Narragansett Bay CommissionNarragansett Bay Commission
Combined Sewer OverflowCombined Sewer Overflow
Control Facilities ProgramControl Facilities Program
The Biggest Project You will NeverThe Biggest Project You will Never
SeeSee
Paul Pinault, P.E. Former Executive Director NBCPaul Pinault, P.E. Former Executive Director NBC
Client Service Leader CDM SmithClient Service Leader CDM Smith
NBC CSONBC CSO
ProgramProgram
Combined Sewer OverflowCombined Sewer Overflow
Control Facilities ProgramControl Facilities Program
Phase I Facilities...Phase I Facilities...
CSO Diversion andCSO Diversion and
CollectionCollection
CSO Storage - MainCSO Storage - Main
Spine TunnelSpine Tunnel
Tunnel Capacity:Tunnel Capacity:
– 61.8 MG Design61.8 MG Design
– 66.5 MG Actual66.5 MG Actual
Tunnel PumpTunnel Pump
StationStation
SITE S1 AND OUTFALL 067
CSO Diversion and CollectionCSO Diversion and Collection
COMBINED SEWAGE
OVERFLOW - DIVERSION AND STORAGE
TUNNEL1.PRS
DIVERSION STRUCTURE
(APPROX. 22'L X 12'W)
INTERCEPTS EXISTING CSO
OVERFLOW
GATE & SCREENING STRUCTURE
(APPROX 35'L x 20'W)
CONTROLS FLOW INTO TUNNEL
APPROACH CHANNEL
ORGANIZES FLOW TO
CREATE VORTEX
DE-AERATION CHAMBER
REMOVES ENTRAINED
AIR FROM FLOWS
RECIRCULATION PIPE
DE-AERATED AIR IS
DRAWN BACK INTO
DROP SHAFT
CONNECTING ADIT
(APPROX 72" DIA; LENGTH
VARIES)
EXISTING SEWER SYSTEM
CURRENTLY OVERFLOWS
INTO RIVERS AND BAY
DURING WET WEATHER NEAR SURFACE
FACILITIES WITHIN
25' OF GROUND
SURFACE
SOIL / ROCK
INTERFACE
- DEPTH VARIES
BETWEEN 40'
AND 160'
MAIN SPINE TUNNEL
(APPROX 26'DIA; 16,000'
LONG & 62 MG STORAGE)
CONVEYS FLOW TO
PUMPING FACILITIES
DROP SHAFT
(5' - 9' DIA; DEPTH 250')
TRANSFERS FLOW
FROM SURFACE TO
TUNNEL DEPTH
VENTILATION SHAFT
(2'-3.5' DIA.)
ENABLES DE-AERATED
AIR TO LEAVE CHAMBER
SUCTION LINE - TRANSFERS
WATER FROM TUNNEL TO
PUMPS
SCREENS
GRITS AND SCREENING
REMOVAL BY GANTRY
CRANE
FORCE MAIN TO
FIELDS POINT
SITE S1
CONFIGURATION OF
PUMP STATION OPERATING
FACILITIES
200' ±
TPS1.PRS
UPPER LEVEL - PUMP FLOOR
LOWER LEVEL
PUMP FLOOR
TPS OPERATION &
CONTROL BUILDING
110'±
68'±
Soil
Depth
155'±
Rock
150'±
TOTAL DEPTH TO
INVERT 305'±
SUMP
SAFE
ROOM
32-FEET DIAMETER
ACCESS SHAFT
MAIN SPINE
TUNNEL
62 MG
11-FEET DIAMETER
EQUIPMENT
HOISTING SHAFT
SAFE
ROOM
SITE S1
CONFIGURATION OF PUMP STATION OPERATING FACILITIES
CSO StorageCSO Storage
Main Spine TunnelMain Spine Tunnel
Tunnel capacity:Tunnel capacity:
– 61.88 MG (Design)61.88 MG (Design)
– 66.5 MG (Actual)66.5 MG (Actual)
Seven dropshaftsSeven dropshafts
divert flow to the tunneldivert flow to the tunnel
BRINE
PUMP
MOBILE REFRIGERATION PLANT
EXPANSION
VALVE
LIQUID
REFRIGERANT
FREEZE
TUBES
COOLING
WATER
LOW PRESSURE
REFRIGERANT GAS
HIGH PRESSURE
REFRIGERANT GAS
COMPRESSOR
CHILLERCONDENSER
DEVELOPING
FREEZEWALL
BRINE FREEZING SYSTEM
Developmental Phases
1
2
3
4
5
6
9
7
8
10
11
2
3
4,5
6,7,8
9,10,11
The End of the TunnelThe End of the Tunnel

