    P3=4	
                                                                        P4=48	
                P1=13	
  
	
  
P4=68	
   P1=33	
  
	
  
Waiting	
  time	
  
P1=134-­‐0-­‐53=81	
  
P2=37-­‐0-­‐17=20	
  
P3=101-­‐0-­‐24=77	
  
P4=162-­‐0-­‐68=94	
  
Average	
  waiting	
  time	
  (AWT)	
  =	
  (81+20+77+94)/4=68	
  
	
  
     • Typically,	
  higher	
  average	
  turnaround	
  than	
  SJF,	
  but	
  better	
  response.	
  
     • Favors	
  processor-­‐bound	
  processes	
  
     • Virtual	
  Round	
  Robin	
  	
  
     • Second	
  queue	
  for	
  formerly	
  blocked	
  processes	
  –	
  given	
  priority	
  
             – At	
  end	
  of	
  time	
  slice,	
  add	
  to	
  end	
  of	
  standard	
  queue	
  
	
  
	
  
	
  
	
  
                                                                                                                                                                                                                                                                                                                                                     32	
  
Highest	
  Response	
  Ratio	
  Next	
  
     • Depends	
  on	
  Response	
  Ratio	
  
             – W	
  =	
  time	
  spent	
  waiting	
  
             – S	
  =	
  expected	
  CPU	
  burst	
  time	
  
             – Response	
  Ratio	
  =	
  (W	
  +	
  S)	
  /	
  S	
  
     • Select	
  process	
  with	
  highest	
  Response	
  Ratio	
  
     • Nonpreemptive,	
  tries	
  to	
  get	
  best	
  average	
  normalized	
  turnaround	
  time	
  
More	
  Algorithms	
  
     • Fair	
  Share	
  Scheduling	
  	
  
             – Think	
  of	
  processes	
  as	
  part	
  of	
  a	
  group	
  
             – Each	
  group	
  has	
  a	
  specified	
  share	
  of	
  the	
  machine	
  it	
  is	
  allowed	
  to	
  use	
  
             – Priority	
  is	
  based	
  on	
  the	
  time	
  this	
  processes	
  is	
  active,	
  and	
  the	
  time	
  the	
  processes	
  in	
  
                 the	
  group	
  have	
  been	
  active	
  
     • Feedback	
  
             – Starts	
  in	
  high-­‐priority	
  queue,	
  moves	
  down	
  in	
  priority	
  as	
  it	
  executes	
  
             – Lower-­‐priority	
  queues	
  often	
  given	
  longer	
  time	
  slices	
  
             – Can	
  starve	
  long	
  processes	
  
                       • Move	
  up	
  processes	
  if	
  they	
  wait	
  too	
  long	
  	
  
Multilevel	
  Queue	
  
     • Ready	
  queue	
  is	
  partitioned	
  into	
  separate	
  queues	
  
     • Each	
  queue	
  has	
  its	
  own	
  scheduling	
  algorithm,	
  e.g.	
  RR,	
  	
  FCFS	
  
     • Scheduling	
  must	
  be	
  done	
  between	
  the	
  queues.	
  
             – Fixed	
  priority	
  scheduling;	
  (i.e.,	
  serve	
  all	
  from	
  one	
  queue	
  and	
  then	
  from	
  other).	
  	
  
                 Possibility	
  of	
  starvation.	
  
             – Time	
  slice	
  –	
  each	
  queue	
  gets	
  a	
  certain	
  amount	
  of	
  CPU	
  time	
  which	
  it	
  can	
  schedule	
  
                 amongst	
  its	
  processes;	
  i.e.,	
  80%	
  to	
  queue	
  in	
  RR,	
  20%	
  to	
  queue	
  in	
  FCFS	
  	
  
Summary	
  
     • Scheduling	
  decides	
  what	
  processes	
  should	
  be	
  executed	
  by	
  the	
  processor	
  
     • Long-­‐term,	
  Medium-­‐term	
  and	
  Short-­‐term	
  Scheduler	
  
             – Deals	
  with	
  creating	
  a	
  new	
  process	
  
             – Deals	
  with	
  swapping	
  processes	
  in/out	
  
             – What	
  process	
  should	
  we	
  run	
  next?	
  
     • A	
  number	
  of	
  performance	
  measures	
  can	
  be	
  used	
  as	
  scheduling	
  criteria	
  
     • There	
  are	
  a	
  number	
  of	
  CPU	
  scheduling	
  algorithms	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
                                                                                                                                                 33	
  
Exercise	
  Given	
  the	
  following	
  processes	
  with	
  the	
  following	
  arrival	
  and	
  burst	
  times	
  
Process(s)	
   Arrival	
   Burst	
                        Calculate	
  the	
  average	
  waiting	
  time	
  when	
  the	
  following	
  
                        Time	
        Time	
              algorithms	
  are	
  used	
  
	
  P1	
                0	
           9	
                 -­‐First	
  come	
  and	
  first	
  serve	
  (FCFS)	
  scheduling	
  algorithm	
  
P2	
                    6	
           22	
                -­‐Round	
  Robin	
  algorithm	
  with	
  quantum	
  of	
  7	
  
P3	
                    3	
           24	
                -­‐Shortest	
  job	
  first	
  with	
  non	
  pre-­‐emptive	
  version	
  	
  
                                                          -­‐Shortest	
  remaining	
  job	
  first	
  (Shortest	
  job	
  first	
  with	
  pre-­‐
P4	
                    7	
           3	
  
                                                          emptive	
  version)	
  
-­‐First	
  come	
  and	
  first	
  serve	
  (FCFS)	
  scheduling	
  algorithm	
  
	
  
	
                                                 P1	
                                          P3	
                           P2	
            P4	
  
	
   P1=3	
   P1=3	
   P1=1	
   P1=2                                   P3=24	
                                 P2=22	
                 P4=3	
  
	
                                                                     	
                                      	
                      	
  
	
   0	
          3	
         6	
      7	
         9	
                                           33	
                           55	
            58	
  
                                                                                                 P2=22	
                        P4=3	
          	
  
	
   P1=9	
   P3=24	
   P2=22	
  P4=3	
   P3=24	
  
                                                   P2=22	
                                       P4=3	
  
Waiting	
  time	
                                  P4=3	
  
P1=9-­‐0-­‐9=0	
                            =2	
  
P2=55-­‐6-­‐22=27	
  
P3=33-­‐3-­‐24=6	
  
P4=58-­‐7-­‐3=48	
  
Average	
  waiting	
  time	
  (AWT)	
  =	
  (0+27+6+48)/4=20.25	
  
	
  
-­‐Round	
  Robin	
  algorithm	
  with	
  quantum	
  of	
  7	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
-­‐Shortest	
  job	
  first	
  with	
  non	
  pre-­‐emptive	
  version	
  	
  
	
  
	
  
	
  
	
  
             	
  
             	
  
             	
  
             	
  
	
  
                                                                                                                                                         34	
  
 
-­‐Shortest	
  remaining	
  job	
  first	
  (Shortest	
  job	
  first	
  with	
  pre-­‐emptive	
  version)	
  
            	
  
            	
  
            	
  
            	
  
            	
  
            	
  
            	
  
            	
  
            	
  
            	
  
Ex.	
  Calculate	
  the	
  wait	
  time	
  for	
  each	
  of	
  the	
  following	
  process	
  and	
  the	
  overall	
  average	
  wait	
  time	
  
when	
  implementing	
  the	
  following	
  algorithm.	
  
-­‐FCFS	
  
-­‐RR	
  
-­‐SJF	
  (non	
  pre-­‐emptive)	
  
-­‐SJF	
  (pre-­‐emptive)	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
                                                                                                                                                35	
  
Deadlocks	
  
Bridge	
  Crossing	
  Example	
  




                                                                                                           	
  
       • Bridge	
  traffic	
  only	
  in	
  one	
  direction.	
  
       • Each	
  section	
  of	
  a	
  bridge	
  can	
  be	
  viewed	
  as	
  a	
  resource.	
  
       • If	
  a	
  deadlock	
  occurs,	
  it	
  can	
  be	
  resolved	
  if	
  one	
  car	
  backs	
  up	
  (preempt	
  resources	
  and	
  
         rollback).	
  
       • Several	
  cars	
  may	
  have	
  to	
  be	
  backed	
  up	
  if	
  a	
  deadlock	
  occurs.	
  
	
  
Recap	
  …	
  Processes	
  …	
  Deadlock	
  
       • Process	
  –	
  program	
  in	
  execution	
  -­‐	
  active	
  element	
  with	
  states	
  
       • Process	
  uses	
  resources	
  during	
  its	
  operation	
  	
  
              – Process	
  takes	
  ownership	
  of	
  CPU,	
  memory,	
  bus	
  ….	
  
       • Processes	
  have	
  to	
  compete	
  for	
  limited	
  recourses	
  
       • Deadlock	
  	
  
              – Permanent	
  blocking	
  of	
  a	
  set	
  of	
  processes	
  that	
  either	
  compete	
  for	
  system	
  
                    resources	
  or	
  communicate	
  with	
  each	
  other	
  
              – Involve	
  conflicting	
  needs	
  for	
  resources	
  by	
  two	
  or	
  more	
  processes	
  
       • Starvation	
  
              – Indefinite	
  delay	
  of	
  a	
  process	
  due	
  to	
  queue	
  of	
  processes	
  
	
  
Process	
  Deadlock	
  
Processes	
  P	
  and	
  Q	
  are	
  competing	
  for	
  recourses	
  D	
  and	
  T	
  
	
  
	
  
Process	
  P	
                              Process	
  Q	
  
Step	
   Action	
                           Step	
   Action	
  
P0	
  	
   Request	
  (D)	
                 Q0	
  	
   Request	
  (T)	
  
P1	
  	
   Lock	
  (D)	
                    Q1	
  	
   Lock	
  (T)	
  
P2	
   Request	
  (T)	
                     Q2	
   Request	
  (D)	
  
P3	
   Lock	
  (T)	
                        Q3	
   Lock	
  (D)	
  
P4	
   Perform	
  function	
                Q4	
   Perform	
  function	
  
P5	
   Unlock	
  (D)	
                      Q5	
   Unlock	
  (T)	
  
P6	
   Unlock	
  (T)	
                      Q6	
   Unlock	
  (D)	
  
	
                                          	
  
	
  
                                                                                                                                                36	
  
Resources	
  
     • Reusable	
  Resources	
  	
  
           – Can	
  only	
  be	
  used	
  by	
  one	
  process	
  at	
  a	
  time.	
  	
  After	
  use,	
  can	
  be	
  reassigned	
  to	
  
                another	
  process	
  	
  
           – Processors,	
  I/O	
  channels,	
  main	
  and	
  secondary	
  memory,	
  files,	
  databases	
  
           – Deadlock	
  occurs	
  if	
  each	
  process	
  holds	
  one	
  resource	
  and	
  requests	
  the	
  other	
  
     • Consumable	
  Resources	
  
           – Created	
  (produced)	
  and	
  destroyed	
  (consumed)	
  by	
  a	
  process	
  
           – Interrupts,	
  signals,	
  messages,	
  and	
  information	
  
           – Can	
  deadlock	
  if	
  both	
  waiting	
  for	
  a	
  message	
  from	
  each	
  other	
  
           – May	
  take	
  a	
  rare	
  combination	
  of	
  events	
  to	
  cause	
  deadlock	
  
	
  
Examples	
  of	
  Deadlock	
  
     • With	
  reusable	
  resources	
  	
  
           – Space	
  is	
  available	
  for	
  allocation	
  of	
  200K	
  bytes	
  
           – Deadlock	
  occurs	
  if	
  both	
  processes	
  progress	
  to	
  
                	
  their	
  second	
  request	
  
     • With	
  consumable	
  resources	
  
           – Deadlock	
  occurs	
  if	
  receive	
  is	
  blocked	
  
	
  
Conditions	
  for	
  Deadlock	
  
Deadlock	
  can	
  arise	
  if	
  four	
  conditions	
  hold	
  simultaneously	
  
     • Mutual	
  Exclusion	
  
           – Only	
  one	
  process	
  can	
  hold	
  the	
  resource	
  at	
  any	
  given	
  time	
  
     • Hold	
  and	
  Wait	
  
           – A	
  process	
  may	
  hold	
  resources	
  while	
  requesting	
  other	
  resources	
  
     • No	
  Preemption	
  
           – No	
  resource	
  may	
  be	
  forcibly	
  removed	
  from	
  a	
  process	
  
     • Circular	
  Wait	
  (event)	
  
           – A	
  closed	
  chain	
  of	
  process	
  exists,	
  each	
  waiting	
  for	
  a	
  resource	
  held	
  by	
  the	
  next	
  
                process	
  in	
  the	
  chain	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
Deadlock	
  Prevention	
  
     • Can	
  prevent	
  deadlock	
  by	
  forbidding	
  one	
  of	
  the	
  conditions	
  
     • Forbid	
  Mutual	
  Exclusion	
  
	
  
                                                                                                                                               37	
  
– Must	
  hold	
  for	
  nonsharable	
  resources	
  
            – Generally	
  not	
  reasonable	
  
       • Forbid	
  Hold	
  and	
  Wait	
  
            – No	
  holding	
  of	
  resources	
  when	
  request	
  made	
  	
  
            – Ask	
  for	
  all	
  resources	
  at	
  one	
  time	
  
            – May	
  block	
  a	
  process	
  in	
  waiting	
  for	
  resources	
  it	
  doesn’t	
  yet	
  need	
  
            – May	
  hold	
  resources	
  that	
  are	
  not	
  needed	
  immediately	
  
            – May	
  not	
  know	
  what	
  to	
  request	
  
       • Forbid	
  No	
  Preemption	
  
            – Take	
  resources	
  away	
  from	
  waiting	
  processes	
  
            – Only	
  feasible	
  if	
  state	
  can	
  be	
  saved,	
  e.g.	
  CPU,	
  Memory	
  
       • Forbid	
  Circular	
  Wait	
  
            – Define	
  a	
  linear	
  order	
  on	
  items	
  
                      • If	
  it	
  needs	
  resources	
  3,	
  15,	
  6,	
  9,	
  and	
  4	
  then	
  must	
  request	
  in	
  the	
  order	
  3,	
  4,	
  6,	
  
                           9,	
  15	
  
                      • May	
  not	
  be	
  easy	
  to	
  define	
  the	
  order	
  
         ***Cannot	
  have	
  circular	
  wait	
  because	
  a	
  process	
  cannot	
  have	
  9	
  and	
  request	
  5	
  
	
  
State	
  of	
  the	
  System	
  
       • State	
  of	
  the	
  system	
  is	
  the	
  current	
  allocation	
  of	
  resources	
  to	
  processes	
  
       • Safe	
  state	
  	
  
                – There	
  exists	
  at	
  least	
  one	
  sequence	
  that	
  does	
  not	
  result	
  in	
  deadlock	
  
                – We	
  can	
  finish	
  all	
  processes	
  by	
  some	
  scheduling	
  sequence	
  
       • Unsafe	
  state	
  is	
  a	
  state	
  that	
  may	
  lead	
  to	
  deadlock	
  
       • When	
  a	
  process	
  requests	
  an	
  available	
  resource,	
  system	
  must	
  decide	
  if	
  immediate	
  
           allocation	
  leaves	
  the	
  system	
  in	
  a	
  safe	
  state	
  
	
  
Current	
  allocation:	
  
	
                                 A	
  B	
  C	
  
P0	
                               0	
  1	
  0	
  
	
  P1	
                           2	
  0	
  0	
  	
  
	
  P2	
                           3	
  0	
  3	
  	
  
	
  P3	
                           2	
  1	
  1	
  	
  
	
  P4	
                           0	
  0	
  2	
  
	
  
Deadlock	
  Avoidance	
  
       • A	
  method	
  which	
  ensures	
  that	
  a	
  system	
  never	
  enter	
  an	
  unsafe	
  state	
  
       • Makes	
  a	
  decision	
  dynamically	
  whether	
  the	
  current	
  resource	
  allocation	
  request	
  will	
  
           potentially	
  lead	
  to	
  a	
  deadlock	
  
       • Requires	
  knowledge	
  of	
  future	
  process	
  request	
  
       • Uses	
  Resource	
  Allocation	
  Denial	
  or	
  Banker’s	
  Algorithm	
  for	
  analysis	
  
	
  
                                                                                                                                                             38	
  
Deadlock	
  Avoidance	
  
     • A	
  method	
  which	
  ensures	
  that	
  a	
  system	
  never	
  enter	
  an	
  unsafe	
  state	
  
     • Makes	
  a	
  decision	
  dynamically	
  whether	
  the	
  current	
  resource	
  allocation	
  request	
  will	
  
       potentially	
  lead	
  to	
  a	
  deadlock	
  
     • Requires	
  knowledge	
  of	
  future	
  process	
  request	
  
     • Uses	
  Resource	
  Allocation	
  Denial	
  or	
  Banker’s	
  Algorithm	
  for	
  analysis	
  
	
  
Deadlock	
  Avoidance	
  	
  
A	
  method	
  which	
  ensures	
  that	
  a	
  system	
  never	
  enter	
  an	
  unsafe	
  state	
  
A	
  decision	
  is	
  made	
  dynamically	
  whether	
  the	
  current	
  resource	
  allocation	
  request	
  will	
  potentially	
  lead	
  to	
  a	
  
deadlock	
  
Assume	
  we	
  know	
  the	
  maximum	
  requests	
  for	
  each	
  process	
  
	
  	
  Process	
  must	
  declare	
  it	
  needs	
  a	
  max	
  of	
  objects	
  
	
  	
  Do	
  not	
  need	
  to	
  use	
  its	
  max	
  claims	
  
	
  	
  Can	
  make	
  requests	
  at	
  any	
  time	
  and	
  in	
  any	
  order	
  
Process	
  Initiation	
  Denial	
  
	
  	
  Track	
  current	
  allocations	
  
	
  	
  Assume	
  all	
  processes	
  may	
  make	
  maximum	
  requests	
  at	
  the	
  same	
  time	
  
	
  	
  Only	
  start	
  process	
  if	
  it	
  can’t	
  result	
  in	
  deadlock	
  regardless	
  of	
  allocation	
  
Requires	
  knowledge	
  of	
  future	
  process	
  request	
  
	
  
Resource	
  Allocation	
  Denial	
  (Banker’s	
  Algorithm)	
  
     • Process	
  makes	
  maximum	
  claims	
  for	
  recourses	
  but	
  no	
  need	
  to	
  use	
  its	
  max	
  claims	
  
     • Process	
  makes	
  a	
  request	
  for	
  resources	
  
     • Reject	
  a	
  request	
  if	
  it	
  exceeds	
  the	
  processes’	
  declared	
  maximum	
  claims	
  
     • Grant	
  a	
  request	
  if	
  the	
  new	
  state	
  would	
  be	
  safe	
  
     • Determining	
  if	
  a	
  state	
  is	
  safe	
  
          – Find	
  any	
  process	
  Pi	
  for	
  which	
  we	
  can	
  meet	
  it’s	
  maximum	
  requests	
  
          – Mark	
  Pi	
  as	
  “done”,	
  add	
  its	
  resources	
  to	
  available	
  resource	
  pool	
  
          – State	
  is	
  safe	
  if	
  we	
  can	
  mark	
  all	
  processes	
  as	
  “done”	
  
     • Block	
  a	
  process	
  if	
  the	
  resources	
  are	
  not	
  currently	
  available	
  or	
  the	
  new	
  state	
  is	
  not	
  safe	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
                                                                                                                                                             39	
  
Example	
  of	
  Banker’s	
  Algorithm	
  
       • Assume	
  that	
  we	
  have	
  five	
  processes:	
  P0,	
  P1,	
  P2,	
  P3	
  and	
  P4.	
  
       • Resource	
  vector:	
  	
  	
   A	
  	
  B	
  	
  C	
  
	
                               	
   10	
  	
  5	
  	
  7	
  
       • Initial	
  state	
  (snapshot	
  at	
  time	
  =	
  0):	
  
	
                               	
  	
  	
  	
  	
  Allocation	
   Max	
  claim	
   Need	
  
	
                               	
   A	
  B	
  C	
   	
                                      A	
  B	
  C	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  A	
  B	
  C	
  
P0	
                             	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  0	
  1	
  0	
   	
   7	
  5	
  3	
  	
   	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  7	
  4	
  3	
  
	
  P1	
                         	
  	
  	
  	
  	
  	
  	
  	
  	
  2	
  0	
  0	
  	
   	
   3	
  2	
  2	
  	
  	
  	
  	
                                     1	
  2	
  2	
  	
  
	
  P2	
                         	
   3	
  0	
  2	
  	
   	
                                  9	
  0	
  2	
  	
  	
  	
                                         6	
  0	
  0	
  	
  
	
  P3	
                         	
   2	
  1	
  1	
  	
   	
                                  2	
  2	
  2	
  	
   	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  0	
  1	
  1	
  
	
  P4	
                         	
   0	
  0	
  2	
   	
                                      4	
  3	
  3	
  	
   	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  4	
  3	
  1	
  	
  
Available	
  vector	
            A	
  	
  B	
  	
  C	
  
	
                               3	
  	
  3	
  	
  2	
  
Exercise:	
  Analyze	
  the	
  state	
  of	
  the	
  system	
  using	
  Bankers’	
  algorithm	
  
Process	
                            Initial	
  allocation	
  	
                                       Need	
  	
                                                 • S
                                                                                                                                                                         Done?	
  No	
  if	
                Updated	
  Available	
  
                                     	
  	
  A	
  	
  	
  	
  	
  	
  B	
  	
  	
  	
  	
  	
  C	
     	
  	
  A	
  	
  	
  	
  	
  	
  B	
  	
  	
  	
  	
  	
  C	
   a 	
                                 	
  	
  	
  	
  A	
  	
  	
  	
  	
  	
  B	
  	
  	
  	
  	
  	
  C	
  
                                                                                                                                                                       t 	
  	
  	
  	
  	
  	
  	
   • S   	
  	
  	
  3	
  	
  	
  	
  	
  	
  	
  	
  3	
  	
  	
  	
  	
  	
  	
  2	
  
                                                                                                                                      i          a
P0	
             0	
  	
  	
  	
  	
  	
  	
  1	
  	
  	
  	
  	
  	
  0	
   7	
  	
  	
  	
  	
  	
  4	
  	
  	
  	
  	
  	
  3	
   s No	
      t        -­‐	
  
                                                                                                                                      f          i
                                                                                                                                      i          s
P1	
             2	
  	
  	
  	
  	
  	
  	
  0	
  	
  	
  	
  	
  	
  0	
   1	
  	
  	
  	
  	
  	
  2	
  	
  	
  	
  	
  	
  2	
   e Yes	
     f        	
  	
  5	
  	
  	
  	
  	
  	
  3	
  	
  	
  	
  	
  	
  2	
  
                                                                                                                                      s          i
                                                                                                                                      	
         e
                                                                                                                                      s          s
P2	
             3	
  	
  	
  	
  	
  	
  	
  0	
  	
  	
  	
  	
  	
  2	
   6	
  	
  	
  	
  	
  	
  0	
  	
  	
  	
  	
  	
  0	
   a No	
      	
       -­‐	
  
                                                                                                                                      f          s        	
  
                                                                                                                                      e          a
P3	
             2	
  	
  	
  	
  	
  	
  	
  1	
  	
  	
  	
  	
  	
  1	
   0	
  	
  	
  	
  	
  	
  1	
  	
  	
  	
  	
  	
  1	
   t Yes	
     f        	
  	
  7	
  	
  	
  	
  	
  	
  4	
  	
  	
  	
  	
  3	
  
                                                                                                                                      y          e
                                                                                                                                      	
         t
P4	
             0	
  	
  	
  	
  	
  	
  	
  0	
  	
  	
  	
  	
  	
  2	
   4	
  	
  	
  	
  	
  	
  3	
  	
  	
  	
  	
  	
  1	
   ? Yes	
     y        	
  	
  7	
  	
  	
  	
  	
  4	
  	
  	
  	
  	
  	
  	
  5	
  
                                                                                                                                      	
  	
     	
  
                                                                                                                                    • S          ?
                                                                                                                                      a          	
  	
  
P0	
             0	
  	
  	
  	
  	
  	
  	
  1	
  	
  	
  	
  	
  	
  0	
   7	
  	
  	
  	
  	
  	
  4	
  	
  	
  	
  	
  	
  3	
   t Yes	
   • S        	
  	
  7	
  	
  	
  	
  	
  	
  5	
  	
  	
  	
  	
  	
  5	
  	
  	
  	
  
                                                                                                                                      i          a
                                                                                                                                      s          t
P2	
             3	
  	
  	
  	
  	
  	
  	
  0	
  	
  	
  	
  	
  	
  2	
   6	
  	
  	
  	
  	
  	
  0	
  	
  	
  	
  	
  	
  0	
   f Yes	
     i        	
  	
  	
  10	
  	
  	
  5	
  	
  	
  	
  	
  7	
  
                                                                                                                                      i          s
                                                                                                                                      e          f
       • Satisfies	
  safety	
  ?	
  the	
  system	
  safety	
  condition	
  (every	
  process	
  can	
  done	
  )	
                  s          i
P1>P3>P4>P0>P2	
                                                                                                                      	
         e
                                                                                                                                      s          s
	
                                                                                                                                               	
  
                                                                                                                                      a
	
                                                                                                                                    f          s
                                                                                                                                      e          a
                                                                                                                                                 f                                                                                                                                            40	
  
                                                                                                                                      t
• Now	
  consider	
  the	
  actual	
  resource	
  requests	
  
       • P0	
  Requests	
  (0,0,0)	
  	
  
               – Check	
  that	
  Need	
  ≤	
  Available,	
  that	
  is,	
  (7,4,3)	
  ≤	
  (3,3,2)	
  ⇒	
  false	
  
	
                            	
   	
  ⇒	
  May	
  lead	
  to	
  unsafe	
  state	
  ⇒	
  Request	
  not	
  granted	
  
       • P1	
  Requests	
  (1,0,2)	
  	
  
               – Check	
  that	
  Need	
  ≤	
  Available,	
  that	
  is,	
  (1,2,2)	
  ≤	
  (3,3,2)	
  ⇒	
  ?	
  
               – Check	
  that	
  Request	
  ≤	
  Max	
  claim,	
  that	
  is,	
  (1,0,2)	
  ≤	
  (3,2,2)	
  ⇒	
  ?	
  
               – Check	
  that	
  Request	
  ≤	
  Available,	
  that	
  is,	
  (1,0,2)	
  ≤	
  (3,3,2)	
  ⇒?	
  
	
                            	
   ⇒	
  System	
  state	
  ?	
  	
   	
  
       • Homework:	
  Can	
  requests	
  for	
  (5,3,0)	
  by	
  P4	
  be	
  granted?	
  
	
  
Deadlock	
  Avoidance	
  
     • Maximum	
  resource	
  requirement	
  must	
  be	
  stated	
  in	
  advance	
  
     • Processes	
  under	
  consideration	
  must	
  be	
  independent;	
  no	
  synchronization	
  requirements	
  
     • There	
  must	
  be	
  a	
  fixed	
  number	
  of	
  resources	
  to	
  allocate	
  
     • Requires	
  knowledge	
  of	
  future	
  process	
  request	
  
     • Avoidance	
  method	
  tends	
  to	
  limit	
  access	
  to	
  resources	
  
	
  
Deadlock	
  Detection	
  
     • Grant	
  arbitrary	
  requests	
  and	
  note	
  when	
  deadlock	
  happens	
  
          – Allow	
  system	
  to	
  enter	
  deadlock	
  state	
  	
  
     • Detect	
  deadlock	
  using	
  a	
  detection	
  algorithm,	
  e.g.	
  
