SlideShare a Scribd company logo
1 of 4
Download to read offline
CHERUKURI SHYAM SHANKAR
H.No.2-53/2
Chaitanyapuri
Dilsukhnagar
HYDERABAD – 500 060
Mobile: +91 95027 07214
+91 89850 20125
E-Mail: cherukurishankar@gmail.com
CAREER OBJECTIVE:
To seek a challenging position which encourages growth and leadership opportunities while utilizing
technical expertise, innovative abilities and interpersonal skills.
As a person I believe in hard work, honesty and a keen follower of teamwork. In Learning new things
and adapting to changing requirements as when required.
EDUCATION QUALIFICATION:
 Diploma in Mechanical Engineering (2000-03) from S.B.T.E.T (HYD) with 61%
 Computer Skills: MS OFFICE
WORK EXPERIENCE:
TOTAL EXPERINICE : 11 YEARS
A)Company : HyperionIT Pvt Ltd
Project : Reliance Refinery Industries Ltd
Role : Manager (Projects)
Duration : Aug 2011 To Till Date
Reporting Officer : Head Office (Managing Director)
Roles & Responsibilities:
To plan, direct ,supervise multidiscipline team and co-ordinate maintenance and shutdown carried out
in the Hydrogen, Aromatics, Polypropylene Captive Power Plant, Utility plants to complete in time,
efficiently, safely and within set budget
Maintenance
 Handled the entire project successfully single handedly. Act as a site based focal point for
activities carried out by the company
 Planning and Execution of Routine Maintenance, Preventive Maintenance, Breakdown
Maintenance, Proactive Maintenance & Corrective maintenance for rotary
 Ensure that bi-weekly safety audits are carried out in accordance with scheduled requirements
 Managing Client expectations by communicating regularly through daily/weekly meetings
 Scheduling, Monitoring, control and overall reporting of all activities at site
 Resource management & optimum utilization
 Allocation of work, conflict resolutions, organizing required permits, interactions with
operations and other sections and monitoring progress to ensure safe working in compliance
with company standards and procedures
 Quantification of materials (BOM/BOQ), progress measurement, procurement, tracking, Co-
ordination, Forecasting and trending for smooth progress of work to achieve the milestones and
targets
 Preparation of Daily reports and project closeout reports & send it to the head office
 Controlling the overall budget of the site by controlling the site expenses & monitoring the
billing to be received from the client
Shutdown Coordinator:
A. Update and publish shutdown project charts detailing planned/proposed shutdown work
across the site
B. Coordinate shutdown dates with Operations and Planning & Scheduling to avoid/minimize
overlap of such work between areas/businesses
C. Coordinate with Operations to ensure permit completion and equipment availability as
indicated in the integrated shutdown schedule
D. Review and co-ordinate the approval of HSE Standards and instructions
E. Preparation and control of shutdown budgets
F. Track material deliveries and develop contingency plans for critical items
G. Ensure the best use of all available labour resources using site approved and bargained
policies. Examples include:
a. Area personnel
b. Shift based personnel
c. Supplemental maintenance
d. Specialty service providers
H. Establish and lead regular maintenance/shutdown planning and status review meetings.
I. Conduct daily schedule review meetings with cross functional team during shutdown.
J. Ensure the optimum amount of work is executed using the resources available while
minimizing schedule changes
K. Shutdown execution, supervision progress monitoring
L. Preparation of Daily reports and project closeout reports
M. Post shutdown demobilization activities, including material return, wrap up reports & duties
as directed by COMPANY
B)Company : Ind-Barath Power Infra Ltd
Project : Ind-Barath Thermal Power Ltd. (2X150 MW)
Role : Sr.Engineer
Duration : Jan 2010 To Jul 2011
Reporting Officer : Vice President (Projects)
Description Of Boiler : CFBC Boiler With 480TPH,140Kg/Cm2 Operating Pressure.
Roles & Responsibilities:
 Inspection of raw material for structure for Boiler
 Erection and Alignment of structure for Boiler
 Inspection of raw material for structure for STG
 Erection and Alignment of structure for STG
 Qualification Test for Welder as per IBR Standards
 Monitoring the welder’s quality performance, reduce the repair percentage in the job
