Company Designation Duration
Jumbo Electromech
Engineering,
Doha, Qatar.
Assistant Project Manager-MEP Jan 2015-Till Date (7 Months)
Senior Project Engineer Aug 2011-Dec 2014(3 Years 5 Months)
Project Engineer May 2009-July 2011(2 Years 3 Months)
Firepro Systems Pvt
Ltd. Bangalore, India.
Associate Engineer for Projects Sept 2008-Apr 2009 (7 Months)
ICP (India) Pvt Ltd.
Bangalore, India.
Project Engineer May 2007-Sep 2008 (1 Year 5 Months)
Professional Experience
Dedicated and strategic‐thinking professional with more than 8 years of experience in
multiple large‐scale projects simultaneously with a strong background in managing and
planning MEP Execution, Mechanical engineering management & supervision, and
Project management of Industrial , Commercial and Residential Buildings. Expertise in
execution of MEP functions in large projects like 5 Star hotels, Shopping malls, IT parks,
Corporate offices, High Rise Luxury Apartments, Hospitals, High rise complexes Etc.
Key Skills: Project Management, MEP Execution, Firefighting, HVAC, Plumbing,
Planning, Monitoring, Preparation of BOQ, Estimation, Sub Contracting, Preparation of
work Order, Decision Making, Budget, Manage Cash Flow, Build Relationships.
Assistant Project Manager-MEP, Jumbo Electromech Engineering, Doha -
Qatar. Jan 2015 – Till Date. Senior Project Engineer: Aug 2011 – Dec 2014 &
Project Engineer: May 2009 – July 2011.
 Responsible for the total administration of the project in line with procedures. Handles all
project communication with the clients and maintains project master files. Coordinate team
meetings, record and distribute minutes. Prepares all project reports required, internally and
externally.
 Assist the Project Management team in reporting to the client and in the management of
consultants and contractors. Liaise closely with the client at all times. Assist in developing
and maintaining good working relationships with development partners and funders to
achieve mutual goals.
 Manages Client and promote marketing thus raising the profile of the Company. Portrays
professional image to clients and responds positively to the needs of customers, supervisors
and colleagues. Aware of importance of marketing and raising company profile and where
possible contributes.
 Understand the scope of work, contract documents, including drawings, specifications,
design and contracts as well as regulatory requirements associated with the project.
 Assist in negotiating agreements and sub-contractor contracts. Reviewing and authorizing all
project Quotations, Invoices/expenses, submit for payment and other follow ups.
 Draft project schedules in Primavera in coordination with the site engineers and supervisors
and monitor the project in line with those schedules. Prepare work schedules and carrying
out resources planning and resource balancing. Maintaining schedules and accountability to
timeline. Optimizes the use of personnel to achieve the schedule. Forecasts and addresses
deviations to schedule.
 Manage key projects issues. Assist the Divisional Manager for the Project and Board
Meetings. Assist the processing of submittals, RFI’s, payment applications and document in
Primavera Contract Management software.
 Maintain a professional and courteous standard at all times. Motivated in work.
Demonstrates energy and enthusiasm. Actively seeks feedback to improve own
performance. Leads with Vision of the end goal and pragmatic decision-making.
 Monitor projects costs in line with the approved budget. Demonstrates cost consciousness;
Manage the value and cost data of the project to ensure the budgets are met. Assist in
developing project pro formats and detailed budgets and manage project costs. Assist in
developing and regularly (monthly) updating cash flow forecast/outlook through end of
projects.
 Liaising with mechanical, electrical engineers and other trades to ensure the correct works
have been included. Carry out site visits throughout the project in order to record
information on the progress of the project against the agreed approved schedule. Ensuring
quality standards and all health & safety requirements are adhered to. Compiling snag list and
ensuring all snags get completed.
 Expertise in conducting design reviews, estimating labor, establishing schedules, creating
contingency plans, provide technical direction to produce, engineer and maintaining budgets
throughout project stages.
 Closely worked in project cost estimating, Cost Budgeting, Preparing BOQ, BOM, materials
selection, quality assurance, transition planning, approval procurement and project close-out
documentation.
