SlideShare a Scribd company logo
HANY METWALLY MOHAMED
N O . 3 7 , M U S T A F A E L - S A W Y S T , H E L W A N , C A I R O , E G Y P T • C O D E 1 1 4 2 1
• + 2 0 1 2 2 2 4 2 4 8 8 8 • h a n y . m e t w a l l y @ h o t m a i l . c o . u k ,
 
1 | P a g e                                                            
 
 
Objective:
I’m seeking an opportunity to direct my experience through a position in Project Management
Field, where experience, mind orientation, engineering and management skills with a commitment
to work can effectively contribute to the global/Local successful operation of the organization and
to help myself grow further professionally and technically to fulfills my personal ambition and
enhances my knowledge.
Mini Professional Biography:
Through my career, I have been assigned to Long Term Mega projects in Oil and Gas Field,
as A Project Engineer, Planning Engineer, Deputy Project Manager in an Owner and Construction
Companies, Senior Planning and Cost Control Engineer with Consultant Company and Cost
Control Consultant for Construction Company.
I have Delivered Many training Sessions, workshops, implementation projects for different Back
ground Personnel/clients; International Project Management Consultancy Organization Such as
CMCS, Collaboration, Management & Control Solutions, Internal training in ECG, Engineering
Consultants Croup Company, Private Educational Centers In Cairo and Non for profit organization,
I have delivered a technical Training Courses Such As PRIMAVERA P6, Online Integration of
ERP system with Primavera and Human Development Courses to different background Personnel.
Educational background:
 B.Sc. Mechanical Engineering, May-2005.
 Faculty of engineering. HELWAN University.
 Diploma of an International Welding Engineer (IWE). March- 2008.
 The International institute of welding (IIW)
A diploma according to ISO 14731 (EN 719) and according to guidelines from The International
institute of welding (IIW) and the European Federation for Welding, Joining and Cutting (EWF).
Extra courses:
 “Extension of Time Request – Delay analysis” From CMCS Egypt, 20 to 28 October 2014. 
 “Certified Cost Professional CCP, Course Preparation” From Campus Academy, Egypt April – 
June 2014. 
 “Project Management Professional PMP, Course Preparation” From Brooklyn Academy, Egypt 
May‐August 2014.  
 “Managing Resources in Primavera P6 Professional Rel 8.1 “from Oracle PromaSatr Egypt.
On May 2013 
 “Managing Projects in Primavera P6 Professional Rel 8.1 “from Oracle PromaSatr Egypt. On
April 2013
 “ASME B31.3 Process Piping” from the American University in Cairo. From 15 to 20 May
2010.
 “ASME VIII DIVISION I Design & Fabrication Of Pressure Vessels” from The American
University In Cairo. From 04 to 10 October 2009.
 “International Welding Engineer (IWE)” from Central Metallurgical Research & Development
Institute (CMRDI) in Cairo. From 4/11/2007 – 16/2/2008 with S.N # IWE AT 0595.
 "Ultrasonic Testing level II" from Detection Welding & NDT Consulting Office according to
SNT-TC-1A, ACCP professional Level III (74268) on December 2nd 2010.
HANY METWALLY MOHAMED
N O . 3 7 , M U S T A F A E L - S A W Y S T , H E L W A N , C A I R O , E G Y P T • C O D E 1 1 4 2 1
• + 2 0 1 2 2 2 4 2 4 8 8 8 • h a n y . m e t w a l l y @ h o t m a i l . c o . u k ,
 
2 | P a g e                                                            
 
 
 "Radiograph Testing level II" from Detection Welding & NDT Consulting Office according to
SNT-TC-1A, ACCP professional Level III (74268) on November 25th 2010.
 "Liquid Penetrant Testing level II" from Detection Welding & NDT Consulting Office
according to SNT-TC-1A, ACCP professional Level III (74268) on November 18th 2010.
 "Applied Welding Technology” (Engineers) from Egyptian Welding Academy (EWA). From
24/7/2004 – 12/8/2004.
Experience summary:
FreeLancer Primavera P6 and Human Development trainer.
1- Orascom Construction Industry (OCI).
Planning Team Leader, ERC Refinery Project.
16 April 2015 till Now
Responsibilities: 
 Leading and Supervising the project planning & Strategy Team in providing overall planning
support for all the Divisions.
 Monitoring the whole project to effectively identify and report areas of concern for mitigating
actions within contract limits and ensure alignment within the other relevant Company and client
Stakeholders.
 Preparing the detailed construction schedules for Civil, Steel, Mechanical and Piping Activities.
 Preparing the resources plans such as Manpower (Direct/Indirect), Equipment mobilization plans
in details.
 Preparing the Cost Plans with reporting to the corporate financial department.
 Preparing the project organization chart with compliance to corporate policy & Client
requirements.
 Preparing the construction equipment maneuvering plans on the construction site especially
during the construction peak period.
 Attending all the site/Head office meetings either with the top management or the coordination
meeting with all disciplines (Civil/Mech./Steel/Piping) and advising for the progress, Impacts and
Corrective actions.
 Monitoring, following up the progress and reporting to Client and Corporate top management.
 Preparing and submitting the daily, weekly & Monthly reports.
 Tracking and Recording issues impacting time Delay and Idled Resources.
 Preparing Acceleration plans with front loaded histogram for the construction activities in order
to achieve the contractual completion date.
 Preparing Monthly reports which reflect the onsite progress and updated Time schedule.
HANY METWALLY MOHAMED
N O . 3 7 , M U S T A F A E L - S A W Y S T , H E L W A N , C A I R O , E G Y P T • C O D E 1 1 4 2 1
• + 2 0 1 2 2 2 4 2 4 8 8 8 • h a n y . m e t w a l l y @ h o t m a i l . c o . u k ,
 
