SlideShare a Scribd company logo
1 of 5
Download to read offline
Nihal Kamal Othman
Villa 232 South Academy (B)-Fifth Settlement
New Cairo
Mobile: 01276749278 – Email:nihal.k.Othman@gmail.com
Personal statement
• Executive engineer with 6 yearsof experience in projects management,contacts, sourcing,
cost analysis, procurement& process fields experienced in preparing tendering prepare and
monitor BOM and cost control throughout the project life cycle. Very experienced in the
Processes of different departments and Monitoring and control of KPI for all departments.
Key Skills
• AUTOCAD / SOLIDWORKS
• Proficiency in all areas of Microsoft Office, including Access, Excel, Word and PowerPoint
• Primavera P6
• PMP preparation Course Certified from“Canadian chamber of commerce”
• Excellent communication skills, both written and verbal
• Maximo
• VB
Employment History
 
Planning Engineer Ridgewood for water Desalination,Cairo, Egypt 
(January 2011 – January 2012) 
Main Tasks:-
• Understand work scope, quantity
• Conduct field scoping to clarify scope as required.
• Understand WBS structure , and work with management and project/maintenance
team in the development of work break down structure for progress measurement,
scheduling ,cost estimating and project control.
• Prepare and manage overall master schedule integrating work breakdown structure using
Primavera P6
• Coordinate schedule from multiple contractors and/or teams and incorporate the
information gathered into the overall project master schedule.
• Prepare cost estimation and schedule bar chart plan considering all in puts (manpower,
equipments and materials ) availability, production and construction sequences.
• Develop work method of statement or procedure as required.
• Understand and able to utilize planning tools such as MS excel, Access, MS Project,
Primavera , Maximo
• Develop and update resource (manpower and equipment) histogram weekly or monthly
as required.
• Evaluate allocation of resources and provide recommendations to maintain required
progress.
• Develop and implement plan versus actual and prepare reports and analyses deviations
from plan.
• Track, monitor and forecast progress of all activities and deliverable such as products,
engineering documents, fabrication status and construction of all discipline.
• Analyze gaps between the planned and actual progress and highlight the areas of concern
which required action of the associate task member.
• Present risk based analysis of most likely completion and expected deviation range.
• Prepare and update three weeks look-ahead schedule that reflect the priority activities
• Liaises with all team leaders and/or members to communicate required completion dates
and interface between functional team/operational team and project team.
• Participate all meeting ( i.e schedule review meeting , progress meeting, coordination
meeting, constructability review meeting)
Additional Tasks:
• Analyze Company income statement and investigate deviation between actual and plan
• Monitor and control equipments standards of operation and investigate any deviation
• Prepare Master plan for all equipments Preventive Maintenance and investigate
implementation Deviation
• Monitor and Control Quality Control processes are followed and implemented in the
department
Procurement and Contract Senior Engineer ,Ridgewood for water 
Desalination, Cairo, Egypt 
(January 2012 – June 2014) 
Main Tasks:-
• Obtain a correct understanding of the client’s requirements.
• Prepare the Company’s quotation response in accordance with the established procedures
for investigation, design, costing and presentation
• To ensure that the documentation received for orders / enquiries is sufficiently
informative/detailed to allow efficient processing of the work
• To process orders in accordance with the established procedures for materials , bought
out items, labour and site equipment
• To maintain an accurate and complete file record of all calculations, Material Lists,
costings, drawings ,correspendance and purchase orders using software such as primavera
,Maximo , and I developed a database using access that can track all documents and
reports for missing documents
• To attend Pre-quote/Pre-installation surveys/meetings
• To prepare and accurate construction for production control
• To prepare full and accurate manufacturing drawings detailed for production (workshop
drawings)
• Source and procure all bought out/non stock items relevant to the contract in a cost
effective manner.
• To source and procure the necessary site equipment to enable installation to be carried
out in a safe and efficient manner.
• To program work load to ensure that all resources arrive on site as scheduled and thereby
allow the installation to be completed as cost effectively as possible.
• To liaise with the client regarding deliveries of materials and the installation of the
program
• Seek client’s / Supplier agreement on payment methods and payement facility in case of
supplier.
Executive project engineer, Ridgewood for water Desalination, Cairo, 
Egypt 
(June 2014 – present) 
 