Project Highlights & Achievements:
 Handled complex projects such as high rise buildings of 2B+G+M+11 Merweb Hotel,
2B+G+M+14 Gloria Hotel, 2B+G+M+7 Residential & Commercial Building, 2B+G+M+5
Qatar Palace Hotel, 2B+G+7 Lazordi Hotel, 2 Private Palace projects, 2B+G+7 Rawdat Al
Khail Building, B+G+7 Building Al Liwan Residence, 151 Villa Project etc., and completed
successfully within given deadlines.
 Heading AMC Division. Holder of Urban Planning Certificate & Civil Defense Certificate.
 Attended Civil defense exhibition & Tower Tech Exhibition and represented the company.
Associate Engineer for Projects, Firepro Systems Pvt. Ltd, Bangalore.
Sep 2008 – April 2009
 Prepared specifications and designs for sprinkler systems. Formulated drawings and
specifications for deluge systems, alarm and fire detection systems, high and low pressure
CO2 systems, fire pumps, underground water supply systems, and deluge fire suppression
systems. Capability to design wet-pipes, system layouts, dry chemicals, foam systems, etc.
 Reviewed and submitted design reports (for fire-fighting systems) to the Fire Department in
order to obtain approval. Designed fire-fighting systems (piping and ventilation) according
to the NFPA code.
 Ability to manage water demand analysis and hydraulic calculations.
 Supervised and provided technical support for the inspection, testing and maintenance of
water based fire protection systems.
 Conducted testing of various fire protection systems and generated reports for approval and
hand over.
 Drafted technical specifications for fire and life safety and related equipment and systems.
Superior experience in fire protection engineering and fire detection, alarm and suppression
systems. Excellent grasp of NFPA and Life Safety codes.
 Remarkable experience in a fire, safety and occupational health and knowledge of liability
issues concerning life safety and fire protection systems.
Project Highlights & Achievements:
 Handled complex projects in site supervision such as high rise buildings Prestige
Shantiniketan, White Field, Manyata Tech Park, Bhagmane Tech Park etc.
 Participated in National level technical symposium on Mechanical Engineering.
Project Engineer, ICP (India) Pvt. Ltd, Bangalore. May 2007 – Sep 2008
 Responsible for production planning of daily production activities. Generating documents
such as general arrangement drawings, equipment layout for the different mechanical
equipments, FRP Drawing Layouts, isometrics, special support sketches, etc.
 Responsible for designing new products for various industries, i.e., Cladding of petrol pumps
such as HPCL, BPCL, IOCL and the FRP industry with detailed engineering specifications
using Auto CAD 2007 and Pro-E Wildfire 5.
 Respond to customer’s queries and problems to the customer's full satisfaction.
 Introduced new ideas optimizing and improving service processes, reduced costs and
maximized flexibilities.
 Work closely with suppliers analyzing and approving engineering changes, as well as
conducting extensive root cause analysis of service part problems proactively addressing
future issues to maximize savings.
 Helped to improve product and equipment designs as well as design and development
practices through the use of proven design tools and methods in CNC and Pultrusion
divisions.
 Responsible for the documentation of analysis, layouts, development and designing
including final engineering drawings.
 Responsible for Preparation of Bill of Quantity and Bill of Materials for Projects.
 Prepare engineering documents, and coordinate with customer, suppliers, and assembly
plants. Maintaining records and archives to company standards.
Project Highlights & Achievements:
 Handled projects for HPCL, BPCL & IOCL Petrol Pump Cladding works and FRP
Pultruded products having a wide range of industrial and commercial applications ranging
from Aerospace, Construction, Chemical, Electrical, Electronic & Transportation industries
etc.
Educational Synopsis
Examination
Discipline/
Specialization
School/College
Board/
University
Year of
Passing
M.B.A Financial Management Annamalai University
Annamalai
University
Pursuing
B.E Mechanical Engineering
A.V.C College of
Engineering
Anna
University
2007
H.S.C Science + Maths Stream
Nehru Mat. Hr. Sec.