3 | P a g e                                                            
 
 
2- ECG Engineering Consultants Group S.A.
Senior Planning and Cost Control Engineer.
01 June 2014 till 15 April 2015
Responsibilities: 
 Preparing the design and tentative time schedules during the proposal phase.
 Updating, during the mobilization phase of the project, the originally prepared milestones
schedule in the proposal phase. Issues the revised milestone schedule after approval by the
Project Manager, to all key personnel of the project.
 Identifying with the assistance of the Project Manager the constraints between the different
project disciplines and the sequence/timing of tasks for fulfillment of the time schedule of the
project.
 Issuing the final form of the time schedule -baseline schedule “REV 0”-to the Project Manager.
 Ensuring issuance of PM Budget to all active projects /additions.
 Reviewing of the assigned budgeted hours and resource assignments to ensure proper resource
allocation for projects/ additions tasks.
 Updating the time schedule on bi-weekly bases reflecting the actual project status (dates,
percentage completion and actual man-hours consumption).
 Planning and initiating corrective actions and Reviewing schedule progress reports.
 Ensuring proper loading of actual hours, and to be in conformity with related progress of work.
 Maintain rectifying any information in Data Base (for example: relocated persons, multidiscipline
assignments, etc.).
 Expedite PM’s to apply any required corrective actions.
 Informing the Project Manager for any deviation from budget man-hours or scheduled time,
makes necessary schedules and resources allocation adjustments.
 Developing during the construction phase, the detailed field schedules in conjunction with the
Construction Manager.
 Reviewing contractors’ schedules and follow it up periodically.
 Preparing evaluation reports for bidder’s proposed time schedules based on conformity with
tender requirements.
 Analyzing and evaluating contractors’ claims, prepares recommendations concerning
justified/excusable time extensions, as the case may be.
2- SHABAKAT Natural Gas a subsidiary NATGAS (National Gas Company)
Senior Project Controls Engineer
June 2010 until May 2014
Responsibilities: 
 Initiating a preliminary Schedule time for projects based on the scope of work, start and due
dates.
 Assisting in the preparation of Project Execution Plan (PEP).
 Assisting in preparation of project’s Quality Control Manual and maintenance of project control
policies and procedures.
 Preparing master project schedule and maintain baseline based on the scope of work and
contractual requirements through Primavera P6.
HANY METWALLY MOHAMED
N O . 3 7 , M U S T A F A E L - S A W Y S T , H E L W A N , C A I R O , E G Y P T • C O D E 1 1 4 2 1
• + 2 0 1 2 2 2 4 2 4 8 8 8 • h a n y . m e t w a l l y @ h o t m a i l . c o . u k ,
 