Main Tasks:-
• Same tasks as previous title with addition of the following tasks
Planning Phase Organizing Monitoring And Control
• Define the project
objective.
• Gain agreement from
the customer.
• Identify and gain
support of stakeholders.
• Develop a statement of
work.
• Create and communicate
a vision to the team
• Oversee development of
a plan to meet the
objective.
• Set up a project
management
information system.
• Assess risks and develop
contingency plans
• Obtain resources to
perform work. (Human
and Non-HumanNeed
Resources)
• Create an environment
which highly motivates
the team to work
together
• Develop and deliver key
documents.
• Maintain documents
associated with project
in an organized manner
• Implement the project
management information
system
• Provide ongoing management
and motivation.
• Monitor progress.
• Manage a change control
process.
• Develop corrective actions
when necessary.
• Communicate with sponsors
and stakeholders.
• Hand Project off and Project
closure process
• Provide management with
accurate data and send them
weekly reports or / as agreed in
the initiation phase
Sample of Projects and tender Submitted: -
• SIDC 10000m3/d plant
• GUPCO Tender and Bid Preparation and project design for40000m3/d and Construction
• More than 100 technical offer submitted
Achievements: -
• Implementing New program using Access & VB to monitor and control KPI for the
company
• Implementing new project process according to the PMO
• Changing with all departments their processes according to ISO 9001
• Attending All External Audits
Education
Ain Shams University/Faculty of Engineering 
(September 2005 – June 2010)
• Major:Mechatronics Department
St.Joseph de l’apparition – Abbasseyah  
(September 1991–June 2005)
• Thanaweya Amma
PMP Preparation course and preparing to attend the exam  
Languages
• Arabic: Mother Tongue
• French: Fluent DELF certificate acquired
• English : Fluent
Trainings
• Piping Design Audi petroleum company - August 2007
• Solid Works (Jan2015-March 2015)
• Pumping & Motors Design & manufacturing Process at Grundfos Hungray and
Denmark– Nov.2014
• Primavera Jan2014
Nihal Kamal Othman Final CV

More Related Content

What's hot

Project Cost Management - PMP preparation course
Project Cost Management - PMP preparation courseProject Cost Management - PMP preparation course
Project Cost Management - PMP preparation courseVladimir Vujovic
 
Role of project engineering in project management
Role of project engineering in project managementRole of project engineering in project management
Role of project engineering in project managementDr. Pramod Deshpande
 
PMBoK, discussion #5: Project Cost Management
PMBoK, discussion #5: Project Cost ManagementPMBoK, discussion #5: Project Cost Management
PMBoK, discussion #5: Project Cost ManagementOleksandr Lutsaievskyi
 
IWP Timeline
IWP TimelineIWP Timeline
IWP TimelineScot Fyfe
 
Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16Aew Sanmai
 
BCA resume - Admin Cum Doc Cont (red1)
BCA resume - Admin Cum Doc Cont (red1)BCA resume - Admin Cum Doc Cont (red1)
BCA resume - Admin Cum Doc Cont (red1)Benjan Amtipuesto
 
Project management (1)
Project management (1)Project management (1)
Project management (1)Hetal Visaria
 
Project control wps office
Project control wps officeProject control wps office
Project control wps officekaransingh1064
 
25 11-big 5- critical success factors for applying (OPM)governance in MENA re...
25 11-big 5- critical success factors for applying (OPM)governance in MENA re...25 11-big 5- critical success factors for applying (OPM)governance in MENA re...
25 11-big 5- critical success factors for applying (OPM)governance in MENA re...Ahmed Al-Senosy Ph.D(cand),MSc,PMP,RMP
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost ManagementSerdar Temiz
 
Lisa Cole's Resume 2017
Lisa Cole's Resume 2017Lisa Cole's Resume 2017
Lisa Cole's Resume 2017Lisa Cole
 

What's hot (20)

project monitoring and control
project monitoring and controlproject monitoring and control
project monitoring and control
 
Raghu CV 30_12_15
Raghu CV 30_12_15Raghu CV 30_12_15
Raghu CV 30_12_15
 
Session 9 4th edition PMP
Session 9 4th edition PMPSession 9 4th edition PMP
Session 9 4th edition PMP
 
Project monitoring lecture 1
Project monitoring lecture 1Project monitoring lecture 1
Project monitoring lecture 1
 