 Project Execution involving Drawing Review, Documentation, Inspection, Man Management and
Co ordinating site erection actives.
 Handling the work as per schedule and conducting review meeting with contractors
 Motivating the team members to achieve the desired targets
 Report preparation for day to day site progress for each work front and generate work. Month
wise progress report
C)Company : Satya Surya Aluminium Industries Ltd, Hyderabad
Client : Nagarjuna Constructions Company Ltd.
Project : Mega Sports Complex, Ranchi.
Cost of the project : Rs.6.50 crores
Role : Site In-Charge
Duration : Oct 2008 to Dec 2009
Reporting Officer : Managing Director
Roles & Responsibilities:
 Handled the entire project successfully single handedly
 Responsible for local purchases on competitive pricing by obtaining and evaluating the offers
 To prepare RA bills
 To Follow up bills & timely payments
 To get the approvals of drawings and documents from the Clients
 To Plan the Fabrication of Pylon Columns & Towers according to the front availability in the
Erection of Columns & Towers
 To prepare and submit Material and erection bills
 To prepare B.O.Q from drawings and submit the men and material requirements to the client
and follow up for timely completion
 To analyze and solve the on-site problems for timely completion of the project.
 To conduct periodical reviews of the project implementation.
D)Company : Systems Tek India Pvt. Ltd.
Summary : Handled 2 Projects IHHR & Pantaloon
Client : IHHR
Project : ISTA Hotel, Hyderabad
Cost of the project : Rs.2.00 crores
Role : Site Engineer
Duration : Feb 2007 to Sept 2008
Reporting Officer : Project Manager
Roles & Responsibilities:
 Solely responsible for the execution of the work within the time frame
 Responsible for local purchases on competitive pricing by obtaining and evaluating the offers
 To mobilize Man Power, Material & Equipments for the Project
 To prepare and submit Material and erection bills
 To prepare B.O.Q from drawings and submit the men and material requirements to the client
and follow up for timely completion
 To assist my Junior Engineers and Supervisors to work with more efficiency
 To analyze and solve the on-site problems for timely completion of the project.
 To conduct internal periodical reviews of the project implementation
 To attend weekly review meetings with the clients to solve the issues raise during execution of
the work
 To prepare the schedules for the completion of the project in the stipulated Period
 To Maintain the Project Cost Value. And Reduce the Expenditure and decreases the Over Heads
Client : Pantaloon
Project : BIG BAZAAR
Cost of the project : Rs.70.00 lakhs
Roles & Responsibilities:
 To prepare BOQ & Drawings for approval by the clients
 To assist my Junior Engineers and Supervisors to work with more efficiency
 To prepare bar chart of project implementation
 To prepare requirement to completion of the project within the stipulated time schedule
 To monitor the mass production of ms pipe with respect to QUALITY & QUANTITY
 To solve the critical point in the drawing with the client
 To maintain the project estimation & project Execution
D)Company : Gokul Krishna Construction Pvt Ltd.
Client : IVRCL, NAVAYUGA, and SEW
Project : SRI PADHA RAO PROJECT, KARIMNAGAR
Cost of the project : Rs.250.00 crores
Nature of work : MS Plate fabrication for the irrigation project.
Role : Jr.Engineer
Duration : Jan 2004 to Jan 2007
Report Officer : Project Manager
Roles & Responsibilities:
 To inspect the MS Plates before Fabrication.
 To plan MS Plates Cutting for the Fabrication of Shells and MS Pipes
 To over-view MS Pipe Fit up Shell to Shell rolling and Fit up stage-wise inspections
 To check and pass fabricated MS Shells and Pipes to conform to the quality norms
 To arrange Final Stage Inspection of Fabricated MS Pipes and Shells Clients and government
officials
STRENGHTS:
 Unique ability to learn any new technology within a short notice and can produce results
 Responsibility & reliability to work in, and an understanding of team environment
 Honesty, integrity and personal ethics with a continual desire to learn and expand horizons and
the ability to work without supervision
 Self-Confidence.
PERSONAL INFORMATION:
 Name : Ch. Shyam Shankar
 Father’s Name : Sri Ch.Suryanarayana
 Date of Birth : 17th August, 1980
 Marital Status : Married
 Languages Known : English, Hindi, Tamil & Telugu
CH. SHYAM SHANKAR