4 | P a g e                                                            
 
 
 Responsible for ensuring that construction projects are completed within set deadlines, on budget,
and in line with all the relevant safety standards and regulations.
 Attending weekly meetings with managers and other engineers to discuss the progress made and
any issues that may arise over the course of the project, make decisions related to logistics and
resources, and collect all the information necessary for planning. Whenever possible.
 Interface with responsible project personnel to obtain periodic status updates of budget. Progress,
forecasts, schedule and issues.
 Consider the costs and possibilities of reducing them without compromising quality or safety.
 Preparing project “S” curves based on approved way percentage / man hours.
 Manpower loading to the schedule and preparation of manpower and equipment histogram.
Project Engineer
June 2008 until May 2010
Responsibilities: 
 Reviewing contracts, scope of works and Shop drawings revision.
 Assisting in establishing project’s Quality Control Manual and technical package preparation for
procurement in existing projects.
 Coordinating the project design, engineering deliverables, engineering activities and ensures the
corresponding design documentation complies with the Quality Procedures per Client and
Company specifications.
 Coordinating the management of engineering sub consultants, and with sub-contractors.
 Coordinating project Technical Risk Assessments.
 Managing the technical documentation to procurement, construction, and regulatory agencies (for
obtaining necessary Permits for the project).
 Interfacing with responsible project personnel to obtain periodic status updates of budget.
Progress, forecasts, schedule and issues.
 Working to determine the best ways to move materials, machinery and equipment between
locations, and coordinate all the resources with ensuring that Safety Practices are implemented.
 Interacting with discipline leads and/or discipline engineers to ensure compliance with project
objectives.
 Preparing weekly progress reports, project procedures, project meeting minutes.
Related projects and clients
 El-ATTF power station pipeline project (70 bars – 16”) NATGAS. EPC Project.
 70 BARG Pressure Reduction Stations, Pietro Fiorintini,” Many Projects of piping systems”.
 70 BARG Pressure Reduction Stations, Metano Impianti,” Many Projects of piping systems”.
 70-10 BARG Gas Regulators, Bryan Donkin RMG,” Many Projects of piping systems”. EPC projects.
 70-10 BARG Gas Regulators, El-FAYOUM Gas Company” Many Projects of piping systems”. EPC
Projects.
 70 BARG PRMS’s, AKFEL MϋHENDISLIK,” Many Projects of piping systems”.
 70-10 BARG Gas Regulators, NATGAS CO,” Many Projects of piping systems”. EPC projects.
 EXTENSION OF ELAB STORAGE TANKS 10,000 radial inch piping system PETROMAINT Co and
ELAB “Egyptian Linear Alkyl Benzene Co”.
 SULFOLANE and HYDROCARBON Pressure vessels. PETROMAINT Co. EPC projects.
HANY METWALLY MOHAMED
N O . 3 7 , M U S T A F A E L - S A W Y S T , H E L W A N , C A I R O , E G Y P T • C O D E 1 1 4 2 1
• + 2 0 1 2 2 2 4 2 4 8 8 8 • h a n y . m e t w a l l y @ h o t m a i l . c o . u k ,
 
5 | P a g e                                                            
 
 
2- April 2008 till June 2008 DSD Ferrometalco (DSD)
Welding Engineer
Responsibilities: 
 Establishing and applying WPS for different projects in different Welding Process (SMAW –
SAW-MIG-MAG), PQR and testing welding personnel for certification.
 Establishing welding maps and welding book for existing projects and welding procedures to
guide production and welding personnel relating to specification restrictions, material processes,
pre- and post-heating requirements which involve use of complex alloys.
 Directing technical personnel in performing inspections to ensure workers' compliance with
established welding procedures, restrictions, and standards; in testing welds for conformance with
national code requirements.
 Preparing technical reports as result of research, development and preventive maintenance
investigations.
 Evaluating new developments in welding field for possible application to current welding
problems or production processes.
 Directing and supervising static equipment’s Installation in site.
 Directing and supervising technical NDE and Quality control personnel in performing
inspections.
 Preparing and reviewing technical reports for all NDE works.
 Interpreting welding “x-ray and gamma Ray “RT films and preparing all required reports.
Related projects
 ANSALDO CALDAIE EL-TEBBIN THERMAL POWER PLANT “piping and steel structure”.
 ORASCOM construction industries Syria Cement Factory “steel Structure”.
 ALSTOM Power inc, GRAIN HRSG's, AGHADA HRSG, Drum Saddle Support Beams for
AGIOS NIKOLAOS CCPP.
3- December 2006 till October 2007. (ECT) sub-contractor to KHALDA Petroleum Company.
Project Engineer
Responsibilities: 
 Assisting in preparation of project’s documentations.
 Assisting in Projects estimation.
 Preparing Shop drawings revision.
 Issuing Invoices according to contract’s scope of works.
 Reviewing Welding procedures specifications WPS and welding books as per required.
 Follow up for Fabrication, sandblasting, painting and installation of steel works.
 Applying Visual inspection.
 Assistant in projects’ estimation.
 Assistant in technical package preparation for existing projects.
 Shop drawings revision.
 Preparing reports for maintenance works.
Related projects
 Steel structures in oil and gas plants.” Continuous Projects”. EPC projects.
 Steel facilities in oil and Gas fields.” Continuous Projects”. EPC projects. 
 
 
 
 
HANY METWALLY MOHAMED
N O . 3 7 , M U S T A F A E L - S A W Y S T , H E L W A N , C A I R O , E G Y P T • C O D E 1 1 4 2 1
• + 2 0 1 2 2 2 4 2 4 8 8 8 • h a n y . m e t w a l l y @ h o t m a i l . c o . u k ,
 
6 | P a g e                                                            
 
 
Professional Membership:
 European Federation for Welding, Joining and Cutting (EWF) member ID # AT06090066.
 Egyptian Engineers syndicate Member, member ID # 48/05251
Skills:
Software Skills:
 Primavera P6 REL 7, 8.1 and MS projects. 
 Very good command of design programs; AutoCAD 2010 & 2011 releases. 
 Excellent command Win 7 operating systems. 
 Very good command of MS Office 2010 (Word, Excel & PowerPoint and Outlook). 
 Good surfing skills on the Internet. 
 