          – Create	
  table	
  of	
  process	
  requests,	
  current	
  allocations	
  
          – Mark	
  any	
  process	
  whose	
  requests	
  can	
  be	
  met	
  (requests	
  £	
  available	
  resources)	
  
          – Reclaim	
  resources	
  held	
  by	
  the	
  marked	
  process	
  	
  
          – If	
  any	
  processes	
  cannot	
  be	
  marked,	
  they	
  are	
  part	
  of	
  a	
  deadlock	
  
     • Use	
  a	
  recovery	
  strategy	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
                                                                                                                          41	
  
Example	
  of	
  Deadlock	
  Detection	
  
Assume	
  that	
  we	
  have	
  five	
  processes	
  with	
  resource	
  vector:	
  	
                                                                                                                        A	
  	
  B	
  	
  C	
  
	
                                   	
   	
  	
                                              	
  	
   	
   	
                               	
  	
  	
  	
  	
   	
  	
  	
  	
                              7	
  	
  2	
  	
  6	
  
and	
  with	
  initial	
  state	
  of	
  allocation	
  matrix:	
   	
  
                                                                                                                 Exercise:	
  
	
                                   	
   A	
  B	
  C	
   	
                                                     Analyse	
  the	
  following	
  two	
  scenarios	
  with	
  
P0	
                                 	
  	
  	
  	
  	
  	
  	
  	
  	
  	
   0	
  1	
  0	
                      request	
  matrices:	
  
	
  P1	
                             	
                                 2	
  0	
  0	
  	
                        	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  Request1	
  	
  	
  	
  	
  Request2	
  
	
  P2	
                             	
   3	
  0	
  3	
  	
                                                      	
                                               A	
  B	
  C	
  	
   	
  	
  	
  	
  	
  	
  A	
  B	
  C	
  
                                                                                                                 P0	
                                             0	
  0	
  0	
  	
   	
  	
  	
  	
  	
  	
  0	
  0	
  0	
  	
  
	
  P3	
                             	
   2	
  1	
  1	
  	
  
                                                                                                                 	
  P1	
   2	
  0	
  2	
  	
   	
  	
  	
  	
  	
  	
  2	
  0	
  2	
  	
  
	
  P4	
                             	
   0	
  0	
  2	
                                                          	
  P2	
   0	
  0	
  0	
  	
   	
  	
  	
  	
  	
  	
  0	
  0	
  1	
  	
  
=>	
  Initial	
  available	
  vector	
  A	
  	
  B	
  	
  C	
                                                    	
  P3	
   1	
  0	
  0	
  	
   	
  	
  	
  	
  	
  	
  1	
  0	
  0	
  
	
                                   	
   0	
  	
  0	
  	
  0	
                                                  	
  P4	
   0	
  0	
  2	
  	
   	
  	
  	
  	
  	
  	
  0	
  0	
  2	
  
Analysis	
  of	
  scenario	
  with	
  Request1	
                                                                 	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
                                                         	
  
           • State	
  of	
  system	
  ?	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
                                                                                                                                                                                                                                        42	
  
Recovery	
  Strategies	
  once	
  Deadlock	
  Detected	
  
     • Abort	
  all	
  deadlocked	
  processes	
  
     • Back	
  up	
  each	
  deadlocked	
  process	
  to	
  some	
  previously	
  defined	
  checkpoint,	
  and	
  restart	
  all	
  
           process	
  
               – original	
  deadlock	
  may	
  occur	
  
     • Successively	
  abort	
  deadlocked	
  processes	
  until	
  deadlock	
  no	
  longer	
  exists	
  
     • Successively	
  preempt	
  resources	
  until	
  deadlock	
  no	
  longer	
  exists	
  
	
  
Selection	
  Criteria	
  Deadlocked	
  Processes	
  
     • Least	
  amount	
  of	
  processor	
  time	
  consumed	
  so	
  far	
  
     • Least	
  number	
  of	
  lines	
  of	
  output	
  produced	
  so	
  far	
  
     • Most	
  estimated	
  time	
  remaining	
  
     • Least	
  total	
  resources	
  allocated	
  so	
  far	
  
     • Lowest	
  priority	
  
Summary	
  
     • Deadlock	
  is	
  a	
  state	
  of	
  permanent	
  blocking	
  of	
  a	
  set	
  of	
  processes	
  due	
  to	
  limited	
  system	
  
           resources	
  	
  
     • Deadlock	
  can	
  arise	
  if	
  Mutual	
  Exclusion,	
  Hold	
  and	
  Wait,	
  No	
  Preemption	
  and	
  Circular	
  Wait	
  
           hold	
  simultaneously	
  
     • Banker’s	
  Algorithm	
  is	
  ensures	
  that	
  a	
  system	
  never	
  enter	
  an	
  unsafe	
  state	
  
     • Detection	
  algorithm	
  allows	
  system	
  to	
  enter	
  deadlock	
  state	
  and	
  uses	
  recovery	
  strategy	
  
	
  
Ex:	
  Two	
  process	
  P0	
  and	
  P1	
  are	
  competing	
  for	
  recourse	
  A	
  and	
  B.	
  Given	
  the	
  following	
  scenario:	
  
Initial	
  available	
  vector	
  A	
  B:	
  4	
  2	
  
Initial	
  allocation	
  matrix	
  	
  	
  A	
  	
  	
  	
  	
  	
  B	
  
	
                                                            P0	
  1	
  	
  	
  	
  	
  	
  	
  2	
  
                                                                                                                    Using	
  the	
  Banker’s	
  algorithm	
  identify	
  if	
  the	
  
	
                                                            P1	
  2	
  	
  	
  	
  	
  	
  	
  2	
  
                                                                                                                    request	
  made	
  by	
  P0	
  and	
  P1	
  can	
  be	
  granted	
  
Maximum	
  claim	
  matrix	
  	
  	
  A	
  	
  	
  	
  	
  	
  B	
  
	
                                                            P0	
  8	
  	
  	
  	
  	
  	
  	
  6	
  
	
                                                            P1	
  4	
  	
  	
  	
  	
  	
  	
  3	
  
Request	
  matrix	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  A	
  	
  	
  	
  	
  	
  B	
  
	
                                                            P0	
  1	
  	
  	
  	
  	
  	
  	
  2	
  
	
                                                            P1	
  2	
  	
  	
  	
  	
  	
  	
  2	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
                                                                                                                                                                                   43	
  
Cache	
  memory	
  
Recap	
  …	
  The	
  Memory	
  Hierarchy	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
   • Problem	
  between	
  CPU	
  and	
  Memory:	
  	
  
          – CPU	
  is	
  very	
  fast	
  whereas	
  main	
  memory	
  DRAM	
  is	
  too	
  slow	
  
          – Slow	
  main	
  memory	
  constraints	
  the	
  ability	
  of	
  a	
  fast	
  CPU	
  
   • Ways	
  to	
  solve	
  the	
  problem:	
  
          – Use	
  SRAM	
  in	
  all	
  main	
  memory	
  but	
  very	
  expensive,	
  not	
  feasible	
  
          – Small	
  capacity	
  of	
  SRAM	
  built	
  between	
  CPU	
  and	
  main	
  memory	
  for	
  frequently	
  
                required	
  information	
  
Cache	
  
   • Small	
  amount	
  of	
  fast	
  memory	
  -­‐	
  for	
  storing	
  recently/frequently	
  used	
  instructions	
  and	
  
       data	
  
   • Sits	
  between	
  normal	
  main	
  memory	
  and	
  CPU	
  
   • Cache	
  memory	
  is	
  based	
  on	
  Locality	
  principles	
  
   • May	
  be	
  located	
  on	
  CPU	
  chip	
  or	
  module	
  




                                                                                                          	
  
	
  
	
  
                                                                                                                                  44	
  
Cache	
  Overview	
  
Operation	
  
     • CPU	
  requests	
  contents	
  of	
  memory	
  location	
  
     • Check	
  cache	
  for	
  this	
  data	
  
     • If	
  present	
  (hit),	
  get	
  from	
  cache	
  (fast)	
  
     • If	
  not	
  present	
  (miss),	
  read	
  required	
  block	
  
       from	
  main	
  memory	
  to	
  cache	
  
     • Then	
  deliver	
  from	
  
                                                         Typical	
  Cache	
  
       cache	
  to	
  CPU	
                               Organization	
  
	
                                                                	
  
Cache	
  memory	
  performance	
  
     • Hit	
  	
  
              – The	
  information	
  requested	
  is	
  found	
  in	
  
                    the	
  cache.	
  
              – Hit	
  ratio	
  (h):	
  the	
  fraction	
  of	
  memory	
  access	
  found	
  in	
  the	
  cache	
  
              – Hit	
  time:	
  time	
  to	
  access	
  the	
  cache:	
  	
  
     • Miss	
  
              – The	
  data	
  requested	
  are	
  not	
  found	
  in	
  the	
  cache.	
  	
  
              – Fetch	
  the	
  information,	
  write	
  into	
  cache	
  and	
  send	
  to	
  CPU	
  
              – Miss	
  ratio	
  =	
  1	
  -­‐	
  h,	
   (the	
  smaller	
  the	
  better)	
  
              – Miss	
  penalty	
  (Tmiss):	
  (time	
  to	
  replace	
  write	
  in	
  cache)	
  +	
  time	
  to	
  send	
  the	
  data	
  to	
  CPU	
  
              – Miss	
  penalty	
  is	
  much	
  longer	
  than	
  hit	
  time	
  
	
  
Cache	
  Design	
  
     • Design	
  objective	
  
              – To	
  provide	
  adequate	
  fast	
  memory	
  at	
  a	
  reasonable	
  cost	
  
     • Design	
  issues	
  
              – How	
  to	
  store	
  data	
  in	
  catch	
  memory?	
  
              – How	
  to	
  determine	
  that	
  a	
  data	
  requested	
  by	
  CPU	
  is	
  in	
  the	
  cache	
  memory?	
  
              – How	
  to	
  find	
  it?	
  
     • Design	
  characteristics	
  
              – Number	
  of	
  Caches,	
  Size,	
  Block	
  Size	
  
              – Mapping	
  methods:	
  direct,	
  associative,	
  set	
  associative	
  
              – Replacement	
  Algorithm	
  
              – Write	
  Policy	
  
	
  
Direct	
  Mapping	
  Cache	
  Memory	
  
     • Data	
  are	
  transferred	
  between	
  cache	
  and	
  main	
  memory	
  in	
  blocks	
  
     • Main	
  memory	
  is	
  divided	
  into	
  blocks	
  
     • Cache	
  built	
  in	
  lines	
  (slots)	
  each	
  of	
  which	
  can	
  hold	
  one	
  block	
  size	
  
     • Each	
  block	
  of	
  main	
  memory	
  maps	
  to	
  only	
  one	
  cache	
  line	
  
	
  
                                                                                                                                                     45	
  
•   Address	
  is	
  in	
  three	
  parts	
  
       •   Least	
  Significant	
  w	
  bits	
  identify	
  unique	
  word	
  –	
  word	
  identifier	
  
       •   The	
  next	
  higher	
  significant	
  r	
  bits	
  specify	
  a	
  cache	
  line	
  –	
  cache	
  line	
  identifier	
  
       •   The	
  most	
  significant	
  s-­‐r	
  bits	
  specify	
  a	
  tag	
  –	
  tag	
  identifier	
  	
  
       •   Most	
  Significant	
  s	
  bits	
  specify	
  one	
  memory	
  block	
  
                                        Tag	
  s-­‐r	
           Line	
  or	
  Slot	
  r	
   Word	
  w	
  
	
  
Direct	
  Mapping	
  Cache	
  Organization	
  
     • No	
  two	
  blocks	
  in	
  the	
  same	
  line	
  have	
  the	
  same	
  Tag	
  field	
  
     • 	
  Check	
  contents	
  of	
  cache	
  by	
  finding	
  line	
  and	
  checking	
  Tag	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
                                                                                                                                        46	
  
Direct	
  Mapping	
  Example	
  
   • Finding	
  a	
  direct	
  mapping	
  address	
  structure	
  for:	
  Main	
  memory	
  capacity	
  =	
  16MBytes;	
  
       Block	
  size=	
  4	
  Bytes	
  and	
  Cache	
  capacity	
  64	
  KBytes	
  
   • Main	
  memory	
  capacity	
  16MBytes	
  =	
  224	
  	
  Bytes	
  =>	
  address	
  length	
  =	
  24	
  bit	
  	
  
   • Block	
  size	
  =	
  4	
  Bytes	
  (words)	
  =	
  22	
  =>	
  2	
  bits	
  for	
  word	
  identifier	
  	
  
   • Number	
  of	
  cache	
  blocks	
  (lines)	
  =	
  cache	
  capacity/block	
  size	
  =	
  64K/4	
  =	
  16K	
  =	
  214	
  	
  =>	
  14	
  bits	
  
       for	
  line	
  identifier	
  	
  
   • Blocks	
  of	
  main	
  memory	
  are	
  divided	
  into	
  sets	
  that	
  are	
  labelled	
  as	
  tag.	
  	
  
                            number of main memory blocks 222
           number of sets =                             = 14 = 28
                               number of cache blocks    2        	
  
     • Or	
  Number	
  of	
  bits	
  for	
  tag	
  =	
  address	
  length	
  –	
  word	
  identifier	
  –	
  line	
  identifier	
  =	
  24	
  –	
  2	
  –	
  14	
  
             =	
  8	
  bits	
  
So,	
  a	
  24-­‐bit	
  address	
  is	
  divided	
  into	
  3	
  parts:	
  tag,	
  slot	
  and	
  word.	
  
Word:	
  2-­‐bit	
  (block	
  size	
  or	
  line	
  size)	
  
Line	
  or	
  Slot:	
  14-­‐bit	
  (as	
  slot	
  address	
  index	
  in	
  cache	
  memory)	
  
Tag:	
  8-­‐bit.	
  
                                Tag	
  s-­‐r	
  =	
  8	
             Line	
  or	
  Slot	
  r	
  =	
  	
  14	
   Word	
  w=	
  2	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
                                                                • Cache	
  line	
  table	
  (number	
  of	
  lines	
  in	
  cache	
  m=	
  214)	
  
	
                                                                      	
  
	
                                                                • Starting	
  memory	
  address	
  of	
  block	
  	
  
                                                                  Cache	
  line	
   	
                         Main	
  Memory	
  blocks	
  held	
  
	
                                                                	
          	
            	
                 Starting	
  memory	
  address	
  of	
  block	
  	
  
	
                                                                0	
         	
            	
                 0,	
  m,	
  2m,	
  3m…2s-­‐m	
  
	
                                                                1	
         	
            	
                 1,	
  m+1,	
  2m+1…2s-­‐m+1	
  
	
                                                                m-­‐1	
   	
              	
                 m-­‐1,	
  2m-­‐1,	
  3m-­‐1…2s-­‐1	
  
                                                                                                                                        	
  
	
                                                              	
  

                                                                                                                                                              47	
  
Direct	
  Mapping	
  Summary	
  
     • Address	
  length	
  =	
  (s	
  +	
  w)	
  bits	
  
     • Number	
  of	
  addressable	
  units	
  =	
  2s+w	
  words	
  or	
  bytes	
  
     • Block	
  size	
  =	
  line	
  size	
  =	
  2w	
  words	
  or	
  bytes	
  
            – Size	
  for	
  word	
  identifier	
  =	
  w	
  bits	
  	
  
     • Number	
  of	
  blocks	
  in	
  main	
  memory	
  =	
  2s+	
  w/2w	
  =	
  2s	
  
     • Number	
  of	
  lines	
  in	
  cache	
  (Number	
  of	
  blocks	
  in	
  cache	
  memory)	
  =	
  m	
  =	
  Cache	
  
       Capacity/Block	
  Size	
  =	
  2r	
  
            – Size	
  for	
  cache	
  line	
  identifier	
  =	
  	
  r	
  bits	
  	
  
     • Size	
  of	
  tag	
  =	
  (s	
  –	
  r)	
  bits	
  
                                            Tag	
  s-­‐r	
             Line	
  or	
  Slot	
  r	
   Word	
  w	
  
	
  
Direct	
  Mapping	
  Features	
  
     • Simple	
  and	
  not	
  expensive	
  
     • Conflict:	
  	
  
            – Fixed	
  location	
  in	
  cache	
  memory	
  for	
  a	
  given	
  main	
  memory	
  block	
  
            – Many	
  main	
  memory	
  blocks	
  have	
  same	
  block	
  number	
  	
  
            – If	
  two	
  blocks	
  with	
  same	
  block	
  number	
  are	
  requested	
  by	
  CPU	
  
                         • The	
  later	
  block	
  will	
  replace	
  (overwrite)	
  the	
  former	
  one	
  
                         • The	
  blocks	
  will	
  be	
  continually	
  swapped	
  in	
  cache	
  memory	
  
                         • The	
  hit	
  ratio	
  will	
  be	
  low,	
  causing	
  miss	
  penalty	
  
     • Possible	
  Solutions:	
  
            – Bigger	
  cache	
  memory	
  
            – Two	
  level	
  caches:	
  level	
  1(L1)	
  and	
  level	
  2	
  (L2)	
  
            – Associative	
  mapping	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
                                                                                                                               48	
  
Associative	
  Mapping	
  
     • A	
  main	
  memory	
  block	
  can	
  load	
  into	
  any	
  line	
  of	
  cache	
  
     • Memory	
  address	
  is	
  interpreted	
  as	
  tag	
  and	
  word	
  
     • Tag	
  uniquely	
  identifies	
  block	
  of	
  memory	
  
     • Every	
  line’s	
  tag	
  is	
  examined	
  for	
  a	
  match	
  
     • Cache	
  searching	
  gets	
  expensive	
                                      Compare	
  tag	
  field	
  with	
  tag	
  entry	
  in	
  
	
                                                                                    cache	
  to	
  check	
  for	
  hit	
  
                                                                                      	
  
Fully	
  Associative	
  Cache	
  Organization	
  
                                                                                                                           	
  




                                                                                                                               	
  
	
  
Associative	
  Mapping	
  Example	
  
     • Finding	
  an	
  associative	
  mapping	
  address	
  structure	
  for:	
  Main	
  memory	
  capacity	
  =	
  
         16MBytes;	
  Block	
  size=	
  4	
  Bytes	
  and	
  Cache	
  capacity	
  64	
  KBytes	
  
     • Main	
  memory	
  capacity	
  16MBytes	
  =	
  224	
  	
  Bytes	
  =>	
  address	
  length	
  =	
  24	
  bit	
  	
  
     • Block	
  size	
  =	
  4	
  Bytes	
  (words)	
  =	
  22	
  =>	
  2	
  bits	
  for	
  word	
  identifier	
  	
  
     • Total	
  number	
  of	
  blocks	
  in	
  main	
  memory	
  =	
  16M/4	
  =	
  222	
  
     • Each	
  Block	
  of	
  main	
  memory	
  is	
  a	
  set,	
  which	
  is	
  labelled	
  as	
  tag.	
  	
  
     • Number	
  of	
  bits	
  for	
  tag	
  (s)	
  =	
  address	
  length	
  –	
  word	
  identifier	
  =	
  24	
  –	
  2	
  =	
  22	
  bits	
  
     • So,	
  a	
  24-­‐bit	
  address	
  is	
  divided	
  into	
  2	
  parts:	
  tag	
  and	
  word.	
  
Word:	
  2-­‐bit	
  (block	
  size	
  or	
  line	
  size)	
  
Tag:	
  22-­‐bit.	
  
                                                        Tag	
  s	
  =	
  22	
        Word	
  w=	
  2	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
                                                                                                                                                    49	
  
 
                                           Tag	
  s	
  =	
  22	
     Word	
  w=	
  2	
  
	
                                                           Address	
  Structure	
  
	
                                                           	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
Associative	
  Mapping	
  Summary	
  
     • Address	
  length	
  =	
  (s	
  +	
  w)	
  bits	
  
     • Number	
  of	
  addressable	
  units	
  =	
  2s+w	
  words	
  or	
  bytes	
  
     • Block	
  size	
  =	
  line	
  size	
  =	
  2w	
  words	
  or	
  bytes	
  
     • Number	
  of	
  blocks	
  in	
  main	
  memory	
  =	
  2s+	
  w/2w	
  =	
  2s	
  
     • Number	
  of	
  lines	
  in	
  cache	
  =	
  undetermined	
  
     • Size	
  of	
  tag	
  =	
  s	
  bits	
  
     • Replacement	
  algorithm	
  required	
  
     • Disadvantages:	
  complex	
  circuitry,	
  extensive	
  comparison	
  of	
  tags	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  

	
  
                                                                                              50	
  
Set	
  Associative	
  Mapping	
  
     • Compromise	
  of	
  direct	
  and	
  associative	
  mappings	
  
     • Cache	
  is	
  divided	
  into	
  a	
  number	
  of	
  sets	
  
     • Each	
  set	
  contains	
  a	
  number	
  of	
  lines	
  
     • A	
  given	
  block	
  maps	
  to	
  any	
  line	
  in	
  a	
  given	
  set	
  
                 – e.g.	
  Block	
  B	
  can	
  be	
  in	
  any	
  line	
  of	
  set	
  i	
  
     • e.g.	
  2	
  lines	
  per	
  set	
  
                 – 2	
  way	
  associative	
  mapping	
  
                 – A	
  given	
  block	
  can	
  be	
  in	
  one	
  of	
  2	
  lines	
  in	
  only	
  one	
  set	
  
     • Extreme	
  cases:	
  	
  
                 – If	
  1	
  cache	
  line/set	
  (total	
  sets=	
  total	
  cache	
  lines)	
  =>	
  direct	
  mapping	
  
                 – If	
  number	
  of	
  set=1	
  (all	
  lines	
  in	
  that	
  set)=>	
  fully	
  associative	
  mapping	
  	
  
	
  
Two	
  Way	
  Set	
  Associative	
  Cache	
  Organizations	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
     • 	
  	
  Use	
  set	
  field	
  to	
  determine	
  cache	
  set	
  to	
  look	
  in	
  
     • 	
  	
  Compare	
  tag	
  field	
  to	
  see	
  if	
  we	
  have	
  a	
  hit	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
                                                                                                                                     51	
  
2-­‐Way	
  Set	
  Associative	
  Mapping	
  Example	
  
     • Finding	
  an	
  associative	
  mapping	
  address	
  structure	
  for:	
  Main	
  memory	
  capacity	
  =	
  
          16MBytes;	
  Block	
  size=	
  4	
  Bytes	
  and	
  Cache	
  capacity	
  64	
  KBytes	
  
     • Main	
  memory	
  capacity	
  16MBytes	
  =	
  224	
  	
  Bytes	
  =>	
  address	
  length	
  =	
  24	
  bit	
  	
  
     • Block	
  size	
  =	
  4	
  Bytes	
  (words)	
  =	
  22	
  =>	
  2	
  bits	
  for	
  word	
  identifier	
  	
  
     • Total	
  number	
  of	
  cache	
  blocks	
  (lines)	
  per	
  set	
  =	
  cache	
  capacity/block	
  size	
  =	
  64K/4	
  =	
  16K	
  =	
  
          214	
  	
  	
  
     • Number	
  of	
  cache	
  lines	
  per	
  set	
  =	
  2	
  
     • Number	
  of	
  cache	
  sets	
  =	
  214/2	
  =	
  213	
  =>	
  14	
  bits	
  for	
  line	
  for	
  set	
  identifier	
  
     • Number	
  of	
  bits	
  for	
  tag	
  (s)	
  =	
  address	
  length	
  –	
  set	
  identifier	
  –	
  word	
  identifier	
  =	
  24	
  –	
  13	
  -­‐	
  2	
  
          =	
  9	
  bits	
  
     • So,	
  a	
  24-­‐bit	
  address	
  is	
  divided	
  into	
  3	
  parts:	
  tag,	
  set	
  and	
  word.	
  
Tag:	
  9-­‐bit,	
  Word:	
  2-­‐bit,	
  Set:	
  13-­‐bit	
  
	
  
	
                                                                Tag	
  9	
  bit	
            Set	
  13	
  bit	
        Word	
  	
  2	
  bit	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
                                                                                                                                                                  52	
  
k-­‐Way	
  Set	
  Associative	
  Mapping	
  Summary	
  
     • Address	
  length	
  =	
  (s	
  +	
  w)	
  bits	
  
     • Number	
  of	
  addressable	
  units	
  =	
  2s+w	
  words	
  or	
  bytes	
  
     • Block	
  size	
  =	
  line	
  size	
  =	
  2w	
  words	
  or	
  bytes	
  
     • Number	
  of	
  blocks	
  in	
  main	
  memory	
  =	
  2d	
  
     • Number	
  of	
  lines	
  in	
  set	
  =	
  k	
  
     • Number	
  of	
  sets	
  =	
  v	
  =	
  2d	
  
     • Number	
  of	
  lines	
  in	
  cache	
  =	
  kv	
  =	
  k	
  *	
  2d	
  
     • Size	
  of	
  tag	
  =	
  (s	
  –	
  d)	
  bits	
  
     • Extreme	
  cases:	
  	
  
              – If	
  k=1,	
  v=number	
  of	
  cache	
  lines	
  =>	
  direct	
  mapping	
  
              – If	
  k=	
  number	
  of	
  cache	
  lines,	
  v=1	
  =>	
  fully	
  associative	
  mapping	
  	
  
Replacement	
  Algorithms	
  
     • Strategy	
  to	
  replace	
  existing	
  block	
  by	
  new	
  block	
  
     • Direct	
  mapping	
  
              – No	
  choice	
  
              – Each	
  block	
  only	
  maps	
  to	
  one	
  line	
  
              – Replace	
  that	
  line	
  
     • Associative	
  &	
  Set	
  associative	
  	
  
              – Hardware	
  implemented	
  algorithm	
  (speed)	
  
              – Least	
  Recently	
  used	
  (LRU)	
  
                       • replace	
  block	
  that	
  was	
  least	
  recently	
  used	
  
              – First	
  in	
  first	
  out	
  (FIFO)	
  
                       • replace	
  block	
  that	
  has	
  been	
  in	
  cache	
  longest	
  
              – Least	
  frequently	
  used	
  
                       • replace	
  block	
  which	
  has	
  had	
  fewest	
  hits	
  
              – Random	
  
Cache	
  coherency	
  
     • The	
  data	
  in	
  cache,	
  altered	
  by	
  CPU,	
  may	
  be	
  different	
  from	
  its	
  corresponding	
  in	
  the	
  main	
  
         memory.	
  	
  
     • Keep	
  consistency:	
  To	
  ensure	
  the	
  contents	
  in	
  cache	
  block	
  are	
  consistent	
  with	
  its	
  mapping	
  
         memory.	
  	
  
Write	
  policy:	
  
     • Must	
  not	
  overwrite	
  a	
  cache	
  block	
  unless	
  main	
  memory	
  is	
  up	
  to	
  date	
  
     • Multiple	
  CPUs	
  may	
  have	
  individual	
  caches	
  
     • I/O	
  may	
  address	
  main	
  memory	
  directly	
  
Write	
  through	
  
     • All	
  writes	
  go	
  to	
  main	
  memory	
  as	
  well	
  as	
  cache	
  
     • Multiple	
  CPUs	
  can	
  monitor	
  main	
  memory	
  traffic	
  to	
  keep	
  local	
  (to	
  CPU)	
  cache	
  up	
  to	
  date	
  
     • Lots	
  of	
  traffic	
  
     • Slows	
  down	
  writes	
  
	
  
                                                                                                                                          53	
  
• Remember	
  bogus	
  write	
  through	
  caches!	
  
Write	
  back	
  
     • Updates	
  initially	
  made	
  in	
  cache	
  only	
  
     • Update	
  bit	
  for	
  cache	
  slot	
  is	
  set	
  when	
  update	
  occurs	
  
     • If	
  block	
  is	
  to	
  be	
  replaced,	
  write	
  to	
  main	
  memory	
  only	
  if	
  update	
  bit	
  is	
  set	
  
     • Other	
  caches	
  get	
  out	
  of	
  sync	
  
     • I/O	
  must	
  access	
  main	
  memory	
  through	
  cache	
  
     • N.B.	
  15%	
  of	
  memory	
  references	
  are	
  writes	
  
Cache	
  typical	
  characteristics	
  
     • Cache	
  size:	
  1	
  -­‐	
  256	
  K	
  
     • Block	
  size:	
  4	
  -­‐	
  128	
  bytes	
  
     • Hit	
  time(h):	
  1	
  -­‐	
  4	
  cycles	
  
     • Miss	
  penalty:	
  8	
  -­‐	
  32	
  cycles	
  
                 – access	
  time:	
  	
  	
  6	
  -­‐10	
  cycles	
  
                 – transfer	
  time:	
  2	
  -­‐	
  22	
  cycles	
  
     • Miss	
  ratio:	
  	
   1%	
  	
  -­‐	
  20%	
  
     Average	
  memory	
  access	
  time:	
  
         Tav	
  =	
  h	
  x	
  Tcache	
  +	
  (1-­‐h)	
  x	
  Tmiss	
  	
  
         e.g.	
  h	
  =	
  90%,	
  Tcache	
  =	
  2	
  cycle,	
  Tmiss=	
  20	
  cycle	
  
         	
  
Summary	
  
     • Cache	
  memory	
  is	
  used	
  to	
  match	
  the	
  processor	
  speed	
  with	
  the	
  rate	
  of	
  information	
  
         transfer	
  	
  
     • Cache	
  memory	
  for	
  frequently	
  used	
  instructions/data	
  	
  
     • Main	
  features	
  of	
  cache	
  design	
  space	
  are	
  
                 – total	
  size,	
  block	
  size	
  
                 – mapping	
  (associativity)	
  
                 – replacement	
  policy	
  
                 – write	
  policy	
  
     • Cache	
  performance	
  can	
  be	
  measured	
  by	
  average	
  memory	
  access	
  time	
  
         	
  
Exercise	
  	
  
Ex1.	
  How	
  many	
  address	
  line	
  are	
  required	
  to	
  access	
  64k	
  works	
  of	
  main	
  memmory?	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
                                                                                                                                     54	
  
Ex2.	
  How	
  many	
  words	
  of	
  memory	
  can	
  be	
  accessed	
  using	
  20	
  address	
  line?	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
Ex3.	
  A	
  cache	
  memory	
  has	
  a	
  hit	
  rate	
  of	
  92%	
  and	
  access	
  time	
  of	
  25ns.	
  It	
  is	
  attached	
  to	
  a	
  main	
  
memory	
  with	
  an	
  access	
  time	
  of	
  90	
  ns.	
  Calculate	
  the	
  main	
  memory	
  access	
  time	
  when	
  cache	
  is	
  
switched	
  on.	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
Ex4.	
  Given	
  that	
  the	
  hit	
  rate	
  to	
  the	
  cache	
  memory	
  for	
  a	
  particular	
  program	
  is	
  0.9.	
  Calculate	
  the	
  
percentage	
  by	
  which	
  the	
  program	
  id	
  speeded	
  up	
  by	
  the	
  use	
  of	
  cache	
  memory	
  over	
  a	
  similar	
  
processer	
  with	
  no	
  cache	
  memory.	
  Suppose	
  cache	
  memory	
  access	
  time	
  is	
  3	
  cycles	
  and	
  main	
  
memory	
  access	
  time	
  is	
  5	
  cycles.	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
                                                                                                                                                        55	
  
Ex5.	
  A	
  main	
  memory	
  has	
  a	
  capacity	
  of	
  32	
  words	
  and	
  a	
  cache	
  memory	
  has	
  a	
  capacity	
  of	
  8	
  
words,	
  if	
  a	
  series	
  of	
  memory	
  address	
  occurred	
  	
  	
  are	
  1,8,15,1,2,5,10,15,9,2,8,9,1,7,8,5	
  and	
  9.	
  