Cost management
Cost managementCost management
Cost management
 
Project Cost Management - PMP preparation course
Project Cost Management - PMP preparation courseProject Cost Management - PMP preparation course
Project Cost Management - PMP preparation course
 
Role of project engineering in project management
Role of project engineering in project managementRole of project engineering in project management
Role of project engineering in project management
 
C.V
C.VC.V
C.V
 
PMBoK, discussion #5: Project Cost Management
PMBoK, discussion #5: Project Cost ManagementPMBoK, discussion #5: Project Cost Management
PMBoK, discussion #5: Project Cost Management
 
IWP Timeline
IWP TimelineIWP Timeline
IWP Timeline
 
Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16
 
BCA resume - Admin Cum Doc Cont (red1)
BCA resume - Admin Cum Doc Cont (red1)BCA resume - Admin Cum Doc Cont (red1)
BCA resume - Admin Cum Doc Cont (red1)
 
Project management (1)
Project management (1)Project management (1)
Project management (1)
 
SenthilKumar_Resume
SenthilKumar_ResumeSenthilKumar_Resume
SenthilKumar_Resume
 
ATCO Engineering - Process Evaluation
ATCO Engineering - Process EvaluationATCO Engineering - Process Evaluation
ATCO Engineering - Process Evaluation
 
PMP Exam Preparation Course: 06 Project Cost Management
PMP Exam Preparation Course: 06 Project Cost ManagementPMP Exam Preparation Course: 06 Project Cost Management
PMP Exam Preparation Course: 06 Project Cost Management
 
Project control wps office
Project control wps officeProject control wps office
Project control wps office
 
25 11-big 5- critical success factors for applying (OPM)governance in MENA re...
25 11-big 5- critical success factors for applying (OPM)governance in MENA re...25 11-big 5- critical success factors for applying (OPM)governance in MENA re...
25 11-big 5- critical success factors for applying (OPM)governance in MENA re...
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
Lisa Cole's Resume 2017
Lisa Cole's Resume 2017Lisa Cole's Resume 2017
Lisa Cole's Resume 2017
 

Viewers also liked

Ejercicio 1 de ecuaciones diferenciales (jhon betancur)
Ejercicio 1 de ecuaciones diferenciales (jhon betancur)Ejercicio 1 de ecuaciones diferenciales (jhon betancur)
Ejercicio 1 de ecuaciones diferenciales (jhon betancur)Miguel Antonio Bula Picon
 
Supreme Reality.jpeg.docx
Supreme Reality.jpeg.docxSupreme Reality.jpeg.docx
Supreme Reality.jpeg.docxMCDub
 
Brandy Waugh's Up to Date Resume
Brandy Waugh's Up to Date ResumeBrandy Waugh's Up to Date Resume
Brandy Waugh's Up to Date ResumeBrandy Waugh
 
Programação do novenário santo andre 2015
Programação do novenário santo andre 2015Programação do novenário santo andre 2015
Programação do novenário santo andre 2015Roberto Rabat Chame
 
Safety personnel and social responsibility
Safety personnel and social responsibilitySafety personnel and social responsibility
Safety personnel and social responsibilitynataliaevelin
 
Large benefits equity tips for new traders
Large benefits equity tips for new tradersLarge benefits equity tips for new traders
Large benefits equity tips for new tradersNiharika Jain
 
Was a Business Acquired? Updates to the Definition of a Business
Was a Business Acquired? Updates to the Definition of a BusinessWas a Business Acquired? Updates to the Definition of a Business
Was a Business Acquired? Updates to the Definition of a BusinessMHM (Mayer Hoffman McCann P.C.)
 
про пробне зно-2017 !
про пробне зно-2017 !про пробне зно-2017 !
про пробне зно-2017 !Olexandr Lazarets
 
Властивості кореня. Урок-казка
Властивості кореня. Урок-казкаВластивості кореня. Урок-казка
Властивості кореня. Урок-казкаOlexandr Lazarets
 
Tha Price Of Tha DEVIL.Pt.1.newer.html
Tha Price Of Tha DEVIL.Pt.1.newer.htmlTha Price Of Tha DEVIL.Pt.1.newer.html
Tha Price Of Tha DEVIL.Pt.1.newer.htmlMCDub
 
Future of Web 2.0 - talk, 22 September 2009
Future of Web 2.0 - talk, 22 September 2009Future of Web 2.0 - talk, 22 September 2009
Future of Web 2.0 - talk, 22 September 2009Dan Armstrong
 