Personal Skills:
 Emotional Intelligence session ‐ 8 Hours 
 DISC Profile session ‐ 4 Hours 
 Negotiation skills session ‐ 4 Hours. 
 Time management session ‐ 4 hours. 
 Presentation skills session ‐ 4 hours. 
 Business communications skills ‐ 4 Hours. 
 Communication Skills Session ‐ 4 hours. 
 Marketing Online session ‐ 4 hours 
Language:
 Very Good command of English both written and spoken.
 Native speaker of Arabic (mother tongue).
Personal Information:
 
Marital Status:  Married
Citizenship:  Egyptian
Date of Birth:       1/3/1981
Military status:  Completed.
Passport:  Valid.
Drive license:  Valid (Egypt)
Permanent Home
Location: 
Cairo –Egypt
References Furnished upon request

More Related Content

What's hot

Planning and Scheduling Construction Projects using Primavera Software A Case...
Planning and Scheduling Construction Projects using Primavera Software A Case...Planning and Scheduling Construction Projects using Primavera Software A Case...
Planning and Scheduling Construction Projects using Primavera Software A Case...
ijtsrd
 
Resume Raza Baloch
Resume Raza BalochResume Raza Baloch
Resume Raza BalochRaza Baloch
 
Vince Winkler CV (Mar 16)
Vince Winkler CV (Mar 16)Vince Winkler CV (Mar 16)
Vince Winkler CV (Mar 16)Vincent Winkler
 
Engr ilyas cv new
Engr ilyas cv newEngr ilyas cv new
Engr ilyas cv new
Malik Ilyas KHATTAK
 
Royce_Brown Resume-82115
Royce_Brown Resume-82115Royce_Brown Resume-82115
Royce_Brown Resume-82115Royce Brown
 
KINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABDKINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABDKINGSLY AROKIAM
 
Planner's Resume
Planner's ResumePlanner's Resume
Planner's Resume
Tanveer Ahmed Niazi
 
Curriculum Vitae (B. Pancho)2015
Curriculum Vitae (B. Pancho)2015Curriculum Vitae (B. Pancho)2015
Curriculum Vitae (B. Pancho)2015Bernard Pancho
 
Tarek Gamil El Fergani_CV
Tarek Gamil El Fergani_CVTarek Gamil El Fergani_CV
Tarek Gamil El Fergani_CVTarek Fergani
 
Resume - Suzanne Pearce
Resume - Suzanne PearceResume - Suzanne Pearce
Resume - Suzanne PearceSuzanne Pearce
 
Mechanical Engineer History
Mechanical Engineer HistoryMechanical Engineer History
Mechanical Engineer HistoryMohamed Talkhan
 
Vineet Sharma-CV.DOCX
Vineet Sharma-CV.DOCXVineet Sharma-CV.DOCX
Vineet Sharma-CV.DOCXVineet Sharma
 

What's hot (20)

ALAA Y ABUGHAIDAH
ALAA Y ABUGHAIDAHALAA Y ABUGHAIDAH
ALAA Y ABUGHAIDAH
 
Mahesh - Resume (3)
Mahesh -   Resume (3)Mahesh -   Resume (3)
Mahesh - Resume (3)
 
Planning and Scheduling Construction Projects using Primavera Software A Case...
Planning and Scheduling Construction Projects using Primavera Software A Case...Planning and Scheduling Construction Projects using Primavera Software A Case...
Planning and Scheduling Construction Projects using Primavera Software A Case...
 
Sachin parab
Sachin parabSachin parab
Sachin parab
 
Peter Khalil CV
Peter Khalil CVPeter Khalil CV
Peter Khalil CV
 
Resume Raza Baloch
Resume Raza BalochResume Raza Baloch
Resume Raza Baloch
 
Cv's Nitinai_Ratchawat
Cv's Nitinai_RatchawatCv's Nitinai_Ratchawat
Cv's Nitinai_Ratchawat
 
Nawaz Eng-OCT
Nawaz Eng-OCTNawaz Eng-OCT
Nawaz Eng-OCT
 
Vince Winkler CV (Mar 16)
Vince Winkler CV (Mar 16)Vince Winkler CV (Mar 16)
Vince Winkler CV (Mar 16)
 
Engr ilyas cv new
Engr ilyas cv newEngr ilyas cv new
Engr ilyas cv new
 
Royce_Brown Resume-82115
Royce_Brown Resume-82115Royce_Brown Resume-82115
Royce_Brown Resume-82115
 
KINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABDKINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABD
 
Planner's Resume
Planner's ResumePlanner's Resume
Planner's Resume
 
Resume - Kamarudheen Parayirikkal
Resume - Kamarudheen ParayirikkalResume - Kamarudheen Parayirikkal
Resume - Kamarudheen Parayirikkal
 
Curriculum Vitae (B. Pancho)2015
Curriculum Vitae (B. Pancho)2015Curriculum Vitae (B. Pancho)2015
Curriculum Vitae (B. Pancho)2015
 