More Related Content

What's hot (19)

RAMESH_Resume
RAMESH_ResumeRAMESH_Resume
RAMESH_Resume
 
CV Abdul Gaffer.docx revised (3)
CV Abdul Gaffer.docx revised (3)CV Abdul Gaffer.docx revised (3)
CV Abdul Gaffer.docx revised (3)
 
Mahesh - Resume (3)
Mahesh -   Resume (3)Mahesh -   Resume (3)
Mahesh - Resume (3)
 
Sayantan resume
Sayantan resumeSayantan resume
Sayantan resume
 
Mantena Neeladri varma_original
Mantena Neeladri varma_originalMantena Neeladri varma_original
Mantena Neeladri varma_original
 
Jahangir.Contractor
Jahangir.ContractorJahangir.Contractor
Jahangir.Contractor
 
My new resume- Copy (1) (3) - Copy
My new resume- Copy (1) (3) - CopyMy new resume- Copy (1) (3) - Copy
My new resume- Copy (1) (3) - Copy
 
avinash chandrashekar-CV
avinash chandrashekar-CVavinash chandrashekar-CV
avinash chandrashekar-CV
 
Planning engineer cv with 9 yrs experience(1)
Planning engineer cv with 9 yrs experience(1)Planning engineer cv with 9 yrs experience(1)
Planning engineer cv with 9 yrs experience(1)
 
Ahmed mahdi cv_planning_engineer
Ahmed mahdi cv_planning_engineerAhmed mahdi cv_planning_engineer
Ahmed mahdi cv_planning_engineer
 
Madhankumar 1984..
Madhankumar 1984..Madhankumar 1984..
Madhankumar 1984..
 
Mehtab zaidi planning engineer cv
Mehtab zaidi planning engineer cvMehtab zaidi planning engineer cv
Mehtab zaidi planning engineer cv
 
Planning engineer cv (mehtab)
Planning engineer cv (mehtab)Planning engineer cv (mehtab)
Planning engineer cv (mehtab)
 
Shanmukharao K_resume
Shanmukharao K_resumeShanmukharao K_resume
Shanmukharao K_resume
 
Thousiq Ahmed civil engineer
Thousiq Ahmed civil  engineerThousiq Ahmed civil  engineer
Thousiq Ahmed civil engineer
 
Resume_-_Sourav_Sengupta
Resume_-_Sourav_SenguptaResume_-_Sourav_Sengupta
Resume_-_Sourav_Sengupta
 
Resume
ResumeResume
Resume
 
Satish Kumar CV- AL FARA'A Group(UAE, SAUDI ARABIA, QATAR, INDIA) (CIVIL Engi...
Satish Kumar CV- AL FARA'A Group(UAE, SAUDI ARABIA, QATAR, INDIA) (CIVIL Engi...Satish Kumar CV- AL FARA'A Group(UAE, SAUDI ARABIA, QATAR, INDIA) (CIVIL Engi...
Satish Kumar CV- AL FARA'A Group(UAE, SAUDI ARABIA, QATAR, INDIA) (CIVIL Engi...
 
CURRICULUM VITAE-1 (2)
CURRICULUM VITAE-1 (2)CURRICULUM VITAE-1 (2)
CURRICULUM VITAE-1 (2)
 

Similar to Experienced Mechanical Engineer Seeking New Challenges

Similar to Experienced Mechanical Engineer Seeking New Challenges (20)

Piping Engineer
Piping EngineerPiping Engineer
Piping Engineer
 
New updated CV ( Siddesha.Maidur)
New updated CV ( Siddesha.Maidur)New updated CV ( Siddesha.Maidur)
New updated CV ( Siddesha.Maidur)
 
C.V_for_Planning_Engg._Datta
C.V_for_Planning_Engg._DattaC.V_for_Planning_Engg._Datta
C.V_for_Planning_Engg._Datta
 
cp civil (1)
cp civil (1)cp civil (1)
cp civil (1)
 
Mari cv - office
Mari cv - officeMari cv - office
Mari cv - office
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2
 
madhu updated cv
madhu updated cvmadhu updated cv
madhu updated cv
 
MAKARAND GOVIND DHAWANE
MAKARAND GOVIND DHAWANEMAKARAND GOVIND DHAWANE
MAKARAND GOVIND DHAWANE
 
Anand
AnandAnand
Anand
 
SASI NEW RESUME
SASI NEW RESUMESASI NEW RESUME
SASI NEW RESUME
 
Santosh -Resume 2016
Santosh -Resume 2016Santosh -Resume 2016
Santosh -Resume 2016
 
vivek-cv
vivek-cvvivek-cv
vivek-cv
 
Resume
ResumeResume
Resume
 
K V KRISHNA RAO RESUME
K V KRISHNA RAO RESUMEK V KRISHNA RAO RESUME
K V KRISHNA RAO RESUME
 
Deepak Kumar_Project
Deepak Kumar_ProjectDeepak Kumar_Project
Deepak Kumar_Project
 