More Related Content

What's hot

Teoria bocatoma
Teoria bocatomaTeoria bocatoma
Teoria bocatoma
jaiffarivera1
 
Post development storm EmpireEng FINAL REPORT
Post development storm EmpireEng FINAL REPORTPost development storm EmpireEng FINAL REPORT
Post development storm EmpireEng FINAL REPORTShawn Austin Smyth
 
Presentation- thesis- Chaofan ZHANG
Presentation- thesis- Chaofan ZHANGPresentation- thesis- Chaofan ZHANG
Presentation- thesis- Chaofan ZHANG
Chaofan ZHANG
 
over veiw on desighn of offshore pipelines
over veiw on desighn of offshore pipelinesover veiw on desighn of offshore pipelines
over veiw on desighn of offshore pipelines
vinod kumar
 
Presentation 1 st 4 km
Presentation 1 st 4 kmPresentation 1 st 4 km
Presentation 1 st 4 km
Svet Dotchev
 
San Elijo Hills Drainage Diversion Hydrogeologist Report
San Elijo Hills Drainage Diversion Hydrogeologist ReportSan Elijo Hills Drainage Diversion Hydrogeologist Report
San Elijo Hills Drainage Diversion Hydrogeologist Reporttalerco
 
economic channel section
economic channel sectioneconomic channel section
economic channel section
Vaibhav Pathak
 
Hidráulica de poços
Hidráulica de poçosHidráulica de poços
Hidráulica de poços
Mateus Manharage
 
Proposed Methodology Shore Approach
Proposed Methodology  Shore ApproachProposed Methodology  Shore Approach
Proposed Methodology Shore ApproachMohd Zaini Baharum
 
Anexo sobre-riego-por-aspersion
Anexo sobre-riego-por-aspersionAnexo sobre-riego-por-aspersion
Anexo sobre-riego-por-aspersion
martinatorafer
 
Ejercicios sobre flujo permanente no uniforme
Ejercicios sobre flujo permanente no uniformeEjercicios sobre flujo permanente no uniforme
Ejercicios sobre flujo permanente no uniforme
FiorbelaGutierrez
 
LABORATORIO DE VERTEDEROS
LABORATORIO DE VERTEDEROS LABORATORIO DE VERTEDEROS
LABORATORIO DE VERTEDEROS
Sergio-alejandro Gaitan-contreras
 
Presentation on notches and weirs
Presentation on notches and weirsPresentation on notches and weirs
Presentation on notches and weirs
sush_vyas
 
Ground water flow to wells
Ground water flow to wellsGround water flow to wells
Ground water flow to wells
SayanDey80
 
Pipe network analysis with examples
Pipe network analysis with examplesPipe network analysis with examples
Pipe network analysis with examples
Mohsin Siddique
 
1 resistance
1 resistance1 resistance
1 resistance
Refee Lubong
 
Characteristics of sharp weirs and the hydraulic jump
Characteristics of sharp weirs and the hydraulic jumpCharacteristics of sharp weirs and the hydraulic jump
Characteristics of sharp weirs and the hydraulic jump
Dickens Mimisa
 
Tp6 principles of siphonic roof drainage systems(dr)
Tp6 principles of siphonic roof drainage systems(dr)Tp6 principles of siphonic roof drainage systems(dr)
Tp6 principles of siphonic roof drainage systems(dr)Marc Buitenhuis
 