Tarek Gamil El Fergani_CV
Tarek Gamil El Fergani_CVTarek Gamil El Fergani_CV
Tarek Gamil El Fergani_CV
 
Resume - Suzanne Pearce
Resume - Suzanne PearceResume - Suzanne Pearce
Resume - Suzanne Pearce
 
Mechanical Engineer History
Mechanical Engineer HistoryMechanical Engineer History
Mechanical Engineer History
 
Gerry_Garciano_resume
Gerry_Garciano_resumeGerry_Garciano_resume
Gerry_Garciano_resume
 
Vineet Sharma-CV.DOCX
Vineet Sharma-CV.DOCXVineet Sharma-CV.DOCX
Vineet Sharma-CV.DOCX
 

Similar to Primavera trainer

Mahmoud Makram-Planning Engineeer-CV
Mahmoud Makram-Planning Engineeer-CVMahmoud Makram-Planning Engineeer-CV
Mahmoud Makram-Planning Engineeer-CVMahmoud Makram
 
kiran Planning sche engineer CV
kiran Planning sche engineer CVkiran Planning sche engineer CV
kiran Planning sche engineer CVkiran kumar Reddy
 
Peter White CV - Latest
Peter White CV - LatestPeter White CV - Latest
Peter White CV - LatestPeter White
 
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015ramiz reyad
 
Vocational training report l&t
Vocational training report l&tVocational training report l&t
Vocational training report l&t
Nishant Pandey
 
Haythem jamli candidature cv
Haythem jamli   candidature cvHaythem jamli   candidature cv
Haythem jamli candidature cv
jamli haythem
 
Nunn Internship Summary - 2015
Nunn Internship Summary - 2015Nunn Internship Summary - 2015
Nunn Internship Summary - 2015Jim Whittaker
 
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.pptCONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
pisal3
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Mostafa Sayed
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2mahmood mansor
 
Belal Khalid Alrwadieh-25 Oct 2016
Belal Khalid Alrwadieh-25 Oct 2016Belal Khalid Alrwadieh-25 Oct 2016
Belal Khalid Alrwadieh-25 Oct 2016belal alrwadieh
 
Shehreyar planning & Costing Engr
Shehreyar planning & Costing EngrShehreyar planning & Costing Engr
Shehreyar planning & Costing EngrShehreyar Khan
 
Project Planning and Scheduling
Project Planning and SchedulingProject Planning and Scheduling
Project Planning and Scheduling
ijtsrd
 
76 s201905
76 s20190576 s201905
76 s201905
IJRAT
 
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEERResume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEERAbd~el Hakim mohamed izran
 

Similar to Primavera trainer (20)

Mahmoud Makram-Planning Engineeer-CV
Mahmoud Makram-Planning Engineeer-CVMahmoud Makram-Planning Engineeer-CV
Mahmoud Makram-Planning Engineeer-CV
 
Henry CV
Henry CVHenry CV
Henry CV
 
Peter White CV
Peter White CV Peter White CV
Peter White CV
 
CV _Rajasekhar- Project Management
CV _Rajasekhar- Project ManagementCV _Rajasekhar- Project Management
CV _Rajasekhar- Project Management
 
kiran Planning sche engineer CV
kiran Planning sche engineer CVkiran Planning sche engineer CV
kiran Planning sche engineer CV
 
Peter White CV - Latest
Peter White CV - LatestPeter White CV - Latest
Peter White CV - Latest
 
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
 
Vocational training report l&t
Vocational training report l&tVocational training report l&t
Vocational training report l&t
 
Haythem jamli candidature cv
Haythem jamli   candidature cvHaythem jamli   candidature cv
Haythem jamli candidature cv
 
Nunn Internship Summary - 2015
Nunn Internship Summary - 2015Nunn Internship Summary - 2015
Nunn Internship Summary - 2015
 
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.pptCONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2
 
Belal Khalid Alrwadieh-25 Oct 2016
Belal Khalid Alrwadieh-25 Oct 2016Belal Khalid Alrwadieh-25 Oct 2016
Belal Khalid Alrwadieh-25 Oct 2016
 
Shehreyar planning & Costing Engr
Shehreyar planning & Costing EngrShehreyar planning & Costing Engr
Shehreyar planning & Costing Engr
 
OPRITESCU ValentinCV (2)
OPRITESCU ValentinCV (2)OPRITESCU ValentinCV (2)
OPRITESCU ValentinCV (2)
 
Project Planning and Scheduling
Project Planning and SchedulingProject Planning and Scheduling
Project Planning and Scheduling
 
76 s201905
76 s20190576 s201905
76 s201905
 
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEERResume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
 