Show	
  the	
  final	
  contents	
  of	
  cache	
  memory	
  and	
  the	
  format	
  of	
  main	
  memory	
  address	
  for	
  	
  
         a. Direct	
  mapped	
  memory	
  with	
  1	
  word	
  block	
  size	
  
         b. Direct	
  mapped	
  memory	
  with	
  2	
  word	
  block	
  size	
  
         c. Associative	
  memory	
  with	
  2	
  word	
  block	
  size	
  use	
  replace	
  LRU	
  
         d. 2	
  way	
  associative	
  memory	
  with	
  1	
  word	
  block	
  size	
  use	
  replace	
  FIFO	
  
	
  	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
                                        	
  
	
  
                                                                                                                                                 56	
  
Memory	
  Management	
  
Recap….	
  Process	
  Swapping	
  
     • A	
  process	
  can	
  be	
  swapped	
  temporarily	
  
       out	
  of	
  memory	
  to	
  a	
  backing	
  store,	
  and	
  
       then	
  brought	
  back	
  into	
  memory	
  for	
  
       continued	
  execution.	
  
     • Backing	
  store	
  –	
  fast	
  disk	
  large	
  enough	
  
       to	
  accommodate	
  copies	
  of	
  all	
  memory	
  
       images	
  for	
  all	
  users.	
  
     • Roll	
  out,	
  roll	
  in	
  –	
  used	
  for	
  priority-­‐
       based	
  scheduling	
  algorithms;	
  lower-­‐
       priority	
  process	
  is	
  swapped	
  out	
  so	
  
       higher-­‐priority	
  process	
  can	
  be	
  loaded	
  
       and	
  executed.	
  
     • Major	
  part	
  of	
  swap	
  time	
  is	
  transfer	
  
       time;	
  total	
  transfer	
  time	
  is	
  directly	
  
       proportional	
  to	
  the	
  amount	
  of	
  
       memory	
  swapped.	
  
	
  
Logical	
  vs.	
  Physical	
  Address	
  Space	
  
     • The	
  concept	
  of	
  a	
  logical	
  address	
  space	
  and	
  physical	
  address	
  space	
  is	
  central	
  to	
  proper	
  
       memory	
  management.	
  
              – Logical	
  address	
  –	
  generated	
  by	
  the	
  CPU;	
  also	
  referred	
  to	
  as	
  virtual	
  address.	
  
              – Physical	
  address	
  –	
  address	
  seen	
  by	
  the	
  memory	
  unit.	
  
     • Logical	
  (virtual)	
  and	
  physical	
  addresses	
  are	
  the	
  same	
  in	
  compile-­‐time;	
  but	
  differ	
  in	
  
       execution	
  time.	
  
	
  
Memory-­‐Management	
  Unit	
  (MMU)	
  
     • Hardware	
  device	
  that	
  maps	
  virtual	
  to	
  
       physical	
  address.	
  
     • In	
  MMU	
  scheme,	
  the	
  value	
  in	
  the	
  
       relocation	
  register	
  is	
  added	
  to	
  every	
  
       address	
  generated	
  by	
  a	
  user	
  process	
  
       at	
  the	
  time	
  it	
  is	
  sent	
  to	
  memory.	
  
     • The	
  user	
  program	
  deals	
  with	
  logical	
  
       addresses;	
  it	
  never	
  sees	
  the	
  real	
  
       physical	
  addresses.	
  
	
  
	
  
	
  
	
  
	
  
                                                                                                                                              57	
  
Overlays	
  
     • Large	
  programs	
  -­‐	
  too	
  big	
  to	
  fit	
  in	
  physical	
  memory	
  
     • Split	
  along	
  logical	
  boundaries	
  
             – Procedures,	
  distinct	
  functions	
  
     • Needed	
  when	
  process	
  is	
  larger	
  than	
  amount	
  of	
  memory	
  allocated	
  to	
  it	
  
     • Keep	
  in	
  memory	
  only	
  those	
  instructions	
  and	
  data	
  that	
  are	
  needed	
  at	
  any	
  given	
  time	
  
     • One	
  overlay	
  in	
  primary	
  memory	
  -­‐	
  rest	
  on	
  disc	
  
     • When	
  branch	
  is	
  made	
  to	
  code	
  on	
  disc	
  
             – Store	
  current	
  overlay	
  on	
  disc,	
  read	
  in	
  new	
  overlay	
  
     • Implemented	
  by	
  user,	
  no	
  special	
  support	
  needed	
  from	
  operating	
  system	
  
	
  
       Large	
  programs	
  can	
  generally	
  be	
  decomposed	
  into	
  sub-­‐units,	
  which	
  are,	
  to	
  an	
  extent,	
  self-­‐contained.	
  
Whilst	
  one	
  sub-­‐unit	
  is	
  active,	
  the	
  others	
  will	
  be	
  dormant.	
  Since	
  this	
  is	
  the	
  case,	
  these	
  others	
  may	
  as	
  well	
  be	
  
removed	
  from	
  primary	
  memory	
  and	
  placed	
  in	
  secondary	
  memory.	
  Sub-­‐units,	
  which	
  can	
  be	
  treated	
  in	
  this	
  way,	
  
are	
  called	
  “overlays”.	
  It	
  is	
  up	
  to	
  the	
  programmer	
  to	
  divide	
  her	
  code	
  into	
  overlays;	
  bearing	
  in	
  mind	
  that	
  
whenever	
  a	
  jump	
  is	
  made	
  to	
  an	
  overlay	
  not	
  currently	
  in	
  primary	
  memory	
  there	
  will	
  be	
  a	
  pause	
  whilst	
  the	
  
required	
  overlay	
  is	
  loaded.	
  Thus,	
  it	
  is	
  important	
  that	
  overlays	
  are	
  chosen	
  so	
  that	
  jumps	
  between	
  them	
  are	
  kept	
  
to	
  a	
  minimum.	
  
       Early	
  PC	
  programs	
  made	
  extensive	
  use	
  of	
  overlays	
  and	
  their	
  use	
  allowed	
  very	
  large	
  programs	
  to	
  be	
  run	
  
even	
  within	
  the	
  original	
  640K	
  RAM	
  limit.	
  However,	
  performance	
  can	
  suffer	
  badly	
  as	
  time	
  is	
  lost	
  moving	
  
overlays	
  to	
  and	
  from	
  secondary	
  memory.	
  This	
  performance	
  loss	
  is	
  quite	
  noticeable	
  to	
  users.	
  For	
  example,	
  
when	
  using	
  a	
  spelling	
  checker	
  in	
  a	
  word	
  processor,	
  there	
  may	
  be	
  a	
  pause	
  (accompanied	
  by	
  frenzied	
  disc	
  
activity)	
  whilst	
  the	
  overlay	
  containing	
  the	
  checker	
  is	
  loaded.	
  Having	
  said	
  that,	
  if	
  the	
  overlay	
  system	
  is	
  well	
  
designed,	
  so	
  that	
  too	
  frequent	
  switching	
  between	
  overlays	
  is	
  avoided	
  and	
  that	
  the	
  size	
  of	
  the	
  overlays	
  is	
  well-­‐
matched	
  to	
  the	
  memory	
  available,	
  then	
  overlays	
  can	
  be	
  highly	
  efficient.	
  The	
  main	
  problem	
  is	
  that	
  the	
  solution	
  
has	
  to	
  be	
  re-­‐invented	
  each	
  time	
  a	
  new	
  program	
  is	
  written	
  or	
  maybe	
  even	
  when	
  an	
  old	
  one	
  is	
  modified.	
  	
  
	
  
Memory	
  Management	
  
     • Five	
  Requirements	
  for	
  Memory	
  Management	
  to	
  satisfy:	
  
          – Relocation	
  
                   • Users	
  generally	
  don’t	
  know	
  where	
  they	
  will	
  be	
  placed	
  in	
  main	
  memory	
  
                   • Generally	
  handled	
  by	
  MMU	
  
          – Protection	
  
                   • Prevent	
  processes	
  from	
  interfering	
  with	
  the	
  O.S.	
  or	
  other	
  processes	
  
          – Sharing	
  
                   • Allow	
  processes	
  to	
  share	
  data/programs	
  
          – Logical	
  Organization	
  
                   • Support	
  modules,	
  shared	
  subroutines	
  
          – Physical	
  Organization	
  
                   • Manage	
  mem	
  «	
  disk	
  transfers	
  
	
  
	
  
	
  
	
  
                                                                                                                                                                           58	
  
Fragmentation	
  
     • External	
  Fragmentation	
  –	
  total	
  memory	
  space	
  exists	
  to	
  satisfy	
  a	
  request,	
  but	
  it	
  is	
  not	
  
       contiguous.	
  
     • Internal	
  Fragmentation	
  –	
  allocated	
  memory	
  may	
  be	
  slightly	
  larger	
  than	
  requested	
  
       memory	
  due	
  a	
  partition,	
  but	
  not	
  being	
  used.	
  
     • Reduce	
  external	
  fragmentation	
  by	
  compaction	
  
          – Shuffle	
  memory	
  contents	
  to	
  place	
  all	
  free	
  memory	
  together	
  in	
  one	
  large	
  block.	
  
          – Compaction	
  is	
  possible	
  only	
  if	
  relocation	
  is	
  dynamic,	
  and	
  is	
  done	
  at	
  execution	
  
                time.	
  
	
  
MM	
  Techniques	
  
     • Fixed	
  Partitioning	
  
     • Dynamic	
  Partitioning	
  
     • Buddy	
  System	
  
     • Simple	
  Paging	
  
     • Simple	
  Segmentation	
  
     • Virtual-­‐Memory	
  Paging	
  
     • Virtual	
  Memory	
  Segmentation	
  
	
  
Fixed	
  Partitioning	
  
           Divide	
  memory	
  into	
  partitions	
  at	
  boot	
  time,	
  partition	
  sizes	
  don’t	
  change	
  
           Simple	
  but	
  has	
  internal	
  fragmentation	
  
Dynamic	
  Partitioning	
  
           Create	
  partitions	
  as	
  programs	
  loaded	
  
           Avoids	
  internal	
  fragmentation,	
  but	
  must	
  deal	
  with	
  external	
  fragmentation	
  
Simple	
  Paging	
  
           Divide	
  memory	
  into	
  equal-­‐size	
  pages,	
  load	
  program	
  into	
  available	
  pages	
  
                       Pages	
  do	
  not	
  need	
  to	
  be	
  consecutive	
  
           No	
  external	
  fragmentation,	
  small	
  amount	
  of	
  internal	
  fragmentation	
  
Simple	
  Segmentation	
  
           Divide	
  program	
  into	
  segments	
  
                       Each	
  segment	
  is	
  contiguous,	
  but	
  different	
  segments	
  need	
  not	
  be	
  
           No	
  internal	
  fragmentation,	
  some	
  external	
  fragmentation	
  
Virtual-­‐Memory	
  Paging	
  
           Like	
  simple	
  paging,	
  but	
  not	
  all	
  pages	
  need	
  to	
  be	
  in	
  memory	
  at	
  one	
  time	
  
           Allows	
  large	
  virtual	
  memory	
  space	
  
           More	
  multiprogramming,	
  overhead	
  
Virtual	
  Memory	
  Segmentation	
  
           Like	
  simple	
  segmentation,	
  but	
  not	
  all	
  segments	
  need	
  to	
  be	
  in	
  memory	
  at	
  one	
  time	
  
           Easy	
  to	
  share	
  modules	
  
           More	
  multiprogramming,	
  overhead	
  
	
  
	
  
	
  
	
  
	
  
                                                                                                                                              59	
  
Fixed	
  Partitioning	
  
   • Memory	
  is	
  divided	
  into	
  a	
  set	
  of	
  partitions,	
  each	
  holds	
  one	
  program	
  
   • May	
  have	
  same	
  or	
  different	
  sizes	
  



       •                                                                              	
  
       • Equal-­‐sized	
  partitions	
  
            – Program	
  may	
  be	
  too	
  large	
  for	
  one	
  partition	
  
                         • Programmer	
  must	
  handle	
  overlays	
  
            – Program	
  may	
  not	
  be	
  big	
  enough	
  to	
  need	
  a	
  full	
  partition	
  
                         • Results	
  in	
  internal	
  fragmentation	
  
       • Variable-­‐sized	
  partitions	
  
            – Can	
  fit	
  partition	
  size	
  to	
  program	
  size	
  
            – Placement	
  
                         • Want	
  to	
  use	
  smallest	
  possible	
  partition	
  
                         • Can	
  have	
  a	
  queue	
  for	
  each	
  partition	
  size,	
  or	
  one	
  queue	
  for	
  all	
  partitions	
  
       • Easy	
  to	
  implement	
  
       • Tends	
  to	
  use	
  memory	
  poorly,	
  especially	
  for	
  small	
  programs	
  (internal	
  fragmentation)	
  
            – Will	
  work	
  if	
  the	
  job	
  sizes	
  can	
  be	
  predicted	
  in	
  advance	
  
	
  
Dynamic	
  Partitioning	
  
     • Create	
  a	
  new	
  partition	
  for	
  each	
  program	
  
     • Only	
  allocate	
  space	
  required	
  
     • Tends	
  to	
  create	
  “holes”	
  as	
  processes	
  are	
  
       swapped	
  in	
  and	
  out	
  (external	
  fragmentation)	
  
     • Tends	
  to	
  generate	
  small	
  holes	
  in	
  memory	
  
       (external	
  fragmentation)	
  
     • Compaction	
  
       -­‐Shifting	
  processes	
  so	
  all	
  of	
  the	
  available	
  
       memory	
  is	
  in	
  one	
  block	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
       -­‐	
  Requires	
  processor	
  time	
  to	
  move	
  items	
  around	
  in	
  memory	
  	
  
       -­‐	
  Requires	
  relocation	
  hardware	
  that	
  can	
  handle	
  the	
  change	
  in	
  addresses	
  
                  >Cannot	
  easily	
  find	
  all	
  possible	
  addresses	
  in	
  the	
  program	
  
	
  
                                                                                                                                                  60	
  
>Need	
  to	
  move	
  program	
  without	
  changing	
  user	
  addresses	
  
       • Placement	
  Algorithms	
  
            – Best-­‐Fit:	
  Find	
  the	
  smallest	
  available	
  block	
  that	
  will	
  hold	
  the	
  program	
  
                  • Tends	
  to	
  produce	
  a	
  lot	
  of	
  small	
  blocks,	
  e.g.	
  use	
  30K	
  block	
  for	
  28K	
  program,	
  
                       leaves	
  2K	
  
            – First-­‐Fit:	
  Find	
  the	
  first	
  block	
  that	
  is	
  large	
  enough	
  (regardless	
  of	
  size)	
  
                  • May	
  leave	
  small	
  blocks	
  at	
  the	
  beginning,	
  larger	
  blocks	
  at	
  the	
  end	
  of	
  
                       memory	
  
                  • Generally	
  best,	
  fastest	
  
            – Next-­‐Fit:	
  Like	
  First-­‐Fit,	
  but	
  start	
  from	
  the	
  last	
  allocation	
  instead	
  of	
  the	
  start	
  
                  • Tends	
  to	
  break	
  up	
  large	
  blocks	
  at	
  the	
  end	
  of	
  memory	
  that	
  First-­‐Fit	
  leaves	
  
                       alone	
  
            – Worst-­‐Fit	
  –	
  Allocate	
  the	
  largest	
  hole	
  
Buddy	
  System	
  
   • Tries	
  to	
  allow	
  a	
  variety	
  of	
  block	
  sizes	
  while	
  avoiding	
  excess	
  fragmentation	
  
   • Blocks	
  generally	
  are	
  of	
  size	
  2k,	
  for	
  a	
  suitable	
  range	
  of	
  k	
  
   • Initially,	
  all	
  memory	
  is	
  one	
  block	
  
   • All	
  sizes	
  are	
  rounded	
  up	
  to	
  2s	
  
   • If	
  a	
  block	
  of	
  size	
  2s	
  is	
  available,	
  allocate	
  it	
  
   • Else	
  find	
  a	
  block	
  of	
  size	
  2s+1	
  and	
  split	
  it	
  in	
  half	
  to	
  create	
  two	
  buddies	
  
   • If	
  two	
  buddies	
  are	
  both	
  free,	
  combine	
  them	
  into	
  a	
  larger	
  block	
  
   • Largely	
  Replaced	
  by	
  paging	
  
    	
  
Buddy	
  System	
  Example	
  




                                                                                                                                     	
  
	
  
                                                                                                                                            61	
  
Paging	
  
   • Divides	
  memory	
  into	
  small	
  (4K	
  or	
  less)	
  pieces	
  of	
  memory	
  (frames)	
  
   • Logically	
  divide	
  program	
  into	
  same-­‐size	
  pieces	
  (pages)	
  
   • Page	
  size	
  typically	
  a	
  power	
  of	
  2	
  to	
  simplify	
  the	
  paging	
  hardware	
  
   • Use	
  a	
  page	
  table	
  to	
  map	
  the	
  pages	
  of	
  the	
  current	
  process	
  to	
  the	
  corresponding	
  frames	
  
      in	
  memory	
  
           	
  
           Example	
                                                                                                                   Page	
  Table	
  
                                                                                                                              A        	
  B    C        D         Free
                                                                                                                              0          -        7        4        13
                                                                                                                              1          -        8        5        14
                                                                                                                              2          -        9        6
                                                                                                                              3                  10        11
                                                                                                                                                           12



                                                                                                                                   	
  
	
  
Logical	
  address	
  space	
  of	
  a	
  process	
  can	
  be	
  noncontiguous;	
  process	
  is	
  allocated	
  physical	
  memory	
  whenever	
  the	
  
latter	
  is	
  available.	
  
Divide	
  physical	
  memory	
  into	
  fixed-­‐sized	
  blocks	
  called	
  frames	
  (size	
  is	
  power	
  of	
  2,	
  between	
  512	
  bytes	
  and	
  8192	
  
bytes).	
  
Divide	
  logical	
  memory	
  into	
  blocks	
  of	
  same	
  size	
  called	
  pages.	
  
Keep	
  track	
  of	
  all	
  free	
  frames.	
  
To	
  run	
  a	
  program	
  of	
  size	
  n	
  pages,	
  need	
  to	
  find	
  n	
  free	
  frames	
  and	
  load	
  program.	
  
Set	
  up	
  a	
  page	
  table	
  to	
  translate	
  logical	
  to	
  physical	
  addresses.	
  	
  
Internal	
  fragmentation.	
  
	
  
Page	
  size	
  typically	
  a	
  power	
  of	
  2	
  to	
  simplify	
  the	
  paging	
  hardware	
  
             Example	
  (16-­‐bit	
  address,	
  1K	
  pages)	
  
                           010101	
  011011010	
  	
  
                           Top	
  6	
  bits	
  (010101)=	
  page	
  #	
  
                           Bottom	
  10	
  bits	
  	
  (011011010)	
  =	
  offset	
  within	
  page	
  
             Common	
  sizes:	
  512	
  bytes,	
  1K,	
  4K	
  
             	
  
             	
  
             	
  
             	
  
             	
  
             	
  
             	
  
             	
  
	
  
	
  
	
  
                                                                                                                                                                  62	
  
Page	
  Table	
  and	
  Free	
  Frames	
  
     • 	
  	
  Set	
  up	
  a	
  page	
  table	
  to	
  translate	
  logical	
  to	
  physical	
  addresses	
  
     • 	
  	
  Keep	
  track	
  of	
  all	
  free	
  frames	
  
     • 	
  	
  To	
  load	
  a	
  program	
  of	
  size	
  n	
  pages,	
  need	
  to	
  find	
  n	
  free	
  frames	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
Implementation	
  of	
  Page	
  Table	
                                                     Before                        After
     • Page	
  table	
  is	
  kept	
  in	
  main	
  memory.	
  
     • Page-­‐table	
  base	
  register	
  (PTBR)	
  points	
  to	
  the	
  page	
  table.	
  
     • Page-­‐table	
  length	
  register	
  (PRLR)	
  indicates	
  size	
  of	
  the	
  page	
  table	
  
     • Use	
  of	
  valid	
  (v)	
  or	
  invalid	
  (i)	
  bit	
  in	
  a	
  page	
  table	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
                                                                                              	
  
	
  
	
  
                                                                                                                                  63	
  
 
Segmentation	
  
     • Memory-­‐management	
  scheme	
  that	
  supports	
  user	
  view	
  of	
  memory.	
  	
  
     • A	
  program	
  is	
  a	
  collection	
  of	
  segments.	
  	
  A	
  segment	
  is	
  a	
  logical	
  unit	
  such	
  as:	
  
       Main	
  program,	
  procedure,	
  function,	
  method,	
  object,	
  local	
  variables,	
  global	
  variables,	
  
Common	
  block,	
  stack,	
  symbol	
  table,	
  arrays	
  
     • Program	
  views	
  memory	
  as	
  a	
  set	
  of	
  segments	
  of	
  varying	
  sizes	
  
             – Easy	
  to	
  handle	
  growing	
  data	
  structures	
  
             – Easy	
  to	
  share	
  libraries,	
  memory	
  
             – Privileges	
  can	
  be	
  applied	
  to	
  a	
  segment	
  
             – Programs	
  may	
  use	
  multiple	
  segments	
  
     • Have	
  a	
  segment	
  table	
  
             – Beginning	
  address	
  
             – Size	
  
             – Present,	
  Modified,	
  Accessed	
  bits	
  
             – Permission/Protection	
  bits	
  
	
  
Summary	
  
     • Process	
  can	
  be	
  swapped	
  out	
  of	
  and	
  back	
  into	
  memory	
  	
  
     • MMU	
  is	
  a	
  hardware	
  device	
  that	
  maps	
  virtual	
  to	
  physical	
  address	
  
     • Overlays	
  needed	
  when	
  process	
  is	
  larger	
  than	
  amount	
  of	
  memory	
  allocated	
  to	
  it	
  
     • There	
  a	
  number	
  of	
  partitioning	
  algorithms	
  
     • Paging	
  divides	
  memory	
  into	
  small	
  pieces	
  called	
  frames	
  and	
  program	
  into	
  pages	
  
       	
  
       	
  
       	
  
       	
  
       	
  
       	
  
       	
  
       	
  
       	
  
       	
  
       	
  
       	
  
       	
  
       	
  
       	
  
       	
  
       	
  
	
  
	
  
                                                                                                                                       64	
  
Exercise	
  	
  
Ex1.)	
  Assume	
  a	
  computer	
  with	
  a	
  memory	
  size	
  of	
  128	
  MB	
  initially	
  empty.	
  Requests	
  and	
  freeing	
  
are	
  received	
  for	
  blocks	
  of	
  memory	
  of	
  P1=	
  5	
  M,	
  P2	
  =	
  30	
  M,	
  P3=	
  25	
  M,	
  P2	
  completed,	
  P4=27	
  M,	
  
P3	
  completed,	
  P5=	
  3	
  M,	
  P1	
  completed,	
  P6=	
  10	
  M.	
  Show	
  hoe	
  the	
  dynamic	
  partitioning	
  would	
  
deal	
  with	
  each	
  request,	
  showing	
  the	
  memory	
  layout	
  at	
  each	
  stage.	
  Use	
  the	
  following	
  strategies	
  
for	
  the	
  dynamic	
  partitioning	
  	
  
         A-­‐ Best	
  fit	
  
         B-­‐ Frist	
  fit	
  
         C-­‐ Next	
  fit	
  
Ex2.)	
  Same	
  problem	
  show	
  how	
  the	
  buddy	
  system	
  would	
  deal	
  with	
  each	
  request,	
  showing	
  the	
  
memory	
  layout	
  at	
  each	
  stage	
  for	
  each	
  of	
  the	
  system	
  
	
  
	
  	
  
              	
  
              	
  
              	
  
              	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
                                                        	
  
	
  
                                                                                                                                                    65	
  
Virtual	
  Memory	
  
Recap	
  …	
  Real	
  to	
  Virtual	
  Memory	
  
       •   Program	
  addresses	
  only	
  logical	
  addresses,	
  Hardware	
  maps	
  to	
  physical	
  addresses	
  
       •   Possible	
  to	
  load	
  only	
  part	
  of	
  a	
  process	
  into	
  memory	
  
       •   Logical	
  address	
  space	
  can	
  be	
  much	
  larger	
  than	
  physical	
  address	
  space	
  	
  
       •   Real	
  Memory	
  –	
  The	
  physical	
  memory	
  occupied	
  by	
  a	
  program	
  
       •   Virtual	
  memory	
  –	
  The	
  larger	
  memory	
  space	
  perceived	
  by	
  the	
  program	
  
       •   Principle	
  of	
  Locality	
  –	
  A	
  program	
  tends	
  to	
  reference	
  the	
  same	
  items	
  
              – Even	
  if	
  same	
  item	
  not	
  used,	
  nearby	
  items	
  will	
  often	
  be	
  referenced	
  
	
  
Virtual	
  Memory	
  
                                                                                           Virtual	
  Memory	
  >>	
  Physical	
  Memory	
  
     • Logical	
  address	
  space	
  can	
  be	
  much	
  
                                                                                           	
  
       larger	
  than	
  physical	
  address	
  space	
  	
  
     • Virtual	
  memory	
  –	
  separation	
  of	
  user	
  
       logical	
  memory	
  from	
  physical	
  
       memory.	
  
              – Possible	
  for	
  a	
  process	
  to	
  be	
  
                   larger	
  than	
  main	
  memory	
  
              – Allows	
  additional	
  processes	
  
                   since	
  only	
  part	
  of	
  each	
  process	
  
                   needs	
  to	
  occupy	
  main	
  memory	
  	
  
              – Allows	
  for	
  more	
  efficient	
  
                   process	
  creation	
  
     • Virtual	
  memory	
  can	
  be	
  implemented	
  
       via:	
  
              – Paging	
  	
  
              – Segmentation	
  
Paging	
  
     • Divides	
  memory	
  into	
  small	
  pieces	
  of	
  memory	
  (frames)	
  
     • Logically	
  divide	
  program	
  into	
  same-­‐size	
  pieces	
  (pages)	
  
     • Use	
  a	
  page	
  table	
  to	
  map	
  the	
  pages	
  of	
  the	
  current	
  process	
  to	
  the	
  corresponding	
  frames	
  
       in	
  memory	
  
Example	
  	
                                                                                               A        B        C           D Free
	
                                                                                                                      Page	
  Table	
  
                                                                                                            0         - 	
   7            4 13
	
  
                                                                                                            1         -         8         5 14
	
  
	
  
                                                                                                            2         -         9         6
	
                                                                                                          3                10 11
	
                                                                                                                                        12
Segmentation	
  

	
  
                                                                                                                                       66	
  
• Programmer	
  sees	
  memory	
  as	
  a	
  set	
  of	
  multiple	
  segments,	
  each	
  with	
  a	
  separate	
  address	
  
         space	
  
       • Growing	
  data	
  structures	
  easier	
  to	
  handle	
  
            – OS	
  can	
  expand	
  or	
  shrink	
  segment	
  
       • Can	
  alter	
  the	
  one	
  segment	
  without	
  modifying	
  other	
  segments	
  
       • Easy	
  to	
  share	
  a	
  library	
  
            – Share	
  one	
  segment	
  among	
  processes	
  
       • Easy	
  memory	
  protection	
  
            – Can	
  set	
  values	
  for	
  the	
  entire	
  segment	
  
	
  
OS	
  Policies	
  
     • Implementation	
  decisions:	
  
             – Paging,	
  Segmentation,	
  or	
  both?	
  
     • Decisions	
  about	
  virtual	
  memory:	
  
             – Fetch	
  Policy	
  –	
  When	
  to	
  bring	
  a	
  page	
  in	
  
             – Placement	
  –	
  Where	
  to	
  put	
  it	
  
             – Replacement	
  –	
  What	
  to	
  remove	
  to	
  make	
  room	
  for	
  a	
  new	
  page	
  
             – Resident	
  Set	
  Management	
  –	
  How	
  many	
  pages	
  to	
  keep	
  in	
  memory	
  
             – Cleaning	
  Policy	
  –	
  When	
  to	
  write	
  a	
  page	
  to	
  disk	
  
             – Load	
  Control	
  –	
  How	
  many	
  processes	
  to	
  keep	
  in	
  memory	
  
	
  
Paging	
  Operation	
  
     • Page	
  Hit	
  -­‐	
  Page	
  is	
  present	
  in	
  
         memory	
  
     • Page	
  Fault	
  –	
  Page	
  not	
  in	
  memory	
  
         (Page	
  marked	
  as	
  not	
  present)	
  
     • Handling	
  a	
  Page	
  Fault	
  
             – CPU	
  determines	
  page	
  isn’t	
  in	
  
                   memory	
  
             – Interrupts	
  the	
  program,	
  
                   starts	
  OS	
  page	
  fault	
  handler	
  
             – OS	
  verifies	
  the	
  reference	
  is	
  
                   valid	
  but	
  not	
  in	
  memory	
  
             – Swap	
  out	
  a	
  page	
  if	
  needed	
  
             – Read	
  referenced	
  page	
  from	
  
                   disk	
  
             – Update	
  page	
  table	
  entry	
  
             – Resume	
  interrupted	
  process	
  
                   (or	
  possible	
  switch	
  to	
  
                   another	
  process)	
  
Page	
  Table	
  Bits	
  
	
  
                                                                                                                                    67	
  
• Valid-­‐invalid	
  bit	
  	
  
            – Indicates	
  if	
  the	
  page	
  is	
  a	
  valid	
  part	
  of	
  the	
  process	
  	
  
            – Prevents	
  a	
  process	
  accessing	
  an	
  erroneous	
  page	
  
       • Referenced	
  bit	
  	
  
            – Indicates	
  that	
  the	
  page	
  has	
  been	
  read	
  	
  
            – Useful	
  for	
  implementing	
  page	
  replacement	
  policies	
  
       • Modified	
  bit	
  	
  
            – Indicates	
  that	
  the	
  page	
  has	
  been	
  written	
  	
  
            – Must	
  be	
  written	
  back	
  on	
  disc	
  before	
  replacing.	
  