Sr.civil engineer
Sr.civil engineerSr.civil engineer
Sr.civil engineer
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
Bijay CV
Bijay CVBijay CV
Bijay CV
 
Harikrishna CV
Harikrishna CVHarikrishna CV
Harikrishna CV
 
Senior Project Engineer
Senior Project EngineerSenior Project Engineer
Senior Project Engineer
 

Experienced Mechanical Engineer Seeking New Challenges

  • 1. CHERUKURI SHYAM SHANKAR H.No.2-53/2 Chaitanyapuri Dilsukhnagar HYDERABAD – 500 060 Mobile: +91 95027 07214 +91 89850 20125 E-Mail: cherukurishankar@gmail.com CAREER OBJECTIVE: To seek a challenging position which encourages growth and leadership opportunities while utilizing technical expertise, innovative abilities and interpersonal skills. As a person I believe in hard work, honesty and a keen follower of teamwork. In Learning new things and adapting to changing requirements as when required. EDUCATION QUALIFICATION:  Diploma in Mechanical Engineering (2000-03) from S.B.T.E.T (HYD) with 61%  Computer Skills: MS OFFICE WORK EXPERIENCE: TOTAL EXPERINICE : 11 YEARS A)Company : HyperionIT Pvt Ltd Project : Reliance Refinery Industries Ltd Role : Manager (Projects) Duration : Aug 2011 To Till Date Reporting Officer : Head Office (Managing Director) Roles & Responsibilities: To plan, direct ,supervise multidiscipline team and co-ordinate maintenance and shutdown carried out in the Hydrogen, Aromatics, Polypropylene Captive Power Plant, Utility plants to complete in time, efficiently, safely and within set budget Maintenance  Handled the entire project successfully single handedly. Act as a site based focal point for activities carried out by the company  Planning and Execution of Routine Maintenance, Preventive Maintenance, Breakdown Maintenance, Proactive Maintenance & Corrective maintenance for rotary  Ensure that bi-weekly safety audits are carried out in accordance with scheduled requirements  Managing Client expectations by communicating regularly through daily/weekly meetings  Scheduling, Monitoring, control and overall reporting of all activities at site  Resource management & optimum utilization  Allocation of work, conflict resolutions, organizing required permits, interactions with operations and other sections and monitoring progress to ensure safe working in compliance with company standards and procedures  Quantification of materials (BOM/BOQ), progress measurement, procurement, tracking, Co- ordination, Forecasting and trending for smooth progress of work to achieve the milestones and targets
  • 2.  Preparation of Daily reports and project closeout reports & send it to the head office  Controlling the overall budget of the site by controlling the site expenses & monitoring the billing to be received from the client Shutdown Coordinator: A. Update and publish shutdown project charts detailing planned/proposed shutdown work across the site B. Coordinate shutdown dates with Operations and Planning & Scheduling to avoid/minimize overlap of such work between areas/businesses C. Coordinate with Operations to ensure permit completion and equipment availability as indicated in the integrated shutdown schedule D. Review and co-ordinate the approval of HSE Standards and instructions E. Preparation and control of shutdown budgets F. Track material deliveries and develop contingency plans for critical items G. Ensure the best use of all available labour resources using site approved and bargained policies. Examples include: a. Area personnel b. Shift based personnel c. Supplemental maintenance d. Specialty service providers H. Establish and lead regular maintenance/shutdown planning and status review meetings. I. Conduct daily schedule review meetings with cross functional team during shutdown. J. Ensure the optimum amount of work is executed using the resources available while minimizing schedule changes K. Shutdown execution, supervision progress monitoring L. Preparation of Daily reports and project closeout reports M. Post shutdown demobilization activities, including material return, wrap up reports & duties as directed by COMPANY B)Company : Ind-Barath Power Infra Ltd Project : Ind-Barath Thermal Power Ltd. (2X150 MW) Role : Sr.Engineer Duration : Jan 2010 To Jul 2011 Reporting Officer : Vice President (Projects) Description Of Boiler : CFBC Boiler With 480TPH,140Kg/Cm2 Operating Pressure. Roles & Responsibilities:  Inspection of raw material for structure for Boiler  Erection and Alignment of structure for Boiler  Inspection of raw material for structure for STG  Erection and Alignment of structure for STG  Qualification Test for Welder as per IBR Standards  Monitoring the welder’s quality performance, reduce the repair percentage in the job  Project Execution involving Drawing Review, Documentation, Inspection, Man Management and Co ordinating site erection actives.  Handling the work as per schedule and conducting review meeting with contractors  Motivating the team members to achieve the desired targets  Report preparation for day to day site progress for each work front and generate work. Month wise progress report