C.V
C.VC.V
C.V
 

Primavera trainer

  • 1. HANY METWALLY MOHAMED N O . 3 7 , M U S T A F A E L - S A W Y S T , H E L W A N , C A I R O , E G Y P T • C O D E 1 1 4 2 1 • + 2 0 1 2 2 2 4 2 4 8 8 8 • h a n y . m e t w a l l y @ h o t m a i l . c o . u k ,   1 | P a g e                                                                 Objective: I’m seeking an opportunity to direct my experience through a position in Project Management Field, where experience, mind orientation, engineering and management skills with a commitment to work can effectively contribute to the global/Local successful operation of the organization and to help myself grow further professionally and technically to fulfills my personal ambition and enhances my knowledge. Mini Professional Biography: Through my career, I have been assigned to Long Term Mega projects in Oil and Gas Field, as A Project Engineer, Planning Engineer, Deputy Project Manager in an Owner and Construction Companies, Senior Planning and Cost Control Engineer with Consultant Company and Cost Control Consultant for Construction Company. I have Delivered Many training Sessions, workshops, implementation projects for different Back ground Personnel/clients; International Project Management Consultancy Organization Such as CMCS, Collaboration, Management & Control Solutions, Internal training in ECG, Engineering Consultants Croup Company, Private Educational Centers In Cairo and Non for profit organization, I have delivered a technical Training Courses Such As PRIMAVERA P6, Online Integration of ERP system with Primavera and Human Development Courses to different background Personnel. Educational background:  B.Sc. Mechanical Engineering, May-2005.  Faculty of engineering. HELWAN University.  Diploma of an International Welding Engineer (IWE). March- 2008.  The International institute of welding (IIW) A diploma according to ISO 14731 (EN 719) and according to guidelines from The International institute of welding (IIW) and the European Federation for Welding, Joining and Cutting (EWF). Extra courses:  “Extension of Time Request – Delay analysis” From CMCS Egypt, 20 to 28 October 2014.   “Certified Cost Professional CCP, Course Preparation” From Campus Academy, Egypt April –  June 2014.   “Project Management Professional PMP, Course Preparation” From Brooklyn Academy, Egypt  May‐August 2014.    “Managing Resources in Primavera P6 Professional Rel 8.1 “from Oracle PromaSatr Egypt. On May 2013   “Managing Projects in Primavera P6 Professional Rel 8.1 “from Oracle PromaSatr Egypt. On April 2013  “ASME B31.3 Process Piping” from the American University in Cairo. From 15 to 20 May 2010.  “ASME VIII DIVISION I Design & Fabrication Of Pressure Vessels” from The American University In Cairo. From 04 to 10 October 2009.  “International Welding Engineer (IWE)” from Central Metallurgical Research & Development Institute (CMRDI) in Cairo. From 4/11/2007 – 16/2/2008 with S.N # IWE AT 0595.  "Ultrasonic Testing level II" from Detection Welding & NDT Consulting Office according to SNT-TC-1A, ACCP professional Level III (74268) on December 2nd 2010.
  • 2. HANY METWALLY MOHAMED N O . 3 7 , M U S T A F A E L - S A W Y S T , H E L W A N , C A I R O , E G Y P T • C O D E 1 1 4 2 1 • + 2 0 1 2 2 2 4 2 4 8 8 8 • h a n y . m e t w a l l y @ h o t m a i l . c o . u k ,   2 | P a g e                                                                  "Radiograph Testing level II" from Detection Welding & NDT Consulting Office according to SNT-TC-1A, ACCP professional Level III (74268) on November 25th 2010.  "Liquid Penetrant Testing level II" from Detection Welding & NDT Consulting Office according to SNT-TC-1A, ACCP professional Level III (74268) on November 18th 2010.  "Applied Welding Technology” (Engineers) from Egyptian Welding Academy (EWA). From 24/7/2004 – 12/8/2004. Experience summary: FreeLancer Primavera P6 and Human Development trainer. 1- Orascom Construction Industry (OCI). Planning Team Leader, ERC Refinery Project. 16 April 2015 till Now Responsibilities:   Leading and Supervising the project planning & Strategy Team in providing overall planning support for all the Divisions.  Monitoring the whole project to effectively identify and report areas of concern for mitigating actions within contract limits and ensure alignment within the other relevant Company and client Stakeholders.  Preparing the detailed construction schedules for Civil, Steel, Mechanical and Piping Activities.  Preparing the resources plans such as Manpower (Direct/Indirect), Equipment mobilization plans in details.  Preparing the Cost Plans with reporting to the corporate financial department.  Preparing the project organization chart with compliance to corporate policy & Client requirements.  Preparing the construction equipment maneuvering plans on the construction site especially during the construction peak period.  Attending all the site/Head office meetings either with the top management or the coordination meeting with all disciplines (Civil/Mech./Steel/Piping) and advising for the progress, Impacts and Corrective actions.  Monitoring, following up the progress and reporting to Client and Corporate top management.  Preparing and submitting the daily, weekly & Monthly reports.  Tracking and Recording issues impacting time Delay and Idled Resources.  Preparing Acceleration plans with front loaded histogram for the construction activities in order to achieve the contractual completion date.  Preparing Monthly reports which reflect the onsite progress and updated Time schedule.