	
  
Policies	
  
     • Fetch	
  Policy	
  	
  
             – When	
  to	
  bring	
  a	
  page	
  into	
  memory	
  
             – Demand	
  Paging	
  –	
  Load	
  the	
  page	
  when	
  a	
  process	
  tries	
  to	
  reference	
  it	
  
                              • Less	
  I/O	
  needed	
  
                              • Less	
  memory	
  needed	
  	
  
                              • Faster	
  response	
  required	
  
             – Prepaging	
  –	
  Bring	
  in	
  pages	
  that	
  are	
  likely	
  to	
  be	
  used	
  in	
  the	
  near	
  future	
  
                              • Try	
  to	
  take	
  advantage	
  of	
  disk	
  characteristics	
  
                              • Hard	
  to	
  correctly	
  guess	
  which	
  pages	
  will	
  be	
  referenced	
  
     • Placement	
  Policy	
  
             – Where	
  to	
  put	
  the	
  page	
  
             – Best-­‐fit,	
  First-­‐Fit,	
  or	
  Next-­‐Fit	
  can	
  be	
  used	
  in	
  with	
  segmentation	
  
	
  
Basic	
  Page	
  Replacement	
  
     • Which	
  page	
  to	
  replace	
  when	
  a	
  new	
  page	
  needs	
  to	
  be	
  loaded	
  
     • Steps:	
  
             1. Find	
  the	
  location	
  of	
  the	
  
                  desired	
  page	
  on	
  disk.	
  
             2. Find	
  a	
  free	
  frame:	
  
                  -­‐	
  If	
  there	
  is	
  a	
  free	
  frame,	
  
                  use	
  it.	
  
                  -­‐	
  If	
  there	
  is	
  no	
  free	
  frame,	
  
                  use	
  a	
  page	
  replacement	
  
                  algorithm	
  to	
  select	
  a	
  
                  victim	
  frame.	
  
             3. Read	
  the	
  desired	
  page	
  
                  into	
  the	
  (newly)	
  free	
  
                  frame.	
  Update	
  the	
  page	
  
                  and	
  frame	
  tables.	
  
             4. Restart	
  the	
  process.	
  
	
  
                                                                                                                                        68	
  
 
Replacement	
  Policy	
  
     • Frame	
  Locking	
  
               – Require	
  a	
  page	
  to	
  stay	
  in	
  memory,	
  e.g.	
  OS	
  Kernel,	
  Interrupt	
  Handlers,	
  Real-­‐Time	
  
                    processes	
  
               – Implemented	
  by	
  bit	
  in	
  data	
  structures	
  
     • Basic	
  Algorithms	
  
               – Optimal	
               	
         	
  
               – First	
  in,	
  First	
  out	
  
               – Least	
  recently	
  used	
                 	
       	
  
               – Clock	
  
     • Evaluate	
  algorithm	
  by	
  running	
  it	
  on	
  a	
  memory	
  references	
  (reference	
  string)	
  and	
  
         computing	
  the	
  number	
  of	
  page	
  hits	
  or	
  faults	
  on	
  that	
  string	
  	
  
     • Page	
  hit	
  rate	
  –	
  ratio	
  of	
  number	
  of	
  pages	
  found	
  in	
  memory	
  to	
  the	
  number	
  of	
  page	
  
         references	
  	
  
     • Page	
  fault	
  rate	
  –	
  ratio	
  of	
  number	
  of	
  pages	
  not	
  found	
  in	
  memory	
  to	
  the	
  number	
  of	
  page	
  
         references	
  	
  
     • Want	
  to	
  maximise	
  page	
  hit	
  rate	
  (minimise	
  page-­‐fault	
  rate)	
  	
  
	
  
First-­‐In-­‐First-­‐Out	
  (FIFO)	
  Algorithm	
  
     • Replace	
  the	
  page	
  in	
  order	
  of	
  entering	
  into	
  the	
  memory	
  frame	
  
     • Example	
  




                                                                                                                                                         	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
FIFO	
  example	
  
	
  
                                                                                                                                                69	
  
• Reference	
  string	
  (sequence	
  of	
  virtual	
  page	
  number	
  in	
  the	
  course	
  of	
  execution)	
  :	
  1,	
  2,	
  3,	
  
         4,	
  1,	
  2,	
  5,	
  1,	
  2,	
  3,	
  4,	
  5	
  
       • Main	
  memory	
  initially	
  empty	
  
       • Calculate	
  page	
  faults	
  (misses)	
  for	
  number	
  of	
  main	
  memory	
  frames	
  (page	
  capacity)	
  =	
  
         1,2,3	
  and	
  4	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
                               	
  
	
  
                                                                                                                                                70	
  
Optimal	
  Algorithm	
  
  • Replace	
  page	
  that	
  will	
  not	
  be	
  used	
  for	
  longest	
  period	
  of	
  time.	
  
  • How	
  do	
  you	
  know	
  this?	
  
  • Used	
  for	
  measuring	
  how	
  well	
  your	
  algorithm	
  performs	
  	
  
           – Gives	
  a	
  standard	
  for	
  other	
  algorithms	
  
  • Example	
  




                                                                                                                                                       	
  
	
  
         	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
Optimal	
  example	
  
     • Reference	
  string	
  (sequence	
  of	
  virtual	
  page	
  number	
  in	
  the	
  course	
  of	
  execution)	
  :	
  1,	
  2,	
  3,	
  
       4,	
  1,	
  2,	
  5,	
  1,	
  2,	
  3,	
  4,	
  5	
  
     • Main	
  memory	
  initially	
  empty	
  
     • Calculate	
  page	
  faults	
  (misses)	
  for	
  number	
  of	
  main	
  memory	
  frames	
  (page	
  capacity)	
  =	
  4	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
                                                                                                                                              71	
  
Least	
  Recently	
  Used	
  (LRU)	
  Algorithm	
  
   • Locate	
  the	
  page	
  that	
  hasn’t	
  been	
  referenced	
  for	
  the	
  longest	
  time	
  
   • Nearly	
  as	
  good	
  at	
  optimal	
  policy	
  in	
  many	
  cases	
  
   • Difficult	
  to	
  implement	
  fully	
  
              • Must	
  keep	
  a	
  ordered	
  list	
  of	
  pages	
  or	
  last	
  accessed	
  time	
  for	
  all	
  pages	
  
   • Counter	
  implementation	
  
              • Every	
  page	
  entry	
  has	
  a	
  counter;	
  every	
  time	
  page	
  is	
  referenced	
  through	
  this	
  entry,	
  
                copy	
  the	
  clock	
  into	
  the	
  counter.	
  
              • When	
  a	
  page	
  needs	
  to	
  be	
  changed,	
  look	
  at	
  the	
  counters	
  to	
  determine	
  which	
  are	
  
                to	
  change.	
  
         	
  
   • Example	
  1	
  




                                                                                                                                                  	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
Example	
  2	
  
Reference	
  string:	
  	
  1,	
  2,	
  3,	
  4,	
  1,	
  2,	
  5,	
  1,	
  2,	
  3,	
  4,	
  5	
  
Page	
  hit	
  ratio:???	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  

	
  
                                                                                                                                         72	
  
Thrashing	
  
     • If	
  a	
  process	
  does	
  not	
  have	
  “enough”	
  pages,	
  the	
  page-­‐fault	
  rate	
  is	
  very	
  high.	
  	
  This	
  leads	
  
         to:	
  
               – Low	
  CPU	
  utilization.	
  
               – OS	
  thinks	
  that	
  it	
  needs	
  to	
  increase	
  the	
  degree	
  of	
  multiprogramming	
  
               – Another	
  process	
  added	
  to	
  the	
  system.	
  
               – A	
  process	
  is	
  busy	
  swapping	
  pages	
  in	
  and	
  out	
  ≡	
  Thrashing	
  
     • Thrashing	
  –	
  Constantly	
  needing	
  to	
  get	
  pages	
  off	
  secondary	
  storage	
  
               – Happens	
  if	
  the	
  OS	
  throws	
  out	
  a	
  piece	
  of	
  memory	
  that	
  is	
  about	
  to	
  be	
  used	
  
               – Can	
  happen	
  if	
  the	
  program	
  scans	
  a	
  long	
  array	
  –	
  continuously	
  referencing	
  pages	
  
                     not	
  used	
  recently	
  
                     	
  
Resident	
  Set	
  Management	
  
     • Resident	
  Set	
  –	
  Those	
  parts	
  of	
  the	
  program	
  being	
  actively	
  used	
  
               – Remaining	
  parts	
  of	
  program	
  on	
  disk	
  
     • Size	
  –	
  How	
  many	
  pages	
  to	
  bring	
  in	
  
               – Smaller	
  sets	
  allow	
  more	
  processes	
  in	
  memory	
  at	
  one	
  time	
  
               – Larger	
  sets	
  reduce	
  #	
  of	
  page	
  faults	
  for	
  each	
  process	
  
               – Fixed	
  Allocation	
  
                          • Each	
  process	
  is	
  assigned	
  a	
  fixed	
  number	
  of	
  pages	
  
               – Variable	
  Allocation	
  
                          • Allow	
  the	
  number	
  of	
  pages	
  for	
  a	
  given	
  process	
  to	
  vary	
  over	
  time	
  
	
  
Cleaning	
  Policy	
  
     • Use	
  modify	
  (dirty)	
  bit	
  to	
  reduce	
  overhead	
  of	
  page	
  transfers	
  –	
  only	
  modified	
  pages	
  are	
  
         written	
  to	
  disk	
  
     • Demand	
  Cleaning	
  –	
  Write	
  out	
  when	
  selected	
  for	
  replacement	
  
               – Process	
  may	
  have	
  to	
  wait	
  for	
  two	
  I/O	
  operations	
  before	
  being	
  able	
  to	
  proceed	
  
     • Pre	
  cleaning	
  –	
  Write	
  out	
  in	
  bunches	
  
               – Do	
  it	
  too	
  soon,	
  and	
  the	
  page	
  may	
  be	
  modified	
  again	
  before	
  being	
  replaced	
  	
  
               – Works	
  well	
  with	
  page	
  buffering	
  
	
  
Load	
  Control	
  
     • Managing	
  how	
  many	
  processes	
  we	
  keep	
  in	
  main	
  memory	
  
     • If	
  too	
  few,	
  all	
  processes	
  may	
  be	
  blocked,	
  may	
  have	
  a	
  lot	
  of	
  swapping	
  
     • Too	
  many	
  can	
  lead	
  to	
  thrashing	
  
         	
  
Summary	
  
     • Virtual	
  memory	
  –	
  larger	
  memory	
  space	
  perceived	
  by	
  the	
  program	
  
     • OS	
  should	
  adapt	
  a	
  number	
  of	
  policy	
  for	
  virtual	
  memory	
  management	
  
     • Page	
  replacement	
  completes	
  separation	
  between	
  logical	
  memory	
  and	
  physical	
  memory	
  
	
  
                                                                                                                                                  73	
  
 
Virtual	
  memory	
  problem	
  	
  
Ex.	
  The	
  following	
  sequence	
  of	
  visual	
  page	
  number	
  with	
  virtual	
  memory	
  2,	
  4,	
  3,	
  6,	
  7,	
  1,	
  3,	
  2,	
  6,	
  3,	
  
5,	
  1,	
  2,	
  3.	
  Assume	
  the	
  main	
  memory	
  is	
  initially	
  empty.	
  Calculate	
  the	
  number	
  of	
  page	
  fault	
  and	
  
show	
  the	
  final	
  contents	
  for	
  the	
  following	
  scenarios:	
  
       a.) 3	
  frames	
  (number	
  of	
  page	
  capacity)	
  with	
  page	
  replacement	
  policy	
  –	
  optimal	
  algorithm	
  
       b.) 4	
  frames	
  (number	
  of	
  page	
  capacity)	
  with	
  page	
  replacement	
  policy	
  –	
  optimal	
  algorithm	
  
       c.) 3	
  frames	
  (number	
  of	
  page	
  capacity)	
  with	
  page	
  replacement	
  policy	
  –	
  Fist	
  in	
  first	
  out	
  
             algorithm	
  
       d.) 4	
  frames	
  (number	
  of	
  page	
  capacity)	
  with	
  page	
  replacement	
  policy	
  –	
  Fist	
  in	
  first	
  out	
  
             algorithm	
  
       e.) 3	
  frames	
  (number	
  of	
  page	
  capacity)	
  with	
  page	
  replacement	
  policy	
  –	
  Least	
  recently	
  used	
  
             algorithm	
  
       f.) 4	
  frames	
  (number	
  of	
  page	
  capacity)	
  with	
  page	
  replacement	
  policy	
  –	
  Least	
  recently	
  used	
  
             algorithm	
  
             	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
                                                                                                                                                             74	
  
 
                                                        File	
  Management	
  
File	
  Management	
  
       • One	
  of	
  the	
  important	
  services	
  of	
  OS	
  	
  
       • Objectives	
  
           – Meet	
  the	
  data	
  requirements	
  of	
  the	
  user	
  
           – Guarantee	
  valid	
  data	
  
           – Optimize	
  performance	
  -­‐	
  Both	
  throughput	
  and	
  response	
  time	
  
           – Support	
  a	
  wide	
  variety	
  of	
  devices	
  
           – Minimize	
  lost	
  or	
  destroyed	
  data	
  
           – Provide	
  a	
  standard	
  set	
  of	
  I/O	
  routines	
  
           – Provide	
  support	
  for	
  multiple	
  users	
  
	
  
OS	
  and	
  File	
  Operations	
  
       • System	
  calls	
  to	
  (for	
  example)	
  create	
  files,	
  delete	
  files,	
  move	
  files,	
  rename	
  files,	
  copy	
  files,	
  
             open	
  files,	
  close	
  file,	
  read	
  files,	
  write	
  files.	
  
       • Open	
  (Fi)	
  –	
  search	
  the	
  directory	
  structure	
  on	
  disk	
  for	
  entry	
  Fi,	
  and	
  move	
  the	
  content	
  of	
  
             entry	
  to	
  memory.	
  
       • Close	
  (Fi)	
  –	
  move	
  the	
  content	
  of	
  entry	
  Fi	
  in	
  memory	
  to	
  directory	
  structure	
  on	
  disk.	
  
       • Control	
  other’s	
  access	
  to	
  files	
  
       • Able	
  to	
  move	
  data	
  between	
  files	
  
       • Back	
  up	
  and	
  recover	
  files	
  
	
  
Access	
  Methods	
  
       • Sequential	
  Access	
  
	
           	
  	
  	
  	
  	
  	
  	
  read	
  next	
  
	
           	
  	
  	
  	
  	
  	
  	
  write	
  next	
  	
  
	
           	
  	
  	
  	
  	
  	
  	
  reset	
  
	
           	
  	
  	
  	
  	
  	
  	
  no	
  read	
  after	
  last	
  write	
  
	
           	
  	
  	
  	
  	
  	
  	
  	
  	
  (rewrite)	
  
       • Direct	
  Access	
  
	
           read	
  n	
  
	
           write	
  n	
  
	
           position	
  to	
  n	
  
	
           	
  	
  	
  	
  	
  	
  	
  	
  read	
  next	
  
	
           	
  	
  	
  	
  	
  	
  	
  	
  write	
  next	
  	
  
	
           	
  	
  	
  	
  	
  	
  	
  	
  rewrite	
  n	
  
	
           	
  
n	
  =	
  relative	
  block	
  number	
  
	
  

	
  
                                                                                                                                                 75	
  
 
Directory	
  Structure	
  
     • A	
  collection	
  of	
  nodes	
  containing	
  information	
  about	
  all	
  files.	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
                                                                                                                        	
  
	
  
	
  
	
  
Both	
  the	
  directory	
  structure	
  and	
  the	
  files	
  reside	
  on	
  disk.	
  
Backups	
  of	
  these	
  two	
  structures	
  are	
  kept	
  on	
  tapes.	
  
	
  
Directory	
  Implementation	
  
     • Linear	
  list	
  of	
  file	
  names	
  with	
  pointer	
  to	
  the	
  data	
  blocks.	
  
               – simple	
  to	
  program	
  
               – time-­‐consuming	
  to	
  execute	
  
     • Hash	
  Table	
  –	
  linear	
  list	
  with	
  hash	
  data	
  structure.	
  
               – decreases	
  directory	
  search	
  time	
  
               – collisions	
  –	
  situations	
  where	
  two	
  file	
  names	
  hash	
  to	
  the	
  same	
  location	
  
               – fixed	
  size	
  
	
  
File	
  Sharing	
  
     • Sharing	
  of	
  files	
  on	
  multi-­‐user	
  systems	
  is	
  desirable.	
  
     • Sharing	
  may	
  be	
  done	
  through	
  a	
  protection	
  scheme.	
  
     • On	
  distributed	
  systems,	
  files	
  may	
  be	
  shared	
  across	
  a	
  network.	
  
     • Network	
  File	
  System	
  (NFS)	
  is	
  a	
  common	
  distributed	
  file-­‐sharing	
  method.	
  
	
  
Protection	
  
     • File	
  owner/creator	
  should	
  be	
  able	
  to	
  control:	
  
               – what	
  can	
  be	
  done	
  
               – by	
  whom	
  
     • Types	
  of	
  access	
  
               – Read	
  
               – Write	
  
               – Execute	
  
               – Append	
  
               – Delete	
  
	
  
                                                                                                                                 76	
  
– List	
  
Allocation	
  Methods	
  
     • An	
  allocation	
  method	
  refers	
  to	
  how	
  disk	
  blocks	
  are	
  allocated	
  for	
  files	
  
     • Three	
  main	
  methods:	
  
             – Contiguous	
  allocation	
  
             – Linked	
  allocation	
  
             – Indexed	
  allocation	
  
	
  
Contiguous	
  Allocation	
  
     • Each	
  file	
  occupies	
  a	
  set	
  of	
  contiguous	
  blocks	
  
       on	
  the	
  disk.	
  
     • Simple	
  –	
  only	
  starting	
  location	
  (block	
  #)	
  and	
  
       length	
  (number	
  of	
  blocks)	
  are	
  required.	
  
     • Random	
  access.	
  
     • Wasteful	
  of	
  space	
  (dynamic	
  storage-­‐
       allocation	
  problem).	
  
     • Files	
  cannot	
  grow.	
  
Linked	
  Allocation	
  
     • Each	
  file	
  is	
  a	
  linked	
  list	
  of	
  disk	
  blocks:	
  blocks	
  

           may	
  be	
  scattered	
  anywhere	
  on	
  the	
  disk.	
  
       •   Simple	
  –	
  need	
  only	
  starting	
  address	
  
       •   Free-­‐space	
  management	
  system	
  –	
  no	
  waste	
  
           of	
  space	
  	
  
       •   No	
  random	
  access	
  
       •   Two	
  file	
  system	
  implementation	
  methods	
  
           (mapping)	
  that	
  uses	
  linked	
  lists:	
  
                  – Linked	
  chain	
  of	
  blocks	
  
                  – File-­‐allocation	
  table	
  (FAT)	
  
	
  
File	
  implementation	
  -­‐	
  Linked	
  chain	
  
     – 	
  	
  Block	
  to	
  be	
  accessed	
  is	
  the	
  Qth	
  block	
  in	
  the	
  
          linked	
  chain	
  of	
  blocks	
  representing	
  the	
  file.	
  	
  
     – 	
  	
  Displacement	
  into	
  block	
  =	
  R	
  +	
  	
  
	
  
	
                                                                                                    File	
  B	
  
	
  
	
  
	
  
	
  
	
  
	
  
                                                                                                                      77	
  
Linked	
  chain	
  -­‐	
  advantages	
  
     • Every	
  block	
  can	
  be	
  used,	
  unlike	
  a	
  scheme	
  that	
  insists	
  that	
  every	
  file	
  is	
  contiguous.	
  
     • No	
  space	
  is	
  lost	
  due	
  to	
  external	
  fragmentation	
  (although	
  there	
  is	
  fragmentation	
  within	
  
               the	
  file,	
  which	
  can	
  lead	
  to	
  performance	
  issues).	
  
     • The	
  directory	
  entry	
  only	
  has	
  to	
  store	
  the	
  first	
  block.	
  The	
  rest	
  of	
  the	
  file	
  can	
  be	
  found	
  
               from	
  there.	
  
     • The	
  size	
  of	
  the	
  file	
  does	
  not	
  have	
  to	
  be	
  known	
  beforehand	
  (unlike	
  a	
  contiguous	
  file	
  
               allocation	
  scheme).	
  
     • When	
  more	
  space	
  is	
  required	
  for	
  a	
  file	
  any	
  block	
  can	
  be	
  allocated	
  (e.g.	
  the	
  first	
  block	
  on	
  
               the	
  free	
  block	
  list).	
  
     • Random	
  access	
  is	
  very	
  slow	
  (as	
  it	
  needs	
  many	
  disc	
  reads	
  to	
  access	
  a	
  random	
  point	
  in	
  the	
  
               file).	
  	
  
                   • The	
  implementation	
  is	
  really	
  only	
  useful	
  for	
  sequential	
  access.	
  
     • Space	
  is	
  lost	
  within	
  each	
  block	
  due	
  to	
  the	
  pointer.	
  	
  
     • The	
  number	
  of	
  bytes	
  is	
  not	
  a	
  power	
  of	
  two.	
  	
  
                   • This	
  is	
  not	
  fatal,	
  but	
  does	
  have	
  an	
  impact	
  on	
  performance.	
  
     • Reliability	
  could	
  be	
  a	
  problem.	
  	
  
                   • one	
  corrupt	
  block	
  pointer	
  and	
  the	
  whole	
  system	
  might	
  become	
  corrupted	
  (e.g.	
  
                              writing	
  over	
  a	
  block	
  that	
  belongs	
  to	
  another	
  file).	
  
	
  
File	
  implementation	
  –	
  FAT	
  
File-­‐Allocation	
  Table	
  (FAT)	
  
This	
  method	
  removes	
  the	
  pointers	
  from	
  the	
  
data	
  block	
  and	
  places	
  them	
  in	
  a	
  table,	
  which	
  is	
  
stored	
  in	
  memory.	
  
	
  
FAT	
  -­‐	
  advantages	
  and	
  disadvantages	
  
     • Advantages	
  
                   – The	
  entire	
  block	
  is	
  available	
  for	
  
                              data.	
  
                   – Random	
  access	
  can	
  be	
  
                              implemented	
  a	
  lot	
  more	
  
                              efficiently.	
  	
  
                   – Although	
  the	
  pointers	
  still	
  have	
  to	
  
                              be	
  followed	
  these	
  are	
  now	
  in	
  main	
  
                              memory	
  and	
  are	
  thus	
  much	
  faster.	
  
     • Disadvantages	
  	
  
                   – The	
  entire	
  table	
  must	
  be	
  in	
  
                              memory	
  all	
  the	
  time.	
  	
  
                                    • For	
  a	
  large	
  disc	
  (with	
  a	
  large	
  number	
  of	
  blocks)	
  this	
  can	
  lead	
  to	
  a	
  large	
  table	
  
                                        having	
  to	
  be	
  kept	
  in	
  memory.	
  
	
  
                                                                                                                                                                    78	
  
Indexed	
  Allocation	
  
     • Brings	
  all	
  pointers	
  together	
  
       into	
  the	
  index	
  block.	
  
     • Logical	
  view.	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
     • Need	
  index	
  table	
  
     • Random	
  access	
  
     • Dynamic	
  access	
  without	
  external	
  fragmentation,	
  but	
  have	
  overhead	
  of	
  index	
  block.	
  
     • Indexed	
  Allocation	
  –	
  Mapping	
  	
  
           – Mapping	
  from	
  logical	
  to	
  physical	
  in	
  a	
  file	
  of	
  unbounded	
  length	
  (block	
  size	
  of	
  512	
  
                 words).	
  We	
  need	
  only	
  1	
  block	
  for	
  index	
  table.	
  
           – Linked	
  scheme	
  –	
  Link	
  blocks	
  of	
  index	
  table	
  (no	
  limit	
  on	
  size).	
  
           – Two-­‐level	
  index	
  (maximum	
  file	
  size	
  is	
  5123)	
  
                                                                                                Indexed	
  Allocation	
  –	
  Mapping	
  
Efficiency	
  and	
  Performance	
  
     • Efficiency	
  dependent	
  on:	
  
           – disk	
  allocation	
  and	
  
                 directory	
  algorithms	
  
           – types	
  of	
  data	
  kept	
  in	
  
                 file’s	
  directory	
  entry	
  
     • Performance	
  
           – disk	
  cache	
  –	
  separate	
  
                 section	
  of	
  main	
  
                 memory	
  for	
  frequently	
  
                 used	
  blocks	
  
           – free-­‐behind	
  and	
  read-­‐
                 ahead	
  –	
  techniques	
  to	
  
                 optimize	
  sequential	
  access	
  
           – improve	
  PC	
  performance	
  by	
  dedicating	
  section	
  of	
  memory	
  as	
  virtual	
  disk,	
  or	
  RAM	
  
                 disk.	
  
	
  
	
  
	
  
                                                                                                                                       79	
  
Summary	
  
     • File	
  management	
  is	
  one	
  of	
  the	
  important	
  services	
  of	
  OS	
  
     • Three	
  main	
  methods	
  to	
  allocate	
  disk	
  blocks	
  to	
  a	
  file	
  	
  
           – Contiguous	
  allocation	
  
           – Linked	
  allocation	
  
           – Indexed	
  allocation	
  
     • Two	
  common	
  file	
  system	
  implementation	
  methods	
  that	
  use	
  linked	
  lists	
  are:	
  
           – Linked	
  chain	
  of	
  blocks	
  
           – File-­‐allocation	
  table	
  (FAT)	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
                                                                            	
  
	
  
	
  
	
  
                                                                                                                    80	
  
Exercise:	
  Write	
  algorithm	
  and	
  LMC	
  program	
  that	
  accepts	
  three	
  values	
  as	
  input	
  and	
  output	
  the	
  
largest	
  number.	
  Assume	
  that	
  all	
  three	
  input	
  values	
  are	
  not	
  equal.	
  (For	
  example	
  if	
  A,	
  B,	
  and	
  C	
  
are	
  three	
  inputs	
  numbers,	
  then	
  if	
  output	
  largest	
  of	
  these	
  three	
  number)	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
         	
  
         	
  
         	
  
         	
  
         	
  
         	
  
         	
  
         	
  
         	
  
	
  
                                                                                                                                                 81	
  
Ex2	
  Given	
  the	
  following	
  processes	
  with	
  the	
  following	
  arrival	
  and	
  burst	
  time	
  
       Process	
   Arrived	
  Time	
   Burst	
  Time	
                      Calculate	
  the	
  AWT	
  when	
  RR	
  scheduling	
  
         	
  P1	
                 0	
                  9	
        algorithm	
  with	
  quantum	
  time	
  =	
  10	
  is	
  used	
  
           P2	
                  12	
                 31	
        	
  
           P3	
                  20	
                 24	
        	
  
           P4	
                  17	
                  3	
        	
  
           P5	
                  35	
                 22	
        	
  
           P6	
                  26	
                 30	
        	
  
           P7	
                  27	
                  2	
        	
  
                                                                  	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
                          	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
                                                                                                                                      82	
  
Ex	
  A	
  main	
  memory	
  has	
  a	
  capacity	
  of	
  128	
  words.	
  Its	
  cache	
  uses	
  a	
  direct	
  mapping.	
  The	
  cache	
  
memory	
  has	
  a	
  capacity	
  of	
  16	
  word	
  organized	
  into	
  4	
  word	
  blocks	
  store	
  the	
  address	
  structure.	
  
Starting	
  with	
  on	
  empty	
  cache	
  the	
  following	
  series	
  of	
  main	
  memory	
  address	
  occurs:	
  25,	
  3,	
  26,	
  
24,	
  88,	
  91,	
  17,	
  15,	
  1,	
  127,	
  9,	
  15,	
  8,	
  7,	
  9,	
  2,	
  5,	
  6	
  ,	
  7,	
  99,	
  98,	
  1	
  
Label	
  each	
  address	
  references	
  in	
  the	
  list	
  as	
  a	
  hit	
  or	
  a	
  miss	
  and	
  show	
  the	
  final	
  contents	
  of	
  the	
  
cache.	
  State	
  the	
  address	
  structure.	
  	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
                                                       	
  
	
  
                                                                                                                                                           83	
  
Ex	
  The	
  following	
  sequence	
  of	
  virtual	
  page	
  number	
  is	
  encountered	
  in	
  the	
  course	
  of	
  execution	
  
on	
  a	
  computer	
  with	
  virtual	
  memory:	
  6,	
  3,	
  1,	
  2,	
  3,	
  4,	
  3,	
  1,	
  7,	
  1,	
  3,	
  2,	
  7,	
  8	
  	
  
Calculate	
  page	
  faults	
  when	
  the	
  number	
  of	
  main	
  memory	
  frames	
  is	
  4.	
  Assume	
  that	
  main	
  
memory	
  is	
  initially	
  empty	
  for	
  the	
  following	
  replacements	
  policies	
  .	
  