Chapter 5 drop sturcutures
Chapter 5 drop sturcuturesChapter 5 drop sturcutures
Chapter 5 drop sturcutures
Mohsin Siddique
 

What's hot (20)

Teoria bocatoma
Teoria bocatomaTeoria bocatoma
Teoria bocatoma
 
Post development storm EmpireEng FINAL REPORT
Post development storm EmpireEng FINAL REPORTPost development storm EmpireEng FINAL REPORT
Post development storm EmpireEng FINAL REPORT
 
Presentation- thesis- Chaofan ZHANG
Presentation- thesis- Chaofan ZHANGPresentation- thesis- Chaofan ZHANG
Presentation- thesis- Chaofan ZHANG
 
over veiw on desighn of offshore pipelines
over veiw on desighn of offshore pipelinesover veiw on desighn of offshore pipelines
over veiw on desighn of offshore pipelines
 
Presentation 1 st 4 km
Presentation 1 st 4 kmPresentation 1 st 4 km
Presentation 1 st 4 km
 
San Elijo Hills Drainage Diversion Hydrogeologist Report
San Elijo Hills Drainage Diversion Hydrogeologist ReportSan Elijo Hills Drainage Diversion Hydrogeologist Report
San Elijo Hills Drainage Diversion Hydrogeologist Report
 
economic channel section
economic channel sectioneconomic channel section
economic channel section
 
Hidráulica de poços
Hidráulica de poçosHidráulica de poços
Hidráulica de poços
 
Proposed Methodology Shore Approach
Proposed Methodology  Shore ApproachProposed Methodology  Shore Approach
Proposed Methodology Shore Approach
 
Anexo sobre-riego-por-aspersion
Anexo sobre-riego-por-aspersionAnexo sobre-riego-por-aspersion
Anexo sobre-riego-por-aspersion
 
Ejercicios sobre flujo permanente no uniforme
Ejercicios sobre flujo permanente no uniformeEjercicios sobre flujo permanente no uniforme
Ejercicios sobre flujo permanente no uniforme
 
LABORATORIO DE VERTEDEROS
LABORATORIO DE VERTEDEROS LABORATORIO DE VERTEDEROS
LABORATORIO DE VERTEDEROS
 
Presentation on notches and weirs
Presentation on notches and weirsPresentation on notches and weirs
Presentation on notches and weirs
 
Ground water flow to wells
Ground water flow to wellsGround water flow to wells
Ground water flow to wells
 
Pipe network analysis with examples
Pipe network analysis with examplesPipe network analysis with examples
Pipe network analysis with examples
 
1 resistance
1 resistance1 resistance
1 resistance
 
Characteristics of sharp weirs and the hydraulic jump
Characteristics of sharp weirs and the hydraulic jumpCharacteristics of sharp weirs and the hydraulic jump
Characteristics of sharp weirs and the hydraulic jump
 
Tp6 principles of siphonic roof drainage systems(dr)
Tp6 principles of siphonic roof drainage systems(dr)Tp6 principles of siphonic roof drainage systems(dr)
Tp6 principles of siphonic roof drainage systems(dr)
 
Weirs and flumes with broad
Weirs and flumes  with broad Weirs and flumes  with broad
Weirs and flumes with broad
 
Chapter 5 drop sturcutures
Chapter 5 drop sturcuturesChapter 5 drop sturcutures
Chapter 5 drop sturcutures
 

Viewers also liked

Public Works Advocacy - The Australian Way
Public Works Advocacy - The Australian WayPublic Works Advocacy - The Australian Way
Public Works Advocacy - The Australian Way
2014 Florida Public Works Expo
 
Aplicacion de la Norma COVENIN 3049-93
Aplicacion de la Norma COVENIN 3049-93Aplicacion de la Norma COVENIN 3049-93
Aplicacion de la Norma COVENIN 3049-93
Eduardo Salazar Calcina
 