  • 3. HANY METWALLY MOHAMED N O . 3 7 , M U S T A F A E L - S A W Y S T , H E L W A N , C A I R O , E G Y P T • C O D E 1 1 4 2 1 • + 2 0 1 2 2 2 4 2 4 8 8 8 • h a n y . m e t w a l l y @ h o t m a i l . c o . u k ,   3 | P a g e                                                                 2- ECG Engineering Consultants Group S.A. Senior Planning and Cost Control Engineer. 01 June 2014 till 15 April 2015 Responsibilities:   Preparing the design and tentative time schedules during the proposal phase.  Updating, during the mobilization phase of the project, the originally prepared milestones schedule in the proposal phase. Issues the revised milestone schedule after approval by the Project Manager, to all key personnel of the project.  Identifying with the assistance of the Project Manager the constraints between the different project disciplines and the sequence/timing of tasks for fulfillment of the time schedule of the project.  Issuing the final form of the time schedule -baseline schedule “REV 0”-to the Project Manager.  Ensuring issuance of PM Budget to all active projects /additions.  Reviewing of the assigned budgeted hours and resource assignments to ensure proper resource allocation for projects/ additions tasks.  Updating the time schedule on bi-weekly bases reflecting the actual project status (dates, percentage completion and actual man-hours consumption).  Planning and initiating corrective actions and Reviewing schedule progress reports.  Ensuring proper loading of actual hours, and to be in conformity with related progress of work.  Maintain rectifying any information in Data Base (for example: relocated persons, multidiscipline assignments, etc.).  Expedite PM’s to apply any required corrective actions.  Informing the Project Manager for any deviation from budget man-hours or scheduled time, makes necessary schedules and resources allocation adjustments.  Developing during the construction phase, the detailed field schedules in conjunction with the Construction Manager.  Reviewing contractors’ schedules and follow it up periodically.  Preparing evaluation reports for bidder’s proposed time schedules based on conformity with tender requirements.  Analyzing and evaluating contractors’ claims, prepares recommendations concerning justified/excusable time extensions, as the case may be. 2- SHABAKAT Natural Gas a subsidiary NATGAS (National Gas Company) Senior Project Controls Engineer June 2010 until May 2014 Responsibilities:   Initiating a preliminary Schedule time for projects based on the scope of work, start and due dates.  Assisting in the preparation of Project Execution Plan (PEP).  Assisting in preparation of project’s Quality Control Manual and maintenance of project control policies and procedures.  Preparing master project schedule and maintain baseline based on the scope of work and contractual requirements through Primavera P6.
  • 4. HANY METWALLY MOHAMED N O . 3 7 , M U S T A F A E L - S A W Y S T , H E L W A N , C A I R O , E G Y P T • C O D E 1 1 4 2 1 • + 2 0 1 2 2 2 4 2 4 8 8 8 • h a n y . m e t w a l l y @ h o t m a i l . c o . u k ,   4 | P a g e                                                                  Responsible for ensuring that construction projects are completed within set deadlines, on budget, and in line with all the relevant safety standards and regulations.  Attending weekly meetings with managers and other engineers to discuss the progress made and any issues that may arise over the course of the project, make decisions related to logistics and resources, and collect all the information necessary for planning. Whenever possible.  Interface with responsible project personnel to obtain periodic status updates of budget. Progress, forecasts, schedule and issues.  Consider the costs and possibilities of reducing them without compromising quality or safety.  Preparing project “S” curves based on approved way percentage / man hours.  Manpower loading to the schedule and preparation of manpower and equipment histogram. Project Engineer June 2008 until May 2010 Responsibilities:   Reviewing contracts, scope of works and Shop drawings revision.  Assisting in establishing project’s Quality Control Manual and technical package preparation for procurement in existing projects.  Coordinating the project design, engineering deliverables, engineering activities and ensures the corresponding design documentation complies with the Quality Procedures per Client and Company specifications.  Coordinating the management of engineering sub consultants, and with sub-contractors.  Coordinating project Technical Risk Assessments.  Managing the technical documentation to procurement, construction, and regulatory agencies (for obtaining necessary Permits for the project).  Interfacing with responsible project personnel to obtain periodic status updates of budget. Progress, forecasts, schedule and issues.  