-­‐FIFO	
  
-­‐LRU	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
                                             	
  
	
  
	
  
                                                                                                                                               84	
  
Ex	
  Consider	
  four	
  process	
  P0,	
  P1,	
  P2,	
  P3	
  and	
  P4	
  are	
  competing	
  for	
  resources	
  A,	
  B,	
  and	
  C.	
  The	
  
following	
  system	
  state	
  is	
  given.	
  Analyze	
  the	
  deadlock	
  state	
  of	
  the	
  system	
  using	
  Banker’s	
  
algorithm.	
  Is	
  the	
  system	
  is	
  in	
  safe	
  state?	
  
Initial	
  available:	
  A	
  B	
  C	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  3	
  3	
  2	
  
                                                                                                                                                                                                                  Resource	
  
                                                     Process	
                                                                          Initial	
  Allocation	
                                                                 Max	
  claim	
                                                                     Need	
  
                                                                                                                                          A	
  	
  	
  	
  	
  	
  	
  B	
  	
  	
  	
  	
  	
  	
  	
  C	
                    A	
  	
  	
  	
  	
  	
  	
  B	
  	
  	
  	
  	
  	
  	
  	
  C	
   A	
  	
  	
  	
  	
  	
  	
  B	
  	
  	
  	
  	
  	
  	
  	
  C	
  
                                                                       P0	
                                                               2	
  	
  	
  	
  	
  	
  	
  	
  1	
  	
  	
  	
  	
  	
  	
  	
  1	
                4	
  	
  	
  	
  	
  	
  	
  5	
  	
  	
  	
  	
  	
  	
  3	
       3	
  	
  	
  	
  	
  	
  	
  3	
  	
  	
  	
  	
  	
  	
  2	
  
                                                                       P1	
                                                               1	
  	
  	
  	
  	
  	
  	
  	
  1	
  	
  	
  	
  	
  	
  	
  	
  0	
                 3	
  	
  	
  	
  	
  	
  	
  2	
  	
  	
  	
  	
  	
  2	
          2	
  	
  	
  	
  	
  	
  	
  1	
  	
  	
  	
  	
  	
  	
  2	
  
                                                                       P2	
                                                               2	
  	
  	
  	
  	
  	
  	
  	
  0	
  	
  	
  	
  	
  	
  	
  	
  2	
                4	
  	
  	
  	
  	
  	
  	
  0	
  	
  	
  	
  	
  	
  	
  2	
       2	
  	
  	
  	
  	
  	
  	
  0	
  	
  	
  	
  	
  	
  	
  0	
  
                                                                       P3	
                                                               2	
  	
  	
  	
  	
  	
  	
  	
  1	
  	
  	
  	
  	
  	
  	
  	
  1	
                2	
  	
  	
  	
  	
  	
  	
  2	
  	
  	
  	
  	
  	
  	
  2	
       0	
  	
  	
  	
  	
  	
  	
  1	
  	
  	
  	
  	
  	
  	
  1	
  
                                                                       P4	
                                                               1	
  	
  	
  	
  	
  	
  	
  	
  0	
  	
  	
  	
  	
  	
  	
  	
  1	
                3	
  	
  	
  	
  	
  	
  	
  3	
  	
  	
  	
  	
  	
  	
  2	
       4	
  	
  	
  	
  	
  	
  	
  3	
  	
  	
  	
  	
  	
  	
  1	
  
If	
  the	
  system	
  is	
  in	
  safe	
  condition,	
  find	
  out	
  if	
  this	
  request	
  will	
  be	
  granted	
  
P4	
  >>	
  A	
  	
  	
  	
  	
  	
  	
  B	
  	
  	
  	
  	
  	
  	
  	
  C	
  	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  4	
  	
  	
  	
  	
  	
  	
  2	
  	
  	
  	
  	
  	
  	
  2	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
                                                                                                                                                                                                                	
  
	
  
	
  
                                                                                                                                                                                                                                                                                                                                                                         85	
  
Ex	
  Consider	
  four	
  process	
  P0,	
  P1,	
  P2,	
  P3	
  and	
  P4	
  are	
  competing	
  for	
  resources	
  A,	
  B,	
  and	
  C.	
  
Assume	
  that	
  we	
  have	
  the	
  following	
  initial	
  availability	
  of	
  the	
  resources	
  and	
  the	
  initial	
  state	
  of	
  
allocations	
  foe	
  the	
  processes.	
  
Initial	
  availability:	
  A	
  B	
  C	
  	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  2	
  3	
  2	
  
         Process	
                                                                                 Initial	
  state	
  of	
  allocate	
                                                                  Request	
  
                                                                                                                                     A	
  	
  	
  	
  	
  	
  	
  B	
  	
  	
  	
  	
  	
  	
  C	
   A	
  	
  	
  	
  	
  	
  	
  B	
  	
  	
  	
  	
  	
  	
  C	
  
                           P0	
                                                                                                      1	
  	
  	
  	
  	
  	
  	
  1	
  	
  	
  	
  	
  	
  	
  0	
   0	
  	
  	
  	
  	
  	
  	
  0	
  	
  	
  	
  	
  	
  	
  0	
  
                           P1	
                                                                                                      1	
  	
  	
  	
  	
  	
  	
  0	
  	
  	
  	
  	
  	
  	
  0	
   2	
  	
  	
  	
  	
  	
  	
  0	
  	
  	
  	
  	
  	
  	
  3	
  
                           P2	
                                                                                                      3	
  	
  	
  	
  	
  	
  	
  0	
  	
  	
  	
  	
  	
  	
  2	
   1	
  	
  	
  	
  	
  	
  	
  1	
  	
  	
  	
  	
  	
  	
  0	
  
                           P3	
                                                                                                      2	
  	
  	
  	
  	
  	
  	
  1	
  	
  	
  	
  	
  	
  	
  1	
   0	
  	
  	
  	
  	
  	
  	
  1	
  	
  	
  	
  	
  	
  	
  1	
  
                           P4	
                                                                                                      0	
  	
  	
  	
  	
  	
  	
  0	
  	
  	
  	
  	
  	
  	
  2	
   5	
  	
  	
  	
  	
  	
  	
  3	
  	
  	
  	
  	
  	
  	
  1	
  
Analyze	
  the	
  above	
  request	
  scenario	
  with	
  the	
  deadlock	
  detection	
  technique	
  as	
  indicated	
  in	
  the	
  	
  




	
  