Third Grade E-Book
Third Grade E-BookThird Grade E-Book
Third Grade E-Book
Rhonda123
 
Wausau Paper Presentation
Wausau Paper PresentationWausau Paper Presentation
Wausau Paper Presentation
2014 Florida Public Works Expo
 
What Every City Manager wants in a Public Works Director
What Every City Manager wants in a Public Works Director What Every City Manager wants in a Public Works Director
What Every City Manager wants in a Public Works Director
2014 Florida Public Works Expo
 
Presentación4
Presentación4Presentación4
Presentación4
Eduardo Salazar Calcina
 
PaulinaWolskaZadanieZTI
PaulinaWolskaZadanieZTIPaulinaWolskaZadanieZTI
PaulinaWolskaZadanieZTIbalbinka
 
City of Edgewater CNG Presentation
City of Edgewater CNG PresentationCity of Edgewater CNG Presentation
City of Edgewater CNG Presentation
2014 Florida Public Works Expo
 
Permanent Backup Lift Station Pumps
Permanent Backup Lift Station PumpsPermanent Backup Lift Station Pumps
Permanent Backup Lift Station Pumps
2014 Florida Public Works Expo
 
Pathway to Sustainable Waste Management
Pathway to Sustainable Waste ManagementPathway to Sustainable Waste Management
Pathway to Sustainable Waste Management
2014 Florida Public Works Expo
 
Outlining the essay
Outlining the essayOutlining the essay
Outlining the essay
Poetrykkk
 

Viewers also liked (16)

Does Size Matter?
Does Size Matter?Does Size Matter?
Does Size Matter?
 
Public Works Advocacy - The Australian Way
Public Works Advocacy - The Australian WayPublic Works Advocacy - The Australian Way
Public Works Advocacy - The Australian Way
 
Aplicacion de la Norma COVENIN 3049-93
Aplicacion de la Norma COVENIN 3049-93Aplicacion de la Norma COVENIN 3049-93
Aplicacion de la Norma COVENIN 3049-93
 
Third Grade E-Book
Third Grade E-BookThird Grade E-Book
Third Grade E-Book
 
Wausau Paper Presentation
Wausau Paper PresentationWausau Paper Presentation
Wausau Paper Presentation
 
Old Cutler Road Improvements
Old Cutler Road ImprovementsOld Cutler Road Improvements
Old Cutler Road Improvements
 
What Every City Manager wants in a Public Works Director
What Every City Manager wants in a Public Works Director What Every City Manager wants in a Public Works Director
What Every City Manager wants in a Public Works Director
 
Presentación4
Presentación4Presentación4
Presentación4
 
PaulinaWolskaZadanieZTI
PaulinaWolskaZadanieZTIPaulinaWolskaZadanieZTI
PaulinaWolskaZadanieZTI
 
Tools for Pavement Preservation
Tools for Pavement PreservationTools for Pavement Preservation
Tools for Pavement Preservation
 
Utility Work within Public Right of Way
Utility Work within Public Right of WayUtility Work within Public Right of Way
Utility Work within Public Right of Way
 
APWA Cool Roofing Made Simple
APWA Cool Roofing Made SimpleAPWA Cool Roofing Made Simple
APWA Cool Roofing Made Simple
 
City of Edgewater CNG Presentation
City of Edgewater CNG PresentationCity of Edgewater CNG Presentation
City of Edgewater CNG Presentation
 
Permanent Backup Lift Station Pumps
Permanent Backup Lift Station PumpsPermanent Backup Lift Station Pumps
Permanent Backup Lift Station Pumps
 
Pathway to Sustainable Waste Management
Pathway to Sustainable Waste ManagementPathway to Sustainable Waste Management
Pathway to Sustainable Waste Management
 