School
State Board 2003
Matriculation Matriculation
Nehru Mat. Hr. Sec.
School
Matriculation 2000
Software Proficiency
 Languages : AutoCAD 2015, Pro-E wildfire 5, CATIA V5 R18,
ANSYS 10.0, C, Primavera P6, SAP ABAP.
 Operating Systems : Windows (98, XP, XP Vista, 7, 8)
 Tools : Microsoft Office
Project Details
The project was done for Modification of Die Design for improving the productivity of an
automobile Rubber Component. The name of the component is bellow used in air brake Booster
assembly in automobiles.
A modification has been proposed in the process of manufacturing of bellows by an
alternate process and the existing die design by using Solid works & Pro E software tools.
Finally it is concluded that this approach not only reduces the defects but also increases the
overall quality of the product and productivity of the company.
Training
Ventura Engineers are the manufacturers of Gear Box casing. For this they are using CNC
milling machine. During my stay, we were trained Production Planning and Scheduling and the
FANUC codes. During manufacturing Jigs and Fixtures were produced as prerequisites.
This guides the tool during the operation. Also during the training we were trained to check the
Dispatch list.
Personal Skills
 Highly self-motivated, Ambitious, Energetic and Enthusiastic person.
 Positive thinking, Confident and Everlasting zeal to learn new things.
 Organized, Efficient and Comprehensive problem solving abilities.
 Good verbal and written communication skills.
 Holder of Qatar Civil Defense & Urban Planning License.
Extracurricular Activities
 Served the people of the Tsunami (2004) hit villages in their rehabilitation.
 Member of Youth Red Cross, National Service Scheme.
 Regular blood donor.
Personal Details
Father’s Name : V. John Bosco
Mother’s Name : J. Prema Adaikalamary
Gender : Male
Date of Birth : 12th
December 1984
Marital Status : Married
Nationality : Indian
Passport Number : G3276692
Driving License : Qatar, Indian
Languages Known : English, Hindi & Tamil (Native Language).
Place: Doha. (J Henry Jayahar)

Henry CV

  • 1.
    J Henry Jayahar Doha- Qatar. E-mail : henryjayahar@yahoo.co.in Mobile : +974-33470321 Objective Intend to build a career with a progressive organization that gives scope to apply my knowledge, experience and skills which enables me to achieve to the highest of my abilities, and be a part of the team that dynamically works towards the growth of the organization. Work Synopsis Company Designation Duration Jumbo Electromech Engineering, Doha, Qatar. Assistant Project Manager-MEP Jan 2015-Till Date (7 Months) Senior Project Engineer Aug 2011-Dec 2014(3 Years 5 Months) Project Engineer May 2009-July 2011(2 Years 3 Months) Firepro Systems Pvt Ltd. Bangalore, India. Associate Engineer for Projects Sept 2008-Apr 2009 (7 Months) ICP (India) Pvt Ltd. Bangalore, India. Project Engineer May 2007-Sep 2008 (1 Year 5 Months) Professional Experience Dedicated and strategic‐thinking professional with more than 8 years of experience in multiple large‐scale projects simultaneously with a strong background in managing and planning MEP Execution, Mechanical engineering management & supervision, and Project management of Industrial , Commercial and Residential Buildings. Expertise in execution of MEP functions in large projects like 5 Star hotels, Shopping malls, IT parks, Corporate offices, High Rise Luxury Apartments, Hospitals, High rise complexes Etc. Key Skills: Project Management, MEP Execution, Firefighting, HVAC, Plumbing, Planning, Monitoring, Preparation of BOQ, Estimation, Sub Contracting, Preparation of work Order, Decision Making, Budget, Manage Cash Flow, Build Relationships. Assistant Project Manager-MEP, Jumbo Electromech Engineering, Doha - Qatar. Jan 2015 – Till Date. Senior Project Engineer: Aug 2011 – Dec 2014 & Project Engineer: May 2009 – July 2011.  Responsible for the total administration of the project in line with procedures. Handles all project communication with the clients and maintains project master files. Coordinate team meetings, record and distribute minutes. Prepares all project reports required, internally and externally.