                                                                                                                                                                                                                                                              86	
  

Operating systems and technologies

  • 1.
    Operating  Systems  and  Technologies   Introduction       Operating  System  viewpoints:     >User  View     >High  Level  View  (System  view)     >User  View   -­‐Varies  interface  being  used.   If  a  personal  computer       -­‐Easy  to  use     -­‐High  performance  without  regard  to  the  effectiveness  of  the  system  is  low  or  not.   If  the  computer  connects  Internet  is  called  network  system       -­‐Requires  sharing  of  system  resources  and  exchanging  information  between  them.         The  operating  system  much  is  designed  system  resources  such  as  CPU,  I/O  devices  are   used  most  effective.     >High  Level  View  (System  view)     -­‐Resources  allocate       Computer  system  has  many  resources  such  as  CPU  time,  memory  space,  file   storage  space,  I/O  devices  that  may  required  to  solve  the  problem     -­‐Program  controller         Control  devices  –  transmit  information,  manage  the  execution  of  user  programs   to  prevent  errors  and  improper  use  of  the  computer.   Input   Computer   Output     Computer  system  –  overview     -­‐Motherboard     Motherboard  is  the  main  circuit  board  in  a  computer,  provides  a  way  for  hardware  in  a   computer  to  communicate  with  each  other.   -­‐Interconnect  between  computer  components     I/O   CPU         Memory     1  
  • 2.
    -­‐CPU  Organization   The  central  processing  unit  (CPU)  is  the  portion  of  a  computer  system  that  carries  out  the   instructions  of  a  computer  program,  to  perform  the  basic  arithmetical,  logical,  and   input/output  operations  of  the  system   -­‐Memory   Memory  is  an  organism's  ability  to  store,  retain,  and  recall  information  and  experiences   -­‐Input/Output     Communication  between  an  information  processing  system  (such  as  a  computer),  and  the   outside  world,  possibly  a  human,  or  another  information  processing  system.  Inputs  are  the   signals  or  data  received  by  the  system,  and  outputs  are  the  signals  or  data  sent  from  it.       Computer  System  Hierarchy   Electonic   Signal   Machine   code   Assembly  Language   Operating  System   High  Level  Language   Application  Software            User       A  brief  history  of  computers   -­‐The  first  generation  –  Vacuum  Tubes   -­‐The  second  generation  –  Transistors   -­‐The  third  generation  –  Integrated  circuit   -­‐The  fourth  generation  –  VLSI     The  first  Generation  -­‐  Vacuum  Tubes  (1945  -­‐1955)   ENIAC  (1943  -­‐  1946)   •  Intended  for  calculating  range  tables  of  aiming  artillery   •  Consisted  of  18000  tubes,  1500  relays,  weight  30  tons,  consumed  140  KW     2  
  • 3.
    •  Decimal  machine   •  Each  digit  represented  by  a  ring  of  10  vacuum  tubes.   • Programmed  with  multi-­‐position  switches  and  jumper  cables.   John  von  Neumann  (1945  -­‐1952)  more  lately  …   •  Originally  a  member  of  the  ENIAC  development  team.   •  First  to  use  binary  arithmetic   •  Architecture  consists  of:  Memory,  ALU,  Program  control,  Input,  Output   •  Stored-­‐program  concept  -­‐  main  memory  store  both  data  and  instructions     The  Second  Generation  -­‐  Transistors  (1955  -­‐1965)   Transistors   •  Transistor  was  invented  in  1948  at  Bell  Labs   •  DEC  PDP-­‐1,  first  affordable  microcomputer  ($120k),  performance  half  that  of        IBM  7090  (the  fastest  computer  in  the  world  at  that  time,  which  cost  millions)   •  PDP-­‐8,  cheap  ($16,000),  the  first  to  use  single  bus   CDC  6600  (1964)   •  An  order  of  magnitude  faster  than  the  mighty  IBM  7094   •  First  highly  parallelized  machine  (up  to  10  instructions  in  parallel)   Burroughs  B5000   •  First  to  emphasise  software  and  high  level  programming  languages  (Algol  60)     The  Third  Generation  -­‐  Integrated  Circuits  (1965  -­‐1980)   •  IBM  System/360   •  Family  of  machines  with  same  assembly  language   •  Designed  for  both  scientific  and  commercial  computing   •  DEC  PDP-­‐11   •  Very  popular  with  universities,  maintained  DEC's  lead  in  microcomputer  market     The  Fourth  Generation  -­‐  VLSI  (1980  -­‐  ?)   •  Lead  to  PC  revolution   •  High  performance,  low  cost     Moore’s  Law     • Transistor  density  on  a  microprocessor  will  double  every  18  to  24  months   • Computer  will  double  in  power  roughly  every  two  years,  but  cost  only  half  as  much     Technology  Trends   Processor   – Logic  Capacity  increases  about  30%  per  year       3  
  • 4.
    – Performance  increases  about  50%  per  year  (2x  every  1.5  years)   Memory  (DRAM)   – Capacity  increases  about  60%  per  year  (4x  every  3  years)   – Performance  increases  3.4%  per  year   Disk   – Capacity  increases  60%  per  year   – Performance  increases  3.4%  per  year   Network  Bandwidth   – Bandwidth  increasing  more  than  100%  per  year!     The  IAS  (von  Neumann)  Machine    *Key  concepts  of  von  Neumann  architecture  include   -­‐Stored  program  concept   -­‐Binary  representation  is  the  basis  for  storing  data  in  computer  memory   -­‐Memory  is  addressed  linearly   -­‐Memory  addressed  by  the  location  number  without  regard  to  the  contents   -­‐Instructions  executed  in  sequence  unless  an  instruction  or  outside  events  cause  branch     Main  memory  storing  programs  and  data  –  1000  storage  locations   ALU  operating  on  binary  data   Control  unit  interpreting  instructions  from  memory  and  executing   Input  and  output  equipment  operated  by  control  unit     Almost  all  of  today’s  computers  have  the  same  general  structure  as  the  IAS  -­‐  referred  to  as     von  Neumann  machines.     The  structure  of  IAS   computer     Arithmetic     And         Logic  Unit           Input   Main       Output     Memory   Equipment       Program       Control  Unit       Some  Observations  Regarding  Computer  Architecture   • Between  1945  and  1951,  von  Neumann  architecture   • Other  experimental  architectures  have  been  developed  and  built   • von  Neumann  architecture  continues  to  be  the  standard  architecture  for  computer     4  
  • 5.
    • No  other  architecture  has  had  any  commercial  success  so  far   • It  is  significant  that  in  a  field  where  technological  changes  happens  almost  overnight,   the  architecture  of  computers  is  virtually  unchanged  since  1951     How  Does  a  Computer  Work?   Hardware  needs  software   • Software  is  a  program  that  consists  of  a  series  of  instructions  (and  data)  for  performing   some  designated  tasks.   • CPU  runs  a  program  by  executing  the  instructions  one  by  one.     • A  program  is  stored  in  the  main  memory  when  it  is  executed.       Five  Classic  Components  of  a  Computer   *Control  gives  directions  to  the  other               components   – Examples:    Bus  controller,  memory   management  unit   *Datapath  performs  arithmetic  and  logic  operations     – Examples:    Adders,  multipliers,  shifters   Memory  holds  data  and  instructions   – Examples:    Cache,  main  memory,  disk     Input  writes  data  to  the  computer  (memory)   – Examples:    Keyboard,  mouse,  joystick   Output  reads  data  from  the  computer   – Examples:    Monitor,  sound  card     The  Little  Man  Computer  (LMC):  Physical  Layout                                 5  
  • 6.
    • Computer  simulator   • 100  mailboxes   – address  00  -­‐  99   – Each  holds  3-­‐digit  decimal  number   • Calculator   – Enter  number   – Temporarily  hold  number     – Add  and  Subtraction   – Display  3  digits   • Hand  counter   – Reset  button   – Instruction  counter   • Little  Man   • In/Out  Basket     The  Little  Man  Computer:  Communication  with  outside  World   >A  user  outside  the  mailroom  communicate  with  the  little  man  by   – Putting  a  3-­‐digit  into  the  in  basket   – Retrieving  a  3-­‐digit  from  the  out  basket   >Apart  from  the  reset  button,  all  communication  between  the  LMC  and  the  outside  world   takes  place  using  3-­‐digit  numbers     The  Little  Man  Computer:  Operation   • A  small  group  of  instructions,  each  consists  of  a  single  digit   • The  first  digit  of  a  3-­‐digit  number  is  used  to  tell  the  Little  Man  which  operation  to   perform.     • In  some  cases,  the  Little  Man  is  required  to  use  a  particular  mailbox  to  store  or  retrieve   data   • The  3  digits  can  be  used  to  give  instructions  to  the  Little  Man  according  to  Operation   Code  (Op-­‐Code)   3  instruction   25  mailbox   address   Operation  Code    (Op-­‐Code)     The  Little  Man  Computer:  Instruction  Set   FORMAT    MEANING   000   Stops  the  Computer  -­‐  the  Little  Man  rests.   1xx   Adds  the  contents  of  mailbox  xx  to  the  calculator  display.     6  
  • 7.
    2xx   Subtracts  the  contents  of  mailbox  xx  from  the  calculator  display.   3xx   Stores  the  calculator  value  into  mailbox  xx.   4xx   Stores  the  address  portion  of  the  calculator  value  (last  2  digits)  into  the   address  portion  of  the  instruction  in  mailbox  xx.   5xx   Loads  the  contents  of  mailbox  xx  into  the  calculator.   6xx   This  instruction  sets  the  instruction  counter  to  the  number  xx,  thus   effectively  branching  to  mailbox  xx     7xx   IF  the  calculator  value  is  zero,  THEN  set  the  instruction  counter  to  the   number  xx,  thus  effectively  branching  to  mailbox  xx.     8xx   IF  the  calculator  value  is  positive  (or  zero),  THEN  set  the  instruction   counter  to  the  number  xx,  thus  effectively  branching  to  mailbox  xx.     901   Read  a  number  from  the  IN  basket  and  key  it  into  the  calculator.   902   Copy  the  number  in  the  calculator  onto  a  slip  of  paper  and  place  it  into   the  OUT  basket.     The  Little  Man  Computer:  Execute  Program   >To  run  an  LMC  program  we  must  carry  out  the  following  steps:   •  Load  the  instructions  into  the  mailboxes,  starting  with  mailbox  00.     • Place  the  data  to  be  used  by  the  program  in  the  IN  basket,  in  the  order  in  which  the   program  will  use  these  data.     • Press  the  RESET  BUTTON  to  set  the  Instruction  Counter  to  00  and  to  also  wakeup  the   Little  Man.    Then     1.  The  Little  Man  looks  into  the  Instruction  Counter   2.  The  Little  Man  finds  the  mailbox  whose  address  has  the  value  in  the  Instruction   Counter  and  fetches  the  3-­‐digit  number  from  the  mailbox.   3.  The  Little  Man  goes  over  to  increase  the  instruction  counter  by  1   4.  The  Little  Man  executes  the  instruction  found  in  the  mailbox   5.  The  Little  Man  repeats  the  by  going  to  1     The  Little  Man  Computer:  Program  Example   Write  a  LMC  program,  which  adds  two  numbers  together     Mailbox   Code   Instruction  Description   01   901   INPUT   02   399   STORE  DATA  to  mailbox  no.  99   03   INPUT   ADD  the  1st  number  to  2nd  number     7  
  • 8.
    04   902   OUTPUT  RESULT   05   000   The  Little  man  rest   99    Data     The  Little  Man  Computer  (LMC)  -­‐  Three  main  aspects   1. Input/Output     • These  are  used  so  the  LMC  can  communicate  with  the  outside  world.   2. Central  Processing  Unit     • Contains  the  core  of  the  computer:  calculator,  reset  button,  instruction  counter   and  the  little  man.   3. Memory     • The  mailboxes  from  00  -­‐  99  each  containing  one  3-­‐digit  number  representing   instructions  or  data.     Central  Processing  Unit  (CPU)   CPU  is  A  hardware  device  (VLSI  chip)  that  integrates  millions  of  transistors  into  a  silicon  chip.     • Lies  at  the  heart  of  a  computer,     •  Executes  instructions  of  a  program,     •  Controls  all  operations  accordingly.             CPU  Architecture     >Arithmetic  Logic  Unit  (ALU)   • Arithmetic  Logic  Unit  (ALU):  primarily  constructed  by  logic  gates  (full  adders)   • It  performs   – Basic  arithmetic  calculations:       8  
  • 9.
                                           e.g.  adding(+),  subtracting(-­‐),  multiplying(x)  and  dividing(/).     – Logic  operations:                                            e.g.  OR,  AND,  NOT,  (Left  or  Right)  Shift,  etc.     • ALU  gets  control  signals  from  the  Control  Unit  to  carry  out  instructions  one  by  one.     >Control  Unit   • One  of  the  most  important  parts  in  a  CPU.     • Consists  of  decoding,  timing  and  control  logic  circuits.       • Main  functions:   – To  decode  instructions,   – To  create  control  signals,  which  tell  the  ALU  and  the  Registers  how  to  operate,   what  to  operate  on,  and  what  to  do  with  the  result.     – To  make  sure  everything  happens  in  the  right  place  at  the  right  time,  with  a  clock.   >Registers   • A  mini-­‐storage  area  built  with  flip-­‐flops  inside  CPU     – PC  (Program  Counter):  Holds  address  of  instruction  being  executed.     – IR  (Instruction  Register):  Holds  instruction  while  it's  decoded/executed.   – ACC  (Accumulator):  Result  of  ALU  operations   – MBR  (Memory  Buffer  Register):  Temporarily  holds  the  instruction/data  fetched   from  the  memory  unit.   – MAR  (Memory  Address  Register):  holds  address.   • ALU  can  retrieve  information  (instruction  or  data)  quickly.   >System  BUS  Structure              System  bus  consists  of  3  functional  groups  of  lines:   • Data  bus  lines   • Control  bus  lines     • Address  bus  lines                     Data  Bus   • Bi-­‐directional  path  for  transmitting  data  between  the  CPU  and  memory,  and   peripherals.   • Width  of  data  bus:  number  of  bits  can  be  transferred  at  a  time   – E.g.  8,  16,  32,  or  64  lines,  each  for  one  bit  binary  data,     • The  width  of  data  bus  is  one  key  factors  in  determining  overall  system  performance.     9  
  • 10.
    Address  Bus   • A  ‘road’  for  conveying  addresses  to  memory  or  input/  output  devices.   • The  number  of  address  lines,  or  width,  determines  maximum  capacity  of  addresses  a   CPU  can  access  to,     i.e.  N  lines:    2N  addressable  memory  (and  I/O)  units,     e.g.8  address  lines:  28  =  256  addresses  from  00000000  to  11111111.   Control  Bus   • Carries  signals  to  control  the  activities  of  data/instruction  transfers  (read  or  write),  or   input/output  devices.   • The  number  of  control  bus  lines  varies,  each  is  designed  to  perform  a  specific  control   task,  e.g.                                        RD:  Read  signal                                      WR:  Write  signal                                      CLK:  system  clock  signal                                      RESET:  reset  control  signal       M68000  CPU  chip   • 64  connection  pins     – 16-­‐bit  Data  Bus  (32-­‐bit  internal).   – 24-­‐bit  address  bus  (for  16  MB).   – 21  control  pins,  e.g.                ,  Halt,  etc.   – 3  pins  for  power  supply:  Vcc,  GNDx2.       >Instruction  execution   CPU  performs  Fetch/Decode/Execute  cycle:   • Fetch  instruction  from  primary  memory   • Increment  Program  Counter   • Decode     • Execute  instruction     • Write  result  to  memory     Fetch  Time  depends  on  access  time  of  memory  and  activity  on  Bus     Decode/Execute  Time  depends  on  type  of  instruction     Instruction  Execution  Cycle                   10  
  • 11.
    Summary   • Most  of  modern  computer  systems  are  based  on  von  Neumann  architecture     • Computer  components:  CPU,  Memory  and  I/O  devices     • BUS  (Control  bus,  data  bus  and  address  bus)  links  computer  components  together   • CPU  (Centre  Processing  Unit):  the  brain  of  a  computer.    Consists  of:  ALU  (Arithmetic  and   Logic  Unit),  Registers,  Control  Unit,  Internal  bus  and  Bus  Interface  Unit.     • CPU  instruction  cycle  includes:    Fetch  →  Decode  →  Execute.     The  Little  Man  Computer:  Exercise   Write  a  LMC  program  which  subtracts  the  second  input  number  from  the  first  input  number   and  outputs  the  result.  (Assumption:  first  input  number    >=  second  input  number)   Mailbox   Code   Instruction  Description   00   901   INPUT  A   01   350   STORE  DATA  to  mailbox  no.  50   02   901   INPUT  B   03   339   STORE  DATA  to  mailbox  no.39   04   550   LOAD  the  first  number   05   239   SUBSTRACT  2nd  from  1st     06     902   OUTPUT  RESULT   07   000   The  little  man  rest                                                                50  Data                                                                39  Data     Exercise  Computer  system  and  number  system   Ex1:  Find  the  word  or  phrase  from  the  list  below  that  best  matches  the  description  in  the   folloeing  question.     a) Binary  number  >  III  Base  2  number   b) Bit  >  II  Binary  digit   c) Central  processor  >  I  Active  part  of  the  computer,  following  the  instructions  of  the   programs  it  adds  numbers,  test  number,  and  so  on   d) Complier  >  VII  Program  that  translates  rom  a  higher-­‐level  notation  to  assembly   language  or  machine  code   e) Integrated  circuit  >  IV  Integrate  dozens  to  hundreds  of  transistors  into  a  single   chip   f) Memory  >  Locations  of  programs  when  they  are  running  containing  the  data   needed  as  well   g) Operating  system  >  Program  that  manages  the  sources  of  a  computer  for  the   benefit  of  the  programs  that  run  on  that  machine     h) Semiconductor  >  Substance  that  does  not  conduct  electricity  well       11  
  • 12.
    Ex2:  Convert  the  following  binary  numbers  to  decimal  number   a.)  1001   b.)  0.111   c.)  0.11011   d.)  1.001   e.)  111.1011   f.)  100.01   Ex3:  Convert  the  following  decimal  number  into  binary  number   a.)  39   b.)  12   C.)  0.25   d.1/8     12  
  • 13.
    e.)  6.25   f.)  33   g.)  12.125   h.)  39.125   Ex:  Discuss  the  main  components  of  the  little  man  computer  and  respond  them  to  in  a  real   computer   -­‐Mailbox  ~=  the  numbering  system  >  memory   -­‐Calculator  >  CPU/  Register     -­‐Little  man  >  Bus  system,  CPU   -­‐Instruction  locations  (hand  counter)  >  program  computer     -­‐In/Put  basket  >  Input  /  Output  device  module   -­‐Reset  button  >  Reset  power                             13  
  • 14.
    Ex:  The  LMC  uses  a  3-­‐digit  mailbox  and  the  following  op-­‐code,  which  are  used  to  write  a   program.  Output  largest  number  of  two  input  number       Mailbox   Code   Instruction  Description   00   901   INPUT  A   01   399   STORE  DATA  to  mailbox   no.99   02   901   INPUT  B   03   389   STORE  DATA  to  mailbox   no.89   04   299   SUBSTRACT  the  A  to  B  (B-­‐A)   05   820   If  B-­‐A  >  0  (go  to  20)   06   599   LOAD  A  (A  is  bigger)   07   621   JUMP  to  21   07   902   OUTPUT   08   000   STOP   .   .   .   .   .   .   .   .   .   .   .   .         20   589   LOAD  B  (B  is  bigger)   21   902   OUTPUT   22   000   STOP                                     14  
  • 15.
    Ex:  The  LMC  uses  a  3-­‐digit  mailbox  and  the  following  op-­‐code,  which  are  used  to  write  a   program.  Output  smallest  number  of  two  input  number       Mailbox   Code   Instruction  Description   00   901   INPUT  A   01   399   STORE  DATA  to  mailbox   no.99   02   901   INPUT  B   03   389   STORE  DATA  to  mailbox   no.89   04   299   SUBSTRACT  the  A  to  B  (B-­‐A)   05   820   If  B-­‐A  >  0  (go  to  20)   06   599   LOAD  B  (B  is  smallest)   07   621   JUMP  to  21   .   .   .   .   .   .   .   .   .   .   .   .         20   589   LOAD  A  (A  is  smallest)   21   902   OUTPUT   22   000   STOP                                         15  
  • 16.
    Operating  Systems,  Processes  and  Inter-­‐Process  Communication       Recap…Computer  System  Components   • Hardware  –  provides  basic  computing  resources  (CPU,  memory,  I/O  devices).   • Operating  system  –  controls  and  coordinates  the  use  of  the  hardware  among  the   various  application  programs  for  the  various  users.   • Applications  programs  –  define  the  ways  in  which  the  system  resources  are  used  to   solve  the  computing  problems  of  the  users  (compilers,  database  systems,  video  games,   business  programs).   • Users  (people,  machines,  other  computers).       What  is  an  Operating  System  (OS)?   • A  program  that  acts  as  an  intermediary  between  an  application  program  (or  a  user)  and   the  computer  hardware   – Allocate  resources  (CPU,  Memory,  disk  space,  etc.)  between  programs  and  users   efficiently   – Allow  the  user  to  conveniently  access  data  and  programs   – Protect  the  system  from  incorrect  or  malicious  programs  and  users   • Operating  system  goals:     16  
  • 17.
    – Execute  user  programs  and  make  solving  user  problems  easier.   – Make  the  computer  system  convenient  to  use.   • Use  the  computer  hardware  in  an  efficient  manner     What  is  an  OS?   • Definitions   – Resource  allocator  –  manages  and  allocates  resources   – Control  program  –  controls  the  execution  of  user  programs  and  operations  of  I/O   devices     – Kernel  –  the  one  program  running  at  all  times  (all  else  being  application  programs)   • Services  typically  provided  by  an  O.S.   – Program  Creation  (editor,  compiler)   – Program  Execution   – Access  to  I/O  devices   – Controlled  access  to  files   – System  Access  (logging  in)   – Error  detection/response   • O.S.  will  evolve  over  time  -­‐  Hardware  upgrades,  New  services     OS  History   • Serial  Processing   – Sign-­‐up  sheet  for  computer  time   – Each  user  would  set  up  the  job,  run  it,  and  collect  output   • Simple  Batch  System  (mid  1950s)   – Try  to  improve  scheduling/setup  time   – Have  a  monitor  that  loads  jobs,  when  a  job  finishes  it  jumps  to  the  monitor  that   loads  the  next  job.   • Multiprogrammed  Batch  System   – Several  programs  in  memory  at  one  time   • One  program  can  do  I/O  while  another  computes   – Needs  memory  management,  scheduling   • Time-­‐Sharing  Systems   – Allow  several  users  to  interact  with  the  system  at  the  same  time   – Single-­‐user  multitasking  (windows  95)       17  
  • 18.
    Compatible   time  sharing   system   (CTSS)  –   1962   Switched   users  every   0.2  second   Supported  up   to  32  users   MULTICS   (1965)   Intended  as   the  computer   *Desirable  hardware  items:   service  for   Memory  protection   Boston   Timer   Strong   Privileged  instructions  (I/O)   influence  on   Interrupts   later  systems       Good  security,     user  interface     OS  Issues   • Process.   – Hard  to  define  formally,  but  think  of  a  running  program.   – O.S.  needs  to  maintain  proper  synchronization  between  processes  (mutual   exclusion,  avoiding  deadlock).   • Main  causes  of  errors:   – Improper  synchronization.   • Must  wait  for  someone  else  to  finish.   – Failed  mutual  exclusion.   • Assigning  two  passengers  to  the  same  seat.   – Nondeterminate  program  execution.   • Output  depends  on  other  programs.   • May  be  a  result  of  misused  common  memory.   – Deadlock.   • Two  processors  each  waiting  for  the  other  to  do  something.   • Memory  management   – Isolate  processes  from  each  other  (shared  memory  may  be  allowed).   – Automatically  move  data  between  main  memory  and  disk.   – Support  long-­‐term  storage.     • Security   – Control  use  of  the  system,  access  to  files  and  other  resources.   • Scheduling     18  
  • 19.
    – Resource  allocation  and  scheduling   – Fairness/priorities/efficiency   • System  structure   – As  systems  grow  larger,  rely  on  modules,  layers  of  abstraction   • Multithreading   – Allow  a  process  to  consist  of  one  or  more  threads  that  share  memory,  files,  etc.   – Helps  with  structuring  programs   • Microkernel   – Assign  only  essential  functions  to  the  kernel  (memory,  communication)   – Other  items  run  as  user  processes   • Symmetric  multiprocessing  (SMP)   – System  may  have  two  or  more  equivalent  processors  that  share  memory,  I/O   • Distributed  operating  system  (clusters)   – Provide  illusion  of  a  single  system  from  several  entities     *Process.   Hard  to  define  formally,  but  think  of  a  running  program.   Three  main  components:     Executable  program.   Data  for  that  program.   Context  (registers,  files,  etc.)  For  the  program.   O.S.  Needs  to  maintain  proper  synchronization  between  processes  (mutual  exclusion,  avoiding   deadlock).   Main  causes  of  errors:   Improper  synchronization.   Must  wait  for  someone  else  to  finish.   Failed  mutual  exclusion.   Assigning  two  passengers  to  the  same  seat.   Nondeterminate  program  execution.   Output  depends  on  other  programs.   May  be  a  result  of  misused  common  memory.   Deadlock.   Two  processors  each  waiting  for  the  other  to  do  something.   Memory  management   Isolate  processes  from  each  other  (shared  memory  may  be  allowed).   Should  allow  only  appropriate  accesses.   Often  implemented  using  virtual  memory.   Automatically  move  data  between  main  memory  and  disk.   Support  modular  programs.   Support  long-­‐term  storage.   Security   Control  use  of  the  system,  access  to  files  and  other  resources.   Areas  of  concern  by  O.S.  Developers:   Access  control.   Information  flow  control.     19  
  • 20.
    Certify  above  controls  are  correct.   Scheduling   Resource  allocation  and  scheduling   Fairness/priorities/efficiency   System  structure   As  systems  grow  larger,  rely  on  modules,  layers  of  abstraction   Electronic  circuits   Instruction  set   Procedures   Interrupts   Primitive  processes   Local  secondary  storage   Virtual  memory   Communications   File  system   Devices   Directories   User  process   Shell     Process   • A  process  is  a  program  in  execution.    A  process  needs  certain  resources,  including  CPU   time,  memory,  files,  and  I/O  devices,  to  accomplish  its  task.   • Three  main  components:     • Executable  program.   • Data  for  that  program.   • Context  (registers,  files,  etc.)  for  the  program.   • The  operating  system  is  responsible  for  the  following  activities  in  connection  with   process  management.   – Process  creation  and  deletion.   – Process  suspension  and  resumption.   – Provision  of  mechanisms  for:   • process  synchronization   • process  communication     Hard  to  define  formally,  but  think  of  a  running  program.   Three  main  components:     Executable  program.   Data  for  that  program.   Context  (registers,  files,  etc.)  For  the  program.   O.S.  Needs  to  maintain  proper  synchronization  between  processes  (mutual  exclusion,  avoiding  deadlock).     An  operating  system  executes  a  variety  of  programs:   Batch  system  –  jobs   Time-­‐shared  systems  –  user  programs  or  tasks     20  
  • 21.
    Textbook  uses  the  terms  job  and  process  almost  interchangeably.   Process  –  a  program  in  execution;  process  execution  must  progress  in  sequential  fashion.     A  process  includes:   program  counter     stack   data  section         Process  Control  Block   • Identifiers   – Process,  Parent,  User   • Processor  State     Information  associated  with  each  process   – User-­‐Visible  Registers   – Control/Status  Registers   – Stack  Pointers  (User,  System)   • Process  Control  Information   – Scheduling/state,  Priority   – Data  structure  info  (links)   – Interprocess  Communication   – Privilege  Information   – Memory  Management   • User  Code   • User  Data   • System  Stack   – Resource  Ownership  and  Utilization     Process  States   • Two-­‐state  model:   – Running   – Not  Running                -­‐  may  be  held  in  a  queue   • Requirements   – Some  way  of  representing  a   process   • Must  include  state  and   memory  use   – Must  keep  track  of  processes  that  are  not  currently  running   – Dispatcher   • Moves  processes  to  the  waiting  queue   • Remove  completed/aborted  processes   • Select  the  next  process  to  run     21  
  • 22.
    Five-­‐state  Model   • Processes  may  be  waiting  for  I/O   • Use  additional  states:   – Running:  currently  being  run   – Ready:  ready  to  run   – Blocked:  waiting  for  an  event  (I/O)   – New:  just  created,  not  yet  admitted  to  set  of  runnable  processes   – Exit:  completed/error  exit   • May  have  separate  waiting  queues  for  each  event         May  have  separate  waiting  queues  for  each  event     Transitions:   Null  ®  New  –  Process  is  created   New  ®  Ready  –  O.S.  is  ready  to  handle  another  process  (Memory,  CPU)   Ready  ®  Running  –  Select  another  process  to  run   Running  ®  Exit  –  Process  has  terminated   Running  ®  Ready  –  End  of  time  slice  or  higher-­‐priority  process  is  ready   Running  ®  Blocked  –  Process  is  waiting  for  an  event  (I/O,  Synchronization)   Blocked  ®  Ready  –  The  event  a  process  is  waiting  for  has  occurred,  can  continue   Ready  ®  Exit  –  Process  terminated  by  O.S.  or  parent   Blocked  ®  Exit  –  Same  reasons     Creating  a  Process   • Assign  a  unique  process  ID   • Allocate  memory  for  the  process   • Initialize  the  process  control  block   – Process  ID,  parent  ID   – Set  program  counter  and  stack  pointer  to  appropriate  values     22  
  • 23.
    – State  usually  set  to  Ready   • Set  links  so  it  is  in  the  appropriate  queue   • Create  other  data  structures   – Memory,  files,  accounting   • Reasons  to  create  a  process   – Submit  a  new  batch  job/Start  program   – User  logs  on  to  the  system   – Device  driver  or  Daemon   – OS  creates  on  behalf  of  a  user     Switching  Processes   • We  will  often  switch  between  the  various  processes  in  the  system   – External  Interrupt  -­‐  time  slice  expired,  I/O  interrupt     – Internal  trap,  e.  g.,  invalid  operation   – Supervisor  call   • Steps  to  take  to  switch  processes   – Save  the  current  processor  state  (registers,  flags,  etc.)   – Set  the  program  counter  to  the  address  of  the  appropriate  routine   – Update  state  of  current  process  from  Running  to  Blocked/Ready/Exit   – Move  the  control  block  to  the  appropriate  queue   – Select  another  process  to  execute   – Move  the  control  block  from  the  appropriate  queue   – Update  the  control  block  of  the  selected  process  to  running   – Update  necessary  memory-­‐management  structures   – Restore  the  context  (registers,  etc.)  of  the  newly  selected  process     Suspending  a  Process   • May  suspend  a  process  by  swapping  part  or  all  of  it  to  disk   – Most  useful  if  we  are  waiting  for  an  event  that  will  not  arrive  soon  (printer,   keyboard)   – If  not  done  well,  can  slow  system  down  by  increasing  disk  I/O  activity                 • Reasons  to  Suspend   – Manage  Resources   – Timing  (backup  at  midnight  process)     23  
  • 24.
    – User  request  (debugging,  background)   – Parent  process  (synchronization,  errors)     New  Transitions:   Blocked  ®  Blocked  Suspend  –  Swap  out  a  blocked  process  to  free  memory   Blocked  Suspend  ®  Ready  Suspend  –  Event  occurs  (O.S.  must  track  expected  event)   Ready  Suspend  ®  Ready  –  Activate  a  process  (higher  priority,  memory  available)   Ready  ®  Ready  Suspend  –  Need  to  free  memory  for  higher-­‐priority  processes   New  ®  Ready  or  Ready  Suspend  –  Can  choose  where  to  put  new  processes   Blocked  Suspend  ®  Blocked  –  Reload  process  expecting  event  soon   Running  ®  Ready  Suspend  –  Preempt  for  higher-­‐priority  process   Key  States:   Ready  –  In  memory,  ready  to  execute   Blocked  –  In  memory,  waiting  for  an  event   Blocked  Suspend  –  On  disk,  waiting  for  an  event   Ready  Suspend  –  On  disk,  ready  to  execute     Terminating  a  Process   • Need  some  way  to  indicate  a  process  is  finished  (system  call  or  instruction)   • Program  may  fail   – Protection  error   – Address  Error   – Invalid  data  operation   – Invalid  or  privileged  instruction   – I/O  Failure   – Parent  process  request   – Operator  intervention  (control-­‐C)     Inter-­‐process  Communication  (IPC)     • Mechanism  for  processes  to  communicate  and  to  synchronize  their  actions.   • Message  system  –  processes  communicate  with  each  other  without  resorting  to  shared   variables.   • IPC  facility  provides  two  operations:   – send(message)  –  message  size  fixed  or  variable     – receive(message)   • If  P  and  Q  wish  to  communicate,  they  need  to:   – establish  a  communication  link  between  them   – exchange  messages  via  send/receive   • Implementation  of  communication  link   – physical  (e.g.,  shared  memory,  hardware  bus)   – logical  (e.g.,  logical  properties)       24  
  • 25.
    Direct  Communication   • Processes  must  name  each  other  explicitly:   – send  (P,  message)  –  send  a  message  to  process  P   – receive(Q,  message)  –  receive  a  message  from  process  Q   • Properties  of  communication  link   – Links  are  established  automatically.   – A  link  is  associated  with  exactly  one  pair  of  communicating  processes.   – Between  each  pair  there  exists  exactly  one  link.   – The  link  may  be  unidirectional,  but  is  usually  bi-­‐directional.     Indirect  Communication   • Messages  are  directed  and  received  from  mailboxes  (also  referred  to  as  ports).   – Each  mailbox  has  a  unique  id.   – Processes  can  communicate  only  if  they  share  a  mailbox.   • Operations   – create  a  new  mailbox   – send  and  receive  messages  through  mailbox   – destroy  a  mailbox   • Properties  of  communication  link   – Link  established  only  if  processes  share  a  common  mailbox   – A  link  may  be  associated  with  many  processes.   – Each  pair  of  processes  may  share  several  communication  links.   – Link  may  be  unidirectional  or  bi-­‐directional.   • Mailbox  sharing   – P1,  P2,  and  P3  share  mailbox  A.   – P1,  sends;  P2  and  P3  receive.   – Who  gets  the  message?   • Solutions   – Allow  a  link  to  be  associated  with  at  most  two  processes.   – Allow  only  one  process  at  a  time  to  execute  a  receive  operation.   – Allow  the  system  to  select  arbitrarily  the  receiver.    Sender  is  notified  who  the   receiver  was.     Primitives  are  defined  as:   Operations     send(A,  message)  –  send  a     message  to  mailbox  A   create  a  new  mailbox       receive(A,  message)  –  receive  a   send  and  receive  messages  through  mailbox     destroy  a  mailbox   message  from  mailbox  A       Client-­‐Server  Communication  –Sockets   • A  socket  is  defined  as  an  endpoint  for  communication.   • Concatenation  of  IP  address  and  port     25  
  • 26.
    • The  socket  161.25.19.8:1625  refers  to  port  1625  on  host  161.25.19.8   • Communication  consists  between  a  pair  of  sockets.       Socket     Socket   (146.86.5.2/1625)   (161.25.19.8/80)         Host  X  (146.86.5.20)     Web  sever  (161.25.19.8/80)     Client-­‐Server  Communication  -­‐Remote  Procedure  Calls   • Remote  procedure  call  (RPC)  abstracts  procedure  calls  between  processes  on  networked   systems.   • Stubs  –  client-­‐side  proxy  for  the  actual  procedure  on  the  server.   • The  client-­‐side  stub  locates  the  server  and  marshalls  the  parameters.   • The  server-­‐side  stub  receives  this  message,  unpacks  the  marshalled  parameters,  and   peforms  the  procedure  on  the  server.      Client-­‐Server  Communication  -­‐Remote  Method  Invocation   • Remote  Method  Invocation  (RMI)  is  a  Java  mechanism  similar  to  RPCs.   • RMI  allows  a  Java  program  on  one  machine  to  invoke  a  method  on  a  remote  object.     Summary   • OS  provides  an  interface  between  a  user  of  a  computer,  an  application  program  and  the  computer   hardware   • OS  have  evolved  over  the  years   • Process  is  set  of  instructions  and  data  and  is  usually  represented  by  states   • OS  needs  to  maintain  proper  synchronization  between  processes   • Processes  use  different  ways  of  communication  to  synchronize  their  actions             26  