Outlining the essay
Outlining the essayOutlining the essay
Outlining the essay
 

Similar to Nbc cso apwa expo july 8 t12

ASH HANDLING PRESENTATION ON POWER PLANT
ASH HANDLING PRESENTATION ON POWER PLANTASH HANDLING PRESENTATION ON POWER PLANT
ASH HANDLING PRESENTATION ON POWER PLANT
neerajshopping
 
Lanchkhuti WS Project Overview
Lanchkhuti WS Project OverviewLanchkhuti WS Project Overview
Lanchkhuti WS Project OverviewVladimir Popovic
 
Obra Presentaton Ash Handling Sysytem 28032023.pptx
Obra Presentaton Ash Handling Sysytem 28032023.pptxObra Presentaton Ash Handling Sysytem 28032023.pptx
Obra Presentaton Ash Handling Sysytem 28032023.pptx
mrujjavalsinghvarana
 
Ws project ozurgeti, georgia
Ws project ozurgeti, georgiaWs project ozurgeti, georgia
Ws project ozurgeti, georgia
Vladimir Popovic
 
Ozurgeti City / Water Supply Project
Ozurgeti City / Water Supply ProjectOzurgeti City / Water Supply Project
Ozurgeti City / Water Supply Project
Vladimir Popovic
 
Rehabilitation of ws system, lanchkhuti, georgia
Rehabilitation of ws system, lanchkhuti, georgiaRehabilitation of ws system, lanchkhuti, georgia
Rehabilitation of ws system, lanchkhuti, georgia
Vladimir Popovic
 
Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)
Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)
Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)
Nandan Shandilya
 
Rehabilitation of ws system vani, georgia
Rehabilitation of ws system vani, georgiaRehabilitation of ws system vani, georgia
Rehabilitation of ws system vani, georgia
Vladimir Popovic
 
Hisham hajaj, stanley consultants
Hisham hajaj, stanley consultantsHisham hajaj, stanley consultants
Hisham hajaj, stanley consultantsSarah El Akkad
 
Fundamentos Teóricos Cloacas
Fundamentos Teóricos CloacasFundamentos Teóricos Cloacas
Fundamentos Teóricos Cloacas
UbaldoJGarca
 
Derventa City WW Project
Derventa City WW ProjectDerventa City WW Project
Derventa City WW Project
Vladimir Popovic
 
Posted plans
Posted plansPosted plans
Posted plans
Marian Vargas Mendoza
 
Haiti hydropower potential-Appendix-F
Haiti hydropower potential-Appendix-FHaiti hydropower potential-Appendix-F
Haiti hydropower potential-Appendix-F
Francis Mitchell
 
Lec7. Design Of Forebay-1.pdf
Lec7. Design Of Forebay-1.pdfLec7. Design Of Forebay-1.pdf
Lec7. Design Of Forebay-1.pdf
Hadiqa Qadir
 
Flood-Con (Innovative Stormwater Management)
Flood-Con (Innovative Stormwater Management)Flood-Con (Innovative Stormwater Management)
Flood-Con (Innovative Stormwater Management)
Jon Rasmussen
 
Project of Air Conditioning and Ventilation System at BOF & CCP Complex (SMS-...
Project of Air Conditioning and Ventilation System at BOF & CCP Complex (SMS-...Project of Air Conditioning and Ventilation System at BOF & CCP Complex (SMS-...
Project of Air Conditioning and Ventilation System at BOF & CCP Complex (SMS-...
kishlay kishan
 
Pump station design manual
Pump station design manualPump station design manual
Pump station design manual
Francis Mitchell
 
STUDIO PRESENTATIO.pptx
STUDIO PRESENTATIO.pptxSTUDIO PRESENTATIO.pptx
STUDIO PRESENTATIO.pptx
AgohaChinonso
 

Similar to Nbc cso apwa expo july 8 t12 (20)

ASH HANDLING PRESENTATION ON POWER PLANT
ASH HANDLING PRESENTATION ON POWER PLANTASH HANDLING PRESENTATION ON POWER PLANT
ASH HANDLING PRESENTATION ON POWER PLANT
 