  • 2.
     Assist theProject Management team in reporting to the client and in the management of consultants and contractors. Liaise closely with the client at all times. Assist in developing and maintaining good working relationships with development partners and funders to achieve mutual goals.  Manages Client and promote marketing thus raising the profile of the Company. Portrays professional image to clients and responds positively to the needs of customers, supervisors and colleagues. Aware of importance of marketing and raising company profile and where possible contributes.  Understand the scope of work, contract documents, including drawings, specifications, design and contracts as well as regulatory requirements associated with the project.  Assist in negotiating agreements and sub-contractor contracts. Reviewing and authorizing all project Quotations, Invoices/expenses, submit for payment and other follow ups.  Draft project schedules in Primavera in coordination with the site engineers and supervisors and monitor the project in line with those schedules. Prepare work schedules and carrying out resources planning and resource balancing. Maintaining schedules and accountability to timeline. Optimizes the use of personnel to achieve the schedule. Forecasts and addresses deviations to schedule.  Manage key projects issues. Assist the Divisional Manager for the Project and Board Meetings. Assist the processing of submittals, RFI’s, payment applications and document in Primavera Contract Management software.  Maintain a professional and courteous standard at all times. Motivated in work. Demonstrates energy and enthusiasm. Actively seeks feedback to improve own performance. Leads with Vision of the end goal and pragmatic decision-making.  Monitor projects costs in line with the approved budget. Demonstrates cost consciousness; Manage the value and cost data of the project to ensure the budgets are met. Assist in developing project pro formats and detailed budgets and manage project costs. Assist in developing and regularly (monthly) updating cash flow forecast/outlook through end of projects.  Liaising with mechanical, electrical engineers and other trades to ensure the correct works have been included. Carry out site visits throughout the project in order to record information on the progress of the project against the agreed approved schedule. Ensuring quality standards and all health & safety requirements are adhered to. Compiling snag list and ensuring all snags get completed.  Expertise in conducting design reviews, estimating labor, establishing schedules, creating contingency plans, provide technical direction to produce, engineer and maintaining budgets throughout project stages.  Closely worked in project cost estimating, Cost Budgeting, Preparing BOQ, BOM, materials selection, quality assurance, transition planning, approval procurement and project close-out documentation.
  • 3.
    Project Highlights &Achievements:  Handled complex projects such as high rise buildings of 2B+G+M+11 Merweb Hotel, 2B+G+M+14 Gloria Hotel, 2B+G+M+7 Residential & Commercial Building, 2B+G+M+5 Qatar Palace Hotel, 2B+G+7 Lazordi Hotel, 2 Private Palace projects, 2B+G+7 Rawdat Al Khail Building, B+G+7 Building Al Liwan Residence, 151 Villa Project etc., and completed successfully within given deadlines.  Heading AMC Division. Holder of Urban Planning Certificate & Civil Defense Certificate.  Attended Civil defense exhibition & Tower Tech Exhibition and represented the company. Associate Engineer for Projects, Firepro Systems Pvt. Ltd, Bangalore. Sep 2008 – April 2009  Prepared specifications and designs for sprinkler systems. Formulated drawings and specifications for deluge systems, alarm and fire detection systems, high and low pressure CO2 systems, fire pumps, underground water supply systems, and deluge fire suppression systems. Capability to design wet-pipes, system layouts, dry chemicals, foam systems, etc.  Reviewed and submitted design reports (for fire-fighting systems) to the Fire Department in order to obtain approval. Designed fire-fighting systems (piping and ventilation) according to the NFPA code.  Ability to manage water demand analysis and hydraulic calculations.  Supervised and provided technical support for the inspection, testing and maintenance of water based fire protection systems.  Conducted testing of various fire protection systems and generated reports for approval and hand over.  Drafted technical specifications for fire and life safety and related equipment and systems. Superior experience in fire protection engineering and fire detection, alarm and suppression systems. Excellent grasp of NFPA and Life Safety codes.  Remarkable experience in a fire, safety and occupational health and knowledge of liability issues concerning life safety and fire protection systems. Project Highlights & Achievements:  Handled complex projects in site supervision such as high rise buildings Prestige Shantiniketan, White Field, Manyata Tech Park, Bhagmane Tech Park etc.  Participated in National level technical symposium on Mechanical Engineering. Project Engineer, ICP (India) Pvt. Ltd, Bangalore. May 2007 – Sep 2008  Responsible for production planning of daily production activities. Generating documents such as general arrangement drawings, equipment layout for the different mechanical equipments, FRP Drawing Layouts, isometrics, special support sketches, etc.