  • 27.
    Process  and  CPU  Scheduling   Recap  …  Process  …  Queues   • Process  –  a  program  in  execution;  process  execution  must  progress  in  sequential   fashion.   • As  a  process  executes,  it  changes  state   • PCB  -­‐  Information  associated  with  each  process   • Queues     – Job  queue  –  set  of  all  processes  in  the  system.   – Ready  queue  –  set  of  all  processes  residing  in  main  memory,  ready  and  waiting  to   execute.   – Device  queues  –  set  of  processes  waiting  for  an  I/O  device.   – Process  migration  between  the  various  queues.   – Starvation  –  indefinite  delay  of  a  process  due  queue  of  processes   – CPU  burst  –  processing  time  of  a  process     CPU–I/O  Burst  Cycle   CPU–I/O  Burst  Cycle   • Process  execution  consists  of  a  cycle  of  CPU     execution  and  I/O  wait.     • Maximum  CPU  utilization  obtained  with     Multiprogramming     Process  Types   • Processes  can  be  described  as  either:   – I/O-­‐bound  process  –  spends  more  time     doing  I/O  than  computations,     many  short  CPU  bursts.   – CPU-­‐bound  process  –  spends  more  time     doing  computations;     few  very  long  CPU  bursts.   • Process  can  be  of  two  types:   – Non  preemptive  –  once  CPU  given  to  the    process  it  cannot  be  released  until  it     completes  its  CPU  burst.   – Preemptive  –  the  process  which  can  be    released  to  before  it  completes  its     CPU  burst.               27  
  • 28.
    Process  Scheduling   • Decide  what  processes  should  be  executed  by  processor   • Long-­‐term  scheduler  (or  job  scheduler)     – deals  with  creating  a  new  process   – selects  which  processes  should  be  brought  into  the  ready  queue.     – is  invoked  infrequently  (seconds,  minutes)  ⇒  (may  be  slow).     • Medium-­‐term  scheduler   – deals  with  swapping  processes  in/out   • Short-­‐term  scheduler  (or  CPU  scheduler)     – selects  which  process  should  be  executed  next  and  allocates  CPU   – is  invoked  very  frequently  (milliseconds)  ⇒  (must  be  fast).   – Invoked  on:   • clock  or  I/O  interrupt   • system  call,  signal     Representation  of  Process  Scheduling       CPU  Scheduler   • Selects  from  among  the  processes  in  memory  that  are  ready  to  execute,  and  allocates   the  CPU  to  one  of  them.   • CPU  scheduling  decisions  may  take  place  when  a  process:   1.   Switches  from  running  to  waiting  state.   2.   Switches  from  running  to  ready  state.   3.   Switches  from  waiting  to  ready.   4.   Terminates.   • Scheduling  under  1  and  4  is  non  preemptive.   • All  other  scheduling  is  preemptive.     28  
  • 29.
    Dispatcher   • Dispatcher  module  gives  control  of  the  CPU  to  the  process  selected  by  the  short-­‐term   scheduler;  this  involves:   – switching  context   – switching  to  user  mode   – jumping  to  the  proper  location  in  the  user  program  to  restart  that  program   • Dispatch  latency  –  time  it  takes  for  the  dispatcher  to  stop  one  process  and  start  another   running.     Scheduling  Criteria   • CPU  utilization     – keep  the  CPU  as  busy  as  possible   • Throughput     – number  of  processes  that  complete  their  execution  per  time  unit   • Turnaround  time     – amount  of  time  to  execute  a  particular  process   • Waiting  time     – amount  of  time  a  process  has  been  waiting  in  the  ready  queue   • Response  time     – amount  of  time  it  takes  from  when  a  request  was  submitted  until  the  first   response  is  produced     Scheduling  Algorithms   • First-­‐Come,  First-­‐Served  (FCFS)  Scheduling   • Shortest-­‐Job-­‐First  (SJR)  Scheduling     • Shortest-­‐Remaining-­‐Time-­‐First  (SRTF)     • Round  Robin  (RR)   • Highest  Response  Ratio  Next   • Feedback     First-­‐Come,  First-­‐Served  (FCFS)  Scheduling   Process:     P1     P2       P3     Waiting  Time     Burst  Time:     24    3      3   =Complete  time  –  Arrived  time  –  Burst  time   Waiting  time   >   P1=24-­‐0-­‐24=0           P2=27-­‐0-­‐3=24   • Suppose  that  the  processes  arrive  in  the  order:  P1,  P  2,  P3           P3=30-­‐0-­‐3=27   The  Gantt  chart  for  the  schedule  is:           P1     P2   P3       P1=24     P2=3     P3=3   CPU  Time     0       P1=24   24   27     30   P2=3   P2=3   P3=3           Average  waiting  time  =       P3=3   P3=3         (0+24+27)/3=17     29   =  
  • 30.
    • Suppose  that  the  processes  arrive  in  the  order  P2  ,  P3  ,  P1  .   The  Gantt  chart  for  the  schedule  is:     P2   P3   P1     P2=3     P3=3   P1=24   CPU  Time       0   3   6   30     P2=3   P3=3   P1=24     P3=3   P1=24   Waiting  Time       =Complete  time  –  Arrived  time  –  Burst  time   P1=24     Waiting  time   >   P1=30-­‐0-­‐24=6   • Processes  queued  in  order  of  arrival         P2=3-­‐0-­‐3=0   • Runs  until  finished  or  blocks  on  I/O         P3=6-­‐0-­‐3=3   Average  waiting  time  =  (6+0+3)/3=3   • Tends  to  penalize  short  processes     – Have  to  wait  for  earlier  long  processes     • Convoy  effect  short  process  behind  long  process     • Favors  processor-­‐bound  processes     –  I/O  processes  block  quickly               Shortest-­‐Job-­‐First  (SJR)  Scheduling     • Associate  with  each  process  the  length    of  its  next  CPU  burst.    Use  these  lengths  to     schedule  the  process  with  the  shortest  time.   • Two  types:   – Nonpreemtive  version   • Select  process  with  shortest  expected  running  time     – once  CPU  given  to  the  process  it  cannot  be  preempted  until   completes  its  CPU  burst.     • Short  processes  may  still  wait  if  a  long  process  has  just  started     – Peemtive  version   • Select  process  with  shortest  expected  running  (or  remaining)  time     • May  switch  processes  when  a  new  process  arrives   – if  a  new  process  arrives  with  CPU  burst  length  less  than  remaining   time  of  current  executing  process,  preempt     • Also  called  Shortest-­‐Remaining-­‐Time-­‐First  (SRTF)  Scheduling   • Difficult  to  estimate  required  time   – Can  only  estimate  the  length  of  Next  CPU  Burst   – Can  estimate  from  previous  runs   • Tends  to  be  less  predictable   • Can  starve  long  processes   – notpreemtive  SJR  is  better  than  SRTF  (preemtive  SRJ)  in  this  regard     • Short  processes  may  still  wait  if  a  long  process  has  just  started     – SRTF  is  better  than  nonpreemptive  SRJ  in  this  regard       30  
  • 31.
    Examples  of  SJF   Process   Arrival  Time     Burst  Time   P1     0.0       7   P2     2.0       4   P3     4.0       1   P4     5.0       4   SJF  (non-­‐preemptive)     P3   P2   P4   P1         P1   P1   P1   P1   P3=1   P2=4   P4=4   CPU  Time     0   2   4   5   7   8   12   16     P1=7   P2=4   P3=1   P4=4   P2=4   P2=4   P4=4     P3=1   P4=4   Waiting  time   P4=4   P1=7-­‐0-­‐7=0   P2=12-­‐2-­‐4=6   P3=8-­‐4-­‐1=3   P4=16-­‐5-­‐4=7   Average  waiting  time  (AWT)  =  (0+6+3+7)/4=4   SJF  (preemptive)   P3     P2   P4     P1     P4=4   P1=5     P1=2   P2=2   P3=1   P2=2     0   2   4   5   7   11   16     P1=7   P1=5   P1=5   P1=5   P1=5   P1=5       P2=4   P2=2 P2=2 P4=4     Waiting  time   P3=1   P4=4   P1=16-­‐0-­‐7=9   P2=7-­‐2-­‐4=1   P3=5-­‐4-­‐1=0   P4=11-­‐5-­‐4=2   Average  waiting  time  (AWT)  =  (9+1+0+2)/4=3     Priority  Scheduling   • A  priority  number  (integer)  is  associated  with  each  process   • The  CPU  is  allocated  to  the  process  with  the  highest  priority  (smallest  integer  ≡  highest   priority).   – Preemptive   – nonpreemptive   • SJF  is  a  priority  scheduling  where  priority  is  the  predicted  next  CPU  burst  time.   • Problem  ≡  Starvation  –  low  priority  processes  may  never  execute.   • Solution  ≡  Aging  –  as  time  progresses  increase  the  priority  of  the  process.     31  
  • 32.
    Round  Robin  (RR)   • Each  process  gets  a  small  unit  of  CPU  time  (time  quantum),  usually  10-­‐100  milliseconds.     After  this  time  has  elapsed,  the  process  is  preempted  and  added  to  the  end  of  the  ready   queue.   • If  there  are  n  processes  in  the  ready  queue  and  the  time  quantum  is  q,  then  each   process  gets  1/n  of  the  CPU  time  in  chunks  of  at  most  q  time  units  at  once.    No  process   waits  more  than  (n-­‐1)q  time  units.   • Performance   – q  large  ⇒  FIFO   – q  small  ⇒  q  must  be  large  with              respect  to  context  switch,              otherwise  overhead  is  too  high.     Example  of  RR   Process          P1                                      P2                                      P3                                  P4   Burst  Time            53                      17                                  24                      68   Time  Quantum  =  20                   • The  Gantt  chart  is:     P2   P3   P1   P4       P1=20   P2=17   P3=20   P4=20   P1=20   P3=4     P4=20   P1=13   P4=20   P4=8                       0   20   37   57   77   97   101   121   134   154   162     P1=53   P2=17   P3=24   P4=68   P1=33   P3=4   P4=48   P1=13   P4=28   P4=8       P2=17   P3=24   P4=68   P1=33   P3=4   P4=48   P1=13   P4=28   P3=24   P4=68   P1=33   P3=4   P4=48   P1=13     P4=68   P1=33     Waiting  time   P1=134-­‐0-­‐53=81   P2=37-­‐0-­‐17=20   P3=101-­‐0-­‐24=77   P4=162-­‐0-­‐68=94   Average  waiting  time  (AWT)  =  (81+20+77+94)/4=68     • Typically,  higher  average  turnaround  than  SJF,  but  better  response.   • Favors  processor-­‐bound  processes   • Virtual  Round  Robin     • Second  queue  for  formerly  blocked  processes  –  given  priority   – At  end  of  time  slice,  add  to  end  of  standard  queue           32  
  • 33.
    Highest  Response  Ratio  Next   • Depends  on  Response  Ratio   – W  =  time  spent  waiting   – S  =  expected  CPU  burst  time   – Response  Ratio  =  (W  +  S)  /  S   • Select  process  with  highest  Response  Ratio   • Nonpreemptive,  tries  to  get  best  average  normalized  turnaround  time   More  Algorithms   • Fair  Share  Scheduling     – Think  of  processes  as  part  of  a  group   – Each  group  has  a  specified  share  of  the  machine  it  is  allowed  to  use   – Priority  is  based  on  the  time  this  processes  is  active,  and  the  time  the  processes  in   the  group  have  been  active   • Feedback   – Starts  in  high-­‐priority  queue,  moves  down  in  priority  as  it  executes   – Lower-­‐priority  queues  often  given  longer  time  slices   – Can  starve  long  processes   • Move  up  processes  if  they  wait  too  long     Multilevel  Queue   • Ready  queue  is  partitioned  into  separate  queues   • Each  queue  has  its  own  scheduling  algorithm,  e.g.  RR,    FCFS   • Scheduling  must  be  done  between  the  queues.   – Fixed  priority  scheduling;  (i.e.,  serve  all  from  one  queue  and  then  from  other).     Possibility  of  starvation.   – Time  slice  –  each  queue  gets  a  certain  amount  of  CPU  time  which  it  can  schedule   amongst  its  processes;  i.e.,  80%  to  queue  in  RR,  20%  to  queue  in  FCFS     Summary   • Scheduling  decides  what  processes  should  be  executed  by  the  processor   • Long-­‐term,  Medium-­‐term  and  Short-­‐term  Scheduler   – Deals  with  creating  a  new  process   – Deals  with  swapping  processes  in/out   – What  process  should  we  run  next?   • A  number  of  performance  measures  can  be  used  as  scheduling  criteria   • There  are  a  number  of  CPU  scheduling  algorithms                   33  
  • 34.
    Exercise  Given  the  following  processes  with  the  following  arrival  and  burst  times   Process(s)   Arrival   Burst   Calculate  the  average  waiting  time  when  the  following   Time   Time   algorithms  are  used    P1   0   9   -­‐First  come  and  first  serve  (FCFS)  scheduling  algorithm   P2   6   22   -­‐Round  Robin  algorithm  with  quantum  of  7   P3   3   24   -­‐Shortest  job  first  with  non  pre-­‐emptive  version     -­‐Shortest  remaining  job  first  (Shortest  job  first  with  pre-­‐ P4   7   3   emptive  version)   -­‐First  come  and  first  serve  (FCFS)  scheduling  algorithm       P1   P3   P2   P4     P1=3   P1=3   P1=1   P1=2 P3=24   P2=22   P4=3             0   3   6   7   9   33   55   58   P2=22   P4=3       P1=9   P3=24   P2=22  P4=3   P3=24   P2=22   P4=3   Waiting  time   P4=3   P1=9-­‐0-­‐9=0   =2   P2=55-­‐6-­‐22=27   P3=33-­‐3-­‐24=6   P4=58-­‐7-­‐3=48   Average  waiting  time  (AWT)  =  (0+27+6+48)/4=20.25     -­‐Round  Robin  algorithm  with  quantum  of  7                     -­‐Shortest  job  first  with  non  pre-­‐emptive  version                       34  
  • 35.
      -­‐Shortest  remaining  job  first  (Shortest  job  first  with  pre-­‐emptive  version)                       Ex.  Calculate  the  wait  time  for  each  of  the  following  process  and  the  overall  average  wait  time   when  implementing  the  following  algorithm.   -­‐FCFS   -­‐RR   -­‐SJF  (non  pre-­‐emptive)   -­‐SJF  (pre-­‐emptive)                                                   35  
  • 36.
    Deadlocks   Bridge  Crossing  Example     • Bridge  traffic  only  in  one  direction.   • Each  section  of  a  bridge  can  be  viewed  as  a  resource.   • If  a  deadlock  occurs,  it  can  be  resolved  if  one  car  backs  up  (preempt  resources  and   rollback).   • Several  cars  may  have  to  be  backed  up  if  a  deadlock  occurs.     Recap  …  Processes  …  Deadlock   • Process  –  program  in  execution  -­‐  active  element  with  states   • Process  uses  resources  during  its  operation     – Process  takes  ownership  of  CPU,  memory,  bus  ….   • Processes  have  to  compete  for  limited  recourses   • Deadlock     – Permanent  blocking  of  a  set  of  processes  that  either  compete  for  system   resources  or  communicate  with  each  other   – Involve  conflicting  needs  for  resources  by  two  or  more  processes   • Starvation   – Indefinite  delay  of  a  process  due  to  queue  of  processes     Process  Deadlock   Processes  P  and  Q  are  competing  for  recourses  D  and  T       Process  P   Process  Q   Step   Action   Step   Action   P0     Request  (D)   Q0     Request  (T)   P1     Lock  (D)   Q1     Lock  (T)   P2   Request  (T)   Q2   Request  (D)   P3   Lock  (T)   Q3   Lock  (D)   P4   Perform  function   Q4   Perform  function   P5   Unlock  (D)   Q5   Unlock  (T)   P6   Unlock  (T)   Q6   Unlock  (D)         36  
  • 37.
    Resources   • Reusable  Resources     – Can  only  be  used  by  one  process  at  a  time.    After  use,  can  be  reassigned  to   another  process     – Processors,  I/O  channels,  main  and  secondary  memory,  files,  databases   – Deadlock  occurs  if  each  process  holds  one  resource  and  requests  the  other   • Consumable  Resources   – Created  (produced)  and  destroyed  (consumed)  by  a  process   – Interrupts,  signals,  messages,  and  information   – Can  deadlock  if  both  waiting  for  a  message  from  each  other   – May  take  a  rare  combination  of  events  to  cause  deadlock     Examples  of  Deadlock   • With  reusable  resources     – Space  is  available  for  allocation  of  200K  bytes   – Deadlock  occurs  if  both  processes  progress  to    their  second  request   • With  consumable  resources   – Deadlock  occurs  if  receive  is  blocked     Conditions  for  Deadlock   Deadlock  can  arise  if  four  conditions  hold  simultaneously   • Mutual  Exclusion   – Only  one  process  can  hold  the  resource  at  any  given  time   • Hold  and  Wait   – A  process  may  hold  resources  while  requesting  other  resources   • No  Preemption   – No  resource  may  be  forcibly  removed  from  a  process   • Circular  Wait  (event)   – A  closed  chain  of  process  exists,  each  waiting  for  a  resource  held  by  the  next   process  in  the  chain                 Deadlock  Prevention   • Can  prevent  deadlock  by  forbidding  one  of  the  conditions   • Forbid  Mutual  Exclusion     37  
  • 38.
    – Must  hold  for  nonsharable  resources   – Generally  not  reasonable   • Forbid  Hold  and  Wait   – No  holding  of  resources  when  request  made     – Ask  for  all  resources  at  one  time   – May  block  a  process  in  waiting  for  resources  it  doesn’t  yet  need   – May  hold  resources  that  are  not  needed  immediately   – May  not  know  what  to  request   • Forbid  No  Preemption   – Take  resources  away  from  waiting  processes   – Only  feasible  if  state  can  be  saved,  e.g.  CPU,  Memory   • Forbid  Circular  Wait   – Define  a  linear  order  on  items   • If  it  needs  resources  3,  15,  6,  9,  and  4  then  must  request  in  the  order  3,  4,  6,   9,  15   • May  not  be  easy  to  define  the  order   ***Cannot  have  circular  wait  because  a  process  cannot  have  9  and  request  5     State  of  the  System   • State  of  the  system  is  the  current  allocation  of  resources  to  processes   • Safe  state     – There  exists  at  least  one  sequence  that  does  not  result  in  deadlock   – We  can  finish  all  processes  by  some  scheduling  sequence   • Unsafe  state  is  a  state  that  may  lead  to  deadlock   • When  a  process  requests  an  available  resource,  system  must  decide  if  immediate   allocation  leaves  the  system  in  a  safe  state     Current  allocation:     A  B  C   P0   0  1  0    P1   2  0  0      P2   3  0  3      P3   2  1  1      P4   0  0  2     Deadlock  Avoidance   • A  method  which  ensures  that  a  system  never  enter  an  unsafe  state   • Makes  a  decision  dynamically  whether  the  current  resource  allocation  request  will   potentially  lead  to  a  deadlock   • Requires  knowledge  of  future  process  request   • Uses  Resource  Allocation  Denial  or  Banker’s  Algorithm  for  analysis     38  
  • 39.
    Deadlock  Avoidance   • A  method  which  ensures  that  a  system  never  enter  an  unsafe  state   • Makes  a  decision  dynamically  whether  the  current  resource  allocation  request  will   potentially  lead  to  a  deadlock   • Requires  knowledge  of  future  process  request   • Uses  Resource  Allocation  Denial  or  Banker’s  Algorithm  for  analysis     Deadlock  Avoidance     A  method  which  ensures  that  a  system  never  enter  an  unsafe  state   A  decision  is  made  dynamically  whether  the  current  resource  allocation  request  will  potentially  lead  to  a   deadlock   Assume  we  know  the  maximum  requests  for  each  process      Process  must  declare  it  needs  a  max  of  objects      Do  not  need  to  use  its  max  claims      Can  make  requests  at  any  time  and  in  any  order   Process  Initiation  Denial      Track  current  allocations      Assume  all  processes  may  make  maximum  requests  at  the  same  time      Only  start  process  if  it  can’t  result  in  deadlock  regardless  of  allocation   Requires  knowledge  of  future  process  request     Resource  Allocation  Denial  (Banker’s  Algorithm)   • Process  makes  maximum  claims  for  recourses  but  no  need  to  use  its  max  claims   • Process  makes  a  request  for  resources   • Reject  a  request  if  it  exceeds  the  processes’  declared  maximum  claims   • Grant  a  request  if  the  new  state  would  be  safe   • Determining  if  a  state  is  safe   – Find  any  process  Pi  for  which  we  can  meet  it’s  maximum  requests   – Mark  Pi  as  “done”,  add  its  resources  to  available  resource  pool   – State  is  safe  if  we  can  mark  all  processes  as  “done”   • Block  a  process  if  the  resources  are  not  currently  available  or  the  new  state  is  not  safe                             39  
  • 40.
    Example  of  Banker’s  Algorithm   • Assume  that  we  have  five  processes:  P0,  P1,  P2,  P3  and  P4.   • Resource  vector:       A    B    C       10    5    7   • Initial  state  (snapshot  at  time  =  0):              Allocation   Max  claim   Need       A  B  C     A  B  C                          A  B  C   P0                      0  1  0     7  5  3                          7  4  3    P1                    2  0  0       3  2  2           1  2  2      P2     3  0  2       9  0  2         6  0  0      P3     2  1  1       2  2  2                            0  1  1    P4     0  0  2     4  3  3                            4  3  1     Available  vector   A    B    C     3    3    2   Exercise:  Analyze  the  state  of  the  system  using  Bankers’  algorithm   Process   Initial  allocation     Need     • S Done?  No  if   Updated  Available      A            B            C      A            B            C   a          A            B            C   t               • S      3                3              2   i a P0   0              1            0   7            4            3   s No   t -­‐   f i i s P1   2              0            0   1            2            2   e Yes   f    5            3            2   s i   e s s P2   3              0            2   6            0            0   a No     -­‐   f s   e a P3   2              1            1   0            1            1   t Yes   f    7            4          3   y e   t P4   0              0            2   4            3            1   ? Yes   y    7          4              5         • S ? a     P0   0              1            0   7            4            3   t Yes   • S    7            5            5         i a s t P2   3              0            2   6            0            0   f Yes   i      10      5          7   i s e f • Satisfies  safety  ?  the  system  safety  condition  (every  process  can  done  )   s i P1>P3>P4>P0>P2     e s s     a   f s e a f 40   t
  • 41.
    • Now  consider  the  actual  resource  requests   • P0  Requests  (0,0,0)     – Check  that  Need  ≤  Available,  that  is,  (7,4,3)  ≤  (3,3,2)  ⇒  false        ⇒  May  lead  to  unsafe  state  ⇒  Request  not  granted   • P1  Requests  (1,0,2)     – Check  that  Need  ≤  Available,  that  is,  (1,2,2)  ≤  (3,3,2)  ⇒  ?   – Check  that  Request  ≤  Max  claim,  that  is,  (1,0,2)  ≤  (3,2,2)  ⇒  ?   – Check  that  Request  ≤  Available,  that  is,  (1,0,2)  ≤  (3,3,2)  ⇒?       ⇒  System  state  ?       • Homework:  Can  requests  for  (5,3,0)  by  P4  be  granted?     Deadlock  Avoidance   • Maximum  resource  requirement  must  be  stated  in  advance   • Processes  under  consideration  must  be  independent;  no  synchronization  requirements   • There  must  be  a  fixed  number  of  resources  to  allocate   • Requires  knowledge  of  future  process  request   • Avoidance  method  tends  to  limit  access  to  resources     Deadlock  Detection   • Grant  arbitrary  requests  and  note  when  deadlock  happens   – Allow  system  to  enter  deadlock  state     • Detect  deadlock  using  a  detection  algorithm,  e.g.   – Create  table  of  process  requests,  current  allocations   – Mark  any  process  whose  requests  can  be  met  (requests  £  available  resources)   – Reclaim  resources  held  by  the  marked  process     – If  any  processes  cannot  be  marked,  they  are  part  of  a  deadlock   • Use  a  recovery  strategy                                 41  
  • 42.
    Example  of  Deadlock  Detection   Assume  that  we  have  five  processes  with  resource  vector:     A    B    C                                     7    2    6   and  with  initial  state  of  allocation  matrix:     Exercise:       A  B  C     Analyse  the  following  two  scenarios  with   P0                       0  1  0   request  matrices:    P1     2  0  0                            Request1          Request2    P2     3  0  3       A  B  C                A  B  C   P0   0  0  0                0  0  0      P3     2  1  1      P1   2  0  2                2  0  2      P4     0  0  2    P2   0  0  0                0  0  1     =>  Initial  available  vector  A    B    C    P3   1  0  0                1  0  0       0    0    0    P4   0  0  2                0  0  2   Analysis  of  scenario  with  Request1                                     • State  of  system  ?                             42  
  • 43.
    Recovery  Strategies  once  Deadlock  Detected   • Abort  all  deadlocked  processes   • Back  up  each  deadlocked  process  to  some  previously  defined  checkpoint,  and  restart  all   process   – original  deadlock  may  occur   • Successively  abort  deadlocked  processes  until  deadlock  no  longer  exists   • Successively  preempt  resources  until  deadlock  no  longer  exists     Selection  Criteria  Deadlocked  Processes   • Least  amount  of  processor  time  consumed  so  far   • Least  number  of  lines  of  output  produced  so  far   • Most  estimated  time  remaining   • Least  total  resources  allocated  so  far   • Lowest  priority   Summary   • Deadlock  is  a  state  of  permanent  blocking  of  a  set  of  processes  due  to  limited  system   resources     • Deadlock  can  arise  if  Mutual  Exclusion,  Hold  and  Wait,  No  Preemption  and  Circular  Wait   hold  simultaneously   • Banker’s  Algorithm  is  ensures  that  a  system  never  enter  an  unsafe  state   • Detection  algorithm  allows  system  to  enter  deadlock  state  and  uses  recovery  strategy     Ex:  Two  process  P0  and  P1  are  competing  for  recourse  A  and  B.  Given  the  following  scenario:   Initial  available  vector  A  B:  4  2   Initial  allocation  matrix      A            B     P0  1              2   Using  the  Banker’s  algorithm  identify  if  the     P1  2              2   request  made  by  P0  and  P1  can  be  granted   Maximum  claim  matrix      A            B     P0  8              6     P1  4              3   Request  matrix                                  A            B     P0  1              2     P1  2              2                     43  
  • 44.
    Cache  memory   Recap  …  The  Memory  Hierarchy                               • Problem  between  CPU  and  Memory:     – CPU  is  very  fast  whereas  main  memory  DRAM  is  too  slow   – Slow  main  memory  constraints  the  ability  of  a  fast  CPU   • Ways  to  solve  the  problem:   – Use  SRAM  in  all  main  memory  but  very  expensive,  not  feasible   – Small  capacity  of  SRAM  built  between  CPU  and  main  memory  for  frequently   required  information   Cache   • Small  amount  of  fast  memory  -­‐  for  storing  recently/frequently  used  instructions  and   data   • Sits  between  normal  main  memory  and  CPU   • Cache  memory  is  based  on  Locality  principles   • May  be  located  on  CPU  chip  or  module         44  
  • 45.
    Cache  Overview   Operation   • CPU  requests  contents  of  memory  location   • Check  cache  for  this  data   • If  present  (hit),  get  from  cache  (fast)   • If  not  present  (miss),  read  required  block   from  main  memory  to  cache   • Then  deliver  from   Typical  Cache   cache  to  CPU   Organization       Cache  memory  performance   • Hit     – The  information  requested  is  found  in   the  cache.   – Hit  ratio  (h):  the  fraction  of  memory  access  found  in  the  cache   – Hit  time:  time  to  access  the  cache:     • Miss   – The  data  requested  are  not  found  in  the  cache.     – Fetch  the  information,  write  into  cache  and  send  to  CPU   – Miss  ratio  =  1  -­‐  h,   (the  smaller  the  better)   – Miss  penalty  (Tmiss):  (time  to  replace  write  in  cache)  +  time  to  send  the  data  to  CPU   – Miss  penalty  is  much  longer  than  hit  time     Cache  Design   • Design  objective   – To  provide  adequate  fast  memory  at  a  reasonable  cost   • Design  issues   – How  to  store  data  in  catch  memory?   – How  to  determine  that  a  data  requested  by  CPU  is  in  the  cache  memory?   – How  to  find  it?   • Design  characteristics   – Number  of  Caches,  Size,  Block  Size   – Mapping  methods:  direct,  associative,  set  associative   – Replacement  Algorithm   – Write  Policy     Direct  Mapping  Cache  Memory   • Data  are  transferred  between  cache  and  main  memory  in  blocks   • Main  memory  is  divided  into  blocks   • Cache  built  in  lines  (slots)  each  of  which  can  hold  one  block  size   • Each  block  of  main  memory  maps  to  only  one  cache  line     45  
  • 46.
    Address  is  in  three  parts   • Least  Significant  w  bits  identify  unique  word  –  word  identifier   • The  next  higher  significant  r  bits  specify  a  cache  line  –  cache  line  identifier   • The  most  significant  s-­‐r  bits  specify  a  tag  –  tag  identifier     • Most  Significant  s  bits  specify  one  memory  block   Tag  s-­‐r   Line  or  Slot  r   Word  w     Direct  Mapping  Cache  Organization   • No  two  blocks  in  the  same  line  have  the  same  Tag  field   •  Check  contents  of  cache  by  finding  line  and  checking  Tag                                                                   46  
  • 47.
    Direct  Mapping  Example   • Finding  a  direct  mapping  address  structure  for:  Main  memory  capacity  =  16MBytes;   Block  size=  4  Bytes  and  Cache  capacity  64  KBytes   • Main  memory  capacity  16MBytes  =  224    Bytes  =>  address  length  =  24  bit     • Block  size  =  4  Bytes  (words)  =  22  =>  2  bits  for  word  identifier     • Number  of  cache  blocks  (lines)  =  cache  capacity/block  size  =  64K/4  =  16K  =  214    =>  14  bits   for  line  identifier     • Blocks  of  main  memory  are  divided  into  sets  that  are  labelled  as  tag.     number of main memory blocks 222 number of sets = = 14 = 28 number of cache blocks 2   • Or  Number  of  bits  for  tag  =  address  length  –  word  identifier  –  line  identifier  =  24  –  2  –  14   =  8  bits   So,  a  24-­‐bit  address  is  divided  into  3  parts:  tag,  slot  and  word.   Word:  2-­‐bit  (block  size  or  line  size)   Line  or  Slot:  14-­‐bit  (as  slot  address  index  in  cache  memory)   Tag:  8-­‐bit.   Tag  s-­‐r  =  8   Line  or  Slot  r  =    14   Word  w=  2                                     • Cache  line  table  (number  of  lines  in  cache  m=  214)         • Starting  memory  address  of  block     Cache  line     Main  Memory  blocks  held           Starting  memory  address  of  block       0       0,  m,  2m,  3m…2s-­‐m     1       1,  m+1,  2m+1…2s-­‐m+1     m-­‐1       m-­‐1,  2m-­‐1,  3m-­‐1…2s-­‐1         47  
  • 48.
    Direct  Mapping  Summary   • Address  length  =  (s  +  w)  bits   • Number  of  addressable  units  =  2s+w  words  or  bytes   • Block  size  =  line  size  =  2w  words  or  bytes   – Size  for  word  identifier  =  w  bits     • Number  of  blocks  in  main  memory  =  2s+  w/2w  =  2s   • Number  of  lines  in  cache  (Number  of  blocks  in  cache  memory)  =  m  =  Cache   Capacity/Block  Size  =  2r   – Size  for  cache  line  identifier  =    r  bits     • Size  of  tag  =  (s  –  r)  bits   Tag  s-­‐r   Line  or  Slot  r   Word  w     Direct  Mapping  Features   • Simple  and  not  expensive   • Conflict:     – Fixed  location  in  cache  memory  for  a  given  main  memory  block   – Many  main  memory  blocks  have  same  block  number     – If  two  blocks  with  same  block  number  are  requested  by  CPU   • The  later  block  will  replace  (overwrite)  the  former  one   • The  blocks  will  be  continually  swapped  in  cache  memory   • The  hit  ratio  will  be  low,  causing  miss  penalty   • Possible  Solutions:   – Bigger  cache  memory   – Two  level  caches:  level  1(L1)  and  level  2  (L2)   – Associative  mapping                                     48  
  • 49.
    Associative  Mapping   • A  main  memory  block  can  load  into  any  line  of  cache   • Memory  address  is  interpreted  as  tag  and  word   • Tag  uniquely  identifies  block  of  memory   • Every  line’s  tag  is  examined  for  a  match   • Cache  searching  gets  expensive   Compare  tag  field  with  tag  entry  in     cache  to  check  for  hit     Fully  Associative  Cache  Organization         Associative  Mapping  Example   • Finding  an  associative  mapping  address  structure  for:  Main  memory  capacity  =   16MBytes;  Block  size=  4  Bytes  and  Cache  capacity  64  KBytes   • Main  memory  capacity  16MBytes  =  224    Bytes  =>  address  length  =  24  bit     • Block  size  =  4  Bytes  (words)  =  22  =>  2  bits  for  word  identifier     • Total  number  of  blocks  in  main  memory  =  16M/4  =  222   • Each  Block  of  main  memory  is  a  set,  which  is  labelled  as  tag.     • Number  of  bits  for  tag  (s)  =  address  length  –  word  identifier  =  24  –  2  =  22  bits   • So,  a  24-­‐bit  address  is  divided  into  2  parts:  tag  and  word.   Word:  2-­‐bit  (block  size  or  line  size)   Tag:  22-­‐bit.   Tag  s  =  22   Word  w=  2                 49  
  • 50.
      Tag  s  =  22   Word  w=  2     Address  Structure                                             Associative  Mapping  Summary   • Address  length  =  (s  +  w)  bits   • Number  of  addressable  units  =  2s+w  words  or  bytes   • Block  size  =  line  size  =  2w  words  or  bytes   • Number  of  blocks  in  main  memory  =  2s+  w/2w  =  2s   • Number  of  lines  in  cache  =  undetermined   • Size  of  tag  =  s  bits   • Replacement  algorithm  required   • Disadvantages:  complex  circuitry,  extensive  comparison  of  tags                     50  
  • 51.
    Set  Associative  Mapping   • Compromise  of  direct  and  associative  mappings   • Cache  is  divided  into  a  number  of  sets   • Each  set  contains  a  number  of  lines   • A  given  block  maps  to  any  line  in  a  given  set   – e.g.  Block  B  can  be  in  any  line  of  set  i   • e.g.  2  lines  per  set   – 2  way  associative  mapping   – A  given  block  can  be  in  one  of  2  lines  in  only  one  set   • Extreme  cases:     – If  1  cache  line/set  (total  sets=  total  cache  lines)  =>  direct  mapping   – If  number  of  set=1  (all  lines  in  that  set)=>  fully  associative  mapping       Two  Way  Set  Associative  Cache  Organizations                                         •    Use  set  field  to  determine  cache  set  to  look  in   •    Compare  tag  field  to  see  if  we  have  a  hit                 51  
  • 52.
    2-­‐Way  Set  Associative  Mapping  Example   • Finding  an  associative  mapping  address  structure  for:  Main  memory  capacity  =   16MBytes;  Block  size=  4  Bytes  and  Cache  capacity  64  KBytes   • Main  memory  capacity  16MBytes  =  224    Bytes  =>  address  length  =  24  bit     • Block  size  =  4  Bytes  (words)  =  22  =>  2  bits  for  word  identifier     • Total  number  of  cache  blocks  (lines)  per  set  =  cache  capacity/block  size  =  64K/4  =  16K  =   214       • Number  of  cache  lines  per  set  =  2   • Number  of  cache  sets  =  214/2  =  213  =>  14  bits  for  line  for  set  identifier   • Number  of  bits  for  tag  (s)  =  address  length  –  set  identifier  –  word  identifier  =  24  –  13  -­‐  2   =  9  bits   • So,  a  24-­‐bit  address  is  divided  into  3  parts:  tag,  set  and  word.   Tag:  9-­‐bit,  Word:  2-­‐bit,  Set:  13-­‐bit       Tag  9  bit   Set  13  bit   Word    2  bit                                                         52  
  • 53.
    k-­‐Way  Set  Associative  Mapping  Summary   • Address  length  =  (s  +  w)  bits   • Number  of  addressable  units  =  2s+w  words  or  bytes   • Block  size  =  line  size  =  2w  words  or  bytes   • Number  of  blocks  in  main  memory  =  2d   • Number  of  lines  in  set  =  k   • Number  of  sets  =  v  =  2d   • Number  of  lines  in  cache  =  kv  =  k  *  2d   • Size  of  tag  =  (s  –  d)  bits   • Extreme  cases:     – If  k=1,  v=number  of  cache  lines  =>  direct  mapping   – If  k=  number  of  cache  lines,  v=1  =>  fully  associative  mapping     Replacement  Algorithms   • Strategy  to  replace  existing  block  by  new  block   • Direct  mapping   – No  choice   – Each  block  only  maps  to  one  line   – Replace  that  line   • Associative  &  Set  associative     – Hardware  implemented  algorithm  (speed)   – Least  Recently  used  (LRU)   • replace  block  that  was  least  recently  used   – First  in  first  out  (FIFO)   • replace  block  that  has  been  in  cache  longest   – Least  frequently  used   • replace  block  which  has  had  fewest  hits   – Random   Cache  coherency   • The  data  in  cache,  altered  by  CPU,  may  be  different  from  its  corresponding  in  the  main   memory.     • Keep  consistency:  To  ensure  the  contents  in  cache  block  are  consistent  with  its  mapping   memory.     Write  policy:   • Must  not  overwrite  a  cache  block  unless  main  memory  is  up  to  date   • Multiple  CPUs  may  have  individual  caches   • I/O  may  address  main  memory  directly   Write  through   • All  writes  go  to  main  memory  as  well  as  cache   • Multiple  CPUs  can  monitor  main  memory  traffic  to  keep  local  (to  CPU)  cache  up  to  date   • Lots  of  traffic   • Slows  down  writes     53  
  • 54.