Tipos Sociedades Mercantiles
Tipos Sociedades MercantilesTipos Sociedades Mercantiles
Tipos Sociedades MercantilesJosé Pech
 

Viewers also liked (20)

Ejercicio 1 de ecuaciones diferenciales (jhon betancur)
Ejercicio 1 de ecuaciones diferenciales (jhon betancur)Ejercicio 1 de ecuaciones diferenciales (jhon betancur)
Ejercicio 1 de ecuaciones diferenciales (jhon betancur)
 
Reveillon Istambul
Reveillon IstambulReveillon Istambul
Reveillon Istambul
 
Supreme Reality.jpeg.docx
Supreme Reality.jpeg.docxSupreme Reality.jpeg.docx
Supreme Reality.jpeg.docx
 
Brandy Waugh's Up to Date Resume
Brandy Waugh's Up to Date ResumeBrandy Waugh's Up to Date Resume
Brandy Waugh's Up to Date Resume
 
Programação do novenário santo andre 2015
Programação do novenário santo andre 2015Programação do novenário santo andre 2015
Programação do novenário santo andre 2015
 
Zno 2015 biology
Zno 2015 biologyZno 2015 biology
Zno 2015 biology
 
Presentación1
Presentación1Presentación1
Presentación1
 
Mapa 1001
Mapa 1001Mapa 1001
Mapa 1001
 
Quienes somos
Quienes somosQuienes somos
Quienes somos
 
Safety personnel and social responsibility
Safety personnel and social responsibilitySafety personnel and social responsibility
Safety personnel and social responsibility
 
cv1
cv1cv1
cv1
 
Large benefits equity tips for new traders
Large benefits equity tips for new tradersLarge benefits equity tips for new traders
Large benefits equity tips for new traders
 
9 Dec
9 Dec9 Dec
9 Dec
 
Was a Business Acquired? Updates to the Definition of a Business
Was a Business Acquired? Updates to the Definition of a BusinessWas a Business Acquired? Updates to the Definition of a Business
Was a Business Acquired? Updates to the Definition of a Business
 
Master mind 2015 update
Master mind 2015 updateMaster mind 2015 update
Master mind 2015 update
 
про пробне зно-2017 !
про пробне зно-2017 !про пробне зно-2017 !
про пробне зно-2017 !
 
Властивості кореня. Урок-казка
Властивості кореня. Урок-казкаВластивості кореня. Урок-казка
Властивості кореня. Урок-казка
 
Tha Price Of Tha DEVIL.Pt.1.newer.html
Tha Price Of Tha DEVIL.Pt.1.newer.htmlTha Price Of Tha DEVIL.Pt.1.newer.html
Tha Price Of Tha DEVIL.Pt.1.newer.html
 
Future of Web 2.0 - talk, 22 September 2009
Future of Web 2.0 - talk, 22 September 2009Future of Web 2.0 - talk, 22 September 2009
Future of Web 2.0 - talk, 22 September 2009
 
Tipos Sociedades Mercantiles
Tipos Sociedades MercantilesTipos Sociedades Mercantiles
Tipos Sociedades Mercantiles
 

Similar to Nihal Kamal Othman Final CV

OLA CV doc NRx (1)
OLA CV doc NRx (1)OLA CV doc NRx (1)
OLA CV doc NRx (1)Saheed Taiwo
 
ERP II Overview.ppt
ERP II Overview.pptERP II Overview.ppt
ERP II Overview.pptFirasAlhilu
 
CV_Alana Miles-2015-
CV_Alana Miles-2015-CV_Alana Miles-2015-
CV_Alana Miles-2015-Alana Miles
 
Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01samansari22
 
projectmanagement-130721095616-phpapp01-converted.pptx
projectmanagement-130721095616-phpapp01-converted.pptxprojectmanagement-130721095616-phpapp01-converted.pptx
projectmanagement-130721095616-phpapp01-converted.pptxChandrasen Sharma
 
Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01samansari22
 
Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01petch phanpha
 
Sherif Yehia CV updated DV
Sherif Yehia CV updated DVSherif Yehia CV updated DV
Sherif Yehia CV updated DVSherif Yehia
 
Haythem jamli candidature cv
Haythem jamli   candidature cvHaythem jamli   candidature cv
Haythem jamli candidature cvjamli haythem
 