  • 3. C)Company : Satya Surya Aluminium Industries Ltd, Hyderabad Client : Nagarjuna Constructions Company Ltd. Project : Mega Sports Complex, Ranchi. Cost of the project : Rs.6.50 crores Role : Site In-Charge Duration : Oct 2008 to Dec 2009 Reporting Officer : Managing Director Roles & Responsibilities:  Handled the entire project successfully single handedly  Responsible for local purchases on competitive pricing by obtaining and evaluating the offers  To prepare RA bills  To Follow up bills & timely payments  To get the approvals of drawings and documents from the Clients  To Plan the Fabrication of Pylon Columns & Towers according to the front availability in the Erection of Columns & Towers  To prepare and submit Material and erection bills  To prepare B.O.Q from drawings and submit the men and material requirements to the client and follow up for timely completion  To analyze and solve the on-site problems for timely completion of the project.  To conduct periodical reviews of the project implementation. D)Company : Systems Tek India Pvt. Ltd. Summary : Handled 2 Projects IHHR & Pantaloon Client : IHHR Project : ISTA Hotel, Hyderabad Cost of the project : Rs.2.00 crores Role : Site Engineer Duration : Feb 2007 to Sept 2008 Reporting Officer : Project Manager Roles & Responsibilities:  Solely responsible for the execution of the work within the time frame  Responsible for local purchases on competitive pricing by obtaining and evaluating the offers  To mobilize Man Power, Material & Equipments for the Project  To prepare and submit Material and erection bills  To prepare B.O.Q from drawings and submit the men and material requirements to the client and follow up for timely completion  To assist my Junior Engineers and Supervisors to work with more efficiency  To analyze and solve the on-site problems for timely completion of the project.  To conduct internal periodical reviews of the project implementation  To attend weekly review meetings with the clients to solve the issues raise during execution of the work  To prepare the schedules for the completion of the project in the stipulated Period  To Maintain the Project Cost Value. And Reduce the Expenditure and decreases the Over Heads Client : Pantaloon Project : BIG BAZAAR Cost of the project : Rs.70.00 lakhs Roles & Responsibilities:  To prepare BOQ & Drawings for approval by the clients  To assist my Junior Engineers and Supervisors to work with more efficiency  To prepare bar chart of project implementation
  • 4.  To prepare requirement to completion of the project within the stipulated time schedule  To monitor the mass production of ms pipe with respect to QUALITY & QUANTITY  To solve the critical point in the drawing with the client  To maintain the project estimation & project Execution D)Company : Gokul Krishna Construction Pvt Ltd. Client : IVRCL, NAVAYUGA, and SEW Project : SRI PADHA RAO PROJECT, KARIMNAGAR Cost of the project : Rs.250.00 crores Nature of work : MS Plate fabrication for the irrigation project. Role : Jr.Engineer Duration : Jan 2004 to Jan 2007 Report Officer : Project Manager Roles & Responsibilities:  To inspect the MS Plates before Fabrication.  To plan MS Plates Cutting for the Fabrication of Shells and MS Pipes  To over-view MS Pipe Fit up Shell to Shell rolling and Fit up stage-wise inspections  To check and pass fabricated MS Shells and Pipes to conform to the quality norms  To arrange Final Stage Inspection of Fabricated MS Pipes and Shells Clients and government officials STRENGHTS:  Unique ability to learn any new technology within a short notice and can produce results  Responsibility & reliability to work in, and an understanding of team environment  Honesty, integrity and personal ethics with a continual desire to learn and expand horizons and the ability to work without supervision  Self-Confidence. PERSONAL INFORMATION:  Name : Ch. Shyam Shankar  Father’s Name : Sri Ch.Suryanarayana  Date of Birth : 17th August, 1980  Marital Status : Married  Languages Known : English, Hindi, Tamil & Telugu CH. SHYAM SHANKAR