Working to determine the best ways to move materials, machinery and equipment between locations, and coordinate all the resources with ensuring that Safety Practices are implemented.  Interacting with discipline leads and/or discipline engineers to ensure compliance with project objectives.  Preparing weekly progress reports, project procedures, project meeting minutes. Related projects and clients  El-ATTF power station pipeline project (70 bars – 16”) NATGAS. EPC Project.  70 BARG Pressure Reduction Stations, Pietro Fiorintini,” Many Projects of piping systems”.  70 BARG Pressure Reduction Stations, Metano Impianti,” Many Projects of piping systems”.  70-10 BARG Gas Regulators, Bryan Donkin RMG,” Many Projects of piping systems”. EPC projects.  70-10 BARG Gas Regulators, El-FAYOUM Gas Company” Many Projects of piping systems”. EPC Projects.  70 BARG PRMS’s, AKFEL MϋHENDISLIK,” Many Projects of piping systems”.  70-10 BARG Gas Regulators, NATGAS CO,” Many Projects of piping systems”. EPC projects.  EXTENSION OF ELAB STORAGE TANKS 10,000 radial inch piping system PETROMAINT Co and ELAB “Egyptian Linear Alkyl Benzene Co”.  SULFOLANE and HYDROCARBON Pressure vessels. PETROMAINT Co. EPC projects.
  • 5. HANY METWALLY MOHAMED N O . 3 7 , M U S T A F A E L - S A W Y S T , H E L W A N , C A I R O , E G Y P T • C O D E 1 1 4 2 1 • + 2 0 1 2 2 2 4 2 4 8 8 8 • h a n y . m e t w a l l y @ h o t m a i l . c o . u k ,   5 | P a g e                                                                 2- April 2008 till June 2008 DSD Ferrometalco (DSD) Welding Engineer Responsibilities:   Establishing and applying WPS for different projects in different Welding Process (SMAW – SAW-MIG-MAG), PQR and testing welding personnel for certification.  Establishing welding maps and welding book for existing projects and welding procedures to guide production and welding personnel relating to specification restrictions, material processes, pre- and post-heating requirements which involve use of complex alloys.  Directing technical personnel in performing inspections to ensure workers' compliance with established welding procedures, restrictions, and standards; in testing welds for conformance with national code requirements.  Preparing technical reports as result of research, development and preventive maintenance investigations.  Evaluating new developments in welding field for possible application to current welding problems or production processes.  Directing and supervising static equipment’s Installation in site.  Directing and supervising technical NDE and Quality control personnel in performing inspections.  Preparing and reviewing technical reports for all NDE works.  Interpreting welding “x-ray and gamma Ray “RT films and preparing all required reports. Related projects  ANSALDO CALDAIE EL-TEBBIN THERMAL POWER PLANT “piping and steel structure”.  ORASCOM construction industries Syria Cement Factory “steel Structure”.  ALSTOM Power inc, GRAIN HRSG's, AGHADA HRSG, Drum Saddle Support Beams for AGIOS NIKOLAOS CCPP. 3- December 2006 till October 2007. (ECT) sub-contractor to KHALDA Petroleum Company. Project Engineer Responsibilities:   Assisting in preparation of project’s documentations.  Assisting in Projects estimation.  Preparing Shop drawings revision.  Issuing Invoices according to contract’s scope of works.  Reviewing Welding procedures specifications WPS and welding books as per required.  Follow up for Fabrication, sandblasting, painting and installation of steel works.  Applying Visual inspection.  Assistant in projects’ estimation.  Assistant in technical package preparation for existing projects.  Shop drawings revision.  Preparing reports for maintenance works. Related projects  Steel structures in oil and gas plants.” Continuous Projects”. EPC projects.  Steel facilities in oil and Gas fields.” Continuous Projects”. EPC projects.         
  • 6. HANY METWALLY MOHAMED N O . 3 7 , M U S T A F A E L - S A W Y S T , H E L W A N , C A I R O , E G Y P T • C O D E 1 1 4 2 1 • + 2 0 1 2 2 2 4 2 4 8 8 8 • h a n y . m e t w a l l y @ h o t m a i l . c o . u k ,   6 | P a g e                                                                 Professional Membership:  European Federation for Welding, Joining and Cutting (EWF) member ID # AT06090066.  Egyptian Engineers syndicate Member, member ID # 48/05251 Skills: Software Skills:  Primavera P6 REL 7, 8.1 and MS projects.   Very good command of design programs; AutoCAD 2010 & 2011 releases.   Excellent command Win 7 operating systems.   Very good command of MS Office 2010 (Word, Excel & PowerPoint and Outlook).   Good surfing skills on the Internet.    Personal Skills:  Emotional Intelligence session ‐ 8 Hours   DISC Profile session ‐ 4 Hours   Negotiation skills session ‐ 4 Hours.   Time management session ‐ 4 hours.   Presentation skills session ‐ 4 hours.   Business communications skills ‐ 4 Hours.   Communication Skills Session ‐ 4 hours.   Marketing Online session ‐ 4 hours  Language:  Very Good command of English both written and spoken.  Native speaker of Arabic (mother tongue). Personal Information:   Marital Status:  Married Citizenship:  Egyptian Date of Birth:       1/3/1981 Military status:  Completed. Passport:  Valid. Drive license:  Valid (Egypt) Permanent Home Location:  Cairo –Egypt References Furnished upon request