Andrew taylor cv march 2016.doc
Andrew taylor cv march 2016.docAndrew taylor cv march 2016.doc
Andrew taylor cv march 2016.docAndy Taylor
 
DISE - Introduction to Project Management
DISE - Introduction to Project ManagementDISE - Introduction to Project Management
DISE - Introduction to Project ManagementRasan Samarasinghe
 
ayed cv.newest one 23.11.2011
ayed cv.newest one 23.11.2011ayed cv.newest one 23.11.2011
ayed cv.newest one 23.11.2011Iyad Hassan
 

Similar to Nihal Kamal Othman Final CV (20)

OLA CV doc NRx (1)
OLA CV doc NRx (1)OLA CV doc NRx (1)
OLA CV doc NRx (1)
 
Varun Garg_CV
Varun Garg_CVVarun Garg_CV
Varun Garg_CV
 
ERP II Overview.ppt
ERP II Overview.pptERP II Overview.ppt
ERP II Overview.ppt
 
Nawaz Eng-OCT
Nawaz Eng-OCTNawaz Eng-OCT
Nawaz Eng-OCT
 
CV_Alana Miles-2015-
CV_Alana Miles-2015-CV_Alana Miles-2015-
CV_Alana Miles-2015-
 
Project management
Project managementProject management
Project management
 
Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01
 
projectmanagement-130721095616-phpapp01-converted.pptx
projectmanagement-130721095616-phpapp01-converted.pptxprojectmanagement-130721095616-phpapp01-converted.pptx
projectmanagement-130721095616-phpapp01-converted.pptx
 
Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01
 
Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01
 
Sherif Yehia CV updated DV
Sherif Yehia CV updated DVSherif Yehia CV updated DV
Sherif Yehia CV updated DV
 
bingsusu.pptx
bingsusu.pptxbingsusu.pptx
bingsusu.pptx
 
Haythem jamli candidature cv
Haythem jamli   candidature cvHaythem jamli   candidature cv
Haythem jamli candidature cv
 
CV
CVCV
CV
 
Andrew taylor cv march 2016.doc
Andrew taylor cv march 2016.docAndrew taylor cv march 2016.doc
Andrew taylor cv march 2016.doc
 
sravankumar
sravankumarsravankumar
sravankumar
 
UCM-CV
UCM-CVUCM-CV
UCM-CV
 
Amr hassan
Amr hassanAmr hassan
Amr hassan
 
DISE - Introduction to Project Management
DISE - Introduction to Project ManagementDISE - Introduction to Project Management
DISE - Introduction to Project Management
 
ayed cv.newest one 23.11.2011
ayed cv.newest one 23.11.2011ayed cv.newest one 23.11.2011
ayed cv.newest one 23.11.2011
 