    • Remember  bogus  write  through  caches!   Write  back   • Updates  initially  made  in  cache  only   • Update  bit  for  cache  slot  is  set  when  update  occurs   • If  block  is  to  be  replaced,  write  to  main  memory  only  if  update  bit  is  set   • Other  caches  get  out  of  sync   • I/O  must  access  main  memory  through  cache   • N.B.  15%  of  memory  references  are  writes   Cache  typical  characteristics   • Cache  size:  1  -­‐  256  K   • Block  size:  4  -­‐  128  bytes   • Hit  time(h):  1  -­‐  4  cycles   • Miss  penalty:  8  -­‐  32  cycles   – access  time:      6  -­‐10  cycles   – transfer  time:  2  -­‐  22  cycles   • Miss  ratio:     1%    -­‐  20%   Average  memory  access  time:   Tav  =  h  x  Tcache  +  (1-­‐h)  x  Tmiss     e.g.  h  =  90%,  Tcache  =  2  cycle,  Tmiss=  20  cycle     Summary   • Cache  memory  is  used  to  match  the  processor  speed  with  the  rate  of  information   transfer     • Cache  memory  for  frequently  used  instructions/data     • Main  features  of  cache  design  space  are   – total  size,  block  size   – mapping  (associativity)   – replacement  policy   – write  policy   • Cache  performance  can  be  measured  by  average  memory  access  time     Exercise     Ex1.  How  many  address  line  are  required  to  access  64k  works  of  main  memmory?                     54  
  • 55.
    Ex2.  How  many  words  of  memory  can  be  accessed  using  20  address  line?                       Ex3.  A  cache  memory  has  a  hit  rate  of  92%  and  access  time  of  25ns.  It  is  attached  to  a  main   memory  with  an  access  time  of  90  ns.  Calculate  the  main  memory  access  time  when  cache  is   switched  on.                       Ex4.  Given  that  the  hit  rate  to  the  cache  memory  for  a  particular  program  is  0.9.  Calculate  the   percentage  by  which  the  program  id  speeded  up  by  the  use  of  cache  memory  over  a  similar   processer  with  no  cache  memory.  Suppose  cache  memory  access  time  is  3  cycles  and  main   memory  access  time  is  5  cycles.                               55  
  • 56.
    Ex5.  A  main  memory  has  a  capacity  of  32  words  and  a  cache  memory  has  a  capacity  of  8   words,  if  a  series  of  memory  address  occurred      are  1,8,15,1,2,5,10,15,9,2,8,9,1,7,8,5  and  9.   Show  the  final  contents  of  cache  memory  and  the  format  of  main  memory  address  for     a. Direct  mapped  memory  with  1  word  block  size   b. Direct  mapped  memory  with  2  word  block  size   c. Associative  memory  with  2  word  block  size  use  replace  LRU   d. 2  way  associative  memory  with  1  word  block  size  use  replace  FIFO                                                                             56  
  • 57.
    Memory  Management   Recap….  Process  Swapping   • A  process  can  be  swapped  temporarily   out  of  memory  to  a  backing  store,  and   then  brought  back  into  memory  for   continued  execution.   • Backing  store  –  fast  disk  large  enough   to  accommodate  copies  of  all  memory   images  for  all  users.   • Roll  out,  roll  in  –  used  for  priority-­‐ based  scheduling  algorithms;  lower-­‐ priority  process  is  swapped  out  so   higher-­‐priority  process  can  be  loaded   and  executed.   • Major  part  of  swap  time  is  transfer   time;  total  transfer  time  is  directly   proportional  to  the  amount  of   memory  swapped.     Logical  vs.  Physical  Address  Space   • The  concept  of  a  logical  address  space  and  physical  address  space  is  central  to  proper   memory  management.   – Logical  address  –  generated  by  the  CPU;  also  referred  to  as  virtual  address.   – Physical  address  –  address  seen  by  the  memory  unit.   • Logical  (virtual)  and  physical  addresses  are  the  same  in  compile-­‐time;  but  differ  in   execution  time.     Memory-­‐Management  Unit  (MMU)   • Hardware  device  that  maps  virtual  to   physical  address.   • In  MMU  scheme,  the  value  in  the   relocation  register  is  added  to  every   address  generated  by  a  user  process   at  the  time  it  is  sent  to  memory.   • The  user  program  deals  with  logical   addresses;  it  never  sees  the  real   physical  addresses.             57  
  • 58.
    Overlays   • Large  programs  -­‐  too  big  to  fit  in  physical  memory   • Split  along  logical  boundaries   – Procedures,  distinct  functions   • Needed  when  process  is  larger  than  amount  of  memory  allocated  to  it   • Keep  in  memory  only  those  instructions  and  data  that  are  needed  at  any  given  time   • One  overlay  in  primary  memory  -­‐  rest  on  disc   • When  branch  is  made  to  code  on  disc   – Store  current  overlay  on  disc,  read  in  new  overlay   • Implemented  by  user,  no  special  support  needed  from  operating  system     Large  programs  can  generally  be  decomposed  into  sub-­‐units,  which  are,  to  an  extent,  self-­‐contained.   Whilst  one  sub-­‐unit  is  active,  the  others  will  be  dormant.  Since  this  is  the  case,  these  others  may  as  well  be   removed  from  primary  memory  and  placed  in  secondary  memory.  Sub-­‐units,  which  can  be  treated  in  this  way,   are  called  “overlays”.  It  is  up  to  the  programmer  to  divide  her  code  into  overlays;  bearing  in  mind  that   whenever  a  jump  is  made  to  an  overlay  not  currently  in  primary  memory  there  will  be  a  pause  whilst  the   required  overlay  is  loaded.  Thus,  it  is  important  that  overlays  are  chosen  so  that  jumps  between  them  are  kept   to  a  minimum.   Early  PC  programs  made  extensive  use  of  overlays  and  their  use  allowed  very  large  programs  to  be  run   even  within  the  original  640K  RAM  limit.  However,  performance  can  suffer  badly  as  time  is  lost  moving   overlays  to  and  from  secondary  memory.  This  performance  loss  is  quite  noticeable  to  users.  For  example,   when  using  a  spelling  checker  in  a  word  processor,  there  may  be  a  pause  (accompanied  by  frenzied  disc   activity)  whilst  the  overlay  containing  the  checker  is  loaded.  Having  said  that,  if  the  overlay  system  is  well   designed,  so  that  too  frequent  switching  between  overlays  is  avoided  and  that  the  size  of  the  overlays  is  well-­‐ matched  to  the  memory  available,  then  overlays  can  be  highly  efficient.  The  main  problem  is  that  the  solution   has  to  be  re-­‐invented  each  time  a  new  program  is  written  or  maybe  even  when  an  old  one  is  modified.       Memory  Management   • Five  Requirements  for  Memory  Management  to  satisfy:   – Relocation   • Users  generally  don’t  know  where  they  will  be  placed  in  main  memory   • Generally  handled  by  MMU   – Protection   • Prevent  processes  from  interfering  with  the  O.S.  or  other  processes   – Sharing   • Allow  processes  to  share  data/programs   – Logical  Organization   • Support  modules,  shared  subroutines   – Physical  Organization   • Manage  mem  «  disk  transfers           58  
  • 59.
    Fragmentation   • External  Fragmentation  –  total  memory  space  exists  to  satisfy  a  request,  but  it  is  not   contiguous.   • Internal  Fragmentation  –  allocated  memory  may  be  slightly  larger  than  requested   memory  due  a  partition,  but  not  being  used.   • Reduce  external  fragmentation  by  compaction   – Shuffle  memory  contents  to  place  all  free  memory  together  in  one  large  block.   – Compaction  is  possible  only  if  relocation  is  dynamic,  and  is  done  at  execution   time.     MM  Techniques   • Fixed  Partitioning   • Dynamic  Partitioning   • Buddy  System   • Simple  Paging   • Simple  Segmentation   • Virtual-­‐Memory  Paging   • Virtual  Memory  Segmentation     Fixed  Partitioning   Divide  memory  into  partitions  at  boot  time,  partition  sizes  don’t  change   Simple  but  has  internal  fragmentation   Dynamic  Partitioning   Create  partitions  as  programs  loaded   Avoids  internal  fragmentation,  but  must  deal  with  external  fragmentation   Simple  Paging   Divide  memory  into  equal-­‐size  pages,  load  program  into  available  pages   Pages  do  not  need  to  be  consecutive   No  external  fragmentation,  small  amount  of  internal  fragmentation   Simple  Segmentation   Divide  program  into  segments   Each  segment  is  contiguous,  but  different  segments  need  not  be   No  internal  fragmentation,  some  external  fragmentation   Virtual-­‐Memory  Paging   Like  simple  paging,  but  not  all  pages  need  to  be  in  memory  at  one  time   Allows  large  virtual  memory  space   More  multiprogramming,  overhead   Virtual  Memory  Segmentation   Like  simple  segmentation,  but  not  all  segments  need  to  be  in  memory  at  one  time   Easy  to  share  modules   More  multiprogramming,  overhead             59  
  • 60.
    Fixed  Partitioning   • Memory  is  divided  into  a  set  of  partitions,  each  holds  one  program   • May  have  same  or  different  sizes   •   • Equal-­‐sized  partitions   – Program  may  be  too  large  for  one  partition   • Programmer  must  handle  overlays   – Program  may  not  be  big  enough  to  need  a  full  partition   • Results  in  internal  fragmentation   • Variable-­‐sized  partitions   – Can  fit  partition  size  to  program  size   – Placement   • Want  to  use  smallest  possible  partition   • Can  have  a  queue  for  each  partition  size,  or  one  queue  for  all  partitions   • Easy  to  implement   • Tends  to  use  memory  poorly,  especially  for  small  programs  (internal  fragmentation)   – Will  work  if  the  job  sizes  can  be  predicted  in  advance     Dynamic  Partitioning   • Create  a  new  partition  for  each  program   • Only  allocate  space  required   • Tends  to  create  “holes”  as  processes  are   swapped  in  and  out  (external  fragmentation)   • Tends  to  generate  small  holes  in  memory   (external  fragmentation)   • Compaction   -­‐Shifting  processes  so  all  of  the  available   memory  is  in  one  block                 -­‐  Requires  processor  time  to  move  items  around  in  memory     -­‐  Requires  relocation  hardware  that  can  handle  the  change  in  addresses   >Cannot  easily  find  all  possible  addresses  in  the  program     60  
  • 61.
    >Need  to  move  program  without  changing  user  addresses   • Placement  Algorithms   – Best-­‐Fit:  Find  the  smallest  available  block  that  will  hold  the  program   • Tends  to  produce  a  lot  of  small  blocks,  e.g.  use  30K  block  for  28K  program,   leaves  2K   – First-­‐Fit:  Find  the  first  block  that  is  large  enough  (regardless  of  size)   • May  leave  small  blocks  at  the  beginning,  larger  blocks  at  the  end  of   memory   • Generally  best,  fastest   – Next-­‐Fit:  Like  First-­‐Fit,  but  start  from  the  last  allocation  instead  of  the  start   • Tends  to  break  up  large  blocks  at  the  end  of  memory  that  First-­‐Fit  leaves   alone   – Worst-­‐Fit  –  Allocate  the  largest  hole   Buddy  System   • Tries  to  allow  a  variety  of  block  sizes  while  avoiding  excess  fragmentation   • Blocks  generally  are  of  size  2k,  for  a  suitable  range  of  k   • Initially,  all  memory  is  one  block   • All  sizes  are  rounded  up  to  2s   • If  a  block  of  size  2s  is  available,  allocate  it   • Else  find  a  block  of  size  2s+1  and  split  it  in  half  to  create  two  buddies   • If  two  buddies  are  both  free,  combine  them  into  a  larger  block   • Largely  Replaced  by  paging     Buddy  System  Example       61  
  • 62.
    Paging   • Divides  memory  into  small  (4K  or  less)  pieces  of  memory  (frames)   • Logically  divide  program  into  same-­‐size  pieces  (pages)   • Page  size  typically  a  power  of  2  to  simplify  the  paging  hardware   • Use  a  page  table  to  map  the  pages  of  the  current  process  to  the  corresponding  frames   in  memory     Example   Page  Table   A  B C D Free 0 - 7 4 13 1 - 8 5 14 2 - 9 6 3 10 11 12     Logical  address  space  of  a  process  can  be  noncontiguous;  process  is  allocated  physical  memory  whenever  the   latter  is  available.   Divide  physical  memory  into  fixed-­‐sized  blocks  called  frames  (size  is  power  of  2,  between  512  bytes  and  8192   bytes).   Divide  logical  memory  into  blocks  of  same  size  called  pages.   Keep  track  of  all  free  frames.   To  run  a  program  of  size  n  pages,  need  to  find  n  free  frames  and  load  program.   Set  up  a  page  table  to  translate  logical  to  physical  addresses.     Internal  fragmentation.     Page  size  typically  a  power  of  2  to  simplify  the  paging  hardware   Example  (16-­‐bit  address,  1K  pages)   010101  011011010     Top  6  bits  (010101)=  page  #   Bottom  10  bits    (011011010)  =  offset  within  page   Common  sizes:  512  bytes,  1K,  4K                         62  
  • 63.
    Page  Table  and  Free  Frames   •    Set  up  a  page  table  to  translate  logical  to  physical  addresses   •    Keep  track  of  all  free  frames   •    To  load  a  program  of  size  n  pages,  need  to  find  n  free  frames                                       Implementation  of  Page  Table   Before After • Page  table  is  kept  in  main  memory.   • Page-­‐table  base  register  (PTBR)  points  to  the  page  table.   • Page-­‐table  length  register  (PRLR)  indicates  size  of  the  page  table   • Use  of  valid  (v)  or  invalid  (i)  bit  in  a  page  table                                       63  
  • 64.
      Segmentation   • Memory-­‐management  scheme  that  supports  user  view  of  memory.     • A  program  is  a  collection  of  segments.    A  segment  is  a  logical  unit  such  as:   Main  program,  procedure,  function,  method,  object,  local  variables,  global  variables,   Common  block,  stack,  symbol  table,  arrays   • Program  views  memory  as  a  set  of  segments  of  varying  sizes   – Easy  to  handle  growing  data  structures   – Easy  to  share  libraries,  memory   – Privileges  can  be  applied  to  a  segment   – Programs  may  use  multiple  segments   • Have  a  segment  table   – Beginning  address   – Size   – Present,  Modified,  Accessed  bits   – Permission/Protection  bits     Summary   • Process  can  be  swapped  out  of  and  back  into  memory     • MMU  is  a  hardware  device  that  maps  virtual  to  physical  address   • Overlays  needed  when  process  is  larger  than  amount  of  memory  allocated  to  it   • There  a  number  of  partitioning  algorithms   • Paging  divides  memory  into  small  pieces  called  frames  and  program  into  pages                                         64  
  • 65.
    Exercise     Ex1.)  Assume  a  computer  with  a  memory  size  of  128  MB  initially  empty.  Requests  and  freeing   are  received  for  blocks  of  memory  of  P1=  5  M,  P2  =  30  M,  P3=  25  M,  P2  completed,  P4=27  M,   P3  completed,  P5=  3  M,  P1  completed,  P6=  10  M.  Show  hoe  the  dynamic  partitioning  would   deal  with  each  request,  showing  the  memory  layout  at  each  stage.  Use  the  following  strategies   for  the  dynamic  partitioning     A-­‐ Best  fit   B-­‐ Frist  fit   C-­‐ Next  fit   Ex2.)  Same  problem  show  how  the  buddy  system  would  deal  with  each  request,  showing  the   memory  layout  at  each  stage  for  each  of  the  system                                                                     65  
  • 66.
    Virtual  Memory   Recap  …  Real  to  Virtual  Memory   • Program  addresses  only  logical  addresses,  Hardware  maps  to  physical  addresses   • Possible  to  load  only  part  of  a  process  into  memory   • Logical  address  space  can  be  much  larger  than  physical  address  space     • Real  Memory  –  The  physical  memory  occupied  by  a  program   • Virtual  memory  –  The  larger  memory  space  perceived  by  the  program   • Principle  of  Locality  –  A  program  tends  to  reference  the  same  items   – Even  if  same  item  not  used,  nearby  items  will  often  be  referenced     Virtual  Memory   Virtual  Memory  >>  Physical  Memory   • Logical  address  space  can  be  much     larger  than  physical  address  space     • Virtual  memory  –  separation  of  user   logical  memory  from  physical   memory.   – Possible  for  a  process  to  be   larger  than  main  memory   – Allows  additional  processes   since  only  part  of  each  process   needs  to  occupy  main  memory     – Allows  for  more  efficient   process  creation   • Virtual  memory  can  be  implemented   via:   – Paging     – Segmentation   Paging   • Divides  memory  into  small  pieces  of  memory  (frames)   • Logically  divide  program  into  same-­‐size  pieces  (pages)   • Use  a  page  table  to  map  the  pages  of  the  current  process  to  the  corresponding  frames   in  memory   Example     A B C D Free   Page  Table   0 -   7 4 13   1 - 8 5 14     2 - 9 6   3 10 11   12 Segmentation     66  
  • 67.
    • Programmer  sees  memory  as  a  set  of  multiple  segments,  each  with  a  separate  address   space   • Growing  data  structures  easier  to  handle   – OS  can  expand  or  shrink  segment   • Can  alter  the  one  segment  without  modifying  other  segments   • Easy  to  share  a  library   – Share  one  segment  among  processes   • Easy  memory  protection   – Can  set  values  for  the  entire  segment     OS  Policies   • Implementation  decisions:   – Paging,  Segmentation,  or  both?   • Decisions  about  virtual  memory:   – Fetch  Policy  –  When  to  bring  a  page  in   – Placement  –  Where  to  put  it   – Replacement  –  What  to  remove  to  make  room  for  a  new  page   – Resident  Set  Management  –  How  many  pages  to  keep  in  memory   – Cleaning  Policy  –  When  to  write  a  page  to  disk   – Load  Control  –  How  many  processes  to  keep  in  memory     Paging  Operation   • Page  Hit  -­‐  Page  is  present  in   memory   • Page  Fault  –  Page  not  in  memory   (Page  marked  as  not  present)   • Handling  a  Page  Fault   – CPU  determines  page  isn’t  in   memory   – Interrupts  the  program,   starts  OS  page  fault  handler   – OS  verifies  the  reference  is   valid  but  not  in  memory   – Swap  out  a  page  if  needed   – Read  referenced  page  from   disk   – Update  page  table  entry   – Resume  interrupted  process   (or  possible  switch  to   another  process)   Page  Table  Bits     67  
  • 68.
    • Valid-­‐invalid  bit     – Indicates  if  the  page  is  a  valid  part  of  the  process     – Prevents  a  process  accessing  an  erroneous  page   • Referenced  bit     – Indicates  that  the  page  has  been  read     – Useful  for  implementing  page  replacement  policies   • Modified  bit     – Indicates  that  the  page  has  been  written     – Must  be  written  back  on  disc  before  replacing.     Policies   • Fetch  Policy     – When  to  bring  a  page  into  memory   – Demand  Paging  –  Load  the  page  when  a  process  tries  to  reference  it   • Less  I/O  needed   • Less  memory  needed     • Faster  response  required   – Prepaging  –  Bring  in  pages  that  are  likely  to  be  used  in  the  near  future   • Try  to  take  advantage  of  disk  characteristics   • Hard  to  correctly  guess  which  pages  will  be  referenced   • Placement  Policy   – Where  to  put  the  page   – Best-­‐fit,  First-­‐Fit,  or  Next-­‐Fit  can  be  used  in  with  segmentation     Basic  Page  Replacement   • Which  page  to  replace  when  a  new  page  needs  to  be  loaded   • Steps:   1. Find  the  location  of  the   desired  page  on  disk.   2. Find  a  free  frame:   -­‐  If  there  is  a  free  frame,   use  it.   -­‐  If  there  is  no  free  frame,   use  a  page  replacement   algorithm  to  select  a   victim  frame.   3. Read  the  desired  page   into  the  (newly)  free   frame.  Update  the  page   and  frame  tables.   4. Restart  the  process.     68  
  • 69.
      Replacement  Policy   • Frame  Locking   – Require  a  page  to  stay  in  memory,  e.g.  OS  Kernel,  Interrupt  Handlers,  Real-­‐Time   processes   – Implemented  by  bit  in  data  structures   • Basic  Algorithms   – Optimal       – First  in,  First  out   – Least  recently  used       – Clock   • Evaluate  algorithm  by  running  it  on  a  memory  references  (reference  string)  and   computing  the  number  of  page  hits  or  faults  on  that  string     • Page  hit  rate  –  ratio  of  number  of  pages  found  in  memory  to  the  number  of  page   references     • Page  fault  rate  –  ratio  of  number  of  pages  not  found  in  memory  to  the  number  of  page   references     • Want  to  maximise  page  hit  rate  (minimise  page-­‐fault  rate)       First-­‐In-­‐First-­‐Out  (FIFO)  Algorithm   • Replace  the  page  in  order  of  entering  into  the  memory  frame   • Example                           FIFO  example     69  
  • 70.
    • Reference  string  (sequence  of  virtual  page  number  in  the  course  of  execution)  :  1,  2,  3,   4,  1,  2,  5,  1,  2,  3,  4,  5   • Main  memory  initially  empty   • Calculate  page  faults  (misses)  for  number  of  main  memory  frames  (page  capacity)  =   1,2,3  and  4                                                                               70  
  • 71.
    Optimal  Algorithm   • Replace  page  that  will  not  be  used  for  longest  period  of  time.   • How  do  you  know  this?   • Used  for  measuring  how  well  your  algorithm  performs     – Gives  a  standard  for  other  algorithms   • Example                             Optimal  example   • Reference  string  (sequence  of  virtual  page  number  in  the  course  of  execution)  :  1,  2,  3,   4,  1,  2,  5,  1,  2,  3,  4,  5   • Main  memory  initially  empty   • Calculate  page  faults  (misses)  for  number  of  main  memory  frames  (page  capacity)  =  4                           71  
  • 72.
    Least  Recently  Used  (LRU)  Algorithm   • Locate  the  page  that  hasn’t  been  referenced  for  the  longest  time   • Nearly  as  good  at  optimal  policy  in  many  cases   • Difficult  to  implement  fully   • Must  keep  a  ordered  list  of  pages  or  last  accessed  time  for  all  pages   • Counter  implementation   • Every  page  entry  has  a  counter;  every  time  page  is  referenced  through  this  entry,   copy  the  clock  into  the  counter.   • When  a  page  needs  to  be  changed,  look  at  the  counters  to  determine  which  are   to  change.     • Example  1                         Example  2   Reference  string:    1,  2,  3,  4,  1,  2,  5,  1,  2,  3,  4,  5   Page  hit  ratio:???                       72  
  • 73.
    Thrashing   • If  a  process  does  not  have  “enough”  pages,  the  page-­‐fault  rate  is  very  high.    This  leads   to:   – Low  CPU  utilization.   – OS  thinks  that  it  needs  to  increase  the  degree  of  multiprogramming   – Another  process  added  to  the  system.   – A  process  is  busy  swapping  pages  in  and  out  ≡  Thrashing   • Thrashing  –  Constantly  needing  to  get  pages  off  secondary  storage   – Happens  if  the  OS  throws  out  a  piece  of  memory  that  is  about  to  be  used   – Can  happen  if  the  program  scans  a  long  array  –  continuously  referencing  pages   not  used  recently     Resident  Set  Management   • Resident  Set  –  Those  parts  of  the  program  being  actively  used   – Remaining  parts  of  program  on  disk   • Size  –  How  many  pages  to  bring  in   – Smaller  sets  allow  more  processes  in  memory  at  one  time   – Larger  sets  reduce  #  of  page  faults  for  each  process   – Fixed  Allocation   • Each  process  is  assigned  a  fixed  number  of  pages   – Variable  Allocation   • Allow  the  number  of  pages  for  a  given  process  to  vary  over  time     Cleaning  Policy   • Use  modify  (dirty)  bit  to  reduce  overhead  of  page  transfers  –  only  modified  pages  are   written  to  disk   • Demand  Cleaning  –  Write  out  when  selected  for  replacement   – Process  may  have  to  wait  for  two  I/O  operations  before  being  able  to  proceed   • Pre  cleaning  –  Write  out  in  bunches   – Do  it  too  soon,  and  the  page  may  be  modified  again  before  being  replaced     – Works  well  with  page  buffering     Load  Control   • Managing  how  many  processes  we  keep  in  main  memory   • If  too  few,  all  processes  may  be  blocked,  may  have  a  lot  of  swapping   • Too  many  can  lead  to  thrashing     Summary   • Virtual  memory  –  larger  memory  space  perceived  by  the  program   • OS  should  adapt  a  number  of  policy  for  virtual  memory  management   • Page  replacement  completes  separation  between  logical  memory  and  physical  memory     73  
  • 74.
      Virtual  memory  problem     Ex.  The  following  sequence  of  visual  page  number  with  virtual  memory  2,  4,  3,  6,  7,  1,  3,  2,  6,  3,   5,  1,  2,  3.  Assume  the  main  memory  is  initially  empty.  Calculate  the  number  of  page  fault  and   show  the  final  contents  for  the  following  scenarios:   a.) 3  frames  (number  of  page  capacity)  with  page  replacement  policy  –  optimal  algorithm   b.) 4  frames  (number  of  page  capacity)  with  page  replacement  policy  –  optimal  algorithm   c.) 3  frames  (number  of  page  capacity)  with  page  replacement  policy  –  Fist  in  first  out   algorithm   d.) 4  frames  (number  of  page  capacity)  with  page  replacement  policy  –  Fist  in  first  out   algorithm   e.) 3  frames  (number  of  page  capacity)  with  page  replacement  policy  –  Least  recently  used   algorithm   f.) 4  frames  (number  of  page  capacity)  with  page  replacement  policy  –  Least  recently  used   algorithm                                                         74  
  • 75.
      File  Management   File  Management   • One  of  the  important  services  of  OS     • Objectives   – Meet  the  data  requirements  of  the  user   – Guarantee  valid  data   – Optimize  performance  -­‐  Both  throughput  and  response  time   – Support  a  wide  variety  of  devices   – Minimize  lost  or  destroyed  data   – Provide  a  standard  set  of  I/O  routines   – Provide  support  for  multiple  users     OS  and  File  Operations   • System  calls  to  (for  example)  create  files,  delete  files,  move  files,  rename  files,  copy  files,   open  files,  close  file,  read  files,  write  files.   • Open  (Fi)  –  search  the  directory  structure  on  disk  for  entry  Fi,  and  move  the  content  of   entry  to  memory.   • Close  (Fi)  –  move  the  content  of  entry  Fi  in  memory  to  directory  structure  on  disk.   • Control  other’s  access  to  files   • Able  to  move  data  between  files   • Back  up  and  recover  files     Access  Methods   • Sequential  Access                  read  next                  write  next                    reset                  no  read  after  last  write                      (rewrite)   • Direct  Access     read  n     write  n     position  to  n                    read  next                    write  next                      rewrite  n       n  =  relative  block  number       75  
  • 76.
      Directory  Structure   • A  collection  of  nodes  containing  information  about  all  files.                         Both  the  directory  structure  and  the  files  reside  on  disk.   Backups  of  these  two  structures  are  kept  on  tapes.     Directory  Implementation   • Linear  list  of  file  names  with  pointer  to  the  data  blocks.   – simple  to  program   – time-­‐consuming  to  execute   • Hash  Table  –  linear  list  with  hash  data  structure.   – decreases  directory  search  time   – collisions  –  situations  where  two  file  names  hash  to  the  same  location   – fixed  size     File  Sharing   • Sharing  of  files  on  multi-­‐user  systems  is  desirable.   • Sharing  may  be  done  through  a  protection  scheme.   • On  distributed  systems,  files  may  be  shared  across  a  network.   • Network  File  System  (NFS)  is  a  common  distributed  file-­‐sharing  method.     Protection   • File  owner/creator  should  be  able  to  control:   – what  can  be  done   – by  whom   • Types  of  access   – Read   – Write   – Execute   – Append   – Delete     76  
  • 77.
    – List   Allocation  Methods   • An  allocation  method  refers  to  how  disk  blocks  are  allocated  for  files   • Three  main  methods:   – Contiguous  allocation   – Linked  allocation   – Indexed  allocation     Contiguous  Allocation   • Each  file  occupies  a  set  of  contiguous  blocks   on  the  disk.   • Simple  –  only  starting  location  (block  #)  and   length  (number  of  blocks)  are  required.   • Random  access.   • Wasteful  of  space  (dynamic  storage-­‐ allocation  problem).   • Files  cannot  grow.   Linked  Allocation   • Each  file  is  a  linked  list  of  disk  blocks:  blocks   may  be  scattered  anywhere  on  the  disk.   • Simple  –  need  only  starting  address   • Free-­‐space  management  system  –  no  waste   of  space     • No  random  access   • Two  file  system  implementation  methods   (mapping)  that  uses  linked  lists:   – Linked  chain  of  blocks   – File-­‐allocation  table  (FAT)     File  implementation  -­‐  Linked  chain   –    Block  to  be  accessed  is  the  Qth  block  in  the   linked  chain  of  blocks  representing  the  file.     –    Displacement  into  block  =  R  +         File  B               77  
  • 78.
    Linked  chain  -­‐  advantages   • Every  block  can  be  used,  unlike  a  scheme  that  insists  that  every  file  is  contiguous.   • No  space  is  lost  due  to  external  fragmentation  (although  there  is  fragmentation  within   the  file,  which  can  lead  to  performance  issues).   • The  directory  entry  only  has  to  store  the  first  block.  The  rest  of  the  file  can  be  found   from  there.   • The  size  of  the  file  does  not  have  to  be  known  beforehand  (unlike  a  contiguous  file   allocation  scheme).   • When  more  space  is  required  for  a  file  any  block  can  be  allocated  (e.g.  the  first  block  on   the  free  block  list).   • Random  access  is  very  slow  (as  it  needs  many  disc  reads  to  access  a  random  point  in  the   file).     • The  implementation  is  really  only  useful  for  sequential  access.   • Space  is  lost  within  each  block  due  to  the  pointer.     • The  number  of  bytes  is  not  a  power  of  two.     • This  is  not  fatal,  but  does  have  an  impact  on  performance.   • Reliability  could  be  a  problem.     • one  corrupt  block  pointer  and  the  whole  system  might  become  corrupted  (e.g.   writing  over  a  block  that  belongs  to  another  file).     File  implementation  –  FAT   File-­‐Allocation  Table  (FAT)   This  method  removes  the  pointers  from  the   data  block  and  places  them  in  a  table,  which  is   stored  in  memory.     FAT  -­‐  advantages  and  disadvantages   • Advantages   – The  entire  block  is  available  for   data.   – Random  access  can  be   implemented  a  lot  more   efficiently.     – Although  the  pointers  still  have  to   be  followed  these  are  now  in  main   memory  and  are  thus  much  faster.   • Disadvantages     – The  entire  table  must  be  in   memory  all  the  time.     • For  a  large  disc  (with  a  large  number  of  blocks)  this  can  lead  to  a  large  table   having  to  be  kept  in  memory.     78  
  • 79.
    Indexed  Allocation   • Brings  all  pointers  together   into  the  index  block.   • Logical  view.                       • Need  index  table   • Random  access   • Dynamic  access  without  external  fragmentation,  but  have  overhead  of  index  block.   • Indexed  Allocation  –  Mapping     – Mapping  from  logical  to  physical  in  a  file  of  unbounded  length  (block  size  of  512   words).  We  need  only  1  block  for  index  table.   – Linked  scheme  –  Link  blocks  of  index  table  (no  limit  on  size).   – Two-­‐level  index  (maximum  file  size  is  5123)   Indexed  Allocation  –  Mapping   Efficiency  and  Performance   • Efficiency  dependent  on:   – disk  allocation  and   directory  algorithms   – types  of  data  kept  in   file’s  directory  entry   • Performance   – disk  cache  –  separate   section  of  main   memory  for  frequently   used  blocks   – free-­‐behind  and  read-­‐ ahead  –  techniques  to   optimize  sequential  access   – improve  PC  performance  by  dedicating  section  of  memory  as  virtual  disk,  or  RAM   disk.         79  
  • 80.
    Summary   • File  management  is  one  of  the  important  services  of  OS   • Three  main  methods  to  allocate  disk  blocks  to  a  file     – Contiguous  allocation   – Linked  allocation   – Indexed  allocation   • Two  common  file  system  implementation  methods  that  use  linked  lists  are:   – Linked  chain  of  blocks   – File-­‐allocation  table  (FAT)                                                                       80  
  • 81.
    Exercise:  Write  algorithm  and  LMC  program  that  accepts  three  values  as  input  and  output  the   largest  number.  Assume  that  all  three  input  values  are  not  equal.  (For  example  if  A,  B,  and  C   are  three  inputs  numbers,  then  if  output  largest  of  these  three  number)                                                                                 81  
  • 82.
    Ex2  Given  the  following  processes  with  the  following  arrival  and  burst  time   Process   Arrived  Time   Burst  Time   Calculate  the  AWT  when  RR  scheduling    P1   0   9   algorithm  with  quantum  time  =  10  is  used   P2   12   31     P3   20   24     P4   17   3     P5   35   22     P6   26   30     P7   27   2                                                                         82  
  • 83.
    Ex  A  main  memory  has  a  capacity  of  128  words.  Its  cache  uses  a  direct  mapping.  The  cache   memory  has  a  capacity  of  16  word  organized  into  4  word  blocks  store  the  address  structure.   Starting  with  on  empty  cache  the  following  series  of  main  memory  address  occurs:  25,  3,  26,   24,  88,  91,  17,  15,  1,  127,  9,  15,  8,  7,  9,  2,  5,  6  ,  7,  99,  98,  1   Label  each  address  references  in  the  list  as  a  hit  or  a  miss  and  show  the  final  contents  of  the   cache.  State  the  address  structure.                                                                               83  
  • 84.
    Ex  The  following  sequence  of  virtual  page  number  is  encountered  in  the  course  of  execution   on  a  computer  with  virtual  memory:  6,  3,  1,  2,  3,  4,  3,  1,  7,  1,  3,  2,  7,  8     Calculate  page  faults  when  the  number  of  main  memory  frames  is  4.  Assume  that  main   memory  is  initially  empty  for  the  following  replacements  policies  .   -­‐FIFO   -­‐LRU                                                                             84  
  • 85.
    Ex  Consider  four  process  P0,  P1,  P2,  P3  and  P4  are  competing  for  resources  A,  B,  and  C.  The   following  system  state  is  given.  Analyze  the  deadlock  state  of  the  system  using  Banker’s   algorithm.  Is  the  system  is  in  safe  state?   Initial  available:  A  B  C                                                              3  3  2   Resource   Process   Initial  Allocation   Max  claim   Need   A              B                C   A              B                C   A              B                C   P0   2                1                1   4              5              3   3              3              2   P1   1                1                0   3              2            2   2              1              2   P2   2                0                2   4              0              2   2              0              0   P3   2                1                1   2              2              2   0              1              1   P4   1                0                1   3              3              2   4              3              1   If  the  system  is  in  safe  condition,  find  out  if  this  request  will  be  granted   P4  >>  A              B                C                          4              2              2                                                         85  
  • 86.
    Ex  Consider  four  process  P0,  P1,  P2,  P3  and  P4  are  competing  for  resources  A,  B,  and  C.   Assume  that  we  have  the  following  initial  availability  of  the  resources  and  the  initial  state  of   allocations  foe  the  processes.   Initial  availability:  A  B  C                                                                      2  3  2   Process   Initial  state  of  allocate   Request   A              B              C   A              B              C   P0   1              1              0   0              0              0   P1   1              0              0   2              0              3   P2   3              0              2   1              1              0   P3   2              1              1   0              1              1   P4   0              0              2   5              3              1   Analyze  the  above  request  scenario  with  the  deadlock  detection  technique  as  indicated  in  the       86