Lanchkhuti WS Project Overview
Lanchkhuti WS Project OverviewLanchkhuti WS Project Overview
Lanchkhuti WS Project Overview
 
Obra Presentaton Ash Handling Sysytem 28032023.pptx
Obra Presentaton Ash Handling Sysytem 28032023.pptxObra Presentaton Ash Handling Sysytem 28032023.pptx
Obra Presentaton Ash Handling Sysytem 28032023.pptx
 
Ws project ozurgeti, georgia
Ws project ozurgeti, georgiaWs project ozurgeti, georgia
Ws project ozurgeti, georgia
 
Ozurgeti City / Water Supply Project
Ozurgeti City / Water Supply ProjectOzurgeti City / Water Supply Project
Ozurgeti City / Water Supply Project
 
Rehabilitation of ws system, lanchkhuti, georgia
Rehabilitation of ws system, lanchkhuti, georgiaRehabilitation of ws system, lanchkhuti, georgia
Rehabilitation of ws system, lanchkhuti, georgia
 
Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)
Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)
Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)
 
Rehabilitation of ws system vani, georgia
Rehabilitation of ws system vani, georgiaRehabilitation of ws system vani, georgia
Rehabilitation of ws system vani, georgia
 
Hisham hajaj, stanley consultants
Hisham hajaj, stanley consultantsHisham hajaj, stanley consultants
Hisham hajaj, stanley consultants
 
Fundamentos Teóricos Cloacas
Fundamentos Teóricos CloacasFundamentos Teóricos Cloacas
Fundamentos Teóricos Cloacas
 
Derventa City WW Project
Derventa City WW ProjectDerventa City WW Project
Derventa City WW Project
 
Vani Water Supply Project
Vani Water Supply ProjectVani Water Supply Project
Vani Water Supply Project
 
Posted plans
Posted plansPosted plans
Posted plans
 
SMS EQUIPMENT ERECT
SMS EQUIPMENT ERECTSMS EQUIPMENT ERECT
SMS EQUIPMENT ERECT
 
Haiti hydropower potential-Appendix-F
Haiti hydropower potential-Appendix-FHaiti hydropower potential-Appendix-F
Haiti hydropower potential-Appendix-F
 
Lec7. Design Of Forebay-1.pdf
Lec7. Design Of Forebay-1.pdfLec7. Design Of Forebay-1.pdf
Lec7. Design Of Forebay-1.pdf
 
Flood-Con (Innovative Stormwater Management)
Flood-Con (Innovative Stormwater Management)Flood-Con (Innovative Stormwater Management)
Flood-Con (Innovative Stormwater Management)
 
Project of Air Conditioning and Ventilation System at BOF & CCP Complex (SMS-...
Project of Air Conditioning and Ventilation System at BOF & CCP Complex (SMS-...Project of Air Conditioning and Ventilation System at BOF & CCP Complex (SMS-...
Project of Air Conditioning and Ventilation System at BOF & CCP Complex (SMS-...
 
Pump station design manual
Pump station design manualPump station design manual
Pump station design manual
 
STUDIO PRESENTATIO.pptx
STUDIO PRESENTATIO.pptxSTUDIO PRESENTATIO.pptx
STUDIO PRESENTATIO.pptx
 

More from 2014 Florida Public Works Expo

Community redevelopment areas and public infrastructure 070714
Community redevelopment areas and public infrastructure 070714Community redevelopment areas and public infrastructure 070714
Community redevelopment areas and public infrastructure 070714
2014 Florida Public Works Expo
 
Closing the Gap - Technology Impact on Building Operations
Closing the Gap - Technology Impact on Building OperationsClosing the Gap - Technology Impact on Building Operations
Closing the Gap - Technology Impact on Building Operations
2014 Florida Public Works Expo
 

More from 2014 Florida Public Works Expo (7)

Community redevelopment areas and public infrastructure 070714
Community redevelopment areas and public infrastructure 070714Community redevelopment areas and public infrastructure 070714
Community redevelopment areas and public infrastructure 070714
 