Nihal Kamal Othman Final CV

  • 1. Nihal Kamal Othman Villa 232 South Academy (B)-Fifth Settlement New Cairo Mobile: 01276749278 – Email:nihal.k.Othman@gmail.com Personal statement • Executive engineer with 6 yearsof experience in projects management,contacts, sourcing, cost analysis, procurement& process fields experienced in preparing tendering prepare and monitor BOM and cost control throughout the project life cycle. Very experienced in the Processes of different departments and Monitoring and control of KPI for all departments. Key Skills • AUTOCAD / SOLIDWORKS • Proficiency in all areas of Microsoft Office, including Access, Excel, Word and PowerPoint • Primavera P6 • PMP preparation Course Certified from“Canadian chamber of commerce” • Excellent communication skills, both written and verbal • Maximo • VB Employment History   Planning Engineer Ridgewood for water Desalination,Cairo, Egypt  (January 2011 – January 2012)  Main Tasks:- • Understand work scope, quantity • Conduct field scoping to clarify scope as required. • Understand WBS structure , and work with management and project/maintenance team in the development of work break down structure for progress measurement, scheduling ,cost estimating and project control. • Prepare and manage overall master schedule integrating work breakdown structure using Primavera P6 • Coordinate schedule from multiple contractors and/or teams and incorporate the information gathered into the overall project master schedule. • Prepare cost estimation and schedule bar chart plan considering all in puts (manpower, equipments and materials ) availability, production and construction sequences. • Develop work method of statement or procedure as required.
  • 2. • Understand and able to utilize planning tools such as MS excel, Access, MS Project, Primavera , Maximo • Develop and update resource (manpower and equipment) histogram weekly or monthly as required. • Evaluate allocation of resources and provide recommendations to maintain required progress. • Develop and implement plan versus actual and prepare reports and analyses deviations from plan. • Track, monitor and forecast progress of all activities and deliverable such as products, engineering documents, fabrication status and construction of all discipline. • Analyze gaps between the planned and actual progress and highlight the areas of concern which required action of the associate task member. • Present risk based analysis of most likely completion and expected deviation range. • Prepare and update three weeks look-ahead schedule that reflect the priority activities • Liaises with all team leaders and/or members to communicate required completion dates and interface between functional team/operational team and project team. • Participate all meeting ( i.e schedule review meeting , progress meeting, coordination meeting, constructability review meeting) Additional Tasks: • Analyze Company income statement and investigate deviation between actual and plan • Monitor and control equipments standards of operation and investigate any deviation • Prepare Master plan for all equipments Preventive Maintenance and investigate implementation Deviation • Monitor and Control Quality Control processes are followed and implemented in the department Procurement and Contract Senior Engineer ,Ridgewood for water  Desalination, Cairo, Egypt  (January 2012 – June 2014)  Main Tasks:- • Obtain a correct understanding of the client’s requirements. • Prepare the Company’s quotation response in accordance with the established procedures for investigation, design, costing and presentation • To ensure that the documentation received for orders / enquiries is sufficiently informative/detailed to allow efficient processing of the work • To process orders in accordance with the established procedures for materials , bought out items, labour and site equipment • To maintain an accurate and complete file record of all calculations, Material Lists, costings, drawings ,correspendance and purchase orders using software such as primavera ,Maximo , and I developed a database using access that can track all documents and reports for missing documents
  • 3. • To attend Pre-quote/Pre-installation surveys/meetings • To prepare and accurate construction for production control • To prepare full and accurate manufacturing drawings detailed for production (workshop drawings) • Source and procure all bought out/non stock items relevant to the contract in a cost effective manner. • To source and procure the necessary site equipment to enable installation to be carried out in a safe and efficient manner. • To program work load to ensure that all resources arrive on site as scheduled and thereby allow the installation to be completed as cost effectively as possible. • To liaise with the client regarding deliveries of materials and the installation of the program • Seek client’s / Supplier agreement on payment methods and payement facility in case of supplier. Executive project engineer, Ridgewood for water Desalination, Cairo,  Egypt  (June 2014 – present)    Main Tasks:- • Same tasks as previous title with addition of the following tasks Planning Phase Organizing Monitoring And Control • Define the project objective. • Gain agreement from the customer. • Identify and gain support of stakeholders. • Develop a statement of work. • Create and communicate a vision to the team • Oversee development of a plan to meet the objective. • Set up a project management information system. • Assess risks and develop contingency plans • Obtain resources to perform work. (Human and Non-HumanNeed Resources) • Create an environment which highly motivates the team to work together • Develop and deliver key documents. • Maintain documents associated with project in an organized manner • Implement the project management information system • Provide ongoing management and motivation. • Monitor progress. • Manage a change control process. • Develop corrective actions when necessary. • Communicate with sponsors and stakeholders. • Hand Project off and Project closure process • Provide management with accurate data and send them weekly reports or / as agreed in the initiation phase
  • 4. Sample of Projects and tender Submitted: - • SIDC 10000m3/d plant • GUPCO Tender and Bid Preparation and project design for40000m3/d and Construction • More than 100 technical offer submitted Achievements: - • Implementing New program using Access & VB to monitor and control KPI for the company • Implementing new project process according to the PMO • Changing with all departments their processes according to ISO 9001 • Attending All External Audits Education Ain Shams University/Faculty of Engineering  (September 2005 – June 2010) • Major:Mechatronics Department St.Joseph de l’apparition – Abbasseyah   (September 1991–June 2005) • Thanaweya Amma PMP Preparation course and preparing to attend the exam   Languages • Arabic: Mother Tongue • French: Fluent DELF certificate acquired • English : Fluent Trainings • Piping Design Audi petroleum company - August 2007 • Solid Works (Jan2015-March 2015) • Pumping & Motors Design & manufacturing Process at Grundfos Hungray and Denmark– Nov.2014 • Primavera Jan2014