  • 4.
     Responsible fordesigning new products for various industries, i.e., Cladding of petrol pumps such as HPCL, BPCL, IOCL and the FRP industry with detailed engineering specifications using Auto CAD 2007 and Pro-E Wildfire 5.  Respond to customer’s queries and problems to the customer's full satisfaction.  Introduced new ideas optimizing and improving service processes, reduced costs and maximized flexibilities.  Work closely with suppliers analyzing and approving engineering changes, as well as conducting extensive root cause analysis of service part problems proactively addressing future issues to maximize savings.  Helped to improve product and equipment designs as well as design and development practices through the use of proven design tools and methods in CNC and Pultrusion divisions.  Responsible for the documentation of analysis, layouts, development and designing including final engineering drawings.  Responsible for Preparation of Bill of Quantity and Bill of Materials for Projects.  Prepare engineering documents, and coordinate with customer, suppliers, and assembly plants. Maintaining records and archives to company standards. Project Highlights & Achievements:  Handled projects for HPCL, BPCL & IOCL Petrol Pump Cladding works and FRP Pultruded products having a wide range of industrial and commercial applications ranging from Aerospace, Construction, Chemical, Electrical, Electronic & Transportation industries etc. Educational Synopsis Examination Discipline/ Specialization School/College Board/ University Year of Passing M.B.A Financial Management Annamalai University Annamalai University Pursuing B.E Mechanical Engineering A.V.C College of Engineering Anna University 2007 H.S.C Science + Maths Stream Nehru Mat. Hr. Sec. School State Board 2003 Matriculation Matriculation Nehru Mat. Hr. Sec. School Matriculation 2000 Software Proficiency  Languages : AutoCAD 2015, Pro-E wildfire 5, CATIA V5 R18, ANSYS 10.0, C, Primavera P6, SAP ABAP.  Operating Systems : Windows (98, XP, XP Vista, 7, 8)  Tools : Microsoft Office
  • 5.
    Project Details The projectwas done for Modification of Die Design for improving the productivity of an automobile Rubber Component. The name of the component is bellow used in air brake Booster assembly in automobiles. A modification has been proposed in the process of manufacturing of bellows by an alternate process and the existing die design by using Solid works & Pro E software tools. Finally it is concluded that this approach not only reduces the defects but also increases the overall quality of the product and productivity of the company. Training Ventura Engineers are the manufacturers of Gear Box casing. For this they are using CNC milling machine. During my stay, we were trained Production Planning and Scheduling and the FANUC codes. During manufacturing Jigs and Fixtures were produced as prerequisites. This guides the tool during the operation. Also during the training we were trained to check the Dispatch list. Personal Skills  Highly self-motivated, Ambitious, Energetic and Enthusiastic person.  Positive thinking, Confident and Everlasting zeal to learn new things.  Organized, Efficient and Comprehensive problem solving abilities.  Good verbal and written communication skills.  Holder of Qatar Civil Defense & Urban Planning License. Extracurricular Activities  Served the people of the Tsunami (2004) hit villages in their rehabilitation.  Member of Youth Red Cross, National Service Scheme.  Regular blood donor. Personal Details Father’s Name : V. John Bosco Mother’s Name : J. Prema Adaikalamary Gender : Male Date of Birth : 12th December 1984 Marital Status : Married Nationality : Indian Passport Number : G3276692 Driving License : Qatar, Indian Languages Known : English, Hindi & Tamil (Native Language). Place: Doha. (J Henry Jayahar)