Closing the Gap - Technology Impact on Building Operations
Closing the Gap - Technology Impact on Building OperationsClosing the Gap - Technology Impact on Building Operations
Closing the Gap - Technology Impact on Building Operations
 
Pipe Bursting
Pipe BurstingPipe Bursting
Pipe Bursting
 
The Pompano Canal Story
The Pompano Canal StoryThe Pompano Canal Story
The Pompano Canal Story
 
Sustainability
SustainabilitySustainability
Sustainability
 
Emergency Watershed Protection Program
Emergency Watershed Protection ProgramEmergency Watershed Protection Program
Emergency Watershed Protection Program
 
Networking for Introverts
Networking for IntrovertsNetworking for Introverts
Networking for Introverts
 

Recently uploaded

NHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdfNHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdf
AjayVejendla3
 
PPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way StopPPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way Stop
ahcitycouncil
 
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
ehbuaw
 
2024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 362024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 36
JSchaus & Associates
 
ZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdfZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdf
Saeed Al Dhaheri
 
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptxPD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
RIDPRO11
 
Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023
ARCResearch
 
What is the point of small housing associations.pptx
What is the point of small housing associations.pptxWhat is the point of small housing associations.pptx
What is the point of small housing associations.pptx
Paul Smith
 
PPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933FPPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933F
ahcitycouncil
 
PPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930FPPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930F
ahcitycouncil
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
ClaudioTebaldi2
 
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
850fcj96
 
PPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services AgmtPPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services Agmt
ahcitycouncil
 
PACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdfPACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdf
Mohammed325561
 
Russian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale warRussian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale war
Antti Rautiainen
 
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptxMHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
ILC- UK
 
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
ukyewh
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
ehbuaw
 
Many ways to support street children.pptx
Many ways to support street children.pptxMany ways to support street children.pptx
Many ways to support street children.pptx
SERUDS INDIA
 
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) AmendmentPPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
ahcitycouncil
 

Recently uploaded (20)

NHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdfNHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdf
 
PPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way StopPPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way Stop
 
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
 
2024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 362024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 36
 
ZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdfZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdf
 
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptxPD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
 
Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023
 
What is the point of small housing associations.pptx
What is the point of small housing associations.pptxWhat is the point of small housing associations.pptx
What is the point of small housing associations.pptx
 
PPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933FPPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933F
 
PPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930FPPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930F
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
 
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
 
PPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services AgmtPPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services Agmt
 
PACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdfPACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdf
 
Russian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale warRussian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale war
 
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptxMHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
 
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
 
Many ways to support street children.pptx
Many ways to support street children.pptxMany ways to support street children.pptx
Many ways to support street children.pptx
 
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) AmendmentPPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
 

Nbc cso apwa expo july 8 t12

  • 1. Narragansett Bay CommissionNarragansett Bay Commission Combined Sewer OverflowCombined Sewer Overflow Control Facilities ProgramControl Facilities Program The Biggest Project You will NeverThe Biggest Project You will Never SeeSee Paul Pinault, P.E. Former Executive Director NBCPaul Pinault, P.E. Former Executive Director NBC Client Service Leader CDM SmithClient Service Leader CDM Smith
  • 2.
  • 3.
  • 4. NBC CSONBC CSO ProgramProgram Combined Sewer OverflowCombined Sewer Overflow Control Facilities ProgramControl Facilities Program
  • 5. Phase I Facilities...Phase I Facilities... CSO Diversion andCSO Diversion and CollectionCollection CSO Storage - MainCSO Storage - Main Spine TunnelSpine Tunnel Tunnel Capacity:Tunnel Capacity: – 61.8 MG Design61.8 MG Design – 66.5 MG Actual66.5 MG Actual Tunnel PumpTunnel Pump StationStation
  • 6. SITE S1 AND OUTFALL 067
  • 7. CSO Diversion and CollectionCSO Diversion and Collection COMBINED SEWAGE OVERFLOW - DIVERSION AND STORAGE TUNNEL1.PRS DIVERSION STRUCTURE (APPROX. 22'L X 12'W) INTERCEPTS EXISTING CSO OVERFLOW GATE & SCREENING STRUCTURE (APPROX 35'L x 20'W) CONTROLS FLOW INTO TUNNEL APPROACH CHANNEL ORGANIZES FLOW TO CREATE VORTEX DE-AERATION CHAMBER REMOVES ENTRAINED AIR FROM FLOWS RECIRCULATION PIPE DE-AERATED AIR IS DRAWN BACK INTO DROP SHAFT CONNECTING ADIT (APPROX 72" DIA; LENGTH VARIES) EXISTING SEWER SYSTEM CURRENTLY OVERFLOWS INTO RIVERS AND BAY DURING WET WEATHER NEAR SURFACE FACILITIES WITHIN 25' OF GROUND SURFACE SOIL / ROCK INTERFACE - DEPTH VARIES BETWEEN 40' AND 160' MAIN SPINE TUNNEL (APPROX 26'DIA; 16,000' LONG & 62 MG STORAGE) CONVEYS FLOW TO PUMPING FACILITIES DROP SHAFT (5' - 9' DIA; DEPTH 250') TRANSFERS FLOW FROM SURFACE TO TUNNEL DEPTH VENTILATION SHAFT (2'-3.5' DIA.) ENABLES DE-AERATED AIR TO LEAVE CHAMBER
  • 8. SUCTION LINE - TRANSFERS WATER FROM TUNNEL TO PUMPS SCREENS GRITS AND SCREENING REMOVAL BY GANTRY CRANE FORCE MAIN TO FIELDS POINT SITE S1 CONFIGURATION OF PUMP STATION OPERATING FACILITIES 200' ± TPS1.PRS UPPER LEVEL - PUMP FLOOR LOWER LEVEL PUMP FLOOR TPS OPERATION & CONTROL BUILDING 110'± 68'± Soil Depth 155'± Rock 150'± TOTAL DEPTH TO INVERT 305'± SUMP SAFE ROOM 32-FEET DIAMETER ACCESS SHAFT MAIN SPINE TUNNEL 62 MG 11-FEET DIAMETER EQUIPMENT HOISTING SHAFT SAFE ROOM SITE S1 CONFIGURATION OF PUMP STATION OPERATING FACILITIES
  • 9. CSO StorageCSO Storage Main Spine TunnelMain Spine Tunnel Tunnel capacity:Tunnel capacity: – 61.88 MG (Design)61.88 MG (Design) – 66.5 MG (Actual)66.5 MG (Actual) Seven dropshaftsSeven dropshafts divert flow to the tunneldivert flow to the tunnel
  • 10. BRINE PUMP MOBILE REFRIGERATION PLANT EXPANSION VALVE LIQUID REFRIGERANT FREEZE TUBES COOLING WATER LOW PRESSURE REFRIGERANT GAS HIGH PRESSURE REFRIGERANT GAS COMPRESSOR CHILLERCONDENSER DEVELOPING FREEZEWALL BRINE FREEZING SYSTEM
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.
  • 22.
  • 23.
  • 24.
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.
  • 38.
  • 39.
  • 40.
  • 41.
  • 42.
  • 43.
  • 44.
  • 45.
  • 46.
  • 47.
  • 48.
  • 49.
  • 50.
  • 52.
  • 53.
  • 54.
  • 55.
  • 56.
  • 57.
  • 58.
  • 59.
  • 60. The End of the TunnelThe End of the Tunnel

Editor's Notes

  1. This contract allowed several means of supporting the soil. 160’ down to top of bedrock, which is a challenge. S/BB chose a freezewall system, selected Moretrench. Conceptually, a freeze system is a closed system with closed end freeze pipes where Calcium chloride brine is continuosly pumped through refrgeration system.
  2. Typical shot of what we might see. Cavern will be excavated in benches. 20’ long bolts, 8” shotcrete